Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidiciplinary Consultants
JUNI 2016
MASJID DARUL HASANAH
PREPARED FOR OWNER
DESIGN & STRUCTURE ANALYSIS MASJID DARUL HASANAH
GARIS CIPTA KARSA ARCHITECTURE CONSULTANT
PREPARED BY STRUCTURAL CONSULTANT
Multidisciplinary Consultant
PT. QIES Nusantara Konsultan
GEDUNG IS PLAZA LT. 5 RUANG 504 JL. PRAMUKA RAYA KAV.150
JAKARTA TIMUR 13120 INDONESIA TEL : (021) 2961 3933 FAX : (021) 2961 3933 EXT. *81
EMAIL : qiesnusantara@gmail.com
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
i
DAFTAR ISI
I. PENDAHULUAN
A. Latar Belakang .................................................................................................... 1
B. Lingkup Pekerjaan .............................................................................................. 1
C. Maksud Dan Tujuan .......................................................................................... 2
D. Data Acuan ........................................................................................................ 2
II. TINJAUAN PUSTAKA
A. Pembebanan ..................................................................................................... 3
B. Perencanaan Stuktur Gedung ............................................................................ 8
III. DATA & ANALISIS STRUKTUR
A. Data Geometrik Struktur dan Klasifikasi Material ......................................... 18
B. Analisis Pembebanan ........................................................................................ 20
C. Pemodelan Struktur .......................................................................................... 23
D. Hasil Analisis Struktur .................................................................................... 24
E. Hasil Perencanaan ............................................................................................ 30
IV. KESIMPULAN
A. Kesimpulan ..................................................................................................... 32
LAMPIRAN
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
ii
DAFTAR GAMBAR
Gambar 1. Parameter Percepatan Response Spectrum
Perioda Pendek SNI 1726:2012 .............................................................. 6
Gambar 2. Parameter Percepatan Response Spectrum 1 detik SNI 1726:2012 ........ 7
Gambar 3. Diagram Alir Perhitungan Lentur Balok ................................................. 10
Gambar 4. Diagram Alir Perhitungan Geser Balok ................................................... 11
Gambar 5. Diagram Alir Perhitungan Torsi Balok ................................................... 12
Gambar 6. Diagram Alir Penulangan Kolom ............................................................ 15
Gambar 7. Tampak Struktur Bangunan .................................................................... 18
Gambar 8. Geometrik Struktur Bangunan ................................................................ 18
Gambar 9. Denah Lantai Satu ................................................................................... 20
.......................................................... 23
Gambar 11. Pemodelan Plat Lantai Dasar ................................................................. 23
Gambar 12. Pemodelan 3D Struktur Gedung ........................................................... 24
Gambar 13. Deformasi Gedung ................................................................................ 26
Gambar 14. Aksial Diagram ..................................................................................... 27
Gambar 15. Moment Diagram .................................................................................. 27
Gambar 16. Torsion Diagram ................................................................................... 28
Gambar 17. Shear Diagram ....................................................................................... 28
Gambar 18. Momen Slab .......................................................................................... 29
Gambar 19. Pengecekan Kapasitas ........................................................................... 29
Gambar 10. Respon Spektrum Lokasi Manado
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
iii
DAFTAR TABEL
Tabel 1. Besarnya Beban Mati ................................................................................... 3
Tabel 2. Besarnya Beban Hidup ................................................................................. 4
Tabel 3. Hasil Analisis Periode dengan Etabs .......................................................... 24
Tabel 4. Nilai Parameter Periode Pendekatan Ct dan x ............................................ 25
Tabel 5. Perbandingan Hasil Priode Fundamental .................................................... 25
Tabel 6. Story Drift Struktur Bangunan .................................................................... 26
Tabel 7. Data Perencanaan Balok ............................................................................. 30
Tabel 8. Data Perencanaan Kolom ............................................................................ 31
Design & Structure Analysis Mesjid Darul Hasanah
I. PENDAHULUAN
A. Latar Belakang
Struktur bangunan gedung harus dirancang sesuai ketentuan yang ada agar kenyamanan
dan keamanan pemilik dan pengguna gedung terpenuhi, tak terkecuali struktur gedung
yang konstruksi utamanya adalah beton. Konstruksi beton harus dirancang agar
memenuhi efektifitas kenyamanan dan pemanfaatan ruangan agar terpenuhinya
kekuatan yang maksimal dan efisien. Salah satunya Mesjid Darul Hasanah dirancang
dengan konstruksi beton baik plat atap, plat lantai, balok, dan kolom.
B. Lingkup Pekerjaan
Lingkup pekerjaan ini adalah sebagai berikut
1. Melaporkan dalam bentuk pemodelan struktur bangunan eksisting sesuai dengan
kondisi laporan rencana pembangunan gedung
2. Melaporkan hasil analisis dan memeriksa model struktur rencana terhadap
kekuatannya berdasarkan ketentuan peraturan yang berlaku
3. Memberikan hasil rekomendasi dari hasi analisis struktur bangunan rencana yang
ada
1
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
2
C. Maksud dan Tujuan
Maksud dan Tujuan dari analisis struktur ini adalah untuk mendapatkan design rencana
yang memenuhi syarat teknis guna memberikan rencana struktur yang baik. Sasaran
dari kegiatan ini adalah mendapatkan rencana struktur yang sesuai kebutuhan.
D. Data Acuan
Data dan standar yang digunakan dalam kegiatan analisis struktur ini adalah:
1. Data bangunan berdasarkan gambar rencana pembangunan gedung
2. SNI 2847 2013 (Standar Struktur Beton Indonesia)
3. SNI 1726 2012 (Standar Gempa Indonesia)
4. SNI 1727 2013 (Standar Pembebanan Indonesia)
5. ACI 318-14 (American Concrete Institute 318)
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
3
II. TINJAUAN PUSTAKA
A. Pembebanan
Semua perhitungan pembebanan mengacu pada SNI persyaratan beton struktur untuk
bangunan gedung, SNI 2847:2013/Mod SEI/ASCE 7-02 dan SNI beban minimum
untuk perancangan bangunan gedung dan struktur lain 1727:2013.
1. Beban Mati
Berdasarkan SNI 1727:2013 Beban mati adalah seluruh beban konstruksi bangunan
gedung yang terpasang, termasuk dinding, lantai, atap, plafond, tangga, dinding
partisi tetap, finishing, dan komponen arsitektural dan struktural lainnya serta
peralatan layan. Dalam hal ini dapat berupa:
a. Beban mati akibat berat sendiri
Beban mati didefinisikan sebagai beban yang ditimbulkan oleh elemen-elemen
struktur bangunan; balok, kolom,,dan pelat lantai. Beban ini akan dihitung
secara otomatis oleh program Etabs.
b. Beban mati tambahan
Beban mati tambahan didefinisikan sebagai beban mati yang diakibatkan oleh
berat dari elemen-elemen tambahan atau finishing yang bersifat permanen.
Tabel 1. Besarnya Beban Mati
Beban Mati Besar Beban
Beton Bertulang 2400 kg/m3 (23,544 KN/m3)
Dinding dan Plesteran
Tebal 15 cm
Tebal 10 cm
300 kg/m2 (2,943 KN/m2)
200 kg/m2 (1,962 KN/m2)
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
4
Langit-Langit + Penggantung 18 kg/m2 (0,176 KN/m2)
Lantai keramik 24 kg/m2 (0,235 KN/m2)
Spesi Per cm tebal 21 kg/m2 (0,206 KN/m2)
Mekanikal dan Elektrikal 25 kg/m2 (0,245KN/m2)
Sumber : SNI 1727:1989 (disesuaikan)
2. Beban Hidup
Berdasarkan SNI 1727:2013 beban hidup adalah beban yang diakibatkan oleh
pengguna dan penghuni bangunan gedung atau struktur lain yang tidak termasuk
beban konstruksi dan beban lingkungan, seperti beban angin, beban hujan, beban
gempa, beban banjir atau beban mati.
Tabel 2. Besarnya Beban Hidup
Hunian atau Penggunaan Merata Psf (KN/m2)
Apartement dan Hotel
Ruang Pribadi
Ruang Publik & Koridor
40 (1,92)
100 (4,79)
Sistem Lantai Akses
Ruang Kantor
Ruang Komputer
50 (2,4)
100 (4,79)
Gudang Persenjataan dan Ruang
Latihan
150 (7,18)
Ruang Pertemuan
Kursi tetap
Lobi
Kursi dapat dipindahkan
Panggung pertemuan
Lantai Podium
100 (4,79)
100 (4,79)
100 (4,79)
100 (4,79)
150 (7,18)
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
5
Balkon dan Dek 100 (4,79)
Ruang Makan dan Restoran 100 (4,79)
Garasi/Parkir Min 40 (1,92)
Tempat Rekreasi
Tempat bowling, kolam
Ruang Dansa
Gimnasium
75 (3,59)
100 (4,79)
100 (4,79)
Atap
Atap datar, berbubung
Atap untuk Taman
20 (0,96)
100 (4,79)
Gudang
Gudang diatas langit-langit
Gudang Berat
Gudang Ringan
20 (0,96)
250 (11,97)
125 (6,00)
Sumber SNI 1727:2013
3. Beban Angin
Beban angin merupakan beban yang diakibatkan oleh faktor lingkungan yaitu faktor
angin itu sendiri.
a. Menentukan kecepatan angin dasar, V
Kecepatan angin dasar harus ditentukan oleh instansi yang berwenang, namun
dalam perencanaan kecepatan angin harus di rencanakan minimal sebesar 110
mph (49,1744 m/s).
b. Menentukan parameter beban angin kategori eksopousure
Untuk bangunan yang direncanakan menggunakan eksopousure tipe C. Karena
eksopousure C berlaku untuk semua kasus di mana eksopousure B atau D tidak
berlaku.
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
6
4. Beban Gempa
Beban gempa adalah semua beban yang bekerja pada bangunan atau bagian
bangunan dari pergerakan tanah akibat gempa itu. Pengaruh gempa pada struktur
ditentukan berdasarkan analisa dinamik, maka yang diartikan dalam beban gempa
itu gaya-gaya di dalam struktur tersebut yang terjadi oleh tanah akibat gempa itu
sendiri. Berdasarkan peta gempa Indonesia SNI 1726-2012, lokasi ini memiliki
respons spektra percepatan pada 0,2 detik, SS = 1,5g (kupang) dan respons spektra
percepatan pada 1 detik, S1 = 0,321g dan rasio redaman kritis = 5%. Kelas situs
adalah SE.
Gambar 1.Parameter Percepatan Response Spectrum Perioda Pendek SNI 1726:2012
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
7
Gambar 2 . Parameter Percepatan Response Spectrum 1 detik SNI 1726:2012
5. Kombinasi Pembebanan
Kombinasi pembebanan yang digunakan berdasarkan Peraturan Beban Minimum
Untuk Perancangan Bangunan Gedung SNI 1727:2013 sebagai berikut:
a. 1,4 DL
b. 1,2 DL + 1,6 LL
c. 1,2 DL + 1 LL + 0,5 TLL + 1 WL(X) + 0,3 WL(Y)
d. 1,2 DL + 1 LL + 0,5 TLL + 0,3 WL(Y) + 1 WL (Y)
e. 1,2 DL + 1LL + 1 QL(X) + 0,3 QL(Y)
f. 1,2 DL + 1 LL + 0,3 QL(Y) + 1 QL (Y)
g. 0,9 DL + 1 WL(X) + 0,3 WL(Y)
h. 0,9 DL + 0,3 WL(Y) + 1 WL(Y)
i. 0,9 DL + 1 QL(X) + 0,3 QL(Y)
j. 0,9 DL + 0,3 QL(Y) + 1 QL(Y)
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
8
B. Perencanaan Struktur Gedung
1. Balok
Secara umum pra desain tinggi balok direncanakan dengan rumus empiris L/12 -
L/14 (balok konvensional), L/20 L/24 (balok prategang), L/4 (balok kantilever),
dan lebar balok diambil 1/211 - 2/3H dimana H adalah tinggi balok.
Perhitungan kebutuhan penulangan balok struktur beton menggunakan bantuan
program komputer. Prosedur desain elemen-elemen balok dari struktur terdiri dua
tahap sebagai berikut:
1. Desain tulangan pokok untuk menahan momen lentur
2. Desain tulangan geser (sengkang) untuk menahan gaya geser
a. Komponen lentur
Komponen-komponen lentur harus memenuhi pasal 23.3 (1(1)) sampai dengan
23.3 (1(4)) agar penampangnya terbukti berkinerja baik. Tiap komponen harus
cukup daktail dan cukup efisien mentransfer momen ke kolom. Perlu dicatat
kolom-kolom yang terkena momen dan hanya kena beban aksial terfaktor < Ag
fc / 10 boleh didesain sebagai komponen lentur.
b. Penulangan Lentur
Syarat momen nominal minimal di sembarang penampang komponen lentur
dinyatakan dalam momen nominal pada muka kolom. Syarat ini menjamin
kekuatan dan dakilitas bila terjadi lateral displacement besar. Persyaratan yang
mengharuskan ada 2 batang tulangan menerus disisi atas maupun bawah balok
dimaksud untuk keperluan pelaksanaan.
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
9
c. Sambungan Lewatan
Sambungan lewatan harus diletakkan di luar daerah sendi plastis. Bila dipakai
sambungan lewatan maka sambungan itu harus didesain sebagai sambungan
lewatan tarik dan harus dikekang sebaik-baiknya. Pada sambungan mekanikal
boleh juga dipakai dan harus memenuhi ketentuan pasal 23.2 (6).
d. Tulangan pengekang
Pengekangan yang cukup disyaratkan harus ada di ujung-ujung komponen
lentur yang kemungkinan besar akan terjadi sendi plastis untuk menjamin
kemampuan daktilitasnya, bila kena beban bolak-balik. Tulangan transversal
perlu dipasang pula untuk menahan gaya melintang dan menghindarkan
tulangan memanjang menekuk.
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
10
Gambar 3. Diagram Alir Perhitungan Lentur Balok
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
11
Gambar 4. Diagram Alir Perhitungan Geser Balok
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
12
Gambar 5. Diagram Alir Perhitungan Torsi Balok
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
13
2. Kolom
Kolom beton murni dapat mendukung beban sangat kecil, tetapi kapasitas daya
dukung bebannya akan meningkat cukup besar jika ditambahkan tulangan
longitudinal. Akibat beban tekan, kolom cenderung tidak hanya memendek dalam
arah memanjang tetapi juga mengembang dalam arah lateral. Kapasitas kolom
semacam ini dapat meningkat dengan memberikan kekangan lateral dalam bentuk
sengkang persegi dengan jarak yang berdekatan atau spiral yang membungkus
sekeliling tulangan longitudinal.
Kenyataanya tidak ada kolom yang dibebani secara aksial sempurna. Semua kolom
menerima lentur dan gaya aksial dan dimensinya harus direncanakan untuk
menahan keduanya. Kolom akan melentur akibat momen dan momen tersebut
cenderung menimbulkan tekanan pada satu sisi kolom dan tarikan pada sisi lainnya.
a. Penulangan lentur
Berdasarkan prinsip Capacity Design di mana kolom harus diberi cukup
kekuatan sehingga kolom-kolom tidak leleh lebih dahulu sebelum balok.
Goyangan lateral memungkinkan terjadinya sendi plastis di ujung-ujung kolom
akan menyebabkan kerusakan berat, karena itu harus dihindarkan. Oleh sebab
itu, kolom-kolm selalu didesain 20 % lebih kuat dari balok-balok di suatu
hubungan balok kolom (HBK).
b. Sambungan Lewatan
Sambungan Lewatan tidak boleh diletakkan di lokasi lo yang kemungkinan
besar akan terjadi pelupasan dan tegangan tinggi tapi harus diletakkan di tengah
tinggi kolom. Sambungan itu harus didesain sebagai sambungan tarik dan harus
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
14
dikekang oleh tulangan transversal yang cukup. Sedang sambungan mekanikal
dan las harus sesuai dengan pasal 23.2 (6).
c. Tulangan Transversal
Ujung-ujung kolom perlu cukup pengekangan untuk menjamin daktilitasnya
bila terjadi pembentukan sendi plastis. Ujung-ujung itu perlu juga tulangan
transversal untuk mencegah pertama kegagalan geser sebelum penampang
mencapai kapasitas lentur dan kedua tulangan menekuk (buckling). Peraturan
menentukan jumlah, jarak, dan lokasi dari tulangan transversal ini sehingga
kebutuhan tulangan pengekangan, kuat geser dan tekuk terpenuhi.
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
15
Gambar 6. Diagram Alir Penulangan Kolom
3. Pelat
Pelat lantai merupakan sebuah elemen dari bangunan yang biasanya ditumpu oleg
gelagar-gelagar, balok beton bertulang ataupun kolom. Pelat lantai sangat
dipengaruhi oleh momen lentur dan geser yang terjadi. Sisi tarik pada pelat terlentur
ditahan oleh tulangan baja, sedangkan gaya geser pada pelat lantai ditahan oleh
beton yang menyusun pelat lantai itu sendiri. Lentur pada pelat lantai dapat
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
16
dibedakan menjadi dua yaitu lentur satu arah, jika perbandingan bentang panjang
dan bentang pendek lebih besar dari 2 (dua), serta lentur dua arah, jika perbandingan
bentang panjang dan bentang pendek lebih kecil sama dengan 2 (dua).
4. Pondasi
Pondasi adalah suatu bagian dari konstruksi bangunan yang berfungsi untuk
menempatkan bangunan dan meneruskan beban yang disalurkan dari struktur atas
ke dalam lapisan tanah yang keras yang dapat memikul beban konstruksi tersebut.
Pondasi secara umum dapat dibagi dalam dua jenis, yaitu pondasi dalam dan
pondasi dangkal. Jenis pondasi yang digunakan pada suatu konstruksi bangunan
dipilih berdasarkan hasil penyelidikan tanah, besarnya beban yang akan bekerja
pada pondasi tersebut, serta biaya dan kemudahan pelaksanaan di lapangan.
Pondasi tapak beton bertulang digunakan pada bangunan bertingkat yang jumlah
tingkatnya tidak terlalu banyak. Daya dukung tanah juga tidak terlalu jelek.
a. Menentukan ukuran pondasi
ult = 1,3 x c x Nc + q x Nq + 0,4 x B x y x Ny
= ult/SF
= P/A
Dimana :
c : kohesi tanah
q : berat tanah di atas bidang
dasar pondasi
y : berat jenis tanah jenuh
SF : safety factor
P : beban tidak terfaktor
A : luas penampang
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
17
b. Kontrol geser
Vu = x L x G
Vc = 1
6 x x b x d
dimana:
Vu : gaya geser
: tegangan tanah
G : daerah pembebanan
geser satu arah
b : panjang pondasi
d : tebal efektif pondasi
Vc : gaya geser nominal
beton
fc : kuat tekan beton
c. Menentukan pembesian pondasi
SNI-2847-2012 pasal 17.4.2, momen terfaktor maksimum untuk sebuah
pondasi telapak setempat harus dihitung pada penampang kritis yang terletak
di:
1. Muka kolom, pedestal, atau dinding, untuk pondasi telapak yang
mendukung kolom, pedestal atau dinding beton.
2. Setengah dari jarak yang diukur dari bagian tengah ke tepi dinding, untuk
pondasi telapak yang mendukung dinding pasangan.
3. Setengah dari jarak yang diukur dari muka kolom ke tepi pelat alas baja,
untuk pondasi yang mendukung pelat dasar baja.
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
18
III. DATA & ANALISIS STRUKTUR
A. Data Geometrik Struktur & Klasifikasi Material
Bangunan Mesjid Darul Hasanah diperuntukkan sebagai tempat ibadah umat Islam
dengan luas total bangunan 339.57m2. Adapun ilustrasinya dapat dilihat dalam gambar
dibawah ini.
Gambar 7. Tampak Struktur Bangunan
Gambar 8. Geometrik Struktur Bangunan
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
19
Ketinggian bangunan memiliki ketinggian sebesar 6000 mm. Adapun Klasifikasi
Material baik material beton dan baja sebagai berikut;
Mutu Beton
Mutu Beton dalam analisis ini diasumsikan menggunakan K-300 atau fc 24.9 MPa
untuk kolom dan plat dan balok K-250 atau fc 20,75 MPa.
Mutu Baja
Mutu Baja yang digunakan dalam analisis perencanaan ini adalah fy 400 MPa untuk
tulangan utama dan fy 240 untuk tulangan sengkang
Struktur dan komponen struktur lainnya harus memiliki kekuatan (Strength), Kekakuan
(Stiffness) dan keteguhan (toughess) yang cukup agar dapat berfungsi selama masa
layannya. Perhitungan analisis struktur eksiting rencana yang ada dilakukan dengan
menggunakan program Etabs Sedangkan perhitungan kapasitas penampang yang ada
dihitung menggunakan Etabs dan dibantu dengan Microsoft Excel.
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
20
Gambar 9. Denah Lantai Satu
B. Analisis Pembebanan
o Baban Mati
Beban mati didefinisikan sebagai beban yang ditimbulkan oleh elemen-elemen
struktur bangunan ; balok, kolom, dan pelat lantai dihitung secara otomatis
melalui bantuan program Etabs.
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
21
o Beban Mati Tambahan / SIDL
Beban mati tambahan didefinisikan sebagai beban mati yang diakibatkan oleh
berat dari elemen-elemen tambahan atau finishing yang bersifat permanen.
Berdasarkan SNI 1727:2013 elemen struktur sebagai berikut:
Berdasarkan Tabel 1 maka beban mati tambahan yang dibebankan pada pelat
lantai sebagai berikut :
- Beban Keramik = = 0,235 kN/m2
- Beban Spesi Ubin = 3 x 0,206 KN/m2 = 0,618 kN/m2
- Mekanikal Elektrikal = = 0,245 kN/ m2
- Beban Plafon + penggantung = = 0,176 kN/m2 +
1,274 kN/m2
o Beban Hidup
Beban hidup didefinisikan sebagai beban yang sifatnya tidak membebani
struktur secara permanen namun beban yang diakibatkan pengguna bangunan.
Berdasarkan fungsi Gedung ini sebagai Ruang Ibadah . Adapun Penyebaran
bebannya dapat yakni 4,79 KN/m
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
22
o Beban Angin
Beban angin merupakan beban yang diakibatkan oleh faktor lingkungan yaitu
faktor angin itu sendiri.
a. Menentukan Kecepatan Angin Dasar, V
Kecepatan angin dasar harus ditentukan oleh instansi yang berwenang,
namun dalam perencanaan kecepatan angin harus di rencanakan minimal
sebesar 110 mph (49,1744 m/s)
b. Menentukan Parameter Beban Angin Kategori Eksopur
Untuk bangunan yang direncanakan menggunakan Eksposur tipe C. karena
Eksposur C berlaku untuk semua kasus di mana Eksposur B atau D tidak
berlaku.
o Beban Gempa
Faktor keutamaan gempa gedung Mesjid Darul Hasanah ini adalah 1,0. Jenis
tanah pada lokasi gedung adalah medium soil.
Adapuan Respon Spektrum dari Lokasi Masjid Darul Hasanah ini Berdasarkan
Analisis Puskim Pekerjaan Umum sebagai berikut:
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
23
Gambar 10. Respon Spektrum Lokasi Manado
C. Pemodelan Struktur
Pemodelan ini dilakukan dengan bantuan program Etabs. Masing-masing elemen
struktur dimodelkan berdasarkan data gambar Rencana Masjid Darul Hasanah dengan
material sesuai kondisi Rencana. Adapun hasil pemodelan struktur bangunan ini
sebagai berikut:
Gambar 11. Pemodelan Plat Lantai Dasar
Setelah keseluruhan elemen struktur dimodelkan dan pendefinisian jenis pengekang
didefinisikan (pondasi) maka selanjutnya pemodelan dapat dianalisis lebih lanjut.
Adapun gambar keseluruhan struktur bangunan gedung sebagai berikut:
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
24
Gambar 12. Pemodelan 3D Struktur Gedung
D. Hasil Analisis Struktur
1. Hasil Priode Alamiah Struktur Bangunan
Dari hasil pemodelan dengan program Etabs maka didapat periode struktur
bangunan sebagai berikut :
Tabel 3. Hasil Analisis Periode dengan Etabs
Case Mode Period
sec
Frequency
cyc/sec
Circular Frequency
rad/sec
Eigenvalue
rad/sec
Modal 1 0,274 3,649 22,9246 525,5361
Modal 2 0,231 4,328 27,1966 739,6572
Modal 3 0,165 6,045 37,9835 1442,7488
Modal 4 0,075 13,406 84,2338 7095,3373
Modal 5 0,062 16,251 102,1052 10425,4731
Modal 6 0,056 17,73 111,404 12410,8463
Modal 7 0,052 19,088 119,9355 14384,5193
Modal 8 0,045 22,421 140,8738 19845,4224
Modal 9 0,044 22,886 143,7962 20677,3494
Modal 10 0,038 26,538 166,7435 27803,3827
Modal 11 0,033 30,575 192,1102 36906,3469
Modal 12 0,033 30,631 192,4604 37040,9971
Dari hasil diatas maka dapat dibandingkan dengan priode fundamental empiris
menurut peraturan SNI 1727:2012 sebagai berikut:
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
25
= .
Ct = Koefisien (Tabel 4)
X = Koefisien (Tabel 4)
hn = Ketinggian struktur
Tabel 4. Nilai Parameter Periode Pendekatan Ct dan x
Tipe Struktur Ct X
Rangka baja pemikul momen 0,0724 0,8
Rangka beton pemikul momen 0,0466 0,9
Rangka baja dengan brecing eksentris 0,0731 0,75
Rangka baja dengan brecing terkekang
terhadap tekuk
0,0731 0,75
Semua system struktur lainnya 0,0488 0,75
Sumber SNI 1727:2013
Maka hasil priode fundamental yang diizinkan tidak melebih:
= .
= 0,0466. 60,9
= 0,233
Dari kedua hasil diatas dapat dibandingkan priode fundamental hasil Etabs 2015
dan peraturan sebagai berikut:
Table 5. Perbandingan Hasil Priode Fundamental
Periode Fundamental
Struktur Periode Fundamental Ijin Keterangan
0,274 detik 0,274 detik Memenuhi
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
26
2. Hasil Deformasi Bangunan Gedung
Gambar 13. Deformasi Gedung
Deformasi maksimum yang terjadi adalah 37,4 mm hal ini masih memenuhi
syarat ijin 40 mm untuk lendutan atau 1/100L (55 mm)
Tabel 6. Story Drift Struktur Bangunan
Story Drift X Y Z
m m m
Max 0.00098 37.5 41.5 11.871
Min 0.00102 37.5 41.5 11.871
Dari hasil story drift diatas masih memenuhi syarat ijin story drift pada gedung
yakni 2% . maka story ijin maksimal struktur gedung ini adalah 0,08m. Hal ini
menunjukan 0,08m > 0,00102m maka story drift masih memenuhi.
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
27
3. Hasil Gaya Dalam Elemen Struktur
a. Gaya Aksial
Gambar 14. Axial Diagram
b. Gaya Momen
Gambar 15. Moment Diagram
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
28
c. Gaya Torsi
Gambar 16. Torsion Diagram
d. Gaya Geser
Gambar 17. Shear Diagram
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
29
e. Gaya Momen Lantai
Gambar 18. Momen Slab
f. Pengecekan struktur dengan program etabs
Gambar 19. Pengecekan Kapasitas
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
30
E. Hasil Analisis Struktur
1. Perencanaan Struktur Balok
Struktur balok yang digunakan pada Mesjid Darul Hasanah ini adalah struktur
beton yakni menggunakan empat tipe dimensi balok
i. 300 x 600
ii. 300 x 500
iii. 200 x 300
iv. 300 x 700
Adapun mutu beton yang harus digunakan adalah K-250. Setelah dilakukan
analisis perencanaan didapatkan hasil resume sebagai berikut:
Tabel 7. Perencanaan Balok
No Section Tipe Kapasitas Kebutuhan Keterangan
1 A 1-2 300 700
M (+) KNm 166,3 117.7015 OK
M (-) KNm 268.1 121.4068 OK
V (KN) 186.15 89.8533 OK
T (KNm) 72,315 21.3956 OK
2 A 2-3 300 700
M (+) KNm 166,3 47.4485 OK
M (-) KNm 268.1 89.5296 OK
V (KN) 186.15 65.0524 OK
T (KNm) 72,315 10.7137 OK
3 A 3-4 300 700
M (+) KNm 166,3 115.5728 OK
M (-) KNm 268.1 117.8215 OK
V (KN) 186.15 87.7045 OK
T (KNm) 72,315 16.2314 OK
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
31
2. Perencanaan Struktur Kolom
Struktur kolom yang digunakan pada Mesjid Darul Hasanah ini adalah struktur
beton yakni menggunakan dua tipe dimensi yakni
a. 450 x 450
b. 600 x 600
Adapun mutu beton yang harus digunakan adalah K-300. Setelah dilakukan
analisis perencanaan didapatkan hasil resume sebagai berikut:
Tabel 8. Perencanaan Kolom
No Section Tipe Kapasitas Kebutuhan Keterangan
1 F 1-1 K 450
P (KN) 3455.58 842.832 OK
M (KNM) 228 27.7927 OK
V(KN) 170,05 17.6258 OK
- 0 OK
2 F 1-2 K 450
P (KN) 3455.58 686.4377 OK
M (KNM) 228 61.0197 OK
V(KN) 170,05 38.4767 OK
- 0 OK
3. Perencanaan Pondasi
Perencanaan pondasi harus dilakukan secara maksimal agar keutuhan bangunan
gedung dapat dijaga, setlah dilakukan analisis maka didapat suatu perencanaan
pondasi dengan Pondasi Telapak dengan beberapa tipe terlampir
Design & Structure Analysis Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS Multidisciplinary Consultants
32
IV. KESIMPULAN
Setelah dilakukan analisis dan design maka dapat disimpulkan sebagai berikut
1. Material beton yang digunakan adalah mutu beton K-300 untuk struktur kolom
sedangkan balok dan plat menggunakan mutu K-250
2. Material tulangan baja yang digunakan dalam perencanaan adalah fy 400 MPa dan
fy 240 MPa
3. Setelah dilakukan analisis maka didapatkan periode getar alamiah struktur gedung ini
adalah 0,274 detik hal ini masih memenuhi syarat maksimal priode getar yang
diizinkan yakni 0,274 detik. Hal ini menjadi kriteria untuk kekakuan gedung
bangunan, maka struktur bangunan ini sudah memiliki kekakuan yang baik.
4. Dari hasil story drift bangunan ini sudah memenuhi syarat yang ada yakni kurang
dari 0,08 m atau story drift bangunan ini sebesar 0,00102 m. Maka gedung ini
memiliki ketangguhan yang baik.
5. Sedangkan lendutan maksimal yang terjadi bahwa gedung ini hanya memiliki
lendutan 37,4 mm. Hal ini masih dalam kriteria ijin yakni 50 mm.
6. Adapun penampang yang digunakan dalam perencanaan ini adalah
a. Balok
i. 300 x 600
ii. 300 x 500
iii. 200 x 300
iv. 300 x 700
b. Kolom
i. 450 x 450
ii. 600 x 600
c. Plat
Plat yang digunakan dalam perencanaan ini adalah plat beton setebal 150 mm
untuk plat lantai dan 100 untuk plat atap
d. Pondasi
Pondasi yang digunakan dalam perencanaan ini adalah pondasi telapak
LAMPIRAN 1. FIRST DOCUMENT
2. ANALYSIS DOCUMENT
3. STRUCTURE DRAWING
QIES NUSANTARA KONSULTAN MULTIDISCIPLINARY CONSULTANTS
LAMPIRAN 1. FIRST DOCUMENT
2. ANALYSIS DOCUMENT
3. STRUCTURE DRAWING
QIES NUSANTARA KONSULTANMULTIDISCIPLINARY CONSULTANTS
POKA (DID)AMBON
GA
RIS CIPTA
KA
RSA
Jl. Cikad
ut N
o. 8
2 Ban
du
ng
Tlp. 08
78 2461 5
376 - 081
2 2080 2544
http
://ww
w.g
arisciptakarsa.co
mRan
cang
- Ban
gu
n
e mail : ko
nsu
l@g
arisciptakarsa.co
mB
B 7D
0BA
D97
- Skype : ru
lli.rosalli
PERENCANAAN PEMBANGUNAN PRASARANAPENUNJANG MESJID DARUL HASANNAH
NOJUDUL GAMBAR
HALAMANGA
RIS CIPTA
KA
RSA
Jl. Cikad
ut N
o. 82 B
and
un
gTlp. 0
878 2461 5
376 - 0812 2080
2544
http
://ww
w.g
arisciptakarsa.comRan
cang
- Ban
gu
n
e mail : ko
nsu
l@g
arisciptakarsa.comB
B 7D
0BA
D97
- Skype : rulli.rosalli
12345
ST-01
ST-02
ST-03
ST-04
ST-05
RENCANA STRUKTUR
SITE PLANT MESJID
6ST-06
DENAH MESJID
TAMPAK DEPAN MESJID
TAMPAK BELAKANG MESJID
7891011
TAMPAK SAMPING KANAN MESJID
TAMPAK SAMPING KIRI MESJID
POTONGAN A-A
POTONGAN B-B
POTONGAN D-D
DETAIL PRINSIP A DAN B
DETAIL PRINSIP C DAN D
ST-07
ST-08
ST-09
ST-10
ST-11
ST-12
ST-13
ST-14
ST-15
DAFTAR ISI
12
POTONGAN C-C
POKA (DID)AMBON
PERENCANAAN PEMBANGUNAN PRASARANA
PENUNJANG MESJID DARUL HASANNAH
1314151617181920212223
DETAIL RENCANA PONDASI MESJID
DETAIL RENCANA SLOOF MESJID
DETAIL RENCANA KOLOM MESJID
DETAIL RENCANA RING BALK 1
DETAIL RENCANA RING BALK 2
DETAIL RENCANA BALOK ATAP MESJID
DETAIL RENCANA PLAT DAK MESJID
DETAIL PONDASI DAN SLOOF
PEMBESIAN SLOOF DAN KOLOM
PEMBESIAN KOLOM
DAN BALOK ATAP
PEMBESIAN BALOK KUBAH DAN RING BALK
ST-16
ST-17
ST-18
ST-19
ST-20
ST-21
ST-22
ST-23
DETAIL PONDASI DAN SLOOF
DETAIL RENCANA KOLOM MESJID
DETAIL RENCANA KOLOM MESJID
DETAIL RENCANA KOLOM MESJID
24252627
ST-24
ST-25
ST-26
ST-27
AREA SH
OLAT
ELT -0.05
ELT 0.00
MIH
RABE
LT +0.10
RG
AUDIO
ELT +0.05
SELASARE
LT -0.25M
EN
ARAE
LT -0.20
TERAS
ELT -0.05
TERAS
ELT -0.25
ELT -0.45 SELASAR
ELT -0.25
ME
NARA
ELT -0.25
SELASARE
LT -0.25
ARE
A TERBUKA
ELT -0.35
ELT -0.45
RG
. PERSIAPAN
ELT +0.05
ME
NARA
ELT -0.20
SELASARE
LT -0.25
TERAS
ELT -0.25
ELT -0.05
ELT -0.45
ELT -0.45
SELASARE
LT -0.25M
EN
ARAE
LT -0.25
SELASARE
LT -0.25
ARE
A TERBUKA
ELT -0.35
SELASARE
LT -0.25
SELASARE
LT -0.25
ELT 0.00
TERAS
ELT -0.25
ELT 0.00
KO
LAM
TEM
PA
T WU
DH
U
TEMPAT WUDHUTEMPAT WUDHU
TEMPAT WUDHU TEMPAT WUDHU
PARKIR MOTOR
ELT -0.35
ELT -0.30
ELT -0.35
ELT -0.35
ELT -0.35
ELT -0.35
ELT -0.35
TAMAN
-0.45
ELT -0.30
ELT -0.30
ELT -0.30
ELT -0.30
ELT -0.35
PARKIR MOBIL
-0.45
-0.45
PARKIR MOTOR
-0.45
PARKIR MOBIL
-0.45
TAMAN
-0.35
TAMAN
-0.35
TEM
PA
T WU
DH
U
ELT -0.30
ELT -0.30
TAMAN
-0.35
ELT -0.35
ELT -0.30
ELT -0.35
ELT -0.35
ELT -0.35
ELT -0.45
ELT -0.45
ELT -0.45
ELT -0.45
ELT -0.45
ELT -0.45
ELT -0.45
ELT -0.45
ELT -0.45
ELT -0.45
ELT -0.45
SITE PLANE M
ESJIDS k a l a 1 : 450
SITE PLAN
E MESJID
1 : 450
ST-01
500500
2020A
500
175430
24601
2
600325
430
45
68
C D E FG
IH
500430
24601
2
600500
430
45
7
175325
DEN
AH M
ESJIDS k a l a 1 : 125
50 1505019575
500500
2020
500 50 1505019575
37
BA C D E F
G
IHB
A
8
ELT -0.05
ELT -0.45
TERAS
ELT -0.25
ELT -0.45
AR
EA SH
OLAT
ELT 0.00
ELT -0.05
TERAS
ELT -0.25
MIH
RAB
ELT +0.10
RG
AUD
IOE
LT +0.05R
G. PER
SIAPANE
LT +0.05
ELT 0.00
ELT 0.00
DEN
AH
MESJID
1 : 125
B CD
ST-02
TAMPAK D
EPAN M
ESJIDS k a l a 1 : 100
TAM
PAK
DEPA
N M
ESJID1
: 100
ST-03
TAMPAK BELAKAN
G M
ESJIDS k a l a 1 : 100
TAM
PAK
BE
LAK
AN
G1
: 100M
ESJID
ST-04
TAMPAK SAM
PING
KANAN
MESJID
S k a l a 1 : 100
TAM
PAK
SAM
PING
KA
NA
N1
: 100M
ESJID
ST-05
TAMPAK SAM
PING
KIRI M
ESJIDS k a l a 1 : 100
TAM
PAK
SAM
PING
KIRI
1 : 100
ME
SJID
ST-06
ELT -0.52 TAM
ANP
ERM
UKAAN
TANAH
0.00
EST +6.00
390 115
EST -3.00
95150
ELT +3.95
ELT 0.00
245
PO
ND
ASI PLATS
ETEMPAT
120X120
PO
ND
ASI PLATS
ETEMPAT
120X120
RG
.AUD
IOR
G.M
IHR
ABR
G.P
ERS
IAPAN
325325
6001250
S k a l a 1 : 100PO
TON
GAN
A-A
PO
ND
ASI PLATS
ETEMPAT
60x60
PO
ND
ASI PLATS
ETEMPAT
60x60
S 30/50
B 15/25
B 20/40
B 20/40
B 15/25
B 15/20
B 15/20
B 15/20
B 15/20
SAM
PAI KETAN
AH KER
AS
ELT +0.05
RG
.AUD
IOE
LT +0.10R
G.M
IHR
ABE
LT +0.05R
G.P
ERS
IAPAN
ELT -0.52 TAM
AN
ELT +3.00
ELT +3.00
ELT +3.95
ELT +3.00
93
B 15/25
B 15/25
S 30/50
S 30/50
S 30/50
EST +3.90
EST +4.85
ELT +2.45
EST +5.00
EST +4.00
EST +4.00
EST -1.50
150900
55393
POTO
NG
AN
A-A
1 : 100
ST-07
B 15/20
890
EST -3.05
485 100
EST -0.50
EST -2.20
65 190 50
ELT -0.25
ELT -0.52 TAM
ANE
LT -0.05 TERAS
ELT 0.00 M
ASJID
488
ELT +3.85
ELT 0.00
ELT +4.65
80
B 20/45
B 25/50
B 25/50
B 20/45
B 25/70
B 25/70
B 15/20
B 15/20
B 15/20
S 30/50
PO
ND
ASI PLATS
ETEMPAT
150X150
PO
ND
ASI PLATS
ETEMPAT
150X150
PO
ND
ASI PLATS
ETEMPAT
200X200
PO
ND
ASI PLATS
ETEMPAT
200X200
PO
ND
ASI PLATS
ETEMPAT
150X150
PO
ND
ASI PLATS
ETEMPAT
150X150
GER
BAN
G SA
MPIN
GM
ASJID
425500
600500
425
GER
BAN
G SA
MPIN
G
2450
S k a l a 1 : 100PO
TON
GAN
B-B
ELT 0.00 M
ASJID
ELT 0.00 M
ASJID
ELT -0.05 TER
AS
ELT -0.52 TAM
ANE
LT -0.25
ELT +4.65
ELT +4.65
B 15/30
B 15/30
836523525
B 25/50
B 25/50
B 25/50
S 30/50
S 30/60
S 30/60
S 30/50
S 30/50
B 25/50
PER
MU
KAANTAN
AH 0.00
EST +5.85
EST +4.85
ELT +2.35
ELT +3.00
EST +6.00
EST +6.00
EST +5.00
EST +5.00
B 12/10
B 12/10
ELT -0.20
POTO
NG
AN
B-B
1 : 100
ST-08
ELT 0.00 M
ASJID
ELT 0.00 M
ASJID
ELT 0.00 M
ASJID
PO
ND
ASI PLATS
ETEMPAT
150X150
S 30/50
PO
ND
ASI PLATS
ETEMPAT
150X150
805
EST 0.00
340 245
EST -2.00
220
522
ELT 0.00
ELT +4.65
52 200
MAS
JID
16001600
S k a l a 1 : 100PO
TON
GAN
C-C
B 15/20
B 15/20
B 25/50
B 25/50
ELT +4.65
ELT -0.25
178 92
B 25/50
B 25/50
S 30/50
EST +6.00
EST +5.85
B 12/10
B 12/10
EST +3.40
ELT +1.75
ELT +2.70
PO
ND
ASI PLATS
ETEMPAT
200X200
PO
ND
ASI PLATS
ETEMPAT
200X200
S 30/60
S 30/60
POTO
NG
AN
C - C
1 : 100
ST-09
890
EST 0.00
EST -3.05
485 100305
ELT -0.45 TAM
ANE
LT +0.10 MIH
RAB
ELT 0.00 M
ASJID
ELT 0.00 M
ASJID
ELT 0.00 M
ASJID
PO
ND
ASI PLATS
ETEMPAT
150X150
PO
ND
ASI PLATS
ETEMPAT
200X200
PO
ND
ASI PLATS
ETEMPAT
200X200
PO
ND
ASI PLATS
ETEMPAT
120X120
B 15/20
B 15/20
B 20/40
B 25/50
B 15/30
B 25/50
B 30/70
B 30/70
S 30/50
463
ELT +4.65
ELT 0.00
2570
ELT +3.95
MIH
RAB
MAS
JID
2702020
500600
500150
S k a l a 1 : 100PO
TON
GAN
D-D
ELT +4.65
ELT +4.65
300
B 15/30
ELT +3.45
68
B 25/50
S 30/60
S 30/60
S 30/50
B 12/10
B 12/10
B 15/20
EST +5.85
EST +4.85
ELT +3.00
ELT +3.68
EST +5.00
EST +6.00
EST +6.00
PO
ND
ASI PLATS
ETEMPAT
150X150
PO
ND
ASI PLATS
ETEMPAT
120X120
POTO
NG
AN
D - D
1 : 100
ST-10
EST +5.00
EST +6.00
935
EST 0.00
485 100
EST -3.50
350
ELT -0.25ELT -0.45 TAMAN
ELT -0.05 TERASELT 0.00
B 20/40
B 25/50
B 15/20
B 15/20
S 30/50
S 30/50
PONDASI PLATSETEMPAT
150X150
GERBANG SAMPING
425
ELT +3.00
ELT +3.83
ELT +4.65ELT +4.10
235 65 83 82465
B 20/40
EST +3.65
EST +4.85
EST +5.85
EST +4.85B 15/30
EST +4.85B 20/40
EST +4.85
S k a l a 1 : 100D
ETAIL PRIN
SIP A
60
60
33
20
60
60
60
60
EST +4.85
EST +5.85
ELT +2.35
EST +4.85
EST +5.85
EST +6.00
300165
EST +5.85
B 15/30EST +4.85
EST 3.65
EST +6.00
EST +0.40EST +0.40
ELT 0.00 MASJID
S k a l a 1 : 100D
ETAIL PRIN
SIP B
890
EST 0.00
EST -3.05485 100305
B 25/50B 30/70
B 15/20
S 30/50S 30/60
PONDASI PLATSETEMPAT
150X150
PONDASI PLATSETEMPAT
200X200
500
ELT -0.45ELT 0.00
ELT +4.65
ELT +3.00
52517
EST +5.00
EST +6.00
935
EST 0.00
485 100
EST -3.50
350
ELT -0.25ELT -0.45 TAMAN
ELT -0.05 TERASELT 0.00
B 20/40
B 25/50
B 15/20
B 15/20
S 30/50
S 30/50
PONDASI PLATSETEMPAT
150X150
GERBANG SAMPING
425
ELT +3.00
ELT +3.83
ELT +4.65ELT +4.10
235 65 83 82465
B 20/40
EST +3.65
EST +4.85
EST +5.85
EST +4.85B 15/30
EST +4.85B 20/40
EST +4.85
S k a l a 1 : 100D
ETAIL PRIN
SIP A
60
60
33
20
60
60
60
60
EST +4.85
EST +5.85
ELT +2.35
EST +4.85
EST +5.85
EST +6.00
300165
EST +5.85
B 15/30EST +4.85
EST 3.65
EST +6.00
EST +0.40EST +0.40
ELT 0.00 MASJID
S k a l a 1 : 100D
ETAIL PRIN
SIP B
890
EST 0.00
EST -3.05485 100305
B 25/50B 30/70
B 15/20
S 30/50S 30/60
PONDASI PLATSETEMPAT
150X150
PONDASI PLATSETEMPAT
200X200
500
ELT -0.45ELT 0.00
ELT +4.65
ELT +3.00
52517
MENARA
ELT
-0.25
MENARA
ELT -0.05
ELT -0.45 SELASAR
ELT
-0.25E
LT -0.25
SELASARE
LT -0.25
AREA TERBUKA
ELT
-0.35
ELT -0.45
ELT
-0.25
TERASE
LT -0.25
MENARA
ELT
-0.25
MENARA
ELT -0.45
SELASARE
LT -0.25
ELT
-0.25
SELASARE
LT -0.25
ELT -0.45
AR
EA SH
OLAT
TERASE
LT -0.05
TERASE
LT -0.25
ELT 0.00
AREA TERBUKA
ELT
-0.35
ELT -0.05
TERASE
LT -0.25
MIH
RABE
LT +
0.10
RG
AUDIO
ELT
+0.05
SELASARE
LT -0.25
RG
. PERSIAPAN
ELT
+0.05
SELASARE
LT -0.25
SELASARE
LT -0.25
ELT 0.00
ELT 0.00
AB
DETA
IL PRIN
SIP A D
AN
B1
: 100
ST-11
EST 0.00
340
EST -3.00
95150
PONDASI PLATSETEMPAT
120X120
RG.AUDIO
325
PONDASI PLATSETEMPAT
60X60
S 30/50
B 15/25
B 15/20B 15/20
SAMPAI KETANAH KERAS
ELT +0.05RG.AUDIO
RG.MIHRAB
B 15/25
150
EST -1.50
785
ELT +3.95
ELT +3.00
95395
ELT 0.00250
ELT +0.10
S k a l a 1 : 100D
ETAIL PRIN
SIP C
50
EST +4.85
EST +3.90B 15/25
EST +3.90
EST +0.40S 30/50
EST +0.404
0
27
50
EST +4.00EST +3.50
EST +3.40 EST +3.90
EST +4.85
EST +5.00
ELT +2.50ELT +2.45
EST +4.90EST +4.50
EST +5.85
ELT +3.00
EST 6.00
EST 5.00
ELT -0.05SELASAR
B 20/40EST +5.85B 15/30EST +4.90
B 20/40EST +4.90
MASJID
ELT +3.68
4656495300
ELT -0.45TAMAN
PONDASI PLATSETEMPAT
120X120 B 15/20
S 20/40
PONDASI BATUKALI
S 15/20
885
EST 0.00
450 95
EST -2.00
300 40
ELT +3.95
ELT +4.65
ELT 0.00ELT 0.00
S k a l a 1 : 100D
ETAIL PRIN
SIP D
EST 0.00
340
EST -3.00
95150
PONDASI PLATSETEMPAT
120X120
RG.AUDIO
325
PONDASI PLATSETEMPAT
60X60
S 30/50
B 15/25
B 15/20B 15/20
SAMPAI KETANAH KERAS
ELT +0.05RG.AUDIO
RG.MIHRAB
B 15/25
150
EST -1.50
785
ELT +3.95
ELT +3.00
95395
ELT 0.00250
ELT +0.10
S k a l a 1 : 100D
ETAIL PRIN
SIP C
50
EST +4.85
EST +3.90B 15/25
EST +3.90
EST +0.40S 30/50
EST +0.404
0
27
50
EST +4.00EST +3.50
EST +3.40 EST +3.90
EST +4.85
EST +5.00
ELT +2.50ELT +2.45
EST +4.90EST +4.50
EST +5.85
ELT +3.00
EST 6.00
EST 5.00
ELT -0.05SELASAR
B 20/40EST +5.85B 15/30EST +4.90
B 20/40EST +4.90
MASJID
ELT +3.68
4656495300
ELT -0.45TAMAN
PONDASI PLATSETEMPAT
120X120 B 15/20
S 20/40
PONDASI BATUKALI
S 15/20
885
EST 0.00
450 95
EST -2.00
300 40
ELT +3.95
ELT +4.65
ELT 0.00ELT 0.00
S k a l a 1 : 100D
ETAIL PRIN
SIP D
MENARA
ELT
-0.25
MENARA
ELT -0.05
ELT -0.45 SELASAR
ELT
-0.25E
LT -0.25
SELASARE
LT -0.25
AREA TERBUKA
ELT
-0.35
ELT -0.45
ELT
-0.25
TERASE
LT -0.25
MENARA
ELT
-0.25
MENARA
ELT -0.45
SELASARE
LT -0.25
ELT
-0.25
SELASARE
LT -0.25
ELT -0.45
AR
EA SH
OLAT
TERASE
LT -0.05
TERASE
LT -0.25
ELT 0.00
AREA TERBUKA
ELT
-0.35
ELT -0.05
TERASE
LT -0.25
MIH
RABE
LT +
0.10
RG
AUDIO
ELT
+0.05
SELASARE
LT -0.25
RG
. PERSIAPAN
ELT
+0.05
SELASARE
LT -0.25
SELASARE
LT -0.25
ELT 0.00
ELT 0.00
C D
DETA
IL PRINSIP C
DA
N D
1 : 100
ST-12
24611
2
580335
440
45
68
24601
3
600605
45
6
165
DEN
AH R
ENC
ANA PO
ND
ASI MESJID
S k a l a 1 : 125
37
P1
P4
335440
605
165
490599
2079
490 40 150402065
A C EF
GH
JIB
P2
P3 150X150
325325
185
D
490599
2079
490 40 150402065
A C EF
GH
JI
B
185
D
P2 120X120
P2
P2P2
P2P2
P3P3
P3P3
P1 200X200
P1
P1
P1
P3P3
P3P3
P4 60x60
P4
P2P2
P4
P4
P2P2
P2P2
8
DEN
AH
RENC
AN
A1
: 125PO
ND
ASI M
ESJID
ST-13
DEN
AH R
ENC
ANA SLO
OF M
ESJIDS k a l a 1 : 125
S1
S1 30/60
S1
S1
S2 30/50
S2S2S2
S2
S2
S2
S2
S2
S2
S2
S2S2
S2S2
S2
S2
S2
S2
S2S2
S2
S2S2
S2S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S1
S2
S2
24711
2
580335
445
45
68
24701
3
600610
45
6
165
37
335445
610
165
490520
2000
490 40 150402065
A C EF
GH
JIB
325325
185
D
490520
2000
490 40 150402065
A C EF
GH
JI
B
185
D
8
DEN
AH
RENC
AN
A1
: 125SLO
OF M
ESJID
ST-14
DEN
AH R
ENC
ANA KO
LOM
UTAM
A MESJID
S k a l a 1 : 125
K2
K1
K1
2445
433
13
45
68
2000
2446
580433
500433
500
K1 45X45
K2 60x60
K1
K1K1
K1K1
K2K1
K1
K1
K1K1
K1K1
K1K1
K1
K1
K2K2
K1
K1
2000
DEN
AH
RENC
AN
A1
: 125K
OLO
M M
ESJID
ST-15
1504904013
49513
4049020
250
490600
490433
1504904013
49513
4049020
250
1 : 125
ST-19
76130
219110
12080
12060
155350
15560
12080
120110
219130
762490
76130
219136
82150
150100
50200
50100
150150
5382
13653
219130
762490
1501131201251207311530
25030
1157312012512011316030
80
2060
1501131201251207311530
25030
1157312012512011316030
80
2060
DEN
AH R
ENC
ANA PIN
TU D
AN JEN
DELA M
ESJIDS k a l a 1 : 125
DEN
AH
REN
CA
NA
PINTU
DA
N JEN
DE
LA M
ESJID
DEN
AH R
ENC
ANA R
ING
BALK 1S k a l a 1 : 125
ELT +4.10
2358
65648
48150
148160
1928
196
2358
77254
150216
178216
54
B 15/20
ELT +3.00B
15/20
ELT +3.00B
15/20E
LT +4.10B
15/20E
LT +4.10B
15/20E
LT +4.10B
15/20
ELT +3.00B 15/20
ELT +4.10B 15/20
ELT +4.10B 15/20
ELT +4.10B 15/20
ELT +4.10B 15/20
ELT +4.10B 15/20
ELT +4.10B 15/20
ELT +3.00B 15/20
ELT +2.50B 15/20
ELT +2.50B 15/20
14852
148150
305148
52305
148
97148
B15/20
3381601489714859230
148160 196971483381601489714859230
195178
195150
ELT +2.35
B 15/20ELT +2.35
15/20E
LT +2.35
15/20E
LT +2.3515/20
ELT +2.35
15/20E
LT +2.35
ELT +2.50B 15/20
ELT +2.45B
15/20E
LT +2.45B
15/20
ELT +4.10B 15/20
ELT +4.10B 15/20
DEN
AH
RENC
AN
A1
: 125R
ING
BA
LK 1
ST-20
DEN
AH R
ENC
ANA R
ING
BALK 2S k a l a 1 : 125
ELT +2.80
2490
656432
307432
543540
2043
562 15070 178
2490
620322
432181
322432
181
B 15/20
ELT +2.80B
15/20
307178
178
543540
2043
562 15070 178
ELT +2.80B
15/20
ELT +2.80B
15/20E
LT +2.80B
15/20
ELT +2.80B
15/20
ELT +2.80B 15/20
ELT +2.80B 15/20
ELT +2.80B 15/20
ELT +2.80B 15/20
ELT +2.80B 15/20
ELT +2.80B 15/20
ELT +2.65B 15/20
ELT +2.65B 15/20
ELT +2.65B 15/20
1270
15/20E
LT +2.40
15/20E
LT +2.40
15/20E
LT +2.40
15/20E
LT +2.40
ELT +4.4515/20
BALOK LENGKUNG
ELT +4.4515/20
BALOK LENGKUNG
ELT +3.1015/20
BALO
K LENG
KUN
G
ELT +3.1015/20
BALO
K LENG
KUN
G
ELT +2.65B 15/20
ELT +3.0015/20
B. LE
NG
KUN
G
ELT +3.6515/20
B. LE
NG
KUN
GE
LT +3.0015/20
B. LE
NG
KUN
G
DEN
AH
RENC
AN
A1
: 125R
ING
BA
LK 2
ST-21
DEN
AH R
ENC
ANA BALO
K ATAP MESJID
S k a l a 1 : 125
EST +4.90B
25/50
ELT +3.90B 15/25
EST +4.85B
25/50
EST +4.85B
25/50
EST +4.85B 25/50
EST +5.85B 25/50
EST +5.85B 25/50 B 25/50
B 25/50
B 25/50EST +5.85
B 25/50
EST +5.85B 25/50
EST +5.85
BALO
K LING
KAR
EST +5.85B
25/50
EST +4.85B15/25
EST +4.85B
15/25E
LT +3.90B
15/25
EST +4.85B15/25
ELT +3.90B 15/25
ELT +3.90B
15/25
EST +5.85B
25/50E
ST +5.85B
25/50
EST +5.85B 25/50
EST +5.85B 25/50
EST +5.85B 25/50
EST +5.85B
25/50
EST +5.85B
25/50E
ST +5.85B
25/50
EST +5.85B
25/50
EST +5.85B
25/50B
25/50
EST +4.85B 25/50
EST +4.85B
25/50
EST +4.85B
25/50
2470
600325
610325
610
13
45
68
490520
2000
490 150402065
A C EF
JIB
185
D
490520
2000
490 40 150402065
A C EF
GH
JI
B
185
D
24701
2
580335
446
45
68
164
37
335445
165
EST +4.85B
25/50
EST +5.85
EST +5.85
EST +5.85
EST +5.85
EST +4.85B 15/30
EST +4.85B 15/30
EST +4.85B
15/30
25/70
BALO
K LING
KAR
EST +4.85B
25/50B
ALOK LIN
GKAR
EST +5.85B
25/50
DEN
AH
RENC
AN
A1
: 125B
ALO
K A
TAP M
ESJID
ST-22
DEN
AH R
ENC
ANA PLAT D
AK MESJID
S k a l a 1 : 125
JIECA
67
85
43
21
JIFDB HG
2470
600325
610325
610
490520
2000
490 150402065 185
490520
2000
490 40 150402065 185
2470
580335
446164
335445
165
PLAT D
AKT=10 C
mE
ST+5.00
PLAT D
AKT=15 C
mE
ST+6.00P
LAT DAK
T=15 Cm
EST+6.00
PLAT D
AKT=15 C
mE
ST+6.00
PLAT D
AKT=15 C
mE
ST+6.00
PLAT D
AKT=15 C
mE
ST+6.00
PLAT D
AKT=15 C
mE
ST+5.00
PLAT D
AKT=15 C
mE
ST+5.00
PLAT D
AKT=15 C
mE
ST+5.00
PLAT D
AKT=15 C
mE
ST+5.00
PLAT D
AKT=15 C
mE
ST+6.00
PLAT D
AKT=15 C
mE
ST+6.00
PLAT D
AKT=15 C
mE
ST+6.00
PLAT D
AKT=10 C
mE
ST+5.00
PLAT D
AKT=10 C
mE
ST+4.00
PLAT D
AKT=10 C
mE
ST+4.00
VO
IDV
OID
VO
ID
DEN
AH
RENC
AN
A1
: 125PLA
T DA
K M
ESJID
ST-23
5 16
4 16
2 16
2 16
19
10 ~ 15C
M
15155555530 15 15 15 1515 15 15 15 1515 5015 15 1520
10 ~ 5C
M
7
357 0.00
-5.70
-0.07
-3.07
-3.37
-3.57
45
45
30
120
PONDASI P2 120x120SKALA 1 : 40
15155555530 15 15 15 1515 15 15 15 1515 50
5 16
4 16
2 16
2 16
15 15 15 720
10 ~ 5C
M
10 ~ 15C
M
19
357 0.00
-5.70
-0.07
-3.07
-3.37
-3.57
60
60
30
150
PONDASI P3 150x150SKALA 1 : 40
15
15
3060
5015155555530 15 15 1520
16
207
5 16
4 16
2 16
2 16
10 ~ 15C
M
10 ~ 5C
M
7
0.00
-5.70
-0.07
-2.07
-1.87
-1.57
PONDASI P4 60x60SKALA 1 : 40
60
60
besi diameter 16
besi diameter 16
besi diameter 10
5 19
4 19
2 19
3 19
PONDASI P1 200x200SKALA 1 : 40
70
70
60
200
10 ~ 15C
M
19
15 15 1010101010101010 190 60 7
SLOOF 30/50SKALA 1 : 40
520
50
besi diameter 19
besi diameter 19
besi diameter 10
SLOOF 30/60SKALA 1 : 40
520
60
706070
20
17
18
15
15
15
15
15
15
18
17
20
200
200
1 : 40
ST-24
DETA
IL PON
DA
SID
AN
SLOO
F
TYPE SLOO
F
LOKASI
POTO
NG
ANPEN
AMPAN
G
DIM
ENSI SLO
OF
300 X 600
TULAN
GAN
ATAS5 D
19 POLO
S
TULAN
GAN
TENG
AH
TULAN
GAN
BAWAH
3 D 19 PO
LOS
TULAN
GAN
SENG
KANG
10 ~ 150
S1 30 X 60
T & L
6 D 19
SKEDU
L KOLO
MSKALA 1 : 100
TYPE KOLO
M
LOKASI
POTO
NG
ANPEN
AMPAN
G
300 X 500
5 D 16 PO
LOS
3 D 16 PO
LOS
10 ~ 150
4 D 16
S2 30 X 50
T & L
K 60 X 60
T & L
600 X 600
5 D 19 PO
LOS
5 D 19 PO
LOS
12 ~ 150
2 D 19
K 50 X 50
T & L
SKEDU
L SLOO
FSKALA 1 : 100
T & LT & L
DIM
ENSI KO
LOM
TULAN
GAN
ATAS
TULAN
GAN
TENG
AH
TULAN
GAN
BAWAH
TULAN
GAN
SENG
KANG
TULAN
GAN
TENG
AH ATAS
TULAN
GAN
TENG
AH BAW
AH
2 D 19
2 D 19
600
600
450
450450 X 450
4 D 16 PO
LOS
4 D 16 PO
LOS
12 ~ 150
-
2 D 16
2 D 16
140 X 400
2 D 13 PO
LOS
2 D 13 PO
LOS
12 ~ 150
-
2 D 13
2 D 13
400
140
K 14 X 40
300
500
600
300
1 : 100
ST-25
PEMB
ESIA
N SLO
OF
DA
N K
OLA
M
SKEDU
L KOLO
MSKALA 1 : 100
TYPE KOLO
M
LOKASI
POTO
NG
ANPEN
AMPAN
G
DIM
ENSI KO
LOM
TULAN
GAN
ATAS
TULAN
GAN
TENG
AH
TULAN
GAN
BAWAH
TULAN
GAN
SENG
KANG
T & L
TULAN
GAN
TENG
AH ATAS
TULAN
GAN
TENG
AH BAW
AH
T & L
140
300
140 X 300
2 D 12 PO
LOS
2 D 12 PO
LOS
10 ~ 150
K 14 X 30
2 D 12
--
T & L
140
140
K 14 X 14
140 X 140
2 D 8
2 D 8
6 ~ 150
- - -
T & L
100
100
K 10 X 10
100 X 100
2 D 8
2 D 8
6 ~ 150
- - -
SKEDU
L BALOK ATAP
SKALA 1 : 100
TYPE BALOK ATAP
LOKASI
POTO
NG
ANPEN
AMPAN
G
DIM
ENSI KO
LOM
TULAN
GAN
ATAS
TULAN
GAN
TENG
AH
TULAN
GAN
BAWAH
TULAN
GAN
SENG
KANG
TULAN
GAN
TENG
AH ATAS
TULAN
GAN
TENG
AH BAW
AH
B2 15 X 30
T & L
150 X 300
3 D 12 PO
LOS
2 D 12
-
2 D 12
2 D 12 PO
LOS
10 ~ 150
250150
B3 15 X 25
T & L
150 X 250
3 D 12 PO
LOS
-
2 D 12
-
2 D 12 PO
LOS
8 ~ 150
150
300B1 25 X 50
T & L
250 X 500
4 D 12 PO
LOS
2 D 12
2 D 12
3 D 12 PO
LOS
10 ~ 150
250
500
1 : 100
ST-26
PEMB
ESIA
N K
OLO
MD
AN
BA
LOK
ATA
P
SKEDU
L BALOK KU
BAHSKALA 1 : 100
TYPE BALOK KU
BAHM
ESJID
LOKASI
POTO
NG
ANPEN
AMPAN
G
DIM
ENSI KO
LOM
TULAN
GAN
ATAS
TULAN
GAN
TENG
AH
TULAN
GAN
BAWAH
TULAN
GAN
SENG
KANG
TULAN
GAN
TENG
AH ATAS 2
TULAN
GAN
TENG
AH BAW
AH 1
TULAN
GAN
TENG
AH ATAS 1
TULAN
GAN
TENG
AH BAW
AH 2
B4 25 X 70
T & L
250 X 700
5 D 19 PO
LOS
2 D 19
3 D 19 PO
LOS
10 ~ 150
2 D 19
2 D 19
2 D 19
2 D 19
B5 25 X 50
T & L
250 X 500
4 D 12 PO
LOS
2 D 12
2 D 10
3 D 12 PO
LOS
10 ~ 150
--
TYPE RIN
G BALK
SKALA 1 : 100
TYPE RIN
G BALK
LOKASI
POTO
NG
ANPEN
AMPAN
G
DIM
ENSI KO
LOM
TULAN
GAN
ATAS
TULAN
GAN
TENG
AH
TULAN
GAN
BAWAH
TULAN
GAN
SENG
KANG
TULAN
GAN
TENG
AH ATAS
TULAN
GAN
TENG
AH BAW
AH
200
150
B 15 X 20
T & L
150 X 200
3 D 12 PO
LOS
-
2 D 12
-
2 D 12 PO
LOS
8 ~ 150
120
100
B 10 X 12
T & L
100 X 120
2 D 12 PO
LOS
---
2 D 12 PO
LOS
8 ~ 150
250
740
500
250
1 : 100
ST-27
PEMB
ESIA
N B
ALO
KK
UB
AH
DA
N RIN
GB
ALK
DEN
AH R
ENC
ANA KO
LOM
PRAKTIS M
ESJIDS k a l a 1 : 125
DEN
AH
RENC
AN
A1
: 125K
OLO
M PRA
KTIS M
ESJID
ST-16
49144
232175
68164
802630
11436
2143026
80164
68175
232144
49114
36
2450
90 19513
72 134 111 134 73 101 30 26430
174 134 111 134 86 150
2035
49144
23283
13466
134201
364201
13466
13483
232144
49
2450
90 19513
72 134 111 134 73 101 30 26430
174 134 111 134 86 150
2035
K3K3K3K3K3K3K3K3K3K3
K3K3K3K3K3K3K3K3K3K3
K3K3
K3K3
K3K3
K3K3
K3K3
K3K3
K3K3
K4K4
K4K4
K4K6
K6
K5K5
K4K4
K3 14x40
K4 14x30
K5 14X14
K6 10X10
K5K5K5
K5K5K5
K4 K3K3
K5K5
K5K5
K5K5
K5K5
3026144
49114
36
201134
66134
83232
14449
8 195 1372 134 111 134 73 101 30 264
3072 134 111 134 86 150
2035
K3
K5
K4
K4
K6
K5
K4
232175
68164
80
K4
K5
K5
K5
K5
K5
K5
K3
K3
K3
K3
K3
K3
K3
K3
K3
K3
K3
K3
K3
K3
K3
K3
K3
10282
DETA
IL DEN
AH
RENC
AN
A K
OLO
M PRA
KTIS M
ESJIDS k a l a 1 : 100
C A
T A T A
N
R E V
I S I
P R O Y E K
DIG
AM
BA
R
TAN
GG
AL
ARSITEK
DISETU
JUI
L. BA
NG
UN
AN
SKA
LA
NO
. LEMB
AR
JUD
UL G
AM
BA
R
CA
D [ team
RU
LLI RO
SALLI. ST
PRA
SAR
AN
A PEN
UN
JAN
G
POK
A (D
ID)
PER
EN
CA
NA
AN
PEMB
AN
GU
NA
N
PERENC
AN
A
GA
RIS CIPTA
KA
RSA
Jl. Cikad
ut N
o. 82 B
and
un
gTlp
. 08
78
24
61
53
76
- 08
12
2080 2544
http
://ww
w.g
arisciptakarsa.co
mR
ancan
g - B
ang
un
e mail : ko
nsu
l@g
arisciptakarsa.co
mB
B 7
D0
BA
D9
7 - Skyp
e : rulli.ro
salli
ME
SJID D
AR
UL H
ASA
NN
AH
JAN
UA
RI, 20163
39.57 M
2
DETA
IL DEN
AH
RENC
AN
A K
OLO
MPRA
KTIS M
ESJID 1
: 100
ST-18
K3 14x40K4 14x30K5 14X14K6 10X10
LAMPIRAN 1. FIRST DOCUMENT
2. ANALYSIS DOCUMENT
3. STRUCTURE DRAWING
QIES NUSANTARA KONSULTANMULTISDICIPLINARY CONSULTANTS
Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE 2016
Date
Time
-
Foundation ID :
CODE DESIGN :
Job Title Masjid Nurul Hasannah
Job Number
Engginer 09/06/2016
Approved Job Code
Address Project Manado Revision
Description Project REVIEW ANALYSIS STRUCTURE
GENERAL DATA
TP 1
SNI 2847:2013
Kontruksi Gedung
[c] 2016 Ristanto 1 Kapsitas Struktur Pondasi Telapak II
Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE 2016
Soil Data (Data Tanah)
Depth Of Foundations (Kedalaman Pondasi) Df = 2,50 m
Heavy Volume Land (Berat Volume Tanah) g = 17,60 kN/m3
In the Corner Swipe (Sudut Gesek Dalam) f = 22,00
Cohesion (Kohesi) c = 0,30 kPa
Prisoners Konus Average (Tahanan Konus Rerata) qc = 34,00 kg/cm2
Dimensions Fondations (Dimensi Pondasi)
Width Fondations Directions X (Lebar Pondasi Arah X) Bx = 2,00 m
Width Fondations Directions Y (Lebar Pondasi Arah Y) By = 2,00 m
Thick Foundation (Ketebalan Pondasi) h = 0,90 m
Width Column Directions X (Lebar Kolom Arah X) bx = 0,30 m
Width Column Directions Y (Lebar Kolom Arah Y) by = 0,30 m
Position Column (Posisi Kolom) as =
Contruction Materials (Bahan Kontruksi)
Kuat tekan beton, fc' = 25,0 MPa
Kuat leleh baja tulangan, fy = 390 MPa
Berat beton bertulang, gc = 24 kN/m3
Expense Plan (Beban Rencana)
Aksial Load (Gaya Aksial Beban Terfaktor) Pu = 418,000 kN
Moment Direction X (Momen Arah X Beban Terfaktor) Mux = 0,123 kNm
Moment Direction Y (Momen Arah Y Beban Terfaktor) Muy = 2,341 kNm
TERZAGHI And PECK (1943)
Soil Bearing Capacity According Theory Terzaghi (1943)
qu = c * Nc * (1 + 0.3 * B / L) + Df * g * Nq + 0.5 * B * Ng * (1 - 0.2 * B / L)
Data Fondations Foot Plat (Data Fondasi Telapak)
Carrying Capacity of Land (Kapasitas Daya Dukung Tanah)
Kontruksi Gedung
[c] 2016 Ristanto 2 Kapsitas Struktur Pondasi Telapak II
Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE 2016
c = Soil Cohession (kN/m2) c = 0,30
Df = Depth Fondations (m) Df = 2,50 m
g = Heavy Voulume Land (kN/m3) g = 17,60 kN/m3
B = Width Fondations (m) B = By = 2,00 m
L = Long fondations (m) L = By = 2,00 m
In the Corner Swipe (Sudut Gesek Dalam) f = 22,00
f = f / 180 * p = 0,383972 rad
a = e(3*p / 4 - f/2)*tan f
= 2,397429
Kpg = 3 * tan2 [ 45 + 1/2*( f + 33) ] = 30,17704
Soil Bearing According Theory Of Terzagi
Nc = 1/ tan f * [ a2 / (2 * cos
2 (45 + f/2) - 1 ] = 20,272
Nq = a2 / [ (2 * cos
2 (45 + f/2) ] = Nc * tan f + 1 = 9,190
Ng = 1/2 * tan f * [ Kpg / cos2 f - 1 ] = 6,889
Ultimate bearing capacity of the soil by Terzaghi :
qu = c*Nc*(1+0.3*B/L) + Df*g*Nq + 0.5*B*Ng*(1-0.2*B/L) = 417,80 kN/m2
Land carrying capacity qa = qu / 3 = 139,27 kN/m2
MEYERHOF (1956)
Soil bearing capacity according to Meyerhof (1956 )
qa = qc / 33 * [ ( B + 0.3 ) / B ]2 * Kd ( in kg/cm
2)
With; Kd = 1 + 0.33 * Df / B Must 1.33
qc = Conus detainee average yield on a foundation sondir ( kg/cm2 )
B = Width Fondations (m) B = By = 2,00 m
Df = Depth Fondationts (m) Df = 2,50 m
Kd = 1 + 0.33 * Df / B = 1,4125 > 1.33
Taken, Kd = 1,33
Prisoners Conus average yield on a foundation sondir, qc = 34,00 kg/cm2
qa = qc / 33 * [ ( B + 0.3 ) / B ]2 * Kd = 1,812 kg/cm
2
Kontruksi Gedung
[c] 2016 Ristanto 3 Kapsitas Struktur Pondasi Telapak II
Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE 2016
Permit the carrying capacity of the land, qa = 181,22 kN/m2
Soil Bearing Capacity According Theory Terzaghi (1943) qa = 139,27 kN/m2
Soil bearing capacity according to Meyerhof (1956 ) qa = 181,22 kN/m2
Support Soil Bearing oF Use qa = 181,22 kN/m2
Basic Size foot plat (Luas Dasar Telapak) A = Bx * By = 4,0000 m2
Prisoners Moment X (Tahanan Momen X) Wx = 1/6 * By * Bx2 = 1,3333 m
3
Prisoners Moment Y (Tahanan Momen Y) Wy = 1/6 * Bx * By2 = 1,3333 m
3
Soil High Above foot plat (Tinggi Tanah diatas Telapak) z = Df - h = 1,60 m
Pressure Against weight (Tekanan Terhadap Berat) q = h * gc + z * g = 49,760 kN/m2
Eksentrisitas on fondasi :
ex = Mux / Pu = 0,0003 m < Bx / 6 = 0,3333 m (OK)
ey = Muy / Pu = 0,0056 m < By / 6 = 0,3333 m (OK)
Maximum ground voltage that occurs at the base of the foundation :
Tegangan tanah maksimum yang terjadi pada dasar fondasi
qmax = Pu / A + Mux / Wx + Muy / Wy + q = 156,108 kN/m2
qmax < qa SAFE (OK)
Support Capascity of Land Use (Kapasitas Daya Dukung Tanah Yang Dipakai)
Voltage Soil Control (Kontrol Tegangan Tanah)
Kontruksi Gedung
[c] 2016 Ristanto 4 Kapsitas Struktur Pondasi Telapak II
Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE 2016
Minimum ground voltage that occurs at the base of the foundation
Tegangan tanah minimum yang terjadi pada dasar fondasi
qmin = Pu / A - Mux / Wx - Muy / Wy + q = 152,412 kN/m2
qmin > 0 Voltage Happend Pull (OK)
Overview Slide Directions X (Tinjauan Geser Arah X)
Distance Center Reinforcment (Jarak Pusat Tulangan) d' = 0,075 m
Effective Thickness foot plat (Tebal efektif Telapak) d = h - d' = 0,825 m
Distance Field Critical (Jarak Bidang Kritis Telapak)
ax = ( Bx - bx - d ) / 2 = 0,438 m
Soil in Sector Critical Voltage Slide X (Tegangan Tanah pada Bidang Kritis Geser X)
qx = qmin + (Bx - ax) / Bx * (qmax - qmin) = 155,300 kN/m2
Shear Force Direction X (Gaya Geser Arah X)
Vux = [ qx + ( qmax - qx ) / 2 - q ] * ax * By = 92,701 kN
Field Width Slide X (Lebar Bidang Geser Arah X) b = By = 2000 mm
Effective Thickness footpla (Tebal Efektif Telapak) d = 825 mm
Ratio Column (Rasio Kolom) bc = bx / by = 1,0000
Strong foot plate sliding direction x (Kuat Geser Telapak Arah X )
Vc = [ 1 + 2 / bc ] * fc' * b * d / 6 * 10-3
= 4125,000 kN
Force Slide On Foot Plate (Gaya Geser Pada Telapak)
Kontruksi Gedung
[c] 2016 Ristanto 5 Kapsitas Struktur Pondasi Telapak II
Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE 2016
Vc = [ as * d / b + 2 ] * fc' * b * d / 12 * 10-3
= 1375,000 kN
Vc = 1 / 3 * fc' * b * d * 10-3
= 2750,000 kN
Then Strong Slide (maka, Kuat Geser) Vc = 1375,000 kN
Reduction Factor (Faktor Reduksi) f = 0,75
Strong Slide (Kuat Geser) f * Vc = 1031,250 kN
Conditions to be met (Syarat yang harus dipenuhi)
f * Vc Vux ####### > 92,701 SAFE (OK)
Overview Slide Directions Y (Tinjauan Geser Arah Y)
Distance Center Reinforcment (Jarak Pusat Tulangan) d' = 0,085 m
Effective Thickness foot plat (Tebal efektif Telapak) d = h - d' = 0,815 m
Distance Field Critical (Jarak Bidang Kritis Telapak)
ay = ( By - by - d ) / 2 = 0,443 m
Soil in Sector Critical Voltage Slide Y (Tegangan Tanah pada Bidang Kritis Geser Y)
qy = qmin + (By - ay) / By * (qmax - qmin) = 155,290 kN/m2
Shear Force Direction Y (Gaya Geser Arah Y)
Vuy = [ qy + ( qmax - qy ) / 2 - q ] * ay * Bx = 93,756 kN
Field Width Slide Y (Lebar Bidang Geser Arah Y) b = Bx = 2000 mm
Effective Thickness footpla (Tebal Efektif Telapak) d = 815 mm
Ratio Column (Rasio Kolom) bc = bx / by = 1,0000
Strong foot plate sliding direction Y (Kuat Geser Telapak Arah Y )
Kontruksi Gedung
[c] 2016 Ristanto 6 Kapsitas Struktur Pondasi Telapak II
Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE 2016
Vc = [ 1 + 2 / bc ] * fc' * b * d / 6 * 10-3
= 4075,000 kN
Vc = [ as * d / b + 2 ] * fc' * b * d / 12 * 10-3
= 1358,333 kN
Vc = 1 / 3 * fc' * b * d * 10-3
= 2716,667 kN
Then Strong Slide (maka, Kuat Geser) Vc = 1358,333 kN
Reduction Factor (Faktor Reduksi) f = 0,75
Strong Slide (Kuat Geser) f * Vc = 1018,750 kN
Conditions to be met (Syarat yang harus dipenuhi)
f * Vc Vux ####### > 93,756 SAFE (OK)
Overview Slide Two Directions (Tinjau Geser Dua Arah)
Distance Center Reinforcment (Jarak Pusat Tulangan) d' = 0,085 m
Effective Thickness foot plat (Tebal efektif Telapak) d = h - d' = 0,82 m
Slide Area Width X (Lebar Bidang Geser X) cx = bx + 2 * d = 1,115 m
Slide Area Width Y (Lebar Bidang Geser Y) cy = by + 2 * d = 1,115 m
Slide Force Pons Happens (Gaya Geser Pons Yang Terjadi)
Vup = ( Bx * By - cx * cy ) * [ ( qmax + qmin ) / 2 - q ] = 288,083 kN
Slide Area Wide Pons (Luas Geser Pons) Ap = 2 * ( cx + cy ) * d = 3,635 m2
Slide Area Width Pons (Lebar Geser Pons) bp = 2 * ( cx + cy ) = 4,460 m
Kontruksi Gedung
[c] 2016 Ristanto 7 Kapsitas Struktur Pondasi Telapak II
Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE 2016
Ratio Column (Rasio Kolom) bc = bx / by = 1,0000
Strong foot plate sliding Pons(Kuat Geser Telapak Pons )
fp = [ 1 + 2 / bc ] * fc' / 6 = 2,500 MPa
fp = [ as * d / bp + 2 ] * fc' / 12 = 0,833 MPa
fp = 1 / 3 * fc' = 1,667 MPa
Then Strong Slide (maka, Kuat Geser) fp = 0,833 MPa
Reduction Factor (Faktor Reduksi) f = 0,75
Strong Slide (Kuat Geser) f * Vnp = f * Ap * fp * 103 = 2271,81 kN
Conditions to be met (Syarat yang harus dipenuhi)
f * Vnp Vup ####### > 288,083 SAFE (OK)
f * Vnp Pu####### > 418,000 SAFE (OK)
Bending Reinforcment Directions X (Tulangan Lentur Arah X)
Distance to the edge of the column to the outside foot plate (Jarak tepi kolom terhadap sisi luar Telapak)
ax = ( Bx - bx ) / 2 = 0,850 m
Voltage ground on the edge of the column (Tegangan tanah pada tepi kolom)
qx = qmin + (Bx - ax) / Bx * (qmax - qmin) = 154,537 kN/m2
Moments that occur in the foundation plate due to ground voltage
(Momen yang terjadi pada plat fondasi akibat tegangan tanah)
Rainforcment Foot Plat (Penulangan Telapak)
Kontruksi Gedung
[c] 2016 Ristanto 8 Kapsitas Struktur Pondasi Telapak II
Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE 2016
Mux = 1/2 * ax2 * [ qx + 2/3 * ( qmax - qx ) - q ] * By = 76,458 kNm
Width Fondation Plate (Lebar Plat Pondasi) b = By = 2000 mm
Thicnrss foot plat (Tebal Telapak) h = 900 mm
Distance Center Reinforcment (Jarak Pusat Tulangan) d' = 75 mm
Effective Thickness foot plat (Tebal efektif Telapak) d = h - d' = 825 mm
Concrete Compressive Strength (Kuat Tekan Beton) fc' = 25 MPa
Strong Yield Reinforcing (Kuat Leleh Baja Tulangan) fy = 390 MPa
Elastic Modulus Steel (Modulus Elastis Baja) Es = 2,00E+05 MPa
Concrate Voltage Distribution Factor (Faktor Distribusi teg) b1 = 0,85
rb = b1* 0.85 * fc/ fy * 600 / ( 600 + fy ) = 0,028069
Reduction Factor (Faktor Reduksi) f = 0,80
Rmax = 0.75 * rb * fy * [1-*0.75* rb * fy / ( 0.85 * fc ) ] = 6,624
Mn = Mux / f = 95,573 kNm
Rn = Mn * 106 / ( b * d
2 ) = 0,07021
Rn < Rmax (OK)
Ratio Reinforcment (Rasio Tulangan)
r = 0.85 * fc / fy * [ 1 - {1 2 * Rn / ( 0.85 * fc ) } ] = 0,0002
Ratio Minimum Reinforcment (Rasio Tulangan Minimum) rmin = 0,0025
Ratio Reinforcment (Rasio Tulangan) r = 0,0025
Rainforcment Area (Luas Tulangan) As = r * b * d = 4125,00 mm2
Diameter Reinforcmen (Diameter Tulangan) D 16 mm
Distance Reinforcment (Jarak Tulangan) s = p / 4 * D2 * b / As = 97 mm
Distence Minimum Rainforcment (Jarak Tulangan Minimum) smax = 200 mm
Distance Reinforcment (Jarak Tulangan) s = 97 mm
Used Reinforcment (Tulangan yang Digunakan) D 16 - 90
Use Area Reinforcment (Luas Tulangan Yang digunakan)
As = p / 4 * D2 * b / s = 4468,04 mm
2
Kontruksi Gedung
[c] 2016 Ristanto 9 Kapsitas Struktur Pondasi Telapak II
Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE 2016
Bending Reinforcment Directions Y (Tulangan Lentur Arah Y)
Distance to the edge of the column to the outside foot plate (Jarak tepi kolom terhadap sisi luar Telapak)
ay = ( By - by ) / 2 = 0,850 m
Voltage ground on the edge of the column (Tegangan tanah pada tepi kolom)
qy = qmin + (By - ay) / By * (qmax - qmin) = 154,537 kN/m2
Moments that occur in the foundation plate due to ground voltage
(Momen yang terjadi pada plat fondasi akibat tegangan tanah)
Muy = 1/2 * ay2 * [ qy + 2/3 * ( qmax - qy ) - q ] * Bx = 76,458 kNm
Width Fondation Plate (Lebar Plat Pondasi) b = Bx = 2000 mm
Thicnrss foot plat (Tebal Telapak) h = 900 mm
Distance Center Reinforcment (Jarak Pusat Tulangan) d' = 85 mm
Effective Thickness foot plat (Tebal efektif Telapak) d = h - d' = 815 mm
Concrete Compressive Strength (Kuat Tekan Beton) fc' = 25 MPa
Strong Yield Reinforcing (Kuat Leleh Baja Tulangan) fy = 390 MPa
Elastic Modulus Steel (Modulus Elastis Baja) Es = 2,00E+05 MPa
Concrate Voltage Distribution Factor (Faktor Distribusi teg) b1 = 0,85
rb = b1* 0.85 * fc/ fy * 600 / ( 600 + fy ) = 0,028069
Reduction Factor (Faktor Reduksi) f = 0,80
Rmax = 0.75 * rb * fy * [1-*0.75* rb * fy / ( 0.85 * fc ) ] = 6,624
Mn = Muy / f = 95,573 kNm
Rn = Mn * 106 / ( b * d
2 ) = 0,07194
Rn < Rmax (OK)
Ratio Reinforcment (Rasio Tulangan)
r = 0.85 * fc / fy * [ 1 - {1 2 * Rn / ( 0.85 * fc ) } ] = 0,0002
Kontruksi Gedung
[c] 2016 Ristanto 10 Kapsitas Struktur Pondasi Telapak II
Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE 2016
Ratio Minimum Reinforcment (Rasio Tulangan Minimum) rmin = 0,0025
Ratio Reinforcment (Rasio Tulangan) r = 0,0025
Rainforcment Area (Luas Tulangan) As = r * b * d = 4075,00 mm2
Diameter Reinforcmen (Diameter Tulangan) D 16 mm
Distance Reinforcment (Jarak Tulangan) s = p / 4 * D2 * b / As = 99 mm
Distence Minimum Rainforcment (Jarak Tulangan Minimum) smax = 200 mm
Distance Reinforcment (Jarak Tulangan) s = 99 mm
Used Reinforcment (Tulangan yang Digunakan) D 16 - 90
Use Area Reinforcment (Luas Tulangan Yang digunakan)
As = p / 4 * D2 * b / s = 4468,04 mm
2
Reinforcment Losses (Tulangan Susut)
Ratio Minimum Reinforcment Losses (Rasio Tulangan Minimum) rsmin = 0,0014
Area Reinforcment Losses Direction X Asx = rsmin* d * Bx = 2310,000 mm2
Area Reinforcment Losses Direction Y Asy = rsmin* d * By = 2282,000 mm2
Diameter Reinforcmen (Diameter Tulangan) 12 mm
Distence Reinforcment Losses Min X sx = p / 4 * 2 * By / Asx = 98 mm
Distence Reinforcment Losses Direction X sx,max = 200 mm
Use Distence Reinforcment Losses Direction X sx = 98 mm
Distence Reinforcment Losses Min Y sy = p / 4 * 2 * Bx / Asy = 99 mm
Distence Reinforcment Losses Direction Y sy,max = 200 mm
Use Distence Reinforcment Losses Direction Y sy = 99 mm
Use Reinforcment Losses X 12 - 90
Use Reinforcment Losses Y 12 - 90
Kontruksi Gedung
[c] 2016 Ristanto 11 Kapsitas Struktur Pondasi Telapak II
Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE 2016
Date
Time
-
Foundation ID :
CODE DESIGN :
Job Title Masjid Nurul Hasannah
Job Number
Engginer 09/06/2016
Approved Job Code
Address Project Manado Revision
Description Project REVIEW ANALYSIS STRUCTURE
GENERAL DATA
TP 2
SNI 2847:2013
Kontruksi Gedung
[c] 2016 Ristanto 1 Kapsitas Struktur Pondasi Telapak II
Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE 2016
Soil Data (Data Tanah)
Depth Of Foundations (Kedalaman Pondasi) Df = 2,00 m
Heavy Volume Land (Berat Volume Tanah) g = 17,60 kN/m3
In the Corner Swipe (Sudut Gesek Dalam) f = 22,00
Cohesion (Kohesi) c = 0,30 kPa
Prisoners Konus Average (Tahanan Konus Rerata) qc = 34,00 kg/cm2
Dimensions Fondations (Dimensi Pondasi)
Width Fondations Directions X (Lebar Pondasi Arah X) Bx = 1,20 m
Width Fondations Directions Y (Lebar Pondasi Arah Y) By = 1,20 m
Thick Foundation (Ketebalan Pondasi) h = 0,70 m
Width Column Directions X (Lebar Kolom Arah X) bx = 0,30 m
Width Column Directions Y (Lebar Kolom Arah Y) by = 0,30 m
Position Column (Posisi Kolom) as =
Contruction Materials (Bahan Kontruksi)
Kuat tekan beton, fc' = 25,0 MPa
Kuat leleh ba