DCS 6.03.2007 T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week 5.04.07 T.Karavicheva and the T0 team T0 DCS Answers to.
Post on 02-Jan-2016
225 Views
Preview:
Transcript
DCS 6.03.2007
T0 DCST0 DCS
Answers to DCS Commissioning and Answers to DCS Commissioning and Installation related questionsInstallation related questions
ALICE week 5.04.07ALICE week 5.04.07T.Karavicheva and the T0 teamT.Karavicheva and the T0 team
KEY dates– Commissioning on surface: “C” part of the
detector is at CERN and was checked last October. The “A” part will arrive to the lab at CERN from Finland mid March
– Detector installation in UX: 30 March – 4 April for “C” part. No access till August, when the “A” part goes down (planned 28-29 Aug).
– Accessible for DCS: for tests in June, fully in August
(DCS Commissioning 6-02-07)
T0-C is at CERN T0-C is at CERN ready for installationready for installation
T0-CT0-C
T0-AT0-A
T0-A T0-A arrived at CERNarrived at CERN
yesterdayyesterday
SUB-SYSTEMS TO COMPLETE– HV/LV
PVSS: Implemented in PVSS 3.1 and tested with final hardware. Already ported to 3.6, to be tested with the hardware. Action: Tatiana with her student
FSM: Follows HMP and V0 design. Waiting for HW from repair. Target date: end February. Action: Tatiana.
HW:– mainframe: delivered one week ago, but was broken (no
boot screen). Returned to pool, no estimate for the repair time yet. Tatiana will check the status
(DCS Commissioning 6-02-07)
Status [HV/LV]Hardware:SY1527 mainframe – in Lyon 3 x A1733N Power Supply Units –was tested byElectronics pool . A1733N are in T0 lab being tested -2 x A1533 LV Power Supply Unit, 6x10V/2.7A wasreceived at CERN some days ago
Software:1. Use PVSS 3.6t00_dcs project updated to 3.6Framework 3.0.0FSM updated to 3.6ALICE UI 3.0*
•2. Upgrading software version From PVSS V3.1 to PVSS V3.6 doneat home Institutes, not yet tested withfinal hardware.3.Will be tested during the March
*) Start testing 05.03.2007
(DCS Commissioning 6-02-07)
– FEE fast
• PVSS: DIM server connected to PVSS was used for tests in October. DIM server will be upgraded in February; final PVSS implementation depends on delivery of electronics (7 different types of modules) but will be ready before installation. Action: Tatiana and her student.
• Not yet done( Electronics production not yet completed)
Status [Fast electronics]Delivered at CERN:
-A2818,V2718
Orded:
2 NIM crates with power supplies (PS) PS: Wiener Power supply UEP22 (300W), ( +/-5V / 17A, +/-12V / 3.4A, +/-24V / 3.4A). - Crate: Wiener 5U NIM crate Crate UEN03 12 slot card cage.
2 VME crate PS: Wiener 0P17.0711 Power-Supply 7237 6U (+5V/100A, +/-12V/10A). –
Crate: Wiener 0B06.3B5J1: Card-Cage 7219 VME64x BIN, Local PSU, 21x6U, RP0 access, Mag tolerant.
The crates with PS are expected to be delivered to CERN in March/April 2007. Modules: Electronics production not yet completed
Ordered: 2 CAEN LED 895B
(DCS Commissioning 6-02-07)
– FEE readout
• PVSS: not implemented. DIM server required to control DRM via A2818 or Ethernet – the software will be copied from TOF (Pietro Antonioli & Ombretta Pinazza), more details beginning of March. Action: Tatiana
• FSM: not implemented – target end March – action Tatiana
• HW• CPDM/TRM: modules received from TOF last October, partial
setup exists. Final modules to be delivered in March
Status [Readout electronics]Delivered at CERN:
2 TRMs, 1 CPDM , A2818 card,T0 Alice box
-DRM (prototype delivered at CERN last weekend) was tested in Bologna
DRM final version –end of April
Ordered : A3486, A1676,A3000(filter)
Software for DCS will be provided by TOF group :1.PVSS project to control ALICE BOX 2. PVSS project to control DRM
CO
NT
RO
LLO
GIC
V+
V-
S+S-
V+
V-
S+S-
V+
V-
S+S-
DC-DC
DC-DC
DC-DC
CO
NT
RO
LLO
GIC
V+
V-
S+S-
V+
V-
S+S-
V+
V-
S+
S-
DC-DC
DC-DC
DC-DC
HOSTILE AREA
SY
1527
SY
ST
EM
MA
INF
RA
ME
CONTROL ROOM
SY1527
EASY Module
EASY Module
48VPOWERSOURCE
48VSERVICEPOWERSOURCE
BR
AN
CH
CO
NT
RO
LL
ER
- A
16
76
INTERRUPTPOWER FAILURE
Control BusP
ow
er L
ine
P.
Ser
vice
Lin
e
48VBACKUPBATTERY
Cabling for CAEN Easy
• 48V service power
• To power control part of the Easy crates/modules
• Propose to add small power supply in same rack as branch controller
• We will take care of PS and cabling
(From Andre Augustinus)
Taken care of by DCS
In UX racks
In CR racks
Status [Laser Calibration]Laser Attenuator
Ethernet-RS232 interface (Digi One)
Hardware: ready for installationSoftware:1. Standard: PVSS 3.6 + FSM
PVSS exists, tested with hardware
FSM: 1st version exists, but might be modified, depending on the calibration procedure(calibration procedure not yet fixed)
CFD Control (CANBERRA 454)
ELMB&DAC for CFD.
The versions tested in CERN: PVSS: 3.1 (3.1 with all patches) OPC server for ELMB: 2.9.1 (now avaible 2.9.1 - requires .net Framework 2.0) JCOP Framework: 2.3.6 (with installation tool - now avaible: 2.3.8 for PVSS 3.1 and 3.0 for PVSS 3.6). ELMB Framework 3.3.1 (now avaible: 3.3.3) I will try to update this to newest versions (including PVSS 3.6).
Crate control
-L.Wallet will provide tools for VME crate
Control.
-NIM crate control (the same solution as for
CFD)
-readout VME crate (TOF solution)
[ T0 FSM Hierarchy ]T0_DCS
T0_C
FE
LaserCalibration
HV LV
OR
Delays
CFDs
Read-outCrateControl
L0 inputgenerator
Attenuator
TUT0
MPD
TVDC TRM
DRM
NIM Crate
1-12
PMT
1-2
Showbox
T0_A
Scalers VME Crate
Read-outcrate
Dev
ice
Inte
llect
ual C
ontr
ol
LEDs
T0 DCS state diagram
DOWNOADING
OFF
STBY_CONFIGURED
STANDBY
READY LOCKED
READY
MOVING_READY
MOVING_STBY_CONF
BEAM_TUNING
MOVING_BEAM_TUN
MOVING_BEAM_TUN
CALIBRATING
DOWNLOADING
DOWNLOADING
GO_STANDBYCONFIGURE (run_mode)CALIBRATE (calib_mode) GO_BEAM_TUNGO_READY
CONFIGURE (run_mode)CALIBRATE (calib_mode)GO_STBY_CONFGO_READY
GO_STBY_CONFGO_BEAM_TUNCALIBRATE (calib_mode)CONFIGURE (run_mode)LOCK
GO_OFFCONFIGURE (run_mode)
GO_STANDBY
UNLOCK
STOP
INTEGRATION WITH OTHER ONLINE SYSTEMS
• Test in lab with part of DCS, DAQ, TRG will start in March