We showcased the CT-3000 on one of Warsaw's main streets for the local road authorities (ZDM) one year ago today. They were impressed with the speed and looked forward to seeing the curb one year later after going through a Warsaw winter before fully accepting extrusion curbing on city projects. We have been periodically checking the curb and it's been holding up fine. We look forward to discussing future possibilities with ZDM and will post another slideshow with more photos as soon as possible.

Transcript

Curb-Tec Europe Sp.j.Demonstration for Warsaw City Authorities (ZDM)

Showing the local road authority, in May of 2010, both the Curb-Tec, Inc. manufactured CT-3000 small extrusion curbing machine as well as the pour-in-place method in order to get it accepted.

Location: Warsaw, Poland, Pulawska St. (Morskie Oko Park)

Length: 50 metersMachine Time: 30 minutes

Finishing Time: 60 minutes (1 finisher)

For more information, please contact us at: info@curb-tec.pl or +48 22 266 0628

CCurb-Tec Europe is a distributor of Curb-Tec, Inc. extrusion curb machines. Curb-Tec’s CT-3000 is widely considered the best in its class.

CCurb-Tec, Inc. was established in 1999 in Florida, USA, and since then has served happy and satisfied customers in 16 countries from six continents. Curb-Tec manufactured products are the result of high-level engineering knowledge gained from experience doing work for the world’s premier hydraulic engineering company, Rexroth, and the U.S. Defense Department. This engineering experience is combined with four decades of jobsite experience in curbing.

CCurb-Tec machines are designed to solve the most common problems, minimize downtime and deliver the best final product.

Pulawska Street has many places needing new curbing… we are choosing the exact site location to do the 50 meter demo.

1

2

Looking at slightly different variations of concrete mixture at Lafarge. Plane delays due to volcano ash caused us to not receive CT-3000 from the US when originally planned… but we wanted to take advantage of as much time as possible therefore we first tested concrete mixture with its little brother, the smaller CT-900.

3

Working with Lafarge after receiving our CT-3000 to find the best concrete mixture that meets inspection standards and has good balance between stiffness and workability. We were working to get a 3 cm slump when the mixing truck arrives at the demo site.

4

Small excavator plus two men took approximately three hours to prepare site for 50 meters of extruded curbing.

5

Setting out the chalk line, and getting the CT-3000 and concrete mixing properly placed prior to the demo starting.

6

Unfortunately, we ran into some technical problems and decided the mixture was a little too dry to continue that day. We felt that it could have easily been used and would have only increased finishing time slightly but that it wasn’t worth it for the purpose of demonstrating to someone who could reschedule the following weekend without much inconvenience.

7

We believe how a company handles difficult situations is the true mark of a great company and we were highly impressed working with Lafarge Concrete in the interval to make a good mixture perfect. Their professional cooperation played a large role in ultimately swaying ZDM that our methods are beneficial in being more time-efficient and cutting costs.

8

Entire hand-finishing, edging and saw-cutting control joints every 2 meters (24 hours later) took one person no more than one hour. Control joints can also be done while concrete is still wet.

9

We noticed when checking a week later that despite not being fully cured until after 28 days, the curb took a few hits by cars and showed no signs of problems.

The work is there… the funding isn’t always though.

Utilizing a CT-3000 is 5X – 10X faster than using prefabricated blocks and reduces jobsite injuries.

Bids are too high to win those contracts? If you are looking for solutions to cut costs… not by taking shortcuts… but by doing your curbing and road-building in a much more efficient way so you can win the contracts… and

better still ensure you stay under budget… contact us and arrange a demo… WE WILL CURB YOUR COSTS!!! For more information, please contact us at: info@curb-tec.pl or +48 22 266 0628