CSSE 37227.October.2008

Adaptive Project FrameworkChapters 13 & 14

OutlineAPF overviewVersion scope

4Quad – Again

APF = Adaptive

APF overview

Tomorrow’s topics

APF core valuesClient-FocusedClient-DrivenIncremental Results Early and OftenContinuous Questioning and IntrospectionChange is Progress to a Better SolutionDon’t Speculate on the Future

Case study – Pizza Delivered Quickly (PDQ)4 Pizza storesNeed to speed-up home deliveryOwner is building “factories”Need software to:

Identify good factory locationsOperate those

Mission-criticalUnbaked & prebaked

Image from http://www.wisebread.com/fast-and-easy-pizza-dough-and-sauce.

Defining version scopeDeveloping the COS

POSFixed version budget and timebox

Planning the version scopeDevelop mid-level WBSPrioritizing version functionality

Prioritizing the scope triangle

Planning cont.Number of cycles and timeboxesFunctionality to cyclesObjective statement

Questions?