CSS Georgia Ordnance

Post on 24-Feb-2016

38 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

CSS Georgia Ordnance . 1863 Inventory of Guns 1 EA - 6 Pounder 3 EA – 8-Inch Shell Guns 2 EA – 9-Inch Shell Guns 1 EA – 24-Pounder 4 EA – 32-Pounder Rifles 1986 Dive Operations – Recovered Items 1 EA – 24-Pounder 1EA – 32 Pounder Rifle - PowerPoint PPT Presentation

Transcript

BUILDING STRONG®

CSS Georgia Ordnance

1

1863 Inventory of Guns

1 EA - 6 Pounder

3 EA – 8-Inch Shell Guns

2 EA – 9-Inch Shell Guns

1 EA – 24-Pounder

4 EA – 32-Pounder Rifles

1986 Dive Operations – Recovered Items

1 EA – 24-Pounder

1EA – 32 Pounder Rifle

Assorted Brooke Projectiles, Percussion Fuses and Spherical Shot

Known Remaining Guns in the Debris Field

2 EA – 32 Pounder Rifles

1 EA – No. 1 Cannon (On Inventory Listed as an 8-Inch Shell Gun)

BUILDING STRONG®2

CSS Georgia Curation

BUILDING STRONG®

CSS Georgia Curation

3

BUILDING STRONG®4

New Savannah Bluff

Lock & Dam Fish Passage

Savannah

Harbor

150 Miles

Augusta, GA

Work performed by

BUILDING STRONG®5

McCoys Cut Diversion Structure

Flow

Re-Routing

Work performed by

BUILDING STRONG®6

Raw Water Storage Impoundment

Work performed by

BUILDING STRONG®7

Raw Water Storage Impoundment

BUILDING STRONG®

Storage Impoundment Concept

8

BUILDING STRONG®9

SHEP Construction Timeline

BUILDING STRONG®

Selected Plan (47-foot alternative) is well justified• Benefit to Cost Ratio of 5.5 to 1• Project First Cost $652 M at FY 12 levels yields $174 M in total annual benefits• Annual O&M costs increase from $22 M to $27 M• Environmental impacts would be mitigated to an acceptable level

Developed a comprehensive mitigation plan ($311M or 47% of project cost)

Includes extensive monitoring and adaptive management

SHEP supports the Administration’s priorities of being protective of the environment, improving infrastructure, creating jobs, and maintaining global competitiveness

ASA(CW) signed ROD on 26 October 2012

Need Congress to adjust 902 limit and signed PPA before construction can begin

Designs for first features underway

10

Summary

BUILDING STRONG®11

Questions?