· CPP of the Cement Plant by replacing the water cooled condensers with the air cooled condensers. Water requirement is 44S()m3/day of which 1300m3/day for the proposed 2x150 MW
Post on 30-May-2020
7 Views
Preview:
Transcript
top related
Post on 30-May-2020
7 Views
Preview:
Transcript
top related