Concept Design Presentation LCCA Meeting, February 12 2014 · Concept Design Presentation LCCA Meeting, February 12 2014 JOINT VENTURE / DN Maint. 1 Science Center 1 S.E. / Aut. 2
Post on 28-May-2020
2 Views
Preview:
Transcript
JOINT VENTURE
/Garrison Elementary School Phase 1 Modernization
Concept Design Presentation LCCA Meeting, February 12 2014
Garrison Elementary School Phase 1 ModernizationConcept Design Presentation LCCA Meeting, February 12 2014
JOINT VENTURE
/
Garrison HistoryNeighborhood School Since 1889
Garrison Elementary SCHOOLYARD IMPROVEMENT PROJECTCONCEPTUAL DESIGN PRESENTATION - JUNE 12 2012 8
1888
1903
1911
1921
1951
1964
1965
1857
1928
Visioning process
Garrison Elementary SCHOOLYARD IMPROVEMENT PROJECTCONCEPTUAL DESIGN PRESENTATION - JUNE 12 2012 9
2012Visioning process
Garrison Elementary School Phase 1 ModernizationConcept Design Presentation LCCA Meeting, February 12 2014
JOINT VENTURE
/
Site Concept Community Visioning 2012 Participatory ProcessEngagement with 100+ community members
•Relationship with nature is a key to learning •Garrison’s schoolyard = neighborhood park•The school can become a community resource
Garrison Elementary School Phase 1 ModernizationConcept Design Presentation LCCA Meeting, February 12 2014
JOINT VENTURE
/
SERVICE & ACCESS
VISIBILITY & SIGHTLINES SITE CIRCULATION
ENVIRONMENTAL INPUTS
Planning Principles
Garrison Elementary School Phase 1 ModernizationConcept Design Presentation LCCA Meeting, February 12 2014
JOINT VENTURE
/
Garrison Elementary SCHOOLYARD IMPROVEMENT PROJECTCONCEPTUAL DESIGN PRESENTATION - JUNE 12 2012 16
PROGRAM NEIGHBORHOOD PARK
NEIGHBORHOOD PARKS
Garrison Elementary SCHOOLYARD IMPROVEMENT PROJECTCONCEPTUAL DESIGN PRESENTATION - JUNE 12 2012 20
PROGRAM OASIS / OUTDOOR CLASSROOM
OASIS / OUTDOOR CLASSROOM
Garrison Elementary SCHOOLYARD IMPROVEMENT PROJECTCONCEPTUAL DESIGN PRESENTATION - JUNE 12 2012 21
PROGRAM PERFORMANCE SPACE
STODDERT SCHOOLPERFORMANCE SPACE
Precedents
Garrison Elementary School Phase 1 ModernizationConcept Design Presentation LCCA Meeting, February 12 2014
JOINT VENTURE
/ Garrison Elementary SCHOOLYARD IMPROVEMENT PROJECTCONCEPTUAL DESIGN PRESENTATION - JUNE 12 2012 17
PROGRAM PORTALS
PORTALS
Garrison Elementary SCHOOLYARD IMPROVEMENT PROJECTCONCEPTUAL DESIGN PRESENTATION - JUNE 12 2012 18
PROGRAM PLAYGROUNDS
PLAYGROUNDS
Garrison Elementary SCHOOLYARD IMPROVEMENT PROJECTCONCEPTUAL DESIGN PRESENTATION - JUNE 12 2012 19
PRECEDENTS SPRINKLER PLAZA
SPRINKLER PLAZA
Garrison Elementary SCHOOLYARD IMPROVEMENT PROJECTCONCEPTUAL DESIGN PRESENTATION - JUNE 12 2012 22
PROGRAM COMMUNITY SQUARE
MOUNT PLEASANT
DUPONT CIRCLE
COMMUNITY SQUARE
Garrison Elementary SCHOOLYARD IMPROVEMENT PROJECTCONCEPTUAL DESIGN PRESENTATION - JUNE 12 2012 23
PROGRAM ENVIRONMENTAL CLASSROOM
STODDERT SCHOOLENVIRONMENTAL CLASSROOM
Garrison Elementary School Phase 1 ModernizationConcept Design Presentation LCCA Meeting, February 12 2014
JOINT VENTURE
/
Site Concept
Garrison Elementary School Phase 1 ModernizationConcept Design Presentation LCCA Meeting, February 12 2014
JOINT VENTURE
/
- 40 SPACES PROVIDED
N
Garrison Elementary School Phase 1 ModernizationConcept Design Presentation LCCA Meeting, February 12 2014
JOINT VENTURE
/
Garrison Elementary School Phase 1 ModernizationConcept Design Presentation LCCA Meeting, February 12 2014
JOINT VENTURE
/
OASIS, PLAY AREAS AND GARDENS
Garrison Elementary School Phase 1 ModernizationConcept Design Presentation LCCA Meeting, February 12 2014
JOINT VENTURE
/
OASIS / OUTDOOR CLASSROOM AND PLAY AREA BEYOND
Garrison Elementary School Phase 1 ModernizationConcept Design Presentation LCCA Meeting, February 12 2014
JOINT VENTURE
/
13TH STREET VIEW - ENTRY PAVILION
Garrison Elementary School Phase 1 ModernizationConcept Design Presentation LCCA Meeting, February 12 2014
JOINT VENTURE
/
VERMONT AVENUE ENTRY PAVILION
Garrison Elementary School Phase 1 ModernizationConcept Design Presentation LCCA Meeting, February 12 2014
JOINT VENTURE
/
R STREET ENTRY PAVILION AND PERFORMANCE SPACE
Garrison Elementary School Phase 1 ModernizationConcept Design Presentation LCCA Meeting, February 12 2014
JOINT VENTURE
/
Phased Modernization
Garrison Elementary School Phase 1 ModernizationConcept Design Presentation LCCA Meeting, February 12 2014
JOINT VENTURE
/
ALLPURPOSE
ROOMSTAIR
CUSTODIALOFFICE
COUNSELOR
COPY
GENERALSTORAGE
STAIR
KITCHEN
MAIN LOBBY
CUST.SUPPLY
BOILERROOM
GENERALSTORAGE
STORAGE
CLASSROOMCLASSROOM
TESTING
OFFICE OFBILINGUAL
EDUACATION
O.B.E.OFFICE
O.B.E. KINDERGARTEN KINDERGARTEN K-2 AUTISM
BOYS
GIRLSTEACHER'SLOUNGE
OFFICE PRINCIPAL
HEALTH SUPPLY &BOOK ROOM
PS/PKCLASSROOM BOYS
GIRLS
OCCUPATIONALTHERAPY
STAIR
PS/PKCLASSROOM
PS/PKAUTISM
CLASSROOMKINDERGARTENKINDERGARTENPARENTCENTER
CORRIDOR
CORRIDOR
INSTRUCTIONALCOACH &LITERACY
CONSULTANT
CLASSROOMTHIRDGRADE
THIRDGRADE
3-5 AUTISMCLASSROOM FIRST GRADE
MUSIC ESPAÑOL CLASSROOM FIRST GRADE
BOYS
GIRLS
STAIR
STAIR
OFFICE OFBILINGUAL
EDUCATION
EMBASSYADOPTIONPROGRAM
SPECIALEDUCATION
OFFICE OFBILINGUAL
EDUCATION
O.B.E.COMPUTER
LAB BOYS
GIRLS
SPECIALEDUCATION
OFFICE STAIR
CORRIDOR
CUST.STORAGE
LOUNGECLASSROOMFIFTH GRADECLASSROOM
POWERLUNCH
PROGRAMLIBRARY LABLIBRARY
STAIR
CORRIDOR
EXISTING SECOND FLOOR PLAN
EXISTING FIRST FLOOR PLAN
EXPA
NSI
ON
JOIN
T
SEW
ER T
UN
NEL
EXPA
NSI
ON
JOIN
TEX
PAN
SIO
N JO
INT
EXPA
NSI
ON
JOIN
T
MAIN FLOOR LEVEL = 0
WEST WING FIRST FLOOR LEVEL = + 24”
EAST WING FIRST FLOOR LEVEL = - 24”
WEST WING SECOND FLOOR LEVEL
EAST WING SECOND FLOOR LEVEL = - 24”
N
Garrison Elementary School Phase 1 ModernizationConcept Design Presentation LCCA Meeting, February 12 2014
JOINT VENTURE
/
Garrison Elementary School Phase 1 ModernizationConcept Design Presentation LCCA Meeting, February 12 2014
JOINT VENTURE
/
DNMaint. 1Science
Center 1
Comp. Lab22S.E. / Aut.
Media Center
G Staff Multi PurposeRoom
Stage Kitchen
Admin.
E.C.S.E. / Aut.
E.C.Special NeedsHealth
E.C.Special Needs
Pre-K GLaundry
Work Room
Instr. Coach
Work RoomWelcomeGallery
B
B
4 4 5 5 G ResourceRoom
33 Music
OT/ PTPre-K Pre-K Pre-K
WorkRoom
BPre-KKK
ArtS.E. / Aut.
Speech
B
G
FIRST FLOOR
SECOND FLOOR
GRADE 1 - 5 ACADEMIC COREEAST WING FLOORS 1 AND 2
GRADE 1 - 5 ACADEMIC COREEAST WING FLOORS 1 AND 2
ENTRANCEWELCOME
ADMINMULTI-PURPOSEMEDIA CENTER
CLUSTER
EARLY CHILDHOOD ACADEMIC COREWEST WING FLOORS 1 AND 2
EARLY CHILDHOOD ACADEMIC COREWEST WING FLOORS 1 AND 2
N
Garrison Elementary School Phase 1 ModernizationConcept Design Presentation LCCA Meeting, February 12 2014
JOINT VENTURE
/
AERIAL SITE VIEW
Garrison Elementary School Phase 1 ModernizationConcept Design Presentation LCCA Meeting, February 12 2014
JOINT VENTURE
/
OPTION A: APPROACHING THE MAIN ENTRANCE FROM 13TH STREET
Garrison Elementary School Phase 1 ModernizationConcept Design Presentation LCCA Meeting, February 12 2014
JOINT VENTURE
/
OPTION B: APPROACHING THE MAIN ENTRANCE FROM 13TH STREET
Garrison Elementary School Phase 1 ModernizationConcept Design Presentation LCCA Meeting, February 12 2014
JOINT VENTURE
/
OPTION A: APPROACHING THE MAIN ENTRANCE FROM 12TH STREET
Garrison Elementary School Phase 1 ModernizationConcept Design Presentation LCCA Meeting, February 12 2014
JOINT VENTURE
/OPTION B: APPROACHING THE MAIN ENTRANCE FROM 12TH STREET
Garrison Elementary School Phase 1 ModernizationConcept Design Presentation LCCA Meeting, February 12 2014
JOINT VENTURE
/
SECTION THROUGH WEST WING @ TYPICAL CLASSROOMS
SECTION THROUGH EAST WING @ MEDIA CENTER
NEW SUNSHADES / LIGHTSHELVES
NEW PV ARRAY
EXPOSED CONCRETE STRUCTURE AT CLASSROOM EXTERIOR WALLS
NEW WINDOWS, TYP.
NEW SUNSHADES / LIGHTSHELVES
NEW PV ARRAY
EXPOSED CONCRETE STRUCTURE AT CLASSROOM EXTERIOR WALLS
MEDIA CENTER BUMP-OUT ADDITION
FIRST FLOOR INFILL STRUCTURE AT EXISTING BOILER ROOM
Garrison Elementary School Phase 1 ModernizationConcept Design Presentation LCCA Meeting, February 12 2014
JOINT VENTURE
/
SECTION THROUGH CENTRAL WING @ MULTI-PURPOSE ROOM AND NEW SECOND STORY LINK
NEW SUNSHADESNEW SECOND STORY LINK
Garrison Elementary School Phase 1 ModernizationConcept Design Presentation LCCA Meeting, February 12 2014
JOINT VENTURE
/
AERIAL SITE VIEW
1228 9th Street, NW, Washington, DC 20001 202 548 7570
www.bellarchitects.comwww.newmanarchitects.com
JOINT VENTURE
/
Civil EngineerWiles Mensch Corporation - DC739 8th Street, SE, 2nd Floor, Washington, DC 20003
Landscape ArchitectLandscape Architecture Bureau, LLC 714 7th Street SE, Washington, DC 20003
Structural EngineerRobert Silman Associates 1053 31st Street NW, Washington, DC 20007
Mechanical, Electrical, Plumbing and Fire Protection Engineer Global Engineering Solutions of Washington DC 1410 Q Street NW, Suite 100, Washington, DC 20009
IT, Security and Audiovisual ConsultantEducational Systems Planning 49 Old Solomon’s Island Road, Suite 301, Annapolis, MD 21401
Foodservice ConsultantNyikos Associates, Inc.18219-A Flower Hill Way, Gaithersburg, MD 20879
Acoustical ConsultantPolysonics405 Belle Air Lane, Warrenton, VA 20186
Environmental Consulting ECS Capitol Services, PLLC655 15th Street, NW, Washington, DC 20005
Cost Estimating TCT Cost Consultants, LLC1090 Vermont Avenue NW, 4th Floor, Suite 230, Washington, DC 20005
Sustainability Consulting GreenShape, LLC1001 Connecticut Avenue NW , Suite 725, Washington, DC 20036
top related