· commissioning of 33/11kV or 66/1 IkV substation, Distribution transformer Substation etc. as well as infrastructure created during electrification of villages/habitations. The
Post on 30-Apr-2020
36 Views
Preview:
Transcript
top related
Post on 30-Apr-2020
36 Views
Preview:
Transcript
top related