Stations: Balancing HSR and Community

Fewer stations means retaining higher speeds; better travel times; stronger ridership

Accommodate regional travel Interface with local transit/transportation

HSR Station Parameters

2

9 Stations from Fort Collins to Pueblo including the Denver Metro area:

Fort Collins North Suburban DIA/Union Station South Suburban West Suburban Monument Colorado Springs (2) Pueblo

Front Range Stations

3

Mountain Stations -6 Stations: Idaho Springs, Silverthorne, Breckenridge, Vail, Beaver Creek, Eagle County Airport

4

15 system stations

15 acres of new development per station; Developable square footage 9 million Potential value over $2 billion Likely funding element of implementation

Benefits?

5

Functionality of the system Potential for development regionally Potential economic return statewide

Station Siting important to..

6

7

Where do we site these stations?

9

San Jose Diridon Station –

Today

San Jose Diridon Station –

Future

10

Public Personal Rapid Transit Consortium

SkyTran

Swift Tram, Inc

Technology Choice

Common Elements

11

◦ Platform◦ Parking

◦ Traffic circulation◦ Transit interface ◦ Passenger Drop-off

◦ Bicycle and PedestrianStation example California HSR

12

Typical Station

13

Platform Requirements

14

Parking Lot or Structure

15

Roadway infrastructure

16

Transit Connection

17

Development and Structured Parking options

1. Optimize Location for access/ridership2. Minimize Sprawl – Promote Infill

◦ Limit demand on resources◦ Leverage current investments

3. Maximize Connectivity ◦ Increase bicycle, pedestrian, transit◦ Consider first mile/last mile connections◦ Minimize parking footprint

18

Community Considerations

Anticipated level of ridership activity at station and operability needs

Origin or Destination? Collector or Distributor station

Role of parking vs. transit at the station

Potential for development surrounding site

Station acreage varies and depends on:

19

Concept Stations

20

station concept – 10 acre

21

22

6-8 acres

2-3 acres

4 acres

23

4 Story Structure - 150 spaces/deck acre 600 spaces

transit interface & passenger drop-off

24

pedestrian plaza

25

station concept – 20+ acres

26

27

10-12 acres

28

6 Story Structure - 150 spaces/deck acre 2 acres - 1500 spaces

transit interface – separate from passenger drop-off

29

30

Transit Distribution from Silverthorne Station

31

32

33

34

35

36

80’ envelope, 600-1000’ platform, 15 acre

site

37

Idaho Springs

Urban Design and Context

38

Are cities willing to implement policies, station area plans and eventual rezoning to achieve

higher density residential and commercial development? Light freight?

Historic relevance

Community character

Compatible with surrounding land use? Compatible with regional plans?