Reykjavik 22-23rd of June 2009 - COBECOS 1
COBECOS SIXTH FRAMEWORK PROGRAMME
PRIORITY 8.1
Costs and Benefits of control strategies
Final consortium meeting
Reykjavik, 22-23rd of June 2009
Reykjavik 22-23rd of June 2009 - COBECOS 2
Aims and expectations of the final meeting
WP 8 finalised (minus one case study)
Conclusions and recommendations
• Start of WP 9
• Agreement on lessons learned and recommendations
• Guidelines for WP-9 and agreements for the outline of the final report
Reykjavik 22-23rd of June 2009 - COBECOS 3
Progress the last 6 months (as agreed in Brussels)
Reykjavik 22-23rd of June 2009 - COBECOS 4
COBECOS progress month 29 - overall picture WP WP name Responsible
partnerDeliverable Deadlin
e for delivery (excluding 45 days)
Month of delivery
Status
WP 10 Project coordination JRC, IoES Web-site 0 0 Finalised on time
WP 1 Literature review NHH Report 3 3 Finalised on time
WP 2 Data Collection CEDEM Report 12 12 Finalised on time
WP 10 Project coordination JRC, IoES Interim activity Report
12 12 Finalised on time
WP 4 Data harmonization JRC Database 12 8 Finalised on time
WP 3 Theoretical modeling IoES Report 18 8, 9 Finalised on time
WP10 Project coordination JRC, IoES Periodic activity report
18 18 Finalised on time
WP10 Project coordination JRC, IoES Periodic management report
18 18 Finalised on time
WP10 Project coordination JRC, IoES Newsletter 18 18 Finalised on time
WP 5 Estimation of theoretical estimations
AZTI Report: (18)24 22 Finalised on time
WP 6 Software development CEFAS Soft ware packagei) design phaseii)implementation phaseiii) maintenance phase
i - 6 ii - 24iii - 30
i)6 - i and ii finalised- User friendly interface available (alpha version)
WP 7 Calibrating and testing
IC Report (21) 24 Draft final report available excluding NHH
WP 8 Simulations IREPA Report
27 Draft final report available excluding NHH
WP 9 Conclusions JRC Final activity reportFinal periodic reportExecutive summary
30 Work in progress
Reykjavik 22-23rd of June 2009 - COBECOS 5
Various activities
Past
Publication in Marine policy - Lone and Frank
CFCA meeting on the application of COBECOS for CBA of Joint Deployment Plans (JDP’s) – Ragnar and Jenny
Future
Presentations at EAFE Malta (6-8 July)- Bertrand and Jenny
Presentation at CFCA for EC and member states (8-10 July)- Raul
Presentation of results to authorities and industry (prel. Sep)– Ragnar and Jenny
Reykjavik 22-23rd of June 2009 - COBECOS 6
Thank you!
Reykjavik 22-23rd of June 2009 - COBECOS 7
Final reports
ACTIVITY • Final activity report
• Final periodic report• A final plan for using and disseminating the knowledge (no input required from partners)
FINANCIAL• Final management report
• Final report on the distribution of the Community contribution
QUESTIONNAIRES (same as for the mid-term delivery):
• A final science and society reporting questionnaire
• A final reporting questionnaire on workforce statistics
• A final socio economic reporting questionnaire
Reykjavik 22-23rd of June 2009 - COBECOS 8
Final deliverables – Periodic report
• Follows the structure of the mid term periodic report
• Includes all work from month 18 and onwards.
Input from the work package leaders from the WP’s active after month 18 (WP 6,7,8 and 9, (1-2 pages):
– Work package objectives
– Progress towards objectives
– Deviation from work programme
– List of deliverables
– Lists of milestones
• Main achievements in the period:– Calibration
– Simulations
Input from the work package leaders of WP 7,8– Summary of the results (max 4 pages)
Reykjavik 22-23rd of June 2009 - COBECOS 9
Final reports – Financial (IoES responsible)
Final management report • Consolidation of all the costs of the contractors .
• Same format as for the Periodic management report.
Final report on the distribution of the Community contribution
• Within 60 days of the receipt of the final payment by the EC a final report on the distribution of the Communitys contribution reporting on the final cumulative distribution of funds made to each contractor
• Same format as for the Periodic management report.
Reykjavik 22-23rd of June 2009 - COBECOS 10
Final deliverables – Publishable final activity report
• The main report for disseminating the results
• Extraction from the guidelines (description):– Resembles an expanded version of the Publishable Executive Summary of the mid term Periodic Report
– Cumulates and summarises the project activities and results over the full duration
– Suitable for direct publication
– While not excluding technical language should be broadly comprehensible to a general reader
• Extraction from the guidelines (content):– Summary description of project objectives
– Contractors involved
– Work performed and end results
– Elaborating on the degree to which the objectives were reached
– Brief description of the methodologies and approaches employed and how they relate to the achievements to the state of the art.
– Explanation of the impact of the project on the industry or research sector
Reykjavik 22-23rd of June 2009 - COBECOS 11
Final deliverables – Publishable final activity report
Outline in Word
Reykjavik 22-23rd of June 2009 - COBECOS 12
Focus for the next 3 months
• Finalisation of WP 7 asap - awaiting contributions from NHH
• Finalisation of WP 8 asap - awaiting contributions from NHH
• WP 9 –by case studies contributions
• Delivery of final activity report (31st of July + 45 days, 28th of August)
• Contribution to the final progress report
• Verify to Paolo that the conclusions are ok
• JRC and IC to improve the user friendly interface. Suggestions for improvements.
• Contact Ragnar for publication in scientific journal/book volume – before August
• Synthesis paper for EAFE verified by the participants next week.
Reykjavik 22-23rd of June 2009 - COBECOS 13