ClearPath Installation Guide - Amazon Web Services Pending ® Aqua Shield ® Membrane Pre-Planning Your Installation Gather all required tool and materials prior to starting your installation.

Post on 03-May-2018

218 Views

Category:

Documents

3 Downloads

Preview:

Click to see full reader

Transcript

Patent Pending

®

Aqua Shield ® Membrane

®

®

®

Pre-Planning Your InstallationGather all required tool and materials prior to starting your installation.

Recommended Tools:Circular Saw or Reciprocating SawWet SawImpact Driver / Cordless DrillFloat³/16” V-Notched Trowel

Hack SawUtility Knife or Heavy Duty Shears

•••••

••

Hammer•Screed•

PVC Pipe CleanerPVC/ABS Cement

••

Other Materials NeededSand/Mortar MixModi�ed Thin Set

2” x 4 “ Joist Hanger2” x 4” Lumber for BlockingDrain Grate (Sold Separately Available in Several Finishes)

••

•••

Sub FloorSub �oor must meet local building code requirements and Tile Council of North America (TCNA) guidelines.

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

WWW.FINPAN.COM

Additional blocking on long edge

Avoid sloping mortar onto membrane that is adhered to the ClearPath DrainPlate.

membrane

top related