Charles M Schulz ndash Sonoma County Airport Status Report for the Board of Supervisors

February 9 2016

Summary Purpose is to outline the Airports five year needs for

development construction and staffing bull Airport BackgroundGovernanceUpdates bull Airline Industry Overview bull Airport Developments

bull Proposed Capital Improvement Projects bull Financial Analysis

bull Airline Rates and Charges bull Proposed Funding Options

bull Staffing and Aircraft Rescue and Firefighting (ARFF) Analysis

Airport Governance Board of

Supervisors

Transportation and Public Works

Charles M Schulz ndash Sonoma County Airport

Aviation Commission

bull Advisory Only bull Guides Policy

Airport Land Use Commission

bull Compatible land use planning around Airport

bull Does not govern on Airport land uses

Federal Aviation Administration

bull Grant Assurances bull Advisory Circulars bull Operating Certificate bull Master Plan bull Airport Layout Plan bull Land Use bull Navigational Aids bull Air Traffic Control bull Grants

US Department of Transportation

bull American with Disabilities Act bull Civil Rights Act bull Passenger Rights

Caltrans

bull Airport Permit bull Airport Loan Program

Transportation Security Administration (TSA)

bull Airport Security bull Badging Requirements bull Airline Security bull Threat Assessments

Airport Background The County of Sonoma purchased the land for the Airport in 1939 and

opened in 1941

The Airport was used as a US Army base from 1942 to 1946 the Airport was enlarged to include the first hangars and the second runway

The Airport encompasses approximately 1200 acres

The Airport had air service between 1947 to 2001 returning in 2007 with Horizon Air providing flights to Los Angeles and Seattle

Since 2007 Horizon AirAlaska has carried over 18 million passengers

The Board approved the Airportrsquos Master Plan in January 2012

Estimating 81000 annual flight operations (take off or landings) at STS in 2015 - airline (5) and general aviation (95) flights

There are 385 aircraft based at STS

The tenants of the Airport generate over $15 million in possessory taxes annually

4 non-profit operators (PCAM EAA CAFEacute 99rsquos) at the Airport

29 volunteer ambassadors 6 of which work alongside therapy dogs

Current Organizational Chart The Airport has 15 employees on staff

8 operations 5 administrative and 2 managers

Airport Enterprise Fund The Airport is an enterprise fund and receives no General Fund contribution

The two largest revenue generators for the Airport are bull Hangar rental income is over $14 million annually bull Parking lots generating over $1 million in fees in 2015

29 based businesses (with approximately 250 based employees) including

bull 2 full service fixed base operators bull 6 rental car agencies bull 3 flight schools bull 2 aircraft repair operations bull 4 governmental agencies (Cal Fire FAA (2 divisions) CAP) bull Air ambulance service (REACH) bull Restaurant bull 9 commercialindustrial companies (in the Airportrsquos business park) bull United Parcel Service (UPS) air freight operations

The Airport has received almost $587 million in federal grant funding since 2008 and another $11 million in pending grants

Airport Enterprise Fund FY 15-16 Revenues and Expenditures

Revenues - $4949005 Expenditures - $4737120

Misc Utilities Industrial PFCs $252115 Wages amp

Benefits $1916170

40

Maintenance $1087180

County Svcs

$690745 15

Prof Svcs $551370

12

$239540 5 5

Aero Operations $2714595

Non-Aero Operations $1513560

31

Park $222100

4

$498750 10

55 23

Airport Master Plan The FAA recommends master plan updates be completed on a 10 year cycle

in order to reflect changes in FAA standards the aviation market and local regulations

The Airportrsquos Master Plan process gets FAA buy-in on Airport development and helps with funding eligibility

FAA-approved element CountyAirport input Public Input

Airfield Layout Plan Land Use and Boundaries

Airport Update

Airport Update ndash Fuel (Gallons Sold) 3000000 6000

2010 2011 2012 2013 2014 2015 000

1000

2000

3000

4000

5000

shy

500000

1000000

1500000

2000000

2500000

Gal

lons

Airport Update ndash Parking Revenues $1000000 5000

000

500

1000

1500

2000

2500

3000

3500

4000

4500

$shy

$100000

$200000

$300000

$400000

$500000

$600000

$700000

$800000

$900000

2010 2011 2012 2013 2014 2015

Actuals Projected Percentage Change

Airport Update ndash Rental Cars Revenues $6000000 4500

2010 2011 2012 2013 2014 2015

Actuals Projected Percentage Change

000

500

1000

1500

2000

2500

3000

3500

4000

$shy

$1000000

$2000000

$3000000

$4000000

$5000000

Airport Updates ndash Passenger Levels

Airport Update - HorizonAlaska Airlines

bull STS is an integral part of the Horizon AirAlaska Airlines market strategy

bull 65 of Horizon Airrsquos total capacity operates out of STS

bull STS is the 14th busiest Airport in the Horizon network (out of 45 destinations)

bull STS is the 6th largest market by available seat miles flown (Seattle Portland Boise Spokane Reno Santa Rosa)

bull Each new flight added by Horizon has quickly sold at near seat capacity

bull Other airlines have noted STSrsquos ability to absorb new seat capacity

Airline Economic Impacts of STS

bull Alaskarsquos seven daily flights represents approximately bull $161 million economic impact bull 490 jobs in the community

bull Anticipate 14 to 16 commercial flights per day by summer of 2021

bull 16 daily flights represents approximately bull $368 million economic impact bull 1120 jobs in the community

bull Every new flight generates approximately a $23 million economic impact and 70 jobs in the community

bull The average visitor to Sonoma County spends $44298 per day

Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento

Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff

Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7

with travel costs $18467 34 $22354 46 $18530 35 $23950 49

Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11

with travel costs $21679 24 $23848 31 $21789 24 $25704 36

Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13

with travel costs $19540 34 $22889 43 $20842 38 $22302 42

San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6

with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data

bull HorizonAlaska airfares are competitive with other regional airports

bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49

Current Passengers and Growth Potential

Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential

STS-LAX 85213 372030 229 63599

STS-SAN 40265 143161 281 31316

STS-SEA 39711 113852 349 17215

STS-PDX 29638 82057 361 11391

Passenger data for YE June 30 2014

Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS

Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14

Airports Used by Sonoma County and Surrounding Area Residents

Share of Passenger Bookings ndash All Airlines

Oakland Sacramento 7 5

STS 2

San jose 1

San Francisco 85

Percentage Share Of Passengers For Bay Area Airports By Airline

Other US AlaskaHorizon 3 American Airlines

6 13

International Delta Air Lines 13 8

Southwest Virgin America 5

4

United Airlines 48

Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the

domestic airline capacity

Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United

Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS

Aircraft manufacturers are shifting production away from small (under 60 seat) jets

Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels

STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels

Departing Seats STS vs Similar AirportsIndexed to CY 2008

20 170

15

10

5

0

-5

-10

-15

-20

STS 81 104

46

01

-63 -52 -37

-116 -164

-136 -170 -154 -151

-169

2008 2009 2010 2011 2012 2013 2014 2015 2016

Airport Developments

Development at STS

In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations

The Airport has four (4) signed term sheets ndash

bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)

bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations

In negotiations with Kaiser Air for a new lease to add a third hangar

Proposed improvements total over $13 million

Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year

Airfield Layout Plan

Developable Parcels

Capital Project Needs

Completed Projects

bull Remodeled existing terminal in 2010 adding 5000 square feet

bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway

bull Rehabilitated the airline parking apron

bull Expanded rental car staging areas

bull Reconfigured the current long-term parking lot to expand parking spaces

bull Reconfigured and expanded the rental car return lot to double the parking spaces

bull Installed a new rental car wash system and vehicle detail area

Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads

bull The service road portion of the project was removed from the main contract to match availability of federal funding

bull Construction is early FY16-17

bull Project was bid in August 2015 waiting for federal funding to award

bull Project estimate is $2 million

bull 9066 federally funded

Runway Safety Area ndash Phase II ndash Service Roads

Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets

current standards for either ARFF or ADA regulations

bull Location of current facility is in the way of long-term terminal expansion needs

bull A new location has not been selected conceptually studied in 2012 Airport Master Plan

bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements

bull Preliminary project estimate is $7 to $8 million

bull Federal funding (90) should be available for this project

bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA

Aircraft Rescue and Firefighting Building

New Long-term Parking Lot

bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers

bull The current long-term lot exceeded capacity 5 times in 2015

bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day

bull The proposed parking lot would add approximately 440 parking spaces

bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000

bull Staff is recommending construction as a single phase project

New long-term parking lot ndash Site location

Terminal

Proposed Terminal Enhancement Project

bull Terminal design objectives included

bull Meeting immediate and near-term needs

bull Establish a project budget for near-term improvements that is affordable for the Airport

bull Design character that signifies its role as a gateway to the region

bull Phase expansion that does not impact current operations

bull Anticipating future needs and establish a pattern of design for future expansions

bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

Existing Terminal

Terminal Renovation ndash Phases I and II

New Holdroom (Phase II) ndash East Elevation

New Holdroom (Phase II) ndash South Elevation

New Holdroom Interior Looking East

New Holdroom Interior Looking North

Flex Space ndash Conventional Construction ndash View from Airfield

Flex Space ndash Tent Option ndash View from Airfield

Existing Terminal ndash View from Airfield Side

Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

Tent option Phase I

Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

Future Expansion ndash Estimated 2025

Future Expansion ndash Estimated 2050

Financial Analysis

Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

financial operations to prepare a financial forecasting model

bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

Airline Rates amp Charges

Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

double current levels

bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

Daily Service $250 per square footper month Non-daily Service $325 per square footper month

Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

The proposed fees are anticipated to increase revenues by $250000 annually

Staff agrees with the consultantrsquos recommended airline rates and charges

Funding Options

Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

Funding Needs

bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

Staffing Analysis

Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

an assessment of staffing for current needs and forecasted Airport growth over the next five years

bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

requirements spending approximately $220000 annually to provide ARFF coverage and training

bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

bull Most airports similar to or larger than STS have contracted ARFF services

bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

Airport Operations Budget 2014

Enplanement 2014

Airport Staff

Contract Fire Fire Contract Cost

Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

Request for Feedback bull Long-term Parking

bull Airport Terminal Improvement Conceptual Plan

bull FundingFinancing Options

Future Board Items bull February 9 2016

bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

design services long-term parking lot design services and long-term parking lot construction)

bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

Charles M Schulz - Sonoma County Airport

2290 Airport Boulevard

Santa Rosa CA 95403

(707) 565-7243

wwwsono macou ntya irportorg

Follow STS on (j Facebook

Im Linkedln

~ Twitter

  • Slide Number 1
  • Summary
  • Airport Governance
  • Airport Background
  • Current Organizational Chart
  • Airport Enterprise Fund
  • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
  • Airport Master Plan
  • Airfield Layout PlanLand Useand Boundaries
  • Airport Update
  • Airport Update ndash Fuel (Gallons Sold)
  • Airport Update ndash Parking Revenues
  • Airport Update ndash Rental Cars Revenues
  • Airport Updates ndash Passenger Levels
  • Airport Update - HorizonAlaska Airlines
  • Slide Number 16
  • Fare Comparison for STS and Other Airports in the Region
  • Current Passengers and Growth Potential
  • Airline Industry Overview ndash Potential Markets
  • Airports Used by Sonoma County and Surrounding Area Residents
  • Percentage Share Of Passengers For Bay Area Airports By Airline
  • Airline Industry Overview
  • Slide Number 23
  • Airport Developments
  • Slide Number 25
  • Airfield Layout PlanDevelopable Parcels
  • Capital Project Needs
  • Slide Number 28
  • Runway Safety Area ndash Phase II ndash Service Roads
  • Runway Safety Area ndash Phase II ndash Service Roads
  • Aircraft Rescue and Firefighting Building
  • Aircraft Rescue and Firefighting Building
  • New Long-term Parking Lot
  • Slide Number 34
  • Proposed Terminal Enhancement Project
  • Existing Terminal
  • Terminal Renovation ndash Phases I and II
  • New Holdroom (Phase II) ndash South Elevation
  • New Holdroom InteriorLooking East
  • Flex Space ndash Tent Option ndash View from Airfield
  • Existing Terminal ndash View from Airfield Side
  • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
  • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
  • Future Expansion ndash Estimated 2025
  • Future Expansion ndash Estimated 2050
  • Financial Analysis
  • Slide Number 47
  • Airline Rates amp Charges
  • Slide Number 49
  • Slide Number 50
  • Funding Options
  • Current Airport Debt
  • Funding Options ndash Long-term
  • Staffing Analysis
  • Staffing Report
  • Aircraft Rescue and Firefighting (ARFF) Services
  • ARFF Services at Comparable Airports
  • Request for Feedback
  • Future Board Items
  • Slide Number 60

    Summary Purpose is to outline the Airports five year needs for

    development construction and staffing bull Airport BackgroundGovernanceUpdates bull Airline Industry Overview bull Airport Developments

    bull Proposed Capital Improvement Projects bull Financial Analysis

    bull Airline Rates and Charges bull Proposed Funding Options

    bull Staffing and Aircraft Rescue and Firefighting (ARFF) Analysis

    Airport Governance Board of

    Supervisors

    Transportation and Public Works

    Charles M Schulz ndash Sonoma County Airport

    Aviation Commission

    bull Advisory Only bull Guides Policy

    Airport Land Use Commission

    bull Compatible land use planning around Airport

    bull Does not govern on Airport land uses

    Federal Aviation Administration

    bull Grant Assurances bull Advisory Circulars bull Operating Certificate bull Master Plan bull Airport Layout Plan bull Land Use bull Navigational Aids bull Air Traffic Control bull Grants

    US Department of Transportation

    bull American with Disabilities Act bull Civil Rights Act bull Passenger Rights

    Caltrans

    bull Airport Permit bull Airport Loan Program

    Transportation Security Administration (TSA)

    bull Airport Security bull Badging Requirements bull Airline Security bull Threat Assessments

    Airport Background The County of Sonoma purchased the land for the Airport in 1939 and

    opened in 1941

    The Airport was used as a US Army base from 1942 to 1946 the Airport was enlarged to include the first hangars and the second runway

    The Airport encompasses approximately 1200 acres

    The Airport had air service between 1947 to 2001 returning in 2007 with Horizon Air providing flights to Los Angeles and Seattle

    Since 2007 Horizon AirAlaska has carried over 18 million passengers

    The Board approved the Airportrsquos Master Plan in January 2012

    Estimating 81000 annual flight operations (take off or landings) at STS in 2015 - airline (5) and general aviation (95) flights

    There are 385 aircraft based at STS

    The tenants of the Airport generate over $15 million in possessory taxes annually

    4 non-profit operators (PCAM EAA CAFEacute 99rsquos) at the Airport

    29 volunteer ambassadors 6 of which work alongside therapy dogs

    Current Organizational Chart The Airport has 15 employees on staff

    8 operations 5 administrative and 2 managers

    Airport Enterprise Fund The Airport is an enterprise fund and receives no General Fund contribution

    The two largest revenue generators for the Airport are bull Hangar rental income is over $14 million annually bull Parking lots generating over $1 million in fees in 2015

    29 based businesses (with approximately 250 based employees) including

    bull 2 full service fixed base operators bull 6 rental car agencies bull 3 flight schools bull 2 aircraft repair operations bull 4 governmental agencies (Cal Fire FAA (2 divisions) CAP) bull Air ambulance service (REACH) bull Restaurant bull 9 commercialindustrial companies (in the Airportrsquos business park) bull United Parcel Service (UPS) air freight operations

    The Airport has received almost $587 million in federal grant funding since 2008 and another $11 million in pending grants

    Airport Enterprise Fund FY 15-16 Revenues and Expenditures

    Revenues - $4949005 Expenditures - $4737120

    Misc Utilities Industrial PFCs $252115 Wages amp

    Benefits $1916170

    40

    Maintenance $1087180

    County Svcs

    $690745 15

    Prof Svcs $551370

    12

    $239540 5 5

    Aero Operations $2714595

    Non-Aero Operations $1513560

    31

    Park $222100

    4

    $498750 10

    55 23

    Airport Master Plan The FAA recommends master plan updates be completed on a 10 year cycle

    in order to reflect changes in FAA standards the aviation market and local regulations

    The Airportrsquos Master Plan process gets FAA buy-in on Airport development and helps with funding eligibility

    FAA-approved element CountyAirport input Public Input

    Airfield Layout Plan Land Use and Boundaries

    Airport Update

    Airport Update ndash Fuel (Gallons Sold) 3000000 6000

    2010 2011 2012 2013 2014 2015 000

    1000

    2000

    3000

    4000

    5000

    shy

    500000

    1000000

    1500000

    2000000

    2500000

    Gal

    lons

    Airport Update ndash Parking Revenues $1000000 5000

    000

    500

    1000

    1500

    2000

    2500

    3000

    3500

    4000

    4500

    $shy

    $100000

    $200000

    $300000

    $400000

    $500000

    $600000

    $700000

    $800000

    $900000

    2010 2011 2012 2013 2014 2015

    Actuals Projected Percentage Change

    Airport Update ndash Rental Cars Revenues $6000000 4500

    2010 2011 2012 2013 2014 2015

    Actuals Projected Percentage Change

    000

    500

    1000

    1500

    2000

    2500

    3000

    3500

    4000

    $shy

    $1000000

    $2000000

    $3000000

    $4000000

    $5000000

    Airport Updates ndash Passenger Levels

    Airport Update - HorizonAlaska Airlines

    bull STS is an integral part of the Horizon AirAlaska Airlines market strategy

    bull 65 of Horizon Airrsquos total capacity operates out of STS

    bull STS is the 14th busiest Airport in the Horizon network (out of 45 destinations)

    bull STS is the 6th largest market by available seat miles flown (Seattle Portland Boise Spokane Reno Santa Rosa)

    bull Each new flight added by Horizon has quickly sold at near seat capacity

    bull Other airlines have noted STSrsquos ability to absorb new seat capacity

    Airline Economic Impacts of STS

    bull Alaskarsquos seven daily flights represents approximately bull $161 million economic impact bull 490 jobs in the community

    bull Anticipate 14 to 16 commercial flights per day by summer of 2021

    bull 16 daily flights represents approximately bull $368 million economic impact bull 1120 jobs in the community

    bull Every new flight generates approximately a $23 million economic impact and 70 jobs in the community

    bull The average visitor to Sonoma County spends $44298 per day

    Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento

    Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff

    Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7

    with travel costs $18467 34 $22354 46 $18530 35 $23950 49

    Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11

    with travel costs $21679 24 $23848 31 $21789 24 $25704 36

    Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13

    with travel costs $19540 34 $22889 43 $20842 38 $22302 42

    San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6

    with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data

    bull HorizonAlaska airfares are competitive with other regional airports

    bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49

    Current Passengers and Growth Potential

    Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential

    STS-LAX 85213 372030 229 63599

    STS-SAN 40265 143161 281 31316

    STS-SEA 39711 113852 349 17215

    STS-PDX 29638 82057 361 11391

    Passenger data for YE June 30 2014

    Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS

    Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14

    Airports Used by Sonoma County and Surrounding Area Residents

    Share of Passenger Bookings ndash All Airlines

    Oakland Sacramento 7 5

    STS 2

    San jose 1

    San Francisco 85

    Percentage Share Of Passengers For Bay Area Airports By Airline

    Other US AlaskaHorizon 3 American Airlines

    6 13

    International Delta Air Lines 13 8

    Southwest Virgin America 5

    4

    United Airlines 48

    Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the

    domestic airline capacity

    Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United

    Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS

    Aircraft manufacturers are shifting production away from small (under 60 seat) jets

    Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels

    STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels

    Departing Seats STS vs Similar AirportsIndexed to CY 2008

    20 170

    15

    10

    5

    0

    -5

    -10

    -15

    -20

    STS 81 104

    46

    01

    -63 -52 -37

    -116 -164

    -136 -170 -154 -151

    -169

    2008 2009 2010 2011 2012 2013 2014 2015 2016

    Airport Developments

    Development at STS

    In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations

    The Airport has four (4) signed term sheets ndash

    bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)

    bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations

    In negotiations with Kaiser Air for a new lease to add a third hangar

    Proposed improvements total over $13 million

    Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year

    Airfield Layout Plan

    Developable Parcels

    Capital Project Needs

    Completed Projects

    bull Remodeled existing terminal in 2010 adding 5000 square feet

    bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway

    bull Rehabilitated the airline parking apron

    bull Expanded rental car staging areas

    bull Reconfigured the current long-term parking lot to expand parking spaces

    bull Reconfigured and expanded the rental car return lot to double the parking spaces

    bull Installed a new rental car wash system and vehicle detail area

    Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads

    bull The service road portion of the project was removed from the main contract to match availability of federal funding

    bull Construction is early FY16-17

    bull Project was bid in August 2015 waiting for federal funding to award

    bull Project estimate is $2 million

    bull 9066 federally funded

    Runway Safety Area ndash Phase II ndash Service Roads

    Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets

    current standards for either ARFF or ADA regulations

    bull Location of current facility is in the way of long-term terminal expansion needs

    bull A new location has not been selected conceptually studied in 2012 Airport Master Plan

    bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements

    bull Preliminary project estimate is $7 to $8 million

    bull Federal funding (90) should be available for this project

    bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA

    Aircraft Rescue and Firefighting Building

    New Long-term Parking Lot

    bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers

    bull The current long-term lot exceeded capacity 5 times in 2015

    bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day

    bull The proposed parking lot would add approximately 440 parking spaces

    bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000

    bull Staff is recommending construction as a single phase project

    New long-term parking lot ndash Site location

    Terminal

    Proposed Terminal Enhancement Project

    bull Terminal design objectives included

    bull Meeting immediate and near-term needs

    bull Establish a project budget for near-term improvements that is affordable for the Airport

    bull Design character that signifies its role as a gateway to the region

    bull Phase expansion that does not impact current operations

    bull Anticipating future needs and establish a pattern of design for future expansions

    bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

    bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

    Existing Terminal

    Terminal Renovation ndash Phases I and II

    New Holdroom (Phase II) ndash East Elevation

    New Holdroom (Phase II) ndash South Elevation

    New Holdroom Interior Looking East

    New Holdroom Interior Looking North

    Flex Space ndash Conventional Construction ndash View from Airfield

    Flex Space ndash Tent Option ndash View from Airfield

    Existing Terminal ndash View from Airfield Side

    Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

    Tent option Phase I

    Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

    Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

    Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

    Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

    Future Expansion ndash Estimated 2025

    Future Expansion ndash Estimated 2050

    Financial Analysis

    Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

    financial operations to prepare a financial forecasting model

    bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

    bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

    bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

    bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

    Airline Rates amp Charges

    Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

    double current levels

    bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

    bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

    bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

    bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

    bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

    Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

    Daily Service $250 per square footper month Non-daily Service $325 per square footper month

    Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

    Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

    ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

    The proposed fees are anticipated to increase revenues by $250000 annually

    Staff agrees with the consultantrsquos recommended airline rates and charges

    Funding Options

    Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

    Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

    Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

    Funding Needs

    bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

    bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

    Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

    bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

    Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

    The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

    Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

    Staffing Analysis

    Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

    an assessment of staffing for current needs and forecasted Airport growth over the next five years

    bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

    bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

    bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

    bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

    Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

    requirements spending approximately $220000 annually to provide ARFF coverage and training

    bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

    bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

    bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

    bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

    ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

    bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

    bull Most airports similar to or larger than STS have contracted ARFF services

    bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

    Airport Operations Budget 2014

    Enplanement 2014

    Airport Staff

    Contract Fire Fire Contract Cost

    Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

    Request for Feedback bull Long-term Parking

    bull Airport Terminal Improvement Conceptual Plan

    bull FundingFinancing Options

    Future Board Items bull February 9 2016

    bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

    bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

    design services long-term parking lot design services and long-term parking lot construction)

    bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

    integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

    bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

    Charles M Schulz - Sonoma County Airport

    2290 Airport Boulevard

    Santa Rosa CA 95403

    (707) 565-7243

    wwwsono macou ntya irportorg

    Follow STS on (j Facebook

    Im Linkedln

    ~ Twitter

    • Slide Number 1
    • Summary
    • Airport Governance
    • Airport Background
    • Current Organizational Chart
    • Airport Enterprise Fund
    • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
    • Airport Master Plan
    • Airfield Layout PlanLand Useand Boundaries
    • Airport Update
    • Airport Update ndash Fuel (Gallons Sold)
    • Airport Update ndash Parking Revenues
    • Airport Update ndash Rental Cars Revenues
    • Airport Updates ndash Passenger Levels
    • Airport Update - HorizonAlaska Airlines
    • Slide Number 16
    • Fare Comparison for STS and Other Airports in the Region
    • Current Passengers and Growth Potential
    • Airline Industry Overview ndash Potential Markets
    • Airports Used by Sonoma County and Surrounding Area Residents
    • Percentage Share Of Passengers For Bay Area Airports By Airline
    • Airline Industry Overview
    • Slide Number 23
    • Airport Developments
    • Slide Number 25
    • Airfield Layout PlanDevelopable Parcels
    • Capital Project Needs
    • Slide Number 28
    • Runway Safety Area ndash Phase II ndash Service Roads
    • Runway Safety Area ndash Phase II ndash Service Roads
    • Aircraft Rescue and Firefighting Building
    • Aircraft Rescue and Firefighting Building
    • New Long-term Parking Lot
    • Slide Number 34
    • Proposed Terminal Enhancement Project
    • Existing Terminal
    • Terminal Renovation ndash Phases I and II
    • New Holdroom (Phase II) ndash South Elevation
    • New Holdroom InteriorLooking East
    • Flex Space ndash Tent Option ndash View from Airfield
    • Existing Terminal ndash View from Airfield Side
    • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
    • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
    • Future Expansion ndash Estimated 2025
    • Future Expansion ndash Estimated 2050
    • Financial Analysis
    • Slide Number 47
    • Airline Rates amp Charges
    • Slide Number 49
    • Slide Number 50
    • Funding Options
    • Current Airport Debt
    • Funding Options ndash Long-term
    • Staffing Analysis
    • Staffing Report
    • Aircraft Rescue and Firefighting (ARFF) Services
    • ARFF Services at Comparable Airports
    • Request for Feedback
    • Future Board Items
    • Slide Number 60

      Airport Governance Board of

      Supervisors

      Transportation and Public Works

      Charles M Schulz ndash Sonoma County Airport

      Aviation Commission

      bull Advisory Only bull Guides Policy

      Airport Land Use Commission

      bull Compatible land use planning around Airport

      bull Does not govern on Airport land uses

      Federal Aviation Administration

      bull Grant Assurances bull Advisory Circulars bull Operating Certificate bull Master Plan bull Airport Layout Plan bull Land Use bull Navigational Aids bull Air Traffic Control bull Grants

      US Department of Transportation

      bull American with Disabilities Act bull Civil Rights Act bull Passenger Rights

      Caltrans

      bull Airport Permit bull Airport Loan Program

      Transportation Security Administration (TSA)

      bull Airport Security bull Badging Requirements bull Airline Security bull Threat Assessments

      Airport Background The County of Sonoma purchased the land for the Airport in 1939 and

      opened in 1941

      The Airport was used as a US Army base from 1942 to 1946 the Airport was enlarged to include the first hangars and the second runway

      The Airport encompasses approximately 1200 acres

      The Airport had air service between 1947 to 2001 returning in 2007 with Horizon Air providing flights to Los Angeles and Seattle

      Since 2007 Horizon AirAlaska has carried over 18 million passengers

      The Board approved the Airportrsquos Master Plan in January 2012

      Estimating 81000 annual flight operations (take off or landings) at STS in 2015 - airline (5) and general aviation (95) flights

      There are 385 aircraft based at STS

      The tenants of the Airport generate over $15 million in possessory taxes annually

      4 non-profit operators (PCAM EAA CAFEacute 99rsquos) at the Airport

      29 volunteer ambassadors 6 of which work alongside therapy dogs

      Current Organizational Chart The Airport has 15 employees on staff

      8 operations 5 administrative and 2 managers

      Airport Enterprise Fund The Airport is an enterprise fund and receives no General Fund contribution

      The two largest revenue generators for the Airport are bull Hangar rental income is over $14 million annually bull Parking lots generating over $1 million in fees in 2015

      29 based businesses (with approximately 250 based employees) including

      bull 2 full service fixed base operators bull 6 rental car agencies bull 3 flight schools bull 2 aircraft repair operations bull 4 governmental agencies (Cal Fire FAA (2 divisions) CAP) bull Air ambulance service (REACH) bull Restaurant bull 9 commercialindustrial companies (in the Airportrsquos business park) bull United Parcel Service (UPS) air freight operations

      The Airport has received almost $587 million in federal grant funding since 2008 and another $11 million in pending grants

      Airport Enterprise Fund FY 15-16 Revenues and Expenditures

      Revenues - $4949005 Expenditures - $4737120

      Misc Utilities Industrial PFCs $252115 Wages amp

      Benefits $1916170

      40

      Maintenance $1087180

      County Svcs

      $690745 15

      Prof Svcs $551370

      12

      $239540 5 5

      Aero Operations $2714595

      Non-Aero Operations $1513560

      31

      Park $222100

      4

      $498750 10

      55 23

      Airport Master Plan The FAA recommends master plan updates be completed on a 10 year cycle

      in order to reflect changes in FAA standards the aviation market and local regulations

      The Airportrsquos Master Plan process gets FAA buy-in on Airport development and helps with funding eligibility

      FAA-approved element CountyAirport input Public Input

      Airfield Layout Plan Land Use and Boundaries

      Airport Update

      Airport Update ndash Fuel (Gallons Sold) 3000000 6000

      2010 2011 2012 2013 2014 2015 000

      1000

      2000

      3000

      4000

      5000

      shy

      500000

      1000000

      1500000

      2000000

      2500000

      Gal

      lons

      Airport Update ndash Parking Revenues $1000000 5000

      000

      500

      1000

      1500

      2000

      2500

      3000

      3500

      4000

      4500

      $shy

      $100000

      $200000

      $300000

      $400000

      $500000

      $600000

      $700000

      $800000

      $900000

      2010 2011 2012 2013 2014 2015

      Actuals Projected Percentage Change

      Airport Update ndash Rental Cars Revenues $6000000 4500

      2010 2011 2012 2013 2014 2015

      Actuals Projected Percentage Change

      000

      500

      1000

      1500

      2000

      2500

      3000

      3500

      4000

      $shy

      $1000000

      $2000000

      $3000000

      $4000000

      $5000000

      Airport Updates ndash Passenger Levels

      Airport Update - HorizonAlaska Airlines

      bull STS is an integral part of the Horizon AirAlaska Airlines market strategy

      bull 65 of Horizon Airrsquos total capacity operates out of STS

      bull STS is the 14th busiest Airport in the Horizon network (out of 45 destinations)

      bull STS is the 6th largest market by available seat miles flown (Seattle Portland Boise Spokane Reno Santa Rosa)

      bull Each new flight added by Horizon has quickly sold at near seat capacity

      bull Other airlines have noted STSrsquos ability to absorb new seat capacity

      Airline Economic Impacts of STS

      bull Alaskarsquos seven daily flights represents approximately bull $161 million economic impact bull 490 jobs in the community

      bull Anticipate 14 to 16 commercial flights per day by summer of 2021

      bull 16 daily flights represents approximately bull $368 million economic impact bull 1120 jobs in the community

      bull Every new flight generates approximately a $23 million economic impact and 70 jobs in the community

      bull The average visitor to Sonoma County spends $44298 per day

      Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento

      Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff

      Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7

      with travel costs $18467 34 $22354 46 $18530 35 $23950 49

      Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11

      with travel costs $21679 24 $23848 31 $21789 24 $25704 36

      Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13

      with travel costs $19540 34 $22889 43 $20842 38 $22302 42

      San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6

      with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data

      bull HorizonAlaska airfares are competitive with other regional airports

      bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49

      Current Passengers and Growth Potential

      Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential

      STS-LAX 85213 372030 229 63599

      STS-SAN 40265 143161 281 31316

      STS-SEA 39711 113852 349 17215

      STS-PDX 29638 82057 361 11391

      Passenger data for YE June 30 2014

      Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS

      Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14

      Airports Used by Sonoma County and Surrounding Area Residents

      Share of Passenger Bookings ndash All Airlines

      Oakland Sacramento 7 5

      STS 2

      San jose 1

      San Francisco 85

      Percentage Share Of Passengers For Bay Area Airports By Airline

      Other US AlaskaHorizon 3 American Airlines

      6 13

      International Delta Air Lines 13 8

      Southwest Virgin America 5

      4

      United Airlines 48

      Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the

      domestic airline capacity

      Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United

      Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS

      Aircraft manufacturers are shifting production away from small (under 60 seat) jets

      Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels

      STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels

      Departing Seats STS vs Similar AirportsIndexed to CY 2008

      20 170

      15

      10

      5

      0

      -5

      -10

      -15

      -20

      STS 81 104

      46

      01

      -63 -52 -37

      -116 -164

      -136 -170 -154 -151

      -169

      2008 2009 2010 2011 2012 2013 2014 2015 2016

      Airport Developments

      Development at STS

      In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations

      The Airport has four (4) signed term sheets ndash

      bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)

      bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations

      In negotiations with Kaiser Air for a new lease to add a third hangar

      Proposed improvements total over $13 million

      Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year

      Airfield Layout Plan

      Developable Parcels

      Capital Project Needs

      Completed Projects

      bull Remodeled existing terminal in 2010 adding 5000 square feet

      bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway

      bull Rehabilitated the airline parking apron

      bull Expanded rental car staging areas

      bull Reconfigured the current long-term parking lot to expand parking spaces

      bull Reconfigured and expanded the rental car return lot to double the parking spaces

      bull Installed a new rental car wash system and vehicle detail area

      Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads

      bull The service road portion of the project was removed from the main contract to match availability of federal funding

      bull Construction is early FY16-17

      bull Project was bid in August 2015 waiting for federal funding to award

      bull Project estimate is $2 million

      bull 9066 federally funded

      Runway Safety Area ndash Phase II ndash Service Roads

      Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets

      current standards for either ARFF or ADA regulations

      bull Location of current facility is in the way of long-term terminal expansion needs

      bull A new location has not been selected conceptually studied in 2012 Airport Master Plan

      bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements

      bull Preliminary project estimate is $7 to $8 million

      bull Federal funding (90) should be available for this project

      bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA

      Aircraft Rescue and Firefighting Building

      New Long-term Parking Lot

      bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers

      bull The current long-term lot exceeded capacity 5 times in 2015

      bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day

      bull The proposed parking lot would add approximately 440 parking spaces

      bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000

      bull Staff is recommending construction as a single phase project

      New long-term parking lot ndash Site location

      Terminal

      Proposed Terminal Enhancement Project

      bull Terminal design objectives included

      bull Meeting immediate and near-term needs

      bull Establish a project budget for near-term improvements that is affordable for the Airport

      bull Design character that signifies its role as a gateway to the region

      bull Phase expansion that does not impact current operations

      bull Anticipating future needs and establish a pattern of design for future expansions

      bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

      bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

      Existing Terminal

      Terminal Renovation ndash Phases I and II

      New Holdroom (Phase II) ndash East Elevation

      New Holdroom (Phase II) ndash South Elevation

      New Holdroom Interior Looking East

      New Holdroom Interior Looking North

      Flex Space ndash Conventional Construction ndash View from Airfield

      Flex Space ndash Tent Option ndash View from Airfield

      Existing Terminal ndash View from Airfield Side

      Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

      Tent option Phase I

      Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

      Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

      Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

      Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

      Future Expansion ndash Estimated 2025

      Future Expansion ndash Estimated 2050

      Financial Analysis

      Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

      financial operations to prepare a financial forecasting model

      bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

      bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

      bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

      bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

      Airline Rates amp Charges

      Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

      double current levels

      bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

      bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

      bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

      bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

      bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

      Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

      Daily Service $250 per square footper month Non-daily Service $325 per square footper month

      Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

      Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

      ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

      The proposed fees are anticipated to increase revenues by $250000 annually

      Staff agrees with the consultantrsquos recommended airline rates and charges

      Funding Options

      Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

      Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

      Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

      Funding Needs

      bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

      bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

      Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

      bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

      Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

      The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

      Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

      Staffing Analysis

      Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

      an assessment of staffing for current needs and forecasted Airport growth over the next five years

      bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

      bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

      bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

      bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

      Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

      requirements spending approximately $220000 annually to provide ARFF coverage and training

      bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

      bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

      bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

      bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

      ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

      bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

      bull Most airports similar to or larger than STS have contracted ARFF services

      bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

      Airport Operations Budget 2014

      Enplanement 2014

      Airport Staff

      Contract Fire Fire Contract Cost

      Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

      Request for Feedback bull Long-term Parking

      bull Airport Terminal Improvement Conceptual Plan

      bull FundingFinancing Options

      Future Board Items bull February 9 2016

      bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

      bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

      design services long-term parking lot design services and long-term parking lot construction)

      bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

      integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

      bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

      Charles M Schulz - Sonoma County Airport

      2290 Airport Boulevard

      Santa Rosa CA 95403

      (707) 565-7243

      wwwsono macou ntya irportorg

      Follow STS on (j Facebook

      Im Linkedln

      ~ Twitter

      • Slide Number 1
      • Summary
      • Airport Governance
      • Airport Background
      • Current Organizational Chart
      • Airport Enterprise Fund
      • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
      • Airport Master Plan
      • Airfield Layout PlanLand Useand Boundaries
      • Airport Update
      • Airport Update ndash Fuel (Gallons Sold)
      • Airport Update ndash Parking Revenues
      • Airport Update ndash Rental Cars Revenues
      • Airport Updates ndash Passenger Levels
      • Airport Update - HorizonAlaska Airlines
      • Slide Number 16
      • Fare Comparison for STS and Other Airports in the Region
      • Current Passengers and Growth Potential
      • Airline Industry Overview ndash Potential Markets
      • Airports Used by Sonoma County and Surrounding Area Residents
      • Percentage Share Of Passengers For Bay Area Airports By Airline
      • Airline Industry Overview
      • Slide Number 23
      • Airport Developments
      • Slide Number 25
      • Airfield Layout PlanDevelopable Parcels
      • Capital Project Needs
      • Slide Number 28
      • Runway Safety Area ndash Phase II ndash Service Roads
      • Runway Safety Area ndash Phase II ndash Service Roads
      • Aircraft Rescue and Firefighting Building
      • Aircraft Rescue and Firefighting Building
      • New Long-term Parking Lot
      • Slide Number 34
      • Proposed Terminal Enhancement Project
      • Existing Terminal
      • Terminal Renovation ndash Phases I and II
      • New Holdroom (Phase II) ndash South Elevation
      • New Holdroom InteriorLooking East
      • Flex Space ndash Tent Option ndash View from Airfield
      • Existing Terminal ndash View from Airfield Side
      • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
      • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
      • Future Expansion ndash Estimated 2025
      • Future Expansion ndash Estimated 2050
      • Financial Analysis
      • Slide Number 47
      • Airline Rates amp Charges
      • Slide Number 49
      • Slide Number 50
      • Funding Options
      • Current Airport Debt
      • Funding Options ndash Long-term
      • Staffing Analysis
      • Staffing Report
      • Aircraft Rescue and Firefighting (ARFF) Services
      • ARFF Services at Comparable Airports
      • Request for Feedback
      • Future Board Items
      • Slide Number 60

        Airport Background The County of Sonoma purchased the land for the Airport in 1939 and

        opened in 1941

        The Airport was used as a US Army base from 1942 to 1946 the Airport was enlarged to include the first hangars and the second runway

        The Airport encompasses approximately 1200 acres

        The Airport had air service between 1947 to 2001 returning in 2007 with Horizon Air providing flights to Los Angeles and Seattle

        Since 2007 Horizon AirAlaska has carried over 18 million passengers

        The Board approved the Airportrsquos Master Plan in January 2012

        Estimating 81000 annual flight operations (take off or landings) at STS in 2015 - airline (5) and general aviation (95) flights

        There are 385 aircraft based at STS

        The tenants of the Airport generate over $15 million in possessory taxes annually

        4 non-profit operators (PCAM EAA CAFEacute 99rsquos) at the Airport

        29 volunteer ambassadors 6 of which work alongside therapy dogs

        Current Organizational Chart The Airport has 15 employees on staff

        8 operations 5 administrative and 2 managers

        Airport Enterprise Fund The Airport is an enterprise fund and receives no General Fund contribution

        The two largest revenue generators for the Airport are bull Hangar rental income is over $14 million annually bull Parking lots generating over $1 million in fees in 2015

        29 based businesses (with approximately 250 based employees) including

        bull 2 full service fixed base operators bull 6 rental car agencies bull 3 flight schools bull 2 aircraft repair operations bull 4 governmental agencies (Cal Fire FAA (2 divisions) CAP) bull Air ambulance service (REACH) bull Restaurant bull 9 commercialindustrial companies (in the Airportrsquos business park) bull United Parcel Service (UPS) air freight operations

        The Airport has received almost $587 million in federal grant funding since 2008 and another $11 million in pending grants

        Airport Enterprise Fund FY 15-16 Revenues and Expenditures

        Revenues - $4949005 Expenditures - $4737120

        Misc Utilities Industrial PFCs $252115 Wages amp

        Benefits $1916170

        40

        Maintenance $1087180

        County Svcs

        $690745 15

        Prof Svcs $551370

        12

        $239540 5 5

        Aero Operations $2714595

        Non-Aero Operations $1513560

        31

        Park $222100

        4

        $498750 10

        55 23

        Airport Master Plan The FAA recommends master plan updates be completed on a 10 year cycle

        in order to reflect changes in FAA standards the aviation market and local regulations

        The Airportrsquos Master Plan process gets FAA buy-in on Airport development and helps with funding eligibility

        FAA-approved element CountyAirport input Public Input

        Airfield Layout Plan Land Use and Boundaries

        Airport Update

        Airport Update ndash Fuel (Gallons Sold) 3000000 6000

        2010 2011 2012 2013 2014 2015 000

        1000

        2000

        3000

        4000

        5000

        shy

        500000

        1000000

        1500000

        2000000

        2500000

        Gal

        lons

        Airport Update ndash Parking Revenues $1000000 5000

        000

        500

        1000

        1500

        2000

        2500

        3000

        3500

        4000

        4500

        $shy

        $100000

        $200000

        $300000

        $400000

        $500000

        $600000

        $700000

        $800000

        $900000

        2010 2011 2012 2013 2014 2015

        Actuals Projected Percentage Change

        Airport Update ndash Rental Cars Revenues $6000000 4500

        2010 2011 2012 2013 2014 2015

        Actuals Projected Percentage Change

        000

        500

        1000

        1500

        2000

        2500

        3000

        3500

        4000

        $shy

        $1000000

        $2000000

        $3000000

        $4000000

        $5000000

        Airport Updates ndash Passenger Levels

        Airport Update - HorizonAlaska Airlines

        bull STS is an integral part of the Horizon AirAlaska Airlines market strategy

        bull 65 of Horizon Airrsquos total capacity operates out of STS

        bull STS is the 14th busiest Airport in the Horizon network (out of 45 destinations)

        bull STS is the 6th largest market by available seat miles flown (Seattle Portland Boise Spokane Reno Santa Rosa)

        bull Each new flight added by Horizon has quickly sold at near seat capacity

        bull Other airlines have noted STSrsquos ability to absorb new seat capacity

        Airline Economic Impacts of STS

        bull Alaskarsquos seven daily flights represents approximately bull $161 million economic impact bull 490 jobs in the community

        bull Anticipate 14 to 16 commercial flights per day by summer of 2021

        bull 16 daily flights represents approximately bull $368 million economic impact bull 1120 jobs in the community

        bull Every new flight generates approximately a $23 million economic impact and 70 jobs in the community

        bull The average visitor to Sonoma County spends $44298 per day

        Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento

        Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff

        Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7

        with travel costs $18467 34 $22354 46 $18530 35 $23950 49

        Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11

        with travel costs $21679 24 $23848 31 $21789 24 $25704 36

        Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13

        with travel costs $19540 34 $22889 43 $20842 38 $22302 42

        San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6

        with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data

        bull HorizonAlaska airfares are competitive with other regional airports

        bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49

        Current Passengers and Growth Potential

        Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential

        STS-LAX 85213 372030 229 63599

        STS-SAN 40265 143161 281 31316

        STS-SEA 39711 113852 349 17215

        STS-PDX 29638 82057 361 11391

        Passenger data for YE June 30 2014

        Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS

        Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14

        Airports Used by Sonoma County and Surrounding Area Residents

        Share of Passenger Bookings ndash All Airlines

        Oakland Sacramento 7 5

        STS 2

        San jose 1

        San Francisco 85

        Percentage Share Of Passengers For Bay Area Airports By Airline

        Other US AlaskaHorizon 3 American Airlines

        6 13

        International Delta Air Lines 13 8

        Southwest Virgin America 5

        4

        United Airlines 48

        Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the

        domestic airline capacity

        Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United

        Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS

        Aircraft manufacturers are shifting production away from small (under 60 seat) jets

        Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels

        STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels

        Departing Seats STS vs Similar AirportsIndexed to CY 2008

        20 170

        15

        10

        5

        0

        -5

        -10

        -15

        -20

        STS 81 104

        46

        01

        -63 -52 -37

        -116 -164

        -136 -170 -154 -151

        -169

        2008 2009 2010 2011 2012 2013 2014 2015 2016

        Airport Developments

        Development at STS

        In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations

        The Airport has four (4) signed term sheets ndash

        bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)

        bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations

        In negotiations with Kaiser Air for a new lease to add a third hangar

        Proposed improvements total over $13 million

        Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year

        Airfield Layout Plan

        Developable Parcels

        Capital Project Needs

        Completed Projects

        bull Remodeled existing terminal in 2010 adding 5000 square feet

        bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway

        bull Rehabilitated the airline parking apron

        bull Expanded rental car staging areas

        bull Reconfigured the current long-term parking lot to expand parking spaces

        bull Reconfigured and expanded the rental car return lot to double the parking spaces

        bull Installed a new rental car wash system and vehicle detail area

        Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads

        bull The service road portion of the project was removed from the main contract to match availability of federal funding

        bull Construction is early FY16-17

        bull Project was bid in August 2015 waiting for federal funding to award

        bull Project estimate is $2 million

        bull 9066 federally funded

        Runway Safety Area ndash Phase II ndash Service Roads

        Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets

        current standards for either ARFF or ADA regulations

        bull Location of current facility is in the way of long-term terminal expansion needs

        bull A new location has not been selected conceptually studied in 2012 Airport Master Plan

        bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements

        bull Preliminary project estimate is $7 to $8 million

        bull Federal funding (90) should be available for this project

        bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA

        Aircraft Rescue and Firefighting Building

        New Long-term Parking Lot

        bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers

        bull The current long-term lot exceeded capacity 5 times in 2015

        bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day

        bull The proposed parking lot would add approximately 440 parking spaces

        bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000

        bull Staff is recommending construction as a single phase project

        New long-term parking lot ndash Site location

        Terminal

        Proposed Terminal Enhancement Project

        bull Terminal design objectives included

        bull Meeting immediate and near-term needs

        bull Establish a project budget for near-term improvements that is affordable for the Airport

        bull Design character that signifies its role as a gateway to the region

        bull Phase expansion that does not impact current operations

        bull Anticipating future needs and establish a pattern of design for future expansions

        bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

        bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

        Existing Terminal

        Terminal Renovation ndash Phases I and II

        New Holdroom (Phase II) ndash East Elevation

        New Holdroom (Phase II) ndash South Elevation

        New Holdroom Interior Looking East

        New Holdroom Interior Looking North

        Flex Space ndash Conventional Construction ndash View from Airfield

        Flex Space ndash Tent Option ndash View from Airfield

        Existing Terminal ndash View from Airfield Side

        Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

        Tent option Phase I

        Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

        Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

        Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

        Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

        Future Expansion ndash Estimated 2025

        Future Expansion ndash Estimated 2050

        Financial Analysis

        Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

        financial operations to prepare a financial forecasting model

        bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

        bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

        bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

        bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

        Airline Rates amp Charges

        Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

        double current levels

        bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

        bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

        bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

        bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

        bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

        Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

        Daily Service $250 per square footper month Non-daily Service $325 per square footper month

        Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

        Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

        ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

        The proposed fees are anticipated to increase revenues by $250000 annually

        Staff agrees with the consultantrsquos recommended airline rates and charges

        Funding Options

        Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

        Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

        Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

        Funding Needs

        bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

        bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

        Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

        bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

        Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

        The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

        Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

        Staffing Analysis

        Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

        an assessment of staffing for current needs and forecasted Airport growth over the next five years

        bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

        bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

        bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

        bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

        Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

        requirements spending approximately $220000 annually to provide ARFF coverage and training

        bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

        bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

        bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

        bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

        ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

        bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

        bull Most airports similar to or larger than STS have contracted ARFF services

        bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

        Airport Operations Budget 2014

        Enplanement 2014

        Airport Staff

        Contract Fire Fire Contract Cost

        Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

        Request for Feedback bull Long-term Parking

        bull Airport Terminal Improvement Conceptual Plan

        bull FundingFinancing Options

        Future Board Items bull February 9 2016

        bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

        bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

        design services long-term parking lot design services and long-term parking lot construction)

        bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

        integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

        bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

        Charles M Schulz - Sonoma County Airport

        2290 Airport Boulevard

        Santa Rosa CA 95403

        (707) 565-7243

        wwwsono macou ntya irportorg

        Follow STS on (j Facebook

        Im Linkedln

        ~ Twitter

        • Slide Number 1
        • Summary
        • Airport Governance
        • Airport Background
        • Current Organizational Chart
        • Airport Enterprise Fund
        • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
        • Airport Master Plan
        • Airfield Layout PlanLand Useand Boundaries
        • Airport Update
        • Airport Update ndash Fuel (Gallons Sold)
        • Airport Update ndash Parking Revenues
        • Airport Update ndash Rental Cars Revenues
        • Airport Updates ndash Passenger Levels
        • Airport Update - HorizonAlaska Airlines
        • Slide Number 16
        • Fare Comparison for STS and Other Airports in the Region
        • Current Passengers and Growth Potential
        • Airline Industry Overview ndash Potential Markets
        • Airports Used by Sonoma County and Surrounding Area Residents
        • Percentage Share Of Passengers For Bay Area Airports By Airline
        • Airline Industry Overview
        • Slide Number 23
        • Airport Developments
        • Slide Number 25
        • Airfield Layout PlanDevelopable Parcels
        • Capital Project Needs
        • Slide Number 28
        • Runway Safety Area ndash Phase II ndash Service Roads
        • Runway Safety Area ndash Phase II ndash Service Roads
        • Aircraft Rescue and Firefighting Building
        • Aircraft Rescue and Firefighting Building
        • New Long-term Parking Lot
        • Slide Number 34
        • Proposed Terminal Enhancement Project
        • Existing Terminal
        • Terminal Renovation ndash Phases I and II
        • New Holdroom (Phase II) ndash South Elevation
        • New Holdroom InteriorLooking East
        • Flex Space ndash Tent Option ndash View from Airfield
        • Existing Terminal ndash View from Airfield Side
        • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
        • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
        • Future Expansion ndash Estimated 2025
        • Future Expansion ndash Estimated 2050
        • Financial Analysis
        • Slide Number 47
        • Airline Rates amp Charges
        • Slide Number 49
        • Slide Number 50
        • Funding Options
        • Current Airport Debt
        • Funding Options ndash Long-term
        • Staffing Analysis
        • Staffing Report
        • Aircraft Rescue and Firefighting (ARFF) Services
        • ARFF Services at Comparable Airports
        • Request for Feedback
        • Future Board Items
        • Slide Number 60

          Current Organizational Chart The Airport has 15 employees on staff

          8 operations 5 administrative and 2 managers

          Airport Enterprise Fund The Airport is an enterprise fund and receives no General Fund contribution

          The two largest revenue generators for the Airport are bull Hangar rental income is over $14 million annually bull Parking lots generating over $1 million in fees in 2015

          29 based businesses (with approximately 250 based employees) including

          bull 2 full service fixed base operators bull 6 rental car agencies bull 3 flight schools bull 2 aircraft repair operations bull 4 governmental agencies (Cal Fire FAA (2 divisions) CAP) bull Air ambulance service (REACH) bull Restaurant bull 9 commercialindustrial companies (in the Airportrsquos business park) bull United Parcel Service (UPS) air freight operations

          The Airport has received almost $587 million in federal grant funding since 2008 and another $11 million in pending grants

          Airport Enterprise Fund FY 15-16 Revenues and Expenditures

          Revenues - $4949005 Expenditures - $4737120

          Misc Utilities Industrial PFCs $252115 Wages amp

          Benefits $1916170

          40

          Maintenance $1087180

          County Svcs

          $690745 15

          Prof Svcs $551370

          12

          $239540 5 5

          Aero Operations $2714595

          Non-Aero Operations $1513560

          31

          Park $222100

          4

          $498750 10

          55 23

          Airport Master Plan The FAA recommends master plan updates be completed on a 10 year cycle

          in order to reflect changes in FAA standards the aviation market and local regulations

          The Airportrsquos Master Plan process gets FAA buy-in on Airport development and helps with funding eligibility

          FAA-approved element CountyAirport input Public Input

          Airfield Layout Plan Land Use and Boundaries

          Airport Update

          Airport Update ndash Fuel (Gallons Sold) 3000000 6000

          2010 2011 2012 2013 2014 2015 000

          1000

          2000

          3000

          4000

          5000

          shy

          500000

          1000000

          1500000

          2000000

          2500000

          Gal

          lons

          Airport Update ndash Parking Revenues $1000000 5000

          000

          500

          1000

          1500

          2000

          2500

          3000

          3500

          4000

          4500

          $shy

          $100000

          $200000

          $300000

          $400000

          $500000

          $600000

          $700000

          $800000

          $900000

          2010 2011 2012 2013 2014 2015

          Actuals Projected Percentage Change

          Airport Update ndash Rental Cars Revenues $6000000 4500

          2010 2011 2012 2013 2014 2015

          Actuals Projected Percentage Change

          000

          500

          1000

          1500

          2000

          2500

          3000

          3500

          4000

          $shy

          $1000000

          $2000000

          $3000000

          $4000000

          $5000000

          Airport Updates ndash Passenger Levels

          Airport Update - HorizonAlaska Airlines

          bull STS is an integral part of the Horizon AirAlaska Airlines market strategy

          bull 65 of Horizon Airrsquos total capacity operates out of STS

          bull STS is the 14th busiest Airport in the Horizon network (out of 45 destinations)

          bull STS is the 6th largest market by available seat miles flown (Seattle Portland Boise Spokane Reno Santa Rosa)

          bull Each new flight added by Horizon has quickly sold at near seat capacity

          bull Other airlines have noted STSrsquos ability to absorb new seat capacity

          Airline Economic Impacts of STS

          bull Alaskarsquos seven daily flights represents approximately bull $161 million economic impact bull 490 jobs in the community

          bull Anticipate 14 to 16 commercial flights per day by summer of 2021

          bull 16 daily flights represents approximately bull $368 million economic impact bull 1120 jobs in the community

          bull Every new flight generates approximately a $23 million economic impact and 70 jobs in the community

          bull The average visitor to Sonoma County spends $44298 per day

          Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento

          Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff

          Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7

          with travel costs $18467 34 $22354 46 $18530 35 $23950 49

          Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11

          with travel costs $21679 24 $23848 31 $21789 24 $25704 36

          Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13

          with travel costs $19540 34 $22889 43 $20842 38 $22302 42

          San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6

          with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data

          bull HorizonAlaska airfares are competitive with other regional airports

          bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49

          Current Passengers and Growth Potential

          Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential

          STS-LAX 85213 372030 229 63599

          STS-SAN 40265 143161 281 31316

          STS-SEA 39711 113852 349 17215

          STS-PDX 29638 82057 361 11391

          Passenger data for YE June 30 2014

          Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS

          Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14

          Airports Used by Sonoma County and Surrounding Area Residents

          Share of Passenger Bookings ndash All Airlines

          Oakland Sacramento 7 5

          STS 2

          San jose 1

          San Francisco 85

          Percentage Share Of Passengers For Bay Area Airports By Airline

          Other US AlaskaHorizon 3 American Airlines

          6 13

          International Delta Air Lines 13 8

          Southwest Virgin America 5

          4

          United Airlines 48

          Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the

          domestic airline capacity

          Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United

          Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS

          Aircraft manufacturers are shifting production away from small (under 60 seat) jets

          Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels

          STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels

          Departing Seats STS vs Similar AirportsIndexed to CY 2008

          20 170

          15

          10

          5

          0

          -5

          -10

          -15

          -20

          STS 81 104

          46

          01

          -63 -52 -37

          -116 -164

          -136 -170 -154 -151

          -169

          2008 2009 2010 2011 2012 2013 2014 2015 2016

          Airport Developments

          Development at STS

          In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations

          The Airport has four (4) signed term sheets ndash

          bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)

          bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations

          In negotiations with Kaiser Air for a new lease to add a third hangar

          Proposed improvements total over $13 million

          Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year

          Airfield Layout Plan

          Developable Parcels

          Capital Project Needs

          Completed Projects

          bull Remodeled existing terminal in 2010 adding 5000 square feet

          bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway

          bull Rehabilitated the airline parking apron

          bull Expanded rental car staging areas

          bull Reconfigured the current long-term parking lot to expand parking spaces

          bull Reconfigured and expanded the rental car return lot to double the parking spaces

          bull Installed a new rental car wash system and vehicle detail area

          Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads

          bull The service road portion of the project was removed from the main contract to match availability of federal funding

          bull Construction is early FY16-17

          bull Project was bid in August 2015 waiting for federal funding to award

          bull Project estimate is $2 million

          bull 9066 federally funded

          Runway Safety Area ndash Phase II ndash Service Roads

          Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets

          current standards for either ARFF or ADA regulations

          bull Location of current facility is in the way of long-term terminal expansion needs

          bull A new location has not been selected conceptually studied in 2012 Airport Master Plan

          bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements

          bull Preliminary project estimate is $7 to $8 million

          bull Federal funding (90) should be available for this project

          bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA

          Aircraft Rescue and Firefighting Building

          New Long-term Parking Lot

          bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers

          bull The current long-term lot exceeded capacity 5 times in 2015

          bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day

          bull The proposed parking lot would add approximately 440 parking spaces

          bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000

          bull Staff is recommending construction as a single phase project

          New long-term parking lot ndash Site location

          Terminal

          Proposed Terminal Enhancement Project

          bull Terminal design objectives included

          bull Meeting immediate and near-term needs

          bull Establish a project budget for near-term improvements that is affordable for the Airport

          bull Design character that signifies its role as a gateway to the region

          bull Phase expansion that does not impact current operations

          bull Anticipating future needs and establish a pattern of design for future expansions

          bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

          bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

          Existing Terminal

          Terminal Renovation ndash Phases I and II

          New Holdroom (Phase II) ndash East Elevation

          New Holdroom (Phase II) ndash South Elevation

          New Holdroom Interior Looking East

          New Holdroom Interior Looking North

          Flex Space ndash Conventional Construction ndash View from Airfield

          Flex Space ndash Tent Option ndash View from Airfield

          Existing Terminal ndash View from Airfield Side

          Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

          Tent option Phase I

          Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

          Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

          Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

          Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

          Future Expansion ndash Estimated 2025

          Future Expansion ndash Estimated 2050

          Financial Analysis

          Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

          financial operations to prepare a financial forecasting model

          bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

          bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

          bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

          bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

          Airline Rates amp Charges

          Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

          double current levels

          bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

          bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

          bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

          bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

          bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

          Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

          Daily Service $250 per square footper month Non-daily Service $325 per square footper month

          Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

          Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

          ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

          The proposed fees are anticipated to increase revenues by $250000 annually

          Staff agrees with the consultantrsquos recommended airline rates and charges

          Funding Options

          Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

          Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

          Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

          Funding Needs

          bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

          bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

          Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

          bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

          Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

          The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

          Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

          Staffing Analysis

          Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

          an assessment of staffing for current needs and forecasted Airport growth over the next five years

          bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

          bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

          bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

          bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

          Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

          requirements spending approximately $220000 annually to provide ARFF coverage and training

          bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

          bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

          bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

          bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

          ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

          bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

          bull Most airports similar to or larger than STS have contracted ARFF services

          bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

          Airport Operations Budget 2014

          Enplanement 2014

          Airport Staff

          Contract Fire Fire Contract Cost

          Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

          Request for Feedback bull Long-term Parking

          bull Airport Terminal Improvement Conceptual Plan

          bull FundingFinancing Options

          Future Board Items bull February 9 2016

          bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

          bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

          design services long-term parking lot design services and long-term parking lot construction)

          bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

          integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

          bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

          Charles M Schulz - Sonoma County Airport

          2290 Airport Boulevard

          Santa Rosa CA 95403

          (707) 565-7243

          wwwsono macou ntya irportorg

          Follow STS on (j Facebook

          Im Linkedln

          ~ Twitter

          • Slide Number 1
          • Summary
          • Airport Governance
          • Airport Background
          • Current Organizational Chart
          • Airport Enterprise Fund
          • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
          • Airport Master Plan
          • Airfield Layout PlanLand Useand Boundaries
          • Airport Update
          • Airport Update ndash Fuel (Gallons Sold)
          • Airport Update ndash Parking Revenues
          • Airport Update ndash Rental Cars Revenues
          • Airport Updates ndash Passenger Levels
          • Airport Update - HorizonAlaska Airlines
          • Slide Number 16
          • Fare Comparison for STS and Other Airports in the Region
          • Current Passengers and Growth Potential
          • Airline Industry Overview ndash Potential Markets
          • Airports Used by Sonoma County and Surrounding Area Residents
          • Percentage Share Of Passengers For Bay Area Airports By Airline
          • Airline Industry Overview
          • Slide Number 23
          • Airport Developments
          • Slide Number 25
          • Airfield Layout PlanDevelopable Parcels
          • Capital Project Needs
          • Slide Number 28
          • Runway Safety Area ndash Phase II ndash Service Roads
          • Runway Safety Area ndash Phase II ndash Service Roads
          • Aircraft Rescue and Firefighting Building
          • Aircraft Rescue and Firefighting Building
          • New Long-term Parking Lot
          • Slide Number 34
          • Proposed Terminal Enhancement Project
          • Existing Terminal
          • Terminal Renovation ndash Phases I and II
          • New Holdroom (Phase II) ndash South Elevation
          • New Holdroom InteriorLooking East
          • Flex Space ndash Tent Option ndash View from Airfield
          • Existing Terminal ndash View from Airfield Side
          • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
          • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
          • Future Expansion ndash Estimated 2025
          • Future Expansion ndash Estimated 2050
          • Financial Analysis
          • Slide Number 47
          • Airline Rates amp Charges
          • Slide Number 49
          • Slide Number 50
          • Funding Options
          • Current Airport Debt
          • Funding Options ndash Long-term
          • Staffing Analysis
          • Staffing Report
          • Aircraft Rescue and Firefighting (ARFF) Services
          • ARFF Services at Comparable Airports
          • Request for Feedback
          • Future Board Items
          • Slide Number 60

            Airport Enterprise Fund The Airport is an enterprise fund and receives no General Fund contribution

            The two largest revenue generators for the Airport are bull Hangar rental income is over $14 million annually bull Parking lots generating over $1 million in fees in 2015

            29 based businesses (with approximately 250 based employees) including

            bull 2 full service fixed base operators bull 6 rental car agencies bull 3 flight schools bull 2 aircraft repair operations bull 4 governmental agencies (Cal Fire FAA (2 divisions) CAP) bull Air ambulance service (REACH) bull Restaurant bull 9 commercialindustrial companies (in the Airportrsquos business park) bull United Parcel Service (UPS) air freight operations

            The Airport has received almost $587 million in federal grant funding since 2008 and another $11 million in pending grants

            Airport Enterprise Fund FY 15-16 Revenues and Expenditures

            Revenues - $4949005 Expenditures - $4737120

            Misc Utilities Industrial PFCs $252115 Wages amp

            Benefits $1916170

            40

            Maintenance $1087180

            County Svcs

            $690745 15

            Prof Svcs $551370

            12

            $239540 5 5

            Aero Operations $2714595

            Non-Aero Operations $1513560

            31

            Park $222100

            4

            $498750 10

            55 23

            Airport Master Plan The FAA recommends master plan updates be completed on a 10 year cycle

            in order to reflect changes in FAA standards the aviation market and local regulations

            The Airportrsquos Master Plan process gets FAA buy-in on Airport development and helps with funding eligibility

            FAA-approved element CountyAirport input Public Input

            Airfield Layout Plan Land Use and Boundaries

            Airport Update

            Airport Update ndash Fuel (Gallons Sold) 3000000 6000

            2010 2011 2012 2013 2014 2015 000

            1000

            2000

            3000

            4000

            5000

            shy

            500000

            1000000

            1500000

            2000000

            2500000

            Gal

            lons

            Airport Update ndash Parking Revenues $1000000 5000

            000

            500

            1000

            1500

            2000

            2500

            3000

            3500

            4000

            4500

            $shy

            $100000

            $200000

            $300000

            $400000

            $500000

            $600000

            $700000

            $800000

            $900000

            2010 2011 2012 2013 2014 2015

            Actuals Projected Percentage Change

            Airport Update ndash Rental Cars Revenues $6000000 4500

            2010 2011 2012 2013 2014 2015

            Actuals Projected Percentage Change

            000

            500

            1000

            1500

            2000

            2500

            3000

            3500

            4000

            $shy

            $1000000

            $2000000

            $3000000

            $4000000

            $5000000

            Airport Updates ndash Passenger Levels

            Airport Update - HorizonAlaska Airlines

            bull STS is an integral part of the Horizon AirAlaska Airlines market strategy

            bull 65 of Horizon Airrsquos total capacity operates out of STS

            bull STS is the 14th busiest Airport in the Horizon network (out of 45 destinations)

            bull STS is the 6th largest market by available seat miles flown (Seattle Portland Boise Spokane Reno Santa Rosa)

            bull Each new flight added by Horizon has quickly sold at near seat capacity

            bull Other airlines have noted STSrsquos ability to absorb new seat capacity

            Airline Economic Impacts of STS

            bull Alaskarsquos seven daily flights represents approximately bull $161 million economic impact bull 490 jobs in the community

            bull Anticipate 14 to 16 commercial flights per day by summer of 2021

            bull 16 daily flights represents approximately bull $368 million economic impact bull 1120 jobs in the community

            bull Every new flight generates approximately a $23 million economic impact and 70 jobs in the community

            bull The average visitor to Sonoma County spends $44298 per day

            Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento

            Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff

            Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7

            with travel costs $18467 34 $22354 46 $18530 35 $23950 49

            Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11

            with travel costs $21679 24 $23848 31 $21789 24 $25704 36

            Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13

            with travel costs $19540 34 $22889 43 $20842 38 $22302 42

            San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6

            with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data

            bull HorizonAlaska airfares are competitive with other regional airports

            bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49

            Current Passengers and Growth Potential

            Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential

            STS-LAX 85213 372030 229 63599

            STS-SAN 40265 143161 281 31316

            STS-SEA 39711 113852 349 17215

            STS-PDX 29638 82057 361 11391

            Passenger data for YE June 30 2014

            Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS

            Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14

            Airports Used by Sonoma County and Surrounding Area Residents

            Share of Passenger Bookings ndash All Airlines

            Oakland Sacramento 7 5

            STS 2

            San jose 1

            San Francisco 85

            Percentage Share Of Passengers For Bay Area Airports By Airline

            Other US AlaskaHorizon 3 American Airlines

            6 13

            International Delta Air Lines 13 8

            Southwest Virgin America 5

            4

            United Airlines 48

            Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the

            domestic airline capacity

            Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United

            Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS

            Aircraft manufacturers are shifting production away from small (under 60 seat) jets

            Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels

            STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels

            Departing Seats STS vs Similar AirportsIndexed to CY 2008

            20 170

            15

            10

            5

            0

            -5

            -10

            -15

            -20

            STS 81 104

            46

            01

            -63 -52 -37

            -116 -164

            -136 -170 -154 -151

            -169

            2008 2009 2010 2011 2012 2013 2014 2015 2016

            Airport Developments

            Development at STS

            In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations

            The Airport has four (4) signed term sheets ndash

            bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)

            bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations

            In negotiations with Kaiser Air for a new lease to add a third hangar

            Proposed improvements total over $13 million

            Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year

            Airfield Layout Plan

            Developable Parcels

            Capital Project Needs

            Completed Projects

            bull Remodeled existing terminal in 2010 adding 5000 square feet

            bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway

            bull Rehabilitated the airline parking apron

            bull Expanded rental car staging areas

            bull Reconfigured the current long-term parking lot to expand parking spaces

            bull Reconfigured and expanded the rental car return lot to double the parking spaces

            bull Installed a new rental car wash system and vehicle detail area

            Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads

            bull The service road portion of the project was removed from the main contract to match availability of federal funding

            bull Construction is early FY16-17

            bull Project was bid in August 2015 waiting for federal funding to award

            bull Project estimate is $2 million

            bull 9066 federally funded

            Runway Safety Area ndash Phase II ndash Service Roads

            Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets

            current standards for either ARFF or ADA regulations

            bull Location of current facility is in the way of long-term terminal expansion needs

            bull A new location has not been selected conceptually studied in 2012 Airport Master Plan

            bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements

            bull Preliminary project estimate is $7 to $8 million

            bull Federal funding (90) should be available for this project

            bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA

            Aircraft Rescue and Firefighting Building

            New Long-term Parking Lot

            bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers

            bull The current long-term lot exceeded capacity 5 times in 2015

            bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day

            bull The proposed parking lot would add approximately 440 parking spaces

            bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000

            bull Staff is recommending construction as a single phase project

            New long-term parking lot ndash Site location

            Terminal

            Proposed Terminal Enhancement Project

            bull Terminal design objectives included

            bull Meeting immediate and near-term needs

            bull Establish a project budget for near-term improvements that is affordable for the Airport

            bull Design character that signifies its role as a gateway to the region

            bull Phase expansion that does not impact current operations

            bull Anticipating future needs and establish a pattern of design for future expansions

            bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

            bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

            Existing Terminal

            Terminal Renovation ndash Phases I and II

            New Holdroom (Phase II) ndash East Elevation

            New Holdroom (Phase II) ndash South Elevation

            New Holdroom Interior Looking East

            New Holdroom Interior Looking North

            Flex Space ndash Conventional Construction ndash View from Airfield

            Flex Space ndash Tent Option ndash View from Airfield

            Existing Terminal ndash View from Airfield Side

            Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

            Tent option Phase I

            Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

            Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

            Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

            Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

            Future Expansion ndash Estimated 2025

            Future Expansion ndash Estimated 2050

            Financial Analysis

            Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

            financial operations to prepare a financial forecasting model

            bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

            bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

            bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

            bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

            Airline Rates amp Charges

            Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

            double current levels

            bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

            bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

            bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

            bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

            bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

            Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

            Daily Service $250 per square footper month Non-daily Service $325 per square footper month

            Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

            Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

            ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

            The proposed fees are anticipated to increase revenues by $250000 annually

            Staff agrees with the consultantrsquos recommended airline rates and charges

            Funding Options

            Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

            Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

            Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

            Funding Needs

            bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

            bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

            Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

            bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

            Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

            The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

            Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

            Staffing Analysis

            Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

            an assessment of staffing for current needs and forecasted Airport growth over the next five years

            bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

            bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

            bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

            bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

            Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

            requirements spending approximately $220000 annually to provide ARFF coverage and training

            bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

            bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

            bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

            bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

            ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

            bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

            bull Most airports similar to or larger than STS have contracted ARFF services

            bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

            Airport Operations Budget 2014

            Enplanement 2014

            Airport Staff

            Contract Fire Fire Contract Cost

            Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

            Request for Feedback bull Long-term Parking

            bull Airport Terminal Improvement Conceptual Plan

            bull FundingFinancing Options

            Future Board Items bull February 9 2016

            bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

            bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

            design services long-term parking lot design services and long-term parking lot construction)

            bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

            integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

            bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

            Charles M Schulz - Sonoma County Airport

            2290 Airport Boulevard

            Santa Rosa CA 95403

            (707) 565-7243

            wwwsono macou ntya irportorg

            Follow STS on (j Facebook

            Im Linkedln

            ~ Twitter

            • Slide Number 1
            • Summary
            • Airport Governance
            • Airport Background
            • Current Organizational Chart
            • Airport Enterprise Fund
            • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
            • Airport Master Plan
            • Airfield Layout PlanLand Useand Boundaries
            • Airport Update
            • Airport Update ndash Fuel (Gallons Sold)
            • Airport Update ndash Parking Revenues
            • Airport Update ndash Rental Cars Revenues
            • Airport Updates ndash Passenger Levels
            • Airport Update - HorizonAlaska Airlines
            • Slide Number 16
            • Fare Comparison for STS and Other Airports in the Region
            • Current Passengers and Growth Potential
            • Airline Industry Overview ndash Potential Markets
            • Airports Used by Sonoma County and Surrounding Area Residents
            • Percentage Share Of Passengers For Bay Area Airports By Airline
            • Airline Industry Overview
            • Slide Number 23
            • Airport Developments
            • Slide Number 25
            • Airfield Layout PlanDevelopable Parcels
            • Capital Project Needs
            • Slide Number 28
            • Runway Safety Area ndash Phase II ndash Service Roads
            • Runway Safety Area ndash Phase II ndash Service Roads
            • Aircraft Rescue and Firefighting Building
            • Aircraft Rescue and Firefighting Building
            • New Long-term Parking Lot
            • Slide Number 34
            • Proposed Terminal Enhancement Project
            • Existing Terminal
            • Terminal Renovation ndash Phases I and II
            • New Holdroom (Phase II) ndash South Elevation
            • New Holdroom InteriorLooking East
            • Flex Space ndash Tent Option ndash View from Airfield
            • Existing Terminal ndash View from Airfield Side
            • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
            • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
            • Future Expansion ndash Estimated 2025
            • Future Expansion ndash Estimated 2050
            • Financial Analysis
            • Slide Number 47
            • Airline Rates amp Charges
            • Slide Number 49
            • Slide Number 50
            • Funding Options
            • Current Airport Debt
            • Funding Options ndash Long-term
            • Staffing Analysis
            • Staffing Report
            • Aircraft Rescue and Firefighting (ARFF) Services
            • ARFF Services at Comparable Airports
            • Request for Feedback
            • Future Board Items
            • Slide Number 60

              Airport Enterprise Fund FY 15-16 Revenues and Expenditures

              Revenues - $4949005 Expenditures - $4737120

              Misc Utilities Industrial PFCs $252115 Wages amp

              Benefits $1916170

              40

              Maintenance $1087180

              County Svcs

              $690745 15

              Prof Svcs $551370

              12

              $239540 5 5

              Aero Operations $2714595

              Non-Aero Operations $1513560

              31

              Park $222100

              4

              $498750 10

              55 23

              Airport Master Plan The FAA recommends master plan updates be completed on a 10 year cycle

              in order to reflect changes in FAA standards the aviation market and local regulations

              The Airportrsquos Master Plan process gets FAA buy-in on Airport development and helps with funding eligibility

              FAA-approved element CountyAirport input Public Input

              Airfield Layout Plan Land Use and Boundaries

              Airport Update

              Airport Update ndash Fuel (Gallons Sold) 3000000 6000

              2010 2011 2012 2013 2014 2015 000

              1000

              2000

              3000

              4000

              5000

              shy

              500000

              1000000

              1500000

              2000000

              2500000

              Gal

              lons

              Airport Update ndash Parking Revenues $1000000 5000

              000

              500

              1000

              1500

              2000

              2500

              3000

              3500

              4000

              4500

              $shy

              $100000

              $200000

              $300000

              $400000

              $500000

              $600000

              $700000

              $800000

              $900000

              2010 2011 2012 2013 2014 2015

              Actuals Projected Percentage Change

              Airport Update ndash Rental Cars Revenues $6000000 4500

              2010 2011 2012 2013 2014 2015

              Actuals Projected Percentage Change

              000

              500

              1000

              1500

              2000

              2500

              3000

              3500

              4000

              $shy

              $1000000

              $2000000

              $3000000

              $4000000

              $5000000

              Airport Updates ndash Passenger Levels

              Airport Update - HorizonAlaska Airlines

              bull STS is an integral part of the Horizon AirAlaska Airlines market strategy

              bull 65 of Horizon Airrsquos total capacity operates out of STS

              bull STS is the 14th busiest Airport in the Horizon network (out of 45 destinations)

              bull STS is the 6th largest market by available seat miles flown (Seattle Portland Boise Spokane Reno Santa Rosa)

              bull Each new flight added by Horizon has quickly sold at near seat capacity

              bull Other airlines have noted STSrsquos ability to absorb new seat capacity

              Airline Economic Impacts of STS

              bull Alaskarsquos seven daily flights represents approximately bull $161 million economic impact bull 490 jobs in the community

              bull Anticipate 14 to 16 commercial flights per day by summer of 2021

              bull 16 daily flights represents approximately bull $368 million economic impact bull 1120 jobs in the community

              bull Every new flight generates approximately a $23 million economic impact and 70 jobs in the community

              bull The average visitor to Sonoma County spends $44298 per day

              Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento

              Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff

              Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7

              with travel costs $18467 34 $22354 46 $18530 35 $23950 49

              Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11

              with travel costs $21679 24 $23848 31 $21789 24 $25704 36

              Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13

              with travel costs $19540 34 $22889 43 $20842 38 $22302 42

              San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6

              with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data

              bull HorizonAlaska airfares are competitive with other regional airports

              bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49

              Current Passengers and Growth Potential

              Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential

              STS-LAX 85213 372030 229 63599

              STS-SAN 40265 143161 281 31316

              STS-SEA 39711 113852 349 17215

              STS-PDX 29638 82057 361 11391

              Passenger data for YE June 30 2014

              Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS

              Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14

              Airports Used by Sonoma County and Surrounding Area Residents

              Share of Passenger Bookings ndash All Airlines

              Oakland Sacramento 7 5

              STS 2

              San jose 1

              San Francisco 85

              Percentage Share Of Passengers For Bay Area Airports By Airline

              Other US AlaskaHorizon 3 American Airlines

              6 13

              International Delta Air Lines 13 8

              Southwest Virgin America 5

              4

              United Airlines 48

              Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the

              domestic airline capacity

              Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United

              Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS

              Aircraft manufacturers are shifting production away from small (under 60 seat) jets

              Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels

              STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels

              Departing Seats STS vs Similar AirportsIndexed to CY 2008

              20 170

              15

              10

              5

              0

              -5

              -10

              -15

              -20

              STS 81 104

              46

              01

              -63 -52 -37

              -116 -164

              -136 -170 -154 -151

              -169

              2008 2009 2010 2011 2012 2013 2014 2015 2016

              Airport Developments

              Development at STS

              In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations

              The Airport has four (4) signed term sheets ndash

              bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)

              bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations

              In negotiations with Kaiser Air for a new lease to add a third hangar

              Proposed improvements total over $13 million

              Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year

              Airfield Layout Plan

              Developable Parcels

              Capital Project Needs

              Completed Projects

              bull Remodeled existing terminal in 2010 adding 5000 square feet

              bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway

              bull Rehabilitated the airline parking apron

              bull Expanded rental car staging areas

              bull Reconfigured the current long-term parking lot to expand parking spaces

              bull Reconfigured and expanded the rental car return lot to double the parking spaces

              bull Installed a new rental car wash system and vehicle detail area

              Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads

              bull The service road portion of the project was removed from the main contract to match availability of federal funding

              bull Construction is early FY16-17

              bull Project was bid in August 2015 waiting for federal funding to award

              bull Project estimate is $2 million

              bull 9066 federally funded

              Runway Safety Area ndash Phase II ndash Service Roads

              Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets

              current standards for either ARFF or ADA regulations

              bull Location of current facility is in the way of long-term terminal expansion needs

              bull A new location has not been selected conceptually studied in 2012 Airport Master Plan

              bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements

              bull Preliminary project estimate is $7 to $8 million

              bull Federal funding (90) should be available for this project

              bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA

              Aircraft Rescue and Firefighting Building

              New Long-term Parking Lot

              bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers

              bull The current long-term lot exceeded capacity 5 times in 2015

              bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day

              bull The proposed parking lot would add approximately 440 parking spaces

              bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000

              bull Staff is recommending construction as a single phase project

              New long-term parking lot ndash Site location

              Terminal

              Proposed Terminal Enhancement Project

              bull Terminal design objectives included

              bull Meeting immediate and near-term needs

              bull Establish a project budget for near-term improvements that is affordable for the Airport

              bull Design character that signifies its role as a gateway to the region

              bull Phase expansion that does not impact current operations

              bull Anticipating future needs and establish a pattern of design for future expansions

              bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

              bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

              Existing Terminal

              Terminal Renovation ndash Phases I and II

              New Holdroom (Phase II) ndash East Elevation

              New Holdroom (Phase II) ndash South Elevation

              New Holdroom Interior Looking East

              New Holdroom Interior Looking North

              Flex Space ndash Conventional Construction ndash View from Airfield

              Flex Space ndash Tent Option ndash View from Airfield

              Existing Terminal ndash View from Airfield Side

              Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

              Tent option Phase I

              Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

              Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

              Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

              Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

              Future Expansion ndash Estimated 2025

              Future Expansion ndash Estimated 2050

              Financial Analysis

              Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

              financial operations to prepare a financial forecasting model

              bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

              bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

              bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

              bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

              Airline Rates amp Charges

              Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

              double current levels

              bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

              bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

              bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

              bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

              bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

              Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

              Daily Service $250 per square footper month Non-daily Service $325 per square footper month

              Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

              Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

              ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

              The proposed fees are anticipated to increase revenues by $250000 annually

              Staff agrees with the consultantrsquos recommended airline rates and charges

              Funding Options

              Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

              Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

              Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

              Funding Needs

              bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

              bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

              Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

              bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

              Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

              The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

              Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

              Staffing Analysis

              Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

              an assessment of staffing for current needs and forecasted Airport growth over the next five years

              bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

              bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

              bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

              bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

              Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

              requirements spending approximately $220000 annually to provide ARFF coverage and training

              bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

              bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

              bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

              bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

              ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

              bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

              bull Most airports similar to or larger than STS have contracted ARFF services

              bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

              Airport Operations Budget 2014

              Enplanement 2014

              Airport Staff

              Contract Fire Fire Contract Cost

              Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

              Request for Feedback bull Long-term Parking

              bull Airport Terminal Improvement Conceptual Plan

              bull FundingFinancing Options

              Future Board Items bull February 9 2016

              bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

              bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

              design services long-term parking lot design services and long-term parking lot construction)

              bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

              integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

              bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

              Charles M Schulz - Sonoma County Airport

              2290 Airport Boulevard

              Santa Rosa CA 95403

              (707) 565-7243

              wwwsono macou ntya irportorg

              Follow STS on (j Facebook

              Im Linkedln

              ~ Twitter

              • Slide Number 1
              • Summary
              • Airport Governance
              • Airport Background
              • Current Organizational Chart
              • Airport Enterprise Fund
              • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
              • Airport Master Plan
              • Airfield Layout PlanLand Useand Boundaries
              • Airport Update
              • Airport Update ndash Fuel (Gallons Sold)
              • Airport Update ndash Parking Revenues
              • Airport Update ndash Rental Cars Revenues
              • Airport Updates ndash Passenger Levels
              • Airport Update - HorizonAlaska Airlines
              • Slide Number 16
              • Fare Comparison for STS and Other Airports in the Region
              • Current Passengers and Growth Potential
              • Airline Industry Overview ndash Potential Markets
              • Airports Used by Sonoma County and Surrounding Area Residents
              • Percentage Share Of Passengers For Bay Area Airports By Airline
              • Airline Industry Overview
              • Slide Number 23
              • Airport Developments
              • Slide Number 25
              • Airfield Layout PlanDevelopable Parcels
              • Capital Project Needs
              • Slide Number 28
              • Runway Safety Area ndash Phase II ndash Service Roads
              • Runway Safety Area ndash Phase II ndash Service Roads
              • Aircraft Rescue and Firefighting Building
              • Aircraft Rescue and Firefighting Building
              • New Long-term Parking Lot
              • Slide Number 34
              • Proposed Terminal Enhancement Project
              • Existing Terminal
              • Terminal Renovation ndash Phases I and II
              • New Holdroom (Phase II) ndash South Elevation
              • New Holdroom InteriorLooking East
              • Flex Space ndash Tent Option ndash View from Airfield
              • Existing Terminal ndash View from Airfield Side
              • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
              • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
              • Future Expansion ndash Estimated 2025
              • Future Expansion ndash Estimated 2050
              • Financial Analysis
              • Slide Number 47
              • Airline Rates amp Charges
              • Slide Number 49
              • Slide Number 50
              • Funding Options
              • Current Airport Debt
              • Funding Options ndash Long-term
              • Staffing Analysis
              • Staffing Report
              • Aircraft Rescue and Firefighting (ARFF) Services
              • ARFF Services at Comparable Airports
              • Request for Feedback
              • Future Board Items
              • Slide Number 60

                Airport Master Plan The FAA recommends master plan updates be completed on a 10 year cycle

                in order to reflect changes in FAA standards the aviation market and local regulations

                The Airportrsquos Master Plan process gets FAA buy-in on Airport development and helps with funding eligibility

                FAA-approved element CountyAirport input Public Input

                Airfield Layout Plan Land Use and Boundaries

                Airport Update

                Airport Update ndash Fuel (Gallons Sold) 3000000 6000

                2010 2011 2012 2013 2014 2015 000

                1000

                2000

                3000

                4000

                5000

                shy

                500000

                1000000

                1500000

                2000000

                2500000

                Gal

                lons

                Airport Update ndash Parking Revenues $1000000 5000

                000

                500

                1000

                1500

                2000

                2500

                3000

                3500

                4000

                4500

                $shy

                $100000

                $200000

                $300000

                $400000

                $500000

                $600000

                $700000

                $800000

                $900000

                2010 2011 2012 2013 2014 2015

                Actuals Projected Percentage Change

                Airport Update ndash Rental Cars Revenues $6000000 4500

                2010 2011 2012 2013 2014 2015

                Actuals Projected Percentage Change

                000

                500

                1000

                1500

                2000

                2500

                3000

                3500

                4000

                $shy

                $1000000

                $2000000

                $3000000

                $4000000

                $5000000

                Airport Updates ndash Passenger Levels

                Airport Update - HorizonAlaska Airlines

                bull STS is an integral part of the Horizon AirAlaska Airlines market strategy

                bull 65 of Horizon Airrsquos total capacity operates out of STS

                bull STS is the 14th busiest Airport in the Horizon network (out of 45 destinations)

                bull STS is the 6th largest market by available seat miles flown (Seattle Portland Boise Spokane Reno Santa Rosa)

                bull Each new flight added by Horizon has quickly sold at near seat capacity

                bull Other airlines have noted STSrsquos ability to absorb new seat capacity

                Airline Economic Impacts of STS

                bull Alaskarsquos seven daily flights represents approximately bull $161 million economic impact bull 490 jobs in the community

                bull Anticipate 14 to 16 commercial flights per day by summer of 2021

                bull 16 daily flights represents approximately bull $368 million economic impact bull 1120 jobs in the community

                bull Every new flight generates approximately a $23 million economic impact and 70 jobs in the community

                bull The average visitor to Sonoma County spends $44298 per day

                Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento

                Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff

                Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7

                with travel costs $18467 34 $22354 46 $18530 35 $23950 49

                Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11

                with travel costs $21679 24 $23848 31 $21789 24 $25704 36

                Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13

                with travel costs $19540 34 $22889 43 $20842 38 $22302 42

                San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6

                with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data

                bull HorizonAlaska airfares are competitive with other regional airports

                bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49

                Current Passengers and Growth Potential

                Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential

                STS-LAX 85213 372030 229 63599

                STS-SAN 40265 143161 281 31316

                STS-SEA 39711 113852 349 17215

                STS-PDX 29638 82057 361 11391

                Passenger data for YE June 30 2014

                Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS

                Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14

                Airports Used by Sonoma County and Surrounding Area Residents

                Share of Passenger Bookings ndash All Airlines

                Oakland Sacramento 7 5

                STS 2

                San jose 1

                San Francisco 85

                Percentage Share Of Passengers For Bay Area Airports By Airline

                Other US AlaskaHorizon 3 American Airlines

                6 13

                International Delta Air Lines 13 8

                Southwest Virgin America 5

                4

                United Airlines 48

                Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the

                domestic airline capacity

                Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United

                Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS

                Aircraft manufacturers are shifting production away from small (under 60 seat) jets

                Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels

                STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels

                Departing Seats STS vs Similar AirportsIndexed to CY 2008

                20 170

                15

                10

                5

                0

                -5

                -10

                -15

                -20

                STS 81 104

                46

                01

                -63 -52 -37

                -116 -164

                -136 -170 -154 -151

                -169

                2008 2009 2010 2011 2012 2013 2014 2015 2016

                Airport Developments

                Development at STS

                In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations

                The Airport has four (4) signed term sheets ndash

                bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)

                bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations

                In negotiations with Kaiser Air for a new lease to add a third hangar

                Proposed improvements total over $13 million

                Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year

                Airfield Layout Plan

                Developable Parcels

                Capital Project Needs

                Completed Projects

                bull Remodeled existing terminal in 2010 adding 5000 square feet

                bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway

                bull Rehabilitated the airline parking apron

                bull Expanded rental car staging areas

                bull Reconfigured the current long-term parking lot to expand parking spaces

                bull Reconfigured and expanded the rental car return lot to double the parking spaces

                bull Installed a new rental car wash system and vehicle detail area

                Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads

                bull The service road portion of the project was removed from the main contract to match availability of federal funding

                bull Construction is early FY16-17

                bull Project was bid in August 2015 waiting for federal funding to award

                bull Project estimate is $2 million

                bull 9066 federally funded

                Runway Safety Area ndash Phase II ndash Service Roads

                Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets

                current standards for either ARFF or ADA regulations

                bull Location of current facility is in the way of long-term terminal expansion needs

                bull A new location has not been selected conceptually studied in 2012 Airport Master Plan

                bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements

                bull Preliminary project estimate is $7 to $8 million

                bull Federal funding (90) should be available for this project

                bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA

                Aircraft Rescue and Firefighting Building

                New Long-term Parking Lot

                bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers

                bull The current long-term lot exceeded capacity 5 times in 2015

                bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day

                bull The proposed parking lot would add approximately 440 parking spaces

                bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000

                bull Staff is recommending construction as a single phase project

                New long-term parking lot ndash Site location

                Terminal

                Proposed Terminal Enhancement Project

                bull Terminal design objectives included

                bull Meeting immediate and near-term needs

                bull Establish a project budget for near-term improvements that is affordable for the Airport

                bull Design character that signifies its role as a gateway to the region

                bull Phase expansion that does not impact current operations

                bull Anticipating future needs and establish a pattern of design for future expansions

                bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

                bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

                Existing Terminal

                Terminal Renovation ndash Phases I and II

                New Holdroom (Phase II) ndash East Elevation

                New Holdroom (Phase II) ndash South Elevation

                New Holdroom Interior Looking East

                New Holdroom Interior Looking North

                Flex Space ndash Conventional Construction ndash View from Airfield

                Flex Space ndash Tent Option ndash View from Airfield

                Existing Terminal ndash View from Airfield Side

                Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                Tent option Phase I

                Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                Future Expansion ndash Estimated 2025

                Future Expansion ndash Estimated 2050

                Financial Analysis

                Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                financial operations to prepare a financial forecasting model

                bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                Airline Rates amp Charges

                Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                double current levels

                bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                The proposed fees are anticipated to increase revenues by $250000 annually

                Staff agrees with the consultantrsquos recommended airline rates and charges

                Funding Options

                Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                Funding Needs

                bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                Staffing Analysis

                Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                an assessment of staffing for current needs and forecasted Airport growth over the next five years

                bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                requirements spending approximately $220000 annually to provide ARFF coverage and training

                bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                bull Most airports similar to or larger than STS have contracted ARFF services

                bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                Airport Operations Budget 2014

                Enplanement 2014

                Airport Staff

                Contract Fire Fire Contract Cost

                Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                Request for Feedback bull Long-term Parking

                bull Airport Terminal Improvement Conceptual Plan

                bull FundingFinancing Options

                Future Board Items bull February 9 2016

                bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                design services long-term parking lot design services and long-term parking lot construction)

                bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                Charles M Schulz - Sonoma County Airport

                2290 Airport Boulevard

                Santa Rosa CA 95403

                (707) 565-7243

                wwwsono macou ntya irportorg

                Follow STS on (j Facebook

                Im Linkedln

                ~ Twitter

                • Slide Number 1
                • Summary
                • Airport Governance
                • Airport Background
                • Current Organizational Chart
                • Airport Enterprise Fund
                • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                • Airport Master Plan
                • Airfield Layout PlanLand Useand Boundaries
                • Airport Update
                • Airport Update ndash Fuel (Gallons Sold)
                • Airport Update ndash Parking Revenues
                • Airport Update ndash Rental Cars Revenues
                • Airport Updates ndash Passenger Levels
                • Airport Update - HorizonAlaska Airlines
                • Slide Number 16
                • Fare Comparison for STS and Other Airports in the Region
                • Current Passengers and Growth Potential
                • Airline Industry Overview ndash Potential Markets
                • Airports Used by Sonoma County and Surrounding Area Residents
                • Percentage Share Of Passengers For Bay Area Airports By Airline
                • Airline Industry Overview
                • Slide Number 23
                • Airport Developments
                • Slide Number 25
                • Airfield Layout PlanDevelopable Parcels
                • Capital Project Needs
                • Slide Number 28
                • Runway Safety Area ndash Phase II ndash Service Roads
                • Runway Safety Area ndash Phase II ndash Service Roads
                • Aircraft Rescue and Firefighting Building
                • Aircraft Rescue and Firefighting Building
                • New Long-term Parking Lot
                • Slide Number 34
                • Proposed Terminal Enhancement Project
                • Existing Terminal
                • Terminal Renovation ndash Phases I and II
                • New Holdroom (Phase II) ndash South Elevation
                • New Holdroom InteriorLooking East
                • Flex Space ndash Tent Option ndash View from Airfield
                • Existing Terminal ndash View from Airfield Side
                • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                • Future Expansion ndash Estimated 2025
                • Future Expansion ndash Estimated 2050
                • Financial Analysis
                • Slide Number 47
                • Airline Rates amp Charges
                • Slide Number 49
                • Slide Number 50
                • Funding Options
                • Current Airport Debt
                • Funding Options ndash Long-term
                • Staffing Analysis
                • Staffing Report
                • Aircraft Rescue and Firefighting (ARFF) Services
                • ARFF Services at Comparable Airports
                • Request for Feedback
                • Future Board Items
                • Slide Number 60

                  Airfield Layout Plan Land Use and Boundaries

                  Airport Update

                  Airport Update ndash Fuel (Gallons Sold) 3000000 6000

                  2010 2011 2012 2013 2014 2015 000

                  1000

                  2000

                  3000

                  4000

                  5000

                  shy

                  500000

                  1000000

                  1500000

                  2000000

                  2500000

                  Gal

                  lons

                  Airport Update ndash Parking Revenues $1000000 5000

                  000

                  500

                  1000

                  1500

                  2000

                  2500

                  3000

                  3500

                  4000

                  4500

                  $shy

                  $100000

                  $200000

                  $300000

                  $400000

                  $500000

                  $600000

                  $700000

                  $800000

                  $900000

                  2010 2011 2012 2013 2014 2015

                  Actuals Projected Percentage Change

                  Airport Update ndash Rental Cars Revenues $6000000 4500

                  2010 2011 2012 2013 2014 2015

                  Actuals Projected Percentage Change

                  000

                  500

                  1000

                  1500

                  2000

                  2500

                  3000

                  3500

                  4000

                  $shy

                  $1000000

                  $2000000

                  $3000000

                  $4000000

                  $5000000

                  Airport Updates ndash Passenger Levels

                  Airport Update - HorizonAlaska Airlines

                  bull STS is an integral part of the Horizon AirAlaska Airlines market strategy

                  bull 65 of Horizon Airrsquos total capacity operates out of STS

                  bull STS is the 14th busiest Airport in the Horizon network (out of 45 destinations)

                  bull STS is the 6th largest market by available seat miles flown (Seattle Portland Boise Spokane Reno Santa Rosa)

                  bull Each new flight added by Horizon has quickly sold at near seat capacity

                  bull Other airlines have noted STSrsquos ability to absorb new seat capacity

                  Airline Economic Impacts of STS

                  bull Alaskarsquos seven daily flights represents approximately bull $161 million economic impact bull 490 jobs in the community

                  bull Anticipate 14 to 16 commercial flights per day by summer of 2021

                  bull 16 daily flights represents approximately bull $368 million economic impact bull 1120 jobs in the community

                  bull Every new flight generates approximately a $23 million economic impact and 70 jobs in the community

                  bull The average visitor to Sonoma County spends $44298 per day

                  Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento

                  Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff

                  Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7

                  with travel costs $18467 34 $22354 46 $18530 35 $23950 49

                  Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11

                  with travel costs $21679 24 $23848 31 $21789 24 $25704 36

                  Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13

                  with travel costs $19540 34 $22889 43 $20842 38 $22302 42

                  San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6

                  with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data

                  bull HorizonAlaska airfares are competitive with other regional airports

                  bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49

                  Current Passengers and Growth Potential

                  Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential

                  STS-LAX 85213 372030 229 63599

                  STS-SAN 40265 143161 281 31316

                  STS-SEA 39711 113852 349 17215

                  STS-PDX 29638 82057 361 11391

                  Passenger data for YE June 30 2014

                  Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS

                  Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14

                  Airports Used by Sonoma County and Surrounding Area Residents

                  Share of Passenger Bookings ndash All Airlines

                  Oakland Sacramento 7 5

                  STS 2

                  San jose 1

                  San Francisco 85

                  Percentage Share Of Passengers For Bay Area Airports By Airline

                  Other US AlaskaHorizon 3 American Airlines

                  6 13

                  International Delta Air Lines 13 8

                  Southwest Virgin America 5

                  4

                  United Airlines 48

                  Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the

                  domestic airline capacity

                  Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United

                  Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS

                  Aircraft manufacturers are shifting production away from small (under 60 seat) jets

                  Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels

                  STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels

                  Departing Seats STS vs Similar AirportsIndexed to CY 2008

                  20 170

                  15

                  10

                  5

                  0

                  -5

                  -10

                  -15

                  -20

                  STS 81 104

                  46

                  01

                  -63 -52 -37

                  -116 -164

                  -136 -170 -154 -151

                  -169

                  2008 2009 2010 2011 2012 2013 2014 2015 2016

                  Airport Developments

                  Development at STS

                  In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations

                  The Airport has four (4) signed term sheets ndash

                  bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)

                  bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations

                  In negotiations with Kaiser Air for a new lease to add a third hangar

                  Proposed improvements total over $13 million

                  Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year

                  Airfield Layout Plan

                  Developable Parcels

                  Capital Project Needs

                  Completed Projects

                  bull Remodeled existing terminal in 2010 adding 5000 square feet

                  bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway

                  bull Rehabilitated the airline parking apron

                  bull Expanded rental car staging areas

                  bull Reconfigured the current long-term parking lot to expand parking spaces

                  bull Reconfigured and expanded the rental car return lot to double the parking spaces

                  bull Installed a new rental car wash system and vehicle detail area

                  Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads

                  bull The service road portion of the project was removed from the main contract to match availability of federal funding

                  bull Construction is early FY16-17

                  bull Project was bid in August 2015 waiting for federal funding to award

                  bull Project estimate is $2 million

                  bull 9066 federally funded

                  Runway Safety Area ndash Phase II ndash Service Roads

                  Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets

                  current standards for either ARFF or ADA regulations

                  bull Location of current facility is in the way of long-term terminal expansion needs

                  bull A new location has not been selected conceptually studied in 2012 Airport Master Plan

                  bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements

                  bull Preliminary project estimate is $7 to $8 million

                  bull Federal funding (90) should be available for this project

                  bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA

                  Aircraft Rescue and Firefighting Building

                  New Long-term Parking Lot

                  bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers

                  bull The current long-term lot exceeded capacity 5 times in 2015

                  bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day

                  bull The proposed parking lot would add approximately 440 parking spaces

                  bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000

                  bull Staff is recommending construction as a single phase project

                  New long-term parking lot ndash Site location

                  Terminal

                  Proposed Terminal Enhancement Project

                  bull Terminal design objectives included

                  bull Meeting immediate and near-term needs

                  bull Establish a project budget for near-term improvements that is affordable for the Airport

                  bull Design character that signifies its role as a gateway to the region

                  bull Phase expansion that does not impact current operations

                  bull Anticipating future needs and establish a pattern of design for future expansions

                  bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

                  bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

                  Existing Terminal

                  Terminal Renovation ndash Phases I and II

                  New Holdroom (Phase II) ndash East Elevation

                  New Holdroom (Phase II) ndash South Elevation

                  New Holdroom Interior Looking East

                  New Holdroom Interior Looking North

                  Flex Space ndash Conventional Construction ndash View from Airfield

                  Flex Space ndash Tent Option ndash View from Airfield

                  Existing Terminal ndash View from Airfield Side

                  Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                  Tent option Phase I

                  Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                  Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                  Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                  Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                  Future Expansion ndash Estimated 2025

                  Future Expansion ndash Estimated 2050

                  Financial Analysis

                  Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                  financial operations to prepare a financial forecasting model

                  bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                  bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                  bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                  bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                  Airline Rates amp Charges

                  Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                  double current levels

                  bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                  bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                  bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                  bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                  bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                  Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                  Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                  Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                  Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                  ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                  The proposed fees are anticipated to increase revenues by $250000 annually

                  Staff agrees with the consultantrsquos recommended airline rates and charges

                  Funding Options

                  Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                  Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                  Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                  Funding Needs

                  bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                  bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                  Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                  bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                  Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                  The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                  Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                  Staffing Analysis

                  Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                  an assessment of staffing for current needs and forecasted Airport growth over the next five years

                  bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                  bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                  bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                  bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                  Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                  requirements spending approximately $220000 annually to provide ARFF coverage and training

                  bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                  bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                  bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                  bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                  ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                  bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                  bull Most airports similar to or larger than STS have contracted ARFF services

                  bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                  Airport Operations Budget 2014

                  Enplanement 2014

                  Airport Staff

                  Contract Fire Fire Contract Cost

                  Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                  Request for Feedback bull Long-term Parking

                  bull Airport Terminal Improvement Conceptual Plan

                  bull FundingFinancing Options

                  Future Board Items bull February 9 2016

                  bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                  bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                  design services long-term parking lot design services and long-term parking lot construction)

                  bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                  integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                  bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                  Charles M Schulz - Sonoma County Airport

                  2290 Airport Boulevard

                  Santa Rosa CA 95403

                  (707) 565-7243

                  wwwsono macou ntya irportorg

                  Follow STS on (j Facebook

                  Im Linkedln

                  ~ Twitter

                  • Slide Number 1
                  • Summary
                  • Airport Governance
                  • Airport Background
                  • Current Organizational Chart
                  • Airport Enterprise Fund
                  • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                  • Airport Master Plan
                  • Airfield Layout PlanLand Useand Boundaries
                  • Airport Update
                  • Airport Update ndash Fuel (Gallons Sold)
                  • Airport Update ndash Parking Revenues
                  • Airport Update ndash Rental Cars Revenues
                  • Airport Updates ndash Passenger Levels
                  • Airport Update - HorizonAlaska Airlines
                  • Slide Number 16
                  • Fare Comparison for STS and Other Airports in the Region
                  • Current Passengers and Growth Potential
                  • Airline Industry Overview ndash Potential Markets
                  • Airports Used by Sonoma County and Surrounding Area Residents
                  • Percentage Share Of Passengers For Bay Area Airports By Airline
                  • Airline Industry Overview
                  • Slide Number 23
                  • Airport Developments
                  • Slide Number 25
                  • Airfield Layout PlanDevelopable Parcels
                  • Capital Project Needs
                  • Slide Number 28
                  • Runway Safety Area ndash Phase II ndash Service Roads
                  • Runway Safety Area ndash Phase II ndash Service Roads
                  • Aircraft Rescue and Firefighting Building
                  • Aircraft Rescue and Firefighting Building
                  • New Long-term Parking Lot
                  • Slide Number 34
                  • Proposed Terminal Enhancement Project
                  • Existing Terminal
                  • Terminal Renovation ndash Phases I and II
                  • New Holdroom (Phase II) ndash South Elevation
                  • New Holdroom InteriorLooking East
                  • Flex Space ndash Tent Option ndash View from Airfield
                  • Existing Terminal ndash View from Airfield Side
                  • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                  • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                  • Future Expansion ndash Estimated 2025
                  • Future Expansion ndash Estimated 2050
                  • Financial Analysis
                  • Slide Number 47
                  • Airline Rates amp Charges
                  • Slide Number 49
                  • Slide Number 50
                  • Funding Options
                  • Current Airport Debt
                  • Funding Options ndash Long-term
                  • Staffing Analysis
                  • Staffing Report
                  • Aircraft Rescue and Firefighting (ARFF) Services
                  • ARFF Services at Comparable Airports
                  • Request for Feedback
                  • Future Board Items
                  • Slide Number 60

                    Airport Update

                    Airport Update ndash Fuel (Gallons Sold) 3000000 6000

                    2010 2011 2012 2013 2014 2015 000

                    1000

                    2000

                    3000

                    4000

                    5000

                    shy

                    500000

                    1000000

                    1500000

                    2000000

                    2500000

                    Gal

                    lons

                    Airport Update ndash Parking Revenues $1000000 5000

                    000

                    500

                    1000

                    1500

                    2000

                    2500

                    3000

                    3500

                    4000

                    4500

                    $shy

                    $100000

                    $200000

                    $300000

                    $400000

                    $500000

                    $600000

                    $700000

                    $800000

                    $900000

                    2010 2011 2012 2013 2014 2015

                    Actuals Projected Percentage Change

                    Airport Update ndash Rental Cars Revenues $6000000 4500

                    2010 2011 2012 2013 2014 2015

                    Actuals Projected Percentage Change

                    000

                    500

                    1000

                    1500

                    2000

                    2500

                    3000

                    3500

                    4000

                    $shy

                    $1000000

                    $2000000

                    $3000000

                    $4000000

                    $5000000

                    Airport Updates ndash Passenger Levels

                    Airport Update - HorizonAlaska Airlines

                    bull STS is an integral part of the Horizon AirAlaska Airlines market strategy

                    bull 65 of Horizon Airrsquos total capacity operates out of STS

                    bull STS is the 14th busiest Airport in the Horizon network (out of 45 destinations)

                    bull STS is the 6th largest market by available seat miles flown (Seattle Portland Boise Spokane Reno Santa Rosa)

                    bull Each new flight added by Horizon has quickly sold at near seat capacity

                    bull Other airlines have noted STSrsquos ability to absorb new seat capacity

                    Airline Economic Impacts of STS

                    bull Alaskarsquos seven daily flights represents approximately bull $161 million economic impact bull 490 jobs in the community

                    bull Anticipate 14 to 16 commercial flights per day by summer of 2021

                    bull 16 daily flights represents approximately bull $368 million economic impact bull 1120 jobs in the community

                    bull Every new flight generates approximately a $23 million economic impact and 70 jobs in the community

                    bull The average visitor to Sonoma County spends $44298 per day

                    Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento

                    Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff

                    Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7

                    with travel costs $18467 34 $22354 46 $18530 35 $23950 49

                    Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11

                    with travel costs $21679 24 $23848 31 $21789 24 $25704 36

                    Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13

                    with travel costs $19540 34 $22889 43 $20842 38 $22302 42

                    San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6

                    with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data

                    bull HorizonAlaska airfares are competitive with other regional airports

                    bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49

                    Current Passengers and Growth Potential

                    Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential

                    STS-LAX 85213 372030 229 63599

                    STS-SAN 40265 143161 281 31316

                    STS-SEA 39711 113852 349 17215

                    STS-PDX 29638 82057 361 11391

                    Passenger data for YE June 30 2014

                    Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS

                    Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14

                    Airports Used by Sonoma County and Surrounding Area Residents

                    Share of Passenger Bookings ndash All Airlines

                    Oakland Sacramento 7 5

                    STS 2

                    San jose 1

                    San Francisco 85

                    Percentage Share Of Passengers For Bay Area Airports By Airline

                    Other US AlaskaHorizon 3 American Airlines

                    6 13

                    International Delta Air Lines 13 8

                    Southwest Virgin America 5

                    4

                    United Airlines 48

                    Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the

                    domestic airline capacity

                    Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United

                    Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS

                    Aircraft manufacturers are shifting production away from small (under 60 seat) jets

                    Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels

                    STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels

                    Departing Seats STS vs Similar AirportsIndexed to CY 2008

                    20 170

                    15

                    10

                    5

                    0

                    -5

                    -10

                    -15

                    -20

                    STS 81 104

                    46

                    01

                    -63 -52 -37

                    -116 -164

                    -136 -170 -154 -151

                    -169

                    2008 2009 2010 2011 2012 2013 2014 2015 2016

                    Airport Developments

                    Development at STS

                    In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations

                    The Airport has four (4) signed term sheets ndash

                    bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)

                    bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations

                    In negotiations with Kaiser Air for a new lease to add a third hangar

                    Proposed improvements total over $13 million

                    Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year

                    Airfield Layout Plan

                    Developable Parcels

                    Capital Project Needs

                    Completed Projects

                    bull Remodeled existing terminal in 2010 adding 5000 square feet

                    bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway

                    bull Rehabilitated the airline parking apron

                    bull Expanded rental car staging areas

                    bull Reconfigured the current long-term parking lot to expand parking spaces

                    bull Reconfigured and expanded the rental car return lot to double the parking spaces

                    bull Installed a new rental car wash system and vehicle detail area

                    Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads

                    bull The service road portion of the project was removed from the main contract to match availability of federal funding

                    bull Construction is early FY16-17

                    bull Project was bid in August 2015 waiting for federal funding to award

                    bull Project estimate is $2 million

                    bull 9066 federally funded

                    Runway Safety Area ndash Phase II ndash Service Roads

                    Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets

                    current standards for either ARFF or ADA regulations

                    bull Location of current facility is in the way of long-term terminal expansion needs

                    bull A new location has not been selected conceptually studied in 2012 Airport Master Plan

                    bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements

                    bull Preliminary project estimate is $7 to $8 million

                    bull Federal funding (90) should be available for this project

                    bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA

                    Aircraft Rescue and Firefighting Building

                    New Long-term Parking Lot

                    bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers

                    bull The current long-term lot exceeded capacity 5 times in 2015

                    bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day

                    bull The proposed parking lot would add approximately 440 parking spaces

                    bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000

                    bull Staff is recommending construction as a single phase project

                    New long-term parking lot ndash Site location

                    Terminal

                    Proposed Terminal Enhancement Project

                    bull Terminal design objectives included

                    bull Meeting immediate and near-term needs

                    bull Establish a project budget for near-term improvements that is affordable for the Airport

                    bull Design character that signifies its role as a gateway to the region

                    bull Phase expansion that does not impact current operations

                    bull Anticipating future needs and establish a pattern of design for future expansions

                    bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

                    bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

                    Existing Terminal

                    Terminal Renovation ndash Phases I and II

                    New Holdroom (Phase II) ndash East Elevation

                    New Holdroom (Phase II) ndash South Elevation

                    New Holdroom Interior Looking East

                    New Holdroom Interior Looking North

                    Flex Space ndash Conventional Construction ndash View from Airfield

                    Flex Space ndash Tent Option ndash View from Airfield

                    Existing Terminal ndash View from Airfield Side

                    Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                    Tent option Phase I

                    Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                    Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                    Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                    Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                    Future Expansion ndash Estimated 2025

                    Future Expansion ndash Estimated 2050

                    Financial Analysis

                    Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                    financial operations to prepare a financial forecasting model

                    bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                    bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                    bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                    bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                    Airline Rates amp Charges

                    Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                    double current levels

                    bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                    bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                    bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                    bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                    bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                    Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                    Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                    Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                    Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                    ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                    The proposed fees are anticipated to increase revenues by $250000 annually

                    Staff agrees with the consultantrsquos recommended airline rates and charges

                    Funding Options

                    Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                    Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                    Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                    Funding Needs

                    bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                    bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                    Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                    bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                    Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                    The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                    Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                    Staffing Analysis

                    Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                    an assessment of staffing for current needs and forecasted Airport growth over the next five years

                    bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                    bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                    bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                    bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                    Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                    requirements spending approximately $220000 annually to provide ARFF coverage and training

                    bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                    bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                    bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                    bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                    ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                    bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                    bull Most airports similar to or larger than STS have contracted ARFF services

                    bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                    Airport Operations Budget 2014

                    Enplanement 2014

                    Airport Staff

                    Contract Fire Fire Contract Cost

                    Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                    Request for Feedback bull Long-term Parking

                    bull Airport Terminal Improvement Conceptual Plan

                    bull FundingFinancing Options

                    Future Board Items bull February 9 2016

                    bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                    bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                    design services long-term parking lot design services and long-term parking lot construction)

                    bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                    integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                    bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                    Charles M Schulz - Sonoma County Airport

                    2290 Airport Boulevard

                    Santa Rosa CA 95403

                    (707) 565-7243

                    wwwsono macou ntya irportorg

                    Follow STS on (j Facebook

                    Im Linkedln

                    ~ Twitter

                    • Slide Number 1
                    • Summary
                    • Airport Governance
                    • Airport Background
                    • Current Organizational Chart
                    • Airport Enterprise Fund
                    • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                    • Airport Master Plan
                    • Airfield Layout PlanLand Useand Boundaries
                    • Airport Update
                    • Airport Update ndash Fuel (Gallons Sold)
                    • Airport Update ndash Parking Revenues
                    • Airport Update ndash Rental Cars Revenues
                    • Airport Updates ndash Passenger Levels
                    • Airport Update - HorizonAlaska Airlines
                    • Slide Number 16
                    • Fare Comparison for STS and Other Airports in the Region
                    • Current Passengers and Growth Potential
                    • Airline Industry Overview ndash Potential Markets
                    • Airports Used by Sonoma County and Surrounding Area Residents
                    • Percentage Share Of Passengers For Bay Area Airports By Airline
                    • Airline Industry Overview
                    • Slide Number 23
                    • Airport Developments
                    • Slide Number 25
                    • Airfield Layout PlanDevelopable Parcels
                    • Capital Project Needs
                    • Slide Number 28
                    • Runway Safety Area ndash Phase II ndash Service Roads
                    • Runway Safety Area ndash Phase II ndash Service Roads
                    • Aircraft Rescue and Firefighting Building
                    • Aircraft Rescue and Firefighting Building
                    • New Long-term Parking Lot
                    • Slide Number 34
                    • Proposed Terminal Enhancement Project
                    • Existing Terminal
                    • Terminal Renovation ndash Phases I and II
                    • New Holdroom (Phase II) ndash South Elevation
                    • New Holdroom InteriorLooking East
                    • Flex Space ndash Tent Option ndash View from Airfield
                    • Existing Terminal ndash View from Airfield Side
                    • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                    • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                    • Future Expansion ndash Estimated 2025
                    • Future Expansion ndash Estimated 2050
                    • Financial Analysis
                    • Slide Number 47
                    • Airline Rates amp Charges
                    • Slide Number 49
                    • Slide Number 50
                    • Funding Options
                    • Current Airport Debt
                    • Funding Options ndash Long-term
                    • Staffing Analysis
                    • Staffing Report
                    • Aircraft Rescue and Firefighting (ARFF) Services
                    • ARFF Services at Comparable Airports
                    • Request for Feedback
                    • Future Board Items
                    • Slide Number 60

                      Airport Update ndash Fuel (Gallons Sold) 3000000 6000

                      2010 2011 2012 2013 2014 2015 000

                      1000

                      2000

                      3000

                      4000

                      5000

                      shy

                      500000

                      1000000

                      1500000

                      2000000

                      2500000

                      Gal

                      lons

                      Airport Update ndash Parking Revenues $1000000 5000

                      000

                      500

                      1000

                      1500

                      2000

                      2500

                      3000

                      3500

                      4000

                      4500

                      $shy

                      $100000

                      $200000

                      $300000

                      $400000

                      $500000

                      $600000

                      $700000

                      $800000

                      $900000

                      2010 2011 2012 2013 2014 2015

                      Actuals Projected Percentage Change

                      Airport Update ndash Rental Cars Revenues $6000000 4500

                      2010 2011 2012 2013 2014 2015

                      Actuals Projected Percentage Change

                      000

                      500

                      1000

                      1500

                      2000

                      2500

                      3000

                      3500

                      4000

                      $shy

                      $1000000

                      $2000000

                      $3000000

                      $4000000

                      $5000000

                      Airport Updates ndash Passenger Levels

                      Airport Update - HorizonAlaska Airlines

                      bull STS is an integral part of the Horizon AirAlaska Airlines market strategy

                      bull 65 of Horizon Airrsquos total capacity operates out of STS

                      bull STS is the 14th busiest Airport in the Horizon network (out of 45 destinations)

                      bull STS is the 6th largest market by available seat miles flown (Seattle Portland Boise Spokane Reno Santa Rosa)

                      bull Each new flight added by Horizon has quickly sold at near seat capacity

                      bull Other airlines have noted STSrsquos ability to absorb new seat capacity

                      Airline Economic Impacts of STS

                      bull Alaskarsquos seven daily flights represents approximately bull $161 million economic impact bull 490 jobs in the community

                      bull Anticipate 14 to 16 commercial flights per day by summer of 2021

                      bull 16 daily flights represents approximately bull $368 million economic impact bull 1120 jobs in the community

                      bull Every new flight generates approximately a $23 million economic impact and 70 jobs in the community

                      bull The average visitor to Sonoma County spends $44298 per day

                      Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento

                      Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff

                      Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7

                      with travel costs $18467 34 $22354 46 $18530 35 $23950 49

                      Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11

                      with travel costs $21679 24 $23848 31 $21789 24 $25704 36

                      Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13

                      with travel costs $19540 34 $22889 43 $20842 38 $22302 42

                      San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6

                      with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data

                      bull HorizonAlaska airfares are competitive with other regional airports

                      bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49

                      Current Passengers and Growth Potential

                      Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential

                      STS-LAX 85213 372030 229 63599

                      STS-SAN 40265 143161 281 31316

                      STS-SEA 39711 113852 349 17215

                      STS-PDX 29638 82057 361 11391

                      Passenger data for YE June 30 2014

                      Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS

                      Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14

                      Airports Used by Sonoma County and Surrounding Area Residents

                      Share of Passenger Bookings ndash All Airlines

                      Oakland Sacramento 7 5

                      STS 2

                      San jose 1

                      San Francisco 85

                      Percentage Share Of Passengers For Bay Area Airports By Airline

                      Other US AlaskaHorizon 3 American Airlines

                      6 13

                      International Delta Air Lines 13 8

                      Southwest Virgin America 5

                      4

                      United Airlines 48

                      Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the

                      domestic airline capacity

                      Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United

                      Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS

                      Aircraft manufacturers are shifting production away from small (under 60 seat) jets

                      Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels

                      STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels

                      Departing Seats STS vs Similar AirportsIndexed to CY 2008

                      20 170

                      15

                      10

                      5

                      0

                      -5

                      -10

                      -15

                      -20

                      STS 81 104

                      46

                      01

                      -63 -52 -37

                      -116 -164

                      -136 -170 -154 -151

                      -169

                      2008 2009 2010 2011 2012 2013 2014 2015 2016

                      Airport Developments

                      Development at STS

                      In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations

                      The Airport has four (4) signed term sheets ndash

                      bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)

                      bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations

                      In negotiations with Kaiser Air for a new lease to add a third hangar

                      Proposed improvements total over $13 million

                      Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year

                      Airfield Layout Plan

                      Developable Parcels

                      Capital Project Needs

                      Completed Projects

                      bull Remodeled existing terminal in 2010 adding 5000 square feet

                      bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway

                      bull Rehabilitated the airline parking apron

                      bull Expanded rental car staging areas

                      bull Reconfigured the current long-term parking lot to expand parking spaces

                      bull Reconfigured and expanded the rental car return lot to double the parking spaces

                      bull Installed a new rental car wash system and vehicle detail area

                      Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads

                      bull The service road portion of the project was removed from the main contract to match availability of federal funding

                      bull Construction is early FY16-17

                      bull Project was bid in August 2015 waiting for federal funding to award

                      bull Project estimate is $2 million

                      bull 9066 federally funded

                      Runway Safety Area ndash Phase II ndash Service Roads

                      Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets

                      current standards for either ARFF or ADA regulations

                      bull Location of current facility is in the way of long-term terminal expansion needs

                      bull A new location has not been selected conceptually studied in 2012 Airport Master Plan

                      bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements

                      bull Preliminary project estimate is $7 to $8 million

                      bull Federal funding (90) should be available for this project

                      bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA

                      Aircraft Rescue and Firefighting Building

                      New Long-term Parking Lot

                      bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers

                      bull The current long-term lot exceeded capacity 5 times in 2015

                      bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day

                      bull The proposed parking lot would add approximately 440 parking spaces

                      bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000

                      bull Staff is recommending construction as a single phase project

                      New long-term parking lot ndash Site location

                      Terminal

                      Proposed Terminal Enhancement Project

                      bull Terminal design objectives included

                      bull Meeting immediate and near-term needs

                      bull Establish a project budget for near-term improvements that is affordable for the Airport

                      bull Design character that signifies its role as a gateway to the region

                      bull Phase expansion that does not impact current operations

                      bull Anticipating future needs and establish a pattern of design for future expansions

                      bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

                      bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

                      Existing Terminal

                      Terminal Renovation ndash Phases I and II

                      New Holdroom (Phase II) ndash East Elevation

                      New Holdroom (Phase II) ndash South Elevation

                      New Holdroom Interior Looking East

                      New Holdroom Interior Looking North

                      Flex Space ndash Conventional Construction ndash View from Airfield

                      Flex Space ndash Tent Option ndash View from Airfield

                      Existing Terminal ndash View from Airfield Side

                      Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                      Tent option Phase I

                      Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                      Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                      Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                      Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                      Future Expansion ndash Estimated 2025

                      Future Expansion ndash Estimated 2050

                      Financial Analysis

                      Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                      financial operations to prepare a financial forecasting model

                      bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                      bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                      bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                      bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                      Airline Rates amp Charges

                      Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                      double current levels

                      bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                      bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                      bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                      bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                      bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                      Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                      Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                      Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                      Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                      ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                      The proposed fees are anticipated to increase revenues by $250000 annually

                      Staff agrees with the consultantrsquos recommended airline rates and charges

                      Funding Options

                      Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                      Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                      Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                      Funding Needs

                      bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                      bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                      Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                      bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                      Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                      The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                      Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                      Staffing Analysis

                      Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                      an assessment of staffing for current needs and forecasted Airport growth over the next five years

                      bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                      bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                      bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                      bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                      Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                      requirements spending approximately $220000 annually to provide ARFF coverage and training

                      bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                      bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                      bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                      bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                      ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                      bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                      bull Most airports similar to or larger than STS have contracted ARFF services

                      bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                      Airport Operations Budget 2014

                      Enplanement 2014

                      Airport Staff

                      Contract Fire Fire Contract Cost

                      Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                      Request for Feedback bull Long-term Parking

                      bull Airport Terminal Improvement Conceptual Plan

                      bull FundingFinancing Options

                      Future Board Items bull February 9 2016

                      bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                      bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                      design services long-term parking lot design services and long-term parking lot construction)

                      bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                      integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                      bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                      Charles M Schulz - Sonoma County Airport

                      2290 Airport Boulevard

                      Santa Rosa CA 95403

                      (707) 565-7243

                      wwwsono macou ntya irportorg

                      Follow STS on (j Facebook

                      Im Linkedln

                      ~ Twitter

                      • Slide Number 1
                      • Summary
                      • Airport Governance
                      • Airport Background
                      • Current Organizational Chart
                      • Airport Enterprise Fund
                      • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                      • Airport Master Plan
                      • Airfield Layout PlanLand Useand Boundaries
                      • Airport Update
                      • Airport Update ndash Fuel (Gallons Sold)
                      • Airport Update ndash Parking Revenues
                      • Airport Update ndash Rental Cars Revenues
                      • Airport Updates ndash Passenger Levels
                      • Airport Update - HorizonAlaska Airlines
                      • Slide Number 16
                      • Fare Comparison for STS and Other Airports in the Region
                      • Current Passengers and Growth Potential
                      • Airline Industry Overview ndash Potential Markets
                      • Airports Used by Sonoma County and Surrounding Area Residents
                      • Percentage Share Of Passengers For Bay Area Airports By Airline
                      • Airline Industry Overview
                      • Slide Number 23
                      • Airport Developments
                      • Slide Number 25
                      • Airfield Layout PlanDevelopable Parcels
                      • Capital Project Needs
                      • Slide Number 28
                      • Runway Safety Area ndash Phase II ndash Service Roads
                      • Runway Safety Area ndash Phase II ndash Service Roads
                      • Aircraft Rescue and Firefighting Building
                      • Aircraft Rescue and Firefighting Building
                      • New Long-term Parking Lot
                      • Slide Number 34
                      • Proposed Terminal Enhancement Project
                      • Existing Terminal
                      • Terminal Renovation ndash Phases I and II
                      • New Holdroom (Phase II) ndash South Elevation
                      • New Holdroom InteriorLooking East
                      • Flex Space ndash Tent Option ndash View from Airfield
                      • Existing Terminal ndash View from Airfield Side
                      • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                      • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                      • Future Expansion ndash Estimated 2025
                      • Future Expansion ndash Estimated 2050
                      • Financial Analysis
                      • Slide Number 47
                      • Airline Rates amp Charges
                      • Slide Number 49
                      • Slide Number 50
                      • Funding Options
                      • Current Airport Debt
                      • Funding Options ndash Long-term
                      • Staffing Analysis
                      • Staffing Report
                      • Aircraft Rescue and Firefighting (ARFF) Services
                      • ARFF Services at Comparable Airports
                      • Request for Feedback
                      • Future Board Items
                      • Slide Number 60

                        Airport Update ndash Parking Revenues $1000000 5000

                        000

                        500

                        1000

                        1500

                        2000

                        2500

                        3000

                        3500

                        4000

                        4500

                        $shy

                        $100000

                        $200000

                        $300000

                        $400000

                        $500000

                        $600000

                        $700000

                        $800000

                        $900000

                        2010 2011 2012 2013 2014 2015

                        Actuals Projected Percentage Change

                        Airport Update ndash Rental Cars Revenues $6000000 4500

                        2010 2011 2012 2013 2014 2015

                        Actuals Projected Percentage Change

                        000

                        500

                        1000

                        1500

                        2000

                        2500

                        3000

                        3500

                        4000

                        $shy

                        $1000000

                        $2000000

                        $3000000

                        $4000000

                        $5000000

                        Airport Updates ndash Passenger Levels

                        Airport Update - HorizonAlaska Airlines

                        bull STS is an integral part of the Horizon AirAlaska Airlines market strategy

                        bull 65 of Horizon Airrsquos total capacity operates out of STS

                        bull STS is the 14th busiest Airport in the Horizon network (out of 45 destinations)

                        bull STS is the 6th largest market by available seat miles flown (Seattle Portland Boise Spokane Reno Santa Rosa)

                        bull Each new flight added by Horizon has quickly sold at near seat capacity

                        bull Other airlines have noted STSrsquos ability to absorb new seat capacity

                        Airline Economic Impacts of STS

                        bull Alaskarsquos seven daily flights represents approximately bull $161 million economic impact bull 490 jobs in the community

                        bull Anticipate 14 to 16 commercial flights per day by summer of 2021

                        bull 16 daily flights represents approximately bull $368 million economic impact bull 1120 jobs in the community

                        bull Every new flight generates approximately a $23 million economic impact and 70 jobs in the community

                        bull The average visitor to Sonoma County spends $44298 per day

                        Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento

                        Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff

                        Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7

                        with travel costs $18467 34 $22354 46 $18530 35 $23950 49

                        Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11

                        with travel costs $21679 24 $23848 31 $21789 24 $25704 36

                        Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13

                        with travel costs $19540 34 $22889 43 $20842 38 $22302 42

                        San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6

                        with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data

                        bull HorizonAlaska airfares are competitive with other regional airports

                        bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49

                        Current Passengers and Growth Potential

                        Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential

                        STS-LAX 85213 372030 229 63599

                        STS-SAN 40265 143161 281 31316

                        STS-SEA 39711 113852 349 17215

                        STS-PDX 29638 82057 361 11391

                        Passenger data for YE June 30 2014

                        Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS

                        Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14

                        Airports Used by Sonoma County and Surrounding Area Residents

                        Share of Passenger Bookings ndash All Airlines

                        Oakland Sacramento 7 5

                        STS 2

                        San jose 1

                        San Francisco 85

                        Percentage Share Of Passengers For Bay Area Airports By Airline

                        Other US AlaskaHorizon 3 American Airlines

                        6 13

                        International Delta Air Lines 13 8

                        Southwest Virgin America 5

                        4

                        United Airlines 48

                        Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the

                        domestic airline capacity

                        Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United

                        Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS

                        Aircraft manufacturers are shifting production away from small (under 60 seat) jets

                        Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels

                        STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels

                        Departing Seats STS vs Similar AirportsIndexed to CY 2008

                        20 170

                        15

                        10

                        5

                        0

                        -5

                        -10

                        -15

                        -20

                        STS 81 104

                        46

                        01

                        -63 -52 -37

                        -116 -164

                        -136 -170 -154 -151

                        -169

                        2008 2009 2010 2011 2012 2013 2014 2015 2016

                        Airport Developments

                        Development at STS

                        In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations

                        The Airport has four (4) signed term sheets ndash

                        bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)

                        bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations

                        In negotiations with Kaiser Air for a new lease to add a third hangar

                        Proposed improvements total over $13 million

                        Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year

                        Airfield Layout Plan

                        Developable Parcels

                        Capital Project Needs

                        Completed Projects

                        bull Remodeled existing terminal in 2010 adding 5000 square feet

                        bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway

                        bull Rehabilitated the airline parking apron

                        bull Expanded rental car staging areas

                        bull Reconfigured the current long-term parking lot to expand parking spaces

                        bull Reconfigured and expanded the rental car return lot to double the parking spaces

                        bull Installed a new rental car wash system and vehicle detail area

                        Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads

                        bull The service road portion of the project was removed from the main contract to match availability of federal funding

                        bull Construction is early FY16-17

                        bull Project was bid in August 2015 waiting for federal funding to award

                        bull Project estimate is $2 million

                        bull 9066 federally funded

                        Runway Safety Area ndash Phase II ndash Service Roads

                        Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets

                        current standards for either ARFF or ADA regulations

                        bull Location of current facility is in the way of long-term terminal expansion needs

                        bull A new location has not been selected conceptually studied in 2012 Airport Master Plan

                        bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements

                        bull Preliminary project estimate is $7 to $8 million

                        bull Federal funding (90) should be available for this project

                        bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA

                        Aircraft Rescue and Firefighting Building

                        New Long-term Parking Lot

                        bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers

                        bull The current long-term lot exceeded capacity 5 times in 2015

                        bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day

                        bull The proposed parking lot would add approximately 440 parking spaces

                        bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000

                        bull Staff is recommending construction as a single phase project

                        New long-term parking lot ndash Site location

                        Terminal

                        Proposed Terminal Enhancement Project

                        bull Terminal design objectives included

                        bull Meeting immediate and near-term needs

                        bull Establish a project budget for near-term improvements that is affordable for the Airport

                        bull Design character that signifies its role as a gateway to the region

                        bull Phase expansion that does not impact current operations

                        bull Anticipating future needs and establish a pattern of design for future expansions

                        bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

                        bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

                        Existing Terminal

                        Terminal Renovation ndash Phases I and II

                        New Holdroom (Phase II) ndash East Elevation

                        New Holdroom (Phase II) ndash South Elevation

                        New Holdroom Interior Looking East

                        New Holdroom Interior Looking North

                        Flex Space ndash Conventional Construction ndash View from Airfield

                        Flex Space ndash Tent Option ndash View from Airfield

                        Existing Terminal ndash View from Airfield Side

                        Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                        Tent option Phase I

                        Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                        Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                        Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                        Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                        Future Expansion ndash Estimated 2025

                        Future Expansion ndash Estimated 2050

                        Financial Analysis

                        Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                        financial operations to prepare a financial forecasting model

                        bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                        bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                        bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                        bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                        Airline Rates amp Charges

                        Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                        double current levels

                        bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                        bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                        bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                        bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                        bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                        Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                        Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                        Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                        Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                        ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                        The proposed fees are anticipated to increase revenues by $250000 annually

                        Staff agrees with the consultantrsquos recommended airline rates and charges

                        Funding Options

                        Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                        Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                        Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                        Funding Needs

                        bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                        bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                        Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                        bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                        Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                        The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                        Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                        Staffing Analysis

                        Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                        an assessment of staffing for current needs and forecasted Airport growth over the next five years

                        bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                        bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                        bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                        bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                        Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                        requirements spending approximately $220000 annually to provide ARFF coverage and training

                        bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                        bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                        bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                        bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                        ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                        bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                        bull Most airports similar to or larger than STS have contracted ARFF services

                        bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                        Airport Operations Budget 2014

                        Enplanement 2014

                        Airport Staff

                        Contract Fire Fire Contract Cost

                        Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                        Request for Feedback bull Long-term Parking

                        bull Airport Terminal Improvement Conceptual Plan

                        bull FundingFinancing Options

                        Future Board Items bull February 9 2016

                        bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                        bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                        design services long-term parking lot design services and long-term parking lot construction)

                        bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                        integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                        bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                        Charles M Schulz - Sonoma County Airport

                        2290 Airport Boulevard

                        Santa Rosa CA 95403

                        (707) 565-7243

                        wwwsono macou ntya irportorg

                        Follow STS on (j Facebook

                        Im Linkedln

                        ~ Twitter

                        • Slide Number 1
                        • Summary
                        • Airport Governance
                        • Airport Background
                        • Current Organizational Chart
                        • Airport Enterprise Fund
                        • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                        • Airport Master Plan
                        • Airfield Layout PlanLand Useand Boundaries
                        • Airport Update
                        • Airport Update ndash Fuel (Gallons Sold)
                        • Airport Update ndash Parking Revenues
                        • Airport Update ndash Rental Cars Revenues
                        • Airport Updates ndash Passenger Levels
                        • Airport Update - HorizonAlaska Airlines
                        • Slide Number 16
                        • Fare Comparison for STS and Other Airports in the Region
                        • Current Passengers and Growth Potential
                        • Airline Industry Overview ndash Potential Markets
                        • Airports Used by Sonoma County and Surrounding Area Residents
                        • Percentage Share Of Passengers For Bay Area Airports By Airline
                        • Airline Industry Overview
                        • Slide Number 23
                        • Airport Developments
                        • Slide Number 25
                        • Airfield Layout PlanDevelopable Parcels
                        • Capital Project Needs
                        • Slide Number 28
                        • Runway Safety Area ndash Phase II ndash Service Roads
                        • Runway Safety Area ndash Phase II ndash Service Roads
                        • Aircraft Rescue and Firefighting Building
                        • Aircraft Rescue and Firefighting Building
                        • New Long-term Parking Lot
                        • Slide Number 34
                        • Proposed Terminal Enhancement Project
                        • Existing Terminal
                        • Terminal Renovation ndash Phases I and II
                        • New Holdroom (Phase II) ndash South Elevation
                        • New Holdroom InteriorLooking East
                        • Flex Space ndash Tent Option ndash View from Airfield
                        • Existing Terminal ndash View from Airfield Side
                        • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                        • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                        • Future Expansion ndash Estimated 2025
                        • Future Expansion ndash Estimated 2050
                        • Financial Analysis
                        • Slide Number 47
                        • Airline Rates amp Charges
                        • Slide Number 49
                        • Slide Number 50
                        • Funding Options
                        • Current Airport Debt
                        • Funding Options ndash Long-term
                        • Staffing Analysis
                        • Staffing Report
                        • Aircraft Rescue and Firefighting (ARFF) Services
                        • ARFF Services at Comparable Airports
                        • Request for Feedback
                        • Future Board Items
                        • Slide Number 60

                          Airport Update ndash Rental Cars Revenues $6000000 4500

                          2010 2011 2012 2013 2014 2015

                          Actuals Projected Percentage Change

                          000

                          500

                          1000

                          1500

                          2000

                          2500

                          3000

                          3500

                          4000

                          $shy

                          $1000000

                          $2000000

                          $3000000

                          $4000000

                          $5000000

                          Airport Updates ndash Passenger Levels

                          Airport Update - HorizonAlaska Airlines

                          bull STS is an integral part of the Horizon AirAlaska Airlines market strategy

                          bull 65 of Horizon Airrsquos total capacity operates out of STS

                          bull STS is the 14th busiest Airport in the Horizon network (out of 45 destinations)

                          bull STS is the 6th largest market by available seat miles flown (Seattle Portland Boise Spokane Reno Santa Rosa)

                          bull Each new flight added by Horizon has quickly sold at near seat capacity

                          bull Other airlines have noted STSrsquos ability to absorb new seat capacity

                          Airline Economic Impacts of STS

                          bull Alaskarsquos seven daily flights represents approximately bull $161 million economic impact bull 490 jobs in the community

                          bull Anticipate 14 to 16 commercial flights per day by summer of 2021

                          bull 16 daily flights represents approximately bull $368 million economic impact bull 1120 jobs in the community

                          bull Every new flight generates approximately a $23 million economic impact and 70 jobs in the community

                          bull The average visitor to Sonoma County spends $44298 per day

                          Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento

                          Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff

                          Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7

                          with travel costs $18467 34 $22354 46 $18530 35 $23950 49

                          Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11

                          with travel costs $21679 24 $23848 31 $21789 24 $25704 36

                          Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13

                          with travel costs $19540 34 $22889 43 $20842 38 $22302 42

                          San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6

                          with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data

                          bull HorizonAlaska airfares are competitive with other regional airports

                          bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49

                          Current Passengers and Growth Potential

                          Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential

                          STS-LAX 85213 372030 229 63599

                          STS-SAN 40265 143161 281 31316

                          STS-SEA 39711 113852 349 17215

                          STS-PDX 29638 82057 361 11391

                          Passenger data for YE June 30 2014

                          Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS

                          Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14

                          Airports Used by Sonoma County and Surrounding Area Residents

                          Share of Passenger Bookings ndash All Airlines

                          Oakland Sacramento 7 5

                          STS 2

                          San jose 1

                          San Francisco 85

                          Percentage Share Of Passengers For Bay Area Airports By Airline

                          Other US AlaskaHorizon 3 American Airlines

                          6 13

                          International Delta Air Lines 13 8

                          Southwest Virgin America 5

                          4

                          United Airlines 48

                          Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the

                          domestic airline capacity

                          Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United

                          Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS

                          Aircraft manufacturers are shifting production away from small (under 60 seat) jets

                          Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels

                          STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels

                          Departing Seats STS vs Similar AirportsIndexed to CY 2008

                          20 170

                          15

                          10

                          5

                          0

                          -5

                          -10

                          -15

                          -20

                          STS 81 104

                          46

                          01

                          -63 -52 -37

                          -116 -164

                          -136 -170 -154 -151

                          -169

                          2008 2009 2010 2011 2012 2013 2014 2015 2016

                          Airport Developments

                          Development at STS

                          In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations

                          The Airport has four (4) signed term sheets ndash

                          bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)

                          bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations

                          In negotiations with Kaiser Air for a new lease to add a third hangar

                          Proposed improvements total over $13 million

                          Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year

                          Airfield Layout Plan

                          Developable Parcels

                          Capital Project Needs

                          Completed Projects

                          bull Remodeled existing terminal in 2010 adding 5000 square feet

                          bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway

                          bull Rehabilitated the airline parking apron

                          bull Expanded rental car staging areas

                          bull Reconfigured the current long-term parking lot to expand parking spaces

                          bull Reconfigured and expanded the rental car return lot to double the parking spaces

                          bull Installed a new rental car wash system and vehicle detail area

                          Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads

                          bull The service road portion of the project was removed from the main contract to match availability of federal funding

                          bull Construction is early FY16-17

                          bull Project was bid in August 2015 waiting for federal funding to award

                          bull Project estimate is $2 million

                          bull 9066 federally funded

                          Runway Safety Area ndash Phase II ndash Service Roads

                          Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets

                          current standards for either ARFF or ADA regulations

                          bull Location of current facility is in the way of long-term terminal expansion needs

                          bull A new location has not been selected conceptually studied in 2012 Airport Master Plan

                          bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements

                          bull Preliminary project estimate is $7 to $8 million

                          bull Federal funding (90) should be available for this project

                          bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA

                          Aircraft Rescue and Firefighting Building

                          New Long-term Parking Lot

                          bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers

                          bull The current long-term lot exceeded capacity 5 times in 2015

                          bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day

                          bull The proposed parking lot would add approximately 440 parking spaces

                          bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000

                          bull Staff is recommending construction as a single phase project

                          New long-term parking lot ndash Site location

                          Terminal

                          Proposed Terminal Enhancement Project

                          bull Terminal design objectives included

                          bull Meeting immediate and near-term needs

                          bull Establish a project budget for near-term improvements that is affordable for the Airport

                          bull Design character that signifies its role as a gateway to the region

                          bull Phase expansion that does not impact current operations

                          bull Anticipating future needs and establish a pattern of design for future expansions

                          bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

                          bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

                          Existing Terminal

                          Terminal Renovation ndash Phases I and II

                          New Holdroom (Phase II) ndash East Elevation

                          New Holdroom (Phase II) ndash South Elevation

                          New Holdroom Interior Looking East

                          New Holdroom Interior Looking North

                          Flex Space ndash Conventional Construction ndash View from Airfield

                          Flex Space ndash Tent Option ndash View from Airfield

                          Existing Terminal ndash View from Airfield Side

                          Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                          Tent option Phase I

                          Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                          Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                          Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                          Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                          Future Expansion ndash Estimated 2025

                          Future Expansion ndash Estimated 2050

                          Financial Analysis

                          Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                          financial operations to prepare a financial forecasting model

                          bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                          bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                          bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                          bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                          Airline Rates amp Charges

                          Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                          double current levels

                          bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                          bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                          bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                          bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                          bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                          Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                          Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                          Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                          Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                          ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                          The proposed fees are anticipated to increase revenues by $250000 annually

                          Staff agrees with the consultantrsquos recommended airline rates and charges

                          Funding Options

                          Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                          Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                          Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                          Funding Needs

                          bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                          bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                          Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                          bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                          Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                          The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                          Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                          Staffing Analysis

                          Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                          an assessment of staffing for current needs and forecasted Airport growth over the next five years

                          bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                          bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                          bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                          bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                          Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                          requirements spending approximately $220000 annually to provide ARFF coverage and training

                          bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                          bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                          bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                          bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                          ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                          bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                          bull Most airports similar to or larger than STS have contracted ARFF services

                          bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                          Airport Operations Budget 2014

                          Enplanement 2014

                          Airport Staff

                          Contract Fire Fire Contract Cost

                          Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                          Request for Feedback bull Long-term Parking

                          bull Airport Terminal Improvement Conceptual Plan

                          bull FundingFinancing Options

                          Future Board Items bull February 9 2016

                          bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                          bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                          design services long-term parking lot design services and long-term parking lot construction)

                          bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                          integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                          bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                          Charles M Schulz - Sonoma County Airport

                          2290 Airport Boulevard

                          Santa Rosa CA 95403

                          (707) 565-7243

                          wwwsono macou ntya irportorg

                          Follow STS on (j Facebook

                          Im Linkedln

                          ~ Twitter

                          • Slide Number 1
                          • Summary
                          • Airport Governance
                          • Airport Background
                          • Current Organizational Chart
                          • Airport Enterprise Fund
                          • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                          • Airport Master Plan
                          • Airfield Layout PlanLand Useand Boundaries
                          • Airport Update
                          • Airport Update ndash Fuel (Gallons Sold)
                          • Airport Update ndash Parking Revenues
                          • Airport Update ndash Rental Cars Revenues
                          • Airport Updates ndash Passenger Levels
                          • Airport Update - HorizonAlaska Airlines
                          • Slide Number 16
                          • Fare Comparison for STS and Other Airports in the Region
                          • Current Passengers and Growth Potential
                          • Airline Industry Overview ndash Potential Markets
                          • Airports Used by Sonoma County and Surrounding Area Residents
                          • Percentage Share Of Passengers For Bay Area Airports By Airline
                          • Airline Industry Overview
                          • Slide Number 23
                          • Airport Developments
                          • Slide Number 25
                          • Airfield Layout PlanDevelopable Parcels
                          • Capital Project Needs
                          • Slide Number 28
                          • Runway Safety Area ndash Phase II ndash Service Roads
                          • Runway Safety Area ndash Phase II ndash Service Roads
                          • Aircraft Rescue and Firefighting Building
                          • Aircraft Rescue and Firefighting Building
                          • New Long-term Parking Lot
                          • Slide Number 34
                          • Proposed Terminal Enhancement Project
                          • Existing Terminal
                          • Terminal Renovation ndash Phases I and II
                          • New Holdroom (Phase II) ndash South Elevation
                          • New Holdroom InteriorLooking East
                          • Flex Space ndash Tent Option ndash View from Airfield
                          • Existing Terminal ndash View from Airfield Side
                          • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                          • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                          • Future Expansion ndash Estimated 2025
                          • Future Expansion ndash Estimated 2050
                          • Financial Analysis
                          • Slide Number 47
                          • Airline Rates amp Charges
                          • Slide Number 49
                          • Slide Number 50
                          • Funding Options
                          • Current Airport Debt
                          • Funding Options ndash Long-term
                          • Staffing Analysis
                          • Staffing Report
                          • Aircraft Rescue and Firefighting (ARFF) Services
                          • ARFF Services at Comparable Airports
                          • Request for Feedback
                          • Future Board Items
                          • Slide Number 60

                            Airport Updates ndash Passenger Levels

                            Airport Update - HorizonAlaska Airlines

                            bull STS is an integral part of the Horizon AirAlaska Airlines market strategy

                            bull 65 of Horizon Airrsquos total capacity operates out of STS

                            bull STS is the 14th busiest Airport in the Horizon network (out of 45 destinations)

                            bull STS is the 6th largest market by available seat miles flown (Seattle Portland Boise Spokane Reno Santa Rosa)

                            bull Each new flight added by Horizon has quickly sold at near seat capacity

                            bull Other airlines have noted STSrsquos ability to absorb new seat capacity

                            Airline Economic Impacts of STS

                            bull Alaskarsquos seven daily flights represents approximately bull $161 million economic impact bull 490 jobs in the community

                            bull Anticipate 14 to 16 commercial flights per day by summer of 2021

                            bull 16 daily flights represents approximately bull $368 million economic impact bull 1120 jobs in the community

                            bull Every new flight generates approximately a $23 million economic impact and 70 jobs in the community

                            bull The average visitor to Sonoma County spends $44298 per day

                            Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento

                            Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff

                            Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7

                            with travel costs $18467 34 $22354 46 $18530 35 $23950 49

                            Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11

                            with travel costs $21679 24 $23848 31 $21789 24 $25704 36

                            Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13

                            with travel costs $19540 34 $22889 43 $20842 38 $22302 42

                            San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6

                            with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data

                            bull HorizonAlaska airfares are competitive with other regional airports

                            bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49

                            Current Passengers and Growth Potential

                            Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential

                            STS-LAX 85213 372030 229 63599

                            STS-SAN 40265 143161 281 31316

                            STS-SEA 39711 113852 349 17215

                            STS-PDX 29638 82057 361 11391

                            Passenger data for YE June 30 2014

                            Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS

                            Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14

                            Airports Used by Sonoma County and Surrounding Area Residents

                            Share of Passenger Bookings ndash All Airlines

                            Oakland Sacramento 7 5

                            STS 2

                            San jose 1

                            San Francisco 85

                            Percentage Share Of Passengers For Bay Area Airports By Airline

                            Other US AlaskaHorizon 3 American Airlines

                            6 13

                            International Delta Air Lines 13 8

                            Southwest Virgin America 5

                            4

                            United Airlines 48

                            Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the

                            domestic airline capacity

                            Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United

                            Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS

                            Aircraft manufacturers are shifting production away from small (under 60 seat) jets

                            Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels

                            STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels

                            Departing Seats STS vs Similar AirportsIndexed to CY 2008

                            20 170

                            15

                            10

                            5

                            0

                            -5

                            -10

                            -15

                            -20

                            STS 81 104

                            46

                            01

                            -63 -52 -37

                            -116 -164

                            -136 -170 -154 -151

                            -169

                            2008 2009 2010 2011 2012 2013 2014 2015 2016

                            Airport Developments

                            Development at STS

                            In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations

                            The Airport has four (4) signed term sheets ndash

                            bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)

                            bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations

                            In negotiations with Kaiser Air for a new lease to add a third hangar

                            Proposed improvements total over $13 million

                            Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year

                            Airfield Layout Plan

                            Developable Parcels

                            Capital Project Needs

                            Completed Projects

                            bull Remodeled existing terminal in 2010 adding 5000 square feet

                            bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway

                            bull Rehabilitated the airline parking apron

                            bull Expanded rental car staging areas

                            bull Reconfigured the current long-term parking lot to expand parking spaces

                            bull Reconfigured and expanded the rental car return lot to double the parking spaces

                            bull Installed a new rental car wash system and vehicle detail area

                            Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads

                            bull The service road portion of the project was removed from the main contract to match availability of federal funding

                            bull Construction is early FY16-17

                            bull Project was bid in August 2015 waiting for federal funding to award

                            bull Project estimate is $2 million

                            bull 9066 federally funded

                            Runway Safety Area ndash Phase II ndash Service Roads

                            Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets

                            current standards for either ARFF or ADA regulations

                            bull Location of current facility is in the way of long-term terminal expansion needs

                            bull A new location has not been selected conceptually studied in 2012 Airport Master Plan

                            bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements

                            bull Preliminary project estimate is $7 to $8 million

                            bull Federal funding (90) should be available for this project

                            bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA

                            Aircraft Rescue and Firefighting Building

                            New Long-term Parking Lot

                            bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers

                            bull The current long-term lot exceeded capacity 5 times in 2015

                            bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day

                            bull The proposed parking lot would add approximately 440 parking spaces

                            bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000

                            bull Staff is recommending construction as a single phase project

                            New long-term parking lot ndash Site location

                            Terminal

                            Proposed Terminal Enhancement Project

                            bull Terminal design objectives included

                            bull Meeting immediate and near-term needs

                            bull Establish a project budget for near-term improvements that is affordable for the Airport

                            bull Design character that signifies its role as a gateway to the region

                            bull Phase expansion that does not impact current operations

                            bull Anticipating future needs and establish a pattern of design for future expansions

                            bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

                            bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

                            Existing Terminal

                            Terminal Renovation ndash Phases I and II

                            New Holdroom (Phase II) ndash East Elevation

                            New Holdroom (Phase II) ndash South Elevation

                            New Holdroom Interior Looking East

                            New Holdroom Interior Looking North

                            Flex Space ndash Conventional Construction ndash View from Airfield

                            Flex Space ndash Tent Option ndash View from Airfield

                            Existing Terminal ndash View from Airfield Side

                            Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                            Tent option Phase I

                            Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                            Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                            Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                            Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                            Future Expansion ndash Estimated 2025

                            Future Expansion ndash Estimated 2050

                            Financial Analysis

                            Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                            financial operations to prepare a financial forecasting model

                            bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                            bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                            bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                            bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                            Airline Rates amp Charges

                            Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                            double current levels

                            bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                            bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                            bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                            bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                            bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                            Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                            Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                            Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                            Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                            ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                            The proposed fees are anticipated to increase revenues by $250000 annually

                            Staff agrees with the consultantrsquos recommended airline rates and charges

                            Funding Options

                            Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                            Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                            Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                            Funding Needs

                            bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                            bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                            Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                            bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                            Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                            The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                            Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                            Staffing Analysis

                            Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                            an assessment of staffing for current needs and forecasted Airport growth over the next five years

                            bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                            bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                            bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                            bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                            Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                            requirements spending approximately $220000 annually to provide ARFF coverage and training

                            bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                            bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                            bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                            bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                            ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                            bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                            bull Most airports similar to or larger than STS have contracted ARFF services

                            bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                            Airport Operations Budget 2014

                            Enplanement 2014

                            Airport Staff

                            Contract Fire Fire Contract Cost

                            Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                            Request for Feedback bull Long-term Parking

                            bull Airport Terminal Improvement Conceptual Plan

                            bull FundingFinancing Options

                            Future Board Items bull February 9 2016

                            bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                            bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                            design services long-term parking lot design services and long-term parking lot construction)

                            bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                            integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                            bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                            Charles M Schulz - Sonoma County Airport

                            2290 Airport Boulevard

                            Santa Rosa CA 95403

                            (707) 565-7243

                            wwwsono macou ntya irportorg

                            Follow STS on (j Facebook

                            Im Linkedln

                            ~ Twitter

                            • Slide Number 1
                            • Summary
                            • Airport Governance
                            • Airport Background
                            • Current Organizational Chart
                            • Airport Enterprise Fund
                            • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                            • Airport Master Plan
                            • Airfield Layout PlanLand Useand Boundaries
                            • Airport Update
                            • Airport Update ndash Fuel (Gallons Sold)
                            • Airport Update ndash Parking Revenues
                            • Airport Update ndash Rental Cars Revenues
                            • Airport Updates ndash Passenger Levels
                            • Airport Update - HorizonAlaska Airlines
                            • Slide Number 16
                            • Fare Comparison for STS and Other Airports in the Region
                            • Current Passengers and Growth Potential
                            • Airline Industry Overview ndash Potential Markets
                            • Airports Used by Sonoma County and Surrounding Area Residents
                            • Percentage Share Of Passengers For Bay Area Airports By Airline
                            • Airline Industry Overview
                            • Slide Number 23
                            • Airport Developments
                            • Slide Number 25
                            • Airfield Layout PlanDevelopable Parcels
                            • Capital Project Needs
                            • Slide Number 28
                            • Runway Safety Area ndash Phase II ndash Service Roads
                            • Runway Safety Area ndash Phase II ndash Service Roads
                            • Aircraft Rescue and Firefighting Building
                            • Aircraft Rescue and Firefighting Building
                            • New Long-term Parking Lot
                            • Slide Number 34
                            • Proposed Terminal Enhancement Project
                            • Existing Terminal
                            • Terminal Renovation ndash Phases I and II
                            • New Holdroom (Phase II) ndash South Elevation
                            • New Holdroom InteriorLooking East
                            • Flex Space ndash Tent Option ndash View from Airfield
                            • Existing Terminal ndash View from Airfield Side
                            • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                            • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                            • Future Expansion ndash Estimated 2025
                            • Future Expansion ndash Estimated 2050
                            • Financial Analysis
                            • Slide Number 47
                            • Airline Rates amp Charges
                            • Slide Number 49
                            • Slide Number 50
                            • Funding Options
                            • Current Airport Debt
                            • Funding Options ndash Long-term
                            • Staffing Analysis
                            • Staffing Report
                            • Aircraft Rescue and Firefighting (ARFF) Services
                            • ARFF Services at Comparable Airports
                            • Request for Feedback
                            • Future Board Items
                            • Slide Number 60

                              Airport Update - HorizonAlaska Airlines

                              bull STS is an integral part of the Horizon AirAlaska Airlines market strategy

                              bull 65 of Horizon Airrsquos total capacity operates out of STS

                              bull STS is the 14th busiest Airport in the Horizon network (out of 45 destinations)

                              bull STS is the 6th largest market by available seat miles flown (Seattle Portland Boise Spokane Reno Santa Rosa)

                              bull Each new flight added by Horizon has quickly sold at near seat capacity

                              bull Other airlines have noted STSrsquos ability to absorb new seat capacity

                              Airline Economic Impacts of STS

                              bull Alaskarsquos seven daily flights represents approximately bull $161 million economic impact bull 490 jobs in the community

                              bull Anticipate 14 to 16 commercial flights per day by summer of 2021

                              bull 16 daily flights represents approximately bull $368 million economic impact bull 1120 jobs in the community

                              bull Every new flight generates approximately a $23 million economic impact and 70 jobs in the community

                              bull The average visitor to Sonoma County spends $44298 per day

                              Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento

                              Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff

                              Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7

                              with travel costs $18467 34 $22354 46 $18530 35 $23950 49

                              Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11

                              with travel costs $21679 24 $23848 31 $21789 24 $25704 36

                              Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13

                              with travel costs $19540 34 $22889 43 $20842 38 $22302 42

                              San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6

                              with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data

                              bull HorizonAlaska airfares are competitive with other regional airports

                              bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49

                              Current Passengers and Growth Potential

                              Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential

                              STS-LAX 85213 372030 229 63599

                              STS-SAN 40265 143161 281 31316

                              STS-SEA 39711 113852 349 17215

                              STS-PDX 29638 82057 361 11391

                              Passenger data for YE June 30 2014

                              Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS

                              Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14

                              Airports Used by Sonoma County and Surrounding Area Residents

                              Share of Passenger Bookings ndash All Airlines

                              Oakland Sacramento 7 5

                              STS 2

                              San jose 1

                              San Francisco 85

                              Percentage Share Of Passengers For Bay Area Airports By Airline

                              Other US AlaskaHorizon 3 American Airlines

                              6 13

                              International Delta Air Lines 13 8

                              Southwest Virgin America 5

                              4

                              United Airlines 48

                              Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the

                              domestic airline capacity

                              Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United

                              Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS

                              Aircraft manufacturers are shifting production away from small (under 60 seat) jets

                              Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels

                              STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels

                              Departing Seats STS vs Similar AirportsIndexed to CY 2008

                              20 170

                              15

                              10

                              5

                              0

                              -5

                              -10

                              -15

                              -20

                              STS 81 104

                              46

                              01

                              -63 -52 -37

                              -116 -164

                              -136 -170 -154 -151

                              -169

                              2008 2009 2010 2011 2012 2013 2014 2015 2016

                              Airport Developments

                              Development at STS

                              In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations

                              The Airport has four (4) signed term sheets ndash

                              bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)

                              bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations

                              In negotiations with Kaiser Air for a new lease to add a third hangar

                              Proposed improvements total over $13 million

                              Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year

                              Airfield Layout Plan

                              Developable Parcels

                              Capital Project Needs

                              Completed Projects

                              bull Remodeled existing terminal in 2010 adding 5000 square feet

                              bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway

                              bull Rehabilitated the airline parking apron

                              bull Expanded rental car staging areas

                              bull Reconfigured the current long-term parking lot to expand parking spaces

                              bull Reconfigured and expanded the rental car return lot to double the parking spaces

                              bull Installed a new rental car wash system and vehicle detail area

                              Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads

                              bull The service road portion of the project was removed from the main contract to match availability of federal funding

                              bull Construction is early FY16-17

                              bull Project was bid in August 2015 waiting for federal funding to award

                              bull Project estimate is $2 million

                              bull 9066 federally funded

                              Runway Safety Area ndash Phase II ndash Service Roads

                              Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets

                              current standards for either ARFF or ADA regulations

                              bull Location of current facility is in the way of long-term terminal expansion needs

                              bull A new location has not been selected conceptually studied in 2012 Airport Master Plan

                              bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements

                              bull Preliminary project estimate is $7 to $8 million

                              bull Federal funding (90) should be available for this project

                              bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA

                              Aircraft Rescue and Firefighting Building

                              New Long-term Parking Lot

                              bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers

                              bull The current long-term lot exceeded capacity 5 times in 2015

                              bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day

                              bull The proposed parking lot would add approximately 440 parking spaces

                              bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000

                              bull Staff is recommending construction as a single phase project

                              New long-term parking lot ndash Site location

                              Terminal

                              Proposed Terminal Enhancement Project

                              bull Terminal design objectives included

                              bull Meeting immediate and near-term needs

                              bull Establish a project budget for near-term improvements that is affordable for the Airport

                              bull Design character that signifies its role as a gateway to the region

                              bull Phase expansion that does not impact current operations

                              bull Anticipating future needs and establish a pattern of design for future expansions

                              bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

                              bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

                              Existing Terminal

                              Terminal Renovation ndash Phases I and II

                              New Holdroom (Phase II) ndash East Elevation

                              New Holdroom (Phase II) ndash South Elevation

                              New Holdroom Interior Looking East

                              New Holdroom Interior Looking North

                              Flex Space ndash Conventional Construction ndash View from Airfield

                              Flex Space ndash Tent Option ndash View from Airfield

                              Existing Terminal ndash View from Airfield Side

                              Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                              Tent option Phase I

                              Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                              Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                              Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                              Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                              Future Expansion ndash Estimated 2025

                              Future Expansion ndash Estimated 2050

                              Financial Analysis

                              Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                              financial operations to prepare a financial forecasting model

                              bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                              bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                              bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                              bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                              Airline Rates amp Charges

                              Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                              double current levels

                              bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                              bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                              bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                              bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                              bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                              Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                              Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                              Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                              Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                              ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                              The proposed fees are anticipated to increase revenues by $250000 annually

                              Staff agrees with the consultantrsquos recommended airline rates and charges

                              Funding Options

                              Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                              Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                              Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                              Funding Needs

                              bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                              bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                              Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                              bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                              Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                              The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                              Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                              Staffing Analysis

                              Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                              an assessment of staffing for current needs and forecasted Airport growth over the next five years

                              bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                              bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                              bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                              bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                              Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                              requirements spending approximately $220000 annually to provide ARFF coverage and training

                              bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                              bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                              bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                              bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                              ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                              bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                              bull Most airports similar to or larger than STS have contracted ARFF services

                              bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                              Airport Operations Budget 2014

                              Enplanement 2014

                              Airport Staff

                              Contract Fire Fire Contract Cost

                              Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                              Request for Feedback bull Long-term Parking

                              bull Airport Terminal Improvement Conceptual Plan

                              bull FundingFinancing Options

                              Future Board Items bull February 9 2016

                              bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                              bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                              design services long-term parking lot design services and long-term parking lot construction)

                              bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                              integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                              bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                              Charles M Schulz - Sonoma County Airport

                              2290 Airport Boulevard

                              Santa Rosa CA 95403

                              (707) 565-7243

                              wwwsono macou ntya irportorg

                              Follow STS on (j Facebook

                              Im Linkedln

                              ~ Twitter

                              • Slide Number 1
                              • Summary
                              • Airport Governance
                              • Airport Background
                              • Current Organizational Chart
                              • Airport Enterprise Fund
                              • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                              • Airport Master Plan
                              • Airfield Layout PlanLand Useand Boundaries
                              • Airport Update
                              • Airport Update ndash Fuel (Gallons Sold)
                              • Airport Update ndash Parking Revenues
                              • Airport Update ndash Rental Cars Revenues
                              • Airport Updates ndash Passenger Levels
                              • Airport Update - HorizonAlaska Airlines
                              • Slide Number 16
                              • Fare Comparison for STS and Other Airports in the Region
                              • Current Passengers and Growth Potential
                              • Airline Industry Overview ndash Potential Markets
                              • Airports Used by Sonoma County and Surrounding Area Residents
                              • Percentage Share Of Passengers For Bay Area Airports By Airline
                              • Airline Industry Overview
                              • Slide Number 23
                              • Airport Developments
                              • Slide Number 25
                              • Airfield Layout PlanDevelopable Parcels
                              • Capital Project Needs
                              • Slide Number 28
                              • Runway Safety Area ndash Phase II ndash Service Roads
                              • Runway Safety Area ndash Phase II ndash Service Roads
                              • Aircraft Rescue and Firefighting Building
                              • Aircraft Rescue and Firefighting Building
                              • New Long-term Parking Lot
                              • Slide Number 34
                              • Proposed Terminal Enhancement Project
                              • Existing Terminal
                              • Terminal Renovation ndash Phases I and II
                              • New Holdroom (Phase II) ndash South Elevation
                              • New Holdroom InteriorLooking East
                              • Flex Space ndash Tent Option ndash View from Airfield
                              • Existing Terminal ndash View from Airfield Side
                              • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                              • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                              • Future Expansion ndash Estimated 2025
                              • Future Expansion ndash Estimated 2050
                              • Financial Analysis
                              • Slide Number 47
                              • Airline Rates amp Charges
                              • Slide Number 49
                              • Slide Number 50
                              • Funding Options
                              • Current Airport Debt
                              • Funding Options ndash Long-term
                              • Staffing Analysis
                              • Staffing Report
                              • Aircraft Rescue and Firefighting (ARFF) Services
                              • ARFF Services at Comparable Airports
                              • Request for Feedback
                              • Future Board Items
                              • Slide Number 60

                                Airline Economic Impacts of STS

                                bull Alaskarsquos seven daily flights represents approximately bull $161 million economic impact bull 490 jobs in the community

                                bull Anticipate 14 to 16 commercial flights per day by summer of 2021

                                bull 16 daily flights represents approximately bull $368 million economic impact bull 1120 jobs in the community

                                bull Every new flight generates approximately a $23 million economic impact and 70 jobs in the community

                                bull The average visitor to Sonoma County spends $44298 per day

                                Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento

                                Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff

                                Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7

                                with travel costs $18467 34 $22354 46 $18530 35 $23950 49

                                Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11

                                with travel costs $21679 24 $23848 31 $21789 24 $25704 36

                                Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13

                                with travel costs $19540 34 $22889 43 $20842 38 $22302 42

                                San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6

                                with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data

                                bull HorizonAlaska airfares are competitive with other regional airports

                                bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49

                                Current Passengers and Growth Potential

                                Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential

                                STS-LAX 85213 372030 229 63599

                                STS-SAN 40265 143161 281 31316

                                STS-SEA 39711 113852 349 17215

                                STS-PDX 29638 82057 361 11391

                                Passenger data for YE June 30 2014

                                Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS

                                Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14

                                Airports Used by Sonoma County and Surrounding Area Residents

                                Share of Passenger Bookings ndash All Airlines

                                Oakland Sacramento 7 5

                                STS 2

                                San jose 1

                                San Francisco 85

                                Percentage Share Of Passengers For Bay Area Airports By Airline

                                Other US AlaskaHorizon 3 American Airlines

                                6 13

                                International Delta Air Lines 13 8

                                Southwest Virgin America 5

                                4

                                United Airlines 48

                                Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the

                                domestic airline capacity

                                Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United

                                Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS

                                Aircraft manufacturers are shifting production away from small (under 60 seat) jets

                                Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels

                                STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels

                                Departing Seats STS vs Similar AirportsIndexed to CY 2008

                                20 170

                                15

                                10

                                5

                                0

                                -5

                                -10

                                -15

                                -20

                                STS 81 104

                                46

                                01

                                -63 -52 -37

                                -116 -164

                                -136 -170 -154 -151

                                -169

                                2008 2009 2010 2011 2012 2013 2014 2015 2016

                                Airport Developments

                                Development at STS

                                In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations

                                The Airport has four (4) signed term sheets ndash

                                bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)

                                bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations

                                In negotiations with Kaiser Air for a new lease to add a third hangar

                                Proposed improvements total over $13 million

                                Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year

                                Airfield Layout Plan

                                Developable Parcels

                                Capital Project Needs

                                Completed Projects

                                bull Remodeled existing terminal in 2010 adding 5000 square feet

                                bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway

                                bull Rehabilitated the airline parking apron

                                bull Expanded rental car staging areas

                                bull Reconfigured the current long-term parking lot to expand parking spaces

                                bull Reconfigured and expanded the rental car return lot to double the parking spaces

                                bull Installed a new rental car wash system and vehicle detail area

                                Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads

                                bull The service road portion of the project was removed from the main contract to match availability of federal funding

                                bull Construction is early FY16-17

                                bull Project was bid in August 2015 waiting for federal funding to award

                                bull Project estimate is $2 million

                                bull 9066 federally funded

                                Runway Safety Area ndash Phase II ndash Service Roads

                                Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets

                                current standards for either ARFF or ADA regulations

                                bull Location of current facility is in the way of long-term terminal expansion needs

                                bull A new location has not been selected conceptually studied in 2012 Airport Master Plan

                                bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements

                                bull Preliminary project estimate is $7 to $8 million

                                bull Federal funding (90) should be available for this project

                                bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA

                                Aircraft Rescue and Firefighting Building

                                New Long-term Parking Lot

                                bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers

                                bull The current long-term lot exceeded capacity 5 times in 2015

                                bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day

                                bull The proposed parking lot would add approximately 440 parking spaces

                                bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000

                                bull Staff is recommending construction as a single phase project

                                New long-term parking lot ndash Site location

                                Terminal

                                Proposed Terminal Enhancement Project

                                bull Terminal design objectives included

                                bull Meeting immediate and near-term needs

                                bull Establish a project budget for near-term improvements that is affordable for the Airport

                                bull Design character that signifies its role as a gateway to the region

                                bull Phase expansion that does not impact current operations

                                bull Anticipating future needs and establish a pattern of design for future expansions

                                bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

                                bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

                                Existing Terminal

                                Terminal Renovation ndash Phases I and II

                                New Holdroom (Phase II) ndash East Elevation

                                New Holdroom (Phase II) ndash South Elevation

                                New Holdroom Interior Looking East

                                New Holdroom Interior Looking North

                                Flex Space ndash Conventional Construction ndash View from Airfield

                                Flex Space ndash Tent Option ndash View from Airfield

                                Existing Terminal ndash View from Airfield Side

                                Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                                Tent option Phase I

                                Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                                Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                                Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                                Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                                Future Expansion ndash Estimated 2025

                                Future Expansion ndash Estimated 2050

                                Financial Analysis

                                Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                                financial operations to prepare a financial forecasting model

                                bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                                bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                                bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                                bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                                Airline Rates amp Charges

                                Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                double current levels

                                bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                The proposed fees are anticipated to increase revenues by $250000 annually

                                Staff agrees with the consultantrsquos recommended airline rates and charges

                                Funding Options

                                Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                Funding Needs

                                bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                Staffing Analysis

                                Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                requirements spending approximately $220000 annually to provide ARFF coverage and training

                                bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                bull Most airports similar to or larger than STS have contracted ARFF services

                                bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                Airport Operations Budget 2014

                                Enplanement 2014

                                Airport Staff

                                Contract Fire Fire Contract Cost

                                Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                Request for Feedback bull Long-term Parking

                                bull Airport Terminal Improvement Conceptual Plan

                                bull FundingFinancing Options

                                Future Board Items bull February 9 2016

                                bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                design services long-term parking lot design services and long-term parking lot construction)

                                bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                Charles M Schulz - Sonoma County Airport

                                2290 Airport Boulevard

                                Santa Rosa CA 95403

                                (707) 565-7243

                                wwwsono macou ntya irportorg

                                Follow STS on (j Facebook

                                Im Linkedln

                                ~ Twitter

                                • Slide Number 1
                                • Summary
                                • Airport Governance
                                • Airport Background
                                • Current Organizational Chart
                                • Airport Enterprise Fund
                                • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                • Airport Master Plan
                                • Airfield Layout PlanLand Useand Boundaries
                                • Airport Update
                                • Airport Update ndash Fuel (Gallons Sold)
                                • Airport Update ndash Parking Revenues
                                • Airport Update ndash Rental Cars Revenues
                                • Airport Updates ndash Passenger Levels
                                • Airport Update - HorizonAlaska Airlines
                                • Slide Number 16
                                • Fare Comparison for STS and Other Airports in the Region
                                • Current Passengers and Growth Potential
                                • Airline Industry Overview ndash Potential Markets
                                • Airports Used by Sonoma County and Surrounding Area Residents
                                • Percentage Share Of Passengers For Bay Area Airports By Airline
                                • Airline Industry Overview
                                • Slide Number 23
                                • Airport Developments
                                • Slide Number 25
                                • Airfield Layout PlanDevelopable Parcels
                                • Capital Project Needs
                                • Slide Number 28
                                • Runway Safety Area ndash Phase II ndash Service Roads
                                • Runway Safety Area ndash Phase II ndash Service Roads
                                • Aircraft Rescue and Firefighting Building
                                • Aircraft Rescue and Firefighting Building
                                • New Long-term Parking Lot
                                • Slide Number 34
                                • Proposed Terminal Enhancement Project
                                • Existing Terminal
                                • Terminal Renovation ndash Phases I and II
                                • New Holdroom (Phase II) ndash South Elevation
                                • New Holdroom InteriorLooking East
                                • Flex Space ndash Tent Option ndash View from Airfield
                                • Existing Terminal ndash View from Airfield Side
                                • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                • Future Expansion ndash Estimated 2025
                                • Future Expansion ndash Estimated 2050
                                • Financial Analysis
                                • Slide Number 47
                                • Airline Rates amp Charges
                                • Slide Number 49
                                • Slide Number 50
                                • Funding Options
                                • Current Airport Debt
                                • Funding Options ndash Long-term
                                • Staffing Analysis
                                • Staffing Report
                                • Aircraft Rescue and Firefighting (ARFF) Services
                                • ARFF Services at Comparable Airports
                                • Request for Feedback
                                • Future Board Items
                                • Slide Number 60

                                  Fare Comparison for STS and Other Airports in the Region STS San Francisco Oakland San Jose Sacramento

                                  Destination Avg Fare Avg Fare Diff Avg Fare Diff Avg Fare Diff Avg Fare Diff

                                  Los Angeles $12096 $11167 -8 $11754 -3 $11030 -9 $12950 7

                                  with travel costs $18467 34 $22354 46 $18530 35 $23950 49

                                  Seattle $16548 $14379 -13 $13248 -20 $14289 -14 $14704 -11

                                  with travel costs $21679 24 $23848 31 $21789 24 $25704 36

                                  Portland $12952 $12240 -5 $12289 -5 $13342 3 $11302 -13

                                  with travel costs $19540 34 $22889 43 $20842 38 $22302 42

                                  San Diego $12174 $11689 -4 $12403 2 $13703 13 $12895 6

                                  with travel costs $18989 36 $23003 47 $21203 43 $23895 49 Fare comparison based on 2013 Department of Transportation data

                                  bull HorizonAlaska airfares are competitive with other regional airports

                                  bull Add the cost to travel to and from other bay area airports (IRS $054mile) and the fares from STS save the average traveler 24-49

                                  Current Passengers and Growth Potential

                                  Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential

                                  STS-LAX 85213 372030 229 63599

                                  STS-SAN 40265 143161 281 31316

                                  STS-SEA 39711 113852 349 17215

                                  STS-PDX 29638 82057 361 11391

                                  Passenger data for YE June 30 2014

                                  Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS

                                  Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14

                                  Airports Used by Sonoma County and Surrounding Area Residents

                                  Share of Passenger Bookings ndash All Airlines

                                  Oakland Sacramento 7 5

                                  STS 2

                                  San jose 1

                                  San Francisco 85

                                  Percentage Share Of Passengers For Bay Area Airports By Airline

                                  Other US AlaskaHorizon 3 American Airlines

                                  6 13

                                  International Delta Air Lines 13 8

                                  Southwest Virgin America 5

                                  4

                                  United Airlines 48

                                  Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the

                                  domestic airline capacity

                                  Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United

                                  Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS

                                  Aircraft manufacturers are shifting production away from small (under 60 seat) jets

                                  Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels

                                  STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels

                                  Departing Seats STS vs Similar AirportsIndexed to CY 2008

                                  20 170

                                  15

                                  10

                                  5

                                  0

                                  -5

                                  -10

                                  -15

                                  -20

                                  STS 81 104

                                  46

                                  01

                                  -63 -52 -37

                                  -116 -164

                                  -136 -170 -154 -151

                                  -169

                                  2008 2009 2010 2011 2012 2013 2014 2015 2016

                                  Airport Developments

                                  Development at STS

                                  In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations

                                  The Airport has four (4) signed term sheets ndash

                                  bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)

                                  bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations

                                  In negotiations with Kaiser Air for a new lease to add a third hangar

                                  Proposed improvements total over $13 million

                                  Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year

                                  Airfield Layout Plan

                                  Developable Parcels

                                  Capital Project Needs

                                  Completed Projects

                                  bull Remodeled existing terminal in 2010 adding 5000 square feet

                                  bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway

                                  bull Rehabilitated the airline parking apron

                                  bull Expanded rental car staging areas

                                  bull Reconfigured the current long-term parking lot to expand parking spaces

                                  bull Reconfigured and expanded the rental car return lot to double the parking spaces

                                  bull Installed a new rental car wash system and vehicle detail area

                                  Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads

                                  bull The service road portion of the project was removed from the main contract to match availability of federal funding

                                  bull Construction is early FY16-17

                                  bull Project was bid in August 2015 waiting for federal funding to award

                                  bull Project estimate is $2 million

                                  bull 9066 federally funded

                                  Runway Safety Area ndash Phase II ndash Service Roads

                                  Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets

                                  current standards for either ARFF or ADA regulations

                                  bull Location of current facility is in the way of long-term terminal expansion needs

                                  bull A new location has not been selected conceptually studied in 2012 Airport Master Plan

                                  bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements

                                  bull Preliminary project estimate is $7 to $8 million

                                  bull Federal funding (90) should be available for this project

                                  bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA

                                  Aircraft Rescue and Firefighting Building

                                  New Long-term Parking Lot

                                  bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers

                                  bull The current long-term lot exceeded capacity 5 times in 2015

                                  bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day

                                  bull The proposed parking lot would add approximately 440 parking spaces

                                  bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000

                                  bull Staff is recommending construction as a single phase project

                                  New long-term parking lot ndash Site location

                                  Terminal

                                  Proposed Terminal Enhancement Project

                                  bull Terminal design objectives included

                                  bull Meeting immediate and near-term needs

                                  bull Establish a project budget for near-term improvements that is affordable for the Airport

                                  bull Design character that signifies its role as a gateway to the region

                                  bull Phase expansion that does not impact current operations

                                  bull Anticipating future needs and establish a pattern of design for future expansions

                                  bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

                                  bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

                                  Existing Terminal

                                  Terminal Renovation ndash Phases I and II

                                  New Holdroom (Phase II) ndash East Elevation

                                  New Holdroom (Phase II) ndash South Elevation

                                  New Holdroom Interior Looking East

                                  New Holdroom Interior Looking North

                                  Flex Space ndash Conventional Construction ndash View from Airfield

                                  Flex Space ndash Tent Option ndash View from Airfield

                                  Existing Terminal ndash View from Airfield Side

                                  Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                                  Tent option Phase I

                                  Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                                  Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                                  Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                                  Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                                  Future Expansion ndash Estimated 2025

                                  Future Expansion ndash Estimated 2050

                                  Financial Analysis

                                  Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                                  financial operations to prepare a financial forecasting model

                                  bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                                  bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                                  bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                                  bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                                  Airline Rates amp Charges

                                  Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                  double current levels

                                  bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                  bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                  bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                  bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                  bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                  Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                  Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                  Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                  Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                  ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                  The proposed fees are anticipated to increase revenues by $250000 annually

                                  Staff agrees with the consultantrsquos recommended airline rates and charges

                                  Funding Options

                                  Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                  Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                  Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                  Funding Needs

                                  bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                  bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                  Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                  bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                  Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                  The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                  Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                  Staffing Analysis

                                  Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                  an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                  bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                  bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                  bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                  bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                  Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                  requirements spending approximately $220000 annually to provide ARFF coverage and training

                                  bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                  bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                  bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                  bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                  ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                  bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                  bull Most airports similar to or larger than STS have contracted ARFF services

                                  bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                  Airport Operations Budget 2014

                                  Enplanement 2014

                                  Airport Staff

                                  Contract Fire Fire Contract Cost

                                  Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                  Request for Feedback bull Long-term Parking

                                  bull Airport Terminal Improvement Conceptual Plan

                                  bull FundingFinancing Options

                                  Future Board Items bull February 9 2016

                                  bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                  bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                  design services long-term parking lot design services and long-term parking lot construction)

                                  bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                  integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                  bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                  Charles M Schulz - Sonoma County Airport

                                  2290 Airport Boulevard

                                  Santa Rosa CA 95403

                                  (707) 565-7243

                                  wwwsono macou ntya irportorg

                                  Follow STS on (j Facebook

                                  Im Linkedln

                                  ~ Twitter

                                  • Slide Number 1
                                  • Summary
                                  • Airport Governance
                                  • Airport Background
                                  • Current Organizational Chart
                                  • Airport Enterprise Fund
                                  • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                  • Airport Master Plan
                                  • Airfield Layout PlanLand Useand Boundaries
                                  • Airport Update
                                  • Airport Update ndash Fuel (Gallons Sold)
                                  • Airport Update ndash Parking Revenues
                                  • Airport Update ndash Rental Cars Revenues
                                  • Airport Updates ndash Passenger Levels
                                  • Airport Update - HorizonAlaska Airlines
                                  • Slide Number 16
                                  • Fare Comparison for STS and Other Airports in the Region
                                  • Current Passengers and Growth Potential
                                  • Airline Industry Overview ndash Potential Markets
                                  • Airports Used by Sonoma County and Surrounding Area Residents
                                  • Percentage Share Of Passengers For Bay Area Airports By Airline
                                  • Airline Industry Overview
                                  • Slide Number 23
                                  • Airport Developments
                                  • Slide Number 25
                                  • Airfield Layout PlanDevelopable Parcels
                                  • Capital Project Needs
                                  • Slide Number 28
                                  • Runway Safety Area ndash Phase II ndash Service Roads
                                  • Runway Safety Area ndash Phase II ndash Service Roads
                                  • Aircraft Rescue and Firefighting Building
                                  • Aircraft Rescue and Firefighting Building
                                  • New Long-term Parking Lot
                                  • Slide Number 34
                                  • Proposed Terminal Enhancement Project
                                  • Existing Terminal
                                  • Terminal Renovation ndash Phases I and II
                                  • New Holdroom (Phase II) ndash South Elevation
                                  • New Holdroom InteriorLooking East
                                  • Flex Space ndash Tent Option ndash View from Airfield
                                  • Existing Terminal ndash View from Airfield Side
                                  • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                  • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                  • Future Expansion ndash Estimated 2025
                                  • Future Expansion ndash Estimated 2050
                                  • Financial Analysis
                                  • Slide Number 47
                                  • Airline Rates amp Charges
                                  • Slide Number 49
                                  • Slide Number 50
                                  • Funding Options
                                  • Current Airport Debt
                                  • Funding Options ndash Long-term
                                  • Staffing Analysis
                                  • Staffing Report
                                  • Aircraft Rescue and Firefighting (ARFF) Services
                                  • ARFF Services at Comparable Airports
                                  • Request for Feedback
                                  • Future Board Items
                                  • Slide Number 60

                                    Current Passengers and Growth Potential

                                    Market Annual Actual Total Round Trip Current Growth STS Passengers Passengers Capture Rate Potential

                                    STS-LAX 85213 372030 229 63599

                                    STS-SAN 40265 143161 281 31316

                                    STS-SEA 39711 113852 349 17215

                                    STS-PDX 29638 82057 361 11391

                                    Passenger data for YE June 30 2014

                                    Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS

                                    Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14

                                    Airports Used by Sonoma County and Surrounding Area Residents

                                    Share of Passenger Bookings ndash All Airlines

                                    Oakland Sacramento 7 5

                                    STS 2

                                    San jose 1

                                    San Francisco 85

                                    Percentage Share Of Passengers For Bay Area Airports By Airline

                                    Other US AlaskaHorizon 3 American Airlines

                                    6 13

                                    International Delta Air Lines 13 8

                                    Southwest Virgin America 5

                                    4

                                    United Airlines 48

                                    Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the

                                    domestic airline capacity

                                    Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United

                                    Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS

                                    Aircraft manufacturers are shifting production away from small (under 60 seat) jets

                                    Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels

                                    STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels

                                    Departing Seats STS vs Similar AirportsIndexed to CY 2008

                                    20 170

                                    15

                                    10

                                    5

                                    0

                                    -5

                                    -10

                                    -15

                                    -20

                                    STS 81 104

                                    46

                                    01

                                    -63 -52 -37

                                    -116 -164

                                    -136 -170 -154 -151

                                    -169

                                    2008 2009 2010 2011 2012 2013 2014 2015 2016

                                    Airport Developments

                                    Development at STS

                                    In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations

                                    The Airport has four (4) signed term sheets ndash

                                    bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)

                                    bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations

                                    In negotiations with Kaiser Air for a new lease to add a third hangar

                                    Proposed improvements total over $13 million

                                    Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year

                                    Airfield Layout Plan

                                    Developable Parcels

                                    Capital Project Needs

                                    Completed Projects

                                    bull Remodeled existing terminal in 2010 adding 5000 square feet

                                    bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway

                                    bull Rehabilitated the airline parking apron

                                    bull Expanded rental car staging areas

                                    bull Reconfigured the current long-term parking lot to expand parking spaces

                                    bull Reconfigured and expanded the rental car return lot to double the parking spaces

                                    bull Installed a new rental car wash system and vehicle detail area

                                    Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads

                                    bull The service road portion of the project was removed from the main contract to match availability of federal funding

                                    bull Construction is early FY16-17

                                    bull Project was bid in August 2015 waiting for federal funding to award

                                    bull Project estimate is $2 million

                                    bull 9066 federally funded

                                    Runway Safety Area ndash Phase II ndash Service Roads

                                    Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets

                                    current standards for either ARFF or ADA regulations

                                    bull Location of current facility is in the way of long-term terminal expansion needs

                                    bull A new location has not been selected conceptually studied in 2012 Airport Master Plan

                                    bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements

                                    bull Preliminary project estimate is $7 to $8 million

                                    bull Federal funding (90) should be available for this project

                                    bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA

                                    Aircraft Rescue and Firefighting Building

                                    New Long-term Parking Lot

                                    bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers

                                    bull The current long-term lot exceeded capacity 5 times in 2015

                                    bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day

                                    bull The proposed parking lot would add approximately 440 parking spaces

                                    bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000

                                    bull Staff is recommending construction as a single phase project

                                    New long-term parking lot ndash Site location

                                    Terminal

                                    Proposed Terminal Enhancement Project

                                    bull Terminal design objectives included

                                    bull Meeting immediate and near-term needs

                                    bull Establish a project budget for near-term improvements that is affordable for the Airport

                                    bull Design character that signifies its role as a gateway to the region

                                    bull Phase expansion that does not impact current operations

                                    bull Anticipating future needs and establish a pattern of design for future expansions

                                    bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

                                    bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

                                    Existing Terminal

                                    Terminal Renovation ndash Phases I and II

                                    New Holdroom (Phase II) ndash East Elevation

                                    New Holdroom (Phase II) ndash South Elevation

                                    New Holdroom Interior Looking East

                                    New Holdroom Interior Looking North

                                    Flex Space ndash Conventional Construction ndash View from Airfield

                                    Flex Space ndash Tent Option ndash View from Airfield

                                    Existing Terminal ndash View from Airfield Side

                                    Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                                    Tent option Phase I

                                    Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                                    Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                                    Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                                    Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                                    Future Expansion ndash Estimated 2025

                                    Future Expansion ndash Estimated 2050

                                    Financial Analysis

                                    Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                                    financial operations to prepare a financial forecasting model

                                    bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                                    bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                                    bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                                    bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                                    Airline Rates amp Charges

                                    Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                    double current levels

                                    bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                    bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                    bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                    bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                    bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                    Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                    Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                    Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                    Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                    ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                    The proposed fees are anticipated to increase revenues by $250000 annually

                                    Staff agrees with the consultantrsquos recommended airline rates and charges

                                    Funding Options

                                    Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                    Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                    Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                    Funding Needs

                                    bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                    bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                    Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                    bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                    Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                    The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                    Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                    Staffing Analysis

                                    Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                    an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                    bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                    bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                    bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                    bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                    Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                    requirements spending approximately $220000 annually to provide ARFF coverage and training

                                    bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                    bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                    bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                    bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                    ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                    bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                    bull Most airports similar to or larger than STS have contracted ARFF services

                                    bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                    Airport Operations Budget 2014

                                    Enplanement 2014

                                    Airport Staff

                                    Contract Fire Fire Contract Cost

                                    Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                    Request for Feedback bull Long-term Parking

                                    bull Airport Terminal Improvement Conceptual Plan

                                    bull FundingFinancing Options

                                    Future Board Items bull February 9 2016

                                    bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                    bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                    design services long-term parking lot design services and long-term parking lot construction)

                                    bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                    integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                    bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                    Charles M Schulz - Sonoma County Airport

                                    2290 Airport Boulevard

                                    Santa Rosa CA 95403

                                    (707) 565-7243

                                    wwwsono macou ntya irportorg

                                    Follow STS on (j Facebook

                                    Im Linkedln

                                    ~ Twitter

                                    • Slide Number 1
                                    • Summary
                                    • Airport Governance
                                    • Airport Background
                                    • Current Organizational Chart
                                    • Airport Enterprise Fund
                                    • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                    • Airport Master Plan
                                    • Airfield Layout PlanLand Useand Boundaries
                                    • Airport Update
                                    • Airport Update ndash Fuel (Gallons Sold)
                                    • Airport Update ndash Parking Revenues
                                    • Airport Update ndash Rental Cars Revenues
                                    • Airport Updates ndash Passenger Levels
                                    • Airport Update - HorizonAlaska Airlines
                                    • Slide Number 16
                                    • Fare Comparison for STS and Other Airports in the Region
                                    • Current Passengers and Growth Potential
                                    • Airline Industry Overview ndash Potential Markets
                                    • Airports Used by Sonoma County and Surrounding Area Residents
                                    • Percentage Share Of Passengers For Bay Area Airports By Airline
                                    • Airline Industry Overview
                                    • Slide Number 23
                                    • Airport Developments
                                    • Slide Number 25
                                    • Airfield Layout PlanDevelopable Parcels
                                    • Capital Project Needs
                                    • Slide Number 28
                                    • Runway Safety Area ndash Phase II ndash Service Roads
                                    • Runway Safety Area ndash Phase II ndash Service Roads
                                    • Aircraft Rescue and Firefighting Building
                                    • Aircraft Rescue and Firefighting Building
                                    • New Long-term Parking Lot
                                    • Slide Number 34
                                    • Proposed Terminal Enhancement Project
                                    • Existing Terminal
                                    • Terminal Renovation ndash Phases I and II
                                    • New Holdroom (Phase II) ndash South Elevation
                                    • New Holdroom InteriorLooking East
                                    • Flex Space ndash Tent Option ndash View from Airfield
                                    • Existing Terminal ndash View from Airfield Side
                                    • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                    • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                    • Future Expansion ndash Estimated 2025
                                    • Future Expansion ndash Estimated 2050
                                    • Financial Analysis
                                    • Slide Number 47
                                    • Airline Rates amp Charges
                                    • Slide Number 49
                                    • Slide Number 50
                                    • Funding Options
                                    • Current Airport Debt
                                    • Funding Options ndash Long-term
                                    • Staffing Analysis
                                    • Staffing Report
                                    • Aircraft Rescue and Firefighting (ARFF) Services
                                    • ARFF Services at Comparable Airports
                                    • Request for Feedback
                                    • Future Board Items
                                    • Slide Number 60

                                      Airline Industry Overview ndash Potential Markets Airport Outbound Round Trip Total Round Trip Potential STS

                                      Passengers Passengers Passengers Guadalajara 135268 193433 52227 Denver 76720 153440 41429 Las Vegas 64080 76244 30498 Honolulu 55918 111836 35788 Phoenix 50224 100448 32143 Maui 43290 86580 27706 Salt Lake City 34894 69788 24426 New York - JFK 157972 315944 85305 Chicago 120596 241192 65122 Boston 99644 199290 53808 New York - EWR 91834 183688 49596 Atlanta 88256 176514 47659 Mexico City 80080 106500 28755 Dallas-Fort Worth 78548 157096 42416 London 71760 143520 38750 Puerto Vallarta 68766 88020 23765 Houston 64970 129940 35084 Paris 63510 127020 34295 Washington DC 62780 125560 33901 Fort Lauderdale 57086 114172 30826 Kona 53364 106728 34153 Kauai 42486 84972 27191 Bookings data for YE 6-30-14

                                      Airports Used by Sonoma County and Surrounding Area Residents

                                      Share of Passenger Bookings ndash All Airlines

                                      Oakland Sacramento 7 5

                                      STS 2

                                      San jose 1

                                      San Francisco 85

                                      Percentage Share Of Passengers For Bay Area Airports By Airline

                                      Other US AlaskaHorizon 3 American Airlines

                                      6 13

                                      International Delta Air Lines 13 8

                                      Southwest Virgin America 5

                                      4

                                      United Airlines 48

                                      Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the

                                      domestic airline capacity

                                      Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United

                                      Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS

                                      Aircraft manufacturers are shifting production away from small (under 60 seat) jets

                                      Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels

                                      STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels

                                      Departing Seats STS vs Similar AirportsIndexed to CY 2008

                                      20 170

                                      15

                                      10

                                      5

                                      0

                                      -5

                                      -10

                                      -15

                                      -20

                                      STS 81 104

                                      46

                                      01

                                      -63 -52 -37

                                      -116 -164

                                      -136 -170 -154 -151

                                      -169

                                      2008 2009 2010 2011 2012 2013 2014 2015 2016

                                      Airport Developments

                                      Development at STS

                                      In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations

                                      The Airport has four (4) signed term sheets ndash

                                      bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)

                                      bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations

                                      In negotiations with Kaiser Air for a new lease to add a third hangar

                                      Proposed improvements total over $13 million

                                      Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year

                                      Airfield Layout Plan

                                      Developable Parcels

                                      Capital Project Needs

                                      Completed Projects

                                      bull Remodeled existing terminal in 2010 adding 5000 square feet

                                      bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway

                                      bull Rehabilitated the airline parking apron

                                      bull Expanded rental car staging areas

                                      bull Reconfigured the current long-term parking lot to expand parking spaces

                                      bull Reconfigured and expanded the rental car return lot to double the parking spaces

                                      bull Installed a new rental car wash system and vehicle detail area

                                      Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads

                                      bull The service road portion of the project was removed from the main contract to match availability of federal funding

                                      bull Construction is early FY16-17

                                      bull Project was bid in August 2015 waiting for federal funding to award

                                      bull Project estimate is $2 million

                                      bull 9066 federally funded

                                      Runway Safety Area ndash Phase II ndash Service Roads

                                      Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets

                                      current standards for either ARFF or ADA regulations

                                      bull Location of current facility is in the way of long-term terminal expansion needs

                                      bull A new location has not been selected conceptually studied in 2012 Airport Master Plan

                                      bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements

                                      bull Preliminary project estimate is $7 to $8 million

                                      bull Federal funding (90) should be available for this project

                                      bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA

                                      Aircraft Rescue and Firefighting Building

                                      New Long-term Parking Lot

                                      bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers

                                      bull The current long-term lot exceeded capacity 5 times in 2015

                                      bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day

                                      bull The proposed parking lot would add approximately 440 parking spaces

                                      bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000

                                      bull Staff is recommending construction as a single phase project

                                      New long-term parking lot ndash Site location

                                      Terminal

                                      Proposed Terminal Enhancement Project

                                      bull Terminal design objectives included

                                      bull Meeting immediate and near-term needs

                                      bull Establish a project budget for near-term improvements that is affordable for the Airport

                                      bull Design character that signifies its role as a gateway to the region

                                      bull Phase expansion that does not impact current operations

                                      bull Anticipating future needs and establish a pattern of design for future expansions

                                      bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

                                      bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

                                      Existing Terminal

                                      Terminal Renovation ndash Phases I and II

                                      New Holdroom (Phase II) ndash East Elevation

                                      New Holdroom (Phase II) ndash South Elevation

                                      New Holdroom Interior Looking East

                                      New Holdroom Interior Looking North

                                      Flex Space ndash Conventional Construction ndash View from Airfield

                                      Flex Space ndash Tent Option ndash View from Airfield

                                      Existing Terminal ndash View from Airfield Side

                                      Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                                      Tent option Phase I

                                      Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                                      Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                                      Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                                      Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                                      Future Expansion ndash Estimated 2025

                                      Future Expansion ndash Estimated 2050

                                      Financial Analysis

                                      Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                                      financial operations to prepare a financial forecasting model

                                      bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                                      bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                                      bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                                      bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                                      Airline Rates amp Charges

                                      Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                      double current levels

                                      bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                      bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                      bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                      bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                      bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                      Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                      Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                      Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                      Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                      ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                      The proposed fees are anticipated to increase revenues by $250000 annually

                                      Staff agrees with the consultantrsquos recommended airline rates and charges

                                      Funding Options

                                      Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                      Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                      Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                      Funding Needs

                                      bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                      bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                      Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                      bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                      Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                      The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                      Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                      Staffing Analysis

                                      Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                      an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                      bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                      bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                      bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                      bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                      Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                      requirements spending approximately $220000 annually to provide ARFF coverage and training

                                      bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                      bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                      bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                      bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                      ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                      bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                      bull Most airports similar to or larger than STS have contracted ARFF services

                                      bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                      Airport Operations Budget 2014

                                      Enplanement 2014

                                      Airport Staff

                                      Contract Fire Fire Contract Cost

                                      Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                      Request for Feedback bull Long-term Parking

                                      bull Airport Terminal Improvement Conceptual Plan

                                      bull FundingFinancing Options

                                      Future Board Items bull February 9 2016

                                      bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                      bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                      design services long-term parking lot design services and long-term parking lot construction)

                                      bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                      integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                      bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                      Charles M Schulz - Sonoma County Airport

                                      2290 Airport Boulevard

                                      Santa Rosa CA 95403

                                      (707) 565-7243

                                      wwwsono macou ntya irportorg

                                      Follow STS on (j Facebook

                                      Im Linkedln

                                      ~ Twitter

                                      • Slide Number 1
                                      • Summary
                                      • Airport Governance
                                      • Airport Background
                                      • Current Organizational Chart
                                      • Airport Enterprise Fund
                                      • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                      • Airport Master Plan
                                      • Airfield Layout PlanLand Useand Boundaries
                                      • Airport Update
                                      • Airport Update ndash Fuel (Gallons Sold)
                                      • Airport Update ndash Parking Revenues
                                      • Airport Update ndash Rental Cars Revenues
                                      • Airport Updates ndash Passenger Levels
                                      • Airport Update - HorizonAlaska Airlines
                                      • Slide Number 16
                                      • Fare Comparison for STS and Other Airports in the Region
                                      • Current Passengers and Growth Potential
                                      • Airline Industry Overview ndash Potential Markets
                                      • Airports Used by Sonoma County and Surrounding Area Residents
                                      • Percentage Share Of Passengers For Bay Area Airports By Airline
                                      • Airline Industry Overview
                                      • Slide Number 23
                                      • Airport Developments
                                      • Slide Number 25
                                      • Airfield Layout PlanDevelopable Parcels
                                      • Capital Project Needs
                                      • Slide Number 28
                                      • Runway Safety Area ndash Phase II ndash Service Roads
                                      • Runway Safety Area ndash Phase II ndash Service Roads
                                      • Aircraft Rescue and Firefighting Building
                                      • Aircraft Rescue and Firefighting Building
                                      • New Long-term Parking Lot
                                      • Slide Number 34
                                      • Proposed Terminal Enhancement Project
                                      • Existing Terminal
                                      • Terminal Renovation ndash Phases I and II
                                      • New Holdroom (Phase II) ndash South Elevation
                                      • New Holdroom InteriorLooking East
                                      • Flex Space ndash Tent Option ndash View from Airfield
                                      • Existing Terminal ndash View from Airfield Side
                                      • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                      • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                      • Future Expansion ndash Estimated 2025
                                      • Future Expansion ndash Estimated 2050
                                      • Financial Analysis
                                      • Slide Number 47
                                      • Airline Rates amp Charges
                                      • Slide Number 49
                                      • Slide Number 50
                                      • Funding Options
                                      • Current Airport Debt
                                      • Funding Options ndash Long-term
                                      • Staffing Analysis
                                      • Staffing Report
                                      • Aircraft Rescue and Firefighting (ARFF) Services
                                      • ARFF Services at Comparable Airports
                                      • Request for Feedback
                                      • Future Board Items
                                      • Slide Number 60

                                        Airports Used by Sonoma County and Surrounding Area Residents

                                        Share of Passenger Bookings ndash All Airlines

                                        Oakland Sacramento 7 5

                                        STS 2

                                        San jose 1

                                        San Francisco 85

                                        Percentage Share Of Passengers For Bay Area Airports By Airline

                                        Other US AlaskaHorizon 3 American Airlines

                                        6 13

                                        International Delta Air Lines 13 8

                                        Southwest Virgin America 5

                                        4

                                        United Airlines 48

                                        Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the

                                        domestic airline capacity

                                        Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United

                                        Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS

                                        Aircraft manufacturers are shifting production away from small (under 60 seat) jets

                                        Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels

                                        STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels

                                        Departing Seats STS vs Similar AirportsIndexed to CY 2008

                                        20 170

                                        15

                                        10

                                        5

                                        0

                                        -5

                                        -10

                                        -15

                                        -20

                                        STS 81 104

                                        46

                                        01

                                        -63 -52 -37

                                        -116 -164

                                        -136 -170 -154 -151

                                        -169

                                        2008 2009 2010 2011 2012 2013 2014 2015 2016

                                        Airport Developments

                                        Development at STS

                                        In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations

                                        The Airport has four (4) signed term sheets ndash

                                        bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)

                                        bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations

                                        In negotiations with Kaiser Air for a new lease to add a third hangar

                                        Proposed improvements total over $13 million

                                        Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year

                                        Airfield Layout Plan

                                        Developable Parcels

                                        Capital Project Needs

                                        Completed Projects

                                        bull Remodeled existing terminal in 2010 adding 5000 square feet

                                        bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway

                                        bull Rehabilitated the airline parking apron

                                        bull Expanded rental car staging areas

                                        bull Reconfigured the current long-term parking lot to expand parking spaces

                                        bull Reconfigured and expanded the rental car return lot to double the parking spaces

                                        bull Installed a new rental car wash system and vehicle detail area

                                        Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads

                                        bull The service road portion of the project was removed from the main contract to match availability of federal funding

                                        bull Construction is early FY16-17

                                        bull Project was bid in August 2015 waiting for federal funding to award

                                        bull Project estimate is $2 million

                                        bull 9066 federally funded

                                        Runway Safety Area ndash Phase II ndash Service Roads

                                        Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets

                                        current standards for either ARFF or ADA regulations

                                        bull Location of current facility is in the way of long-term terminal expansion needs

                                        bull A new location has not been selected conceptually studied in 2012 Airport Master Plan

                                        bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements

                                        bull Preliminary project estimate is $7 to $8 million

                                        bull Federal funding (90) should be available for this project

                                        bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA

                                        Aircraft Rescue and Firefighting Building

                                        New Long-term Parking Lot

                                        bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers

                                        bull The current long-term lot exceeded capacity 5 times in 2015

                                        bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day

                                        bull The proposed parking lot would add approximately 440 parking spaces

                                        bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000

                                        bull Staff is recommending construction as a single phase project

                                        New long-term parking lot ndash Site location

                                        Terminal

                                        Proposed Terminal Enhancement Project

                                        bull Terminal design objectives included

                                        bull Meeting immediate and near-term needs

                                        bull Establish a project budget for near-term improvements that is affordable for the Airport

                                        bull Design character that signifies its role as a gateway to the region

                                        bull Phase expansion that does not impact current operations

                                        bull Anticipating future needs and establish a pattern of design for future expansions

                                        bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

                                        bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

                                        Existing Terminal

                                        Terminal Renovation ndash Phases I and II

                                        New Holdroom (Phase II) ndash East Elevation

                                        New Holdroom (Phase II) ndash South Elevation

                                        New Holdroom Interior Looking East

                                        New Holdroom Interior Looking North

                                        Flex Space ndash Conventional Construction ndash View from Airfield

                                        Flex Space ndash Tent Option ndash View from Airfield

                                        Existing Terminal ndash View from Airfield Side

                                        Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                                        Tent option Phase I

                                        Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                                        Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                                        Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                                        Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                                        Future Expansion ndash Estimated 2025

                                        Future Expansion ndash Estimated 2050

                                        Financial Analysis

                                        Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                                        financial operations to prepare a financial forecasting model

                                        bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                                        bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                                        bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                                        bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                                        Airline Rates amp Charges

                                        Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                        double current levels

                                        bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                        bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                        bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                        bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                        bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                        Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                        Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                        Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                        Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                        ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                        The proposed fees are anticipated to increase revenues by $250000 annually

                                        Staff agrees with the consultantrsquos recommended airline rates and charges

                                        Funding Options

                                        Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                        Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                        Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                        Funding Needs

                                        bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                        bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                        Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                        bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                        Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                        The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                        Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                        Staffing Analysis

                                        Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                        an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                        bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                        bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                        bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                        bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                        Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                        requirements spending approximately $220000 annually to provide ARFF coverage and training

                                        bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                        bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                        bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                        bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                        ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                        bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                        bull Most airports similar to or larger than STS have contracted ARFF services

                                        bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                        Airport Operations Budget 2014

                                        Enplanement 2014

                                        Airport Staff

                                        Contract Fire Fire Contract Cost

                                        Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                        Request for Feedback bull Long-term Parking

                                        bull Airport Terminal Improvement Conceptual Plan

                                        bull FundingFinancing Options

                                        Future Board Items bull February 9 2016

                                        bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                        bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                        design services long-term parking lot design services and long-term parking lot construction)

                                        bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                        integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                        bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                        Charles M Schulz - Sonoma County Airport

                                        2290 Airport Boulevard

                                        Santa Rosa CA 95403

                                        (707) 565-7243

                                        wwwsono macou ntya irportorg

                                        Follow STS on (j Facebook

                                        Im Linkedln

                                        ~ Twitter

                                        • Slide Number 1
                                        • Summary
                                        • Airport Governance
                                        • Airport Background
                                        • Current Organizational Chart
                                        • Airport Enterprise Fund
                                        • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                        • Airport Master Plan
                                        • Airfield Layout PlanLand Useand Boundaries
                                        • Airport Update
                                        • Airport Update ndash Fuel (Gallons Sold)
                                        • Airport Update ndash Parking Revenues
                                        • Airport Update ndash Rental Cars Revenues
                                        • Airport Updates ndash Passenger Levels
                                        • Airport Update - HorizonAlaska Airlines
                                        • Slide Number 16
                                        • Fare Comparison for STS and Other Airports in the Region
                                        • Current Passengers and Growth Potential
                                        • Airline Industry Overview ndash Potential Markets
                                        • Airports Used by Sonoma County and Surrounding Area Residents
                                        • Percentage Share Of Passengers For Bay Area Airports By Airline
                                        • Airline Industry Overview
                                        • Slide Number 23
                                        • Airport Developments
                                        • Slide Number 25
                                        • Airfield Layout PlanDevelopable Parcels
                                        • Capital Project Needs
                                        • Slide Number 28
                                        • Runway Safety Area ndash Phase II ndash Service Roads
                                        • Runway Safety Area ndash Phase II ndash Service Roads
                                        • Aircraft Rescue and Firefighting Building
                                        • Aircraft Rescue and Firefighting Building
                                        • New Long-term Parking Lot
                                        • Slide Number 34
                                        • Proposed Terminal Enhancement Project
                                        • Existing Terminal
                                        • Terminal Renovation ndash Phases I and II
                                        • New Holdroom (Phase II) ndash South Elevation
                                        • New Holdroom InteriorLooking East
                                        • Flex Space ndash Tent Option ndash View from Airfield
                                        • Existing Terminal ndash View from Airfield Side
                                        • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                        • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                        • Future Expansion ndash Estimated 2025
                                        • Future Expansion ndash Estimated 2050
                                        • Financial Analysis
                                        • Slide Number 47
                                        • Airline Rates amp Charges
                                        • Slide Number 49
                                        • Slide Number 50
                                        • Funding Options
                                        • Current Airport Debt
                                        • Funding Options ndash Long-term
                                        • Staffing Analysis
                                        • Staffing Report
                                        • Aircraft Rescue and Firefighting (ARFF) Services
                                        • ARFF Services at Comparable Airports
                                        • Request for Feedback
                                        • Future Board Items
                                        • Slide Number 60

                                          Percentage Share Of Passengers For Bay Area Airports By Airline

                                          Other US AlaskaHorizon 3 American Airlines

                                          6 13

                                          International Delta Air Lines 13 8

                                          Southwest Virgin America 5

                                          4

                                          United Airlines 48

                                          Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the

                                          domestic airline capacity

                                          Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United

                                          Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS

                                          Aircraft manufacturers are shifting production away from small (under 60 seat) jets

                                          Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels

                                          STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels

                                          Departing Seats STS vs Similar AirportsIndexed to CY 2008

                                          20 170

                                          15

                                          10

                                          5

                                          0

                                          -5

                                          -10

                                          -15

                                          -20

                                          STS 81 104

                                          46

                                          01

                                          -63 -52 -37

                                          -116 -164

                                          -136 -170 -154 -151

                                          -169

                                          2008 2009 2010 2011 2012 2013 2014 2015 2016

                                          Airport Developments

                                          Development at STS

                                          In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations

                                          The Airport has four (4) signed term sheets ndash

                                          bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)

                                          bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations

                                          In negotiations with Kaiser Air for a new lease to add a third hangar

                                          Proposed improvements total over $13 million

                                          Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year

                                          Airfield Layout Plan

                                          Developable Parcels

                                          Capital Project Needs

                                          Completed Projects

                                          bull Remodeled existing terminal in 2010 adding 5000 square feet

                                          bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway

                                          bull Rehabilitated the airline parking apron

                                          bull Expanded rental car staging areas

                                          bull Reconfigured the current long-term parking lot to expand parking spaces

                                          bull Reconfigured and expanded the rental car return lot to double the parking spaces

                                          bull Installed a new rental car wash system and vehicle detail area

                                          Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads

                                          bull The service road portion of the project was removed from the main contract to match availability of federal funding

                                          bull Construction is early FY16-17

                                          bull Project was bid in August 2015 waiting for federal funding to award

                                          bull Project estimate is $2 million

                                          bull 9066 federally funded

                                          Runway Safety Area ndash Phase II ndash Service Roads

                                          Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets

                                          current standards for either ARFF or ADA regulations

                                          bull Location of current facility is in the way of long-term terminal expansion needs

                                          bull A new location has not been selected conceptually studied in 2012 Airport Master Plan

                                          bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements

                                          bull Preliminary project estimate is $7 to $8 million

                                          bull Federal funding (90) should be available for this project

                                          bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA

                                          Aircraft Rescue and Firefighting Building

                                          New Long-term Parking Lot

                                          bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers

                                          bull The current long-term lot exceeded capacity 5 times in 2015

                                          bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day

                                          bull The proposed parking lot would add approximately 440 parking spaces

                                          bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000

                                          bull Staff is recommending construction as a single phase project

                                          New long-term parking lot ndash Site location

                                          Terminal

                                          Proposed Terminal Enhancement Project

                                          bull Terminal design objectives included

                                          bull Meeting immediate and near-term needs

                                          bull Establish a project budget for near-term improvements that is affordable for the Airport

                                          bull Design character that signifies its role as a gateway to the region

                                          bull Phase expansion that does not impact current operations

                                          bull Anticipating future needs and establish a pattern of design for future expansions

                                          bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

                                          bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

                                          Existing Terminal

                                          Terminal Renovation ndash Phases I and II

                                          New Holdroom (Phase II) ndash East Elevation

                                          New Holdroom (Phase II) ndash South Elevation

                                          New Holdroom Interior Looking East

                                          New Holdroom Interior Looking North

                                          Flex Space ndash Conventional Construction ndash View from Airfield

                                          Flex Space ndash Tent Option ndash View from Airfield

                                          Existing Terminal ndash View from Airfield Side

                                          Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                                          Tent option Phase I

                                          Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                                          Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                                          Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                                          Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                                          Future Expansion ndash Estimated 2025

                                          Future Expansion ndash Estimated 2050

                                          Financial Analysis

                                          Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                                          financial operations to prepare a financial forecasting model

                                          bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                                          bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                                          bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                                          bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                                          Airline Rates amp Charges

                                          Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                          double current levels

                                          bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                          bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                          bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                          bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                          bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                          Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                          Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                          Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                          Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                          ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                          The proposed fees are anticipated to increase revenues by $250000 annually

                                          Staff agrees with the consultantrsquos recommended airline rates and charges

                                          Funding Options

                                          Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                          Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                          Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                          Funding Needs

                                          bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                          bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                          Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                          bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                          Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                          The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                          Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                          Staffing Analysis

                                          Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                          an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                          bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                          bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                          bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                          bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                          Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                          requirements spending approximately $220000 annually to provide ARFF coverage and training

                                          bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                          bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                          bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                          bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                          ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                          bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                          bull Most airports similar to or larger than STS have contracted ARFF services

                                          bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                          Airport Operations Budget 2014

                                          Enplanement 2014

                                          Airport Staff

                                          Contract Fire Fire Contract Cost

                                          Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                          Request for Feedback bull Long-term Parking

                                          bull Airport Terminal Improvement Conceptual Plan

                                          bull FundingFinancing Options

                                          Future Board Items bull February 9 2016

                                          bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                          bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                          design services long-term parking lot design services and long-term parking lot construction)

                                          bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                          integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                          bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                          Charles M Schulz - Sonoma County Airport

                                          2290 Airport Boulevard

                                          Santa Rosa CA 95403

                                          (707) 565-7243

                                          wwwsono macou ntya irportorg

                                          Follow STS on (j Facebook

                                          Im Linkedln

                                          ~ Twitter

                                          • Slide Number 1
                                          • Summary
                                          • Airport Governance
                                          • Airport Background
                                          • Current Organizational Chart
                                          • Airport Enterprise Fund
                                          • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                          • Airport Master Plan
                                          • Airfield Layout PlanLand Useand Boundaries
                                          • Airport Update
                                          • Airport Update ndash Fuel (Gallons Sold)
                                          • Airport Update ndash Parking Revenues
                                          • Airport Update ndash Rental Cars Revenues
                                          • Airport Updates ndash Passenger Levels
                                          • Airport Update - HorizonAlaska Airlines
                                          • Slide Number 16
                                          • Fare Comparison for STS and Other Airports in the Region
                                          • Current Passengers and Growth Potential
                                          • Airline Industry Overview ndash Potential Markets
                                          • Airports Used by Sonoma County and Surrounding Area Residents
                                          • Percentage Share Of Passengers For Bay Area Airports By Airline
                                          • Airline Industry Overview
                                          • Slide Number 23
                                          • Airport Developments
                                          • Slide Number 25
                                          • Airfield Layout PlanDevelopable Parcels
                                          • Capital Project Needs
                                          • Slide Number 28
                                          • Runway Safety Area ndash Phase II ndash Service Roads
                                          • Runway Safety Area ndash Phase II ndash Service Roads
                                          • Aircraft Rescue and Firefighting Building
                                          • Aircraft Rescue and Firefighting Building
                                          • New Long-term Parking Lot
                                          • Slide Number 34
                                          • Proposed Terminal Enhancement Project
                                          • Existing Terminal
                                          • Terminal Renovation ndash Phases I and II
                                          • New Holdroom (Phase II) ndash South Elevation
                                          • New Holdroom InteriorLooking East
                                          • Flex Space ndash Tent Option ndash View from Airfield
                                          • Existing Terminal ndash View from Airfield Side
                                          • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                          • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                          • Future Expansion ndash Estimated 2025
                                          • Future Expansion ndash Estimated 2050
                                          • Financial Analysis
                                          • Slide Number 47
                                          • Airline Rates amp Charges
                                          • Slide Number 49
                                          • Slide Number 50
                                          • Funding Options
                                          • Current Airport Debt
                                          • Funding Options ndash Long-term
                                          • Staffing Analysis
                                          • Staffing Report
                                          • Aircraft Rescue and Firefighting (ARFF) Services
                                          • ARFF Services at Comparable Airports
                                          • Request for Feedback
                                          • Future Board Items
                                          • Slide Number 60

                                            Airline Industry Overview 4 Airlines (United Delta American and Southwest) control 83 of the

                                            domestic airline capacity

                                            Low cost carriers (LCCs such as Allegiant and Spirit) are growing at a faster rate than legacy carriers like Delta and United

                                            Recent pilot regulations have increased the need for mainline pilots reducing the number of pilots available for regional markets like STS

                                            Aircraft manufacturers are shifting production away from small (under 60 seat) jets

                                            Non-hub airports similar to STS has seen a reduction in capacity (seats) to a point 17 below 2008 levels

                                            STS has beat the trends compared to other non-hub airports and has increased available seats by over 17 of the 2008 levels

                                            Departing Seats STS vs Similar AirportsIndexed to CY 2008

                                            20 170

                                            15

                                            10

                                            5

                                            0

                                            -5

                                            -10

                                            -15

                                            -20

                                            STS 81 104

                                            46

                                            01

                                            -63 -52 -37

                                            -116 -164

                                            -136 -170 -154 -151

                                            -169

                                            2008 2009 2010 2011 2012 2013 2014 2015 2016

                                            Airport Developments

                                            Development at STS

                                            In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations

                                            The Airport has four (4) signed term sheets ndash

                                            bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)

                                            bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations

                                            In negotiations with Kaiser Air for a new lease to add a third hangar

                                            Proposed improvements total over $13 million

                                            Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year

                                            Airfield Layout Plan

                                            Developable Parcels

                                            Capital Project Needs

                                            Completed Projects

                                            bull Remodeled existing terminal in 2010 adding 5000 square feet

                                            bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway

                                            bull Rehabilitated the airline parking apron

                                            bull Expanded rental car staging areas

                                            bull Reconfigured the current long-term parking lot to expand parking spaces

                                            bull Reconfigured and expanded the rental car return lot to double the parking spaces

                                            bull Installed a new rental car wash system and vehicle detail area

                                            Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads

                                            bull The service road portion of the project was removed from the main contract to match availability of federal funding

                                            bull Construction is early FY16-17

                                            bull Project was bid in August 2015 waiting for federal funding to award

                                            bull Project estimate is $2 million

                                            bull 9066 federally funded

                                            Runway Safety Area ndash Phase II ndash Service Roads

                                            Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets

                                            current standards for either ARFF or ADA regulations

                                            bull Location of current facility is in the way of long-term terminal expansion needs

                                            bull A new location has not been selected conceptually studied in 2012 Airport Master Plan

                                            bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements

                                            bull Preliminary project estimate is $7 to $8 million

                                            bull Federal funding (90) should be available for this project

                                            bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA

                                            Aircraft Rescue and Firefighting Building

                                            New Long-term Parking Lot

                                            bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers

                                            bull The current long-term lot exceeded capacity 5 times in 2015

                                            bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day

                                            bull The proposed parking lot would add approximately 440 parking spaces

                                            bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000

                                            bull Staff is recommending construction as a single phase project

                                            New long-term parking lot ndash Site location

                                            Terminal

                                            Proposed Terminal Enhancement Project

                                            bull Terminal design objectives included

                                            bull Meeting immediate and near-term needs

                                            bull Establish a project budget for near-term improvements that is affordable for the Airport

                                            bull Design character that signifies its role as a gateway to the region

                                            bull Phase expansion that does not impact current operations

                                            bull Anticipating future needs and establish a pattern of design for future expansions

                                            bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

                                            bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

                                            Existing Terminal

                                            Terminal Renovation ndash Phases I and II

                                            New Holdroom (Phase II) ndash East Elevation

                                            New Holdroom (Phase II) ndash South Elevation

                                            New Holdroom Interior Looking East

                                            New Holdroom Interior Looking North

                                            Flex Space ndash Conventional Construction ndash View from Airfield

                                            Flex Space ndash Tent Option ndash View from Airfield

                                            Existing Terminal ndash View from Airfield Side

                                            Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                                            Tent option Phase I

                                            Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                                            Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                                            Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                                            Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                                            Future Expansion ndash Estimated 2025

                                            Future Expansion ndash Estimated 2050

                                            Financial Analysis

                                            Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                                            financial operations to prepare a financial forecasting model

                                            bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                                            bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                                            bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                                            bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                                            Airline Rates amp Charges

                                            Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                            double current levels

                                            bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                            bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                            bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                            bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                            bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                            Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                            Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                            Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                            Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                            ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                            The proposed fees are anticipated to increase revenues by $250000 annually

                                            Staff agrees with the consultantrsquos recommended airline rates and charges

                                            Funding Options

                                            Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                            Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                            Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                            Funding Needs

                                            bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                            bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                            Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                            bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                            Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                            The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                            Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                            Staffing Analysis

                                            Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                            an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                            bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                            bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                            bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                            bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                            Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                            requirements spending approximately $220000 annually to provide ARFF coverage and training

                                            bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                            bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                            bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                            bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                            ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                            bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                            bull Most airports similar to or larger than STS have contracted ARFF services

                                            bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                            Airport Operations Budget 2014

                                            Enplanement 2014

                                            Airport Staff

                                            Contract Fire Fire Contract Cost

                                            Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                            Request for Feedback bull Long-term Parking

                                            bull Airport Terminal Improvement Conceptual Plan

                                            bull FundingFinancing Options

                                            Future Board Items bull February 9 2016

                                            bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                            bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                            design services long-term parking lot design services and long-term parking lot construction)

                                            bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                            integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                            bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                            Charles M Schulz - Sonoma County Airport

                                            2290 Airport Boulevard

                                            Santa Rosa CA 95403

                                            (707) 565-7243

                                            wwwsono macou ntya irportorg

                                            Follow STS on (j Facebook

                                            Im Linkedln

                                            ~ Twitter

                                            • Slide Number 1
                                            • Summary
                                            • Airport Governance
                                            • Airport Background
                                            • Current Organizational Chart
                                            • Airport Enterprise Fund
                                            • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                            • Airport Master Plan
                                            • Airfield Layout PlanLand Useand Boundaries
                                            • Airport Update
                                            • Airport Update ndash Fuel (Gallons Sold)
                                            • Airport Update ndash Parking Revenues
                                            • Airport Update ndash Rental Cars Revenues
                                            • Airport Updates ndash Passenger Levels
                                            • Airport Update - HorizonAlaska Airlines
                                            • Slide Number 16
                                            • Fare Comparison for STS and Other Airports in the Region
                                            • Current Passengers and Growth Potential
                                            • Airline Industry Overview ndash Potential Markets
                                            • Airports Used by Sonoma County and Surrounding Area Residents
                                            • Percentage Share Of Passengers For Bay Area Airports By Airline
                                            • Airline Industry Overview
                                            • Slide Number 23
                                            • Airport Developments
                                            • Slide Number 25
                                            • Airfield Layout PlanDevelopable Parcels
                                            • Capital Project Needs
                                            • Slide Number 28
                                            • Runway Safety Area ndash Phase II ndash Service Roads
                                            • Runway Safety Area ndash Phase II ndash Service Roads
                                            • Aircraft Rescue and Firefighting Building
                                            • Aircraft Rescue and Firefighting Building
                                            • New Long-term Parking Lot
                                            • Slide Number 34
                                            • Proposed Terminal Enhancement Project
                                            • Existing Terminal
                                            • Terminal Renovation ndash Phases I and II
                                            • New Holdroom (Phase II) ndash South Elevation
                                            • New Holdroom InteriorLooking East
                                            • Flex Space ndash Tent Option ndash View from Airfield
                                            • Existing Terminal ndash View from Airfield Side
                                            • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                            • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                            • Future Expansion ndash Estimated 2025
                                            • Future Expansion ndash Estimated 2050
                                            • Financial Analysis
                                            • Slide Number 47
                                            • Airline Rates amp Charges
                                            • Slide Number 49
                                            • Slide Number 50
                                            • Funding Options
                                            • Current Airport Debt
                                            • Funding Options ndash Long-term
                                            • Staffing Analysis
                                            • Staffing Report
                                            • Aircraft Rescue and Firefighting (ARFF) Services
                                            • ARFF Services at Comparable Airports
                                            • Request for Feedback
                                            • Future Board Items
                                            • Slide Number 60

                                              Departing Seats STS vs Similar AirportsIndexed to CY 2008

                                              20 170

                                              15

                                              10

                                              5

                                              0

                                              -5

                                              -10

                                              -15

                                              -20

                                              STS 81 104

                                              46

                                              01

                                              -63 -52 -37

                                              -116 -164

                                              -136 -170 -154 -151

                                              -169

                                              2008 2009 2010 2011 2012 2013 2014 2015 2016

                                              Airport Developments

                                              Development at STS

                                              In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations

                                              The Airport has four (4) signed term sheets ndash

                                              bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)

                                              bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations

                                              In negotiations with Kaiser Air for a new lease to add a third hangar

                                              Proposed improvements total over $13 million

                                              Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year

                                              Airfield Layout Plan

                                              Developable Parcels

                                              Capital Project Needs

                                              Completed Projects

                                              bull Remodeled existing terminal in 2010 adding 5000 square feet

                                              bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway

                                              bull Rehabilitated the airline parking apron

                                              bull Expanded rental car staging areas

                                              bull Reconfigured the current long-term parking lot to expand parking spaces

                                              bull Reconfigured and expanded the rental car return lot to double the parking spaces

                                              bull Installed a new rental car wash system and vehicle detail area

                                              Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads

                                              bull The service road portion of the project was removed from the main contract to match availability of federal funding

                                              bull Construction is early FY16-17

                                              bull Project was bid in August 2015 waiting for federal funding to award

                                              bull Project estimate is $2 million

                                              bull 9066 federally funded

                                              Runway Safety Area ndash Phase II ndash Service Roads

                                              Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets

                                              current standards for either ARFF or ADA regulations

                                              bull Location of current facility is in the way of long-term terminal expansion needs

                                              bull A new location has not been selected conceptually studied in 2012 Airport Master Plan

                                              bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements

                                              bull Preliminary project estimate is $7 to $8 million

                                              bull Federal funding (90) should be available for this project

                                              bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA

                                              Aircraft Rescue and Firefighting Building

                                              New Long-term Parking Lot

                                              bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers

                                              bull The current long-term lot exceeded capacity 5 times in 2015

                                              bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day

                                              bull The proposed parking lot would add approximately 440 parking spaces

                                              bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000

                                              bull Staff is recommending construction as a single phase project

                                              New long-term parking lot ndash Site location

                                              Terminal

                                              Proposed Terminal Enhancement Project

                                              bull Terminal design objectives included

                                              bull Meeting immediate and near-term needs

                                              bull Establish a project budget for near-term improvements that is affordable for the Airport

                                              bull Design character that signifies its role as a gateway to the region

                                              bull Phase expansion that does not impact current operations

                                              bull Anticipating future needs and establish a pattern of design for future expansions

                                              bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

                                              bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

                                              Existing Terminal

                                              Terminal Renovation ndash Phases I and II

                                              New Holdroom (Phase II) ndash East Elevation

                                              New Holdroom (Phase II) ndash South Elevation

                                              New Holdroom Interior Looking East

                                              New Holdroom Interior Looking North

                                              Flex Space ndash Conventional Construction ndash View from Airfield

                                              Flex Space ndash Tent Option ndash View from Airfield

                                              Existing Terminal ndash View from Airfield Side

                                              Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                                              Tent option Phase I

                                              Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                                              Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                                              Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                                              Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                                              Future Expansion ndash Estimated 2025

                                              Future Expansion ndash Estimated 2050

                                              Financial Analysis

                                              Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                                              financial operations to prepare a financial forecasting model

                                              bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                                              bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                                              bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                                              bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                                              Airline Rates amp Charges

                                              Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                              double current levels

                                              bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                              bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                              bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                              bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                              bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                              Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                              Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                              Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                              Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                              ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                              The proposed fees are anticipated to increase revenues by $250000 annually

                                              Staff agrees with the consultantrsquos recommended airline rates and charges

                                              Funding Options

                                              Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                              Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                              Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                              Funding Needs

                                              bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                              bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                              Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                              bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                              Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                              The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                              Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                              Staffing Analysis

                                              Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                              an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                              bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                              bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                              bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                              bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                              Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                              requirements spending approximately $220000 annually to provide ARFF coverage and training

                                              bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                              bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                              bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                              bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                              ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                              bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                              bull Most airports similar to or larger than STS have contracted ARFF services

                                              bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                              Airport Operations Budget 2014

                                              Enplanement 2014

                                              Airport Staff

                                              Contract Fire Fire Contract Cost

                                              Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                              Request for Feedback bull Long-term Parking

                                              bull Airport Terminal Improvement Conceptual Plan

                                              bull FundingFinancing Options

                                              Future Board Items bull February 9 2016

                                              bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                              bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                              design services long-term parking lot design services and long-term parking lot construction)

                                              bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                              integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                              bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                              Charles M Schulz - Sonoma County Airport

                                              2290 Airport Boulevard

                                              Santa Rosa CA 95403

                                              (707) 565-7243

                                              wwwsono macou ntya irportorg

                                              Follow STS on (j Facebook

                                              Im Linkedln

                                              ~ Twitter

                                              • Slide Number 1
                                              • Summary
                                              • Airport Governance
                                              • Airport Background
                                              • Current Organizational Chart
                                              • Airport Enterprise Fund
                                              • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                              • Airport Master Plan
                                              • Airfield Layout PlanLand Useand Boundaries
                                              • Airport Update
                                              • Airport Update ndash Fuel (Gallons Sold)
                                              • Airport Update ndash Parking Revenues
                                              • Airport Update ndash Rental Cars Revenues
                                              • Airport Updates ndash Passenger Levels
                                              • Airport Update - HorizonAlaska Airlines
                                              • Slide Number 16
                                              • Fare Comparison for STS and Other Airports in the Region
                                              • Current Passengers and Growth Potential
                                              • Airline Industry Overview ndash Potential Markets
                                              • Airports Used by Sonoma County and Surrounding Area Residents
                                              • Percentage Share Of Passengers For Bay Area Airports By Airline
                                              • Airline Industry Overview
                                              • Slide Number 23
                                              • Airport Developments
                                              • Slide Number 25
                                              • Airfield Layout PlanDevelopable Parcels
                                              • Capital Project Needs
                                              • Slide Number 28
                                              • Runway Safety Area ndash Phase II ndash Service Roads
                                              • Runway Safety Area ndash Phase II ndash Service Roads
                                              • Aircraft Rescue and Firefighting Building
                                              • Aircraft Rescue and Firefighting Building
                                              • New Long-term Parking Lot
                                              • Slide Number 34
                                              • Proposed Terminal Enhancement Project
                                              • Existing Terminal
                                              • Terminal Renovation ndash Phases I and II
                                              • New Holdroom (Phase II) ndash South Elevation
                                              • New Holdroom InteriorLooking East
                                              • Flex Space ndash Tent Option ndash View from Airfield
                                              • Existing Terminal ndash View from Airfield Side
                                              • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                              • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                              • Future Expansion ndash Estimated 2025
                                              • Future Expansion ndash Estimated 2050
                                              • Financial Analysis
                                              • Slide Number 47
                                              • Airline Rates amp Charges
                                              • Slide Number 49
                                              • Slide Number 50
                                              • Funding Options
                                              • Current Airport Debt
                                              • Funding Options ndash Long-term
                                              • Staffing Analysis
                                              • Staffing Report
                                              • Aircraft Rescue and Firefighting (ARFF) Services
                                              • ARFF Services at Comparable Airports
                                              • Request for Feedback
                                              • Future Board Items
                                              • Slide Number 60

                                                Airport Developments

                                                Development at STS

                                                In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations

                                                The Airport has four (4) signed term sheets ndash

                                                bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)

                                                bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations

                                                In negotiations with Kaiser Air for a new lease to add a third hangar

                                                Proposed improvements total over $13 million

                                                Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year

                                                Airfield Layout Plan

                                                Developable Parcels

                                                Capital Project Needs

                                                Completed Projects

                                                bull Remodeled existing terminal in 2010 adding 5000 square feet

                                                bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway

                                                bull Rehabilitated the airline parking apron

                                                bull Expanded rental car staging areas

                                                bull Reconfigured the current long-term parking lot to expand parking spaces

                                                bull Reconfigured and expanded the rental car return lot to double the parking spaces

                                                bull Installed a new rental car wash system and vehicle detail area

                                                Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads

                                                bull The service road portion of the project was removed from the main contract to match availability of federal funding

                                                bull Construction is early FY16-17

                                                bull Project was bid in August 2015 waiting for federal funding to award

                                                bull Project estimate is $2 million

                                                bull 9066 federally funded

                                                Runway Safety Area ndash Phase II ndash Service Roads

                                                Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets

                                                current standards for either ARFF or ADA regulations

                                                bull Location of current facility is in the way of long-term terminal expansion needs

                                                bull A new location has not been selected conceptually studied in 2012 Airport Master Plan

                                                bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements

                                                bull Preliminary project estimate is $7 to $8 million

                                                bull Federal funding (90) should be available for this project

                                                bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA

                                                Aircraft Rescue and Firefighting Building

                                                New Long-term Parking Lot

                                                bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers

                                                bull The current long-term lot exceeded capacity 5 times in 2015

                                                bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day

                                                bull The proposed parking lot would add approximately 440 parking spaces

                                                bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000

                                                bull Staff is recommending construction as a single phase project

                                                New long-term parking lot ndash Site location

                                                Terminal

                                                Proposed Terminal Enhancement Project

                                                bull Terminal design objectives included

                                                bull Meeting immediate and near-term needs

                                                bull Establish a project budget for near-term improvements that is affordable for the Airport

                                                bull Design character that signifies its role as a gateway to the region

                                                bull Phase expansion that does not impact current operations

                                                bull Anticipating future needs and establish a pattern of design for future expansions

                                                bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

                                                bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

                                                Existing Terminal

                                                Terminal Renovation ndash Phases I and II

                                                New Holdroom (Phase II) ndash East Elevation

                                                New Holdroom (Phase II) ndash South Elevation

                                                New Holdroom Interior Looking East

                                                New Holdroom Interior Looking North

                                                Flex Space ndash Conventional Construction ndash View from Airfield

                                                Flex Space ndash Tent Option ndash View from Airfield

                                                Existing Terminal ndash View from Airfield Side

                                                Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                                                Tent option Phase I

                                                Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                                                Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                                                Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                                                Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                                                Future Expansion ndash Estimated 2025

                                                Future Expansion ndash Estimated 2050

                                                Financial Analysis

                                                Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                                                financial operations to prepare a financial forecasting model

                                                bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                                                bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                                                bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                                                bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                                                Airline Rates amp Charges

                                                Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                                double current levels

                                                bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                                bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                                bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                                bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                                bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                                Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                                Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                                Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                                Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                                ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                                The proposed fees are anticipated to increase revenues by $250000 annually

                                                Staff agrees with the consultantrsquos recommended airline rates and charges

                                                Funding Options

                                                Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                                Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                                Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                                Funding Needs

                                                bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                                bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                                Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                                bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                                Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                                The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                                Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                                Staffing Analysis

                                                Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                                an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                                bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                                bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                                bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                                bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                                Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                                requirements spending approximately $220000 annually to provide ARFF coverage and training

                                                bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                                bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                                bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                                bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                                ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                bull Most airports similar to or larger than STS have contracted ARFF services

                                                bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                Airport Operations Budget 2014

                                                Enplanement 2014

                                                Airport Staff

                                                Contract Fire Fire Contract Cost

                                                Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                Request for Feedback bull Long-term Parking

                                                bull Airport Terminal Improvement Conceptual Plan

                                                bull FundingFinancing Options

                                                Future Board Items bull February 9 2016

                                                bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                design services long-term parking lot design services and long-term parking lot construction)

                                                bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                Charles M Schulz - Sonoma County Airport

                                                2290 Airport Boulevard

                                                Santa Rosa CA 95403

                                                (707) 565-7243

                                                wwwsono macou ntya irportorg

                                                Follow STS on (j Facebook

                                                Im Linkedln

                                                ~ Twitter

                                                • Slide Number 1
                                                • Summary
                                                • Airport Governance
                                                • Airport Background
                                                • Current Organizational Chart
                                                • Airport Enterprise Fund
                                                • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                • Airport Master Plan
                                                • Airfield Layout PlanLand Useand Boundaries
                                                • Airport Update
                                                • Airport Update ndash Fuel (Gallons Sold)
                                                • Airport Update ndash Parking Revenues
                                                • Airport Update ndash Rental Cars Revenues
                                                • Airport Updates ndash Passenger Levels
                                                • Airport Update - HorizonAlaska Airlines
                                                • Slide Number 16
                                                • Fare Comparison for STS and Other Airports in the Region
                                                • Current Passengers and Growth Potential
                                                • Airline Industry Overview ndash Potential Markets
                                                • Airports Used by Sonoma County and Surrounding Area Residents
                                                • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                • Airline Industry Overview
                                                • Slide Number 23
                                                • Airport Developments
                                                • Slide Number 25
                                                • Airfield Layout PlanDevelopable Parcels
                                                • Capital Project Needs
                                                • Slide Number 28
                                                • Runway Safety Area ndash Phase II ndash Service Roads
                                                • Runway Safety Area ndash Phase II ndash Service Roads
                                                • Aircraft Rescue and Firefighting Building
                                                • Aircraft Rescue and Firefighting Building
                                                • New Long-term Parking Lot
                                                • Slide Number 34
                                                • Proposed Terminal Enhancement Project
                                                • Existing Terminal
                                                • Terminal Renovation ndash Phases I and II
                                                • New Holdroom (Phase II) ndash South Elevation
                                                • New Holdroom InteriorLooking East
                                                • Flex Space ndash Tent Option ndash View from Airfield
                                                • Existing Terminal ndash View from Airfield Side
                                                • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                • Future Expansion ndash Estimated 2025
                                                • Future Expansion ndash Estimated 2050
                                                • Financial Analysis
                                                • Slide Number 47
                                                • Airline Rates amp Charges
                                                • Slide Number 49
                                                • Slide Number 50
                                                • Funding Options
                                                • Current Airport Debt
                                                • Funding Options ndash Long-term
                                                • Staffing Analysis
                                                • Staffing Report
                                                • Aircraft Rescue and Firefighting (ARFF) Services
                                                • ARFF Services at Comparable Airports
                                                • Request for Feedback
                                                • Future Board Items
                                                • Slide Number 60

                                                  Development at STS

                                                  In October 2015 Board approved new lease with Sonoma Jet Center allowing for significant improvements and expansion of their current operations

                                                  The Airport has four (4) signed term sheets ndash

                                                  bull three (3) new leases to current leaseholders (VineJet PropJet and the Pacific Coast Air Museum)

                                                  bull a new lease with TruAir for the lease of the former Airport shop area for corporate aircraft charter service and flight school operations

                                                  In negotiations with Kaiser Air for a new lease to add a third hangar

                                                  Proposed improvements total over $13 million

                                                  Proposed improvements will generate between $200000 and $300000 in additional annual revenue for the Airport In addition tenants pay 11 possessory interest taxes ndash ex $10000000 based aircraft would pay $110000 per year

                                                  Airfield Layout Plan

                                                  Developable Parcels

                                                  Capital Project Needs

                                                  Completed Projects

                                                  bull Remodeled existing terminal in 2010 adding 5000 square feet

                                                  bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway

                                                  bull Rehabilitated the airline parking apron

                                                  bull Expanded rental car staging areas

                                                  bull Reconfigured the current long-term parking lot to expand parking spaces

                                                  bull Reconfigured and expanded the rental car return lot to double the parking spaces

                                                  bull Installed a new rental car wash system and vehicle detail area

                                                  Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads

                                                  bull The service road portion of the project was removed from the main contract to match availability of federal funding

                                                  bull Construction is early FY16-17

                                                  bull Project was bid in August 2015 waiting for federal funding to award

                                                  bull Project estimate is $2 million

                                                  bull 9066 federally funded

                                                  Runway Safety Area ndash Phase II ndash Service Roads

                                                  Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets

                                                  current standards for either ARFF or ADA regulations

                                                  bull Location of current facility is in the way of long-term terminal expansion needs

                                                  bull A new location has not been selected conceptually studied in 2012 Airport Master Plan

                                                  bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements

                                                  bull Preliminary project estimate is $7 to $8 million

                                                  bull Federal funding (90) should be available for this project

                                                  bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA

                                                  Aircraft Rescue and Firefighting Building

                                                  New Long-term Parking Lot

                                                  bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers

                                                  bull The current long-term lot exceeded capacity 5 times in 2015

                                                  bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day

                                                  bull The proposed parking lot would add approximately 440 parking spaces

                                                  bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000

                                                  bull Staff is recommending construction as a single phase project

                                                  New long-term parking lot ndash Site location

                                                  Terminal

                                                  Proposed Terminal Enhancement Project

                                                  bull Terminal design objectives included

                                                  bull Meeting immediate and near-term needs

                                                  bull Establish a project budget for near-term improvements that is affordable for the Airport

                                                  bull Design character that signifies its role as a gateway to the region

                                                  bull Phase expansion that does not impact current operations

                                                  bull Anticipating future needs and establish a pattern of design for future expansions

                                                  bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

                                                  bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

                                                  Existing Terminal

                                                  Terminal Renovation ndash Phases I and II

                                                  New Holdroom (Phase II) ndash East Elevation

                                                  New Holdroom (Phase II) ndash South Elevation

                                                  New Holdroom Interior Looking East

                                                  New Holdroom Interior Looking North

                                                  Flex Space ndash Conventional Construction ndash View from Airfield

                                                  Flex Space ndash Tent Option ndash View from Airfield

                                                  Existing Terminal ndash View from Airfield Side

                                                  Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                                                  Tent option Phase I

                                                  Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                                                  Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                                                  Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                                                  Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                                                  Future Expansion ndash Estimated 2025

                                                  Future Expansion ndash Estimated 2050

                                                  Financial Analysis

                                                  Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                                                  financial operations to prepare a financial forecasting model

                                                  bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                                                  bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                                                  bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                                                  bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                                                  Airline Rates amp Charges

                                                  Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                                  double current levels

                                                  bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                                  bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                                  bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                                  bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                                  bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                                  Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                                  Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                                  Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                                  Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                                  ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                                  The proposed fees are anticipated to increase revenues by $250000 annually

                                                  Staff agrees with the consultantrsquos recommended airline rates and charges

                                                  Funding Options

                                                  Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                                  Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                                  Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                                  Funding Needs

                                                  bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                                  bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                                  Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                                  bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                                  Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                                  The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                                  Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                                  Staffing Analysis

                                                  Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                                  an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                                  bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                                  bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                                  bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                                  bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                                  Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                                  requirements spending approximately $220000 annually to provide ARFF coverage and training

                                                  bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                                  bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                                  bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                                  bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                                  ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                  bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                  bull Most airports similar to or larger than STS have contracted ARFF services

                                                  bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                  Airport Operations Budget 2014

                                                  Enplanement 2014

                                                  Airport Staff

                                                  Contract Fire Fire Contract Cost

                                                  Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                  Request for Feedback bull Long-term Parking

                                                  bull Airport Terminal Improvement Conceptual Plan

                                                  bull FundingFinancing Options

                                                  Future Board Items bull February 9 2016

                                                  bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                  bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                  design services long-term parking lot design services and long-term parking lot construction)

                                                  bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                  integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                  bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                  Charles M Schulz - Sonoma County Airport

                                                  2290 Airport Boulevard

                                                  Santa Rosa CA 95403

                                                  (707) 565-7243

                                                  wwwsono macou ntya irportorg

                                                  Follow STS on (j Facebook

                                                  Im Linkedln

                                                  ~ Twitter

                                                  • Slide Number 1
                                                  • Summary
                                                  • Airport Governance
                                                  • Airport Background
                                                  • Current Organizational Chart
                                                  • Airport Enterprise Fund
                                                  • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                  • Airport Master Plan
                                                  • Airfield Layout PlanLand Useand Boundaries
                                                  • Airport Update
                                                  • Airport Update ndash Fuel (Gallons Sold)
                                                  • Airport Update ndash Parking Revenues
                                                  • Airport Update ndash Rental Cars Revenues
                                                  • Airport Updates ndash Passenger Levels
                                                  • Airport Update - HorizonAlaska Airlines
                                                  • Slide Number 16
                                                  • Fare Comparison for STS and Other Airports in the Region
                                                  • Current Passengers and Growth Potential
                                                  • Airline Industry Overview ndash Potential Markets
                                                  • Airports Used by Sonoma County and Surrounding Area Residents
                                                  • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                  • Airline Industry Overview
                                                  • Slide Number 23
                                                  • Airport Developments
                                                  • Slide Number 25
                                                  • Airfield Layout PlanDevelopable Parcels
                                                  • Capital Project Needs
                                                  • Slide Number 28
                                                  • Runway Safety Area ndash Phase II ndash Service Roads
                                                  • Runway Safety Area ndash Phase II ndash Service Roads
                                                  • Aircraft Rescue and Firefighting Building
                                                  • Aircraft Rescue and Firefighting Building
                                                  • New Long-term Parking Lot
                                                  • Slide Number 34
                                                  • Proposed Terminal Enhancement Project
                                                  • Existing Terminal
                                                  • Terminal Renovation ndash Phases I and II
                                                  • New Holdroom (Phase II) ndash South Elevation
                                                  • New Holdroom InteriorLooking East
                                                  • Flex Space ndash Tent Option ndash View from Airfield
                                                  • Existing Terminal ndash View from Airfield Side
                                                  • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                  • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                  • Future Expansion ndash Estimated 2025
                                                  • Future Expansion ndash Estimated 2050
                                                  • Financial Analysis
                                                  • Slide Number 47
                                                  • Airline Rates amp Charges
                                                  • Slide Number 49
                                                  • Slide Number 50
                                                  • Funding Options
                                                  • Current Airport Debt
                                                  • Funding Options ndash Long-term
                                                  • Staffing Analysis
                                                  • Staffing Report
                                                  • Aircraft Rescue and Firefighting (ARFF) Services
                                                  • ARFF Services at Comparable Airports
                                                  • Request for Feedback
                                                  • Future Board Items
                                                  • Slide Number 60

                                                    Airfield Layout Plan

                                                    Developable Parcels

                                                    Capital Project Needs

                                                    Completed Projects

                                                    bull Remodeled existing terminal in 2010 adding 5000 square feet

                                                    bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway

                                                    bull Rehabilitated the airline parking apron

                                                    bull Expanded rental car staging areas

                                                    bull Reconfigured the current long-term parking lot to expand parking spaces

                                                    bull Reconfigured and expanded the rental car return lot to double the parking spaces

                                                    bull Installed a new rental car wash system and vehicle detail area

                                                    Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads

                                                    bull The service road portion of the project was removed from the main contract to match availability of federal funding

                                                    bull Construction is early FY16-17

                                                    bull Project was bid in August 2015 waiting for federal funding to award

                                                    bull Project estimate is $2 million

                                                    bull 9066 federally funded

                                                    Runway Safety Area ndash Phase II ndash Service Roads

                                                    Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets

                                                    current standards for either ARFF or ADA regulations

                                                    bull Location of current facility is in the way of long-term terminal expansion needs

                                                    bull A new location has not been selected conceptually studied in 2012 Airport Master Plan

                                                    bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements

                                                    bull Preliminary project estimate is $7 to $8 million

                                                    bull Federal funding (90) should be available for this project

                                                    bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA

                                                    Aircraft Rescue and Firefighting Building

                                                    New Long-term Parking Lot

                                                    bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers

                                                    bull The current long-term lot exceeded capacity 5 times in 2015

                                                    bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day

                                                    bull The proposed parking lot would add approximately 440 parking spaces

                                                    bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000

                                                    bull Staff is recommending construction as a single phase project

                                                    New long-term parking lot ndash Site location

                                                    Terminal

                                                    Proposed Terminal Enhancement Project

                                                    bull Terminal design objectives included

                                                    bull Meeting immediate and near-term needs

                                                    bull Establish a project budget for near-term improvements that is affordable for the Airport

                                                    bull Design character that signifies its role as a gateway to the region

                                                    bull Phase expansion that does not impact current operations

                                                    bull Anticipating future needs and establish a pattern of design for future expansions

                                                    bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

                                                    bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

                                                    Existing Terminal

                                                    Terminal Renovation ndash Phases I and II

                                                    New Holdroom (Phase II) ndash East Elevation

                                                    New Holdroom (Phase II) ndash South Elevation

                                                    New Holdroom Interior Looking East

                                                    New Holdroom Interior Looking North

                                                    Flex Space ndash Conventional Construction ndash View from Airfield

                                                    Flex Space ndash Tent Option ndash View from Airfield

                                                    Existing Terminal ndash View from Airfield Side

                                                    Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                                                    Tent option Phase I

                                                    Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                                                    Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                                                    Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                                                    Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                                                    Future Expansion ndash Estimated 2025

                                                    Future Expansion ndash Estimated 2050

                                                    Financial Analysis

                                                    Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                                                    financial operations to prepare a financial forecasting model

                                                    bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                                                    bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                                                    bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                                                    bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                                                    Airline Rates amp Charges

                                                    Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                                    double current levels

                                                    bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                                    bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                                    bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                                    bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                                    bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                                    Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                                    Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                                    Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                                    Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                                    ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                                    The proposed fees are anticipated to increase revenues by $250000 annually

                                                    Staff agrees with the consultantrsquos recommended airline rates and charges

                                                    Funding Options

                                                    Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                                    Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                                    Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                                    Funding Needs

                                                    bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                                    bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                                    Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                                    bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                                    Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                                    The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                                    Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                                    Staffing Analysis

                                                    Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                                    an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                                    bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                                    bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                                    bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                                    bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                                    Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                                    requirements spending approximately $220000 annually to provide ARFF coverage and training

                                                    bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                                    bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                                    bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                                    bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                                    ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                    bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                    bull Most airports similar to or larger than STS have contracted ARFF services

                                                    bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                    Airport Operations Budget 2014

                                                    Enplanement 2014

                                                    Airport Staff

                                                    Contract Fire Fire Contract Cost

                                                    Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                    Request for Feedback bull Long-term Parking

                                                    bull Airport Terminal Improvement Conceptual Plan

                                                    bull FundingFinancing Options

                                                    Future Board Items bull February 9 2016

                                                    bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                    bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                    design services long-term parking lot design services and long-term parking lot construction)

                                                    bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                    integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                    bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                    Charles M Schulz - Sonoma County Airport

                                                    2290 Airport Boulevard

                                                    Santa Rosa CA 95403

                                                    (707) 565-7243

                                                    wwwsono macou ntya irportorg

                                                    Follow STS on (j Facebook

                                                    Im Linkedln

                                                    ~ Twitter

                                                    • Slide Number 1
                                                    • Summary
                                                    • Airport Governance
                                                    • Airport Background
                                                    • Current Organizational Chart
                                                    • Airport Enterprise Fund
                                                    • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                    • Airport Master Plan
                                                    • Airfield Layout PlanLand Useand Boundaries
                                                    • Airport Update
                                                    • Airport Update ndash Fuel (Gallons Sold)
                                                    • Airport Update ndash Parking Revenues
                                                    • Airport Update ndash Rental Cars Revenues
                                                    • Airport Updates ndash Passenger Levels
                                                    • Airport Update - HorizonAlaska Airlines
                                                    • Slide Number 16
                                                    • Fare Comparison for STS and Other Airports in the Region
                                                    • Current Passengers and Growth Potential
                                                    • Airline Industry Overview ndash Potential Markets
                                                    • Airports Used by Sonoma County and Surrounding Area Residents
                                                    • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                    • Airline Industry Overview
                                                    • Slide Number 23
                                                    • Airport Developments
                                                    • Slide Number 25
                                                    • Airfield Layout PlanDevelopable Parcels
                                                    • Capital Project Needs
                                                    • Slide Number 28
                                                    • Runway Safety Area ndash Phase II ndash Service Roads
                                                    • Runway Safety Area ndash Phase II ndash Service Roads
                                                    • Aircraft Rescue and Firefighting Building
                                                    • Aircraft Rescue and Firefighting Building
                                                    • New Long-term Parking Lot
                                                    • Slide Number 34
                                                    • Proposed Terminal Enhancement Project
                                                    • Existing Terminal
                                                    • Terminal Renovation ndash Phases I and II
                                                    • New Holdroom (Phase II) ndash South Elevation
                                                    • New Holdroom InteriorLooking East
                                                    • Flex Space ndash Tent Option ndash View from Airfield
                                                    • Existing Terminal ndash View from Airfield Side
                                                    • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                    • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                    • Future Expansion ndash Estimated 2025
                                                    • Future Expansion ndash Estimated 2050
                                                    • Financial Analysis
                                                    • Slide Number 47
                                                    • Airline Rates amp Charges
                                                    • Slide Number 49
                                                    • Slide Number 50
                                                    • Funding Options
                                                    • Current Airport Debt
                                                    • Funding Options ndash Long-term
                                                    • Staffing Analysis
                                                    • Staffing Report
                                                    • Aircraft Rescue and Firefighting (ARFF) Services
                                                    • ARFF Services at Comparable Airports
                                                    • Request for Feedback
                                                    • Future Board Items
                                                    • Slide Number 60

                                                      Capital Project Needs

                                                      Completed Projects

                                                      bull Remodeled existing terminal in 2010 adding 5000 square feet

                                                      bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway

                                                      bull Rehabilitated the airline parking apron

                                                      bull Expanded rental car staging areas

                                                      bull Reconfigured the current long-term parking lot to expand parking spaces

                                                      bull Reconfigured and expanded the rental car return lot to double the parking spaces

                                                      bull Installed a new rental car wash system and vehicle detail area

                                                      Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads

                                                      bull The service road portion of the project was removed from the main contract to match availability of federal funding

                                                      bull Construction is early FY16-17

                                                      bull Project was bid in August 2015 waiting for federal funding to award

                                                      bull Project estimate is $2 million

                                                      bull 9066 federally funded

                                                      Runway Safety Area ndash Phase II ndash Service Roads

                                                      Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets

                                                      current standards for either ARFF or ADA regulations

                                                      bull Location of current facility is in the way of long-term terminal expansion needs

                                                      bull A new location has not been selected conceptually studied in 2012 Airport Master Plan

                                                      bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements

                                                      bull Preliminary project estimate is $7 to $8 million

                                                      bull Federal funding (90) should be available for this project

                                                      bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA

                                                      Aircraft Rescue and Firefighting Building

                                                      New Long-term Parking Lot

                                                      bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers

                                                      bull The current long-term lot exceeded capacity 5 times in 2015

                                                      bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day

                                                      bull The proposed parking lot would add approximately 440 parking spaces

                                                      bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000

                                                      bull Staff is recommending construction as a single phase project

                                                      New long-term parking lot ndash Site location

                                                      Terminal

                                                      Proposed Terminal Enhancement Project

                                                      bull Terminal design objectives included

                                                      bull Meeting immediate and near-term needs

                                                      bull Establish a project budget for near-term improvements that is affordable for the Airport

                                                      bull Design character that signifies its role as a gateway to the region

                                                      bull Phase expansion that does not impact current operations

                                                      bull Anticipating future needs and establish a pattern of design for future expansions

                                                      bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

                                                      bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

                                                      Existing Terminal

                                                      Terminal Renovation ndash Phases I and II

                                                      New Holdroom (Phase II) ndash East Elevation

                                                      New Holdroom (Phase II) ndash South Elevation

                                                      New Holdroom Interior Looking East

                                                      New Holdroom Interior Looking North

                                                      Flex Space ndash Conventional Construction ndash View from Airfield

                                                      Flex Space ndash Tent Option ndash View from Airfield

                                                      Existing Terminal ndash View from Airfield Side

                                                      Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                                                      Tent option Phase I

                                                      Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                                                      Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                                                      Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                                                      Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                                                      Future Expansion ndash Estimated 2025

                                                      Future Expansion ndash Estimated 2050

                                                      Financial Analysis

                                                      Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                                                      financial operations to prepare a financial forecasting model

                                                      bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                                                      bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                                                      bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                                                      bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                                                      Airline Rates amp Charges

                                                      Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                                      double current levels

                                                      bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                                      bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                                      bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                                      bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                                      bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                                      Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                                      Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                                      Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                                      Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                                      ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                                      The proposed fees are anticipated to increase revenues by $250000 annually

                                                      Staff agrees with the consultantrsquos recommended airline rates and charges

                                                      Funding Options

                                                      Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                                      Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                                      Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                                      Funding Needs

                                                      bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                                      bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                                      Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                                      bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                                      Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                                      The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                                      Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                                      Staffing Analysis

                                                      Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                                      an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                                      bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                                      bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                                      bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                                      bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                                      Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                                      requirements spending approximately $220000 annually to provide ARFF coverage and training

                                                      bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                                      bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                                      bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                                      bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                                      ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                      bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                      bull Most airports similar to or larger than STS have contracted ARFF services

                                                      bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                      Airport Operations Budget 2014

                                                      Enplanement 2014

                                                      Airport Staff

                                                      Contract Fire Fire Contract Cost

                                                      Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                      Request for Feedback bull Long-term Parking

                                                      bull Airport Terminal Improvement Conceptual Plan

                                                      bull FundingFinancing Options

                                                      Future Board Items bull February 9 2016

                                                      bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                      bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                      design services long-term parking lot design services and long-term parking lot construction)

                                                      bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                      integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                      bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                      Charles M Schulz - Sonoma County Airport

                                                      2290 Airport Boulevard

                                                      Santa Rosa CA 95403

                                                      (707) 565-7243

                                                      wwwsono macou ntya irportorg

                                                      Follow STS on (j Facebook

                                                      Im Linkedln

                                                      ~ Twitter

                                                      • Slide Number 1
                                                      • Summary
                                                      • Airport Governance
                                                      • Airport Background
                                                      • Current Organizational Chart
                                                      • Airport Enterprise Fund
                                                      • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                      • Airport Master Plan
                                                      • Airfield Layout PlanLand Useand Boundaries
                                                      • Airport Update
                                                      • Airport Update ndash Fuel (Gallons Sold)
                                                      • Airport Update ndash Parking Revenues
                                                      • Airport Update ndash Rental Cars Revenues
                                                      • Airport Updates ndash Passenger Levels
                                                      • Airport Update - HorizonAlaska Airlines
                                                      • Slide Number 16
                                                      • Fare Comparison for STS and Other Airports in the Region
                                                      • Current Passengers and Growth Potential
                                                      • Airline Industry Overview ndash Potential Markets
                                                      • Airports Used by Sonoma County and Surrounding Area Residents
                                                      • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                      • Airline Industry Overview
                                                      • Slide Number 23
                                                      • Airport Developments
                                                      • Slide Number 25
                                                      • Airfield Layout PlanDevelopable Parcels
                                                      • Capital Project Needs
                                                      • Slide Number 28
                                                      • Runway Safety Area ndash Phase II ndash Service Roads
                                                      • Runway Safety Area ndash Phase II ndash Service Roads
                                                      • Aircraft Rescue and Firefighting Building
                                                      • Aircraft Rescue and Firefighting Building
                                                      • New Long-term Parking Lot
                                                      • Slide Number 34
                                                      • Proposed Terminal Enhancement Project
                                                      • Existing Terminal
                                                      • Terminal Renovation ndash Phases I and II
                                                      • New Holdroom (Phase II) ndash South Elevation
                                                      • New Holdroom InteriorLooking East
                                                      • Flex Space ndash Tent Option ndash View from Airfield
                                                      • Existing Terminal ndash View from Airfield Side
                                                      • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                      • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                      • Future Expansion ndash Estimated 2025
                                                      • Future Expansion ndash Estimated 2050
                                                      • Financial Analysis
                                                      • Slide Number 47
                                                      • Airline Rates amp Charges
                                                      • Slide Number 49
                                                      • Slide Number 50
                                                      • Funding Options
                                                      • Current Airport Debt
                                                      • Funding Options ndash Long-term
                                                      • Staffing Analysis
                                                      • Staffing Report
                                                      • Aircraft Rescue and Firefighting (ARFF) Services
                                                      • ARFF Services at Comparable Airports
                                                      • Request for Feedback
                                                      • Future Board Items
                                                      • Slide Number 60

                                                        Completed Projects

                                                        bull Remodeled existing terminal in 2010 adding 5000 square feet

                                                        bull Runway Safety Area Project added 885 feet of runway for a 6000 foot long runway

                                                        bull Rehabilitated the airline parking apron

                                                        bull Expanded rental car staging areas

                                                        bull Reconfigured the current long-term parking lot to expand parking spaces

                                                        bull Reconfigured and expanded the rental car return lot to double the parking spaces

                                                        bull Installed a new rental car wash system and vehicle detail area

                                                        Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads

                                                        bull The service road portion of the project was removed from the main contract to match availability of federal funding

                                                        bull Construction is early FY16-17

                                                        bull Project was bid in August 2015 waiting for federal funding to award

                                                        bull Project estimate is $2 million

                                                        bull 9066 federally funded

                                                        Runway Safety Area ndash Phase II ndash Service Roads

                                                        Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets

                                                        current standards for either ARFF or ADA regulations

                                                        bull Location of current facility is in the way of long-term terminal expansion needs

                                                        bull A new location has not been selected conceptually studied in 2012 Airport Master Plan

                                                        bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements

                                                        bull Preliminary project estimate is $7 to $8 million

                                                        bull Federal funding (90) should be available for this project

                                                        bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA

                                                        Aircraft Rescue and Firefighting Building

                                                        New Long-term Parking Lot

                                                        bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers

                                                        bull The current long-term lot exceeded capacity 5 times in 2015

                                                        bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day

                                                        bull The proposed parking lot would add approximately 440 parking spaces

                                                        bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000

                                                        bull Staff is recommending construction as a single phase project

                                                        New long-term parking lot ndash Site location

                                                        Terminal

                                                        Proposed Terminal Enhancement Project

                                                        bull Terminal design objectives included

                                                        bull Meeting immediate and near-term needs

                                                        bull Establish a project budget for near-term improvements that is affordable for the Airport

                                                        bull Design character that signifies its role as a gateway to the region

                                                        bull Phase expansion that does not impact current operations

                                                        bull Anticipating future needs and establish a pattern of design for future expansions

                                                        bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

                                                        bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

                                                        Existing Terminal

                                                        Terminal Renovation ndash Phases I and II

                                                        New Holdroom (Phase II) ndash East Elevation

                                                        New Holdroom (Phase II) ndash South Elevation

                                                        New Holdroom Interior Looking East

                                                        New Holdroom Interior Looking North

                                                        Flex Space ndash Conventional Construction ndash View from Airfield

                                                        Flex Space ndash Tent Option ndash View from Airfield

                                                        Existing Terminal ndash View from Airfield Side

                                                        Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                                                        Tent option Phase I

                                                        Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                                                        Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                                                        Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                                                        Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                                                        Future Expansion ndash Estimated 2025

                                                        Future Expansion ndash Estimated 2050

                                                        Financial Analysis

                                                        Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                                                        financial operations to prepare a financial forecasting model

                                                        bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                                                        bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                                                        bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                                                        bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                                                        Airline Rates amp Charges

                                                        Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                                        double current levels

                                                        bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                                        bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                                        bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                                        bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                                        bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                                        Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                                        Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                                        Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                                        Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                                        ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                                        The proposed fees are anticipated to increase revenues by $250000 annually

                                                        Staff agrees with the consultantrsquos recommended airline rates and charges

                                                        Funding Options

                                                        Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                                        Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                                        Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                                        Funding Needs

                                                        bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                                        bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                                        Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                                        bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                                        Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                                        The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                                        Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                                        Staffing Analysis

                                                        Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                                        an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                                        bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                                        bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                                        bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                                        bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                                        Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                                        requirements spending approximately $220000 annually to provide ARFF coverage and training

                                                        bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                                        bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                                        bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                                        bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                                        ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                        bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                        bull Most airports similar to or larger than STS have contracted ARFF services

                                                        bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                        Airport Operations Budget 2014

                                                        Enplanement 2014

                                                        Airport Staff

                                                        Contract Fire Fire Contract Cost

                                                        Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                        Request for Feedback bull Long-term Parking

                                                        bull Airport Terminal Improvement Conceptual Plan

                                                        bull FundingFinancing Options

                                                        Future Board Items bull February 9 2016

                                                        bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                        bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                        design services long-term parking lot design services and long-term parking lot construction)

                                                        bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                        integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                        bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                        Charles M Schulz - Sonoma County Airport

                                                        2290 Airport Boulevard

                                                        Santa Rosa CA 95403

                                                        (707) 565-7243

                                                        wwwsono macou ntya irportorg

                                                        Follow STS on (j Facebook

                                                        Im Linkedln

                                                        ~ Twitter

                                                        • Slide Number 1
                                                        • Summary
                                                        • Airport Governance
                                                        • Airport Background
                                                        • Current Organizational Chart
                                                        • Airport Enterprise Fund
                                                        • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                        • Airport Master Plan
                                                        • Airfield Layout PlanLand Useand Boundaries
                                                        • Airport Update
                                                        • Airport Update ndash Fuel (Gallons Sold)
                                                        • Airport Update ndash Parking Revenues
                                                        • Airport Update ndash Rental Cars Revenues
                                                        • Airport Updates ndash Passenger Levels
                                                        • Airport Update - HorizonAlaska Airlines
                                                        • Slide Number 16
                                                        • Fare Comparison for STS and Other Airports in the Region
                                                        • Current Passengers and Growth Potential
                                                        • Airline Industry Overview ndash Potential Markets
                                                        • Airports Used by Sonoma County and Surrounding Area Residents
                                                        • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                        • Airline Industry Overview
                                                        • Slide Number 23
                                                        • Airport Developments
                                                        • Slide Number 25
                                                        • Airfield Layout PlanDevelopable Parcels
                                                        • Capital Project Needs
                                                        • Slide Number 28
                                                        • Runway Safety Area ndash Phase II ndash Service Roads
                                                        • Runway Safety Area ndash Phase II ndash Service Roads
                                                        • Aircraft Rescue and Firefighting Building
                                                        • Aircraft Rescue and Firefighting Building
                                                        • New Long-term Parking Lot
                                                        • Slide Number 34
                                                        • Proposed Terminal Enhancement Project
                                                        • Existing Terminal
                                                        • Terminal Renovation ndash Phases I and II
                                                        • New Holdroom (Phase II) ndash South Elevation
                                                        • New Holdroom InteriorLooking East
                                                        • Flex Space ndash Tent Option ndash View from Airfield
                                                        • Existing Terminal ndash View from Airfield Side
                                                        • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                        • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                        • Future Expansion ndash Estimated 2025
                                                        • Future Expansion ndash Estimated 2050
                                                        • Financial Analysis
                                                        • Slide Number 47
                                                        • Airline Rates amp Charges
                                                        • Slide Number 49
                                                        • Slide Number 50
                                                        • Funding Options
                                                        • Current Airport Debt
                                                        • Funding Options ndash Long-term
                                                        • Staffing Analysis
                                                        • Staffing Report
                                                        • Aircraft Rescue and Firefighting (ARFF) Services
                                                        • ARFF Services at Comparable Airports
                                                        • Request for Feedback
                                                        • Future Board Items
                                                        • Slide Number 60

                                                          Future Capital Projects Runway Safety Area ndash Phase II ndash Service Roads

                                                          bull The service road portion of the project was removed from the main contract to match availability of federal funding

                                                          bull Construction is early FY16-17

                                                          bull Project was bid in August 2015 waiting for federal funding to award

                                                          bull Project estimate is $2 million

                                                          bull 9066 federally funded

                                                          Runway Safety Area ndash Phase II ndash Service Roads

                                                          Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets

                                                          current standards for either ARFF or ADA regulations

                                                          bull Location of current facility is in the way of long-term terminal expansion needs

                                                          bull A new location has not been selected conceptually studied in 2012 Airport Master Plan

                                                          bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements

                                                          bull Preliminary project estimate is $7 to $8 million

                                                          bull Federal funding (90) should be available for this project

                                                          bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA

                                                          Aircraft Rescue and Firefighting Building

                                                          New Long-term Parking Lot

                                                          bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers

                                                          bull The current long-term lot exceeded capacity 5 times in 2015

                                                          bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day

                                                          bull The proposed parking lot would add approximately 440 parking spaces

                                                          bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000

                                                          bull Staff is recommending construction as a single phase project

                                                          New long-term parking lot ndash Site location

                                                          Terminal

                                                          Proposed Terminal Enhancement Project

                                                          bull Terminal design objectives included

                                                          bull Meeting immediate and near-term needs

                                                          bull Establish a project budget for near-term improvements that is affordable for the Airport

                                                          bull Design character that signifies its role as a gateway to the region

                                                          bull Phase expansion that does not impact current operations

                                                          bull Anticipating future needs and establish a pattern of design for future expansions

                                                          bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

                                                          bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

                                                          Existing Terminal

                                                          Terminal Renovation ndash Phases I and II

                                                          New Holdroom (Phase II) ndash East Elevation

                                                          New Holdroom (Phase II) ndash South Elevation

                                                          New Holdroom Interior Looking East

                                                          New Holdroom Interior Looking North

                                                          Flex Space ndash Conventional Construction ndash View from Airfield

                                                          Flex Space ndash Tent Option ndash View from Airfield

                                                          Existing Terminal ndash View from Airfield Side

                                                          Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                                                          Tent option Phase I

                                                          Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                                                          Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                                                          Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                                                          Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                                                          Future Expansion ndash Estimated 2025

                                                          Future Expansion ndash Estimated 2050

                                                          Financial Analysis

                                                          Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                                                          financial operations to prepare a financial forecasting model

                                                          bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                                                          bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                                                          bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                                                          bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                                                          Airline Rates amp Charges

                                                          Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                                          double current levels

                                                          bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                                          bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                                          bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                                          bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                                          bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                                          Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                                          Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                                          Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                                          Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                                          ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                                          The proposed fees are anticipated to increase revenues by $250000 annually

                                                          Staff agrees with the consultantrsquos recommended airline rates and charges

                                                          Funding Options

                                                          Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                                          Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                                          Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                                          Funding Needs

                                                          bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                                          bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                                          Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                                          bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                                          Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                                          The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                                          Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                                          Staffing Analysis

                                                          Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                                          an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                                          bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                                          bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                                          bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                                          bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                                          Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                                          requirements spending approximately $220000 annually to provide ARFF coverage and training

                                                          bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                                          bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                                          bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                                          bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                                          ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                          bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                          bull Most airports similar to or larger than STS have contracted ARFF services

                                                          bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                          Airport Operations Budget 2014

                                                          Enplanement 2014

                                                          Airport Staff

                                                          Contract Fire Fire Contract Cost

                                                          Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                          Request for Feedback bull Long-term Parking

                                                          bull Airport Terminal Improvement Conceptual Plan

                                                          bull FundingFinancing Options

                                                          Future Board Items bull February 9 2016

                                                          bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                          bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                          design services long-term parking lot design services and long-term parking lot construction)

                                                          bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                          integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                          bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                          Charles M Schulz - Sonoma County Airport

                                                          2290 Airport Boulevard

                                                          Santa Rosa CA 95403

                                                          (707) 565-7243

                                                          wwwsono macou ntya irportorg

                                                          Follow STS on (j Facebook

                                                          Im Linkedln

                                                          ~ Twitter

                                                          • Slide Number 1
                                                          • Summary
                                                          • Airport Governance
                                                          • Airport Background
                                                          • Current Organizational Chart
                                                          • Airport Enterprise Fund
                                                          • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                          • Airport Master Plan
                                                          • Airfield Layout PlanLand Useand Boundaries
                                                          • Airport Update
                                                          • Airport Update ndash Fuel (Gallons Sold)
                                                          • Airport Update ndash Parking Revenues
                                                          • Airport Update ndash Rental Cars Revenues
                                                          • Airport Updates ndash Passenger Levels
                                                          • Airport Update - HorizonAlaska Airlines
                                                          • Slide Number 16
                                                          • Fare Comparison for STS and Other Airports in the Region
                                                          • Current Passengers and Growth Potential
                                                          • Airline Industry Overview ndash Potential Markets
                                                          • Airports Used by Sonoma County and Surrounding Area Residents
                                                          • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                          • Airline Industry Overview
                                                          • Slide Number 23
                                                          • Airport Developments
                                                          • Slide Number 25
                                                          • Airfield Layout PlanDevelopable Parcels
                                                          • Capital Project Needs
                                                          • Slide Number 28
                                                          • Runway Safety Area ndash Phase II ndash Service Roads
                                                          • Runway Safety Area ndash Phase II ndash Service Roads
                                                          • Aircraft Rescue and Firefighting Building
                                                          • Aircraft Rescue and Firefighting Building
                                                          • New Long-term Parking Lot
                                                          • Slide Number 34
                                                          • Proposed Terminal Enhancement Project
                                                          • Existing Terminal
                                                          • Terminal Renovation ndash Phases I and II
                                                          • New Holdroom (Phase II) ndash South Elevation
                                                          • New Holdroom InteriorLooking East
                                                          • Flex Space ndash Tent Option ndash View from Airfield
                                                          • Existing Terminal ndash View from Airfield Side
                                                          • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                          • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                          • Future Expansion ndash Estimated 2025
                                                          • Future Expansion ndash Estimated 2050
                                                          • Financial Analysis
                                                          • Slide Number 47
                                                          • Airline Rates amp Charges
                                                          • Slide Number 49
                                                          • Slide Number 50
                                                          • Funding Options
                                                          • Current Airport Debt
                                                          • Funding Options ndash Long-term
                                                          • Staffing Analysis
                                                          • Staffing Report
                                                          • Aircraft Rescue and Firefighting (ARFF) Services
                                                          • ARFF Services at Comparable Airports
                                                          • Request for Feedback
                                                          • Future Board Items
                                                          • Slide Number 60

                                                            Runway Safety Area ndash Phase II ndash Service Roads

                                                            Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets

                                                            current standards for either ARFF or ADA regulations

                                                            bull Location of current facility is in the way of long-term terminal expansion needs

                                                            bull A new location has not been selected conceptually studied in 2012 Airport Master Plan

                                                            bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements

                                                            bull Preliminary project estimate is $7 to $8 million

                                                            bull Federal funding (90) should be available for this project

                                                            bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA

                                                            Aircraft Rescue and Firefighting Building

                                                            New Long-term Parking Lot

                                                            bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers

                                                            bull The current long-term lot exceeded capacity 5 times in 2015

                                                            bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day

                                                            bull The proposed parking lot would add approximately 440 parking spaces

                                                            bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000

                                                            bull Staff is recommending construction as a single phase project

                                                            New long-term parking lot ndash Site location

                                                            Terminal

                                                            Proposed Terminal Enhancement Project

                                                            bull Terminal design objectives included

                                                            bull Meeting immediate and near-term needs

                                                            bull Establish a project budget for near-term improvements that is affordable for the Airport

                                                            bull Design character that signifies its role as a gateway to the region

                                                            bull Phase expansion that does not impact current operations

                                                            bull Anticipating future needs and establish a pattern of design for future expansions

                                                            bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

                                                            bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

                                                            Existing Terminal

                                                            Terminal Renovation ndash Phases I and II

                                                            New Holdroom (Phase II) ndash East Elevation

                                                            New Holdroom (Phase II) ndash South Elevation

                                                            New Holdroom Interior Looking East

                                                            New Holdroom Interior Looking North

                                                            Flex Space ndash Conventional Construction ndash View from Airfield

                                                            Flex Space ndash Tent Option ndash View from Airfield

                                                            Existing Terminal ndash View from Airfield Side

                                                            Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                                                            Tent option Phase I

                                                            Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                                                            Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                                                            Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                                                            Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                                                            Future Expansion ndash Estimated 2025

                                                            Future Expansion ndash Estimated 2050

                                                            Financial Analysis

                                                            Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                                                            financial operations to prepare a financial forecasting model

                                                            bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                                                            bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                                                            bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                                                            bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                                                            Airline Rates amp Charges

                                                            Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                                            double current levels

                                                            bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                                            bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                                            bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                                            bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                                            bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                                            Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                                            Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                                            Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                                            Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                                            ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                                            The proposed fees are anticipated to increase revenues by $250000 annually

                                                            Staff agrees with the consultantrsquos recommended airline rates and charges

                                                            Funding Options

                                                            Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                                            Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                                            Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                                            Funding Needs

                                                            bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                                            bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                                            Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                                            bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                                            Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                                            The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                                            Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                                            Staffing Analysis

                                                            Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                                            an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                                            bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                                            bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                                            bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                                            bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                                            Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                                            requirements spending approximately $220000 annually to provide ARFF coverage and training

                                                            bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                                            bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                                            bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                                            bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                                            ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                            bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                            bull Most airports similar to or larger than STS have contracted ARFF services

                                                            bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                            Airport Operations Budget 2014

                                                            Enplanement 2014

                                                            Airport Staff

                                                            Contract Fire Fire Contract Cost

                                                            Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                            Request for Feedback bull Long-term Parking

                                                            bull Airport Terminal Improvement Conceptual Plan

                                                            bull FundingFinancing Options

                                                            Future Board Items bull February 9 2016

                                                            bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                            bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                            design services long-term parking lot design services and long-term parking lot construction)

                                                            bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                            integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                            bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                            Charles M Schulz - Sonoma County Airport

                                                            2290 Airport Boulevard

                                                            Santa Rosa CA 95403

                                                            (707) 565-7243

                                                            wwwsono macou ntya irportorg

                                                            Follow STS on (j Facebook

                                                            Im Linkedln

                                                            ~ Twitter

                                                            • Slide Number 1
                                                            • Summary
                                                            • Airport Governance
                                                            • Airport Background
                                                            • Current Organizational Chart
                                                            • Airport Enterprise Fund
                                                            • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                            • Airport Master Plan
                                                            • Airfield Layout PlanLand Useand Boundaries
                                                            • Airport Update
                                                            • Airport Update ndash Fuel (Gallons Sold)
                                                            • Airport Update ndash Parking Revenues
                                                            • Airport Update ndash Rental Cars Revenues
                                                            • Airport Updates ndash Passenger Levels
                                                            • Airport Update - HorizonAlaska Airlines
                                                            • Slide Number 16
                                                            • Fare Comparison for STS and Other Airports in the Region
                                                            • Current Passengers and Growth Potential
                                                            • Airline Industry Overview ndash Potential Markets
                                                            • Airports Used by Sonoma County and Surrounding Area Residents
                                                            • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                            • Airline Industry Overview
                                                            • Slide Number 23
                                                            • Airport Developments
                                                            • Slide Number 25
                                                            • Airfield Layout PlanDevelopable Parcels
                                                            • Capital Project Needs
                                                            • Slide Number 28
                                                            • Runway Safety Area ndash Phase II ndash Service Roads
                                                            • Runway Safety Area ndash Phase II ndash Service Roads
                                                            • Aircraft Rescue and Firefighting Building
                                                            • Aircraft Rescue and Firefighting Building
                                                            • New Long-term Parking Lot
                                                            • Slide Number 34
                                                            • Proposed Terminal Enhancement Project
                                                            • Existing Terminal
                                                            • Terminal Renovation ndash Phases I and II
                                                            • New Holdroom (Phase II) ndash South Elevation
                                                            • New Holdroom InteriorLooking East
                                                            • Flex Space ndash Tent Option ndash View from Airfield
                                                            • Existing Terminal ndash View from Airfield Side
                                                            • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                            • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                            • Future Expansion ndash Estimated 2025
                                                            • Future Expansion ndash Estimated 2050
                                                            • Financial Analysis
                                                            • Slide Number 47
                                                            • Airline Rates amp Charges
                                                            • Slide Number 49
                                                            • Slide Number 50
                                                            • Funding Options
                                                            • Current Airport Debt
                                                            • Funding Options ndash Long-term
                                                            • Staffing Analysis
                                                            • Staffing Report
                                                            • Aircraft Rescue and Firefighting (ARFF) Services
                                                            • ARFF Services at Comparable Airports
                                                            • Request for Feedback
                                                            • Future Board Items
                                                            • Slide Number 60

                                                              Aircraft Rescue and Firefighting Building bull The current ARFF building was constructed in 1972 and no longer meets

                                                              current standards for either ARFF or ADA regulations

                                                              bull Location of current facility is in the way of long-term terminal expansion needs

                                                              bull A new location has not been selected conceptually studied in 2012 Airport Master Plan

                                                              bull The Airport plans to begin environmental studies for a new ARFF facility in FY 16-17 and the design phase could begin as early as FY 17-18 The Airport is waiting for FAA determination on NEPA documentation requirements

                                                              bull Preliminary project estimate is $7 to $8 million

                                                              bull Federal funding (90) should be available for this project

                                                              bull The funds to complete environment studies will be requested in the FY 16shy17 Airport Enterprise Budget request and for grant funding from the FAA

                                                              Aircraft Rescue and Firefighting Building

                                                              New Long-term Parking Lot

                                                              bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers

                                                              bull The current long-term lot exceeded capacity 5 times in 2015

                                                              bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day

                                                              bull The proposed parking lot would add approximately 440 parking spaces

                                                              bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000

                                                              bull Staff is recommending construction as a single phase project

                                                              New long-term parking lot ndash Site location

                                                              Terminal

                                                              Proposed Terminal Enhancement Project

                                                              bull Terminal design objectives included

                                                              bull Meeting immediate and near-term needs

                                                              bull Establish a project budget for near-term improvements that is affordable for the Airport

                                                              bull Design character that signifies its role as a gateway to the region

                                                              bull Phase expansion that does not impact current operations

                                                              bull Anticipating future needs and establish a pattern of design for future expansions

                                                              bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

                                                              bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

                                                              Existing Terminal

                                                              Terminal Renovation ndash Phases I and II

                                                              New Holdroom (Phase II) ndash East Elevation

                                                              New Holdroom (Phase II) ndash South Elevation

                                                              New Holdroom Interior Looking East

                                                              New Holdroom Interior Looking North

                                                              Flex Space ndash Conventional Construction ndash View from Airfield

                                                              Flex Space ndash Tent Option ndash View from Airfield

                                                              Existing Terminal ndash View from Airfield Side

                                                              Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                                                              Tent option Phase I

                                                              Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                                                              Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                                                              Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                                                              Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                                                              Future Expansion ndash Estimated 2025

                                                              Future Expansion ndash Estimated 2050

                                                              Financial Analysis

                                                              Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                                                              financial operations to prepare a financial forecasting model

                                                              bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                                                              bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                                                              bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                                                              bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                                                              Airline Rates amp Charges

                                                              Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                                              double current levels

                                                              bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                                              bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                                              bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                                              bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                                              bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                                              Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                                              Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                                              Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                                              Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                                              ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                                              The proposed fees are anticipated to increase revenues by $250000 annually

                                                              Staff agrees with the consultantrsquos recommended airline rates and charges

                                                              Funding Options

                                                              Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                                              Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                                              Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                                              Funding Needs

                                                              bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                                              bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                                              Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                                              bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                                              Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                                              The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                                              Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                                              Staffing Analysis

                                                              Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                                              an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                                              bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                                              bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                                              bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                                              bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                                              Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                                              requirements spending approximately $220000 annually to provide ARFF coverage and training

                                                              bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                                              bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                                              bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                                              bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                                              ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                              bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                              bull Most airports similar to or larger than STS have contracted ARFF services

                                                              bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                              Airport Operations Budget 2014

                                                              Enplanement 2014

                                                              Airport Staff

                                                              Contract Fire Fire Contract Cost

                                                              Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                              Request for Feedback bull Long-term Parking

                                                              bull Airport Terminal Improvement Conceptual Plan

                                                              bull FundingFinancing Options

                                                              Future Board Items bull February 9 2016

                                                              bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                              bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                              design services long-term parking lot design services and long-term parking lot construction)

                                                              bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                              integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                              bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                              Charles M Schulz - Sonoma County Airport

                                                              2290 Airport Boulevard

                                                              Santa Rosa CA 95403

                                                              (707) 565-7243

                                                              wwwsono macou ntya irportorg

                                                              Follow STS on (j Facebook

                                                              Im Linkedln

                                                              ~ Twitter

                                                              • Slide Number 1
                                                              • Summary
                                                              • Airport Governance
                                                              • Airport Background
                                                              • Current Organizational Chart
                                                              • Airport Enterprise Fund
                                                              • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                              • Airport Master Plan
                                                              • Airfield Layout PlanLand Useand Boundaries
                                                              • Airport Update
                                                              • Airport Update ndash Fuel (Gallons Sold)
                                                              • Airport Update ndash Parking Revenues
                                                              • Airport Update ndash Rental Cars Revenues
                                                              • Airport Updates ndash Passenger Levels
                                                              • Airport Update - HorizonAlaska Airlines
                                                              • Slide Number 16
                                                              • Fare Comparison for STS and Other Airports in the Region
                                                              • Current Passengers and Growth Potential
                                                              • Airline Industry Overview ndash Potential Markets
                                                              • Airports Used by Sonoma County and Surrounding Area Residents
                                                              • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                              • Airline Industry Overview
                                                              • Slide Number 23
                                                              • Airport Developments
                                                              • Slide Number 25
                                                              • Airfield Layout PlanDevelopable Parcels
                                                              • Capital Project Needs
                                                              • Slide Number 28
                                                              • Runway Safety Area ndash Phase II ndash Service Roads
                                                              • Runway Safety Area ndash Phase II ndash Service Roads
                                                              • Aircraft Rescue and Firefighting Building
                                                              • Aircraft Rescue and Firefighting Building
                                                              • New Long-term Parking Lot
                                                              • Slide Number 34
                                                              • Proposed Terminal Enhancement Project
                                                              • Existing Terminal
                                                              • Terminal Renovation ndash Phases I and II
                                                              • New Holdroom (Phase II) ndash South Elevation
                                                              • New Holdroom InteriorLooking East
                                                              • Flex Space ndash Tent Option ndash View from Airfield
                                                              • Existing Terminal ndash View from Airfield Side
                                                              • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                              • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                              • Future Expansion ndash Estimated 2025
                                                              • Future Expansion ndash Estimated 2050
                                                              • Financial Analysis
                                                              • Slide Number 47
                                                              • Airline Rates amp Charges
                                                              • Slide Number 49
                                                              • Slide Number 50
                                                              • Funding Options
                                                              • Current Airport Debt
                                                              • Funding Options ndash Long-term
                                                              • Staffing Analysis
                                                              • Staffing Report
                                                              • Aircraft Rescue and Firefighting (ARFF) Services
                                                              • ARFF Services at Comparable Airports
                                                              • Request for Feedback
                                                              • Future Board Items
                                                              • Slide Number 60

                                                                Aircraft Rescue and Firefighting Building

                                                                New Long-term Parking Lot

                                                                bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers

                                                                bull The current long-term lot exceeded capacity 5 times in 2015

                                                                bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day

                                                                bull The proposed parking lot would add approximately 440 parking spaces

                                                                bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000

                                                                bull Staff is recommending construction as a single phase project

                                                                New long-term parking lot ndash Site location

                                                                Terminal

                                                                Proposed Terminal Enhancement Project

                                                                bull Terminal design objectives included

                                                                bull Meeting immediate and near-term needs

                                                                bull Establish a project budget for near-term improvements that is affordable for the Airport

                                                                bull Design character that signifies its role as a gateway to the region

                                                                bull Phase expansion that does not impact current operations

                                                                bull Anticipating future needs and establish a pattern of design for future expansions

                                                                bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

                                                                bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

                                                                Existing Terminal

                                                                Terminal Renovation ndash Phases I and II

                                                                New Holdroom (Phase II) ndash East Elevation

                                                                New Holdroom (Phase II) ndash South Elevation

                                                                New Holdroom Interior Looking East

                                                                New Holdroom Interior Looking North

                                                                Flex Space ndash Conventional Construction ndash View from Airfield

                                                                Flex Space ndash Tent Option ndash View from Airfield

                                                                Existing Terminal ndash View from Airfield Side

                                                                Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                                                                Tent option Phase I

                                                                Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                                                                Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                                                                Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                                                                Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                                                                Future Expansion ndash Estimated 2025

                                                                Future Expansion ndash Estimated 2050

                                                                Financial Analysis

                                                                Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                                                                financial operations to prepare a financial forecasting model

                                                                bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                                                                bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                                                                bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                                                                bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                                                                Airline Rates amp Charges

                                                                Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                                                double current levels

                                                                bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                                                bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                                                bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                                                bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                                                bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                                                Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                                                Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                                                Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                                                Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                                                ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                                                The proposed fees are anticipated to increase revenues by $250000 annually

                                                                Staff agrees with the consultantrsquos recommended airline rates and charges

                                                                Funding Options

                                                                Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                                                Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                                                Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                                                Funding Needs

                                                                bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                                                bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                                                Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                                                bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                                                Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                                                The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                                                Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                                                Staffing Analysis

                                                                Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                                                an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                                                bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                                                bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                                                bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                                                bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                                                Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                                                requirements spending approximately $220000 annually to provide ARFF coverage and training

                                                                bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                                                bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                                                bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                                                bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                                                ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                                bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                                bull Most airports similar to or larger than STS have contracted ARFF services

                                                                bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                                Airport Operations Budget 2014

                                                                Enplanement 2014

                                                                Airport Staff

                                                                Contract Fire Fire Contract Cost

                                                                Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                                Request for Feedback bull Long-term Parking

                                                                bull Airport Terminal Improvement Conceptual Plan

                                                                bull FundingFinancing Options

                                                                Future Board Items bull February 9 2016

                                                                bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                                bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                                design services long-term parking lot design services and long-term parking lot construction)

                                                                bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                                integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                                bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                                Charles M Schulz - Sonoma County Airport

                                                                2290 Airport Boulevard

                                                                Santa Rosa CA 95403

                                                                (707) 565-7243

                                                                wwwsono macou ntya irportorg

                                                                Follow STS on (j Facebook

                                                                Im Linkedln

                                                                ~ Twitter

                                                                • Slide Number 1
                                                                • Summary
                                                                • Airport Governance
                                                                • Airport Background
                                                                • Current Organizational Chart
                                                                • Airport Enterprise Fund
                                                                • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                                • Airport Master Plan
                                                                • Airfield Layout PlanLand Useand Boundaries
                                                                • Airport Update
                                                                • Airport Update ndash Fuel (Gallons Sold)
                                                                • Airport Update ndash Parking Revenues
                                                                • Airport Update ndash Rental Cars Revenues
                                                                • Airport Updates ndash Passenger Levels
                                                                • Airport Update - HorizonAlaska Airlines
                                                                • Slide Number 16
                                                                • Fare Comparison for STS and Other Airports in the Region
                                                                • Current Passengers and Growth Potential
                                                                • Airline Industry Overview ndash Potential Markets
                                                                • Airports Used by Sonoma County and Surrounding Area Residents
                                                                • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                                • Airline Industry Overview
                                                                • Slide Number 23
                                                                • Airport Developments
                                                                • Slide Number 25
                                                                • Airfield Layout PlanDevelopable Parcels
                                                                • Capital Project Needs
                                                                • Slide Number 28
                                                                • Runway Safety Area ndash Phase II ndash Service Roads
                                                                • Runway Safety Area ndash Phase II ndash Service Roads
                                                                • Aircraft Rescue and Firefighting Building
                                                                • Aircraft Rescue and Firefighting Building
                                                                • New Long-term Parking Lot
                                                                • Slide Number 34
                                                                • Proposed Terminal Enhancement Project
                                                                • Existing Terminal
                                                                • Terminal Renovation ndash Phases I and II
                                                                • New Holdroom (Phase II) ndash South Elevation
                                                                • New Holdroom InteriorLooking East
                                                                • Flex Space ndash Tent Option ndash View from Airfield
                                                                • Existing Terminal ndash View from Airfield Side
                                                                • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                                • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                                • Future Expansion ndash Estimated 2025
                                                                • Future Expansion ndash Estimated 2050
                                                                • Financial Analysis
                                                                • Slide Number 47
                                                                • Airline Rates amp Charges
                                                                • Slide Number 49
                                                                • Slide Number 50
                                                                • Funding Options
                                                                • Current Airport Debt
                                                                • Funding Options ndash Long-term
                                                                • Staffing Analysis
                                                                • Staffing Report
                                                                • Aircraft Rescue and Firefighting (ARFF) Services
                                                                • ARFF Services at Comparable Airports
                                                                • Request for Feedback
                                                                • Future Board Items
                                                                • Slide Number 60

                                                                  New Long-term Parking Lot

                                                                  bull Preliminary design was completed by Transportation and Public Works (PW) engineering staff for a new lot southeast of the terminal Final design will be completed by PW on-call Professional Engineering Service Providers

                                                                  bull The current long-term lot exceeded capacity 5 times in 2015

                                                                  bull Increasing to 8 daily flights in 2016 the long-term lot is expected to exceed capacity every weekend and holiday until the second lot can be constructed Each new flight creates the need for approximately 50 parking spots per day

                                                                  bull The proposed parking lot would add approximately 440 parking spaces

                                                                  bull Total cost estimated to be $38 to 46 million Can be built in one or two phases if constructed as one phase it would save approximately $650000

                                                                  bull Staff is recommending construction as a single phase project

                                                                  New long-term parking lot ndash Site location

                                                                  Terminal

                                                                  Proposed Terminal Enhancement Project

                                                                  bull Terminal design objectives included

                                                                  bull Meeting immediate and near-term needs

                                                                  bull Establish a project budget for near-term improvements that is affordable for the Airport

                                                                  bull Design character that signifies its role as a gateway to the region

                                                                  bull Phase expansion that does not impact current operations

                                                                  bull Anticipating future needs and establish a pattern of design for future expansions

                                                                  bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

                                                                  bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

                                                                  Existing Terminal

                                                                  Terminal Renovation ndash Phases I and II

                                                                  New Holdroom (Phase II) ndash East Elevation

                                                                  New Holdroom (Phase II) ndash South Elevation

                                                                  New Holdroom Interior Looking East

                                                                  New Holdroom Interior Looking North

                                                                  Flex Space ndash Conventional Construction ndash View from Airfield

                                                                  Flex Space ndash Tent Option ndash View from Airfield

                                                                  Existing Terminal ndash View from Airfield Side

                                                                  Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                                                                  Tent option Phase I

                                                                  Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                                                                  Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                                                                  Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                                                                  Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                                                                  Future Expansion ndash Estimated 2025

                                                                  Future Expansion ndash Estimated 2050

                                                                  Financial Analysis

                                                                  Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                                                                  financial operations to prepare a financial forecasting model

                                                                  bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                                                                  bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                                                                  bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                                                                  bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                                                                  Airline Rates amp Charges

                                                                  Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                                                  double current levels

                                                                  bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                                                  bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                                                  bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                                                  bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                                                  bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                                                  Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                                                  Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                                                  Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                                                  Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                                                  ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                                                  The proposed fees are anticipated to increase revenues by $250000 annually

                                                                  Staff agrees with the consultantrsquos recommended airline rates and charges

                                                                  Funding Options

                                                                  Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                                                  Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                                                  Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                                                  Funding Needs

                                                                  bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                                                  bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                                                  Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                                                  bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                                                  Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                                                  The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                                                  Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                                                  Staffing Analysis

                                                                  Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                                                  an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                                                  bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                                                  bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                                                  bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                                                  bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                                                  Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                                                  requirements spending approximately $220000 annually to provide ARFF coverage and training

                                                                  bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                                                  bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                                                  bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                                                  bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                                                  ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                                  bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                                  bull Most airports similar to or larger than STS have contracted ARFF services

                                                                  bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                                  Airport Operations Budget 2014

                                                                  Enplanement 2014

                                                                  Airport Staff

                                                                  Contract Fire Fire Contract Cost

                                                                  Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                                  Request for Feedback bull Long-term Parking

                                                                  bull Airport Terminal Improvement Conceptual Plan

                                                                  bull FundingFinancing Options

                                                                  Future Board Items bull February 9 2016

                                                                  bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                                  bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                                  design services long-term parking lot design services and long-term parking lot construction)

                                                                  bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                                  integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                                  bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                                  Charles M Schulz - Sonoma County Airport

                                                                  2290 Airport Boulevard

                                                                  Santa Rosa CA 95403

                                                                  (707) 565-7243

                                                                  wwwsono macou ntya irportorg

                                                                  Follow STS on (j Facebook

                                                                  Im Linkedln

                                                                  ~ Twitter

                                                                  • Slide Number 1
                                                                  • Summary
                                                                  • Airport Governance
                                                                  • Airport Background
                                                                  • Current Organizational Chart
                                                                  • Airport Enterprise Fund
                                                                  • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                                  • Airport Master Plan
                                                                  • Airfield Layout PlanLand Useand Boundaries
                                                                  • Airport Update
                                                                  • Airport Update ndash Fuel (Gallons Sold)
                                                                  • Airport Update ndash Parking Revenues
                                                                  • Airport Update ndash Rental Cars Revenues
                                                                  • Airport Updates ndash Passenger Levels
                                                                  • Airport Update - HorizonAlaska Airlines
                                                                  • Slide Number 16
                                                                  • Fare Comparison for STS and Other Airports in the Region
                                                                  • Current Passengers and Growth Potential
                                                                  • Airline Industry Overview ndash Potential Markets
                                                                  • Airports Used by Sonoma County and Surrounding Area Residents
                                                                  • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                                  • Airline Industry Overview
                                                                  • Slide Number 23
                                                                  • Airport Developments
                                                                  • Slide Number 25
                                                                  • Airfield Layout PlanDevelopable Parcels
                                                                  • Capital Project Needs
                                                                  • Slide Number 28
                                                                  • Runway Safety Area ndash Phase II ndash Service Roads
                                                                  • Runway Safety Area ndash Phase II ndash Service Roads
                                                                  • Aircraft Rescue and Firefighting Building
                                                                  • Aircraft Rescue and Firefighting Building
                                                                  • New Long-term Parking Lot
                                                                  • Slide Number 34
                                                                  • Proposed Terminal Enhancement Project
                                                                  • Existing Terminal
                                                                  • Terminal Renovation ndash Phases I and II
                                                                  • New Holdroom (Phase II) ndash South Elevation
                                                                  • New Holdroom InteriorLooking East
                                                                  • Flex Space ndash Tent Option ndash View from Airfield
                                                                  • Existing Terminal ndash View from Airfield Side
                                                                  • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                                  • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                                  • Future Expansion ndash Estimated 2025
                                                                  • Future Expansion ndash Estimated 2050
                                                                  • Financial Analysis
                                                                  • Slide Number 47
                                                                  • Airline Rates amp Charges
                                                                  • Slide Number 49
                                                                  • Slide Number 50
                                                                  • Funding Options
                                                                  • Current Airport Debt
                                                                  • Funding Options ndash Long-term
                                                                  • Staffing Analysis
                                                                  • Staffing Report
                                                                  • Aircraft Rescue and Firefighting (ARFF) Services
                                                                  • ARFF Services at Comparable Airports
                                                                  • Request for Feedback
                                                                  • Future Board Items
                                                                  • Slide Number 60

                                                                    New long-term parking lot ndash Site location

                                                                    Terminal

                                                                    Proposed Terminal Enhancement Project

                                                                    bull Terminal design objectives included

                                                                    bull Meeting immediate and near-term needs

                                                                    bull Establish a project budget for near-term improvements that is affordable for the Airport

                                                                    bull Design character that signifies its role as a gateway to the region

                                                                    bull Phase expansion that does not impact current operations

                                                                    bull Anticipating future needs and establish a pattern of design for future expansions

                                                                    bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

                                                                    bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

                                                                    Existing Terminal

                                                                    Terminal Renovation ndash Phases I and II

                                                                    New Holdroom (Phase II) ndash East Elevation

                                                                    New Holdroom (Phase II) ndash South Elevation

                                                                    New Holdroom Interior Looking East

                                                                    New Holdroom Interior Looking North

                                                                    Flex Space ndash Conventional Construction ndash View from Airfield

                                                                    Flex Space ndash Tent Option ndash View from Airfield

                                                                    Existing Terminal ndash View from Airfield Side

                                                                    Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                                                                    Tent option Phase I

                                                                    Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                                                                    Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                                                                    Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                                                                    Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                                                                    Future Expansion ndash Estimated 2025

                                                                    Future Expansion ndash Estimated 2050

                                                                    Financial Analysis

                                                                    Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                                                                    financial operations to prepare a financial forecasting model

                                                                    bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                                                                    bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                                                                    bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                                                                    bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                                                                    Airline Rates amp Charges

                                                                    Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                                                    double current levels

                                                                    bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                                                    bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                                                    bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                                                    bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                                                    bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                                                    Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                                                    Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                                                    Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                                                    Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                                                    ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                                                    The proposed fees are anticipated to increase revenues by $250000 annually

                                                                    Staff agrees with the consultantrsquos recommended airline rates and charges

                                                                    Funding Options

                                                                    Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                                                    Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                                                    Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                                                    Funding Needs

                                                                    bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                                                    bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                                                    Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                                                    bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                                                    Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                                                    The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                                                    Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                                                    Staffing Analysis

                                                                    Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                                                    an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                                                    bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                                                    bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                                                    bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                                                    bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                                                    Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                                                    requirements spending approximately $220000 annually to provide ARFF coverage and training

                                                                    bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                                                    bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                                                    bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                                                    bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                                                    ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                                    bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                                    bull Most airports similar to or larger than STS have contracted ARFF services

                                                                    bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                                    Airport Operations Budget 2014

                                                                    Enplanement 2014

                                                                    Airport Staff

                                                                    Contract Fire Fire Contract Cost

                                                                    Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                                    Request for Feedback bull Long-term Parking

                                                                    bull Airport Terminal Improvement Conceptual Plan

                                                                    bull FundingFinancing Options

                                                                    Future Board Items bull February 9 2016

                                                                    bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                                    bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                                    design services long-term parking lot design services and long-term parking lot construction)

                                                                    bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                                    integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                                    bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                                    Charles M Schulz - Sonoma County Airport

                                                                    2290 Airport Boulevard

                                                                    Santa Rosa CA 95403

                                                                    (707) 565-7243

                                                                    wwwsono macou ntya irportorg

                                                                    Follow STS on (j Facebook

                                                                    Im Linkedln

                                                                    ~ Twitter

                                                                    • Slide Number 1
                                                                    • Summary
                                                                    • Airport Governance
                                                                    • Airport Background
                                                                    • Current Organizational Chart
                                                                    • Airport Enterprise Fund
                                                                    • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                                    • Airport Master Plan
                                                                    • Airfield Layout PlanLand Useand Boundaries
                                                                    • Airport Update
                                                                    • Airport Update ndash Fuel (Gallons Sold)
                                                                    • Airport Update ndash Parking Revenues
                                                                    • Airport Update ndash Rental Cars Revenues
                                                                    • Airport Updates ndash Passenger Levels
                                                                    • Airport Update - HorizonAlaska Airlines
                                                                    • Slide Number 16
                                                                    • Fare Comparison for STS and Other Airports in the Region
                                                                    • Current Passengers and Growth Potential
                                                                    • Airline Industry Overview ndash Potential Markets
                                                                    • Airports Used by Sonoma County and Surrounding Area Residents
                                                                    • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                                    • Airline Industry Overview
                                                                    • Slide Number 23
                                                                    • Airport Developments
                                                                    • Slide Number 25
                                                                    • Airfield Layout PlanDevelopable Parcels
                                                                    • Capital Project Needs
                                                                    • Slide Number 28
                                                                    • Runway Safety Area ndash Phase II ndash Service Roads
                                                                    • Runway Safety Area ndash Phase II ndash Service Roads
                                                                    • Aircraft Rescue and Firefighting Building
                                                                    • Aircraft Rescue and Firefighting Building
                                                                    • New Long-term Parking Lot
                                                                    • Slide Number 34
                                                                    • Proposed Terminal Enhancement Project
                                                                    • Existing Terminal
                                                                    • Terminal Renovation ndash Phases I and II
                                                                    • New Holdroom (Phase II) ndash South Elevation
                                                                    • New Holdroom InteriorLooking East
                                                                    • Flex Space ndash Tent Option ndash View from Airfield
                                                                    • Existing Terminal ndash View from Airfield Side
                                                                    • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                                    • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                                    • Future Expansion ndash Estimated 2025
                                                                    • Future Expansion ndash Estimated 2050
                                                                    • Financial Analysis
                                                                    • Slide Number 47
                                                                    • Airline Rates amp Charges
                                                                    • Slide Number 49
                                                                    • Slide Number 50
                                                                    • Funding Options
                                                                    • Current Airport Debt
                                                                    • Funding Options ndash Long-term
                                                                    • Staffing Analysis
                                                                    • Staffing Report
                                                                    • Aircraft Rescue and Firefighting (ARFF) Services
                                                                    • ARFF Services at Comparable Airports
                                                                    • Request for Feedback
                                                                    • Future Board Items
                                                                    • Slide Number 60

                                                                      Proposed Terminal Enhancement Project

                                                                      bull Terminal design objectives included

                                                                      bull Meeting immediate and near-term needs

                                                                      bull Establish a project budget for near-term improvements that is affordable for the Airport

                                                                      bull Design character that signifies its role as a gateway to the region

                                                                      bull Phase expansion that does not impact current operations

                                                                      bull Anticipating future needs and establish a pattern of design for future expansions

                                                                      bull Proposed option contemplates less space versus FAA optimal space recommendations in order to match Airport financing ability and to maximize future expansion potential

                                                                      bull Anticipated cost is $74 to $102 million and may be eligible for future FAA funding

                                                                      Existing Terminal

                                                                      Terminal Renovation ndash Phases I and II

                                                                      New Holdroom (Phase II) ndash East Elevation

                                                                      New Holdroom (Phase II) ndash South Elevation

                                                                      New Holdroom Interior Looking East

                                                                      New Holdroom Interior Looking North

                                                                      Flex Space ndash Conventional Construction ndash View from Airfield

                                                                      Flex Space ndash Tent Option ndash View from Airfield

                                                                      Existing Terminal ndash View from Airfield Side

                                                                      Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                                                                      Tent option Phase I

                                                                      Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                                                                      Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                                                                      Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                                                                      Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                                                                      Future Expansion ndash Estimated 2025

                                                                      Future Expansion ndash Estimated 2050

                                                                      Financial Analysis

                                                                      Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                                                                      financial operations to prepare a financial forecasting model

                                                                      bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                                                                      bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                                                                      bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                                                                      bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                                                                      Airline Rates amp Charges

                                                                      Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                                                      double current levels

                                                                      bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                                                      bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                                                      bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                                                      bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                                                      bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                                                      Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                                                      Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                                                      Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                                                      Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                                                      ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                                                      The proposed fees are anticipated to increase revenues by $250000 annually

                                                                      Staff agrees with the consultantrsquos recommended airline rates and charges

                                                                      Funding Options

                                                                      Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                                                      Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                                                      Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                                                      Funding Needs

                                                                      bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                                                      bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                                                      Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                                                      bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                                                      Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                                                      The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                                                      Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                                                      Staffing Analysis

                                                                      Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                                                      an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                                                      bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                                                      bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                                                      bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                                                      bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                                                      Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                                                      requirements spending approximately $220000 annually to provide ARFF coverage and training

                                                                      bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                                                      bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                                                      bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                                                      bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                                                      ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                                      bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                                      bull Most airports similar to or larger than STS have contracted ARFF services

                                                                      bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                                      Airport Operations Budget 2014

                                                                      Enplanement 2014

                                                                      Airport Staff

                                                                      Contract Fire Fire Contract Cost

                                                                      Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                                      Request for Feedback bull Long-term Parking

                                                                      bull Airport Terminal Improvement Conceptual Plan

                                                                      bull FundingFinancing Options

                                                                      Future Board Items bull February 9 2016

                                                                      bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                                      bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                                      design services long-term parking lot design services and long-term parking lot construction)

                                                                      bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                                      integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                                      bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                                      Charles M Schulz - Sonoma County Airport

                                                                      2290 Airport Boulevard

                                                                      Santa Rosa CA 95403

                                                                      (707) 565-7243

                                                                      wwwsono macou ntya irportorg

                                                                      Follow STS on (j Facebook

                                                                      Im Linkedln

                                                                      ~ Twitter

                                                                      • Slide Number 1
                                                                      • Summary
                                                                      • Airport Governance
                                                                      • Airport Background
                                                                      • Current Organizational Chart
                                                                      • Airport Enterprise Fund
                                                                      • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                                      • Airport Master Plan
                                                                      • Airfield Layout PlanLand Useand Boundaries
                                                                      • Airport Update
                                                                      • Airport Update ndash Fuel (Gallons Sold)
                                                                      • Airport Update ndash Parking Revenues
                                                                      • Airport Update ndash Rental Cars Revenues
                                                                      • Airport Updates ndash Passenger Levels
                                                                      • Airport Update - HorizonAlaska Airlines
                                                                      • Slide Number 16
                                                                      • Fare Comparison for STS and Other Airports in the Region
                                                                      • Current Passengers and Growth Potential
                                                                      • Airline Industry Overview ndash Potential Markets
                                                                      • Airports Used by Sonoma County and Surrounding Area Residents
                                                                      • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                                      • Airline Industry Overview
                                                                      • Slide Number 23
                                                                      • Airport Developments
                                                                      • Slide Number 25
                                                                      • Airfield Layout PlanDevelopable Parcels
                                                                      • Capital Project Needs
                                                                      • Slide Number 28
                                                                      • Runway Safety Area ndash Phase II ndash Service Roads
                                                                      • Runway Safety Area ndash Phase II ndash Service Roads
                                                                      • Aircraft Rescue and Firefighting Building
                                                                      • Aircraft Rescue and Firefighting Building
                                                                      • New Long-term Parking Lot
                                                                      • Slide Number 34
                                                                      • Proposed Terminal Enhancement Project
                                                                      • Existing Terminal
                                                                      • Terminal Renovation ndash Phases I and II
                                                                      • New Holdroom (Phase II) ndash South Elevation
                                                                      • New Holdroom InteriorLooking East
                                                                      • Flex Space ndash Tent Option ndash View from Airfield
                                                                      • Existing Terminal ndash View from Airfield Side
                                                                      • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                                      • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                                      • Future Expansion ndash Estimated 2025
                                                                      • Future Expansion ndash Estimated 2050
                                                                      • Financial Analysis
                                                                      • Slide Number 47
                                                                      • Airline Rates amp Charges
                                                                      • Slide Number 49
                                                                      • Slide Number 50
                                                                      • Funding Options
                                                                      • Current Airport Debt
                                                                      • Funding Options ndash Long-term
                                                                      • Staffing Analysis
                                                                      • Staffing Report
                                                                      • Aircraft Rescue and Firefighting (ARFF) Services
                                                                      • ARFF Services at Comparable Airports
                                                                      • Request for Feedback
                                                                      • Future Board Items
                                                                      • Slide Number 60

                                                                        Existing Terminal

                                                                        Terminal Renovation ndash Phases I and II

                                                                        New Holdroom (Phase II) ndash East Elevation

                                                                        New Holdroom (Phase II) ndash South Elevation

                                                                        New Holdroom Interior Looking East

                                                                        New Holdroom Interior Looking North

                                                                        Flex Space ndash Conventional Construction ndash View from Airfield

                                                                        Flex Space ndash Tent Option ndash View from Airfield

                                                                        Existing Terminal ndash View from Airfield Side

                                                                        Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                                                                        Tent option Phase I

                                                                        Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                                                                        Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                                                                        Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                                                                        Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                                                                        Future Expansion ndash Estimated 2025

                                                                        Future Expansion ndash Estimated 2050

                                                                        Financial Analysis

                                                                        Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                                                                        financial operations to prepare a financial forecasting model

                                                                        bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                                                                        bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                                                                        bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                                                                        bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                                                                        Airline Rates amp Charges

                                                                        Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                                                        double current levels

                                                                        bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                                                        bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                                                        bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                                                        bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                                                        bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                                                        Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                                                        Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                                                        Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                                                        Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                                                        ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                                                        The proposed fees are anticipated to increase revenues by $250000 annually

                                                                        Staff agrees with the consultantrsquos recommended airline rates and charges

                                                                        Funding Options

                                                                        Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                                                        Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                                                        Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                                                        Funding Needs

                                                                        bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                                                        bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                                                        Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                                                        bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                                                        Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                                                        The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                                                        Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                                                        Staffing Analysis

                                                                        Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                                                        an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                                                        bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                                                        bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                                                        bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                                                        bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                                                        Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                                                        requirements spending approximately $220000 annually to provide ARFF coverage and training

                                                                        bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                                                        bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                                                        bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                                                        bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                                                        ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                                        bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                                        bull Most airports similar to or larger than STS have contracted ARFF services

                                                                        bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                                        Airport Operations Budget 2014

                                                                        Enplanement 2014

                                                                        Airport Staff

                                                                        Contract Fire Fire Contract Cost

                                                                        Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                                        Request for Feedback bull Long-term Parking

                                                                        bull Airport Terminal Improvement Conceptual Plan

                                                                        bull FundingFinancing Options

                                                                        Future Board Items bull February 9 2016

                                                                        bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                                        bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                                        design services long-term parking lot design services and long-term parking lot construction)

                                                                        bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                                        integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                                        bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                                        Charles M Schulz - Sonoma County Airport

                                                                        2290 Airport Boulevard

                                                                        Santa Rosa CA 95403

                                                                        (707) 565-7243

                                                                        wwwsono macou ntya irportorg

                                                                        Follow STS on (j Facebook

                                                                        Im Linkedln

                                                                        ~ Twitter

                                                                        • Slide Number 1
                                                                        • Summary
                                                                        • Airport Governance
                                                                        • Airport Background
                                                                        • Current Organizational Chart
                                                                        • Airport Enterprise Fund
                                                                        • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                                        • Airport Master Plan
                                                                        • Airfield Layout PlanLand Useand Boundaries
                                                                        • Airport Update
                                                                        • Airport Update ndash Fuel (Gallons Sold)
                                                                        • Airport Update ndash Parking Revenues
                                                                        • Airport Update ndash Rental Cars Revenues
                                                                        • Airport Updates ndash Passenger Levels
                                                                        • Airport Update - HorizonAlaska Airlines
                                                                        • Slide Number 16
                                                                        • Fare Comparison for STS and Other Airports in the Region
                                                                        • Current Passengers and Growth Potential
                                                                        • Airline Industry Overview ndash Potential Markets
                                                                        • Airports Used by Sonoma County and Surrounding Area Residents
                                                                        • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                                        • Airline Industry Overview
                                                                        • Slide Number 23
                                                                        • Airport Developments
                                                                        • Slide Number 25
                                                                        • Airfield Layout PlanDevelopable Parcels
                                                                        • Capital Project Needs
                                                                        • Slide Number 28
                                                                        • Runway Safety Area ndash Phase II ndash Service Roads
                                                                        • Runway Safety Area ndash Phase II ndash Service Roads
                                                                        • Aircraft Rescue and Firefighting Building
                                                                        • Aircraft Rescue and Firefighting Building
                                                                        • New Long-term Parking Lot
                                                                        • Slide Number 34
                                                                        • Proposed Terminal Enhancement Project
                                                                        • Existing Terminal
                                                                        • Terminal Renovation ndash Phases I and II
                                                                        • New Holdroom (Phase II) ndash South Elevation
                                                                        • New Holdroom InteriorLooking East
                                                                        • Flex Space ndash Tent Option ndash View from Airfield
                                                                        • Existing Terminal ndash View from Airfield Side
                                                                        • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                                        • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                                        • Future Expansion ndash Estimated 2025
                                                                        • Future Expansion ndash Estimated 2050
                                                                        • Financial Analysis
                                                                        • Slide Number 47
                                                                        • Airline Rates amp Charges
                                                                        • Slide Number 49
                                                                        • Slide Number 50
                                                                        • Funding Options
                                                                        • Current Airport Debt
                                                                        • Funding Options ndash Long-term
                                                                        • Staffing Analysis
                                                                        • Staffing Report
                                                                        • Aircraft Rescue and Firefighting (ARFF) Services
                                                                        • ARFF Services at Comparable Airports
                                                                        • Request for Feedback
                                                                        • Future Board Items
                                                                        • Slide Number 60

                                                                          Terminal Renovation ndash Phases I and II

                                                                          New Holdroom (Phase II) ndash East Elevation

                                                                          New Holdroom (Phase II) ndash South Elevation

                                                                          New Holdroom Interior Looking East

                                                                          New Holdroom Interior Looking North

                                                                          Flex Space ndash Conventional Construction ndash View from Airfield

                                                                          Flex Space ndash Tent Option ndash View from Airfield

                                                                          Existing Terminal ndash View from Airfield Side

                                                                          Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                                                                          Tent option Phase I

                                                                          Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                                                                          Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                                                                          Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                                                                          Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                                                                          Future Expansion ndash Estimated 2025

                                                                          Future Expansion ndash Estimated 2050

                                                                          Financial Analysis

                                                                          Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                                                                          financial operations to prepare a financial forecasting model

                                                                          bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                                                                          bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                                                                          bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                                                                          bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                                                                          Airline Rates amp Charges

                                                                          Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                                                          double current levels

                                                                          bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                                                          bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                                                          bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                                                          bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                                                          bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                                                          Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                                                          Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                                                          Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                                                          Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                                                          ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                                                          The proposed fees are anticipated to increase revenues by $250000 annually

                                                                          Staff agrees with the consultantrsquos recommended airline rates and charges

                                                                          Funding Options

                                                                          Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                                                          Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                                                          Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                                                          Funding Needs

                                                                          bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                                                          bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                                                          Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                                                          bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                                                          Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                                                          The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                                                          Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                                                          Staffing Analysis

                                                                          Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                                                          an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                                                          bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                                                          bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                                                          bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                                                          bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                                                          Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                                                          requirements spending approximately $220000 annually to provide ARFF coverage and training

                                                                          bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                                                          bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                                                          bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                                                          bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                                                          ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                                          bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                                          bull Most airports similar to or larger than STS have contracted ARFF services

                                                                          bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                                          Airport Operations Budget 2014

                                                                          Enplanement 2014

                                                                          Airport Staff

                                                                          Contract Fire Fire Contract Cost

                                                                          Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                                          Request for Feedback bull Long-term Parking

                                                                          bull Airport Terminal Improvement Conceptual Plan

                                                                          bull FundingFinancing Options

                                                                          Future Board Items bull February 9 2016

                                                                          bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                                          bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                                          design services long-term parking lot design services and long-term parking lot construction)

                                                                          bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                                          integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                                          bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                                          Charles M Schulz - Sonoma County Airport

                                                                          2290 Airport Boulevard

                                                                          Santa Rosa CA 95403

                                                                          (707) 565-7243

                                                                          wwwsono macou ntya irportorg

                                                                          Follow STS on (j Facebook

                                                                          Im Linkedln

                                                                          ~ Twitter

                                                                          • Slide Number 1
                                                                          • Summary
                                                                          • Airport Governance
                                                                          • Airport Background
                                                                          • Current Organizational Chart
                                                                          • Airport Enterprise Fund
                                                                          • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                                          • Airport Master Plan
                                                                          • Airfield Layout PlanLand Useand Boundaries
                                                                          • Airport Update
                                                                          • Airport Update ndash Fuel (Gallons Sold)
                                                                          • Airport Update ndash Parking Revenues
                                                                          • Airport Update ndash Rental Cars Revenues
                                                                          • Airport Updates ndash Passenger Levels
                                                                          • Airport Update - HorizonAlaska Airlines
                                                                          • Slide Number 16
                                                                          • Fare Comparison for STS and Other Airports in the Region
                                                                          • Current Passengers and Growth Potential
                                                                          • Airline Industry Overview ndash Potential Markets
                                                                          • Airports Used by Sonoma County and Surrounding Area Residents
                                                                          • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                                          • Airline Industry Overview
                                                                          • Slide Number 23
                                                                          • Airport Developments
                                                                          • Slide Number 25
                                                                          • Airfield Layout PlanDevelopable Parcels
                                                                          • Capital Project Needs
                                                                          • Slide Number 28
                                                                          • Runway Safety Area ndash Phase II ndash Service Roads
                                                                          • Runway Safety Area ndash Phase II ndash Service Roads
                                                                          • Aircraft Rescue and Firefighting Building
                                                                          • Aircraft Rescue and Firefighting Building
                                                                          • New Long-term Parking Lot
                                                                          • Slide Number 34
                                                                          • Proposed Terminal Enhancement Project
                                                                          • Existing Terminal
                                                                          • Terminal Renovation ndash Phases I and II
                                                                          • New Holdroom (Phase II) ndash South Elevation
                                                                          • New Holdroom InteriorLooking East
                                                                          • Flex Space ndash Tent Option ndash View from Airfield
                                                                          • Existing Terminal ndash View from Airfield Side
                                                                          • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                                          • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                                          • Future Expansion ndash Estimated 2025
                                                                          • Future Expansion ndash Estimated 2050
                                                                          • Financial Analysis
                                                                          • Slide Number 47
                                                                          • Airline Rates amp Charges
                                                                          • Slide Number 49
                                                                          • Slide Number 50
                                                                          • Funding Options
                                                                          • Current Airport Debt
                                                                          • Funding Options ndash Long-term
                                                                          • Staffing Analysis
                                                                          • Staffing Report
                                                                          • Aircraft Rescue and Firefighting (ARFF) Services
                                                                          • ARFF Services at Comparable Airports
                                                                          • Request for Feedback
                                                                          • Future Board Items
                                                                          • Slide Number 60

                                                                            New Holdroom (Phase II) ndash East Elevation

                                                                            New Holdroom (Phase II) ndash South Elevation

                                                                            New Holdroom Interior Looking East

                                                                            New Holdroom Interior Looking North

                                                                            Flex Space ndash Conventional Construction ndash View from Airfield

                                                                            Flex Space ndash Tent Option ndash View from Airfield

                                                                            Existing Terminal ndash View from Airfield Side

                                                                            Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                                                                            Tent option Phase I

                                                                            Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                                                                            Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                                                                            Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                                                                            Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                                                                            Future Expansion ndash Estimated 2025

                                                                            Future Expansion ndash Estimated 2050

                                                                            Financial Analysis

                                                                            Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                                                                            financial operations to prepare a financial forecasting model

                                                                            bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                                                                            bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                                                                            bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                                                                            bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                                                                            Airline Rates amp Charges

                                                                            Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                                                            double current levels

                                                                            bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                                                            bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                                                            bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                                                            bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                                                            bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                                                            Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                                                            Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                                                            Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                                                            Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                                                            ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                                                            The proposed fees are anticipated to increase revenues by $250000 annually

                                                                            Staff agrees with the consultantrsquos recommended airline rates and charges

                                                                            Funding Options

                                                                            Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                                                            Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                                                            Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                                                            Funding Needs

                                                                            bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                                                            bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                                                            Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                                                            bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                                                            Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                                                            The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                                                            Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                                                            Staffing Analysis

                                                                            Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                                                            an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                                                            bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                                                            bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                                                            bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                                                            bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                                                            Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                                                            requirements spending approximately $220000 annually to provide ARFF coverage and training

                                                                            bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                                                            bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                                                            bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                                                            bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                                                            ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                                            bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                                            bull Most airports similar to or larger than STS have contracted ARFF services

                                                                            bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                                            Airport Operations Budget 2014

                                                                            Enplanement 2014

                                                                            Airport Staff

                                                                            Contract Fire Fire Contract Cost

                                                                            Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                                            Request for Feedback bull Long-term Parking

                                                                            bull Airport Terminal Improvement Conceptual Plan

                                                                            bull FundingFinancing Options

                                                                            Future Board Items bull February 9 2016

                                                                            bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                                            bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                                            design services long-term parking lot design services and long-term parking lot construction)

                                                                            bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                                            integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                                            bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                                            Charles M Schulz - Sonoma County Airport

                                                                            2290 Airport Boulevard

                                                                            Santa Rosa CA 95403

                                                                            (707) 565-7243

                                                                            wwwsono macou ntya irportorg

                                                                            Follow STS on (j Facebook

                                                                            Im Linkedln

                                                                            ~ Twitter

                                                                            • Slide Number 1
                                                                            • Summary
                                                                            • Airport Governance
                                                                            • Airport Background
                                                                            • Current Organizational Chart
                                                                            • Airport Enterprise Fund
                                                                            • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                                            • Airport Master Plan
                                                                            • Airfield Layout PlanLand Useand Boundaries
                                                                            • Airport Update
                                                                            • Airport Update ndash Fuel (Gallons Sold)
                                                                            • Airport Update ndash Parking Revenues
                                                                            • Airport Update ndash Rental Cars Revenues
                                                                            • Airport Updates ndash Passenger Levels
                                                                            • Airport Update - HorizonAlaska Airlines
                                                                            • Slide Number 16
                                                                            • Fare Comparison for STS and Other Airports in the Region
                                                                            • Current Passengers and Growth Potential
                                                                            • Airline Industry Overview ndash Potential Markets
                                                                            • Airports Used by Sonoma County and Surrounding Area Residents
                                                                            • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                                            • Airline Industry Overview
                                                                            • Slide Number 23
                                                                            • Airport Developments
                                                                            • Slide Number 25
                                                                            • Airfield Layout PlanDevelopable Parcels
                                                                            • Capital Project Needs
                                                                            • Slide Number 28
                                                                            • Runway Safety Area ndash Phase II ndash Service Roads
                                                                            • Runway Safety Area ndash Phase II ndash Service Roads
                                                                            • Aircraft Rescue and Firefighting Building
                                                                            • Aircraft Rescue and Firefighting Building
                                                                            • New Long-term Parking Lot
                                                                            • Slide Number 34
                                                                            • Proposed Terminal Enhancement Project
                                                                            • Existing Terminal
                                                                            • Terminal Renovation ndash Phases I and II
                                                                            • New Holdroom (Phase II) ndash South Elevation
                                                                            • New Holdroom InteriorLooking East
                                                                            • Flex Space ndash Tent Option ndash View from Airfield
                                                                            • Existing Terminal ndash View from Airfield Side
                                                                            • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                                            • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                                            • Future Expansion ndash Estimated 2025
                                                                            • Future Expansion ndash Estimated 2050
                                                                            • Financial Analysis
                                                                            • Slide Number 47
                                                                            • Airline Rates amp Charges
                                                                            • Slide Number 49
                                                                            • Slide Number 50
                                                                            • Funding Options
                                                                            • Current Airport Debt
                                                                            • Funding Options ndash Long-term
                                                                            • Staffing Analysis
                                                                            • Staffing Report
                                                                            • Aircraft Rescue and Firefighting (ARFF) Services
                                                                            • ARFF Services at Comparable Airports
                                                                            • Request for Feedback
                                                                            • Future Board Items
                                                                            • Slide Number 60

                                                                              New Holdroom Interior Looking East

                                                                              New Holdroom Interior Looking North

                                                                              Flex Space ndash Conventional Construction ndash View from Airfield

                                                                              Flex Space ndash Tent Option ndash View from Airfield

                                                                              Existing Terminal ndash View from Airfield Side

                                                                              Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                                                                              Tent option Phase I

                                                                              Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                                                                              Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                                                                              Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                                                                              Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                                                                              Future Expansion ndash Estimated 2025

                                                                              Future Expansion ndash Estimated 2050

                                                                              Financial Analysis

                                                                              Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                                                                              financial operations to prepare a financial forecasting model

                                                                              bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                                                                              bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                                                                              bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                                                                              bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                                                                              Airline Rates amp Charges

                                                                              Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                                                              double current levels

                                                                              bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                                                              bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                                                              bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                                                              bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                                                              bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                                                              Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                                                              Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                                                              Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                                                              Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                                                              ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                                                              The proposed fees are anticipated to increase revenues by $250000 annually

                                                                              Staff agrees with the consultantrsquos recommended airline rates and charges

                                                                              Funding Options

                                                                              Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                                                              Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                                                              Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                                                              Funding Needs

                                                                              bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                                                              bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                                                              Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                                                              bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                                                              Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                                                              The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                                                              Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                                                              Staffing Analysis

                                                                              Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                                                              an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                                                              bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                                                              bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                                                              bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                                                              bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                                                              Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                                                              requirements spending approximately $220000 annually to provide ARFF coverage and training

                                                                              bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                                                              bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                                                              bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                                                              bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                                                              ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                                              bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                                              bull Most airports similar to or larger than STS have contracted ARFF services

                                                                              bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                                              Airport Operations Budget 2014

                                                                              Enplanement 2014

                                                                              Airport Staff

                                                                              Contract Fire Fire Contract Cost

                                                                              Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                                              Request for Feedback bull Long-term Parking

                                                                              bull Airport Terminal Improvement Conceptual Plan

                                                                              bull FundingFinancing Options

                                                                              Future Board Items bull February 9 2016

                                                                              bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                                              bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                                              design services long-term parking lot design services and long-term parking lot construction)

                                                                              bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                                              integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                                              bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                                              Charles M Schulz - Sonoma County Airport

                                                                              2290 Airport Boulevard

                                                                              Santa Rosa CA 95403

                                                                              (707) 565-7243

                                                                              wwwsono macou ntya irportorg

                                                                              Follow STS on (j Facebook

                                                                              Im Linkedln

                                                                              ~ Twitter

                                                                              • Slide Number 1
                                                                              • Summary
                                                                              • Airport Governance
                                                                              • Airport Background
                                                                              • Current Organizational Chart
                                                                              • Airport Enterprise Fund
                                                                              • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                                              • Airport Master Plan
                                                                              • Airfield Layout PlanLand Useand Boundaries
                                                                              • Airport Update
                                                                              • Airport Update ndash Fuel (Gallons Sold)
                                                                              • Airport Update ndash Parking Revenues
                                                                              • Airport Update ndash Rental Cars Revenues
                                                                              • Airport Updates ndash Passenger Levels
                                                                              • Airport Update - HorizonAlaska Airlines
                                                                              • Slide Number 16
                                                                              • Fare Comparison for STS and Other Airports in the Region
                                                                              • Current Passengers and Growth Potential
                                                                              • Airline Industry Overview ndash Potential Markets
                                                                              • Airports Used by Sonoma County and Surrounding Area Residents
                                                                              • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                                              • Airline Industry Overview
                                                                              • Slide Number 23
                                                                              • Airport Developments
                                                                              • Slide Number 25
                                                                              • Airfield Layout PlanDevelopable Parcels
                                                                              • Capital Project Needs
                                                                              • Slide Number 28
                                                                              • Runway Safety Area ndash Phase II ndash Service Roads
                                                                              • Runway Safety Area ndash Phase II ndash Service Roads
                                                                              • Aircraft Rescue and Firefighting Building
                                                                              • Aircraft Rescue and Firefighting Building
                                                                              • New Long-term Parking Lot
                                                                              • Slide Number 34
                                                                              • Proposed Terminal Enhancement Project
                                                                              • Existing Terminal
                                                                              • Terminal Renovation ndash Phases I and II
                                                                              • New Holdroom (Phase II) ndash South Elevation
                                                                              • New Holdroom InteriorLooking East
                                                                              • Flex Space ndash Tent Option ndash View from Airfield
                                                                              • Existing Terminal ndash View from Airfield Side
                                                                              • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                                              • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                                              • Future Expansion ndash Estimated 2025
                                                                              • Future Expansion ndash Estimated 2050
                                                                              • Financial Analysis
                                                                              • Slide Number 47
                                                                              • Airline Rates amp Charges
                                                                              • Slide Number 49
                                                                              • Slide Number 50
                                                                              • Funding Options
                                                                              • Current Airport Debt
                                                                              • Funding Options ndash Long-term
                                                                              • Staffing Analysis
                                                                              • Staffing Report
                                                                              • Aircraft Rescue and Firefighting (ARFF) Services
                                                                              • ARFF Services at Comparable Airports
                                                                              • Request for Feedback
                                                                              • Future Board Items
                                                                              • Slide Number 60

                                                                                Flex Space ndash Conventional Construction ndash View from Airfield

                                                                                Flex Space ndash Tent Option ndash View from Airfield

                                                                                Existing Terminal ndash View from Airfield Side

                                                                                Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                                                                                Tent option Phase I

                                                                                Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                                                                                Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                                                                                Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                                                                                Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                                                                                Future Expansion ndash Estimated 2025

                                                                                Future Expansion ndash Estimated 2050

                                                                                Financial Analysis

                                                                                Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                                                                                financial operations to prepare a financial forecasting model

                                                                                bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                                                                                bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                                                                                bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                                                                                bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                                                                                Airline Rates amp Charges

                                                                                Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                                                                double current levels

                                                                                bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                                                                bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                                                                bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                                                                bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                                                                bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                                                                Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                                                                Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                                                                Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                                                                Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                                                                ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                                                                The proposed fees are anticipated to increase revenues by $250000 annually

                                                                                Staff agrees with the consultantrsquos recommended airline rates and charges

                                                                                Funding Options

                                                                                Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                                                                Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                                                                Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                                                                Funding Needs

                                                                                bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                                                                bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                                                                Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                                                                bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                                                                Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                                                                The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                                                                Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                                                                Staffing Analysis

                                                                                Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                                                                an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                                                                bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                                                                bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                                                                bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                                                                bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                                                                Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                                                                requirements spending approximately $220000 annually to provide ARFF coverage and training

                                                                                bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                                                                bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                                                                bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                                                                bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                                                                ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                                                bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                                                bull Most airports similar to or larger than STS have contracted ARFF services

                                                                                bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                                                Airport Operations Budget 2014

                                                                                Enplanement 2014

                                                                                Airport Staff

                                                                                Contract Fire Fire Contract Cost

                                                                                Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                                                Request for Feedback bull Long-term Parking

                                                                                bull Airport Terminal Improvement Conceptual Plan

                                                                                bull FundingFinancing Options

                                                                                Future Board Items bull February 9 2016

                                                                                bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                                                bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                                                design services long-term parking lot design services and long-term parking lot construction)

                                                                                bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                                                integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                                                bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                                                Charles M Schulz - Sonoma County Airport

                                                                                2290 Airport Boulevard

                                                                                Santa Rosa CA 95403

                                                                                (707) 565-7243

                                                                                wwwsono macou ntya irportorg

                                                                                Follow STS on (j Facebook

                                                                                Im Linkedln

                                                                                ~ Twitter

                                                                                • Slide Number 1
                                                                                • Summary
                                                                                • Airport Governance
                                                                                • Airport Background
                                                                                • Current Organizational Chart
                                                                                • Airport Enterprise Fund
                                                                                • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                                                • Airport Master Plan
                                                                                • Airfield Layout PlanLand Useand Boundaries
                                                                                • Airport Update
                                                                                • Airport Update ndash Fuel (Gallons Sold)
                                                                                • Airport Update ndash Parking Revenues
                                                                                • Airport Update ndash Rental Cars Revenues
                                                                                • Airport Updates ndash Passenger Levels
                                                                                • Airport Update - HorizonAlaska Airlines
                                                                                • Slide Number 16
                                                                                • Fare Comparison for STS and Other Airports in the Region
                                                                                • Current Passengers and Growth Potential
                                                                                • Airline Industry Overview ndash Potential Markets
                                                                                • Airports Used by Sonoma County and Surrounding Area Residents
                                                                                • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                                                • Airline Industry Overview
                                                                                • Slide Number 23
                                                                                • Airport Developments
                                                                                • Slide Number 25
                                                                                • Airfield Layout PlanDevelopable Parcels
                                                                                • Capital Project Needs
                                                                                • Slide Number 28
                                                                                • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                • Aircraft Rescue and Firefighting Building
                                                                                • Aircraft Rescue and Firefighting Building
                                                                                • New Long-term Parking Lot
                                                                                • Slide Number 34
                                                                                • Proposed Terminal Enhancement Project
                                                                                • Existing Terminal
                                                                                • Terminal Renovation ndash Phases I and II
                                                                                • New Holdroom (Phase II) ndash South Elevation
                                                                                • New Holdroom InteriorLooking East
                                                                                • Flex Space ndash Tent Option ndash View from Airfield
                                                                                • Existing Terminal ndash View from Airfield Side
                                                                                • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                                                • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                                                • Future Expansion ndash Estimated 2025
                                                                                • Future Expansion ndash Estimated 2050
                                                                                • Financial Analysis
                                                                                • Slide Number 47
                                                                                • Airline Rates amp Charges
                                                                                • Slide Number 49
                                                                                • Slide Number 50
                                                                                • Funding Options
                                                                                • Current Airport Debt
                                                                                • Funding Options ndash Long-term
                                                                                • Staffing Analysis
                                                                                • Staffing Report
                                                                                • Aircraft Rescue and Firefighting (ARFF) Services
                                                                                • ARFF Services at Comparable Airports
                                                                                • Request for Feedback
                                                                                • Future Board Items
                                                                                • Slide Number 60

                                                                                  Existing Terminal ndash View from Airfield Side

                                                                                  Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                                                                                  Tent option Phase I

                                                                                  Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                                                                                  Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                                                                                  Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                                                                                  Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                                                                                  Future Expansion ndash Estimated 2025

                                                                                  Future Expansion ndash Estimated 2050

                                                                                  Financial Analysis

                                                                                  Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                                                                                  financial operations to prepare a financial forecasting model

                                                                                  bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                                                                                  bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                                                                                  bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                                                                                  bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                                                                                  Airline Rates amp Charges

                                                                                  Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                                                                  double current levels

                                                                                  bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                                                                  bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                                                                  bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                                                                  bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                                                                  bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                                                                  Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                                                                  Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                                                                  Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                                                                  Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                                                                  ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                                                                  The proposed fees are anticipated to increase revenues by $250000 annually

                                                                                  Staff agrees with the consultantrsquos recommended airline rates and charges

                                                                                  Funding Options

                                                                                  Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                                                                  Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                                                                  Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                                                                  Funding Needs

                                                                                  bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                                                                  bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                                                                  Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                                                                  bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                                                                  Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                                                                  The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                                                                  Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                                                                  Staffing Analysis

                                                                                  Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                                                                  an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                                                                  bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                                                                  bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                                                                  bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                                                                  bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                                                                  Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                                                                  requirements spending approximately $220000 annually to provide ARFF coverage and training

                                                                                  bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                                                                  bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                                                                  bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                                                                  bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                                                                  ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                                                  bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                                                  bull Most airports similar to or larger than STS have contracted ARFF services

                                                                                  bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                                                  Airport Operations Budget 2014

                                                                                  Enplanement 2014

                                                                                  Airport Staff

                                                                                  Contract Fire Fire Contract Cost

                                                                                  Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                                                  Request for Feedback bull Long-term Parking

                                                                                  bull Airport Terminal Improvement Conceptual Plan

                                                                                  bull FundingFinancing Options

                                                                                  Future Board Items bull February 9 2016

                                                                                  bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                                                  bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                                                  design services long-term parking lot design services and long-term parking lot construction)

                                                                                  bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                                                  integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                                                  bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                                                  Charles M Schulz - Sonoma County Airport

                                                                                  2290 Airport Boulevard

                                                                                  Santa Rosa CA 95403

                                                                                  (707) 565-7243

                                                                                  wwwsono macou ntya irportorg

                                                                                  Follow STS on (j Facebook

                                                                                  Im Linkedln

                                                                                  ~ Twitter

                                                                                  • Slide Number 1
                                                                                  • Summary
                                                                                  • Airport Governance
                                                                                  • Airport Background
                                                                                  • Current Organizational Chart
                                                                                  • Airport Enterprise Fund
                                                                                  • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                                                  • Airport Master Plan
                                                                                  • Airfield Layout PlanLand Useand Boundaries
                                                                                  • Airport Update
                                                                                  • Airport Update ndash Fuel (Gallons Sold)
                                                                                  • Airport Update ndash Parking Revenues
                                                                                  • Airport Update ndash Rental Cars Revenues
                                                                                  • Airport Updates ndash Passenger Levels
                                                                                  • Airport Update - HorizonAlaska Airlines
                                                                                  • Slide Number 16
                                                                                  • Fare Comparison for STS and Other Airports in the Region
                                                                                  • Current Passengers and Growth Potential
                                                                                  • Airline Industry Overview ndash Potential Markets
                                                                                  • Airports Used by Sonoma County and Surrounding Area Residents
                                                                                  • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                                                  • Airline Industry Overview
                                                                                  • Slide Number 23
                                                                                  • Airport Developments
                                                                                  • Slide Number 25
                                                                                  • Airfield Layout PlanDevelopable Parcels
                                                                                  • Capital Project Needs
                                                                                  • Slide Number 28
                                                                                  • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                  • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                  • Aircraft Rescue and Firefighting Building
                                                                                  • Aircraft Rescue and Firefighting Building
                                                                                  • New Long-term Parking Lot
                                                                                  • Slide Number 34
                                                                                  • Proposed Terminal Enhancement Project
                                                                                  • Existing Terminal
                                                                                  • Terminal Renovation ndash Phases I and II
                                                                                  • New Holdroom (Phase II) ndash South Elevation
                                                                                  • New Holdroom InteriorLooking East
                                                                                  • Flex Space ndash Tent Option ndash View from Airfield
                                                                                  • Existing Terminal ndash View from Airfield Side
                                                                                  • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                                                  • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                                                  • Future Expansion ndash Estimated 2025
                                                                                  • Future Expansion ndash Estimated 2050
                                                                                  • Financial Analysis
                                                                                  • Slide Number 47
                                                                                  • Airline Rates amp Charges
                                                                                  • Slide Number 49
                                                                                  • Slide Number 50
                                                                                  • Funding Options
                                                                                  • Current Airport Debt
                                                                                  • Funding Options ndash Long-term
                                                                                  • Staffing Analysis
                                                                                  • Staffing Report
                                                                                  • Aircraft Rescue and Firefighting (ARFF) Services
                                                                                  • ARFF Services at Comparable Airports
                                                                                  • Request for Feedback
                                                                                  • Future Board Items
                                                                                  • Slide Number 60

                                                                                    Phase 1 Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facility Staff is recommending conventional construction (also shown is Phase 2a - move existing hold room north)

                                                                                    Tent option Phase I

                                                                                    Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                                                                                    Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                                                                                    Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                                                                                    Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                                                                                    Future Expansion ndash Estimated 2025

                                                                                    Future Expansion ndash Estimated 2050

                                                                                    Financial Analysis

                                                                                    Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                                                                                    financial operations to prepare a financial forecasting model

                                                                                    bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                                                                                    bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                                                                                    bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                                                                                    bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                                                                                    Airline Rates amp Charges

                                                                                    Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                                                                    double current levels

                                                                                    bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                                                                    bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                                                                    bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                                                                    bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                                                                    bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                                                                    Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                                                                    Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                                                                    Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                                                                    Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                                                                    ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                                                                    The proposed fees are anticipated to increase revenues by $250000 annually

                                                                                    Staff agrees with the consultantrsquos recommended airline rates and charges

                                                                                    Funding Options

                                                                                    Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                                                                    Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                                                                    Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                                                                    Funding Needs

                                                                                    bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                                                                    bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                                                                    Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                                                                    bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                                                                    Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                                                                    The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                                                                    Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                                                                    Staffing Analysis

                                                                                    Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                                                                    an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                                                                    bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                                                                    bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                                                                    bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                                                                    bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                                                                    Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                                                                    requirements spending approximately $220000 annually to provide ARFF coverage and training

                                                                                    bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                                                                    bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                                                                    bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                                                                    bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                                                                    ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                                                    bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                                                    bull Most airports similar to or larger than STS have contracted ARFF services

                                                                                    bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                                                    Airport Operations Budget 2014

                                                                                    Enplanement 2014

                                                                                    Airport Staff

                                                                                    Contract Fire Fire Contract Cost

                                                                                    Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                                                    Request for Feedback bull Long-term Parking

                                                                                    bull Airport Terminal Improvement Conceptual Plan

                                                                                    bull FundingFinancing Options

                                                                                    Future Board Items bull February 9 2016

                                                                                    bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                                                    bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                                                    design services long-term parking lot design services and long-term parking lot construction)

                                                                                    bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                                                    integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                                                    bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                                                    Charles M Schulz - Sonoma County Airport

                                                                                    2290 Airport Boulevard

                                                                                    Santa Rosa CA 95403

                                                                                    (707) 565-7243

                                                                                    wwwsono macou ntya irportorg

                                                                                    Follow STS on (j Facebook

                                                                                    Im Linkedln

                                                                                    ~ Twitter

                                                                                    • Slide Number 1
                                                                                    • Summary
                                                                                    • Airport Governance
                                                                                    • Airport Background
                                                                                    • Current Organizational Chart
                                                                                    • Airport Enterprise Fund
                                                                                    • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                                                    • Airport Master Plan
                                                                                    • Airfield Layout PlanLand Useand Boundaries
                                                                                    • Airport Update
                                                                                    • Airport Update ndash Fuel (Gallons Sold)
                                                                                    • Airport Update ndash Parking Revenues
                                                                                    • Airport Update ndash Rental Cars Revenues
                                                                                    • Airport Updates ndash Passenger Levels
                                                                                    • Airport Update - HorizonAlaska Airlines
                                                                                    • Slide Number 16
                                                                                    • Fare Comparison for STS and Other Airports in the Region
                                                                                    • Current Passengers and Growth Potential
                                                                                    • Airline Industry Overview ndash Potential Markets
                                                                                    • Airports Used by Sonoma County and Surrounding Area Residents
                                                                                    • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                                                    • Airline Industry Overview
                                                                                    • Slide Number 23
                                                                                    • Airport Developments
                                                                                    • Slide Number 25
                                                                                    • Airfield Layout PlanDevelopable Parcels
                                                                                    • Capital Project Needs
                                                                                    • Slide Number 28
                                                                                    • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                    • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                    • Aircraft Rescue and Firefighting Building
                                                                                    • Aircraft Rescue and Firefighting Building
                                                                                    • New Long-term Parking Lot
                                                                                    • Slide Number 34
                                                                                    • Proposed Terminal Enhancement Project
                                                                                    • Existing Terminal
                                                                                    • Terminal Renovation ndash Phases I and II
                                                                                    • New Holdroom (Phase II) ndash South Elevation
                                                                                    • New Holdroom InteriorLooking East
                                                                                    • Flex Space ndash Tent Option ndash View from Airfield
                                                                                    • Existing Terminal ndash View from Airfield Side
                                                                                    • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                                                    • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                                                    • Future Expansion ndash Estimated 2025
                                                                                    • Future Expansion ndash Estimated 2050
                                                                                    • Financial Analysis
                                                                                    • Slide Number 47
                                                                                    • Airline Rates amp Charges
                                                                                    • Slide Number 49
                                                                                    • Slide Number 50
                                                                                    • Funding Options
                                                                                    • Current Airport Debt
                                                                                    • Funding Options ndash Long-term
                                                                                    • Staffing Analysis
                                                                                    • Staffing Report
                                                                                    • Aircraft Rescue and Firefighting (ARFF) Services
                                                                                    • ARFF Services at Comparable Airports
                                                                                    • Request for Feedback
                                                                                    • Future Board Items
                                                                                    • Slide Number 60

                                                                                      Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility

                                                                                      Phase 3 - Relocate car rental agency booths and baggage claim to flex-space and construct canopy and circulation gallery at previous baggage claim area

                                                                                      Phase 4 - Remodel existing car rental agency booths and baggage claim area into new airline ticketing area and add new baggage drop-off belt system

                                                                                      Phase 5 - Remodel existing airline ticketing area into concession and office space and create new terminal vestibule

                                                                                      Future Expansion ndash Estimated 2025

                                                                                      Future Expansion ndash Estimated 2050

                                                                                      Financial Analysis

                                                                                      Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                                                                                      financial operations to prepare a financial forecasting model

                                                                                      bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                                                                                      bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                                                                                      bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                                                                                      bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                                                                                      Airline Rates amp Charges

                                                                                      Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                                                                      double current levels

                                                                                      bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                                                                      bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                                                                      bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                                                                      bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                                                                      bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                                                                      Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                                                                      Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                                                                      Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                                                                      Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                                                                      ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                                                                      The proposed fees are anticipated to increase revenues by $250000 annually

                                                                                      Staff agrees with the consultantrsquos recommended airline rates and charges

                                                                                      Funding Options

                                                                                      Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                                                                      Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                                                                      Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                                                                      Funding Needs

                                                                                      bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                                                                      bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                                                                      Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                                                                      bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                                                                      Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                                                                      The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                                                                      Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                                                                      Staffing Analysis

                                                                                      Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                                                                      an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                                                                      bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                                                                      bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                                                                      bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                                                                      bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                                                                      Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                                                                      requirements spending approximately $220000 annually to provide ARFF coverage and training

                                                                                      bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                                                                      bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                                                                      bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                                                                      bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                                                                      ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                                                      bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                                                      bull Most airports similar to or larger than STS have contracted ARFF services

                                                                                      bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                                                      Airport Operations Budget 2014

                                                                                      Enplanement 2014

                                                                                      Airport Staff

                                                                                      Contract Fire Fire Contract Cost

                                                                                      Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                                                      Request for Feedback bull Long-term Parking

                                                                                      bull Airport Terminal Improvement Conceptual Plan

                                                                                      bull FundingFinancing Options

                                                                                      Future Board Items bull February 9 2016

                                                                                      bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                                                      bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                                                      design services long-term parking lot design services and long-term parking lot construction)

                                                                                      bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                                                      integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                                                      bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                                                      Charles M Schulz - Sonoma County Airport

                                                                                      2290 Airport Boulevard

                                                                                      Santa Rosa CA 95403

                                                                                      (707) 565-7243

                                                                                      wwwsono macou ntya irportorg

                                                                                      Follow STS on (j Facebook

                                                                                      Im Linkedln

                                                                                      ~ Twitter

                                                                                      • Slide Number 1
                                                                                      • Summary
                                                                                      • Airport Governance
                                                                                      • Airport Background
                                                                                      • Current Organizational Chart
                                                                                      • Airport Enterprise Fund
                                                                                      • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                                                      • Airport Master Plan
                                                                                      • Airfield Layout PlanLand Useand Boundaries
                                                                                      • Airport Update
                                                                                      • Airport Update ndash Fuel (Gallons Sold)
                                                                                      • Airport Update ndash Parking Revenues
                                                                                      • Airport Update ndash Rental Cars Revenues
                                                                                      • Airport Updates ndash Passenger Levels
                                                                                      • Airport Update - HorizonAlaska Airlines
                                                                                      • Slide Number 16
                                                                                      • Fare Comparison for STS and Other Airports in the Region
                                                                                      • Current Passengers and Growth Potential
                                                                                      • Airline Industry Overview ndash Potential Markets
                                                                                      • Airports Used by Sonoma County and Surrounding Area Residents
                                                                                      • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                                                      • Airline Industry Overview
                                                                                      • Slide Number 23
                                                                                      • Airport Developments
                                                                                      • Slide Number 25
                                                                                      • Airfield Layout PlanDevelopable Parcels
                                                                                      • Capital Project Needs
                                                                                      • Slide Number 28
                                                                                      • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                      • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                      • Aircraft Rescue and Firefighting Building
                                                                                      • Aircraft Rescue and Firefighting Building
                                                                                      • New Long-term Parking Lot
                                                                                      • Slide Number 34
                                                                                      • Proposed Terminal Enhancement Project
                                                                                      • Existing Terminal
                                                                                      • Terminal Renovation ndash Phases I and II
                                                                                      • New Holdroom (Phase II) ndash South Elevation
                                                                                      • New Holdroom InteriorLooking East
                                                                                      • Flex Space ndash Tent Option ndash View from Airfield
                                                                                      • Existing Terminal ndash View from Airfield Side
                                                                                      • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                                                      • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                                                      • Future Expansion ndash Estimated 2025
                                                                                      • Future Expansion ndash Estimated 2050
                                                                                      • Financial Analysis
                                                                                      • Slide Number 47
                                                                                      • Airline Rates amp Charges
                                                                                      • Slide Number 49
                                                                                      • Slide Number 50
                                                                                      • Funding Options
                                                                                      • Current Airport Debt
                                                                                      • Funding Options ndash Long-term
                                                                                      • Staffing Analysis
                                                                                      • Staffing Report
                                                                                      • Aircraft Rescue and Firefighting (ARFF) Services
                                                                                      • ARFF Services at Comparable Airports
                                                                                      • Request for Feedback
                                                                                      • Future Board Items
                                                                                      • Slide Number 60

                                                                                        Future Expansion ndash Estimated 2025

                                                                                        Future Expansion ndash Estimated 2050

                                                                                        Financial Analysis

                                                                                        Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                                                                                        financial operations to prepare a financial forecasting model

                                                                                        bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                                                                                        bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                                                                                        bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                                                                                        bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                                                                                        Airline Rates amp Charges

                                                                                        Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                                                                        double current levels

                                                                                        bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                                                                        bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                                                                        bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                                                                        bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                                                                        bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                                                                        Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                                                                        Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                                                                        Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                                                                        Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                                                                        ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                                                                        The proposed fees are anticipated to increase revenues by $250000 annually

                                                                                        Staff agrees with the consultantrsquos recommended airline rates and charges

                                                                                        Funding Options

                                                                                        Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                                                                        Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                                                                        Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                                                                        Funding Needs

                                                                                        bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                                                                        bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                                                                        Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                                                                        bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                                                                        Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                                                                        The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                                                                        Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                                                                        Staffing Analysis

                                                                                        Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                                                                        an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                                                                        bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                                                                        bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                                                                        bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                                                                        bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                                                                        Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                                                                        requirements spending approximately $220000 annually to provide ARFF coverage and training

                                                                                        bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                                                                        bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                                                                        bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                                                                        bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                                                                        ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                                                        bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                                                        bull Most airports similar to or larger than STS have contracted ARFF services

                                                                                        bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                                                        Airport Operations Budget 2014

                                                                                        Enplanement 2014

                                                                                        Airport Staff

                                                                                        Contract Fire Fire Contract Cost

                                                                                        Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                                                        Request for Feedback bull Long-term Parking

                                                                                        bull Airport Terminal Improvement Conceptual Plan

                                                                                        bull FundingFinancing Options

                                                                                        Future Board Items bull February 9 2016

                                                                                        bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                                                        bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                                                        design services long-term parking lot design services and long-term parking lot construction)

                                                                                        bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                                                        integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                                                        bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                                                        Charles M Schulz - Sonoma County Airport

                                                                                        2290 Airport Boulevard

                                                                                        Santa Rosa CA 95403

                                                                                        (707) 565-7243

                                                                                        wwwsono macou ntya irportorg

                                                                                        Follow STS on (j Facebook

                                                                                        Im Linkedln

                                                                                        ~ Twitter

                                                                                        • Slide Number 1
                                                                                        • Summary
                                                                                        • Airport Governance
                                                                                        • Airport Background
                                                                                        • Current Organizational Chart
                                                                                        • Airport Enterprise Fund
                                                                                        • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                                                        • Airport Master Plan
                                                                                        • Airfield Layout PlanLand Useand Boundaries
                                                                                        • Airport Update
                                                                                        • Airport Update ndash Fuel (Gallons Sold)
                                                                                        • Airport Update ndash Parking Revenues
                                                                                        • Airport Update ndash Rental Cars Revenues
                                                                                        • Airport Updates ndash Passenger Levels
                                                                                        • Airport Update - HorizonAlaska Airlines
                                                                                        • Slide Number 16
                                                                                        • Fare Comparison for STS and Other Airports in the Region
                                                                                        • Current Passengers and Growth Potential
                                                                                        • Airline Industry Overview ndash Potential Markets
                                                                                        • Airports Used by Sonoma County and Surrounding Area Residents
                                                                                        • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                                                        • Airline Industry Overview
                                                                                        • Slide Number 23
                                                                                        • Airport Developments
                                                                                        • Slide Number 25
                                                                                        • Airfield Layout PlanDevelopable Parcels
                                                                                        • Capital Project Needs
                                                                                        • Slide Number 28
                                                                                        • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                        • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                        • Aircraft Rescue and Firefighting Building
                                                                                        • Aircraft Rescue and Firefighting Building
                                                                                        • New Long-term Parking Lot
                                                                                        • Slide Number 34
                                                                                        • Proposed Terminal Enhancement Project
                                                                                        • Existing Terminal
                                                                                        • Terminal Renovation ndash Phases I and II
                                                                                        • New Holdroom (Phase II) ndash South Elevation
                                                                                        • New Holdroom InteriorLooking East
                                                                                        • Flex Space ndash Tent Option ndash View from Airfield
                                                                                        • Existing Terminal ndash View from Airfield Side
                                                                                        • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                                                        • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                                                        • Future Expansion ndash Estimated 2025
                                                                                        • Future Expansion ndash Estimated 2050
                                                                                        • Financial Analysis
                                                                                        • Slide Number 47
                                                                                        • Airline Rates amp Charges
                                                                                        • Slide Number 49
                                                                                        • Slide Number 50
                                                                                        • Funding Options
                                                                                        • Current Airport Debt
                                                                                        • Funding Options ndash Long-term
                                                                                        • Staffing Analysis
                                                                                        • Staffing Report
                                                                                        • Aircraft Rescue and Firefighting (ARFF) Services
                                                                                        • ARFF Services at Comparable Airports
                                                                                        • Request for Feedback
                                                                                        • Future Board Items
                                                                                        • Slide Number 60

                                                                                          Future Expansion ndash Estimated 2050

                                                                                          Financial Analysis

                                                                                          Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                                                                                          financial operations to prepare a financial forecasting model

                                                                                          bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                                                                                          bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                                                                                          bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                                                                                          bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                                                                                          Airline Rates amp Charges

                                                                                          Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                                                                          double current levels

                                                                                          bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                                                                          bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                                                                          bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                                                                          bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                                                                          bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                                                                          Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                                                                          Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                                                                          Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                                                                          Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                                                                          ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                                                                          The proposed fees are anticipated to increase revenues by $250000 annually

                                                                                          Staff agrees with the consultantrsquos recommended airline rates and charges

                                                                                          Funding Options

                                                                                          Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                                                                          Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                                                                          Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                                                                          Funding Needs

                                                                                          bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                                                                          bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                                                                          Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                                                                          bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                                                                          Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                                                                          The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                                                                          Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                                                                          Staffing Analysis

                                                                                          Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                                                                          an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                                                                          bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                                                                          bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                                                                          bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                                                                          bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                                                                          Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                                                                          requirements spending approximately $220000 annually to provide ARFF coverage and training

                                                                                          bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                                                                          bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                                                                          bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                                                                          bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                                                                          ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                                                          bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                                                          bull Most airports similar to or larger than STS have contracted ARFF services

                                                                                          bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                                                          Airport Operations Budget 2014

                                                                                          Enplanement 2014

                                                                                          Airport Staff

                                                                                          Contract Fire Fire Contract Cost

                                                                                          Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                                                          Request for Feedback bull Long-term Parking

                                                                                          bull Airport Terminal Improvement Conceptual Plan

                                                                                          bull FundingFinancing Options

                                                                                          Future Board Items bull February 9 2016

                                                                                          bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                                                          bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                                                          design services long-term parking lot design services and long-term parking lot construction)

                                                                                          bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                                                          integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                                                          bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                                                          Charles M Schulz - Sonoma County Airport

                                                                                          2290 Airport Boulevard

                                                                                          Santa Rosa CA 95403

                                                                                          (707) 565-7243

                                                                                          wwwsono macou ntya irportorg

                                                                                          Follow STS on (j Facebook

                                                                                          Im Linkedln

                                                                                          ~ Twitter

                                                                                          • Slide Number 1
                                                                                          • Summary
                                                                                          • Airport Governance
                                                                                          • Airport Background
                                                                                          • Current Organizational Chart
                                                                                          • Airport Enterprise Fund
                                                                                          • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                                                          • Airport Master Plan
                                                                                          • Airfield Layout PlanLand Useand Boundaries
                                                                                          • Airport Update
                                                                                          • Airport Update ndash Fuel (Gallons Sold)
                                                                                          • Airport Update ndash Parking Revenues
                                                                                          • Airport Update ndash Rental Cars Revenues
                                                                                          • Airport Updates ndash Passenger Levels
                                                                                          • Airport Update - HorizonAlaska Airlines
                                                                                          • Slide Number 16
                                                                                          • Fare Comparison for STS and Other Airports in the Region
                                                                                          • Current Passengers and Growth Potential
                                                                                          • Airline Industry Overview ndash Potential Markets
                                                                                          • Airports Used by Sonoma County and Surrounding Area Residents
                                                                                          • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                                                          • Airline Industry Overview
                                                                                          • Slide Number 23
                                                                                          • Airport Developments
                                                                                          • Slide Number 25
                                                                                          • Airfield Layout PlanDevelopable Parcels
                                                                                          • Capital Project Needs
                                                                                          • Slide Number 28
                                                                                          • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                          • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                          • Aircraft Rescue and Firefighting Building
                                                                                          • Aircraft Rescue and Firefighting Building
                                                                                          • New Long-term Parking Lot
                                                                                          • Slide Number 34
                                                                                          • Proposed Terminal Enhancement Project
                                                                                          • Existing Terminal
                                                                                          • Terminal Renovation ndash Phases I and II
                                                                                          • New Holdroom (Phase II) ndash South Elevation
                                                                                          • New Holdroom InteriorLooking East
                                                                                          • Flex Space ndash Tent Option ndash View from Airfield
                                                                                          • Existing Terminal ndash View from Airfield Side
                                                                                          • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                                                          • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                                                          • Future Expansion ndash Estimated 2025
                                                                                          • Future Expansion ndash Estimated 2050
                                                                                          • Financial Analysis
                                                                                          • Slide Number 47
                                                                                          • Airline Rates amp Charges
                                                                                          • Slide Number 49
                                                                                          • Slide Number 50
                                                                                          • Funding Options
                                                                                          • Current Airport Debt
                                                                                          • Funding Options ndash Long-term
                                                                                          • Staffing Analysis
                                                                                          • Staffing Report
                                                                                          • Aircraft Rescue and Firefighting (ARFF) Services
                                                                                          • ARFF Services at Comparable Airports
                                                                                          • Request for Feedback
                                                                                          • Future Board Items
                                                                                          • Slide Number 60

                                                                                            Financial Analysis

                                                                                            Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                                                                                            financial operations to prepare a financial forecasting model

                                                                                            bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                                                                                            bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                                                                                            bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                                                                                            bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                                                                                            Airline Rates amp Charges

                                                                                            Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                                                                            double current levels

                                                                                            bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                                                                            bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                                                                            bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                                                                            bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                                                                            bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                                                                            Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                                                                            Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                                                                            Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                                                                            Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                                                                            ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                                                                            The proposed fees are anticipated to increase revenues by $250000 annually

                                                                                            Staff agrees with the consultantrsquos recommended airline rates and charges

                                                                                            Funding Options

                                                                                            Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                                                                            Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                                                                            Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                                                                            Funding Needs

                                                                                            bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                                                                            bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                                                                            Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                                                                            bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                                                                            Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                                                                            The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                                                                            Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                                                                            Staffing Analysis

                                                                                            Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                                                                            an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                                                                            bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                                                                            bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                                                                            bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                                                                            bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                                                                            Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                                                                            requirements spending approximately $220000 annually to provide ARFF coverage and training

                                                                                            bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                                                                            bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                                                                            bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                                                                            bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                                                                            ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                                                            bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                                                            bull Most airports similar to or larger than STS have contracted ARFF services

                                                                                            bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                                                            Airport Operations Budget 2014

                                                                                            Enplanement 2014

                                                                                            Airport Staff

                                                                                            Contract Fire Fire Contract Cost

                                                                                            Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                                                            Request for Feedback bull Long-term Parking

                                                                                            bull Airport Terminal Improvement Conceptual Plan

                                                                                            bull FundingFinancing Options

                                                                                            Future Board Items bull February 9 2016

                                                                                            bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                                                            bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                                                            design services long-term parking lot design services and long-term parking lot construction)

                                                                                            bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                                                            integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                                                            bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                                                            Charles M Schulz - Sonoma County Airport

                                                                                            2290 Airport Boulevard

                                                                                            Santa Rosa CA 95403

                                                                                            (707) 565-7243

                                                                                            wwwsono macou ntya irportorg

                                                                                            Follow STS on (j Facebook

                                                                                            Im Linkedln

                                                                                            ~ Twitter

                                                                                            • Slide Number 1
                                                                                            • Summary
                                                                                            • Airport Governance
                                                                                            • Airport Background
                                                                                            • Current Organizational Chart
                                                                                            • Airport Enterprise Fund
                                                                                            • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                                                            • Airport Master Plan
                                                                                            • Airfield Layout PlanLand Useand Boundaries
                                                                                            • Airport Update
                                                                                            • Airport Update ndash Fuel (Gallons Sold)
                                                                                            • Airport Update ndash Parking Revenues
                                                                                            • Airport Update ndash Rental Cars Revenues
                                                                                            • Airport Updates ndash Passenger Levels
                                                                                            • Airport Update - HorizonAlaska Airlines
                                                                                            • Slide Number 16
                                                                                            • Fare Comparison for STS and Other Airports in the Region
                                                                                            • Current Passengers and Growth Potential
                                                                                            • Airline Industry Overview ndash Potential Markets
                                                                                            • Airports Used by Sonoma County and Surrounding Area Residents
                                                                                            • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                                                            • Airline Industry Overview
                                                                                            • Slide Number 23
                                                                                            • Airport Developments
                                                                                            • Slide Number 25
                                                                                            • Airfield Layout PlanDevelopable Parcels
                                                                                            • Capital Project Needs
                                                                                            • Slide Number 28
                                                                                            • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                            • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                            • Aircraft Rescue and Firefighting Building
                                                                                            • Aircraft Rescue and Firefighting Building
                                                                                            • New Long-term Parking Lot
                                                                                            • Slide Number 34
                                                                                            • Proposed Terminal Enhancement Project
                                                                                            • Existing Terminal
                                                                                            • Terminal Renovation ndash Phases I and II
                                                                                            • New Holdroom (Phase II) ndash South Elevation
                                                                                            • New Holdroom InteriorLooking East
                                                                                            • Flex Space ndash Tent Option ndash View from Airfield
                                                                                            • Existing Terminal ndash View from Airfield Side
                                                                                            • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                                                            • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                                                            • Future Expansion ndash Estimated 2025
                                                                                            • Future Expansion ndash Estimated 2050
                                                                                            • Financial Analysis
                                                                                            • Slide Number 47
                                                                                            • Airline Rates amp Charges
                                                                                            • Slide Number 49
                                                                                            • Slide Number 50
                                                                                            • Funding Options
                                                                                            • Current Airport Debt
                                                                                            • Funding Options ndash Long-term
                                                                                            • Staffing Analysis
                                                                                            • Staffing Report
                                                                                            • Aircraft Rescue and Firefighting (ARFF) Services
                                                                                            • ARFF Services at Comparable Airports
                                                                                            • Request for Feedback
                                                                                            • Future Board Items
                                                                                            • Slide Number 60

                                                                                              Financial Forecast bull In 2014 the Airport hired a firm specializing in airport business and

                                                                                              financial operations to prepare a financial forecasting model

                                                                                              bull This model forecasts operational levels and costs capital plan funding capacity sustainable airline fees and projects revenues for the next five years

                                                                                              bull The model converted the Airportrsquos budget into an industry standard format allocating costs to the appropriate cost centers This model confirmed the Airportrsquos assumption that the current airline rates and charges are insufficient to be sustainable and calculated the appropriate fees

                                                                                              bull The model incorporates revenue impacts as passenger volumes change and included projected other airport developments

                                                                                              bull The model includes expenditure impacts from the Airportrsquos Capital Improvement Plan (CPP) and staffing growth as outlined in the staffing analysis

                                                                                              Airline Rates amp Charges

                                                                                              Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                                                                              double current levels

                                                                                              bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                                                                              bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                                                                              bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                                                                              bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                                                                              bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                                                                              Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                                                                              Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                                                                              Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                                                                              Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                                                                              ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                                                                              The proposed fees are anticipated to increase revenues by $250000 annually

                                                                                              Staff agrees with the consultantrsquos recommended airline rates and charges

                                                                                              Funding Options

                                                                                              Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                                                                              Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                                                                              Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                                                                              Funding Needs

                                                                                              bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                                                                              bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                                                                              Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                                                                              bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                                                                              Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                                                                              The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                                                                              Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                                                                              Staffing Analysis

                                                                                              Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                                                                              an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                                                                              bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                                                                              bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                                                                              bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                                                                              bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                                                                              Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                                                                              requirements spending approximately $220000 annually to provide ARFF coverage and training

                                                                                              bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                                                                              bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                                                                              bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                                                                              bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                                                                              ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                                                              bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                                                              bull Most airports similar to or larger than STS have contracted ARFF services

                                                                                              bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                                                              Airport Operations Budget 2014

                                                                                              Enplanement 2014

                                                                                              Airport Staff

                                                                                              Contract Fire Fire Contract Cost

                                                                                              Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                                                              Request for Feedback bull Long-term Parking

                                                                                              bull Airport Terminal Improvement Conceptual Plan

                                                                                              bull FundingFinancing Options

                                                                                              Future Board Items bull February 9 2016

                                                                                              bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                                                              bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                                                              design services long-term parking lot design services and long-term parking lot construction)

                                                                                              bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                                                              integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                                                              bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                                                              Charles M Schulz - Sonoma County Airport

                                                                                              2290 Airport Boulevard

                                                                                              Santa Rosa CA 95403

                                                                                              (707) 565-7243

                                                                                              wwwsono macou ntya irportorg

                                                                                              Follow STS on (j Facebook

                                                                                              Im Linkedln

                                                                                              ~ Twitter

                                                                                              • Slide Number 1
                                                                                              • Summary
                                                                                              • Airport Governance
                                                                                              • Airport Background
                                                                                              • Current Organizational Chart
                                                                                              • Airport Enterprise Fund
                                                                                              • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                                                              • Airport Master Plan
                                                                                              • Airfield Layout PlanLand Useand Boundaries
                                                                                              • Airport Update
                                                                                              • Airport Update ndash Fuel (Gallons Sold)
                                                                                              • Airport Update ndash Parking Revenues
                                                                                              • Airport Update ndash Rental Cars Revenues
                                                                                              • Airport Updates ndash Passenger Levels
                                                                                              • Airport Update - HorizonAlaska Airlines
                                                                                              • Slide Number 16
                                                                                              • Fare Comparison for STS and Other Airports in the Region
                                                                                              • Current Passengers and Growth Potential
                                                                                              • Airline Industry Overview ndash Potential Markets
                                                                                              • Airports Used by Sonoma County and Surrounding Area Residents
                                                                                              • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                                                              • Airline Industry Overview
                                                                                              • Slide Number 23
                                                                                              • Airport Developments
                                                                                              • Slide Number 25
                                                                                              • Airfield Layout PlanDevelopable Parcels
                                                                                              • Capital Project Needs
                                                                                              • Slide Number 28
                                                                                              • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                              • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                              • Aircraft Rescue and Firefighting Building
                                                                                              • Aircraft Rescue and Firefighting Building
                                                                                              • New Long-term Parking Lot
                                                                                              • Slide Number 34
                                                                                              • Proposed Terminal Enhancement Project
                                                                                              • Existing Terminal
                                                                                              • Terminal Renovation ndash Phases I and II
                                                                                              • New Holdroom (Phase II) ndash South Elevation
                                                                                              • New Holdroom InteriorLooking East
                                                                                              • Flex Space ndash Tent Option ndash View from Airfield
                                                                                              • Existing Terminal ndash View from Airfield Side
                                                                                              • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                                                              • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                                                              • Future Expansion ndash Estimated 2025
                                                                                              • Future Expansion ndash Estimated 2050
                                                                                              • Financial Analysis
                                                                                              • Slide Number 47
                                                                                              • Airline Rates amp Charges
                                                                                              • Slide Number 49
                                                                                              • Slide Number 50
                                                                                              • Funding Options
                                                                                              • Current Airport Debt
                                                                                              • Funding Options ndash Long-term
                                                                                              • Staffing Analysis
                                                                                              • Staffing Report
                                                                                              • Aircraft Rescue and Firefighting (ARFF) Services
                                                                                              • ARFF Services at Comparable Airports
                                                                                              • Request for Feedback
                                                                                              • Future Board Items
                                                                                              • Slide Number 60

                                                                                                Airline Rates amp Charges

                                                                                                Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                                                                                double current levels

                                                                                                bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                                                                                bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                                                                                bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                                                                                bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                                                                                bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                                                                                Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                                                                                Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                                                                                Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                                                                                Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                                                                                ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                                                                                The proposed fees are anticipated to increase revenues by $250000 annually

                                                                                                Staff agrees with the consultantrsquos recommended airline rates and charges

                                                                                                Funding Options

                                                                                                Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                                                                                Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                                                                                Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                                                                                Funding Needs

                                                                                                bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                                                                                bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                                                                                Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                                                                                bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                                                                                Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                                                                                The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                                                                                Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                                                                                Staffing Analysis

                                                                                                Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                                                                                an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                                                                                bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                                                                                bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                                                                                bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                                                                                bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                                                                                Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                                                                                requirements spending approximately $220000 annually to provide ARFF coverage and training

                                                                                                bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                                                                                bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                                                                                bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                                                                                bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                                                                                ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                                                                bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                                                                bull Most airports similar to or larger than STS have contracted ARFF services

                                                                                                bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                                                                Airport Operations Budget 2014

                                                                                                Enplanement 2014

                                                                                                Airport Staff

                                                                                                Contract Fire Fire Contract Cost

                                                                                                Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                                                                Request for Feedback bull Long-term Parking

                                                                                                bull Airport Terminal Improvement Conceptual Plan

                                                                                                bull FundingFinancing Options

                                                                                                Future Board Items bull February 9 2016

                                                                                                bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                                                                bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                                                                design services long-term parking lot design services and long-term parking lot construction)

                                                                                                bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                                                                integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                                                                bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                                                                Charles M Schulz - Sonoma County Airport

                                                                                                2290 Airport Boulevard

                                                                                                Santa Rosa CA 95403

                                                                                                (707) 565-7243

                                                                                                wwwsono macou ntya irportorg

                                                                                                Follow STS on (j Facebook

                                                                                                Im Linkedln

                                                                                                ~ Twitter

                                                                                                • Slide Number 1
                                                                                                • Summary
                                                                                                • Airport Governance
                                                                                                • Airport Background
                                                                                                • Current Organizational Chart
                                                                                                • Airport Enterprise Fund
                                                                                                • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                                                                • Airport Master Plan
                                                                                                • Airfield Layout PlanLand Useand Boundaries
                                                                                                • Airport Update
                                                                                                • Airport Update ndash Fuel (Gallons Sold)
                                                                                                • Airport Update ndash Parking Revenues
                                                                                                • Airport Update ndash Rental Cars Revenues
                                                                                                • Airport Updates ndash Passenger Levels
                                                                                                • Airport Update - HorizonAlaska Airlines
                                                                                                • Slide Number 16
                                                                                                • Fare Comparison for STS and Other Airports in the Region
                                                                                                • Current Passengers and Growth Potential
                                                                                                • Airline Industry Overview ndash Potential Markets
                                                                                                • Airports Used by Sonoma County and Surrounding Area Residents
                                                                                                • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                                                                • Airline Industry Overview
                                                                                                • Slide Number 23
                                                                                                • Airport Developments
                                                                                                • Slide Number 25
                                                                                                • Airfield Layout PlanDevelopable Parcels
                                                                                                • Capital Project Needs
                                                                                                • Slide Number 28
                                                                                                • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                                • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                                • Aircraft Rescue and Firefighting Building
                                                                                                • Aircraft Rescue and Firefighting Building
                                                                                                • New Long-term Parking Lot
                                                                                                • Slide Number 34
                                                                                                • Proposed Terminal Enhancement Project
                                                                                                • Existing Terminal
                                                                                                • Terminal Renovation ndash Phases I and II
                                                                                                • New Holdroom (Phase II) ndash South Elevation
                                                                                                • New Holdroom InteriorLooking East
                                                                                                • Flex Space ndash Tent Option ndash View from Airfield
                                                                                                • Existing Terminal ndash View from Airfield Side
                                                                                                • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                                                                • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                                                                • Future Expansion ndash Estimated 2025
                                                                                                • Future Expansion ndash Estimated 2050
                                                                                                • Financial Analysis
                                                                                                • Slide Number 47
                                                                                                • Airline Rates amp Charges
                                                                                                • Slide Number 49
                                                                                                • Slide Number 50
                                                                                                • Funding Options
                                                                                                • Current Airport Debt
                                                                                                • Funding Options ndash Long-term
                                                                                                • Staffing Analysis
                                                                                                • Staffing Report
                                                                                                • Aircraft Rescue and Firefighting (ARFF) Services
                                                                                                • ARFF Services at Comparable Airports
                                                                                                • Request for Feedback
                                                                                                • Future Board Items
                                                                                                • Slide Number 60

                                                                                                  Recommended Airline Fees bull The financial report recommended airline rates and charges approximately

                                                                                                  double current levels

                                                                                                  bull Airlines use a Cost Per Enplaned (CPE) passenger as their metric for airport costs (current CPE ~ $149 proposed CPE ~ $295)

                                                                                                  bull The proposed fee increase has been discussed with and is acceptable to Alaska Airlines

                                                                                                  bull Some airlines operate less than daily or irregular schedules and prefer a set ldquoper turnrdquo A set fee enables them to better budget station costs

                                                                                                  bull With the potential for adding new less than daily service a new fee has been proposed for less than daily providers which includes a premium over daily rates and charges (consistent with industry standards)

                                                                                                  bull Current Airline fees are $163 per square footper month for lobby (ticket counters and queue) and office space as well as a monthly fee of $363 for use of the securityhold room These fees will be deleted and a new fee structure will be established

                                                                                                  Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                                                                                  Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                                                                                  Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                                                                                  Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                                                                                  ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                                                                                  The proposed fees are anticipated to increase revenues by $250000 annually

                                                                                                  Staff agrees with the consultantrsquos recommended airline rates and charges

                                                                                                  Funding Options

                                                                                                  Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                                                                                  Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                                                                                  Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                                                                                  Funding Needs

                                                                                                  bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                                                                                  bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                                                                                  Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                                                                                  bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                                                                                  Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                                                                                  The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                                                                                  Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                                                                                  Staffing Analysis

                                                                                                  Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                                                                                  an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                                                                                  bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                                                                                  bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                                                                                  bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                                                                                  bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                                                                                  Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                                                                                  requirements spending approximately $220000 annually to provide ARFF coverage and training

                                                                                                  bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                                                                                  bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                                                                                  bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                                                                                  bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                                                                                  ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                                                                  bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                                                                  bull Most airports similar to or larger than STS have contracted ARFF services

                                                                                                  bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                                                                  Airport Operations Budget 2014

                                                                                                  Enplanement 2014

                                                                                                  Airport Staff

                                                                                                  Contract Fire Fire Contract Cost

                                                                                                  Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                                                                  Request for Feedback bull Long-term Parking

                                                                                                  bull Airport Terminal Improvement Conceptual Plan

                                                                                                  bull FundingFinancing Options

                                                                                                  Future Board Items bull February 9 2016

                                                                                                  bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                                                                  bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                                                                  design services long-term parking lot design services and long-term parking lot construction)

                                                                                                  bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                                                                  integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                                                                  bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                                                                  Charles M Schulz - Sonoma County Airport

                                                                                                  2290 Airport Boulevard

                                                                                                  Santa Rosa CA 95403

                                                                                                  (707) 565-7243

                                                                                                  wwwsono macou ntya irportorg

                                                                                                  Follow STS on (j Facebook

                                                                                                  Im Linkedln

                                                                                                  ~ Twitter

                                                                                                  • Slide Number 1
                                                                                                  • Summary
                                                                                                  • Airport Governance
                                                                                                  • Airport Background
                                                                                                  • Current Organizational Chart
                                                                                                  • Airport Enterprise Fund
                                                                                                  • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                                                                  • Airport Master Plan
                                                                                                  • Airfield Layout PlanLand Useand Boundaries
                                                                                                  • Airport Update
                                                                                                  • Airport Update ndash Fuel (Gallons Sold)
                                                                                                  • Airport Update ndash Parking Revenues
                                                                                                  • Airport Update ndash Rental Cars Revenues
                                                                                                  • Airport Updates ndash Passenger Levels
                                                                                                  • Airport Update - HorizonAlaska Airlines
                                                                                                  • Slide Number 16
                                                                                                  • Fare Comparison for STS and Other Airports in the Region
                                                                                                  • Current Passengers and Growth Potential
                                                                                                  • Airline Industry Overview ndash Potential Markets
                                                                                                  • Airports Used by Sonoma County and Surrounding Area Residents
                                                                                                  • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                                                                  • Airline Industry Overview
                                                                                                  • Slide Number 23
                                                                                                  • Airport Developments
                                                                                                  • Slide Number 25
                                                                                                  • Airfield Layout PlanDevelopable Parcels
                                                                                                  • Capital Project Needs
                                                                                                  • Slide Number 28
                                                                                                  • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                                  • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                                  • Aircraft Rescue and Firefighting Building
                                                                                                  • Aircraft Rescue and Firefighting Building
                                                                                                  • New Long-term Parking Lot
                                                                                                  • Slide Number 34
                                                                                                  • Proposed Terminal Enhancement Project
                                                                                                  • Existing Terminal
                                                                                                  • Terminal Renovation ndash Phases I and II
                                                                                                  • New Holdroom (Phase II) ndash South Elevation
                                                                                                  • New Holdroom InteriorLooking East
                                                                                                  • Flex Space ndash Tent Option ndash View from Airfield
                                                                                                  • Existing Terminal ndash View from Airfield Side
                                                                                                  • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                                                                  • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                                                                  • Future Expansion ndash Estimated 2025
                                                                                                  • Future Expansion ndash Estimated 2050
                                                                                                  • Financial Analysis
                                                                                                  • Slide Number 47
                                                                                                  • Airline Rates amp Charges
                                                                                                  • Slide Number 49
                                                                                                  • Slide Number 50
                                                                                                  • Funding Options
                                                                                                  • Current Airport Debt
                                                                                                  • Funding Options ndash Long-term
                                                                                                  • Staffing Analysis
                                                                                                  • Staffing Report
                                                                                                  • Aircraft Rescue and Firefighting (ARFF) Services
                                                                                                  • ARFF Services at Comparable Airports
                                                                                                  • Request for Feedback
                                                                                                  • Future Board Items
                                                                                                  • Slide Number 60

                                                                                                    Recommended Airline Rates and Charges Terminal ndash Preferential Space Rental ndash assigned (NEW)

                                                                                                    Daily Service $250 per square footper month Non-daily Service $325 per square footper month

                                                                                                    Ticket Counter and Queue rental - unassigned (NEW) Daily Service $028 per Enplaned Passenger Non-daily Service $036 per Enplaned Passenger

                                                                                                    Joint Use Space (NEW) Daily Service $160 per Enplaned Passenger Non-daily Service $208 per Enplaned Passenger

                                                                                                    ldquoPer Turnrdquo Charge (NEW) ldquoPer turnrdquo charges are the sum of applicable non-daily rates and charges including landing fees use of applicable terminal spaces and equipment Calculated on aircraft weight and 90 of the seating capacity

                                                                                                    The proposed fees are anticipated to increase revenues by $250000 annually

                                                                                                    Staff agrees with the consultantrsquos recommended airline rates and charges

                                                                                                    Funding Options

                                                                                                    Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                                                                                    Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                                                                                    Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                                                                                    Funding Needs

                                                                                                    bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                                                                                    bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                                                                                    Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                                                                                    bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                                                                                    Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                                                                                    The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                                                                                    Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                                                                                    Staffing Analysis

                                                                                                    Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                                                                                    an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                                                                                    bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                                                                                    bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                                                                                    bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                                                                                    bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                                                                                    Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                                                                                    requirements spending approximately $220000 annually to provide ARFF coverage and training

                                                                                                    bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                                                                                    bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                                                                                    bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                                                                                    bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                                                                                    ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                                                                    bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                                                                    bull Most airports similar to or larger than STS have contracted ARFF services

                                                                                                    bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                                                                    Airport Operations Budget 2014

                                                                                                    Enplanement 2014

                                                                                                    Airport Staff

                                                                                                    Contract Fire Fire Contract Cost

                                                                                                    Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                                                                    Request for Feedback bull Long-term Parking

                                                                                                    bull Airport Terminal Improvement Conceptual Plan

                                                                                                    bull FundingFinancing Options

                                                                                                    Future Board Items bull February 9 2016

                                                                                                    bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                                                                    bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                                                                    design services long-term parking lot design services and long-term parking lot construction)

                                                                                                    bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                                                                    integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                                                                    bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                                                                    Charles M Schulz - Sonoma County Airport

                                                                                                    2290 Airport Boulevard

                                                                                                    Santa Rosa CA 95403

                                                                                                    (707) 565-7243

                                                                                                    wwwsono macou ntya irportorg

                                                                                                    Follow STS on (j Facebook

                                                                                                    Im Linkedln

                                                                                                    ~ Twitter

                                                                                                    • Slide Number 1
                                                                                                    • Summary
                                                                                                    • Airport Governance
                                                                                                    • Airport Background
                                                                                                    • Current Organizational Chart
                                                                                                    • Airport Enterprise Fund
                                                                                                    • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                                                                    • Airport Master Plan
                                                                                                    • Airfield Layout PlanLand Useand Boundaries
                                                                                                    • Airport Update
                                                                                                    • Airport Update ndash Fuel (Gallons Sold)
                                                                                                    • Airport Update ndash Parking Revenues
                                                                                                    • Airport Update ndash Rental Cars Revenues
                                                                                                    • Airport Updates ndash Passenger Levels
                                                                                                    • Airport Update - HorizonAlaska Airlines
                                                                                                    • Slide Number 16
                                                                                                    • Fare Comparison for STS and Other Airports in the Region
                                                                                                    • Current Passengers and Growth Potential
                                                                                                    • Airline Industry Overview ndash Potential Markets
                                                                                                    • Airports Used by Sonoma County and Surrounding Area Residents
                                                                                                    • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                                                                    • Airline Industry Overview
                                                                                                    • Slide Number 23
                                                                                                    • Airport Developments
                                                                                                    • Slide Number 25
                                                                                                    • Airfield Layout PlanDevelopable Parcels
                                                                                                    • Capital Project Needs
                                                                                                    • Slide Number 28
                                                                                                    • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                                    • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                                    • Aircraft Rescue and Firefighting Building
                                                                                                    • Aircraft Rescue and Firefighting Building
                                                                                                    • New Long-term Parking Lot
                                                                                                    • Slide Number 34
                                                                                                    • Proposed Terminal Enhancement Project
                                                                                                    • Existing Terminal
                                                                                                    • Terminal Renovation ndash Phases I and II
                                                                                                    • New Holdroom (Phase II) ndash South Elevation
                                                                                                    • New Holdroom InteriorLooking East
                                                                                                    • Flex Space ndash Tent Option ndash View from Airfield
                                                                                                    • Existing Terminal ndash View from Airfield Side
                                                                                                    • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                                                                    • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                                                                    • Future Expansion ndash Estimated 2025
                                                                                                    • Future Expansion ndash Estimated 2050
                                                                                                    • Financial Analysis
                                                                                                    • Slide Number 47
                                                                                                    • Airline Rates amp Charges
                                                                                                    • Slide Number 49
                                                                                                    • Slide Number 50
                                                                                                    • Funding Options
                                                                                                    • Current Airport Debt
                                                                                                    • Funding Options ndash Long-term
                                                                                                    • Staffing Analysis
                                                                                                    • Staffing Report
                                                                                                    • Aircraft Rescue and Firefighting (ARFF) Services
                                                                                                    • ARFF Services at Comparable Airports
                                                                                                    • Request for Feedback
                                                                                                    • Future Board Items
                                                                                                    • Slide Number 60

                                                                                                      Funding Options

                                                                                                      Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                                                                                      Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                                                                                      Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                                                                                      Funding Needs

                                                                                                      bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                                                                                      bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                                                                                      Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                                                                                      bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                                                                                      Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                                                                                      The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                                                                                      Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                                                                                      Staffing Analysis

                                                                                                      Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                                                                                      an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                                                                                      bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                                                                                      bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                                                                                      bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                                                                                      bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                                                                                      Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                                                                                      requirements spending approximately $220000 annually to provide ARFF coverage and training

                                                                                                      bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                                                                                      bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                                                                                      bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                                                                                      bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                                                                                      ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                                                                      bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                                                                      bull Most airports similar to or larger than STS have contracted ARFF services

                                                                                                      bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                                                                      Airport Operations Budget 2014

                                                                                                      Enplanement 2014

                                                                                                      Airport Staff

                                                                                                      Contract Fire Fire Contract Cost

                                                                                                      Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                                                                      Request for Feedback bull Long-term Parking

                                                                                                      bull Airport Terminal Improvement Conceptual Plan

                                                                                                      bull FundingFinancing Options

                                                                                                      Future Board Items bull February 9 2016

                                                                                                      bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                                                                      bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                                                                      design services long-term parking lot design services and long-term parking lot construction)

                                                                                                      bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                                                                      integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                                                                      bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                                                                      Charles M Schulz - Sonoma County Airport

                                                                                                      2290 Airport Boulevard

                                                                                                      Santa Rosa CA 95403

                                                                                                      (707) 565-7243

                                                                                                      wwwsono macou ntya irportorg

                                                                                                      Follow STS on (j Facebook

                                                                                                      Im Linkedln

                                                                                                      ~ Twitter

                                                                                                      • Slide Number 1
                                                                                                      • Summary
                                                                                                      • Airport Governance
                                                                                                      • Airport Background
                                                                                                      • Current Organizational Chart
                                                                                                      • Airport Enterprise Fund
                                                                                                      • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                                                                      • Airport Master Plan
                                                                                                      • Airfield Layout PlanLand Useand Boundaries
                                                                                                      • Airport Update
                                                                                                      • Airport Update ndash Fuel (Gallons Sold)
                                                                                                      • Airport Update ndash Parking Revenues
                                                                                                      • Airport Update ndash Rental Cars Revenues
                                                                                                      • Airport Updates ndash Passenger Levels
                                                                                                      • Airport Update - HorizonAlaska Airlines
                                                                                                      • Slide Number 16
                                                                                                      • Fare Comparison for STS and Other Airports in the Region
                                                                                                      • Current Passengers and Growth Potential
                                                                                                      • Airline Industry Overview ndash Potential Markets
                                                                                                      • Airports Used by Sonoma County and Surrounding Area Residents
                                                                                                      • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                                                                      • Airline Industry Overview
                                                                                                      • Slide Number 23
                                                                                                      • Airport Developments
                                                                                                      • Slide Number 25
                                                                                                      • Airfield Layout PlanDevelopable Parcels
                                                                                                      • Capital Project Needs
                                                                                                      • Slide Number 28
                                                                                                      • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                                      • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                                      • Aircraft Rescue and Firefighting Building
                                                                                                      • Aircraft Rescue and Firefighting Building
                                                                                                      • New Long-term Parking Lot
                                                                                                      • Slide Number 34
                                                                                                      • Proposed Terminal Enhancement Project
                                                                                                      • Existing Terminal
                                                                                                      • Terminal Renovation ndash Phases I and II
                                                                                                      • New Holdroom (Phase II) ndash South Elevation
                                                                                                      • New Holdroom InteriorLooking East
                                                                                                      • Flex Space ndash Tent Option ndash View from Airfield
                                                                                                      • Existing Terminal ndash View from Airfield Side
                                                                                                      • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                                                                      • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                                                                      • Future Expansion ndash Estimated 2025
                                                                                                      • Future Expansion ndash Estimated 2050
                                                                                                      • Financial Analysis
                                                                                                      • Slide Number 47
                                                                                                      • Airline Rates amp Charges
                                                                                                      • Slide Number 49
                                                                                                      • Slide Number 50
                                                                                                      • Funding Options
                                                                                                      • Current Airport Debt
                                                                                                      • Funding Options ndash Long-term
                                                                                                      • Staffing Analysis
                                                                                                      • Staffing Report
                                                                                                      • Aircraft Rescue and Firefighting (ARFF) Services
                                                                                                      • ARFF Services at Comparable Airports
                                                                                                      • Request for Feedback
                                                                                                      • Future Board Items
                                                                                                      • Slide Number 60

                                                                                                        Current Airport Debt Maturity 2016 2016 2017 2018 2019 2020 2021

                                                                                                        Airport Debt Summary Date Balance Payment Payment Payment Payment Payment Payment GAN ndash RSA Mar-16 1000000 14000 Hangar Construction Jun-16 109527 109527 Treasury Note ndash Apron Jul-16 2000000 28000 28000 GAN - RSA Mitigation Sep-17 3500000 49000 49000 Hangar Construction Jan-18 266693 122268 122268 30012 GAN - RSA II Apr-18 3000000 40000 40000 40000 Building Acquisition May-20 618809 147009 147009 147009 147009 59135 Runway Extension May-29 4359747 406935 406935 406935 406935 406935 406935 Total Annual Payment 916739 793212 623956 553944 466070 406935 Interest only payments Principal paid by grant funds

                                                                                                        Total debt service costs will decrease by $362795 in 2019 and by $509804 in 2021

                                                                                                        Funding Needs

                                                                                                        bull $10 -14 million in long-term debt is needed for both the terminal and parking lot projects

                                                                                                        bull The Airport is not able to absorb new debt payments until 2019 and will need either financial assistance or interim short-term financing (treasury notes)

                                                                                                        Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                                                                                        bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                                                                                        Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                                                                                        The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                                                                                        Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                                                                                        Staffing Analysis

                                                                                                        Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                                                                                        an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                                                                                        bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                                                                                        bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                                                                                        bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                                                                                        bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                                                                                        Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                                                                                        requirements spending approximately $220000 annually to provide ARFF coverage and training

                                                                                                        bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                                                                                        bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                                                                                        bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                                                                                        bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                                                                                        ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                                                                        bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                                                                        bull Most airports similar to or larger than STS have contracted ARFF services

                                                                                                        bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                                                                        Airport Operations Budget 2014

                                                                                                        Enplanement 2014

                                                                                                        Airport Staff

                                                                                                        Contract Fire Fire Contract Cost

                                                                                                        Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                                                                        Request for Feedback bull Long-term Parking

                                                                                                        bull Airport Terminal Improvement Conceptual Plan

                                                                                                        bull FundingFinancing Options

                                                                                                        Future Board Items bull February 9 2016

                                                                                                        bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                                                                        bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                                                                        design services long-term parking lot design services and long-term parking lot construction)

                                                                                                        bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                                                                        integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                                                                        bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                                                                        Charles M Schulz - Sonoma County Airport

                                                                                                        2290 Airport Boulevard

                                                                                                        Santa Rosa CA 95403

                                                                                                        (707) 565-7243

                                                                                                        wwwsono macou ntya irportorg

                                                                                                        Follow STS on (j Facebook

                                                                                                        Im Linkedln

                                                                                                        ~ Twitter

                                                                                                        • Slide Number 1
                                                                                                        • Summary
                                                                                                        • Airport Governance
                                                                                                        • Airport Background
                                                                                                        • Current Organizational Chart
                                                                                                        • Airport Enterprise Fund
                                                                                                        • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                                                                        • Airport Master Plan
                                                                                                        • Airfield Layout PlanLand Useand Boundaries
                                                                                                        • Airport Update
                                                                                                        • Airport Update ndash Fuel (Gallons Sold)
                                                                                                        • Airport Update ndash Parking Revenues
                                                                                                        • Airport Update ndash Rental Cars Revenues
                                                                                                        • Airport Updates ndash Passenger Levels
                                                                                                        • Airport Update - HorizonAlaska Airlines
                                                                                                        • Slide Number 16
                                                                                                        • Fare Comparison for STS and Other Airports in the Region
                                                                                                        • Current Passengers and Growth Potential
                                                                                                        • Airline Industry Overview ndash Potential Markets
                                                                                                        • Airports Used by Sonoma County and Surrounding Area Residents
                                                                                                        • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                                                                        • Airline Industry Overview
                                                                                                        • Slide Number 23
                                                                                                        • Airport Developments
                                                                                                        • Slide Number 25
                                                                                                        • Airfield Layout PlanDevelopable Parcels
                                                                                                        • Capital Project Needs
                                                                                                        • Slide Number 28
                                                                                                        • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                                        • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                                        • Aircraft Rescue and Firefighting Building
                                                                                                        • Aircraft Rescue and Firefighting Building
                                                                                                        • New Long-term Parking Lot
                                                                                                        • Slide Number 34
                                                                                                        • Proposed Terminal Enhancement Project
                                                                                                        • Existing Terminal
                                                                                                        • Terminal Renovation ndash Phases I and II
                                                                                                        • New Holdroom (Phase II) ndash South Elevation
                                                                                                        • New Holdroom InteriorLooking East
                                                                                                        • Flex Space ndash Tent Option ndash View from Airfield
                                                                                                        • Existing Terminal ndash View from Airfield Side
                                                                                                        • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                                                                        • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                                                                        • Future Expansion ndash Estimated 2025
                                                                                                        • Future Expansion ndash Estimated 2050
                                                                                                        • Financial Analysis
                                                                                                        • Slide Number 47
                                                                                                        • Airline Rates amp Charges
                                                                                                        • Slide Number 49
                                                                                                        • Slide Number 50
                                                                                                        • Funding Options
                                                                                                        • Current Airport Debt
                                                                                                        • Funding Options ndash Long-term
                                                                                                        • Staffing Analysis
                                                                                                        • Staffing Report
                                                                                                        • Aircraft Rescue and Firefighting (ARFF) Services
                                                                                                        • ARFF Services at Comparable Airports
                                                                                                        • Request for Feedback
                                                                                                        • Future Board Items
                                                                                                        • Slide Number 60

                                                                                                          Funding Options ndash Long-term In working with Auditor Controller Treasurer Tax Collector (ACTTC) staff and their consultant KNN Public Finance (KNN) the Airport has explored several options for funding

                                                                                                          bull Department of Transportation ndash Local Airport Loan Program bull The California Economic and Infrastructure Development Bank (IBank)

                                                                                                          Infrastructure State Revolving Fund (ISRF) Program bull Airport Revenue Bonds bull County investment in the future (General Fund Contribution) bull A variable rate loan bull A conventional fixed rate loan ndash staff recommended option

                                                                                                          The KNN report identified the most viable option for funding is a conventional fixed rate loan using the Countyrsquos credit

                                                                                                          Staff is recommending this option and requests direction from the Board to allow further analysis on this option The Airport will return to the Board with final recommendations for both short-term and long-term funding solutions

                                                                                                          Staffing Analysis

                                                                                                          Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                                                                                          an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                                                                                          bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                                                                                          bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                                                                                          bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                                                                                          bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                                                                                          Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                                                                                          requirements spending approximately $220000 annually to provide ARFF coverage and training

                                                                                                          bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                                                                                          bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                                                                                          bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                                                                                          bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                                                                                          ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                                                                          bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                                                                          bull Most airports similar to or larger than STS have contracted ARFF services

                                                                                                          bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                                                                          Airport Operations Budget 2014

                                                                                                          Enplanement 2014

                                                                                                          Airport Staff

                                                                                                          Contract Fire Fire Contract Cost

                                                                                                          Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                                                                          Request for Feedback bull Long-term Parking

                                                                                                          bull Airport Terminal Improvement Conceptual Plan

                                                                                                          bull FundingFinancing Options

                                                                                                          Future Board Items bull February 9 2016

                                                                                                          bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                                                                          bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                                                                          design services long-term parking lot design services and long-term parking lot construction)

                                                                                                          bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                                                                          integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                                                                          bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                                                                          Charles M Schulz - Sonoma County Airport

                                                                                                          2290 Airport Boulevard

                                                                                                          Santa Rosa CA 95403

                                                                                                          (707) 565-7243

                                                                                                          wwwsono macou ntya irportorg

                                                                                                          Follow STS on (j Facebook

                                                                                                          Im Linkedln

                                                                                                          ~ Twitter

                                                                                                          • Slide Number 1
                                                                                                          • Summary
                                                                                                          • Airport Governance
                                                                                                          • Airport Background
                                                                                                          • Current Organizational Chart
                                                                                                          • Airport Enterprise Fund
                                                                                                          • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                                                                          • Airport Master Plan
                                                                                                          • Airfield Layout PlanLand Useand Boundaries
                                                                                                          • Airport Update
                                                                                                          • Airport Update ndash Fuel (Gallons Sold)
                                                                                                          • Airport Update ndash Parking Revenues
                                                                                                          • Airport Update ndash Rental Cars Revenues
                                                                                                          • Airport Updates ndash Passenger Levels
                                                                                                          • Airport Update - HorizonAlaska Airlines
                                                                                                          • Slide Number 16
                                                                                                          • Fare Comparison for STS and Other Airports in the Region
                                                                                                          • Current Passengers and Growth Potential
                                                                                                          • Airline Industry Overview ndash Potential Markets
                                                                                                          • Airports Used by Sonoma County and Surrounding Area Residents
                                                                                                          • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                                                                          • Airline Industry Overview
                                                                                                          • Slide Number 23
                                                                                                          • Airport Developments
                                                                                                          • Slide Number 25
                                                                                                          • Airfield Layout PlanDevelopable Parcels
                                                                                                          • Capital Project Needs
                                                                                                          • Slide Number 28
                                                                                                          • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                                          • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                                          • Aircraft Rescue and Firefighting Building
                                                                                                          • Aircraft Rescue and Firefighting Building
                                                                                                          • New Long-term Parking Lot
                                                                                                          • Slide Number 34
                                                                                                          • Proposed Terminal Enhancement Project
                                                                                                          • Existing Terminal
                                                                                                          • Terminal Renovation ndash Phases I and II
                                                                                                          • New Holdroom (Phase II) ndash South Elevation
                                                                                                          • New Holdroom InteriorLooking East
                                                                                                          • Flex Space ndash Tent Option ndash View from Airfield
                                                                                                          • Existing Terminal ndash View from Airfield Side
                                                                                                          • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                                                                          • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                                                                          • Future Expansion ndash Estimated 2025
                                                                                                          • Future Expansion ndash Estimated 2050
                                                                                                          • Financial Analysis
                                                                                                          • Slide Number 47
                                                                                                          • Airline Rates amp Charges
                                                                                                          • Slide Number 49
                                                                                                          • Slide Number 50
                                                                                                          • Funding Options
                                                                                                          • Current Airport Debt
                                                                                                          • Funding Options ndash Long-term
                                                                                                          • Staffing Analysis
                                                                                                          • Staffing Report
                                                                                                          • Aircraft Rescue and Firefighting (ARFF) Services
                                                                                                          • ARFF Services at Comparable Airports
                                                                                                          • Request for Feedback
                                                                                                          • Future Board Items
                                                                                                          • Slide Number 60

                                                                                                            Staffing Analysis

                                                                                                            Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                                                                                            an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                                                                                            bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                                                                                            bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                                                                                            bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                                                                                            bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                                                                                            Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                                                                                            requirements spending approximately $220000 annually to provide ARFF coverage and training

                                                                                                            bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                                                                                            bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                                                                                            bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                                                                                            bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                                                                                            ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                                                                            bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                                                                            bull Most airports similar to or larger than STS have contracted ARFF services

                                                                                                            bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                                                                            Airport Operations Budget 2014

                                                                                                            Enplanement 2014

                                                                                                            Airport Staff

                                                                                                            Contract Fire Fire Contract Cost

                                                                                                            Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                                                                            Request for Feedback bull Long-term Parking

                                                                                                            bull Airport Terminal Improvement Conceptual Plan

                                                                                                            bull FundingFinancing Options

                                                                                                            Future Board Items bull February 9 2016

                                                                                                            bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                                                                            bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                                                                            design services long-term parking lot design services and long-term parking lot construction)

                                                                                                            bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                                                                            integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                                                                            bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                                                                            Charles M Schulz - Sonoma County Airport

                                                                                                            2290 Airport Boulevard

                                                                                                            Santa Rosa CA 95403

                                                                                                            (707) 565-7243

                                                                                                            wwwsono macou ntya irportorg

                                                                                                            Follow STS on (j Facebook

                                                                                                            Im Linkedln

                                                                                                            ~ Twitter

                                                                                                            • Slide Number 1
                                                                                                            • Summary
                                                                                                            • Airport Governance
                                                                                                            • Airport Background
                                                                                                            • Current Organizational Chart
                                                                                                            • Airport Enterprise Fund
                                                                                                            • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                                                                            • Airport Master Plan
                                                                                                            • Airfield Layout PlanLand Useand Boundaries
                                                                                                            • Airport Update
                                                                                                            • Airport Update ndash Fuel (Gallons Sold)
                                                                                                            • Airport Update ndash Parking Revenues
                                                                                                            • Airport Update ndash Rental Cars Revenues
                                                                                                            • Airport Updates ndash Passenger Levels
                                                                                                            • Airport Update - HorizonAlaska Airlines
                                                                                                            • Slide Number 16
                                                                                                            • Fare Comparison for STS and Other Airports in the Region
                                                                                                            • Current Passengers and Growth Potential
                                                                                                            • Airline Industry Overview ndash Potential Markets
                                                                                                            • Airports Used by Sonoma County and Surrounding Area Residents
                                                                                                            • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                                                                            • Airline Industry Overview
                                                                                                            • Slide Number 23
                                                                                                            • Airport Developments
                                                                                                            • Slide Number 25
                                                                                                            • Airfield Layout PlanDevelopable Parcels
                                                                                                            • Capital Project Needs
                                                                                                            • Slide Number 28
                                                                                                            • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                                            • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                                            • Aircraft Rescue and Firefighting Building
                                                                                                            • Aircraft Rescue and Firefighting Building
                                                                                                            • New Long-term Parking Lot
                                                                                                            • Slide Number 34
                                                                                                            • Proposed Terminal Enhancement Project
                                                                                                            • Existing Terminal
                                                                                                            • Terminal Renovation ndash Phases I and II
                                                                                                            • New Holdroom (Phase II) ndash South Elevation
                                                                                                            • New Holdroom InteriorLooking East
                                                                                                            • Flex Space ndash Tent Option ndash View from Airfield
                                                                                                            • Existing Terminal ndash View from Airfield Side
                                                                                                            • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                                                                            • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                                                                            • Future Expansion ndash Estimated 2025
                                                                                                            • Future Expansion ndash Estimated 2050
                                                                                                            • Financial Analysis
                                                                                                            • Slide Number 47
                                                                                                            • Airline Rates amp Charges
                                                                                                            • Slide Number 49
                                                                                                            • Slide Number 50
                                                                                                            • Funding Options
                                                                                                            • Current Airport Debt
                                                                                                            • Funding Options ndash Long-term
                                                                                                            • Staffing Analysis
                                                                                                            • Staffing Report
                                                                                                            • Aircraft Rescue and Firefighting (ARFF) Services
                                                                                                            • ARFF Services at Comparable Airports
                                                                                                            • Request for Feedback
                                                                                                            • Future Board Items
                                                                                                            • Slide Number 60

                                                                                                              Staffing Report bull The Airport working with the Human Resources Department (HR) conducted

                                                                                                              an assessment of staffing for current needs and forecasted Airport growth over the next five years

                                                                                                              bull This assessment identified the need for four additional positions in the short-term and more staff positions in the long-term The specific job classifications still need to be coordinated with HR

                                                                                                              bull The Airport will address the recommended short-term staffing changes as part of the budgetary process and as funding allows

                                                                                                              bull ARFF coverage is currently provided by the Airport Operations staff who meet the FAA training requirement for those duties

                                                                                                              bull Future information gathered regarding contracting ARFF services will assist with the needs assessment for long-term staffing If ARFF services are contracted fewer dedicated Airport staff will be needed

                                                                                                              Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                                                                                              requirements spending approximately $220000 annually to provide ARFF coverage and training

                                                                                                              bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                                                                                              bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                                                                                              bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                                                                                              bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                                                                                              ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                                                                              bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                                                                              bull Most airports similar to or larger than STS have contracted ARFF services

                                                                                                              bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                                                                              Airport Operations Budget 2014

                                                                                                              Enplanement 2014

                                                                                                              Airport Staff

                                                                                                              Contract Fire Fire Contract Cost

                                                                                                              Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                                                                              Request for Feedback bull Long-term Parking

                                                                                                              bull Airport Terminal Improvement Conceptual Plan

                                                                                                              bull FundingFinancing Options

                                                                                                              Future Board Items bull February 9 2016

                                                                                                              bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                                                                              bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                                                                              design services long-term parking lot design services and long-term parking lot construction)

                                                                                                              bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                                                                              integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                                                                              bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                                                                              Charles M Schulz - Sonoma County Airport

                                                                                                              2290 Airport Boulevard

                                                                                                              Santa Rosa CA 95403

                                                                                                              (707) 565-7243

                                                                                                              wwwsono macou ntya irportorg

                                                                                                              Follow STS on (j Facebook

                                                                                                              Im Linkedln

                                                                                                              ~ Twitter

                                                                                                              • Slide Number 1
                                                                                                              • Summary
                                                                                                              • Airport Governance
                                                                                                              • Airport Background
                                                                                                              • Current Organizational Chart
                                                                                                              • Airport Enterprise Fund
                                                                                                              • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                                                                              • Airport Master Plan
                                                                                                              • Airfield Layout PlanLand Useand Boundaries
                                                                                                              • Airport Update
                                                                                                              • Airport Update ndash Fuel (Gallons Sold)
                                                                                                              • Airport Update ndash Parking Revenues
                                                                                                              • Airport Update ndash Rental Cars Revenues
                                                                                                              • Airport Updates ndash Passenger Levels
                                                                                                              • Airport Update - HorizonAlaska Airlines
                                                                                                              • Slide Number 16
                                                                                                              • Fare Comparison for STS and Other Airports in the Region
                                                                                                              • Current Passengers and Growth Potential
                                                                                                              • Airline Industry Overview ndash Potential Markets
                                                                                                              • Airports Used by Sonoma County and Surrounding Area Residents
                                                                                                              • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                                                                              • Airline Industry Overview
                                                                                                              • Slide Number 23
                                                                                                              • Airport Developments
                                                                                                              • Slide Number 25
                                                                                                              • Airfield Layout PlanDevelopable Parcels
                                                                                                              • Capital Project Needs
                                                                                                              • Slide Number 28
                                                                                                              • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                                              • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                                              • Aircraft Rescue and Firefighting Building
                                                                                                              • Aircraft Rescue and Firefighting Building
                                                                                                              • New Long-term Parking Lot
                                                                                                              • Slide Number 34
                                                                                                              • Proposed Terminal Enhancement Project
                                                                                                              • Existing Terminal
                                                                                                              • Terminal Renovation ndash Phases I and II
                                                                                                              • New Holdroom (Phase II) ndash South Elevation
                                                                                                              • New Holdroom InteriorLooking East
                                                                                                              • Flex Space ndash Tent Option ndash View from Airfield
                                                                                                              • Existing Terminal ndash View from Airfield Side
                                                                                                              • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                                                                              • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                                                                              • Future Expansion ndash Estimated 2025
                                                                                                              • Future Expansion ndash Estimated 2050
                                                                                                              • Financial Analysis
                                                                                                              • Slide Number 47
                                                                                                              • Airline Rates amp Charges
                                                                                                              • Slide Number 49
                                                                                                              • Slide Number 50
                                                                                                              • Funding Options
                                                                                                              • Current Airport Debt
                                                                                                              • Funding Options ndash Long-term
                                                                                                              • Staffing Analysis
                                                                                                              • Staffing Report
                                                                                                              • Aircraft Rescue and Firefighting (ARFF) Services
                                                                                                              • ARFF Services at Comparable Airports
                                                                                                              • Request for Feedback
                                                                                                              • Future Board Items
                                                                                                              • Slide Number 60

                                                                                                                Aircraft Rescue and Firefighting (ARFF) Services bull Airport staff dedicates 825 hours per day to meet FAA and TSA stand-by

                                                                                                                requirements spending approximately $220000 annually to provide ARFF coverage and training

                                                                                                                bull There are four different alert levels Alert 1 is a ldquostandbyrdquo only alert - majority of alerts Alert 2 involves small aircraft Alert 3 involves large aircraft Alert 4 miscellaneous category

                                                                                                                bull The Airport averaged two alerts per month over the last six years (with one alert 3 over this period)

                                                                                                                bull Two informal estimates were obtained for contracted ARFF services for $600000 and $12 million per year

                                                                                                                bull A Request for Information will be released in early 2016 and information brought to the Board for direction during preparation of the FY 17-18 budget

                                                                                                                ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                                                                                bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                                                                                bull Most airports similar to or larger than STS have contracted ARFF services

                                                                                                                bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                                                                                Airport Operations Budget 2014

                                                                                                                Enplanement 2014

                                                                                                                Airport Staff

                                                                                                                Contract Fire Fire Contract Cost

                                                                                                                Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                                                                                Request for Feedback bull Long-term Parking

                                                                                                                bull Airport Terminal Improvement Conceptual Plan

                                                                                                                bull FundingFinancing Options

                                                                                                                Future Board Items bull February 9 2016

                                                                                                                bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                                                                                bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                                                                                design services long-term parking lot design services and long-term parking lot construction)

                                                                                                                bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                                                                                integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                                                                                bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                                                                                Charles M Schulz - Sonoma County Airport

                                                                                                                2290 Airport Boulevard

                                                                                                                Santa Rosa CA 95403

                                                                                                                (707) 565-7243

                                                                                                                wwwsono macou ntya irportorg

                                                                                                                Follow STS on (j Facebook

                                                                                                                Im Linkedln

                                                                                                                ~ Twitter

                                                                                                                • Slide Number 1
                                                                                                                • Summary
                                                                                                                • Airport Governance
                                                                                                                • Airport Background
                                                                                                                • Current Organizational Chart
                                                                                                                • Airport Enterprise Fund
                                                                                                                • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                                                                                • Airport Master Plan
                                                                                                                • Airfield Layout PlanLand Useand Boundaries
                                                                                                                • Airport Update
                                                                                                                • Airport Update ndash Fuel (Gallons Sold)
                                                                                                                • Airport Update ndash Parking Revenues
                                                                                                                • Airport Update ndash Rental Cars Revenues
                                                                                                                • Airport Updates ndash Passenger Levels
                                                                                                                • Airport Update - HorizonAlaska Airlines
                                                                                                                • Slide Number 16
                                                                                                                • Fare Comparison for STS and Other Airports in the Region
                                                                                                                • Current Passengers and Growth Potential
                                                                                                                • Airline Industry Overview ndash Potential Markets
                                                                                                                • Airports Used by Sonoma County and Surrounding Area Residents
                                                                                                                • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                                                                                • Airline Industry Overview
                                                                                                                • Slide Number 23
                                                                                                                • Airport Developments
                                                                                                                • Slide Number 25
                                                                                                                • Airfield Layout PlanDevelopable Parcels
                                                                                                                • Capital Project Needs
                                                                                                                • Slide Number 28
                                                                                                                • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                                                • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                                                • Aircraft Rescue and Firefighting Building
                                                                                                                • Aircraft Rescue and Firefighting Building
                                                                                                                • New Long-term Parking Lot
                                                                                                                • Slide Number 34
                                                                                                                • Proposed Terminal Enhancement Project
                                                                                                                • Existing Terminal
                                                                                                                • Terminal Renovation ndash Phases I and II
                                                                                                                • New Holdroom (Phase II) ndash South Elevation
                                                                                                                • New Holdroom InteriorLooking East
                                                                                                                • Flex Space ndash Tent Option ndash View from Airfield
                                                                                                                • Existing Terminal ndash View from Airfield Side
                                                                                                                • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                                                                                • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                                                                                • Future Expansion ndash Estimated 2025
                                                                                                                • Future Expansion ndash Estimated 2050
                                                                                                                • Financial Analysis
                                                                                                                • Slide Number 47
                                                                                                                • Airline Rates amp Charges
                                                                                                                • Slide Number 49
                                                                                                                • Slide Number 50
                                                                                                                • Funding Options
                                                                                                                • Current Airport Debt
                                                                                                                • Funding Options ndash Long-term
                                                                                                                • Staffing Analysis
                                                                                                                • Staffing Report
                                                                                                                • Aircraft Rescue and Firefighting (ARFF) Services
                                                                                                                • ARFF Services at Comparable Airports
                                                                                                                • Request for Feedback
                                                                                                                • Future Board Items
                                                                                                                • Slide Number 60

                                                                                                                  ARFF Services at Comparable Airports Airport staff researched comparable California airports on ARFF coverage

                                                                                                                  bull Determined each airport handled and covered costs for ARFF in a manner most fitting for their circumstances

                                                                                                                  bull Most airports similar to or larger than STS have contracted ARFF services

                                                                                                                  bull Contract ARFF services can be provided by private contractors local governments local fire district or Cal-Fire

                                                                                                                  Airport Operations Budget 2014

                                                                                                                  Enplanement 2014

                                                                                                                  Airport Staff

                                                                                                                  Contract Fire Fire Contract Cost

                                                                                                                  Monterey $7700000 205000 380 Contracted $1200000 Bakersfield $9000000 143200 210 Contracted Equip cost only San Luis Obispo $4055000 140000 140 Contracted $600000 Sonoma County $4471144 120000 140 In-house $0 Stockton $3497000 71800 120 Contracted $170000 Arcata $5500000 56700 120 In-house $0 Santa Maria $4183000 51400 120 Contracted $634000 Redding $2861000 24900 90 Contracted Equip cost only

                                                                                                                  Request for Feedback bull Long-term Parking

                                                                                                                  bull Airport Terminal Improvement Conceptual Plan

                                                                                                                  bull FundingFinancing Options

                                                                                                                  Future Board Items bull February 9 2016

                                                                                                                  bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                                                                                  bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                                                                                  design services long-term parking lot design services and long-term parking lot construction)

                                                                                                                  bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                                                                                  integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                                                                                  bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                                                                                  Charles M Schulz - Sonoma County Airport

                                                                                                                  2290 Airport Boulevard

                                                                                                                  Santa Rosa CA 95403

                                                                                                                  (707) 565-7243

                                                                                                                  wwwsono macou ntya irportorg

                                                                                                                  Follow STS on (j Facebook

                                                                                                                  Im Linkedln

                                                                                                                  ~ Twitter

                                                                                                                  • Slide Number 1
                                                                                                                  • Summary
                                                                                                                  • Airport Governance
                                                                                                                  • Airport Background
                                                                                                                  • Current Organizational Chart
                                                                                                                  • Airport Enterprise Fund
                                                                                                                  • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                                                                                  • Airport Master Plan
                                                                                                                  • Airfield Layout PlanLand Useand Boundaries
                                                                                                                  • Airport Update
                                                                                                                  • Airport Update ndash Fuel (Gallons Sold)
                                                                                                                  • Airport Update ndash Parking Revenues
                                                                                                                  • Airport Update ndash Rental Cars Revenues
                                                                                                                  • Airport Updates ndash Passenger Levels
                                                                                                                  • Airport Update - HorizonAlaska Airlines
                                                                                                                  • Slide Number 16
                                                                                                                  • Fare Comparison for STS and Other Airports in the Region
                                                                                                                  • Current Passengers and Growth Potential
                                                                                                                  • Airline Industry Overview ndash Potential Markets
                                                                                                                  • Airports Used by Sonoma County and Surrounding Area Residents
                                                                                                                  • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                                                                                  • Airline Industry Overview
                                                                                                                  • Slide Number 23
                                                                                                                  • Airport Developments
                                                                                                                  • Slide Number 25
                                                                                                                  • Airfield Layout PlanDevelopable Parcels
                                                                                                                  • Capital Project Needs
                                                                                                                  • Slide Number 28
                                                                                                                  • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                                                  • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                                                  • Aircraft Rescue and Firefighting Building
                                                                                                                  • Aircraft Rescue and Firefighting Building
                                                                                                                  • New Long-term Parking Lot
                                                                                                                  • Slide Number 34
                                                                                                                  • Proposed Terminal Enhancement Project
                                                                                                                  • Existing Terminal
                                                                                                                  • Terminal Renovation ndash Phases I and II
                                                                                                                  • New Holdroom (Phase II) ndash South Elevation
                                                                                                                  • New Holdroom InteriorLooking East
                                                                                                                  • Flex Space ndash Tent Option ndash View from Airfield
                                                                                                                  • Existing Terminal ndash View from Airfield Side
                                                                                                                  • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                                                                                  • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                                                                                  • Future Expansion ndash Estimated 2025
                                                                                                                  • Future Expansion ndash Estimated 2050
                                                                                                                  • Financial Analysis
                                                                                                                  • Slide Number 47
                                                                                                                  • Airline Rates amp Charges
                                                                                                                  • Slide Number 49
                                                                                                                  • Slide Number 50
                                                                                                                  • Funding Options
                                                                                                                  • Current Airport Debt
                                                                                                                  • Funding Options ndash Long-term
                                                                                                                  • Staffing Analysis
                                                                                                                  • Staffing Report
                                                                                                                  • Aircraft Rescue and Firefighting (ARFF) Services
                                                                                                                  • ARFF Services at Comparable Airports
                                                                                                                  • Request for Feedback
                                                                                                                  • Future Board Items
                                                                                                                  • Slide Number 60

                                                                                                                    Request for Feedback bull Long-term Parking

                                                                                                                    bull Airport Terminal Improvement Conceptual Plan

                                                                                                                    bull FundingFinancing Options

                                                                                                                    Future Board Items bull February 9 2016

                                                                                                                    bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                                                                                    bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                                                                                    design services long-term parking lot design services and long-term parking lot construction)

                                                                                                                    bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                                                                                    integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                                                                                    bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                                                                                    Charles M Schulz - Sonoma County Airport

                                                                                                                    2290 Airport Boulevard

                                                                                                                    Santa Rosa CA 95403

                                                                                                                    (707) 565-7243

                                                                                                                    wwwsono macou ntya irportorg

                                                                                                                    Follow STS on (j Facebook

                                                                                                                    Im Linkedln

                                                                                                                    ~ Twitter

                                                                                                                    • Slide Number 1
                                                                                                                    • Summary
                                                                                                                    • Airport Governance
                                                                                                                    • Airport Background
                                                                                                                    • Current Organizational Chart
                                                                                                                    • Airport Enterprise Fund
                                                                                                                    • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                                                                                    • Airport Master Plan
                                                                                                                    • Airfield Layout PlanLand Useand Boundaries
                                                                                                                    • Airport Update
                                                                                                                    • Airport Update ndash Fuel (Gallons Sold)
                                                                                                                    • Airport Update ndash Parking Revenues
                                                                                                                    • Airport Update ndash Rental Cars Revenues
                                                                                                                    • Airport Updates ndash Passenger Levels
                                                                                                                    • Airport Update - HorizonAlaska Airlines
                                                                                                                    • Slide Number 16
                                                                                                                    • Fare Comparison for STS and Other Airports in the Region
                                                                                                                    • Current Passengers and Growth Potential
                                                                                                                    • Airline Industry Overview ndash Potential Markets
                                                                                                                    • Airports Used by Sonoma County and Surrounding Area Residents
                                                                                                                    • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                                                                                    • Airline Industry Overview
                                                                                                                    • Slide Number 23
                                                                                                                    • Airport Developments
                                                                                                                    • Slide Number 25
                                                                                                                    • Airfield Layout PlanDevelopable Parcels
                                                                                                                    • Capital Project Needs
                                                                                                                    • Slide Number 28
                                                                                                                    • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                                                    • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                                                    • Aircraft Rescue and Firefighting Building
                                                                                                                    • Aircraft Rescue and Firefighting Building
                                                                                                                    • New Long-term Parking Lot
                                                                                                                    • Slide Number 34
                                                                                                                    • Proposed Terminal Enhancement Project
                                                                                                                    • Existing Terminal
                                                                                                                    • Terminal Renovation ndash Phases I and II
                                                                                                                    • New Holdroom (Phase II) ndash South Elevation
                                                                                                                    • New Holdroom InteriorLooking East
                                                                                                                    • Flex Space ndash Tent Option ndash View from Airfield
                                                                                                                    • Existing Terminal ndash View from Airfield Side
                                                                                                                    • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                                                                                    • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                                                                                    • Future Expansion ndash Estimated 2025
                                                                                                                    • Future Expansion ndash Estimated 2050
                                                                                                                    • Financial Analysis
                                                                                                                    • Slide Number 47
                                                                                                                    • Airline Rates amp Charges
                                                                                                                    • Slide Number 49
                                                                                                                    • Slide Number 50
                                                                                                                    • Funding Options
                                                                                                                    • Current Airport Debt
                                                                                                                    • Funding Options ndash Long-term
                                                                                                                    • Staffing Analysis
                                                                                                                    • Staffing Report
                                                                                                                    • Aircraft Rescue and Firefighting (ARFF) Services
                                                                                                                    • ARFF Services at Comparable Airports
                                                                                                                    • Request for Feedback
                                                                                                                    • Future Board Items
                                                                                                                    • Slide Number 60

                                                                                                                      Future Board Items bull February 9 2016

                                                                                                                      bull Fee Hearing and Airline Rates and Charges adoption bull Engineering Services Master Agreement

                                                                                                                      bull Spring 2016 bull Parking Lot Design Services Agreement bull Task Order for Terminal Design Services bull Interim Funding Agreements (Short-term funding options for terminal

                                                                                                                      design services long-term parking lot design services and long-term parking lot construction)

                                                                                                                      bull Master Agreement for Construction Management Services bull Contract Amendment with Electronic Innovations for design assistance and

                                                                                                                      integration for security systems in the proposed terminal space bull Alaska Airlines new Airline Operating Agreement

                                                                                                                      bull Fall 2016 bull Long-term Debt Solution bull Terminal Construction Contract

                                                                                                                      Charles M Schulz - Sonoma County Airport

                                                                                                                      2290 Airport Boulevard

                                                                                                                      Santa Rosa CA 95403

                                                                                                                      (707) 565-7243

                                                                                                                      wwwsono macou ntya irportorg

                                                                                                                      Follow STS on (j Facebook

                                                                                                                      Im Linkedln

                                                                                                                      ~ Twitter

                                                                                                                      • Slide Number 1
                                                                                                                      • Summary
                                                                                                                      • Airport Governance
                                                                                                                      • Airport Background
                                                                                                                      • Current Organizational Chart
                                                                                                                      • Airport Enterprise Fund
                                                                                                                      • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                                                                                      • Airport Master Plan
                                                                                                                      • Airfield Layout PlanLand Useand Boundaries
                                                                                                                      • Airport Update
                                                                                                                      • Airport Update ndash Fuel (Gallons Sold)
                                                                                                                      • Airport Update ndash Parking Revenues
                                                                                                                      • Airport Update ndash Rental Cars Revenues
                                                                                                                      • Airport Updates ndash Passenger Levels
                                                                                                                      • Airport Update - HorizonAlaska Airlines
                                                                                                                      • Slide Number 16
                                                                                                                      • Fare Comparison for STS and Other Airports in the Region
                                                                                                                      • Current Passengers and Growth Potential
                                                                                                                      • Airline Industry Overview ndash Potential Markets
                                                                                                                      • Airports Used by Sonoma County and Surrounding Area Residents
                                                                                                                      • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                                                                                      • Airline Industry Overview
                                                                                                                      • Slide Number 23
                                                                                                                      • Airport Developments
                                                                                                                      • Slide Number 25
                                                                                                                      • Airfield Layout PlanDevelopable Parcels
                                                                                                                      • Capital Project Needs
                                                                                                                      • Slide Number 28
                                                                                                                      • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                                                      • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                                                      • Aircraft Rescue and Firefighting Building
                                                                                                                      • Aircraft Rescue and Firefighting Building
                                                                                                                      • New Long-term Parking Lot
                                                                                                                      • Slide Number 34
                                                                                                                      • Proposed Terminal Enhancement Project
                                                                                                                      • Existing Terminal
                                                                                                                      • Terminal Renovation ndash Phases I and II
                                                                                                                      • New Holdroom (Phase II) ndash South Elevation
                                                                                                                      • New Holdroom InteriorLooking East
                                                                                                                      • Flex Space ndash Tent Option ndash View from Airfield
                                                                                                                      • Existing Terminal ndash View from Airfield Side
                                                                                                                      • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                                                                                      • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                                                                                      • Future Expansion ndash Estimated 2025
                                                                                                                      • Future Expansion ndash Estimated 2050
                                                                                                                      • Financial Analysis
                                                                                                                      • Slide Number 47
                                                                                                                      • Airline Rates amp Charges
                                                                                                                      • Slide Number 49
                                                                                                                      • Slide Number 50
                                                                                                                      • Funding Options
                                                                                                                      • Current Airport Debt
                                                                                                                      • Funding Options ndash Long-term
                                                                                                                      • Staffing Analysis
                                                                                                                      • Staffing Report
                                                                                                                      • Aircraft Rescue and Firefighting (ARFF) Services
                                                                                                                      • ARFF Services at Comparable Airports
                                                                                                                      • Request for Feedback
                                                                                                                      • Future Board Items
                                                                                                                      • Slide Number 60

                                                                                                                        Charles M Schulz - Sonoma County Airport

                                                                                                                        2290 Airport Boulevard

                                                                                                                        Santa Rosa CA 95403

                                                                                                                        (707) 565-7243

                                                                                                                        wwwsono macou ntya irportorg

                                                                                                                        Follow STS on (j Facebook

                                                                                                                        Im Linkedln

                                                                                                                        ~ Twitter

                                                                                                                        • Slide Number 1
                                                                                                                        • Summary
                                                                                                                        • Airport Governance
                                                                                                                        • Airport Background
                                                                                                                        • Current Organizational Chart
                                                                                                                        • Airport Enterprise Fund
                                                                                                                        • Airport Enterprise Fund FY 15-16 Revenues and Expenditures
                                                                                                                        • Airport Master Plan
                                                                                                                        • Airfield Layout PlanLand Useand Boundaries
                                                                                                                        • Airport Update
                                                                                                                        • Airport Update ndash Fuel (Gallons Sold)
                                                                                                                        • Airport Update ndash Parking Revenues
                                                                                                                        • Airport Update ndash Rental Cars Revenues
                                                                                                                        • Airport Updates ndash Passenger Levels
                                                                                                                        • Airport Update - HorizonAlaska Airlines
                                                                                                                        • Slide Number 16
                                                                                                                        • Fare Comparison for STS and Other Airports in the Region
                                                                                                                        • Current Passengers and Growth Potential
                                                                                                                        • Airline Industry Overview ndash Potential Markets
                                                                                                                        • Airports Used by Sonoma County and Surrounding Area Residents
                                                                                                                        • Percentage Share Of Passengers For Bay Area Airports By Airline
                                                                                                                        • Airline Industry Overview
                                                                                                                        • Slide Number 23
                                                                                                                        • Airport Developments
                                                                                                                        • Slide Number 25
                                                                                                                        • Airfield Layout PlanDevelopable Parcels
                                                                                                                        • Capital Project Needs
                                                                                                                        • Slide Number 28
                                                                                                                        • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                                                        • Runway Safety Area ndash Phase II ndash Service Roads
                                                                                                                        • Aircraft Rescue and Firefighting Building
                                                                                                                        • Aircraft Rescue and Firefighting Building
                                                                                                                        • New Long-term Parking Lot
                                                                                                                        • Slide Number 34
                                                                                                                        • Proposed Terminal Enhancement Project
                                                                                                                        • Existing Terminal
                                                                                                                        • Terminal Renovation ndash Phases I and II
                                                                                                                        • New Holdroom (Phase II) ndash South Elevation
                                                                                                                        • New Holdroom InteriorLooking East
                                                                                                                        • Flex Space ndash Tent Option ndash View from Airfield
                                                                                                                        • Existing Terminal ndash View from Airfield Side
                                                                                                                        • Phase 1Build Flex-space (either tent or conventional construction) and move hold room and security areas into the new facilityStaff is recommending conventional construction(also shown is Phase 2a - move existing hold room north)
                                                                                                                        • Phase 2 - Build new hold room and security area make connection to flex space and existing terminal and move hold room and security to new facility
                                                                                                                        • Future Expansion ndash Estimated 2025
                                                                                                                        • Future Expansion ndash Estimated 2050
                                                                                                                        • Financial Analysis
                                                                                                                        • Slide Number 47
                                                                                                                        • Airline Rates amp Charges
                                                                                                                        • Slide Number 49
                                                                                                                        • Slide Number 50
                                                                                                                        • Funding Options
                                                                                                                        • Current Airport Debt
                                                                                                                        • Funding Options ndash Long-term
                                                                                                                        • Staffing Analysis
                                                                                                                        • Staffing Report
                                                                                                                        • Aircraft Rescue and Firefighting (ARFF) Services
                                                                                                                        • ARFF Services at Comparable Airports
                                                                                                                        • Request for Feedback