Carter Lake Hydroelectric Project. Presented to CREA Energy Summit By Carl Brouwer October 2011. Carter Lake Outlet Bypass Addition. Capacity: 250 cfs Completed 2008 Cost: $12M. Project Layout. Project Particulars. 2 -1,300 KW Francis Turbines 480 volt generators and controls - PowerPoint PPT Presentation

Transcript

Carter Lake Hydroelectric Project

Presented to CREA Energy SummitBy Carl Brouwer

October 2011

Carter Lake Outlet Bypass Addition

Capacity: 250 cfsCompleted 2008Cost: $12M

Project Layout

Project Particulars

2 -1,300 KW Francis Turbines480 volt generators and controls85 foot x 38 foot Powerhouse2oo feet of 72-inch PenstockConnection to St. Vrain CanalConnection to PVREA

Project Sizing

0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 10

100

200

300

400

500

Time Flow Exceeded

Flo

w (

cfs

)

0 50 100

150

200

250

300

350

400

450

0

2000

4000

6000

8000

10000

Design Flow Rate (cfs)

MW

hrs

Station Layout

Layout Drawing

Outside View

USBR Lease of Power PrivilegeInitiate LOPP

Process USBR Advertises

in Fed. Register Prepare

Proposal USBR Proposa

l Review

Preliminary LOPP

Final LOPP

1 Month

2 Months

6 Months

2 Months

1 Months

3 Months

•Replaces FERC on USBR Facilities•Requires EA•Approx. 1 – 1.5 Years•Approx. $5/MWhr•40 Year Term

Project CostsCOST ITEM AMOUNTTurbines/Generators/Controls

$3,500,000

Site Construction $1,800,000

Transformer/Switchgear $130,000

PVREA Costs $140,000

Engineering/CM/Administration

$630,000

TOTAL $6,200,000**Does not include permitting, feasibility, pre-design, and turbine design of $500k

Project EconomicsPresent Value of Costs: $8,300,000Present Value of Revenue:

$13,400,000Net Present Value of Project:

$5,100,000Benefit/Cost Ratio: 1.6

Financing$2,000,000: 2%, 20-Year-Colorado

Water Resources and Power Development Authority

$4,700,000: 2%, 20-Year, Internal Loan from Northern Water to New Hydropower Enterprise

Loan Repayment Based Upon Revenue-Only

Includes 1-Year Debt Service in Reserve (Rainy Day Fund)

Future Cash Flow

2012

2014

2016

2018

2020

2022

2024

2026

2028

2030

2032

2034

2036

2038

2040

2042

2044

2046

2048

2050

2052

-

1

2

3

4

5

6

7

8

USBR LOPP

O&M

NW Loan

CWRPDA Loan

Revenue$1

00

K