Transcript

BASHKIA TIRANË

Municipality Tirana

STRATEGIC PROJECTS

APRIL 2015

Strategic Projects

1. Tirana Northen Boulevard and River Project

2. Multimodal Terminal

3. Light Rail System (LRS )Tram

4. Tirana Techno - Park

5. Tirana Public Lighting Project

6. Energy Efficency Project

TIRANA NORTHEN BOULEVARD AND RIVER PROJECT Description

885 Ha

TIRANA NORTHEN BOULEVARD AND RIVER PROJECT

Phase I

The Southen section of the

boulevard

885 Ha

TIRANA NORTHEN BOULEVARD AND RIVER PROJECT

Description

River Project

885 Ha

TIRANA NORTHEN BOULEVARD AND RIVER PROJECT

Description

885 Ha

The northen section of boulevard

TIRANA NORTHEN BOULEVARD AND RIVER PROJECT

Goals

2000 jobs directly

21.000 employees

43.000 habitants

TIRANA NORTHEN BOULEVARD AND RIVER PROJECT

Extension of the Boulevard

TIRANA NORTHEN BOULEVARD AND RIVER PROJECT

6 Squares

2

4

6

3

5

1

6 squares

TIRANA NORTHEN BOULEVARD AND RIVER PROJECT

Square connector

TIRANA NORTHEN BOULEVARD AND RIVER PROJECT

Merchant Square

TIRANA NORTHEN BOULEVARD AND RIVER PROJECT

Square of Justice

TIRANA NORTHEN BOULEVARD AND RIVER PROJECT

Cultural Square

TIRANA NORTHEN BOULEVARD AND RIVER PROJECT

Youth Square

TIRANA NORTHEN BOULEVARD AND RIVER PROJECT

Square connector with the river

TIRANA NORTHEN BOULEVARD AND RIVER PROJECT

Square connector with the river

TIRANA NORTHEN BOULEVARD AND RIVER PROJECT

Current status

Phaze I On september 6, 2013 with a

value of 26 mln Euro

Phaze II On January 17, 2014

with a value of 12,8 mln Euro

Blocked by central

Goverment

MULTIMODAL TERMINAL

Description

MULTIMODAL TERMINAL

Locat ion

M U L T I M O D A L T E R M I N A L

F u n c t i o n a l O r g a n i z a t i o n

1 . Rai lway s ta t ion ( t ram -t ra in )

2 . B u s T e r m i na l

3 . P a s s e n g e r T e r m i n a l

4 . Suppor t serv ices center

MULTIMODAL TERMINAL

GOALS

MULTIMODAL TERMINAL

GOALS

Integration of the public transport lines

Coverage of 75% of inter-urban traffic

Coverage of 75% of inter-urban traffic

Increasing of the public transport commodities

Road safety

Employment Opportunities

MULTIMODAL TERMINAL

Benefits

Benefits

MULTIMODAL TERMINAL

6 tone CO2 less / day

Reduction of noise pollution

3,1 km occupied space

2.500 litra/ less oil / day

psychological stress reduction

MULTIMODAL TERMINAL

Current status

M a y 2 0 1 4

Concession procedure

Diagram PPP

Va lue 40 mi l ion euro

Blocked by central

Goverment

TRAM

Description

TRAMI

2 Lines

Line 2 “East- West (Kinostudio-Kombinat)

Line1 “North- South” (Square i Nënë Tereza- city-multimodal Terminal

-length 7.2 km

-about 70,000 passenger/day.

-length 8,4 km

-about 90,000 passenger/day

T R A M

G o a l s

Increase the number o f passengers

who use pub l ik t ranspor t

Rel iable pub l ic t ransport

Rapid Transporta t ion

Bloced by centra l

goverment

TRAM

Benef i ts

Reduce a i r no ise leve l and improvement o f the leve l o f CO2 in the c i ty

To reduce opera t ing cots and reduce the number o f road acc idents

R e duc e t r a v e l t im e a nd inc r e a s e c om f or t in t r a v e l

C ons t ruc t ion o f t he l ine K inos t ud io - Kombinat , l e ng t h 9 .5 k m

Pr ov ide s t ha i t in t he f i r s t pha s e o f t r a ns por t one 9 0 .0 0 0 pa s s a nge r / da y

Description Tirana LRT

The feasibility study and project desing

dor line 2

Value 155,5 milion EUR

68,6 milion passenger / year

Blocked by central goverment

TIRANA TECHNO - PARK

Description

30.000 m2

TIRANA TECHNO - PARK

GOALS

Absorpt ion of labor and inte l lectual

The improvement o f research resources and o ther serv ices

Ma na ge m e nt o f l a r ge t r a c t s o f l a nd

Large investments c rash

S t r e n t hn ing t he loc a l e c onom y a nd in t e r na t iona l

TIRANA TECHNO - PARK

Statusi Aktual

January 2014 Feasibi l i ty study

Land for construct ion of techno park

Energy Efficency Project Benefits

45% of the road network

Energy Efficency Project Benefits

Menaging d ig i ta l l ight ing

The improvement of the quality of l ight ing

R e duc ing e ne r gy c ons um pt ion in

pub l i c l igh t ing in m e a s ur e 4 5 %

Energy cost reduction

Lowering the cost of maintenance

Ti t le to the CO 2 reduct ion

Energy Efficency Project Benefits

Energy Efficency Project

Benefits

Thank you !

BELGRADE, 23 April 2015

top related