Building for Learning ProjectPhoto Progress Report 4

November 2009 – December 2009

Project commencement 21st September 2009

AWCC Chairperson Kerryn Dwyer-Parish with Graeme Connelly undertaking site inspections

Kerryn braved the situation – high heels and all

The 65mm of rain made for 4 ‘internal swimming pools’ but

the task is completed

And no photographic record is complete without some ‘rabbit ears’

November Internal Refurbishments continue

Internal Refurbishments Administration Area

New ceilings, plaster, office and painting

Key workers without who the job could not be done.

December new on-site substation for power required.

December – carpet, ceilings and windows in modernised Administration area

December – steel, bond deck arrives for 1st Floor

December – underground cable boring and concrete footings for stairways and elevator

December – Company Directors tour with Graeme Connelly – girls were happy, boys were serious.

L-R. Chairperson Kerryn Dwyer-Parish, Director Jan Wyatt-Brown, Director Alison Mitchell, Corporate Services Manager Pauline Butler, Builder Graeme

Connelly, Director Rod Jones, Director David Ryan.

December – bracing underneath bond deck and steel ready for concrete floor above

Final preparations and then concrete pour starting 6am, 22nd December – 150 tonne concrete

22nd December – 11 truck loads of concrete