SOLAR POWERSOLAR POWER SYSTEMSYSTEMSOLAR POWERSOLAR POWER SYSTEMSYSTEMFOR BTS SUPPLYFOR BTS SUPPLY
• Leading EPC company in renewable energy
sector
• Having track record on delivering high quality
WHOWE AREWHOWE ARE
green energy system in all over Indonesia
• One of subsidiary company for PT LENWHOWE AREWHOWE ARE One of subsidiary company for PT LEN
Industri (Persero)
• System Solution
System Design, Engineering, System Integration
• Services
Installation Testing Commissioning Training After
WHATWE DOWHATWE DO
Installation, Testing, Commissioning, Training, After
Sales Services
S l & M k iWHAT WE DOWHATWE DO • Sales & Marketing
PV Modules, Energy Limiter, Solar Lighting, Solar
Charge Controller
• Solar Module (PT LEN Industri facility)
Annual capacity of 9 MW
• Solar Home System• Solar Home System
• Solar Street Lighting
OUR PRODUCTSOUR PRODUCTS
• PV Stand Alone Power Supply System
• Hybrid Power Supply SystemOUR PRODUCTSOUR PRODUCTS• Grid Connected System
• Grid Connected With Backup System• Grid Connected With Backup System
SOLAR POWERSOLAR POWER SYSTEMSYSTEMSOLAR POWERSOLAR POWER SYSTEMSYSTEMFOR BTS SUPPLYFOR BTS SUPPLY
• Effective land use with high roof PV module installationg
• High efficient solar energy extraction
C t k i f t l d di t ib ti l• Compact packaging for control and distribution panel
• Direct status and alarm signal to BTS
FEATURESFEATURES
• Data logger for recording energy usage (up to 3 month)
• Monitoring system (optional)FEATURESFEATURES g y ( p )
A l C it f 50 l t f BTS i t fAnnual Capacity of 50 solar power system for BTS, consist of :
• 10 solar power system for 2 kW capacity
• 15 solar power system for 1 kW capacity
• 25 solar power system for 500 W capacity
SYSTEMSYSTEM
p y p y
CAPACITYCAPACITY
DC BUS
Battery Bank
WindController
P L NGRIDRECTIFIER
SYSTEMSYSTEM BLOCKBLOCKDIAGRAMDIAGRAM
Wind Turbine
DIAGRAMDIAGRAMMODEL 1MODEL 1
PV Array ChargeController
BTSLOAD
DC Hybrid Power SystemController
Main supply : Battery, PV, Wind turbineS d l PLNSecondary supply : PLNNormal condition : PV & WT will charge battery and supply BTSPV & WT will charge battery and supply BTS loadEmpty Battery (30%SOC) :
SYSTEMSYSTEMDESCRIPTIONDESCRIPTION
p y y ( )PLN will supply BTS load and charge batteryBattery up to 80% SOC : DESCRIPTIONDESCRIPTION
MODEL 1MODEL 1 PLN will switch off and main supply will continue supplying BTS load
DC BUS
Battery Bank
GENSETRECTIFIER
SYSTEMSYSTEM BLOCKBLOCKDIAGRAMDIAGRAMDIAGRAMDIAGRAMMODELMODEL 22
PV Array ChargeController BTS
LOAD
DC Power System
LOAD
Main supply : Battery PhotovoltaicMain supply : Battery, Photovoltaic
Backup supply : genset
Normal condition : PV will charge battery and supply BTS
SYSTEMSYSTEMDESCRIPTIONDESCRIPTION
loadBackup condition :
DESCRIPTIONDESCRIPTIONMODELMODEL 22 Genset will supply BTS load and
charge battery until battery reach 70% SOCSOC
enclosure
EQUIPMENTEQUIPMENT Battery Bank
ARRANGEMENTARRANGEMENT
Controller
CAPEX & OPEX ILLUSTRATIONCAPEX & OPEX ILLUSTRATION
OUR EXPERIENCEOUR EXPERIENCEOUR EXPERIENCEOUR EXPERIENCEBTS GIRISARIBTS GIRISARI BALIBALI
BTS Power Requirement:S o e equ e e tElectric Power Capacity = 1500 wattHours operation per day = 24 hoursAir Conditioner and lamp supplied by PLN
BTS GIRISARIBTS GIRISARIEnergy consumption = 36 kWh
Load Safety Factor = 10 %
BALIBALITotal Energy Requirement/day = 40 kWh
SYSTEM SPECIFICATIONSYSTEM SPECIFICATIONPhotovoltaic System : Polycristaline, 4.8 kWp (48 pcs, @ 100Wp)
Battery Bank : OPzV, 57.6 kWh (48 cell @ 600 Ah)
Ch C t ll PWM t 48 Vd i 100 ACharge Controller : PWM type, 48 Vdc, min 100 Ampere,
PV Support System : High Roof, on top shelter for 4800 Wp
Wind Turbine : 2500 Watt 48 Vdc
BTS GIRISARIBTS GIRISARI
Wind Turbine : 2500 Watt, 48 Vdc
Wind Tower : 24 meter Self Support, steel galvanize
Protection Panel : AC and DC protection systemBALIBALI
Protection Panel : AC and DC protection system
Monitoring Unit : Online Monitoring via GPRS channel
Direct alarm to NMS for system failureDirect alarm to NMS for system failure
SITE PICTURESITE PICTURE
BTS GIRISARIBTS GIRISARIBALIBALI
SITE PICTURESITE PICTURE
BTS GIRISARIBTS GIRISARIBALIBALI
SITE PICTURESITE PICTURE
BTS GIRISARIBTS GIRISARIBALIBALI
SITE EVALUATIONSITE EVALUATION
BTS GIRISARIBTS GIRISARIBALIBALI
SITE MONITORINGSITE MONITORING
BTS GIRISARIBTS GIRISARIBALIBALI
OUR EXPERIENCEOUR EXPERIENCEBTS RD BANGKO & RUMBAI JAYABTS RD BANGKO & RUMBAI JAYA
RIAURIAU
BTS Power Requirement:q
Electric Power Capacity = 2000 watt
Hours operation per day = 24 hoursHours operation per day 24 hours
Energy consumption = 48 kWh
BTS RDBTS RDBANGKO &BANGKO &
Energy consumption 48 kWh
Load Safety Factor = 10 %
BANGKO &BANGKO &RUMBAI JAYARUMBAI JAYA Total Energy Requirement/day = 52,8 kWh
SYSTEM SPECIFICATIONSYSTEM SPECIFICATIONPh t lt i S t P l i t li 12 kW (120 @ 100W )Photovoltaic System : Polycristaline, 12 kWp (120 pcs, @ 100Wp)
Battery Bank : OPzV, 96 kWh (24 cell, @ 2000 Ah)
Charge Controller : MPPT type 48 Vdc 270 AmpereCharge Controller : MPPT type, 48 Vdc, 270 Ampere,
PV Support System : High Roof, on top shelter for 12000 Wp
Protection Panel : AC and DC protection system
BTS RDBTS RDBANGKO &BANGKO &
Protection Panel : AC and DC protection system
Monitoring Unit : Local System Monitoring Unit
Direct alarm to NMS for system failureBANGKO &BANGKO &RUMBAI JAYARUMBAI JAYA
ect a a to S o syste a u e
SITE PICTURESITE PICTURE
BTS RDBTS RDBANGKO &BANGKO &BANGKO &BANGKO &
RUMBAI JAYARUMBAI JAYA
SITE PICTURESITE PICTURE
BTS RDBTS RDBANGKO &BANGKO &BANGKO &BANGKO &
RUMBAI JAYARUMBAI JAYA
SITE PICTURESITE PICTURE
BTS RDBTS RDBANGKO &BANGKO &BANGKO &BANGKO &
RUMBAI JAYARUMBAI JAYA
SITE PICTURESITE PICTURE
BTS RDBTS RDBANGKO &BANGKO &BANGKO &BANGKO &
RUMBAI JAYARUMBAI JAYA
top related