BOILER LAYOUT

ENGINEERING

In Indian Scenario

10/4/2017 boben2005@gmail.com

PRODUCT ENGINEERING (FOSSIL BOILERS)IMPROVEMENTS DONE IN BOILER LAYOUTS

• REDUCTION OF BOILER COLUMNS IN 500 MW CONTRACTS. 53 COLUMNS PROVIDED IN RAMAGUNDAM UNIT 7, REDUCED TO 43 Nos IN KAHALGOAN & TO 39 Nos IN BELLARY.

• INTEGRATION OF LIFT STRUCTURE WITH BOILER STRUCTURE AS AGAINST STAND-ALONE STRUCTURE EARLIER.

• WIDER SPACING OF BOILER MAIN COLUMNS (From Boiler centre line ) FOR BETTER ACCESS SPACE.

• FIRST 250 MW DESIGNED WITH 7 BOWL MILLS WITH REAR MILL ARRANGEMENT & WITH UNSYMMETRIC ARRANGEMENT OF MILLS { 4 NOS ON LEFT SIDE & 3 NOS ON RIGHT SIDE WITH A CENTRE GAP} FOR KORBA 2x 250 MW

10/4/2017 boben2005@gmail.com

PRODUCT ENGINEERING (FOSSIL BOILERS IMPROVEMENTS DONE IN BOILER LAYOUTS

• RETROFIT OF ECONOMISER COIL HANDLING

• IMPROVEMENT OF BRACING PATTERN ON THE REAR SIDE OF THE BOILER FOR ECONOMISER COIL HANDLING.

• RELOCATION OF GATES IN THE ECONOMISER BYPASS DUCTS FOR ECONOMISER COIL HANDLING .

• OPTIMIZATION OF DAMPERS IN THE AIR DUCTS TO AIR PREHEATERS.

• LAYOUT FOR THE TWIN REHEATER HEADERS FOR 500 MW NEW CONTRACTS.

10/4/2017 boben2005@gmail.com

REGULAR ARRANGEMENT OF BOILER COLUMNS FOR RAMAGUNDAM 500 MW UNIT 7 (53 NO OF COLUMNS)

10/4/2017 boben2005@gmail.com

OPTIMIZED BOILER COLUMN LOCATION FOR KAHALGAON 500 MW (43 NOS OF COLUMNS)

10/4/2017 boben2005@gmail.com

OPTIMIZED ARRANGEMENT OF BOILER COLUMNS FOR BELLARY 500 MW UNIT (39 NO OF COLUMNS)

10/4/2017 boben2005@gmail.com

DESIGN IMPROVEMENT IN THE BOILER LIFT STRUCTURE

10/4/2017 boben2005@gmail.com

DIMEMSIONAL DETAILS OF BOILER COLUMNS FOR KAHALGOAN 500 MW

10/4/2017 boben2005@gmail.com

SUMMARY OF BOILER COLUMN SPACING IN CURRENT 500 MW UNITS

CONTRACT NAME NO OF COLUMNS

SPACING OF BOILER MAIN COLUMNS FROM BOILER CENTRE

LINE

RAMAGUNDAM 500 MW UNIT 7

53 NOS 13 M

KAHALGOAN 500 MW 43 NOS 15.5 M

BELLARY 500 MW 39 NOS 14.5 M 10/4/2017 boben2005@gmail.com

BELLARY TPS 1 x 500 MW BOILERSALIENT FEATURES OF BOILER LAYOUT

• SIDE MILL LAYOUT.

• 7 NUMBERS OF XRP 1003 BOWL MILLS

• WIDER MAIN BOILER COLUMN PITCHING AT 29 MTRS.

• TRISECTOR REGEN AIRHEATER 31.5 VIM(T) 2000 - USED IN THIS CONTRACT

10/4/2017 boben2005@gmail.com

• LARGE MAN HOLE DOOR(1.8 x 0.9 Mt) ENVISAGED IN PENT HOUSE FOR MAINTANECE.

• CL ELEVATION OF RING HEADER = 10.25 Mtrs.

• CL ELEVATION OF DRUM = 70.608 Mtrs.

• BOTTOM OF THE CEILING GIRDER = 78.550 Mts.

BELLARY TPS 1 x 500 MW BOILERSALIENT FEATURES OF BOILER LAYOUT

10/4/2017 boben2005@gmail.com

GA OF BOILERSECTIONAL ELEVATION

10/4/2017 boben2005@gmail.com

GA OF BOILERSECTIONAL PLAN

10/4/2017 boben2005@gmail.com

BOILER COLUMN LOCATION WITH

MAIN AUXILIRIES

10/4/2017 boben2005@gmail.com

BELLARY TPS 1 x 500 MW BOILERSALIENT FEATURES OF BOILER LAYOUT KEY PLAN OF BOILER AND ID SYSTEM

10/4/2017 boben2005@gmail.com

BELLARY TPS 1 x 500 MW BOILERSALIENT FEATURES OF BOILER LAYOUT

LAYOUT OF ID SYSTEM - ELEVATION

10/4/2017 boben2005@gmail.com

BELLARY TPS 1 x 500 MW BOILERSALIENT FEATURES OF BOILER LAYOUT

LAYOUT OF ID SYSTEM - PLAN

10/4/2017 boben2005@gmail.com

SALIENT FEATURES OF KORBA 2 x 250 MW UNITS

1. FIRST 250 MW UNIT WITH SEVEN BOWL MILLS WITH REAR MILL LAYOUT.

1. MILLS LOCATED UNSYMMETRICALLY ABOUT THE BOILER AXIS : 4 NOS ON THE LEFT SIDE & 3 NOS ON THE RIGHT SIDE WITH AN EMPTY BAY AT THE CENTRE

10/4/2017 boben2005@gmail.com

GENERAL ARRANGEMENT DRAWING SIDE ELEVATION: KORBA 2 x 250 MW

10/4/2017 boben2005@gmail.com

KORBA 2 X 250 MW SECTIONAL PLAN

10/4/2017 boben2005@gmail.com

KORBA 2 x 250 MW : I.D SYSTEM SECTIONAL ELEVATION

10/4/2017 boben2005@gmail.com

KORBA 2 x 250 MW : I.D SYSTEM PLAN

10/4/2017 boben2005@gmail.com

Structure for handling of Eco. Coils from Zero mtr. to 43.5 mtrs.

10/4/2017 boben2005@gmail.com

Replacement work of Eco. Bank in Unit#4

10/4/2017 boben2005@gmail.com

10/4/2017 boben2005@gmail.com

Eco. Coil shifting to the position

10/4/2017 boben2005@gmail.com

10/4/2017 boben2005@gmail.com

Manual handling arrangement for insertion and removal of Eco. Coils from platform to inside the boiler

10/4/2017 boben2005@gmail.com

VINDYACHAL

UNIT Nos. 7 & 8

(NO HANDLING ENVISAGED)

WITH PERMANENT BRACING

10/4/2017 boben2005@gmail.com

SIMHADRI

WITH REMOVABLE BRACING

10/4/2017 boben2005@gmail.com

TALCHER 4X500MW

WITH POST

10/4/2017 boben2005@gmail.com

KAHALGAON 2X500MW

OPEN

WITHOUT POST AND BRACINGS

10/4/2017 boben2005@gmail.com

EARLIER ARRANGEMENT WITH GATES HINDERING THE ECONOMISER COIL WITHDRAWAL

10/4/2017 boben2005@gmail.com

MODIFIED ARRANGEMENT OF GATES TO FACILITATE THE EASY WITHDRAWAL OF ECONOMISER COILS

10/4/2017 boben2005@gmail.com

B – BIPLANE DAMPER

L – LOUVER DAMPER

10/4/2017 boben2005@gmail.com

10/4/2017 boben2005@gmail.com

B – BIPLANE DAMPER

L – LOUVER DAMPER

10/4/2017 boben2005@gmail.com

LAYOUT OF SINGLE HRH HEADER

10/4/2017 boben2005@gmail.com

NEW LAYOUT WITH TWIN HRH HEADER

10/4/2017 boben2005@gmail.com

MODIFIED ROUTING OF HRH PIPING

OLD ARRANGEMENT MODIFIED ARRANGEMENT10/4/2017 boben2005@gmail.com

Any Quires boben2005@gmail.com10/4/2017 boben2005@gmail.com