Material Dimensiuni [Inaltime] Volume Total volume [m] [m³] [m³]
Parter
C20/25
Grinda d= 30 cm
1x 3.360*0.300*0.500 0.500 0.504 0.504
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 2.000*0.300*0.500 0.500 0.3 0.3
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 2.000*0.300*0.500 0.500 0.3 0.3
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 2.000*0.300*0.500 0.500 0.3 0.3
1/29
4154883
Beton si beton armat - beton turnat
Proiect:Creator:Data / Ora:Nota:
Practica Cluj certificareVasile7/15/2014 / 02:27Cantitati mult prea exacte!
1x 1.900*0.300*0.500 0.500 0.285 0.285
1x 3.850*0.300*0.500 0.500 0.578 0.578
1x 4.350*0.300*0.500 0.500 0.653 0.653
1x 4.350*0.300*0.500 0.500 0.653 0.653
1x 3.850*0.300*0.500 0.500 0.578 0.578
1x 1.900*0.300*0.500 0.500 0.285 0.285
1x 3.850*0.300*0.500 0.500 0.578 0.578
1x 3.850*0.300*0.500 0.500 0.578 0.578
1x 1.900*0.300*0.500 0.500 0.285 0.285
1x 3.850*0.300*0.500 0.500 0.578 0.578
1x 1.900*0.300*1.000 1.000 0.57 0.57
1x 1.900*0.300*1.000 1.000 0.57 0.57
1x 3.850*0.300*0.500 0.500 0.578 0.578
2/29
4154883
Beton si beton armat - beton turnat
Proiect:Creator:Data / Ora:Nota:
Practica Cluj certificareVasile7/15/2014 / 02:27Cantitati mult prea exacte!
1x 1.900*0.300*0.500 0.500 0.285 0.285
1x 3.850*0.300*0.500 0.500 0.578 0.578
1x 4.350*0.300*0.500 0.500 0.653 0.653
1x 4.350*0.300*0.500 0.500 0.653 0.653
1x 2.000*0.300*0.500 0.500 0.3 0.3
Total Grinda, d= 30 cm 15.922
Total Grinzi 15.922
3/29
4154883
Beton si beton armat - beton turnat
Proiect:Creator:Data / Ora:Nota:
Practica Cluj certificareVasile7/15/2014 / 02:27Cantitati mult prea exacte!
Material Dimensiuni [Inaltime] Volume Total volume [m] [m³] [m³]
Perete d= 30 cm
1x 4.300*0.300*3.000 3.000 3.87 3.87
1x 4.300*0.300*3.000 3.000 3.87 3.87
1x 3.900*0.300*3.000 3.000 3.51 3.51
1x 3.900*0.300*3.000 3.000 3.51 3.51
1x 4.300*0.300*3.000 3.000 3.87 3.87
1x 4.300*0.300*3.000 3.000 3.87 3.87
1x 3.900*0.300*3.000 3.000 3.51 3.51
1x 3.900*0.300*3.000 3.000 3.51 3.51
Total Perete, d= 30 cm 29.520
Total Grinzi 29.520
4/29
4154883
Beton si beton armat - beton turnat
Proiect:Creator:Data / Ora:Nota:
Practica Cluj certificareVasile7/15/2014 / 02:27Cantitati mult prea exacte!
Material Dimensiuni [Inaltime] Volume Total volume [m] [m³] [m³]
Planseu d= 15 cm
1x 22.600*11.800*0.150 0.150 40.002
1x -3*(4.300*0.150*0.150) 0.150 -0.291
1x -(4.400*0.100*0.150) 0.150 -0.066
1x -(1.288*0.100*0.150) 0.150 -0.019
1x -(4.500*1.778*0.150) 0.150 -1.2
1x -(4.600*1.900*0.150) 0.150 -1.311
1x -(4.450*4.100*0.150) 0.150 -2.737
1x -(2.000*0.100*0.150) 0.150 -0.03
1x -(1.900*0.150*0.150) 0.150 -0.043
1x -(3.850*2.200*0.150) 0.150 -1.271
33.034
Total Planseu, d= 15 cm 33.034
Total Plansee 33.034
Stalp
1x 0.600*0.600*3.000 3.000 1.08 1.08
1x 0.990*0.500*3.000 3.000 1.485 1.485
1x 0.600*0.600*3.000 3.000 1.08 1.08
1x 0.600*0.600*3.000 3.000 1.08 1.08
1x 0.600*0.600*3.000 3.000 1.08 1.08
1x 0.500*0.500*3.000 3.000 0.75 0.75
1x 0.500*0.500*3.000 3.000 0.75 0.75
1x 0.500*0.500*3.000 3.000 0.75 0.75
5/29
4154883
Beton si beton armat - beton turnat
Proiect:Creator:Data / Ora:Nota:
Practica Cluj certificareVasile7/15/2014 / 02:27Cantitati mult prea exacte!
1x 0.500*0.500*3.000 3.000 0.75 0.75
1x 0.600*0.600*3.000 3.000 1.08 1.08
1x 0.600*0.600*3.000 3.000 1.08 1.08
1x 0.600*0.600*3.000 3.000 1.08 1.08
1x 0.600*0.600*3.000 3.000 1.08 1.08
1x 0.500*0.500*3.000 3.000 0.75 0.75
1x 0.500*0.500*3.000 3.000 0.75 0.75
1x 0.500*0.500*3.000 3.000 0.75 0.75
1x 0.500*0.500*3.000 3.000 0.75 0.75
1x 0.500*0.500*3.000 3.000 0.75 0.75
1x 0.500*0.500*3.000 3.000 0.75 0.75
1x 0.500*0.400*3.000 3.000 0.6
1x 0.5*(0.500+0.400)*0.100*3.000
3.000 0.135
0.735
1x 0.500*0.500*3.000 3.000 0.75 0.75
6/29
4154883
Beton si beton armat - beton turnat
Proiect:Creator:Data / Ora:Nota:
Practica Cluj certificareVasile7/15/2014 / 02:27Cantitati mult prea exacte!
1x 0.500*0.500*3.000 3.000 0.75 0.75
1x 0.500*0.500*3.000 3.000 0.75 0.75
1x 0.500*0.500*3.000 3.000 0.75 0.75
Total Stalp 21.360
Total Stalpi 21.360
Total Material: C20/25 99.836
Suma totala Parter 99.836
Etaj 1
C20/25
Grinda d= 30 cm
1x 2.000*0.300*0.500 0.500 0.3 0.3
1x 4.350*0.300*0.500 0.500 0.653 0.653
1x 4.350*0.300*0.500 0.500 0.653 0.653
1x 3.850*0.300*0.500 0.500 0.578 0.578
1x 1.900*0.300*0.500 0.500 0.285 0.285
1x 3.850*0.300*0.500 0.500 0.578 0.578
1x 1.900*0.300*1.000 1.000 0.57 0.57
7/29
4154883
Beton si beton armat - beton turnat
Proiect:Creator:Data / Ora:Nota:
Practica Cluj certificareVasile7/15/2014 / 02:27Cantitati mult prea exacte!
1x 1.900*0.300*1.000 1.000 0.57 0.57
1x 3.850*0.300*0.500 0.500 0.578 0.578
1x 1.900*0.300*0.500 0.500 0.285 0.285
1x 3.850*0.300*0.500 0.500 0.578 0.578
1x 3.850*0.300*0.500 0.500 0.578 0.578
1x 1.900*0.300*0.500 0.500 0.285 0.285
1x 3.850*0.300*0.500 0.500 0.578 0.578
1x 4.350*0.300*0.500 0.500 0.653 0.653
1x 4.350*0.300*0.500 0.500 0.653 0.653
1x 3.850*0.300*0.500 0.500 0.578 0.578
1x 1.900*0.300*0.500 0.500 0.285 0.285
1x 2.000*0.300*0.500 0.500 0.3 0.3
1x 4.400*0.300*0.500 0.500 0.66 0.66
8/29
4154883
Beton si beton armat - beton turnat
Proiect:Creator:Data / Ora:Nota:
Practica Cluj certificareVasile7/15/2014 / 02:27Cantitati mult prea exacte!
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 2.000*0.300*0.500 0.500 0.3 0.3
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 2.000*0.300*0.500 0.500 0.3 0.3
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 3.360*0.300*0.500 0.500 0.504 0.504
Total Grinda, d= 30 cm 15.922
Total Grinzi 15.922
9/29
4154883
Beton si beton armat - beton turnat
Proiect:Creator:Data / Ora:Nota:
Practica Cluj certificareVasile7/15/2014 / 02:27Cantitati mult prea exacte!
Material Dimensiuni [Inaltime] Volume Total volume [m] [m³] [m³]
Perete d= 30 cm
1x 3.900*0.300*2.800 2.800 3.276 3.276
1x 3.900*0.300*2.800 2.800 3.276 3.276
1x 4.300*0.300*2.800 2.800 3.612 3.612
1x 4.300*0.300*2.800 2.800 3.612 3.612
1x 3.900*0.300*2.800 2.800 3.276 3.276
1x 3.900*0.300*2.800 2.800 3.276 3.276
1x 4.300*0.300*2.800 2.800 3.612 3.612
1x 4.300*0.300*2.800 2.800 3.612 3.612
Total Perete, d= 30 cm 27.552
Total Grinzi 27.552
10/29
4154883
Beton si beton armat - beton turnat
Proiect:Creator:Data / Ora:Nota:
Practica Cluj certificareVasile7/15/2014 / 02:27Cantitati mult prea exacte!
Material Dimensiuni [Inaltime] Volume Total volume [m] [m³] [m³]
Planseu d= 15 cm
1x 22.600*11.800*0.150 0.150 40.002
1x -(2.100*0.100*0.150) 0.150 -0.032
1x -(1.900*0.150*0.150) 0.150 -0.043
1x -(3.850*2.200*0.150) 0.150 -1.271
1x -(1.360*0.600*0.150) 0.150 -0.122
1x -3*(4.300*0.150*0.150) 0.150 -0.291
1x -(4.400*0.100*0.150) 0.150 -0.066
1x -(1.288*0.100*0.150) 0.150 -0.019
1x -(4.500*1.778*0.150) 0.150 -1.2
1x -(4.600*1.900*0.150) 0.150 -1.311
35.647
Total Planseu, d= 15 cm 35.647
Total Plansee 35.647
Stalp
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.400*2.800 2.800 0.56
1x 0.5*(0.500+0.400)*0.100*2.800
2.800 0.126
0.686
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
11/29
4154883
Beton si beton armat - beton turnat
Proiect:Creator:Data / Ora:Nota:
Practica Cluj certificareVasile7/15/2014 / 02:27Cantitati mult prea exacte!
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.600*0.600*2.800 2.800 1.008 1.008
1x 0.600*0.600*2.800 2.800 1.008 1.008
1x 0.600*0.600*2.800 2.800 1.008 1.008
1x 0.600*0.600*2.800 2.800 1.008 1.008
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.600*0.600*2.800 2.800 1.008 1.008
1x 0.600*0.600*2.800 2.800 1.008 1.008
12/29
4154883
Beton si beton armat - beton turnat
Proiect:Creator:Data / Ora:Nota:
Practica Cluj certificareVasile7/15/2014 / 02:27Cantitati mult prea exacte!
1x 0.600*0.600*2.800 2.800 1.008 1.008
1x 0.990*0.500*2.800 2.800 1.386 1.386
1x 0.600*0.600*2.800 2.800 1.008 1.008
Total Stalp 19.936
Total Stalpi 19.936
Total Material: C20/25 99.057
Suma totala Etaj 1 99.057
Etaj 4
C20/25
Grinda d= 30 cm
1x 3.360*0.300*0.500 0.500 0.504 0.504
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 2.000*0.300*0.500 0.500 0.3 0.3
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 4.400*0.300*0.500 0.500 0.66 0.66
13/29
4154883
Beton si beton armat - beton turnat
Proiect:Creator:Data / Ora:Nota:
Practica Cluj certificareVasile7/15/2014 / 02:27Cantitati mult prea exacte!
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 2.000*0.300*0.500 0.500 0.3 0.3
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 2.000*0.300*0.500 0.500 0.3 0.3
1x 1.900*0.300*0.500 0.500 0.285 0.285
1x 3.850*0.300*0.500 0.500 0.578 0.578
1x 4.350*0.300*0.500 0.500 0.653 0.653
1x 4.350*0.300*0.500 0.500 0.653 0.653
1x 3.850*0.300*0.500 0.500 0.578 0.578
1x 1.900*0.300*0.500 0.500 0.285 0.285
1x 3.850*0.300*0.500 0.500 0.578 0.578
1x 3.850*0.300*0.500 0.500 0.578 0.578
14/29
4154883
Beton si beton armat - beton turnat
Proiect:Creator:Data / Ora:Nota:
Practica Cluj certificareVasile7/15/2014 / 02:27Cantitati mult prea exacte!
1x 1.900*0.300*0.500 0.500 0.285 0.285
1x 3.850*0.300*0.500 0.500 0.578 0.578
1x 1.900*0.300*1.000 1.000 0.57 0.57
1x 1.900*0.300*1.000 1.000 0.57 0.57
1x 3.850*0.300*0.500 0.500 0.578 0.578
1x 1.900*0.300*0.500 0.500 0.285 0.285
1x 3.850*0.300*0.500 0.500 0.578 0.578
1x 4.350*0.300*0.500 0.500 0.653 0.653
1x 4.350*0.300*0.500 0.500 0.653 0.653
1x 2.000*0.300*0.500 0.500 0.3 0.3
Total Grinda, d= 30 cm 15.922
Total Grinzi 15.922
15/29
4154883
Beton si beton armat - beton turnat
Proiect:Creator:Data / Ora:Nota:
Practica Cluj certificareVasile7/15/2014 / 02:27Cantitati mult prea exacte!
Material Dimensiuni [Inaltime] Volume Total volume [m] [m³] [m³]
Perete d= 30 cm
1x 3.900*0.300*2.800 2.800 3.276 3.276
1x 3.900*0.300*2.800 2.800 3.276 3.276
1x 3.900*0.300*2.800 2.800 3.276 3.276
1x 4.900*0.300*2.800 2.800 4.116 4.116
1x 4.900*0.300*2.800 2.800 4.116 4.116
1x 4.900*0.300*2.800 2.800 4.116 4.116
1x 4.900*0.300*2.800 2.800 4.116 4.116
1x 3.900*0.300*2.800 2.800 3.276 3.276
Total Perete, d= 30 cm 29.568
Total Grinzi 29.568
16/29
4154883
Beton si beton armat - beton turnat
Proiect:Creator:Data / Ora:Nota:
Practica Cluj certificareVasile7/15/2014 / 02:27Cantitati mult prea exacte!
Material Dimensiuni [Inaltime] Volume Total volume [m] [m³] [m³]
Planseu d= 15 cm
1x 22.600*11.800*0.150 0.150 40.002
1x -3*(4.300*0.150*0.150) 0.150 -0.291
1x -(4.400*0.100*0.150) 0.150 -0.066
1x -(1.288*0.100*0.150) 0.150 -0.019
1x -(4.500*1.778*0.150) 0.150 -1.2
1x -(4.600*1.900*0.150) 0.150 -1.311
1x -(4.450*4.100*0.150) 0.150 -2.737
1x -(2.000*0.100*0.150) 0.150 -0.03
1x -(1.900*0.150*0.150) 0.150 -0.043
1x -(3.850*2.200*0.150) 0.150 -1.271
33.034
Total Planseu, d= 15 cm 33.034
Total Plansee 33.034
Stalp
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.400*2.800 2.800 0.56
1x 0.5*(0.500+0.400)*0.100*2.800
2.800 0.126
0.686
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
17/29
4154883
Beton si beton armat - beton turnat
Proiect:Creator:Data / Ora:Nota:
Practica Cluj certificareVasile7/15/2014 / 02:27Cantitati mult prea exacte!
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.600*0.600*2.800 2.800 1.008 1.008
1x 0.600*0.600*2.800 2.800 1.008 1.008
1x 0.600*0.600*2.800 2.800 1.008 1.008
1x 0.600*0.600*2.800 2.800 1.008 1.008
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.600*0.600*2.800 2.800 1.008 1.008
1x 0.600*0.600*2.800 2.800 1.008 1.008
18/29
4154883
Beton si beton armat - beton turnat
Proiect:Creator:Data / Ora:Nota:
Practica Cluj certificareVasile7/15/2014 / 02:27Cantitati mult prea exacte!
1x 0.600*0.600*2.800 2.800 1.008 1.008
1x 0.990*0.500*2.800 2.800 1.386 1.386
1x 0.600*0.600*2.800 2.800 1.008 1.008
Total Stalp 19.936
Total Stalpi 19.936
Total Material: C20/25 98.460
Suma totala Etaj 4 98.460
Etaj 3
C20/25
Grinda d= 30 cm
1x 3.360*0.300*0.500 0.500 0.504 0.504
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 2.000*0.300*0.500 0.500 0.3 0.3
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 4.400*0.300*0.500 0.500 0.66 0.66
19/29
4154883
Beton si beton armat - beton turnat
Proiect:Creator:Data / Ora:Nota:
Practica Cluj certificareVasile7/15/2014 / 02:27Cantitati mult prea exacte!
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 2.000*0.300*0.500 0.500 0.3 0.3
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 2.000*0.300*0.500 0.500 0.3 0.3
1x 1.900*0.300*0.500 0.500 0.285 0.285
1x 3.850*0.300*0.500 0.500 0.578 0.578
1x 4.350*0.300*0.500 0.500 0.653 0.653
1x 4.350*0.300*0.500 0.500 0.653 0.653
1x 3.850*0.300*0.500 0.500 0.578 0.578
1x 1.900*0.300*0.500 0.500 0.285 0.285
1x 3.850*0.300*0.500 0.500 0.578 0.578
1x 3.850*0.300*0.500 0.500 0.578 0.578
20/29
4154883
Beton si beton armat - beton turnat
Proiect:Creator:Data / Ora:Nota:
Practica Cluj certificareVasile7/15/2014 / 02:27Cantitati mult prea exacte!
1x 1.900*0.300*0.500 0.500 0.285 0.285
1x 3.850*0.300*0.500 0.500 0.578 0.578
1x 1.900*0.300*1.000 1.000 0.57 0.57
1x 1.900*0.300*1.000 1.000 0.57 0.57
1x 3.850*0.300*0.500 0.500 0.578 0.578
1x 1.900*0.300*0.500 0.500 0.285 0.285
1x 3.850*0.300*0.500 0.500 0.578 0.578
1x 4.350*0.300*0.500 0.500 0.653 0.653
1x 4.350*0.300*0.500 0.500 0.653 0.653
1x 2.000*0.300*0.500 0.500 0.3 0.3
Total Grinda, d= 30 cm 15.922
Total Grinzi 15.922
21/29
4154883
Beton si beton armat - beton turnat
Proiect:Creator:Data / Ora:Nota:
Practica Cluj certificareVasile7/15/2014 / 02:27Cantitati mult prea exacte!
Material Dimensiuni [Inaltime] Volume Total volume [m] [m³] [m³]
Perete d= 30 cm
1x 4.300*0.300*2.800 2.800 3.612 3.612
1x 4.300*0.300*2.800 2.800 3.612 3.612
1x 3.900*0.300*2.800 2.800 3.276 3.276
1x 3.900*0.300*2.800 2.800 3.276 3.276
1x 4.300*0.300*2.800 2.800 3.612 3.612
1x 4.300*0.300*2.800 2.800 3.612 3.612
1x 3.900*0.300*2.800 2.800 3.276 3.276
1x 3.900*0.300*2.800 2.800 3.276 3.276
Total Perete, d= 30 cm 27.552
Total Grinzi 27.552
Stalp
1x 0.600*0.600*2.800 2.800 1.008 1.008
1x 0.990*0.500*2.800 2.800 1.386 1.386
1x 0.600*0.600*2.800 2.800 1.008 1.008
22/29
4154883
Beton si beton armat - beton turnat
Proiect:Creator:Data / Ora:Nota:
Practica Cluj certificareVasile7/15/2014 / 02:27Cantitati mult prea exacte!
1x 0.600*0.600*2.800 2.800 1.008 1.008
1x 0.600*0.600*2.800 2.800 1.008 1.008
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.600*0.600*2.800 2.800 1.008 1.008
1x 0.600*0.600*2.800 2.800 1.008 1.008
1x 0.600*0.600*2.800 2.800 1.008 1.008
1x 0.600*0.600*2.800 2.800 1.008 1.008
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
23/29
4154883
Beton si beton armat - beton turnat
Proiect:Creator:Data / Ora:Nota:
Practica Cluj certificareVasile7/15/2014 / 02:27Cantitati mult prea exacte!
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.400*2.800 2.800 0.56
1x 0.5*(0.500+0.400)*0.100*2.800
2.800 0.126
0.686
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
Total Stalp 19.936
Total Stalpi 19.936
Total Material: C20/25 63.410
Suma totala Etaj 3 63.410
Etaj 2
C20/25
Grinda d= 30 cm
1x 3.360*0.300*0.500 0.500 0.504 0.504
1x 4.400*0.300*0.500 0.500 0.66 0.66
24/29
4154883
Beton si beton armat - beton turnat
Proiect:Creator:Data / Ora:Nota:
Practica Cluj certificareVasile7/15/2014 / 02:27Cantitati mult prea exacte!
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 2.000*0.300*0.500 0.500 0.3 0.3
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 2.000*0.300*0.500 0.500 0.3 0.3
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 4.400*0.300*0.500 0.500 0.66 0.66
1x 2.000*0.300*0.500 0.500 0.3 0.3
1x 1.900*0.300*0.500 0.500 0.285 0.285
1x 3.850*0.300*0.500 0.500 0.578 0.578
1x 4.350*0.300*0.500 0.500 0.653 0.653
25/29
4154883
Beton si beton armat - beton turnat
Proiect:Creator:Data / Ora:Nota:
Practica Cluj certificareVasile7/15/2014 / 02:27Cantitati mult prea exacte!
1x 4.350*0.300*0.500 0.500 0.653 0.653
1x 3.850*0.300*0.500 0.500 0.578 0.578
1x 1.900*0.300*0.500 0.500 0.285 0.285
1x 3.850*0.300*0.500 0.500 0.578 0.578
1x 3.850*0.300*0.500 0.500 0.578 0.578
1x 1.900*0.300*0.500 0.500 0.285 0.285
1x 3.850*0.300*0.500 0.500 0.578 0.578
1x 1.900*0.300*1.000 1.000 0.57 0.57
1x 1.900*0.300*1.000 1.000 0.57 0.57
1x 3.850*0.300*0.500 0.500 0.578 0.578
1x 1.900*0.300*0.500 0.500 0.285 0.285
1x 3.850*0.300*0.500 0.500 0.578 0.578
1x 4.350*0.300*0.500 0.500 0.653 0.653
26/29
4154883
Beton si beton armat - beton turnat
Proiect:Creator:Data / Ora:Nota:
Practica Cluj certificareVasile7/15/2014 / 02:27Cantitati mult prea exacte!
1x 4.350*0.300*0.500 0.500 0.653 0.653
1x 2.000*0.300*0.500 0.500 0.3 0.3
Total Grinda, d= 30 cm 15.922
Total Grinzi 15.922
Perete d= 30 cm
1x 4.300*0.300*2.800 2.800 3.612 3.612
1x 4.300*0.300*2.800 2.800 3.612 3.612
1x 3.900*0.300*2.800 2.800 3.276 3.276
1x 3.900*0.300*2.800 2.800 3.276 3.276
1x 4.300*0.300*2.800 2.800 3.612 3.612
1x 4.300*0.300*2.800 2.800 3.612 3.612
1x 3.900*0.300*2.800 2.800 3.276 3.276
1x 3.900*0.300*2.800 2.800 3.276 3.276
Total Perete, d= 30 cm 27.552
Total Grinzi 27.552
Stalp
1x 0.600*0.600*2.800 2.800 1.008 1.008
27/29
4154883
Beton si beton armat - beton turnat
Proiect:Creator:Data / Ora:Nota:
Practica Cluj certificareVasile7/15/2014 / 02:27Cantitati mult prea exacte!
1x 0.990*0.500*2.800 2.800 1.386 1.386
1x 0.600*0.600*2.800 2.800 1.008 1.008
1x 0.600*0.600*2.800 2.800 1.008 1.008
1x 0.600*0.600*2.800 2.800 1.008 1.008
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.600*0.600*2.800 2.800 1.008 1.008
1x 0.600*0.600*2.800 2.800 1.008 1.008
1x 0.600*0.600*2.800 2.800 1.008 1.008
1x 0.600*0.600*2.800 2.800 1.008 1.008
1x 0.500*0.500*2.800 2.800 0.7 0.7
28/29
4154883
Beton si beton armat - beton turnat
Proiect:Creator:Data / Ora:Nota:
Practica Cluj certificareVasile7/15/2014 / 02:27Cantitati mult prea exacte!
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.400*2.800 2.800 0.56
1x 0.5*(0.500+0.400)*0.100*2.800
2.800 0.126
0.686
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
1x 0.500*0.500*2.800 2.800 0.7 0.7
Total Stalp 19.936
Total Stalpi 19.936
Total Material: C20/25 63.410
Suma totala Etaj 2 63.410
29/29
4154883