BesIII Computing Environment ------Computer Centre , IHEP, Beijing.
zhangf@mail.ihep.ac.cn
BESIII Computing Environment
BesIII Computing Environment ------Computer Centre , IHEP, Beijing.
zhangf@mail.ihep.ac.cn
1. Computing in IHEP
2. BESIII Computing
Pre-Grid
1. Computing in IHEP
BesIII Computing Environment ------Computer Centre , IHEP, Beijing.
zhangf@mail.ihep.ac.cn
Event size (kB)
Number of Event Data volume ( GB
)
Raw data 2 ~1.5×108 300Rec. data 6 ~1.5×108 900DST data 0.6 ~1.5×108 90
Current BESII ComputingCurrent BESII Computing
The total real and Monte Carlo data produced by The total real and Monte Carlo data produced by
BES and BESII are about BES and BESII are about 13 TB13 TB. .
The BESII computing environment is The BESII computing environment is built on:built on:
•PC/Linux/Cluster
•NFS/AFS
•openPBS/GangLia
•CERN/CASTOR
Current BESII ComputingCurrent BESII Computing
Schematic view of BESII computing environment
Current BESII ComputingCurrent BESII Computing
The BESII Computing Environment:The BESII Computing Environment:
• 6 file servers (2 GB memory and extra gigabit network adapter for
each).
• 7.3 TB disk space.
• 64 worker nodes (Pentium IV 2.6 and 2.8 GHz CPUs and 1 GB memory for each).
• CISCO and Cabletron Switches.
Current BESII ComputingCurrent BESII Computing
2.BesIII Computing
BesIII Computing Environment------Computer Centre , IHEP, Beijing.
zhangf@mail.ihep.ac.cn
Event size (kB)
Number of Event Data volume ( TB
)
Raw data 12 ~1.×1010 120Rec. data 24 ~1.×1010 240DST data 2 ~1.×1010 20
• The BESIII experiment is planed to begin to collect data in 2007.
• The peak luminosity of the BEPCII at the J/ Ψ resonance will be about 1033cm-2s-1, with the peak event rate at 3000 Hz.
• The J/ Ψ production in the first year will collect about 1×1010 J/Ψ events.
• In the following years the production for Ψ’, D and Ds studies one will also totally collect about another 1×1010 events .
BesIII Computing Environment
Estimated data size of BESIII experiment in the first production year
BesIII Computing Environment
Data volume ( TB ) Storage mediumJ/ Ψ event Ψ’, D, Ds event
Raw data 120 120 Tape
Rec. data 240×2 240×2 Tape
DST data 20×2 20×2 Disk
MC 240 240 Tape
MC-Rec. 240×2 240×2 Tape
MC-DST 20×2 20×2 Disk
Sum 2,800 ( TB )
• The number of events of the MC generated data will be 2 times as the real data.
• 2 versions of the reconstructed real data will be stored , while the simulated data will store only one copy
Estimated total amount of data of BESIII in it’s whole production life time
1. It is very complicated and difficult to estimate the CPU number needed for the whole data production works, MC simulation works, and physics analysis, since there’s no direct experience of the data processing from BESIII it self at present, and the IT technology develops so fast.
2. The total estimated CPU power needed for data process and data analysis for BESIII experiment will be accumulated up to
1,000 to 2,000 the fastest CPUs at present.
3. This number is a very rough estimation, and will vary with the knowledge of the BESIII data processing, and with the IT trend in the following years.
BesIII Computing Environment
BesIII Computing Environment
Data flow of BESIII experiment
and other services: HTTP service Mail service AFS Home directory service Application service …
BesIII Computing Environment
The BesIII Computing Environment will provide 3 main services:
1. Public interactive Login service
2. Batch job service
3. Storage service
BESIII Analysis
Public Logon Service Platform
Physicist user
Batch cluster
Mass storage
Uniform environment variables
Uniform file accessUniform tool accessUniform library access
Load Balancing System
Data access
Computing
•MC
•Reconstruction
•Analysis PB
GB/MB
Computing Mode
Pre-Grid
The operating system and tools software of the BESIII computing environment will mainly use free software.
BesIII Computing Environment
One should note the risk when using free software: performance and stability.
------Computer Centre , IHEP, Beijing.
zhangf@mail.ihep.ac.cn
OpenPBS vs. PBS Pro
BesIII Computing Environment
PBS Pro vs. LSF
------Computer Centre , IHEP, Beijing.
zhangf@mail.ihep.ac.cn
BQS?
CONDOR?
……?
BesIII Computing Environment
Physical part: Logical part:
1. Computing Element
2. Storage Element
3. Network Element
4. Security Element
I. Security Policy
II. Administration Policy
III. User Policy
Construction/Upgrading
Maintenance/Supporting
BesIII Computing Environment
The BESIII computing environment is planed to be constructed step by step during 2005 –2010.
1. Jan., 2005—Dec., 2005: Study on each of the computing components, CPU, disk, Tape, SLC3 linux system, batch job management software, etc. Design a computing prototype, test the hardware and software components in an integrated environment.
2. Jan., 2006—Dec., 2006: Build a test-bed according to the prototype with full functions, with the 1/10 scale of the complete BESIII computing environment. Do the first Data Challenge and detailed system tests. Extend the test-bed to a 1/2 scale and then do the second Data Challenge.
3. Jan., 2007— : Extend the system to the full scale and provide full computing services needed by the first year data production of BESIII experiment. Extend the system along with the increasingly requirements of the experiment.
BesIII Computing Environment
BESIII Prototyp
e
BesIII Computing Environment
•Test the hardware
•Test the software
•Data Challenge Test
•Train people
•…
On the prototype, we need:
BES On line system
Offline PC Farm YBJ
CERN (CMS&Atlas) Computing Center
pku
CASTOR
Physics data cache
Tier 1
Tier 2
Tier 3This diagram only
Shows HEPDataGrid in China
10Gbps
E-science
BesIII Computing Environment
1. The BESIII computing environment will be constructed in an open architecture, which is robust, secure, scalable and extendable, and is open friendly to be integrated with other new technologies, such as Grid.
2. To share the computing resources with other BESIII collaborators, and other HEP experiments.
Grid?
Thanks
------Computer Centre , IHEP, Beijing.
zhangf@mail.ihep.ac.cn
Suppose:10 physicists access the 1/100 of the whole data and do analysis, , want to get results in 24 小时:
55 SI95
J/Ψ
J/Ψ + Ψ ’ : 2.6*104 *2 --> 6 *104 * 2 ?) peak requirement
J/Ψ:
Estimation
BesIII Computing Environment
BesIII Computing Technical Proposal ------Computer Centre , IHEP, Beijin
g.
zhangf@mail.ihep.ac.cn
3. IT Technology Trend
BesIII Computing Technical Proposal ------Computer Centre , IHEP, Beijin
g.
zhangf@mail.ihep.ac.cn
PIV 2.8G =:1000 SI2K, <1000 USD
( 包括主板、内存、 CPU 、硬盘、机箱 )
PASTA, the Technology Tracking Team for Processors, Memory, Storage and Architectures, LCB, CERN.
1 SI95 ~ 10 SI2K~10 CU
BesIII Computing Technical Proposal ------Computer Centre , IHEP, Beijin
g.
zhangf@mail.ihep.ac.cn3.2GHZ
1 SI95 ~ 10 SI2K~10 CU
BesIII Computing Technical Proposal ------Computer Centre , IHEP, Beijin
g.
zhangf@mail.ihep.ac.cn
2000 SI2K
1 SI95 ~ 10 SI2K~10 CU
BesIII Computing Technical Proposal ------Computer Centre , IHEP, Beijin
g.
zhangf@mail.ihep.ac.cn
BesIII Computing Technical Proposal ------Computer Centre , IHEP, Beijin
g.
zhangf@mail.ihep.ac.cn
0
200
400
600
800
1000
1200
1400
2. 4G 2. 6G 2. 8G 3. 0G 3. 2G
I ntel P4 CPU系列
SI20
00
00. 20. 40. 60. 811. 21. 41. 61. 8
/SI2
000
圆
SI 2000/SI 2000圆
0100200300400500600700800900
1000
2000+ 2400+ 2600+ 2800+ 3000+AMD XP CPU系列
SI20
000
0. 2
0. 4
0. 6
0. 8
1
1. 2
1. 4
/SI2
000
圆
SI 2000
/ SI 2000圆
AMD:Advanced Micro Devices, Epox 8KHA+ Motherboard, AMD Athlon (TM) XP
Intel:Dell Precision Workstation 360 (P4) 系列
Data from Chinese market, Oct. 2004
BesIII Computing Technical Proposal ------Computer Centre , IHEP, Beijin
g.
zhangf@mail.ihep.ac.cn
Storage
BesIII Computing Technical Proposal ------Computer Centre , IHEP, Beijin
g.
zhangf@mail.ihep.ac.cn
Storage
BesIII Computing Technical Proposal ------Computer Centre , IHEP, Beijin
g.
zhangf@mail.ihep.ac.cn不同容量硬盘性价比 :2004年10月,中国北京。
012345678
80G 120G 160G 200G 250G
GB硬盘容量( )
/GB
圆
数据来源:媒体公告价格。
Storage
BesIII Computing Technical Proposal ------Computer Centre , IHEP, Beijin
g.
zhangf@mail.ihep.ac.cn
Comparison of current different Tape Technology
Storage
BesIII Computing Technical Proposal ------Computer Centre , IHEP, Beijin
g.
zhangf@mail.ihep.ac.cn
Comparison of different Tape Medias.
LTO2?
BesIII Computing Technical Proposal ------Computer Centre , IHEP, Beijin
g.
zhangf@mail.ihep.ac.cn
Market Response
BesIII Computing Technical Proposal ------Computer Centre , IHEP, Beijin
g.
zhangf@mail.ihep.ac.cn
4.Cost Estimate
BesIII Computing Technical Proposal ------Computer Centre , IHEP, Beijin
g.
zhangf@mail.ihep.ac.cn
Electrical Power supply:1. Computing box: 300w * 500 (box) = 150 KW
2. Storage system: 10 KW
3. Cooling system: 10 KW
170 KW
Room Space:1. Computing box: 150cm*50cm*500(box)=375 m2/(3 layer) =: 125m2
2. Storage system: 50m2
3. Cooling system: 10m2
~200 m2
PC Farms @ CERN
http://tjs.web.cern.ch/tjs/
BesIII Computing Technical Proposal ------Computer Centre , IHEP, Beijin
g.
zhangf@mail.ihep.ac.cn
Man Power:1. R&D group 5(soft)
+5(hard)
2. Maintenance&Technical Support 5(soft)+10(hard)
30??
BesIII Computing Technical Proposal ------Computer Centre , IHEP, Beijin
g.
zhangf@mail.ihep.ac.cn
5.Load Balancing & Cluster
lxp
lus0
01
lxp
lus0
01
lxp
lus0
01
lxp
lus0
01
lxp
lus0
01
lxp
lus0
01
lxp
lus0
01
lxp
lus0
01
lxp
lus0
01
lxb
atc
h0
01
lxb
atc
h0
01
lxb
atc
h0
01
lxb
atc
h0
01
lxb
atc
h0
01
lxb
atc
h0
01
lxb
atc
h0
01
lxb
atc
h0
01
lxb
atc
h0
01
lxb
atc
h0
01
load balancing
AFS/LSF?
dis
k0
01
rfio
tap
e0
01
rfio
dis
k0
01 tap
e0
01
Batch Servers(FARM)
Interactive Servers (LxPlus)
Disk Servers
http://tjs.web.cern.ch/tjs/
Data Storage(CASTOR)
Tape Servers
IHEP future computing environment Junior
CERN?
LVS
IHEP Public Linux Logon Platform(LxPlus?)
LVS
top related