Beginner Advanced Proficientvalleyoakscharterschool.org/wp-content/uploads/...level of difficulty. And yes, you may do any project that is below your skill level. In other words, proficient
Post on 05-Jul-2020
0 Views
Preview:
Transcript
Woodworking is a persistent
mentor of patience, and the true
craftsman has learned it quite well. Todd Warren
Beginner Advanced Proficient
W elcome to the Valley Oaks Charter School woodworking catalog. In the following pages you will find a number of project designs for the beginning, advanced, and proficient woodworker. Please find a project to build according to your skill as a woodworker and bring the plans with you to every shop class.
Yes, you may build something that is not in this catalog, and yes you may put your own little spin or changes to any of the plans you like. If you do, however, make sure you have the plans or changes drawn on paper and receive approval from the instructor before beginning.
To determine if you are a beginning, advanced, or proficient woodworker, simply count the number of projects you have done in each category below. Once you have completed three projects in one difficulty level, you may advance to the next level of difficulty. And yes, you may do any project that is below your skill level. In other words, proficient woodworkers are welcome to do advanced or beginner projects.
Have fun and be safe! Mr. Warren
Project designs Beginner projects (Difficulty level 1):
Games 1. Card Box (for playing cards) 2. Solitaire 3. Tic-tac-toe Board
Garden 1. Garden Signs 2. Pot Stickers
Home and Office 1. Candle Holder 2. Office Mate 3. Picture Frame 4. Shaped Candle Holder 5. Book/DVD Case
Kitchen and Bath 1. Book Holder 2. Napkin Holder 3. Paper Plate Holder 4. Spaghetti Measuring Tool 5. Toothbrush Holder
Teen 1. CD Holder 2. Hat Rack 3. Video Game Controller Rack 4. Guitar Rack (wall mounted) 5. Necklace Holder 6. Jewelry Rack
Toys 1. Toy Airplane 2. Toy Car 3. Push Duck Toy 4. Toy Race Car 5. Spinning Top 6. Toy Boat
Advanced Projects (Difficulty level 2):
Games 1. Tic-tac-toe Box
Garden 1. Garden Toolbox 2. Window Box 3. Wishing Well 4. Bird Feeder
Home and Office 1. CD Holder (standing) 2. Toolbox 3. CD Holder 2 4. Door Stop 5. Mantle Clock 6. Magazine Rack 7. Shelf 8. Quilt Holder (standing)
Kitchen and Bath 1. Step Stool 2. Fruit Basket 3. Paper Towel Holder (wall mounted)
Teen 1. Bow and Arrow Rack (wall mounted) 2. Game Controller Rack (wall mounted) 3. Game Controller Holder 4. Skateboard Rack (wall mounted) 5. Skateboard Rack (standing)
Proficient Projects (Difficulty level 3-5):
Games 1. Chinese Checkers 2. Cribbage Board 3. Mancala Board 4. Checkerboard
Garden 1. Bird House 2. Garden Planting Table 3. Wagon Plant Holder
Home and Office 1. Office Box 2. Square Bowl 3. Entry Table 4. Plant Table 5. Box with Sliding Lid 6. Shelf 7. Bookends 8. Curio Shelf
Kitchen and Bath 1. Breadbox 2. Cutting Board 1 3. Cookbook Holder 4. Footstool 5. Cutting Board 2 6. Salt and Pepper Shakers 7. Wood bowl
Teen 1. Deco Box 2. Children’s Bench
Toys
1. Model T Car
# NAME QTY CUT SIZE
A BOTTOM 2 3/4 X 2 1/2 X 4
B FRONT 1 3/4 X 1 1/2 X 7 1/2
C BACK 1 3/4 X 1 1/2 X 7 1/2
D SIDE 2 3/4 X 1 1/2 X 4
E TOP 1 3/4 X 5 1/2 X 7 1/2
F DIVIDER 1 3/4 X 1 1/2 X 4
LIST OF MATERIALS:
1. 1X6 DOUGLAS FIR (TOP) 2. 1x3 DOUGLAS FIR (BOTTOM) 3. 1X2 DOUGLAS FIR (SIDES)
CUTTING SCHEDULE: REQUIRED TOOLS
1. MITER SAW 2. TABLE SANDER 3. SCROLL SAW
JOINERY
1. NAIL GUN
FUN OPTIONS
1. WOOD BURN IMAGE IN BOX TOP. DO A SEARCH ON LINE FOR AN IMAGE.
2. LINE INSIDE OF BOX WITH FELT
TOP VIEW
FRONT VIEW RIGHT SIDE VIEW
TOP VIEW SECTION DIVIDER DETAIL
7 1/2” 5
1/2”
E
1 1/
2”
7 1/2” 4”
B
A A
S
F
D S
C
1 1
/2”
G A
M
E
S
Card Storage Box
Scale 1/4” = 1”
Name:
Class:
Date:
Difficulty Level
1
2 1/4
# NAME QTY CUT SIZE
A BOTTOM 9 3/4 X 7 1/8 X 7 1/8
B GAME X 4 3/4 X 1 1/2 X 1 1/2
C GAME 0 4 3/4 X 1 1/2 X 1 1/2
D DOWEL 9 1/4 Ø X 1 1/2
LIST OF MATERIALS:
1. 1X7 DOUGLAS FIR 2. 1x3 DOUBLAS FIR
CUTTING SCHEDULE:
REQUIRED TOOLS
1. MITER SAW 2. DRILL PRESS
3. ROUTER
JOINERY
1. GLUE—BUTT JOINT
FUN OPTIONS
1. STAIN 0 AND X DIFFERENT COLORS
2 1/4 2 1/4
2 1
/4
2 1
/4
2 1
/4 A
C
D
TOP VIEW
PLAYING PIECES
DRILL 1 1/2 Ø HOLE SAW FOR PLAY-
ING PIECE. THEN DRILL CENTER
HOLE AT 3/8 Ø. USE CIRCLE CLAMP.
DRILL CENTER HOLE FIRST AT 3/8 Ø.
THEN, USE SCROLL SAW FOR SHAP-
ING X PIECE.
ROUTER 3/16”
GROOVES INTO BOARD
B
G A
M
E
S
Tic-tac-toe
Scale 1/4” = 1”
Name:
Class:
Date:
Difficulty Level
1
# NAME QTY CUT SIZE
A BOTTOM 1 3/4 X 7 1/8 X 7 1/8
LIST OF MATERIALS:
1. 1X8 DOUGLAS FIR
CUTTING SCHEDULE:
REQUIRED TOOLS
1. MITER SAW
2. DRILL PRESS 3. HAND ROUTER (OPTIONAL)
7 1
/8
TOP VIEW
7 1/8
1 5/16” 1 5
/16”
1 5/16” 1 5
/16”
3/4”
ON
CENTER
3/8” Ø
2” Ø
3 9/16” 3 9/16”
G A
M
E
S
Solitaire
Scale 1/2” = 1”
Name:
Class:
Date:
Difficulty Level
1
A
# NAME QTY CUT SIZE
A SIGN 1 3/4 X 3 1/2 X 12
B SUPPORT 1 3/4 X 1 1/2 X 24
LIST OF MATERIALS:
1. 1X4 DOUGLAS FIR 2. 1X2 DOUGLAS FIR
CUTTING SCHEDULE:
NOTES:
1. ALL JOINTS TO BE ATTACED WITH TWO
SCREWS SET IN COUNTER SINK HOLES
FROM BACK.
OOO NNN III
OOO NNN
TTT OOO MMM AAA TTT OOO
PPP EEE PPP PPP EEE RRR
CCC AAA RRR RRR OOO TTT
BBB EEE AAA NNN SSS
12”
24”
FRONT VIEW SIDE VIEW
G A
R
D
E
N
Difficulty Level
1 GARDEN SIGNS
Scale 1/4” = 1”
Name:
Class:
Date:
# NAME QTY CUT SIZE
A SHAPES 1 3/4 X SEE PATTERN
B STICK 1 3/8 X 12 DOWEL
LIST OF MATERIALS:
1. 1X4 DOUGLAS FIR 2. 3/8” DOWEL
CUTTING SCHEDULE:
NOTES:
1. ALL JOINTS TO BE GLUED INTO 3/8”
HOLE IN BOTTOM OF FIGURE.
G A
R
D
E
N
Difficulty Level
1 Pot Stickers
Scale 1/4” = 1”
Name:
Class:
Date:
FRONT VIEW RIGHT SIDE VIEW
TOP VIEW
# NAME QTY CUT SIZE
A BOTTOM 1 3/4 X 2 1/2 X 12
B TOP 1 3/4 X 2 1/2 X 5
C RISER 2 3/4 X 1 1/2 X 2 1/2
LIST OF MATERIALS:
1. 1X3 DOUGLAS FIR
2. 1X2 DOUGLAS FIR
CUTTING SCHEDULE:
1 1
/4 ”
12 ”
1 3/4 ”
2 1
/2 ”
5 ”
2” Ø COUNTER
SINK 3/8” DEEP
1 3/4 ”
6
2 1/2”
A
B
C
NOTES:
1. ALL JOINTS TO BE GLUED.
Difficulty Level
1 Candle Holder
Scale 1/4” = 1”
Name:
Class:
Date:
HO
ME
&
O
FF
IC
E
FRONT VIEW RIGHT SIDE VIEW
TOP VIEW
1/4” X 3/4”
TRIM, SET 1/2
DISTANCE OF
FRAME
2 1
/2 ”
1 1
/2 ”
9 ”
4 ”
8 ”
8 ”
8 ”
1 1/2 ”
2 1/2 ”
# NAME QTY CUT SIZE
A BOTTOM 1 3/4 X 2 1/2 X 8
B TOP 1 3/4 X 1 1/2 X 8
C SIDE FRAME 2 3/4 X 1 1/2 X 9
D FRAME 2 3/4 X 1 1/2 X 4
E SIDE TRIM 2 1/2 X 3/4 X 6
F TRIM 2 1/2 X 3/4 X 4
G FEET 2 1/2 X 3/4 X 2 1//2
LIST OF MATERIALS:
1. 1X3 DOUGLAS FIR
2. 1X2 DOUGLAS FIR 3. 1/2 X 3/4 DOWEL
CUTTING SCHEDULE:
JOINERY:
1. ALL JOINTS TO BE GLUED.
HO
ME
&
O
FF
IC
E
Difficulty Level
1 4x6 Picture Frame
Scale 1/4” = 1”
Name:
Class:
Date:
B
A
C
D
E
F
G
# NAME QTY CUT SIZE
A BASE, SIDE 2 3/4 X 1 1/2 X 14
B BASE, END 2 3/4 X 1 1/2 X 2 1/2
C SUPPORT 2 3/4 X 5 1/2 X 7
D DOWEL 2 1/4” Ø X 1 1/2
E FEET 2 3/4 X 1 1/2 X 6 1/2
LIST OF MATERIALS:
1. 1X3 DOUGLAS FIR (BOTTOM) 2. 1X6 DOUGLAS FIR (SUPPORT) 3. 1/4” Ø DOWEL
CUTTING SCHEDULE:
REQUIRED TOOLS
1. MITER SAW 2. SCROLL SAW
3. DISC SANDER
JOINERY
1. GLUE—BUTT JOINT
14”
A
B
TOP VIEW
5 1/2”
FRONT VIEW OF SUPPORT
5 1
/2”
FRONT VIEW
6 1/2”
SIDE VIEW
1 1
/2”
7”
C
1 1/2” 1 1/2” 2 1/2” 1/4” DOWEL LOCK D
E
HO
ME
&
O
FF
IC
E
Book Holder
Scale 1/4” = 1”
Name:
Class:
Date:
Difficulty Level
1
1”
# NAME QTY CUT SIZE
A TOP 1 3/4 X 7 1/4 X 19 1/2
B BACK 1 3/4 X 1 1/2 X 19 1/2
C DECO RAIL 1 3/4 X 2 1/2 X 16 1/2
D DECO RAIL 1 3/4 X 3 1/2 X 16 1/2
E SHELF 2 3/4 X 7 1/4 X 16 1/2
F SIDE 2 3/4 X 7 1/4 X 30
LIST OF MATERIALS:
1. 1X2 DOUGLAS FIR 2. 1X8 DOUGLAS FIR 3. 1X4 DOUGLAS FIR 4. 1X3 DOUGLAS FIR
CUTTING SCHEDULE:
REQUIRED TOOLS
1. MITER SAW 2. SCROLL SAW
3. DISC SANDER 4. ORBITAL SANDER 5. ROUTER
JOINERY
1. NAIL GUN
TOP VIEW
FRONT VIEW
31 1
/2”
3 1
/2”
8 3
/4”
8 3
/4”
9”
19 1/2”
18”
8”
A
B
C
D
E
F
HO
ME
&
O
FF
IC
E
Book/DVD CASE
Scale 1/4” = 2”
Name:
Class:
Date:
Difficulty Level
1
# NAME QTY CUT SIZE
A
B
C
D
E
F
LIST OF MATERIALS:
1. 1X6 DOUGLAS FIR
CUTTING SCHEDULE:
REQUIRED TOOLS
1. MITER SAW 2. DRILL PRESS
3. SCROLL SAW
JOINERY
FUN OPTIONS
1. COME UP WITH YOUR OWN SHAPES OR USE AN ONLINE SHAPE BY DOING AN IMAGE SEARCH IN “COLORING PAGES” OF YOUR FAVORITE DESIGNS
CUT CIRCLE USING A
1 5/8 Ø DRILL BIT
1/2” DEEP
CUT OUT PATTERN AND GLUE TO WOOD USING A SPRAY ADHESIVE. DRILL THE
HOLE FIRST. THEN, CUT OUT PATTERN USING A SCROLL SAW.
HO
ME
&
O
FF
IC
E
Candle Holder
Actual size
Name:
Class:
Date:
Difficulty Level
1
CUT CIRCLE USING A
1 5/8 Ø DRILL BIT
1/2” DEEP
FRONT VIEW RIGHT SIDE VIEW
TOP VIEW
3 1
/2 ”
1 1/8 ”
7 ”
9 ”
9 ” 3 1/2 ”
3 1
/2 ”
2 ”
1 1
/2 ”
7 ” 1 1/2 ”
1 1/8 ”
5/8 ”
5/8 ”
3/8” DOWEL
# NAME QTY CUT SIZE
A BOTTOM 1 3/4 X 3 1/2 X 9
B SIDE 2 3/4 X 3 1/2 X 7
C END 2 3/4 X 1 1/2 X 3 1/2
D DIVIDER 1 3/4 X 1 1/2 X 3 1/2
E DOWEL 3 3/8” X 2 1/2”
LIST OF MATERIALS:
1. 1X4 DOUGLAS FIR
2. 1X2 DOUGLAS FIR
3. 3/8” DOWEL
CUTTING SCHEDULE:
JOINERY:
1. ALL JOINTS TO BE GLUED.
B
A
C
D
E
HO
ME
&
O
FF
IC
E
Difficulty Level
1 Office Mate
Scale 1/4” = 1”
Name:
Class:
Date:
# NAME QTY CUT SIZE
A BOTTOM 1 3/4 X 5 1/2 X 12 3/4
B HOLDERS 2 3/4 X 3 1/2 X 4 3/4
LIST OF MATERIALS:
1. 1X6 DOUGLAS FIR (BASE) 2. 1X4 DOUGLAS FIR (HOLDERS)
CUTTING SCHEDULE: REQUIRED TOOLS
1. MITER SAW 2. DRILL PRESS 3. PLANER
JOINERY
1. SCREW—COUNTERSINK
12 3/4”
4 3
/4”
3/4
” 3/8” Ø COUNTER SINK
12 3/4”
4 1/4” 4 1/4”
3/4” 3/4”
2 3/4”
2” Ø 1/4” DEEP
2 3/4” rad.
5 1
/2”
2 3
/4”
2 1/8”
TOP VIEW
FRONT VIEW
A
1 3/4” rad.
RIGHT SIDE VIEW
3 1/2”
B
KIT
CH
EN
&
B
AT
H
NAPKIN HOLDER
Scale 1/4” = 1”
Name:
Class:
Date:
Difficulty Level
1
# NAME QTY CUT SIZE
A SIDE 2 3/4 X 5 1/2 X 11 1/4
B DOWEL 6 3/8 X 3 3/4
C
D
E
F
LIST OF MATERIALS:
1. 1X6 DOUGLAS FIR (SIDES) 2. 3/8” DOWEL
CUTTING SCHEDULE:
REQUIRED TOOLS
1. MITER SAW 2. DRILL PRESS
3. SCROLL OR BAND SAW 4. DISC SANDER
JOINERY
1. GLUE—COUNTER SINK DOWEL
FUN OPTIONS
1. WOOD BURN IMAGE INTO FRONT. 2. ROUTER EDGES WITH 1/4 ROUND
11 1/4
5 1
/2
4 1
/2
3/4 1 2 1/4 2 1/4 1 3/4 3 1/4
3/4
2
2
3/4
SECTION
SIDE VIEW
S
B
A
S
3/8” HOLE DRILLED
3/8” DEEP
6 3/4
8” r
KIT
CH
EN
&
B
AT
H
PAPER PLATE HOLDER
Scale 1/4” = 1”
Name:
Class:
Date:
Difficulty Level
1
2 1/4 2 1/4
# NAME QTY CUT SIZE
A TOOL 1 3/4 X 3 X 15
LIST OF MATERIALS:
1. 1X4 DOUGLAS FIR
CUTTING SCHEDULE:
REQUIRED TOOLS
1. MITER SAW 2. DRILL PRESS
3. PLANER
NOTES
1. ROUTER EDGES
FUN OPTIONS
1. LABEL HOLES BY WOOD BURNING
1 3/4 Ø
15
1 1/2 Ø
1 1/8 Ø
7/8 Ø
3/8 Ø CENTER HANGING HOLE
1 3
/4
3
2 1
/2
2 1
/2
4 1
/4
1
3 Ø
2 Ø
1 1/4
H O
M
E
K
IT
CH
EN
&
B
AT
H
SPAGHETTI TOOL
Scale 1/4” = 1/2”
Name:
Class:
Date:
Difficulty Level
1
# NAME QTY CUT SIZE
A TOP 1 3/4 X 3 1/2 X 10
B SIDE 2 3/4 X 2 1/2 X 3 1/2
C BACK 1 3/4 X 1 1/2 X 8
D BOTTOM 1 3/4 X 3 1/2 X 10
LIST OF MATERIALS:
1. 1X4 DOUGLAS FIR (TOP AND BOTTOM) 2. 1X3 DOUGLAS FIR (SIDES) 3. 1X2 DOUGLAS FIR (BACK) 4.
CUTTING SCHEDULE:
REQUIRED TOOLS
1. MITER SAW 2. DRILL PRESS
3. TABLE SANDER
JOINERY
1. GLUE—BUTT JOINT
FRONT VIEW RIGHT SIDE VIEW
10
A
A
B
C
D
1 3/4 1 1/8 1 1/8 1 1/8 2
3 1
/2 1
3/4
2 1/4 Ø 3/4 Ø
3 1
/2
1 1
/2
B
D
A
TOP VIEW
H O
M
E
K
IT
CH
EN
&
B
AT
H
Toothbrush Holder
Scale 1/4” = 1”
Name:
Class:
Date:
Difficulty Level
1
FRONT VIEW RIGHT SIDE VIEW
3/8” DOWEL ROD
5 1
/2
11 3/4
3/4
TOP VIEW
5 1/2
1” RADIUS
SECTION S
1/2
1 3/8
S
4 1/4
4-1
/2
2
4 1
/4
3/8”Ø X 3/8”
COUNTER SINK
# NAME QTY CUT SIZE
A SIDE 2 3/4 X 5 1/2 X 5 1/2
B RACK 3 3/8 DOWEL X 11
LIST OF MATERIALS:
1. 1X6 DOUGLAS FIR (SIDES) 2. 3/8” DOWEL (RACK)
CUTTING SCHEDULE:
REQUIRED TOOLS
1. MITER SAW 2. DRILL PRESS
3. SCROLL SAW 4. TABLE SANDER
JOINERY
1. GLUE
A
B
CD Holder
Scale 1/4” = 1”
Name:
Date:
Class:
T E
E
N
Difficulty Level
1
# NAME QTY CUT SIZE
A MOUNT 1 3/4 X 31/2 X 16
B PEGS 4
LIST OF MATERIALS:
1. 1X4 DOUGLAS FIR 2. SHAKER PEGS 3. SCREW CAPS
CUTTING SCHEDULE:
REQUIRED TOOLS
1. MITER SAW 2. DRILL PRESS
3. ROUTER 4. SCROLL SAW
JOINERY
1. GLUE
FUN OPTIONS
1. WOOD BURN DESIGNS
16
3 1
/2 A
FRONT VIEW
2 4 4 4 2
T E
E
N
HAT RACK
Name:
Class:
Date:
Difficulty Level
1
# NAME QTY CUT SIZE
A BACK 1 3/4 X 3 1/2 X 15
B HANGER 8 3/8 Ø X 3 1/2
LIST OF MATERIALS:
1. 1X4 DOUGLAS FIR 2. 3/8 Ø DOWEL
CUTTING SCHEDULE: REQUIRED TOOLS:
1. MITER SAW
2. DRILL PRESS 3. ROUTER
JOINERY:
1. GLUE
15
3 3
1/2
3
1/2
3
1/2
3 1/2
1/2
60 ̊ 12 ̊
3 1/2
1/2 1/2 2 1/2
TOP VIEW
FRONT VIEW SIDE VIEW
GAME CONTROLLER RACK
Scale 1/4” = 1”
Difficulty Level
2
B
A
12 ̊
T E
E
N
Name:
Class:
Date:
# NAME QTY CUT SIZE
A BACK 1 3/4 X 5 1/2 X 5 1/2
B HANGER 2 3/4 X 3 1/2 X 5
LIST OF MATERIALS:
1. 1X6 DOUGLAS FIR 2. 1X4 DOUGLAS FIR
CUTTING SCHEDULE:
REQUIRED TOOLS
1. MITER SAW 2. DRILL PRESS
3. TABLE SANDER
JOINERY
1. SCREW—COUNTERSINK
FRONT VIEW SIDE VIEW
2
5 1
/2
A
5 1/2 5
1 r
1 1/2 r
3/4
1/4
OTHER IDEAS
T E
E
N
GUITAR HANGER
Scale 1/4” = 1”
Name:
Class:
Date:
Difficulty Level
1
# NAME QTY CUT SIZE
A BACK 1 3/4 X 2 1/2 X 12
B PEGS 11 SHAKER PEGS
LIST OF MATERIALS:
1. 1X3 DOUGLAS FIR 2. SHAKER PEGS (SMALL)
CUTTING SCHEDULE:
REQUIRED TOOLS
1. MITER SAW 2. DRILL PRESS
3. ROUTER
JOINERY
1. GLUE
12
2 1
/2 A
B
TOP VIEW
PEGS 1” APART
FRONT VIEW
T E
E
N
NECKLAS HOLDER
Scale 1/4” = 1”
Name:
Class:
Date:
Difficulty Level
1
A
# NAME QTY CUT SIZE
A BOTTOM 1 3/4 X 2 1/2 X 8
B NECKLAS
SUPPORT
1 3/4 X 1 1/2 X 6 1/2
C SIDE 2 3/4 X 1 1/2 X 12
D RING RACK 2 1/4 DOWEL X 7 1/4
E BASE 1 3/4 X 1 1/2 X 6 1/2
LIST OF MATERIALS:
1. 1X3 DOUGLAS FIR 2. 1X2 DOUGLAS FIR 3. 1/4 DOWEL 4. SHAKER PEGS
CUTTING SCHEDULE:
REQUIRED TOOLS
1. MITER SAW 2. DRILL PRESS
JOINERY
1. GLUE
TOP VIEW
8
FRONT VIEW
2 1
/2 1
1/2
6 1/2
A
1 1 1 3/8 1 3/8
B
C
D
E
12
3 1
/2
4
DRILL 1/4” Ø HOLE 3/8”
DEEP IN THE CENTER
OF EACH SIDE FOR
RING RACK DOWELS
T E
E
N
JEWELRY RACK
Scale 1/4” = 1”
Name:
Class:
Date:
Difficulty Level
1
SIDE VIEW
# NAME QTY CUT SIZE
A BODY 1 1 1/2 X 3 1/2 X 12 1/2
B WING 1 1/2 X 3 1/2 X 8 1/4
C STABILIZER 2 3/8 X 1 1/2 X 2 1/2
LIST OF MATERIALS:
1. 2X4 DOUGLAS FIR 2. 1X4 DOUGLAS FIR 3. 1X3 DOUGLAS FIR
CUTTING SCHEDULE:
C
A
B
8 1
/4”
1 1
/2”
7”
1 1/2”
12 1/2”
2” 6 1/4” 4 1/4”
1 1
/2”
3 1
/2” 1
1/4
” 3/4
”
5” 5 1/2”
3 1/2” 1 1/2”
1 1/4”
3/4
” 3/4
” 1”
1/2
”
7 1
/4”
2” 1” 2 1
/2”
TOP VIEW
1/2” MORTICE 1/2” DEEP
T O
Y
S
NOTES:
1. ALL JOINTS TO BE MORTICE AND TENON.
Difficulty Level
1 Toy Airplane
Scale 1/4” = 1”
Name:
Class:
Date:
½”
SIDE VIEW
TOP VIEW
# NAME QTY CUT SIZE
A BODY 1 1 1/2 X 3 1/2 X 11
B TOP 1 1 1/2 X 3 1/2 X 7 1/4
C WHEEL 4 3/4 X 1 3/4 Ø
D FINDER 4 1/4 X 3 Ø
LIST OF MATERIALS:
1. 2X4 DOUGLAS FIR 2. 1X4 DOUGLAS FIR 3. 3/8 CAP 4. 1/4 PLY OR HARDWOOD
CUTTING SCHEDULE:
JOINERY:
1. ALL JOINTS TO BE GLUED
3 1
/2”
11”
A
B
C
2” 7 1/4” 1 3/4”
3/8” CAP
3” 1 1
/2”
1 1
/2”
7 1/4”
1 1/2” 1 3/4” 1 3/4” 1 1/2”
3/4
”
1 1/2” r 1” r
1 3/4” Ø
WHEEL—SIDE VIEW
3/8” Ø
7/16” Ø
T O
Y
S
Difficulty Level
1 Toy Car
Scale 1/4” = 1”
Name:
Class:
Date:
D
SIDE VIEW— ACTUAL SIZE
CUT OUT DUCK PATTERN AND ATTACH TO WOOD
# NAME QTY CUT SIZE
A BODY 1 3/4 X 3 1/2 X 4 3/4
B WHEEL 2 3/4 X 2 Ø
C HANDLE 1 3/8 DOWEL X 24
LIST OF MATERIALS:
1. 1X4 DOUGLAS FIR 2. 1X3 DOUGLAS FIR
CUTTING SCHEDULE:
USE 1/4 TAPERED DRILL BIT TO INDENT THE EYES
A
B
WHEEL
2” Ø WITH 3/8 Ø HOLE IN THE CENTER FOR DOWEL CUT GROOVE FOR
LEATHER DUCK FEET
T O
Y
S
Difficulty Level
1 Duck Push Toy
Full Scale
Name:
Class:
Date:
SIDE VIEW FINDER
# NAME QTY CUT SIZE
A BODY 1 1 1/2 X 3 X 12
B FINDER 2 3/4 X 1 1/2 X 6 1/2
C B. SPOILER 1 1/2 X 1 1/2 X 3
D F. SPOILER 1 1/2 X 1 3/4 X 3
E WHEEL 4 3/4 X 2 1/2 Ø
LIST OF MATERIALS:
1. 2X4 DOUGLAS FIR 2. 1X2 DOUGLAS FIR
CUTTING SCHEDULE:
12”
NOTES
1. ALL JOINTS TO BE GLUED.
A
B
C
1 3/4” 3 1/4” 2” 5”
1 1/2”
1/2
” 1
/2”
1/2
” 1
1/4
” 1
1/4
”
3”
2” 1/2”
1 1/4” r.
6 1/2”
1 1
/2”
1 1
/4”
1 1/4” r.
10” r.
3/8” Ø HOLES
3/4
”
3/4
”
1”
1/2
”
SIDE VIEW BODY
2 1/2” Ø WHEEL
WHEEL
SPOILERS
3”
3”
1 1/2” 1 3/4”
D
E T
O
Y
S
Difficulty Level
1 Toy Race Car
Scale 1/4” = 1”
Name:
Class:
Date:
FRONT VIEW SPINNING TOP
TOP VIEW
# NAME QTY CUT SIZE
A HANDLE 1 3/4 X 1 1/2 X 6
B TOP 1 3/4 X 2 1/2 Ø
C DOWEL 1 3/8 X 3
LIST OF MATERIALS:
1. 1X2 HARDWOOD 2. 1X3 DOUGLAS FIR
CUTTING SCHEDULE:
3/4
”
6 ”
2” Ø
1” Ø
1 1/8 ”
7/16” Ø
1 1/8 ”
3/8
1 1
/2 ”
3/4
”
3/8” Ø DOWEL
2 1/2” Ø USE HOLE SAW
A
T O
Y
S
Difficulty Level
1 Spinning Top
Scale 1/4” = 1/2”
Name:
Class:
Date:
SIDE VIEW PADDLE PLAN
TOP VIEW
# NAME QTY CUT SIZE
A BOTTOM 1 3/4 X 5 1/2 X 15
B DECK 1 3/4 X 3 1/2 X 4
C TOP DECK 1 3/4 X 3 1/2 X 4
D SIDE 2 3/4 X 3 1/2 X 2 1/2
E STACK 2 3/4 Ø DOWEL X 4
F MOTOR 2 3/4 Ø DOWEL X 4
G MASONITE
PADDLE
2 1/4 X 3 1/2 X 2 1/2
LIST OF MATERIALS:
1. 1X6 DOUGLAS FIR 2. 1X4 DOUGLAS FIR 3. 3/8 Ø DOWEL 4. 3/4 Ø DOWEL
5. 1/4 MASONITE
CUTTING SCHEDULE:
15
5 1
/2
4 4 4
3 1/2
3 1
/2 A
B
C
D
D
F
E
2 1
/2
D
A
B
C F
E
G
3 1
/2
1/4
1 5
/8
USE 1/4” MASONITE
T O
Y
S
Toy Boat
Scale 1/4” = 1”
Name:
Class:
Date:
Difficulty Level
1
Advanced wood
d · e · s · i · g · n · s
B
2 1/4 2 1/4 2 1/4
2 1
/4
2 1
/4
2 1
/4
A
GAME BOARD-TOP VIEW
PLAYING PIECES
DRILL 1 1/2 Ø HOLE SAW FOR PLAY-
ING PIECE. THEN DRILL CENTER
HOLE AT 3/8 Ø. USE CIRCLE CLAMP.
DRILL CENTER HOLE FIRST AT 3/8 Ø.
THEN, USE SCROLL SAW FOR SHAP-
ING X PIECE.
GAME BOX-TOP VIEW
7 1/8
7 1
/8
3/16 GROOVE
8”
6 5/8
4”
# NAME QTY CUT SIZE
A TOP 1 3/4 X 7 1/8 X 7 1/8
B BOTTOM 1 3/4 X 7 1/8 X 7 1/8
C SIDE 2 3/4 X 3 1/2 X 7 7/8
D SIDE 2 3/4 X 3 1/2 X 6 3/8
E X’s 5 3/4 X 1 1/2 X 1 1/2
F O’s 5 3/4 X 1 1/2 Ø
LIST OF MATERIALS:
1. 1X4DOUGLAS FIR 2. 1X8 DOUGLAS FIR 3. 1X2 DOUGLAS FIR
CUTTING SCHEDULE:
REQUIRED TOOLS
1. MITER SAW 2. ROUTER
JOINERY
1. GLUE—BUTT JOINT
GAME BOX-SECTION
ROUTER 3/8 X 3/4
RABBET TOP AND
BOTTOM. ROUTER
AFTER BOX IS
ASSEMBLED
1 1/2” NOTCH
G A
M
E
S
Tic-tac-toe Box
Scale 1/4” = 1”
Name:
Class:
Date:
Difficulty Level
2
2 1
/4
2 1
/4
2 1
/4
2 1
/4
2 1
/4
2 1
/4
FRONT VIEW RIGHT SIDE VIEW
12
”
16”
TOP VIEW
7 1/8”
5 1
/2”
1” DOWEL HANDLE
16”
7 1
/8”
3/8” SCREW PLUG
1 1
/2”
A
B
C
D
# NAME QTY CUT SIZE
A BOTTOM 1 3/4 X 5 1/2 X 14 1/2
B SIDE 2 3/4 X 5 1/2 X 14 1/2
C END 2 3/4 X 7 1/8 X 12
D HANDLE 1 1” DOWEL X 16
E DIVIDER 2 3/4 X 5 1/2 X 5 5/8
LIST OF MATERIALS:
1. 1X6 DOUGLAS FIR 2. 1X8 DOUGLAS FIR 3. 1” DOWEL 4. 3/8” WOOD CAPS OR PLUGS
CUTTING SCHEDULE:
NOTES:
1. ALL JOINTS TO HAVE SCREW FASTNERS
2. COUNTER SINK AND PLUG SCREW HOLES
1” DOWEL HANDLE
5 1
/2”
3”
4” 6”
E
G A
R
D
E
N
Difficulty Level
2 Garden Toolbox
Scale 1/4” = 1”
Name:
Class:
Date:
# NAME QTY CUT SIZE
A FRONT 1 3/4 X 5 1/2 X 24
B SIDE 2 3/4 X 5 1/2 X 5 1/2
C FACE TRIM 2 3/4 X 1 1/2 X 25 1/2
D SIDE TRIM 2 3/4 X 1 1/2 X 7
E BRACE 2 3/4 X 4 1/2 X 3 1/2
F BOTTOM 1 3/4 X 5 1/2 X 5 1/2
G BACK 1 3/4 X 2 1/2 X 22 1/2
LIST OF MATERIALS:
1. 1X6 DOUGLAS FIR 2. 1X2 DOUGLAS FIR 3. 1X3 DOUGLAS FIR
CUTTING SCHEDULE:
JOINERY:
1. NAIL GUN JOINTS 2. MITER JOINT TOP AND BOTTOM DECO-
RATIVE RAILS
5 1
/2”
1 1
/2”
1 1
/2”
3 1
/2”
4 1/2”
4 1/2”
3” r
RIGHT SIDE VIEW
FRONT VIEW
4 1/2” 4 1/2”
A
B
C
E
D
G A
R
D
E
N
Difficulty Level
2 Window Box
Scale 1/4” = 1”
Name:
Class:
Date:
# NAME QTY CUT SIZE
A TOP 2 3/4 X 7 1/4 X 14
B RIDGE 1 3/4 X 1 1/2 X 15 1/2
C DECO 2 3/4 X 1 1/2 X 2
D ROOF SIDE 2 3/4 X 5 1/2 X 13
E RISER 2 3/4 X 2 1/2 X 25
F BOX TOP 4 3/4 X 2 1/2 X 10
G SIDE RAIL 8 3/4 X 2 1/2 X 8 3/4
H SIDE 4 3/4 X 7 1/4X 10
I BOTTOM 1 3/4 X 5 1/2 X 5 1/2
LIST OF MATERIALS:
1. 1X8 DOUGLAS FIR (TOP AND SIDES)
2. 1X2 DOUGLAS FIR (RIDGE AND DECO) 3. 1X6 DOUGLAS FIR (ROOF SIDE AND
BOTTOM 4. 1X3 DOUGLAS FIR (RISER AND RAILS)
CUTTING SCHEDULE:
REQUIRED TOOLS:
1. MITER SAW 2. BAND SAW
3. OSC. ORBITAL SANDER 4. SCROLL SAW
JOINERY:
1. NAIL GUN 2. ATTACH RISER WITH SCREWS BEFORE
ATTACHING SIDE RAILS 3. MITER CUT ALL CORNERS
C
E
B
A
D
F
G
H
G
27
10
7 1/4 G
A
R
D
E
N
Name:
Class:
Date:
Wishing Well
Scale 1/4” = 1”
Difficulty Level
2
FRONT VIEW RIGHT SIDE VIEW
9 ”
5”
45° MITER CUT
1 1
/2 ”
4 1/
4”
TOP VIEW
NOTES:
1. ALL JOINTS TO BE JOINED WITH A NAIL GUN USING 1 1/4” NAILS.
2. DO NOT ATTACH TOP TO FRAME. TOP HANGS FROM ROPE
SECTION A
5”
3 1/2”
11”
1 1
/2 ”
3/4” 3/4”
3/8” DOWEL
1/4” HOLE
BOTH SIDES
45°
3/8” DOWEL
1/2
”
5 3
/8 ”
2 ”
2 ”
1/8” PLEXY
GLASS
1/8” PLEXY
GLASS SET IN
DADO
3/8
”
3/8” DOWEL
1/2
”
1/4”
HOLE
5 1/2”
A
11 ”
1/8” DADO
A
B
C
D
F
E
G A
R
D
E
N
Difficulty Level
2 Bird Feeder
Scale 1/4” = 1”
Name:
Class:
Date:
FRONT VIEW RIGHT SIDE VIEW
8”
16”
TOP VIEW
7 1/8”
3 3/4” RADIUS
3 1
/2”
1” DOWEL HANDLE
16”
7 1
/8”
3/8” SCREW PLUG
1” DOWEL HANDLE
1 1
/2”
A
B
C
D
# NAME QTY CUT SIZE
A BOTTOM 1 3/4 X 5 1/2 X 14 1/2
B SIDE 2 3/4 X 3 1/2 X 14 1/2
C END 2 3/4 X 7 1/8 X 2 1/2
D HANDLE 1 1” DOWEL X 16
LIST OF MATERIALS:
1. 1X6 DOUGLAS FIR 2. 1X8 DOUGLAS FIR 3. 1X4 DOUGLAS FIR 4. 1” DOWEL
5. 3/8” WOOD CAPS OR PLUGS
CUTTING SCHEDULE:
NOTES:
1. ALL JOINTS TO HAVE SCREW FASTNERS
2. COUNTER SINK AND PLUG SCREW HOLES
Difficulty Level
2 TOOL BOX
Scale 1/4” = 1”
Name:
Date:
Class:
HO
ME
&
O
FF
IC
E
FRONT VIEW
RIGHT SIDE VIEW
5 1
/2
11
TOP VIEW
5 1/2
# NAME QTY CUT SIZE
A SIDE 2 3/4 X 5 1/2 X 5 1/2
B SHELF 2 3/4 X 2 1/2 X 2 1/2
LIST OF MATERIALS:
1. 1X3 DOUGLAS FIR (SHELF) 2. 1X6 DOUGLAS FIR (SIDES)
CUTTING SCHEDULE:
REQUIRED TOOLS
1. MITER SAW
2. DRILL PRESS 3. SCROLL SAW 4. TABLE SANDER
JOINERY
1. SCREW FASTENERS W/ PLUG OR CAP
A
B
3” RADIUS
3/4
2 3/4
4 1/4
2 3
/4
1
1 1
/4
3/8”Ø X 3/8” DEEP
COUNTER SINK
1
1 1/4
2 1
/2
2 1
/2
A
11
CD Holder 2
Scale 1/4” = 1”
Name:
Date:
Class:
HO
ME
&
O
FF
IC
E
Difficulty Level
2
SIDE VIEW
BODY
5 1/2 10
FACE
NOSE
HANDS
FEET
4 1/4” DIAMETER
2 1/4” DIAMETER
2x2 1/2 OVAL
2 3/4 x 3 1/2 OVAL
1 1/8” r.
2 1/8” r.
5 X 5 1/2 OVAL
FRONT VIEW
5 1/2
3/4
5
Difficulty Level
2 BEAR DOOR STOP
Scale 1/4” = 1”
Name:
Date:
Class:
HO
ME
&
O
FF
IC
E
FRONT VIEW RIGHT SIDE VIEW
4 ”
TOP VIEW
10 3/4”
12 1/2”
2 3/4” RADIUS
2 3/4” RADIUS
1” RADIUS
2” DIAMETER
ROUTERED
EDGE
3 1
/2 ”
10 3/4”
12 1/2”
ROUTERED EDGE
4 ”
3 1/2”
# NAME QTY CUT SIZE
A BOTTOM 1 3/4 X 3 1/2 X 12 1/2
B CLOCK 1 3/4 X 5 1/2 X 10 3/4
LIST OF MATERIALS:
1. 1X4 DOUGLAS FIR
2. 1x6 DOUGLAS FIR
CUTTING SCHEDULE: REQUIRED TOOLS
1. MITER SAW 2. DRILL PRESS 3. TABLE SANDERS 4. SCROLL SAW
5. ROUTER
JOINERY
1. SCREW—COUNTER SINK OR
2. GLUE, DOWEL
A
B
HO
ME
&
O
FF
IC
E
Difficulty Level
2 MANTLE CLOCK
Scale 1/4” = 1”
Name:
Class:
Date:
1 1/2 1 1/2 1 1/2 1 1/2
16
4
B
1 1/2 1 1/2 1 1/2 1 1
/4
1 1
/4
1 1
/4
1 1
/4
SIDE VIEW SECTION FRONT VIEW
1
15
7
1 1
/2
1 1/2” r
A
C
# NAME QTY CUT SIZE
A SIDE 2 3/4 X 9 1/4 X 17 1/2
B RAIL 4 3/4 X 1 1/2 X 14 1/2
C HANDLE 1 3/4 X 1 1/2 X 14 1/2
D BOTTOM 1 3/4 X 5 1/2 X 14 1/2
E STYLES 10 3/4 X 1 1/2 X 7
F SHELF 1 3/4 X 1 1/2 X 14 1/2
G SHELF 1 3/4 X 2 1/2 X 14 1/2
LIST OF MATERIALS:
1. 1X12 DOUGLAS FIR
2. 1X10 DOUGLAS FIR 3. 1x12 DOUGLAS FIR 4. 1X8 DOUGLAS FIR
JOINERY
1. SCREW—COUNTER SINK AND PLUG FOR BOTTOM
2. MORTICE AND TENNON FOR RAILS
CUTTING SCHEDULE:
7
2” r
1 1
/2 G F
D
E
9 1/4
3
HO
ME
&
O
FF
IC
E
Difficulty Level
2 Magazine Rack
Scale 1/4” = 1”
Name:
Class:
Date:
# NAME QTY CUT SIZE
A TOP 1 3/4 X 5 1/2 X 16
B SIDE 2 3/4 X 5 1/2 X 7
C FRONT 1 3/4 X 2 1/2 X 13 1/2
D PEG 3
E
F
LIST OF MATERIALS:
1. 1X6 DOUGLAS FIR 2. 1X3 DOUGLAS FIR 3. 1X8 DOUGLAS FIR 4. WOOD SHAKER PEGS
CUTTING SCHEDULE:
REQUIRED TOOLS
1. MITER SAW 2. DRILL PRESS
3. SCROLL SAW OR BAND SAW 4. OSCILLATING ORBITAL SANDER
JOINERY
1. NAIL GUN
FUN OPTIONS
1. ROUTER THE EDGE OF THE SHELF TOP
16
13 1/2
2 1/
2
1 1/
2
3 3/4 3 3 3 3/4
1 1/2
2 r
3/4 r
5 1/2
7 1
/2
5
TOP VIEW
SIDE VIEW
1 1/2 r
C
A
B
HO
ME
&
O
FF
IC
E
SHELF
Scale 1/4” = 1”
Name:
Class:
Date:
Difficulty Level
2
# NAME QTY CUT SIZE
A LEG 2 3/4 X 7 1/8 X 32
B RAIL 4 3/4 X 2 1/2 X 34 1/2
LIST OF MATERIALS:
1. 1X8 DOUGLAS FIR 2. 1x3 DOUGLAS FIR
REQUIRED TOOLS
1. MITER SAW 2. SCROLL SAW 3. TABLE SANDERS
JOINERY
1. SCREW—COUNTER SINK AND PLUG
32
7 1/8
CUTTING SCHEDULE:
6 6
FRONT VIEW
HO
ME
&
O
FF
IC
E
SIDE VIEW
36
A
B
B
B
QUILT HOLDER
Scale 1/4” = 2”
Name:
Class:
Date:
Difficulty Level
2
# NAME QTY CUT SIZE
A BOTTOM 1 3/4 X 11 1/4 X 11 1/4
B TOP RAIL 6 3/4 X 3/4 X 4 3/4
C HOLDER 1 3/4 X 4 1/2 X 10
D DOWEL 19 3/8 X 3
LIST OF MATERIALS:
1. 1X12 DOUGLAS FIR
2. 1X1 DOUGLAS FIR 3. 1x6 DOUGLAS FIR 4. 3/8” Ø DOWEL
CUTTING SCHEDULE: REQUIRED TOOLS
1. MITER SAW
2. DRILL PRESS 3. TABLE SANDERS 4. SCROLL SAW
JOINERY
1. SCREW—COUNTER SINK 2. GLUE
6 1/4”
11 1/4
TOP VIEW
B
C
A
2 1
/2
10
TOP VIEW
4 3/4
KIT
CH
EN
&
B
AT
H
Fruit Basket
Scale 1/4” = 1”
Name:
Class:
Date:
Difficulty Level
2
# NAME QTY CUT SIZE
A TOP 1 3/4 X 5 1/2 X 14 1/4
B SIDE 2 3/4 X 5 1/2 X 7
C DECO RAIL 1 3/4 X 2 1/2 X 13 3/4
D BACK 1 3/4 X 2 1/2 X 12 1/4
E TOP BACK 1 3/4 X 1 1/2 X 13
F DOWEL 1 3/4 X 7 1/4 X 15 3/4
LIST OF MATERIALS:
1. 1X6 DOUGLAS FIR 2. 1X3 DOUGLAS FIR 3. 1” DOWEL 4. 3/8” DOWEL
CUTTING SCHEDULE:
REQUIRED TOOLS
1. MITER SAW 2. SCROLL OR BAND SAW
3. OSCILLATING ORBITAL SANDER 4. DISC SANDER 5. DRILL PRESS
JOINERY
1. SCREW—COUNTER SINK AND PLUG
FUN OPTIONS
1. WOOD BURN IMAGES
14 1/4 5 1
/2
2 1
/2
7
5 1/2
A
TOP VIEW
FRONT VIEW
2 1
/2
2 1
/2
2 1/2 3
1 1
/2
1” r
1” r
3 1
/2
E
E
D
F
C
B
KIT
CH
EN
&
B
AT
H
PAPER TOWEL HOLDER
Scale 1/4” = 1”
Name:
Class:
Date:
Difficulty Level
2
# NAME QTY CUT SIZE
A STEP 2 3/4 X 5 1/2 X 15
B SIDE 2 3/4 X 12 1/2 X 11 1/4
C RAIL 2 3/4 X 1 1/2 X 13 13 1/2
D FEET 4 3/4 X 1 1/2 X 3
E BACK RAIL 1 3/4 X 2 1/2 X 13 1/2
F
LIST OF MATERIALS:
1. 1X6 DOUGLAS FIR 2. 1x3 DOUGLAS FIR 3. 1X2 DOUGLAS FIR
CUTTING SCHEDULE:
REQUIRED TOOLS
1. MITER SAW 2. SCROLL SAW
3.
JOINERY
1. NAIL GUN
15
13 1/2
1 1/
2
1 1/
2
2 1/
2
6 1/
2
5 3
/4
11 1/4
5
1 1/
2
2 1/4 r
12 1
/2
5
FRONT VIEW
E
SIDE VIEW
A
A
B
C
C
D D
D D
KIT
CH
EN
&
B
AT
H
STEP STOOL
Scale 1/4” = 1”
Name:
Class:
Date:
Difficulty Level
2
2 1
/4
# NAME QTY CUT SIZE
A SIDES 2 3/4 X 7 1/8 X 30
B TOP 1 3/4 X 5 1/2 X 28 1/2
C BOTTOM 1 3/4 X 3 1/2 X 28 1/2
D ARROW
SUPPORTS
2 3/4 X 2 1/2 X 28 1/2
LIST OF MATERIALS:
1. 1X8 DOUGLAS FIR 2. 1X4 DOUGLAS FIR 3. 1X3 DOUGLAS FIR 4. SHAKER PEGS
REQUIRED TOOLS
1. MITER SAW 2. DRILL PRESS
3. PLANER
JOINERY
1. SCREW—COUNTERSINK
7 1/8
6
6
A
FRONT VIEW
2 ½
6
4 1
/2
30
SECTION
B
30
30
4
2 ½
2 ½
15
1/2” Ø ARROW HOLES
TOP SUPPORT DRILL THROUGH
BOTTOM SUPPORT DRILL 3/8” DEEP
15 2
1 3
/4
CUTTING SCHEDULE:
C
SHAKER PEGS 5” ON CENTER
T E
E
N
BOWANDARROW RACK
Scale 1/4” = 2”
Name:
Class:
Date:
Difficulty Level
2
# NAME QTY CUT SIZE
A BACK 1 3/4 X 9 1/8 X 30
B FRONT 1 3/4 X 3 1/2 X 9 1/8
C SIDE 2 3/4 X 5 1/2 X 27
D BOTTOM 2 3/4 X 5 1/2 X 9 1/8
LIST OF MATERIALS:
1. 1X10 DOUGLAS FIR
2. 1X6 DOUGLAS FIR 3. 1X4 DOUGLAS FIR 4. SHAKER PEGS
CUTTING SCHEDULE: REQUIRED TOOLS:
1. MITER SAW 2. DRILL PRESS 3. ROUTER
JOINERY:
1. NAIL GUN OR SCREW W/ COUNTER SINK
TOP VIEW
FRONT VIEW SIDE VIEW
GAME CONTROLLER RACK
Scale 1/4” = 1”
Difficulty Level
2
B
30
9 1/8
A
5 1/2
8 2
C
D
B
27
1
9
2 1/2 r
2 1/2 r
2 1/2 r
9 r
5 3/
4
4 1
/2
5
3 3
3/8 r
3/8 r
9 1/8
5 1/
2
T E
E
N
Name:
Class:
Date:
# NAME QTY CUT SIZE
A BASE 1 3/4 X 9 1/8 X 11
B HOLDER 2 3/4 X 9 1/8 X 6
LIST OF MATERIALS:
1. 1X10 DOUGLAS FIR
CUTTING SCHEDULE: REQUIRED TOOLS:
1. MITER SAW 2. DRILL PRESS 3. SCROLL SAW 4. ROUTER
JOINERY:
1. SCREW—COUNTERSINK
9 1/8
FRONT VIEW SIDE VIEW
GAME CONTROLLER RACK
Scale 1/4” = 1”
Difficulty Level
2
11
3 1/2
6
9 1/8
2 1
/2
1 1/2 r
1 1/8 r
1 1/2 r B
A
TOP VIEW
9 1/8
11
T E
E
N
Name:
Class:
Date:
FRONT VIEW RIGHT SIDE VIEW
13”
8 1/2”
TOP VIEW SECTION A
7 1
/8”
5 1
/2”
3 1
/2”
3 1/2”
1 3
/4”
2 3/4” RADIUS
7”
A
8 1/2”
NOTES:
1. ALL JOINTS TO BE SCREW FASTNERS WITH 1/4 COUNTERSINK
2. CAP ALL HOLES
1”
1”
2 3
/4”
1 1
/2 ”
7 ”
7 ”
6”
A
B
C
C
3/4”
3/4”
Difficulty Level
2 CD Holder
Scale 1/4” = 1”
Name:
Date:
Class:
T E
E
N
7 1/8”
# NAME QTY CUT SIZE
A SIDES 2 3/4 X 7 1/8 X 24
B BACKS 2 3/4 X 3 1/2 X 13 1/2
LIST OF MATERIALS:
1. 1X8 DOUGLAS FIR (SIDES) 2. 1X4 DOUGLAS FIR (BACKS)
CUTTING SCHEDULE: REQUIRED TOOLS
1. MITER SAW 2. DRILL PRESS 3. PLANER
JOINERY
1. SCREW—COUNTERSINK
15
FRONT VIEW
B
7 1/8
A
6
3 1
/4
1 ¼
6
1 ¼
5
1 ¼
4 1/2
24
SIDE VIEW
24
T E
E
N
SKATEBOARD RACK Scale 1/4” = 2”
Name:
Class:
Date:
Difficulty Level
2
# NAME QTY CUT SIZE
A SIDE 9 3/4 X 7 1/8 X 28
B BASE 2 3/4 X 7 1/8 X 15
C DIVIDER 6 3/4 X 3 1/2 X 14 1/2
LIST OF MATERIALS:
1. 1X8 DOUGLAS FIR
2. 1X2 DOUGLAS FIR (GAME PIECES) 3. 1/4 X 3/4 DOUGLAS FIR (DIVIDERS) 4. 1/4 DOWEL (PEGS)
REQUIRED TOOLS
1. MITER SAW 2. DRILL PRESS 3. SLIDING MITER
4. SCROLL SAW 5. SANDER
16
FRONT VIEW
C 28
7 1/8
6
3 1
/4 A
1 ¼
6
1 ¼
9
1 ¼
4 1/2
28
SIDE VIEW
7 1
/8
1” rad
CUTTING SCHEDULE: JOINERY
1. SCREW—COUNTER SINK AND PLUG
14
15
B
15̊
T E
E
N
SKATEBOARD RACK
Scale 1/4” = 2”
Name:
Class:
Date:
Difficulty Level
2
Proficient Woodworker
the
# NAME QTY CUT SIZE
A BOTTOM 1 3/4 X 9 1/4 X 9 1/4
B SIDE 4 3/4 X 2 1/2 X 10
C TOP 1 3/4 X 9 1/4 X 9 1/4
D
E
F
LIST OF MATERIALS:
1. 1X10 DOUGLAS FIR (TOP AND BOTTOM) 2. 1X3 DOUGLAS FIR (SIDES)
CUTTING SCHEDULE: REQUIRED TOOLS
1. MITER SAW 2. TABLE SANDER 3. OSCILATING ORBITAL SANDER
4. ROUTER
JOINERY
1. NAIL GUN
2. 45̊ MITER CUT SIDES
FRONT AND SIDE VIEW
SIDE VIEW SECTION
TOP VIEW
9 1/4” 9
1/4”
C
10”
S
2 1/
2”
2 1
/2”
B
A
C
B B
S
ROUTER RABBET NOTCH
ALL FOUR SIDES 3/8” WIDE
AND 3/4” DEEP AFTER BOX
HAS BEEN ASSEMBLED
USE 1” Ø SANDING CYLINDER
FOR FINGER NOTCH
MITER JOINT ALL
FOUR CORNERS
USE TEMPLATE PROVIDED
ON BACK FOR HOLE
LOCATION
G A
M
E
S
Chinese Checkers
Scale 1/4” = 1”
Name:
Class:
Date:
Difficulty Level
3
G A
M
E
S
Difficulty Level
3 Cribbage Board
Scale 1/4” = 1”
Name:
Class:
Date:
# NAME QTY CUT SIZE
A GAME BD. 3 3/4 X 1 1/2 X 12 1/2
B END 2 3/4 X 1 1/2 X 4 1/2
C
D
E
F
LIST OF MATERIALS:
1. 1X2 WOOD OF CHOICE
CUTTING SCHEDULE: REQUIRED TOOLS
1. MITER SAW
2. DRILL PRESS 3. PLANER 4. JOINTER
JOINERY
1. GLUE—BUTT JOINT
FUN OPTIONS
1. CHOOSE CONTRASTING COLOR WOOD FOR CENTER AND END PIECES
2. WOOD BURN IMAGES IN MIDDLE PIECE 3. WOOD BURN DIVIDER LINES BETWEEN
GROUPS OF FIVE HOLES
12 1/2”
1 1/
2”
1 1/
2”
1 1/
2”
1 1/4”
DRILL 1/8” Ø HOLES 1/4” APART IN GROUPS
OF FIVE. SET HOLE DEPTH AT 1/4” DEEP.
BEGIN ROWS 3/4” FROM EDGE AND PLACE
EACH GROUP OF FIVE 3/4” APART.
3/4”
11/2” 1 1/2”
1/2”
1/
2”
3/4” 3/4” 3/4”
A B
STEPS TO MAKING A CHECKERBOARD
1. CHOOSE TWO DIFFERENT SPECIES OF WOOD, ONE DARK AND ONE LIGHT
2. CUT THE WOOD INTO STRIPS 1 1/2” WIDE BY 10” LONG
3. COVER THE CHECKERBOARD CLAMPING JIG WITH WAX PAPER.
4. POSITION THE STRIPS ON THE JIG ALTERNATING THE COLOR. GLUE THE STRIPS TOGETHER.
MAKE SURE YOU GLUE ON BOTH EDGES OF THE STRIPS.
5. ONCE THE GLUE IS DRY, CROSS CUT 1/2” OFF ONE END.
6. PLACE THE NEWLY CUT FLAT END AGAINST THE FENCE ON A TABLE SAW AND CROSS CUT THE
REMAINING SECTIONS 1 1/2” WIDE. LAYOUT THE PIECES IN ORDER AS YOU CUT THEM ROTAT-
ING EVERY OTHER PIECE TO FORM THE CHECKERBOARD PATTERN
7. GLUE THE PIECES TOGETHER USING THE CHECKERBOARD CLAMPING JIG.
8. PLANE THE SURFACES ON A PLANER AND SAND SMOOTH
9. CUT FRAME PIECES TO FIT USING A 45̊ MITER JOINT FOR THE CORNERS
10. PLANE EAC FRAME PIECE INDIVIDUALLY TO THE THICKNESS OF THE CHECKERBOARD.
11. GLUE THE FRAME AND THE CHECKERBOARD PIECES TOGETHER IN THE SAME SET UP.
17”
17”
2 1/2” 1 1/2”
2 1
/2”
1 1
/2”
NOTES:
1. ALL JOINTS TO BE FASTENED WITH
GLUE BUTT JOINT
LIST OF MATERIALS:
1. 1X4 STOCK OF YOUR CHOICE
2. 1X6 STOCK OF YOUR CHOICE
CUTTING SCHEDULE:
# NAME QTY CUT SIZE
A TOP 4 3/4 X 2 1/2 X 17
B DARK 4 3/4 X 1 1/2 X 10
C LIGHT 1 3/4 X 1 1/2 X 10
A
C B
G A
M
E
S
Difficulty Level
7 Checkerboard
Scale 1/4” = 1”
Name:
Class:
Date:
# NAME QTY CUT SIZE
A GAME BD. 1 3/4 X 5 1/2 X 17
B SIDE 2 3/4 X 3/4 X 8
C SIDE 2 3/4 X 3/4 X 19 1/2
D TRIM 2 1/2 X 1/2 X 18
E TRIM 2 1/2 X 1/2 X 5 1/2
F
LIST OF MATERIALS:
1. 1X6 DOUGLAS FIR (GAME BOARD) 2. 1/2 X 1/2 DOUGLAS FIR (TRIM) 3. 3/4 X 3/4 DOUGLAS FIR (SIDES)
CUTTING SCHEDULE:
REQUIRED TOOLS
1. MITER SAW 2. TABLE SANDER 3. SCROLL SAW
4. ROUTER
JOINERY
1. NAIL GUN—BUTT JOINT
2. NAIL GUN—MITER JOINT
FUN OPTIONS
1. WOOD BURN SCROLL PATTERNS IN RECESSED TRIM.
2. STAIN RECESSED TRIM DIFFERENT
COLOR BEFORE GLUING
5 1/2 18
19 1
/2
7 1/2
17
S
TOP VIEW
SECTION VIEW
1 1
/2
2
2
TYP.
1 1/2
1 3/4 x 2 1/4 CORE-BOX OR
ROUND BOTTOM ROUTER BIT
1/2” STOCK PROVIDES A 1/4”
DECORATIVE RECESS
A B
C E
D
S
MITER CUT ALL FOUR
CORNERS
G A
M
E
S
Mancala Board
Scale 1/4” = 1”
Name:
Class:
Date:
Difficulty Level
3
FRONT VIEW RIGHT SIDE VIEW
5 ”
5 1/2”
45°
4 ”
2” dia
3/8” dia
45° MITER CUT
5 1/
4 ”
2 3/4” 5”
3/8”
DOWEL
1 1/2”
3/4
”
6 1/2”
3 ”
5 1/2”
TOP VIEW
5 1/2
”
6 1/2
”
5 3/8”
NOTES:
1. ALL JOINTS TO BE JOINED
WITH A NAIL GUN USING 1 1/4” NAILS.
# NAME QTY CUT SIZE
A ROOF 2 3/4 X 5 1/2 X 5 1/4
B SIDE 2 3/4 X 3 1/2 X 5
C FRONT/
BACK
2 3/4 X 5 1/2 X 8
D BOTTOM 1 3/4 X 5 1/2 X 6 1/2
E PORCH 1 3/4 X 3 X 3
F PERCH 1 3/8 X 2 DOWEL
LIST OF MATERIALS:
1. 1X6 DOUGLAS FIR 2. 1X4 DOUGLAS FIR 3. 3/8” Ø DOWEL
CUTTING SCHEDULE:
A
A
A
B C
D
E
E
G A
R
D
E
N
Difficulty Level
3 Bird House
Scale 1/4” = 1”
Name:
Class:
Date:
# NAME QTY CUT SIZE
A F/B RAIL 4 3/4 X 2 1/2 X 33
B LEG 4 3/4 X 1 1/2 X 36
C SIDE RAIL 4 3/4 X 2 1/2 X 9
D SLATS 36 3/4 X 1 1/2 X 12
LIST OF MATERIALS:
1. 1X3 DOUGLAS FIR 2. 1X2 DOUGLAS FIR 3. 2X2 DOUGLAS FIR
CUTTING SCHEDULE:
NOTES
1. NAIL GUN SLATS ONTO FRAME.
2. POCKET SCREW LEGS TO FRAME
36”
12”
12”
36”
TOP VIEW
FRONT VIEW SIDE VIEW
A
B
C
D
G A
R
D
E
N
Difficulty Level
3 Garden Planting Table
Scale 1/4” = 3”
Name:
Class:
Date:
# NAME QTY CUT SIZE
A FR. RAIL 6 3/4 X 1 1/2 X 16
B SD. RAIL 6 3/4 X 1 1/2 X 8
C CORNER 8 3/4 X 1 1/2 X 6
D SLATS 7 3/4 X 1 1/2 X 8
E WHEEL 4 3/4 X 4 Ø
LIST OF MATERIALS:
1. 1X6 DOUGLAS FIR 2. 1X2 DOUGLAS FIR
CUTTING SCHEDULE:
NOTES: 1. NAIL GUN ALL JOINTS 2. LAG SCREW WHEEL TO SIDE
PANEL
A B
C
D
TOP VIEW
FRONT VIEW SIDE VIEW
E
WHEEL PLAN
Difficulty Level
3 Wagon Plant Holder
Scale 1/4” = 1”
Name:
Class:
Date:
G A
R
D
E
N
4” Ø
USE 4” HOLE SAW TO CUT
16
8
6
1 1/2” Ø HUB
1 1
/4
FRONT VIEW RIGHT SIDE VIEW
5 1
/2”
5 1/2”
4 3
/4”
3”
3/4” rad.
2 1/2”
1”
3/8” DOWEL
DRILL THROUGH
3 1
/2”
45̊
5 1/2”
TOP VIEW
5 1/2”
4”
2 3
/4”
3/8” DOWEL
DRILL HOLE COMPLETELY
THROUGH
5 1
/2”
2 1
/4”
NOTES:
1. ALL JOINTS TO BE JOINED WITH A NAIL
GUN USING 1 1/4” NAILS.
# NAME QTY CUT SIZE
A HANDLE 1 3/4 X 5 1/2 X 5 1/2
B FRONT/ 2 3/4 X 5 1/2 X 3
C SIDE 2 3/4 X 5 1/2 X 4 3/4
D BOTTOM 1 3/4 X 5 1/2 X 4
E DIVIDER 1 3/8 X 5 1/2 DOWEL
LIST OF MATERIALS:
1. 1X6 DOUGLAS FIR 2. 3/8” Ø DOWEL
CUTTING SCHEDULE:
A
B
D
E
C
HO
ME
&
O
FF
IC
E
OFFICE BOX
Scale 1/4” = 1”
Name:
Class:
Date:
Difficulty Level
3
FRONT VIEW
3 1
/2” 15̊
5”
NOTES:
1. ALL JOINTS TO BE JOINED WITH A NAIL
GUN USING 1 1/4” NAILS. 2. DO NOT CUT 9” LENGTHS. CUT FOUR
12” LENGTHS. THEN, SET MITER SAW TABLE AT 15̊ AND THE SAW AT 45̊ .
NEXT, CUT ONE END OF EACH OF THE FOUR PIECES. FINALLY, SET UP A STOP BLOCK FOR 9” AND CUT THE REMAIN-
# NAME QTY CUT SIZE
A SIDE 4 3/4 X 3 1/2 X 9
See note 2 below
B BOTTOM 1 3/4 X 3 1/2 X 3 3 1/2
LIST OF MATERIALS:
1. 1X4 DOUGLAS FIR
CUTTING SCHEDULE:
9”
9”
45̊
9”
TOP VIEW
A
B
HO
ME
&
O
FF
IC
E
SQUARE BOWL
Scale 1/4” = 1”
Name:
Class:
Date:
Difficulty Level
3
# NAME QTY CUT SIZE
A TOP 4 3/4 X 3 1/2 X 12
B LEG 4 1 1/2 X 1 1/2 X 31 1/4
C SHELF 4 3/4 X 3 1/2 X 36
D RAIL 8 3/4 X 2 1/2 X 8
LIST OF MATERIALS:
1. 2X2 DOUGLAS FIR
2. 1X4 DOUGLAS FIR 3. 1x3 DOUGLAS FIR
REQUIRED TOOLS
1. MITER SAW 2. PLANER
3. JOINTER 4. TABLE SAW 5. BISCUIT JOINTER
JOINERY
1. POCKET SCREW 2. BISCUIT JOINTS FOR TOP
A
31 1
/4
2 1
/2
2 1
/2
6
B
C
D
D
CUTTING SCHEDULE:
TOP VIEW
FRONT VIEW
12
12
A
8
HO
ME
&
O
FF
IC
E
Difficulty Level
4 Plant Table
Scale 1/4” = 2”
Name:
Class:
Date:
# NAME QTY CUT SIZE
A TOP 4 3/4 X 3 1/2 X 36
B LEG 4 1 1/2 X 1 1/2 X 31 1/4
C SHELF 3 3/4 X 3 1/2 X 36
D RAIL 4 3/4 X 2 1/2 X 29
E RAIL 4 3/4 X 2 1/2 X 8
F
LIST OF MATERIALS:
1. 2X2 DOUGLAS FIR
2. 1X4 DOUGLAS FIR 3. 1x3 DOUGLAS FIR
REQUIRED TOOLS
1. MITER SAW 2. PLANER
3. JOINTER 4. TABLE SAW
JOINERY
1. POCKET SCREW
36
10 1
/2
29
31 1
/4
2 1
/2
2 1
/2
6
A
B
C
D
D
CUTTING SCHEDULE:
TOP VIEW
FRONT VIEW SIDE VIEW
8
31 1
/4
HO
ME
&
O
FF
IC
E
ENTRY TABLE
Scale 1/4” = 3”
Name:
Class:
Date:
Difficulty Level
4
12”
# NAME QTY CUT SIZE
A TOP 1 3/4 X 5 1/2 X 10 1/2
B SIDE 2 3/4 X 5 1/2 X 12
C END A 1 3/4 X 5 1/2 X 6 1/2
D END B 2 3/4 X 5 1/2 X 4 1/2
E HANDLE 1 3/4 X 2 1/2 X 10
F BOTTOM 1 TEACHER CUT
LIST OF MATERIALS:
1. 1X3 DOUGLAS FIR 2. 1X6 DOUGLAS FIR
CUTTING SCHEDULE:
REQUIRED TOOLS
1. MITER SAW 2. SCROLL SAW 3. DISC SANDER 4. OSCILATING SANDER
5. ROUTER
JOINERY
1. DOWEL
1/2” DADO
BOTH SIDES
TOP VIEW
1/2” COVE
BOTH SIDES
OF TOP
1”
3/4”
5 1
/2”
SIDES
5 1
/2”
2 1
/2”
10 1/2”
3/4”
1”
2 1/2” r
2 1/2” r
END A END B
6 1/2”
3/4”
1”
SECTION A
6 1
/2”
3 1
/4”
3 1
/4”
A
B
6 1/2”
C
3 1
/2” D
D
6 1/2”
3/4”
1”
E
3/8” DOWEL
HANDLE
3/8” HOLE FOR DOWEL
A
4 1
/2”
HO
ME
&
O
FF
IC
E
BOX WITH LID
Scale 1/4” = 1”
Name:
Class:
Date:
Difficulty Level
4
FRONT VIEW RIGHT SIDE VIEW
7”
1”
5 1/2”
45°
45°
MITER
JOINT W/
BISCUIT
1”
1”
1”
7”
CHOOSE
YOUR OWN
PATTERN
TOP VIEW
A
C
NOTES:
1. ALL JOINTS TO BE FASTENED WITH
BISCUITS 2. ROUTER FACE EDGES 3. CUT THE MITER BEFORE CUTTING
LENGTH OF BASE AND SUPPORT
LIST OF MATERIALS:
1. 1X6 DOUGLAS FIR
CUTTING SCHEDULE:
# NAME QTY CUT SIZE
A BASE 2 3/4 X 5 1/2 X 7
B RISER 2 3/4 X 5 1/2 X 7
C DESIGN 2 YOU CHOOSE
B
Bookends
Scale 1/4” = 1”
HO
ME
&
O
FF
IC
E
Difficulty Level
5
Name:
Date:
Class:
FRONT VIEW
10”
TOP VIEW
14”
3 1
/2”
4 1/4”
4 1/4”
3 1
/2”
3 1
/2”
NOTES:
1. ALL JOINTS TO BE FASTENED WITH
BISCUITS 2. CUT A MITER JOINT AT THE END OF
EACH PIECE. THEN MEASURE AND CUT THE REMAINING MITER JOINT AT THE
OPPOSITE END. 3. AFTER ASSEMBLY, ROUTER A 1/4” RAB-
BET JOINT ON THE BACK OF EACH SMALL SHELF AND INSERT A BACK. IN
THE BACK, CUT OUT A DESIGN.
# NAME QTY CUT SIZE
A TOP/
BOTTOM
2 3/4 X 3 1/2 X 14
See note #3 below
B SIDE
SHELF
2 3/4 X 3 1/2 X 4 1/4
See note #3 below
C BOTTOM/
TOP SHELF
2 3/4 X 3 1/2 X 5
See note #3 below
D BACK 2 1/4 X 3 3/4 X 4 3/4
E SIDE 2 3/4 X 3 1/2 X 10
See note #3 below
LIST OF MATERIALS:
1. 1X4 DOUGLAS FIR
2. 1/4 PLYWOOD
CUTTING SCHEDULE:
A
B
C
D
E
45̊ MITER
JOINT
14”
Difficulty Level
5 CURIO SHELF
Scale 1/2” = 1”
Name:
Date:
Class:
HO
ME
&
O
FF
IC
E
2 1/2” rad.
1 1/4” rad.
1 1/4” rad.
11 1/2”
14 1/2”
5 1
/2 ”
3 1
/4”
4” 4”
4 7
/8 ”
5 1/2”
TOP VIEW
FRONT VIEW RIGHT SIDE VIEW
1 1
/2”
1 1
/2”
5 1
/2 ”
14 1/2”
A
B
C
4 7/8” 5/8”
2 1/4” r
¾” rad.
1 5/8”r
D
E
¾” r
5 1
/2”
1 1
/2”
NOTES:
1. ALL JOINTS TO BE FASTENED WITH
DOWELS 2. ROUTER SHELF EDGES ON THREE SIDES
# NAME QTY CUT SIZE
A SHELF 1 3/4 X 5 1/2 X 14 1/2
B BACK 1 3/4 X 3 1/2 X 11 1/2
C BACK RAIL 1 3/4 X 1 1/2 X 11 1/2
D SIDE 2 3/4 X 5 1/2 X 4 7/8
E SIDE DECO 2 3/4 X 5 1/2 X 4 7/8
F HANGER 2 SHAKER PEG
LIST OF MATERIALS:
1. 1X6 DOUGLAS FIR
2. 1X4 DOUGLAS FIR 3. 1X2 DOUGLAS FIR 4. SHAKER PEG
CUTTING SCHEDULE:
Difficulty Level
4 Shelf
Scale 1/4” = 1”
Name:
Date:
Class:
HO
ME
&
O
FF
IC
E
KIT
CH
EN
&
B
AT
H
BREADBOX
Scale 1/4” = 1”
Name:
Class:
Date:
Difficulty Level
3
# NAME QTY CUT SIZE
A TOP 1 3/4 X 5 1/2 X 14 1/2
B SIDE 2 3/4 X 9 1/4 X 11 1/4
C BOTTOM 1 3/4 X 9 1/4 X 14 1/2
D BACK 1 3/4 X 11 1/4 X 14 1/2
E FRONT 1 3/4 X 2 1/2 X 16
F DOOR 1 3/4 X 7 1/2 X 16
G TRIM 1 3/4 X 1 1/2 X 14 1/2
LIST OF MATERIALS:
1. 1X3 DOUGLAS FIR (FRONT)
2. 1X10 DOUGLAS FIR (BOTTOM) 3. 1x12 DOUGLAS FIR (BACK AND SIDES) 4. 1X8 DOUGLAS FIR (DOOR) 5. 1X2 DOUGLAS FIR (TRIM)
CUTTING SCHEDULE:
REQUIRED TOOLS
1. MITER SAW
2. DRILL PRESS
JOINERY
1. SCREW—COUNTER SINK AND PLUG
FUN OPTIONS
1. WOOD BURN IMAGE INTO DOOR.
16 2
1/2
14 1/2
5 1/4 12
9 1/4
2 1
/2
7 1/
2
FRONT VIEW
A G
B
D F
C E
E
F
9 1/4
11
1/4
5 1/4
2 1/2
B
SECTION VIEW REDUCED SIDE VIEW
KIT
CH
EN
&
B
AT
H
CUTTING BOARD
Scale 1/4” = 1”
Name:
Class:
Date:
# NAME QTY CUT SIZE
A BOARD 2 3/4 X 3 X 3
B BOARD 2 3/4 X 3 X 8
C ACCENT 2 3/4 X 1/4 X 3
D ACCENT 2 3/4 X 1/4 X 13 1/4
E SPACER 2 3/4 X 3/4 X 3
F SPACER 2 3/4 X 3/4 X 13 1/4
LIST OF MATERIALS:
1. 1X4 DOUGLAS FIR (BOARD) 2. 1x1 DOUGLAS FIR (SPACER) 3. 1X6 ACCENT WOOD
CUTTING SCHEDULE:
REQUIRED TOOLS
1. MITER SAW 2. DRILL PRESS W/ 3” HOLE SAW
3. PLANER 4. JOINTER
JOINERY
1. GLUE
FUN OPTIONS
1. USE DIFFERENT COLOR WOOD FOR DECO STRIPS AND CIRCLE INLAY
13 1/4
8 3
1/4” ACCENT WOOD
3
4” Ø ACCENT WOOD
3
8 1
/4
A B
SPECIAL INSTRUCTIONS:
1. CUT TWO PIECES OF 1X4 DOUGLAS FIR TO 12”
2. PLAIN TO 3” ON JOINTER
3. CUT TO FINISH SIZES 3” AND 8”
4. CUT ACCENT AND SPACER PIECES 3” AND 13 3/4”
5. GLUE SECTIONS I AND II (PIECES A, B, C AND E)
6. GLUE SECTION III (PIECES D AND F)
7. THEN, GLUE SECTIONS I, II, AND III TOGETHER
8. USE 4” HOLE SAW TO CUT OUT CIRCLE
9. CUT 4” CIRCLE OF ACCENT WOOD WITH HOLE SAW
10. USE 3/4” MORTISER TO CUT SQUARE OUT OF CENTER OF CIRCLE
11. GLUE IN 3/4 X 3/4 ACCENT WOOD IN SQUARE
12. INSERT CIRCLE
13. RUN CUTTING BOARD THROUGH PLANER UNTIL FLAT SURFACE IS ACQUIRED
C
D
3/4” SPACER
E
F
SECTION I
SECTION II
SECTION III
Difficulty Level
4
TOP VIEW
NOTES:
1. ALL JOINTS TO BE JOINED WITH 3/8” Ø
DOWELS
# NAME QTY CUT SIZE
A SHELF 1 3/4 X 2 1/2 X 15
B BACK 1 3/4 X 10 X 3 3 1/2
C RISER 1 3/4 X 2 1/2 X 8
LIST OF MATERIALS:
1. 1X12 DOUGLAS FIR 2. 1X3 DOUGLAS FIR
CUTTING SCHEDULE:
15 ”
7 1/2”
2”
6” r 3” r
1”
1/4
”
3” r
1”
1 1/2” r
1 1/2” r 1 1/2” r
1 3/4” r
10”
FRONT VIEW SIDE VIEW
8”
2 1/2” 2 ”
A
B C
KIT
CH
EN
&
B
AT
H
Difficulty Level
4 COOKBOOK HOLDER
Scale 1/4” = 1”
Name:
Class:
Date:
FRONT VIEW RIGHT SIDE VIEW
TOP VIEW
11 1/8”
9 1
/4”
3/4
”
10”
3 1/2” 3 1/2”
10°
14”
CHOOSE
YOUR OWN
ARC SHAPE
3 1
/2”
3/4
” 1/2” TENON
3/4
” 1”
14”
11 1
/8”
3 1
/2”
3 1
/2”
1/2” TENON
PLUG
3 ”
2 1
/2”
2 1
/2”
3 ”
2”
10°
END
CUTS
NOTES:
1. ALL JOINTS TO BE FASTENED WITH
MORTICE AND TENON 2. ROUTER TOP EDGES
LIST OF MATERIALS:
1. 1X4 DOUGLAS FIR
2. 1X12 DOUGLAS FIR
CUTTING SCHEDULE: A
B
# NAME QTY CUT SIZE
A TOP 1 3/4 X 11 1/8 X 14
B SIDE 2 3/4 X 11 1/8 X 10
C SUPPORT 1 3/4 X 3 1/2 X CUT
D TENON 12 1/2 SQUARE DOWEL
C
FOOTSTOOL
Scale 1/4” = 2”
KIT
CH
EN
&
B
AT
H
Difficulty Level
6
Name:
Date:
Class:
18 ”
6 ”
12 ”
10 ”
2”
NOTES:
1. ALL JOINTS TO BE FASTENED WITH
GLUE BUT JOINT
LIST OF MATERIALS:
1. 1X DARK WOOD
2. 1X MEDIUM WOOD 3. 1X LIGHT WOOD
CUTTING SCHEDULE:
# NAME QTY CUT SIZE
A DARK 7 3/4 X 1/2 X 18
B MEDIUM 4 3/4 X 1/2 X 18
C LIGHT 2 3/4 X 1 X 18
D LIGHT 2 3/4 X 1 1/2 X 18
A
B C
D
KIT
CH
EN
&
B
AT
H
Difficulty Level
7 Cutting Board
Scale 1/4” = 1”
Name:
Class:
Date:
Difficulty Level
8 SALT/PEPPER SHAKERS
No scale
Name:
Date:
Class:
KIT
CH
EN
&
B
AT
H
Difficulty Level
8 BOWL IDEAS
Name:
Date:
Class:
KIT
CH
EN
&
B
AT
H
SIDE VIEW
7 1/2”
18”
8”
3” 3”
11 1/8”
1 1/2”
4 1/2” r
7” r
3” r
ARC SEAT 1/2”
FROM HORIZONTAL
3̊
NOTES:
1. ALL JOINTS TO BE FASTENED WITH
MORTICE AND TENON
# NAME QTY CUT SIZE
A SIDE 2 3/4 X 11 1/8 X 18
B RAIL 5 3/4 X 2 1/2 X 20
C SUPPORT 1 3/4 X 2 1/2 X 17 1/2
D TENON 24 1/2 SQUARE DOWEL
LIST OF MATERIALS:
1. 1X4 DOUGLAS FIR
2. 1X12 DOUGLAS FIR
CUTTING SCHEDULE:
A
B
PARTIAL TOP VIEW
1/2” 1/2”
1”
2 1
/2”
1/2” MORTICE
AND TENON
1/2” MORTICE
AND TENON
CHILD’S BENCH
Scale 1/4” = 2”
T E
E
N
Difficulty Level
6
Name:
Date:
Class:
10” 1” 1”
12”
ROUTER EDGES
3 1
/2”
3 1
/2”
5 1/8” 1” 1”
7 1/8”
1/2” SQUARE DOWEL
MITER CUT ATTACHED W/
NAIL GUN
12”
7 1
/8”
DETERMINE YOUR OWN
SCROLL PATTERN
TOP VIEW
FRONT VIEW RIGHT SIDE VIEW
Love
NOTES:
1. ALL JOINTS TO BE FASTENED WITH BIS-
CUITS 2. CUT A MITER JOINT AT THE END OF EACH
PIECE. THEN MEASURE AND CUT THE RE-MAINING MITER JOINT AT THE OPPOSITE
END. 3. ROUTER TOP EDGES OF TOP AND BOTTOM
# NAME QTY CUT SIZE
A TOP/
BOTTOM
2 3/4 X 7 1/8 X 12
B FRONT/
BACK
2 3/4 X 3 1/2 X 11 1/2
See note #3 below
C SIDE 2 3/4 X 1 1/2 X 11 1/2
See note #3 below
D TRIM - 1/2 TRIM TO FIT
See note #3 below
LIST OF MATERIALS:
1. 1X4 DOUGLAS FIR
2. 1X8 DOUGLAS FIR 3. 1/2 SQUARE DOWEL
CUTTING SCHEDULE:
A
B C
D
T E
E
N
Difficulty Level
5 DECO BOX
Scale 1/4” = 1”
Name:
Class:
Date:
TOP VIEW
# NAME QTY CUT SIZE
A BODY 1 1 1/2 X 3 1/2 X 10
B FINDER 1 3/4 X 2 X 11 1/2
C CHASIS 1 3/4 X 2 1/2 X 11
D FRAME 4 3/8 SQ. DOWEL X 1 1/4
E ROOF 1 1/2 X 2 1/2 X 3 1/2
F WHEEL 4 3/4 X 2 Ø
G BUMPER 2 3/4 SQ. DOWEL X 2 1/2
LIST OF MATERIALS:
1. 2X4 DOUGLAS FIR
2. 1X3 DOUGLAS FIR 3. 3/8 CAP 4. 3/8 SQUARE DOWEL 5. 3/4 SQUARE DOWEL
6. 1/2 X 4 DOUGLAS FIR
CUTTING SCHEDULE:
JOINERY:
1. ALL JOINTS TO BE GLUED
2 1
/2”
11”
F
2
10
2” Ø
WHEEL—SIDE VIEW
3/8” Ø
3 1/2
1 1
/2
1 1
/2
1 1
/4
1 1
/2
2
4 1/2 3 3
A
B
A
C
D
E
SIDE VIEW
Difficulty Level
3 MODEL T
Scale 1/4” = 1”
Name:
Class:
Date:
T O
Y
S
top related