Before After Presentation Baywood#3 Apartment Turnover

Post on 18-May-2015

112 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

As the project manager for this job, I developed the scope of work, designed the kitchen, and dispatched the proper tradesmen.

Transcript

New Laminate Floor in Kitchen• Hauled Garbage• Installed 5/8” OSB Board• Installed Pergo Flooring• Custom Cuts Multiple Doorways• Installed New Quarter Round Molding

New Laminate Floor in Kitchen• Hauled Garbage• Installed 5/8” OSB Board• Installed Pergo Flooring• Custom Cuts Doors, Baseboard Heaters• Installed New Quarter Round Molding

New Kitchen• Extensive shimming because of sloping

floor• Custom sink because of vent pipe• Cut counter around exposed vent pipe

Kitchen (continued): New Wiring for Dishwasher• Installed new sub-panel• Ran wiring for Stove• Ran wiring for Dishwasher• Installed new GFCI outlet

New Electric Subpanel

New Dishwasher Wiring (before dishwasher delivery )

New Carpeting in Stairway and Bedroom

Also: Ceiling Repair & New

Ceiling Fan

Bathtub• New Silicone Caulking• Patched hole in tub finish• Thoroughly Cleaned

Bathroom: Cleaned Ceramic Floor

Stairway Wall Patching &

Painting