April 2011Time schedules are preliminary and subject to change
US 24 – Resurfacing from Harrison to Bartonville
BA
D
E
F
A
B
C
D
E
F
G
IL 8 – Pavement reconstruction from Sunrise to Farm Crk
C
IL 40 – Reconstruction from Mossville Road to north of Cedar Hills Dr
US 150 – Resurfacing from Detroit to Tennessee
I 74 – Beam repair for Pinecrest bridge
IL 29 – Resurfacing and Intersection Improvements from Wesley Rd to Park Drive
G
US 24/IL 9 – Bridge replacement over La Marsh Creek
May 2011Time schedules are preliminary and subject to change
US 24 – Resurfacing from Harrison to Bartonville
BA
D
E
F
A
B
C
D
E
F
G
IL 8 – Pavement reconstruction from Sunrise to Farm Crk
C
IL 40 – Reconstruction from Mossville Road to north of Cedar Hills Dr
US 150 – Resurfacing from Detroit to Tennessee
I 74 – Beam repair for Pinecrest bridge
G
US 24/IL 9 – Bridge replacement over La Marsh Creek
H
H
US 24 – Bridge joint replacement over Kickapoo Creek
IL 29 – Resurfacing and Intersection Improvements from Wesley Rd to Park Drive
June 2011Time schedules are preliminary and subject to change
US 24 – Resurfacing from Harrison to Bartonville
BA
DF
A
B
C
D
G
IL 8 – Pavement reconstruction from Sunrise to Farm Crk
C
IL 40 – Reconstruction from Mossville Road to north of Cedar Hills Dr
US 150 – Resurfacing from Detroit to Tennessee
G
US 24/IL 9 – Bridge replacement over La Marsh Creek
H
H
US 24 – Bridge joint replacement over Kickapoo Creek
July 2011Time schedules are preliminary and subject to change
B
B
C
G
IL 8 – Pavement reconstruction from Sunrise to Farm Crk
C
IL 40 – Reconstruction from Mossville Road to north of Cedar Hills Dr
G
US 24/IL 9 – Bridge replacement over La Marsh Creek
H
H
US 24 – Bridge joint replacement over Kickapoo Creek
I 74 – Pavement Repair near University St.I
I
August 2011Time schedules are preliminary and subject to change
B
B
C
G
IL 8 – Pavement reconstruction from Sunrise to Farm Crk
C
IL 40 – Reconstruction from Mossville Road to north of Cedar Hills Dr
G
US 24/IL 9 – Bridge replacement over La Marsh Creek
H
H
US 24 – Bridge joint replacement over Kickapoo Creek
I 74 – Pavement Repair near University St.I
I
I 474 –over the IL River- Bridge Deck and Joint RepairsJ
IL 29/US 150 Ramp reconstructionK
IL 98 – Resurfacing from Parkway to N PekinLK
L
J
September 2011Time schedules are preliminary and subject to change
B
B
C
G
IL 8 – Pavement reconstruction from Sunrise to Farm Crk
C
IL 40 – Reconstruction from Mossville Road to north of Cedar Hills Dr
G
US 24/IL 9 – Bridge replacement over La Marsh Creek
H
H
US 24 – Bridge joint replacement over Kickapoo Creek
I
J
IL 29/US 150 Ramp reconstructionK
IL 98 – Resurfacing from Parkway to N PekinLK
L
I 74 – Pavement Repair near University St.I
J
I 474 –over the IL River- Bridge Deck and Joint Repairs
October 2011Time schedules are preliminary and subject to change
B
B
C
G
IL 8 – Pavement reconstruction from Sunrise to Farm Crk
C
IL 40 – Reconstruction from Mossville Road to north of Cedar Hills Dr
G
US 24/IL 9 – Bridge replacement over La Marsh Creek
H
H
US 24 – Bridge joint replacement over Kickapoo Creek
J
IL 29/US 150 Ramp reconstructionK
IL 98 – Resurfacing from Parkway to N PekinL
K
L
M
M
IL 6 – Resurfacing from US 150 to Hoerr’s Pond
N
N
US 150 - Bridge joint repairs over RR
J
I 474 –over the IL River- Bridge Deck and Joint Repairs
November 2011Time schedules are preliminary and subject to change
B
B IL 8 – Pavement reconstruction from Sunrise to Farm Crk
J
IL 29/US 150 Ramp reconstructionK
IL 98 – Resurfacing from Parkway to N PekinL
K
L
M
M
IL 6 – Resurfacing from US 150 to Hoerr’s Pond
N
N
US 150 - Bridge joint repairs over RR
J
I 474 –over the IL River- Bridge Deck and Joint Repairs