MICE RF HP System
rprogress
Contents• System Overview
– MICE Hall System– Test System at Daresbury
• Amplifier update and status– Amplifier testing
• LLRF• Layout
– Will be presented by Alan Grant
• ConclusionAndrew Moss
RF system components
Andrew Moss
2 MW Amplifier
2 MW Amplifier
Master OscillatorControls etc
201 MHz Cavity Module
2 MW Amplifier
2 MW Amplifier
201 MHz Cavity Module
LBNL CERN
250 kW Amplifier
250 kW Amplifier
250 kW Amplifier
250 kW Amplifier
HT Supplies
HT Supplies
Daresbury
DL Test SystemAt present
Auxiliary Systems
Auxiliary Systems
NEW
Amplifier layout
Andrew Moss
Test system at Daresbury
Andrew Moss
Status of Amplifier s and power supplies
• Test bay at DL is operational and able to test amplifiers and power supplies as they become available
• New 250 kW amplifier has been bought, and has been under test at the manufacturers
• First 250kW amplifier has operated at 100kW with old tube, then 240kW with new tube fitted during 2012
• First TH116 high power amplifier has operated at 1MW during 2011 using an old RAL tube – new MICE tube fitted, has operated at 1.2MW for short time
• Two further 250kW amplifiers are being refurbished now• Two 2MW CERN amplifiers circuits refurbished but awaiting assembly
and high power test• Still need to build 3 more sets of power supplies – including set for TIARA
tests in experimental hall September 2013
Andrew Moss
New amplifier in test bay at Photonis USA
Andrew Moss
New 250kW amplifier enclosure
Andrew Moss
New amplifier operating at 240MHz (driver low on gain at 201MHz)
Delivered to Mississippi on 8th June 2012
New tetrode tube in DL test amplifier number 1
•Tube needed to be conditioned after spending 3 years on shelf• Input matching required careful tuning as new valve presents different RF load eventually this was optimised at around 20dB•After 20 hours running, with a lot of adjustments to amplifier and electrical parameters, system is stable and predictable with linear response• Still some issues with screen power supply to sort out – loading of screen is moving with beam current and output loading
Andrew Moss
250kW amplifiers numbers 2 and 3 • One amplifier is now completed and assembled in rack• Small number of parts left to source from the manufacturer because they are missing – may need modification to suit much older design of amplifier enclosure• final 250kW amplifier will be assembled back into rack in the next few months
Andrew Moss
CERN amplifiers• Need assembly with the support
of CERN • Very similar electrical design
philosophy for the heater and control functions etc
• Addition of cathode switch electronics needed and possible small modifications so that they can be operated by the power supplies we already have – will be done as we find issues
• Already have additional coax sections (for twin output couplers) and second test load
Andrew Moss
RF and power supply testing• Operation at 1.2MW with good conversion efficiency and gain
• Overload of power supply resistors during a crowbar caused system stop, replaced with higher power units, testing underway, but now problematic – repeated crowbar events
Andrew Moss
Forward power into load
Current status HP Tests• Testing of the amplifier system continued into late 2012
– However performance above 300kW proved to be very difficult
• After a period of diagnosis on the power supply and amplifiers it was decided to remove the new tube and revert back to the old used tube to re-establish settings on the amplifier system
• As the power tube was removed it became clear that sparking had occurred around the valve which clearly indicated the source of the problems we had experienced– This would have triggered the initial crowbar event– Would have inhibited further increases in output power
Andrew Moss
116 triode removal
Andrew Moss
Evidence of arcing on HT connection
HT top box• HT top box is where high voltage
is applied to the anode• Water coolant is supplied to the
valve using insulating glass rods• On the original LBNL amplifier,
coolant passed out of the system as steam
• CERN HT top box with ability to pass both coolant flow and return pipes, which is why it was used
• Original LBNL HT top box with small inlet for only one coolant pipe
• HT box to tube interface is slightly different and is where fault is created
• LBNL HT top box is being converted to two water pipes and with correct spacing should remove issue that created arcing
Andrew Moss
HT Top Box
Andrew Moss
• The seating of the valve in the HT top box has caused the arcing
• The HT box actually belongs to another amplifier and was swapped in to speed up the commissioning process
• However there are some dimensional and location differences that obviously have caused the issues that we can see when the tube is removed
HT connection• Picture shows the correct spring
finger arrangement that is required for the LBNL amplifier
• Using the CERN top box allowed the valve to be pressed too far down into the socket causing the incorrect alignment
• All parts are being machined now ready for fitment to the amplifier in the next 5 weeks
• Amplifier testing will then proceed again with the old Triode tube first to 1MW
• The Triode tube will then be swapped for the new device and tested to 2MW
Andrew Moss
Coax power and Losses • Assuming 2MW from the amplifier and 500kW for each cavity
coupler• Using calculations obtained from MEGA, the peak standoff for 6
inch coax with MICE parameters is 3MW, for 4 inch coax it is 1.4MW
• With N2 gas at 1.5Bar this rises 3.6MW and 1.68MW respectively• Using slow cavity filling technique the reflected power from the
cavity can be substantially reduced (P forward + P reflected = P total) we expect P reflected to be less than 20% of P forward = peak standoff will not be exceeded at start of each pulse
• Calculations of attenuation and hence power loss though coax is 10% per cavity coupler, which will reduce gradient available, overdriving amplifier maybe possible with reduced reliability – still need to test this
Andrew Moss
RF to beam synchronisation• Cavity phase and amplitude will be stabilised to 0.5 deg and
1% with the ability to run as high a gradient as possible• Muon particles will arrive randomly in the cooling channel for
acceleration at various phase angles • Cavity phase angle will have to be measured for each muon
and time stamped for analysis after a period of running• Time of flight detectors along the cooling channel will be used
to trigger electronics to measure and digitise the state of the cavity phase angle to < 15 pS
• Groups from Sheffield and Strathclyde University’s in conjunction with DL and LBNL are working on possible solutions for this area of the experiment
Andrew Moss
Digital low level RF Control• To control and regulate
cavity amplitude and phase angle during the RF pulse
• DL able to build up hardware ~ 3months
• Systems in use already with EPICS control, feedback, feedforward, resonance control etc
• Ramped pulse structure to limit reflected power tested on bench with 1.3GHz cavity
Andrew Moss
AmplifierMice cavities
RF system monitoring and protection
Andrew Moss
Summary• Progress on all three 250kW amplifiers including new system in USA• Tested first MICE high power tube and system to 1.2MW, some issues to
resolve before 2MW – Arc on anode HT plate identified– Probably the cause of the crowbar events– Modification to HT circuit completed, re-assembly completion imminent– Problems with crowbar circuit resolved
• High power testing to resume at DL as soon as resources allow– 2MW peak power objective
• Tests in MICE hall by September• We plan to replicate the power supplies and install and test them at DL –
this will allow testing to continue, then move one set of amplifiers and power supplies to the MICE hall for September 2013
Andrew Moss
Extra Slides
Andrew Moss
Page 24Page
24
Cavity Progress at LBNL/FermiLab • 1st Cavity Electropolished
• Now at FermiLab• 9 Cavities to be polished• New Coupler Design
• Nearing Completion• 6 Actuators to be built
• For the tuning arms• FermiLab/MTA have other
required components • Ready to move to clean
room• Assembly of 1st cavity• Install into single cavity
test chamber• Testing initially in fringing
field• ~1T
Cavity section view
Page 25Page
25
Revision to RF layout
• Proposed change to layout• Pairing of identical amplifier
assemblies• Should afford efficiency in
running up• Two hybrids move to the
amplifier side of the shield wall
• Line lengths re-matched by sections lying along the top of the shield wall
• No interference with crane service
Cavity section view
Original Arrangement
Revised Arrangement
Page 26Page
26
Revision to RF layout
Cavity section view
Preparation for TIARA & Procurement• Plan for installation of STEP IV allows for amplifier installation in 1st
slot• To meet TIARA deadline, September 2013
• Procurement of co-axial components, new tetrode and amplifier modulator components
• New Tetrode procured• Component list for co-axial and modulator components ready• Procurement of components required for TIARA prioritised
View over top of shield wall
• Mounting clamps and hangers for co-axial lines designed
Review of the RF system• Review meeting held in December 2011 to assess all aspects of current RF system design and
strategy - praise for the design work we had done and the results with the amplifiers • The main concern of the review panel was of the RF coax layout, the panel suggested a
different layout that would improve access to the amplifiers and simplify the coax runs. • This was taken on board and a new layout designed
Previously a lot of RF components were placed behind Shield wall
TH116 Triode amplifiers
4616 tetrode amplifiers
RF phasing
Andrew Moss
Andrew MossAmplifier order changed so that experience of LBNL amplifiers will be consistent
Andrew Moss
Coax system distribution
Andrew Moss
RF coax parts list
Andrew Moss
All RF coax parts identified and designed to fit between the amplifiers and the cavities
Andrew Moss
RF distribution• RF coax distribution system has been finalised in 3D
CAD so that line lengths are matched• Enough flexibility has been built into the system to
take up small random errors• Purchasing of components has begun• System will be pressurised with 2 Bar of nitrogen to
help voltage standoff and use RF pulse shaping to minimise RF reflected power during the cavity filling period – this will increase reliability