An Introduction to On-line Partial Discharge Surveys. PARTIAL DISCHARGE. When high voltage insulating material breaks down Partial Discharges are created, measured in units of charge known as pico-Coulombs or millivolts. WHAT IS PARTIAL DISCHARGE?. - PowerPoint PPT Presentation

Transcript

IQ Services

An Introduction to On-line Partial Discharge Surveys

IQ Services

PARTIAL DISCHARGE

When high voltage insulating material breaks down Partial Discharges are created, measured in units of charge

known as pico-Coulombs or millivolts.

IQ Services

WHAT IS PARTIAL DISCHARGE?

• Electrical discharges occurring inside medium and high voltage insulation (flaws, cracks, voids, irregularities).

• These imperfections create voltage stresses and cause eventual failure of the insulation.

• Insulation failures begin with and are characterized by small but detectable releases of energy or Partial Discharge.

IQ Services

• For many years partial discharge testing has been an IEEE/ANSI standard to identify insulation problems in electrical apparatus before it leaves the factory floor.

• Many U.S. and International standards have been developed for partial discharge testing.

• Until recently Partial Discharge testing was limited to testing at manufacturer’s laboratories.

• Now computers and sophisticated equipment can isolate and detect Partial Discharge occurrences in the field.

PARTIAL DISCHARGE TESTING USED FOR QUALITY

ASSURANCE

IQ Services

IQ Services

NO OUTAGE EVALUATION

These proven technologies exist today to evaluate medium or high voltage systems while the system is energized.

1. Oil testing/DGA – limited to oil transformers

2. Infrared testing – visible loose connections only

3. Visual inspections – problems may not be visible

4. Power Quality – cannot detect insulation failures

5. Vibration – limited to motors and transformers

6. Partial Discharge Testing – single best all-around test

IQ Services PARTIAL DISCHARGE VS. INFRARED

How are Partial Discharge Inspections different from Infrared Inspections?

• Infrared identifies electrical current problems (loose connections) that result in heat. The specimen must be visible to the naked eye for the infrared camera to detect a problem.

• Partial Discharge identifies voltage problems that result in insulation breakdown and generation of Partial Discharges. The specimen does not need to be visible for Partial Discharges to be detected.

IQ Services

IQ Services

IQ Services

IQ Services

IQ Services

INSULATION BREAKDOWN

Why should we be concerned with insulation breakdown and Partial Discharges?

IQ Services

• NFPA 70B states that insulation breakdown is the number one cause of electrical failures.

• In medium and high voltage equipment, partial discharges are the first indication of insulation breakdown.

INSULATION BREAKDOWN

IQ Services

Component Percentage of insulation failure Transformers 84% Circuit Breakers 21% Disconnect Switches 15% Insulated Switchgear Bus 95% Bus duct 90% Cable 89% Cable Joints (splices) 91% Cable Terminations 87% Based on IEEE Gold Book Table 36

Total Failures due to Insulation Breakdown

IQ Services

WHAT TYPE OF FACILITES ARE AFFECTED?

• INDUSTRIAL - Large Manufacturing, Cogeneration

• COMMERCIAL - Research Parks, High Rises• INSTITUTIONAL - Campuses, Hospitals• GOVERNMENTAL - Military Bases, Large Office Complexes• UTILITY - Investor Owned, Municipalities

IQ Services

WHERE DO PARTIAL DISCHARGES OCCUR?

• Electrical Systems > 600V (2.4KV, 4.16 KV, 12KV, etc.)

• Types of Equipment Subject to Partial Discharge

-Cables -Transformers-Circuit Breakers - Instrument Transformers

-Switchgear (CT’s, PT’s)

-Insulators - Bushings-Generators - Motors-Surge Arrestors - Capacitors

IQ Services

ADVANTAGES OF PARTIAL DISCHARGE SURVEYS

• PREDICTIVE - failures can be prevented.• NO OUTAGE NECESSARY - does not interrupt operations.• NON-DESTRUCTIVE - no damage to electrical system.• TRENDING - comparison to previous tests possible• PRIORITIZE MAINTENANCE ACTIVITIES - determine which equipment to service first.• PLANNING - allows time to schedule repairs.• FINANCIAL CONTROL – repairs can be budgeted.

IQ Services

 

TYPICAL MEDIUM VOLTAGE POWER CABLE

CONSTRUCTION

IQ Services

Source Switchgear

Ground Level

Underground Cable in Conduit (not visible)

Visible Cable Terminations

Load Unit Substation

Visible Cable Terminations

TYPICAL HIGH VOLTAGE UNDERGROUND CABLE

SYSTEM

IQ Services

3 STAGES OF CABLE INSULATION FAILURE

IQ Services

STAGE 1

Imperfections and voids

voids

INSULATION

/ / / /CONDUCTOR / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /

INSULATION

No problems, minor voids therefore minor partial discharges

Jacket, Shield, Semi-conducting shield

Jacket, Shield, Semi-conducting shield

IQ Services

INSULATION

/ / / /CONDUCTOR / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /

INSULATION

Tracking begins

Jacket, Shield, Semi-conducting shield

Jacket, Shield, Semi-conducting shield

STAGE 2

IQ Services

INSULATION

INSULATION

CABLE FAILURE!

Jacket, Shield, Semi-conducting shield

Jacket, Shield, Semi-conducting shield

Blow-upPhase-to-ground

/ / / /CONDUCTOR / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /

STAGE 3

IQ Services

HOW CAN PARTIAL DISCHARGES BE DETECTED?

Discharges are detected by special signal processing equipment designed to eliminate outside interference.

Capacitive Methods - For Unshielded Components - Dry Type Transformers - Instrument Transformers - Switchgear

Inductive Methods - metal enclosed components - Shielded Cables and Components - Oil Filled Transformers - Rotating Apparatus Acoustic Emission Methods - Dry & Oil Transformers - Switchgear - Unshielded Cables

IQ Services

Test Equipment & Sensors

IQ Services

Partial Discharge detection of a flaw in a dry type transformer using

capacitive coupling

flaw

Transformer Coil

Capacitive sensor

Detector

IQ Services

High Voltage Bus

Metallic Switchgear cover (signal detected outside)

Partial discharge site (inside)

Propagation of Transient Earth Voltages (TEV) in Switchgear

IQ Services

Measurements

using Capacitive PD

sensors

IQ Services Switchgear failure due to internal tracking

IQ Services

Tracking on epoxy resin busbar

IQ Services

Start of tracking on insulation

IQ Services

Failed Switchgear Insulation

IQ Services

Detecting PD Using Airborne Acoustic (Ultrasonic) Sensors

Insulator

Busbar

Sensor

IQ Services

Airborne Acoustic Sensor

IQ Services

Insulator Failure Prevented

IQ Services

Partial Discharge detection of a void in a shielded cable using inductive coupling.

Insulation

+

VoidShield (grounded)

Conductor

Detector

Inductive Sensor

IQ Services

IQ Services

High Frequency Current Transformer Used to Test Cable in High Voltage Substation

IQ ServicesFailing Terminations

IQ Services

Molded Cable Accessory Failure

IQ Services

Splice Void

IQ Services

Shield Delamination Causing Partial Discharge

IQ Services

Poor Workmanship Causing Partial Discharge

IQ Services

Testing 15kV cables

On-line testing of cables PD damage to termination

Case Study

IQ Services

Identifying & Prioritising Circuits Most at Risk Using On-Line PD Survey

LIVE LINE PARTIAL DISCHARGE SURVEY RESULTS OF 629 HV FEEDERS

0

100

200

300

400

500

600

700

800

900

1000

1 21

42

63

84

105

126

147

168

190

211

232

253

274

295

316

337

358

379

400

421

442

463

484

505

526

547

568

589

610

FEEDERS

mV

Dis

ch

arg

e

ACTION

CONCERN

IQ Services

PD Survey - Worst 30 ResultsLIVE LINE SURVEY WORST 30 RESULTS

0

100

200

300

400

500

600

700

800

900

1000

mV

DIS

CH

AR

GE

Dischargingjoint

Tripped

Tripped

Wet cable

Tripped

Tripped

and consequences within 3 months

IQ Services

PERFORMING A PARTIAL DISCHARGE SURVEY

• Analyze the single line drawing to develop plan• Onsite Measurement

– Removal of equipment covers.– Record field data.– Obtain signatures of atypical components.

• Offsite Data Analysis– Correlate measurements to single line drawing.– Compare atypical results to like insulation from database.– Analyze signatures.– Trend Results.

• Report Generation– Recognize immediate failure possibilities.– Recommend possible repairs.– Recommend possible resurvey frequency.

IQ Services

SUMMARY

• Electric Insulation will fail.

• Predicting failures is now possible through Partial Discharge Analysis.

• No outage is required to survey the equipment.

• Results can be prioritized and trended.

• Partial Discharge Surveys should be performed annually.

IQ Services

 

We apologize to every electrical professional for taking 252 yearsto prevent your failures.

    

Benjamin Franklin discovered electricityin 1752. This year we launched an easy

to use, cost effective “no-outage” electricalinspection technology that detects

medium and high voltage equipmentproblems before they fail!

 

top related