Product Identification
3
lazing bar clip (Std)ABC001
ean-toloakingrim
ALC---/1
Glazing bar clip (Valley)ABC002
Aluminium Ridge Top CapACP---/1
Aluminium Half Ridge
Top Cap
AHC---/1
asketAGS305
Aluminium inialA C 001
Aluminium low profileresting
ALP---/1
Fixing - Finialadaptor M8x50HD screwACC002
Radius nd flashing trimA P004
Standard twin boltand nutsSHBC001T
ecommended tools - Glazing hammer/Mallet, 6mm drill bit
Additional materials - Small timber block
ro ctive film - Peel back and remove after installation. Safely dispose of the redundant film.
Please read in conjunction with the main
nstallation guide supplied in the roof
Alumini m Transom Top CapATC---/25
Aluminium Transom Top CapAOC---/2
Aluminium Georgian Top CapAGC---/25
Aluminium Starter Top CapASC---/25
Alumini m Full Ridge Radiusnd Cover
ACP 01
Alumini m Half Ridge Radiusnd Cover Left
AHC001L
Alumini m Half Ridge Radiusnd Cover Right
AHC001R
Aluminium Ball FinialACF001
Radius end clamp washerACP003
Brush - half ridgeradius end coverAHC 02
Brush - full ridgeradius end coverACP002
8/4/2019 Aluminium Roof Installation Guide
3/7
5
Installation
nsure the eaves beam, glazing bars, ridge/wallplate are alreadynstalled Ensure the top cap clip spring is in the loaded and primedosition (as shown).
01
nsure the clip is orientated as shown, with trigger towards the ridge.
02
Ensure the rain baffle upper wing is lifted prior to fitting the topcappings.
03
Knock the glazing bar top cappings on with a glazing hammer/malletand timber block. Each capping is numbered according to its position inthe roof.
04
Fit the glazing bar end caps by sliding onto the plastic fixing blocks.Push fit the insert into the end cap.
06
rill a 6mm hole, then use the fixing provided (CRN010) to attach thetop cap to the glazing bar. (Not required if using Cornice with wire ties)
05
04
To reset clips see Appendix 1
site cutting is necessary (drainage slots need inserting or a down pipe hole has
be cut) ensure all swarf is kept away from the painted surface and then; sealth a primer/corrosion inhibitor and then top coat. Alternatively, use a suitable
ap sealant to prevent the onset of corrosion. These steps are critical in marinevironments.
ake care when fitting aluminium products to not use excessive force. Grease marks, dirt and mastic spillage may be removed using white spirit.
3 4
5
hen opening sealed packs, use a special box knife opener.
2
storing in warehouse racking or on frails/roof racks, take care to supporte products and do not over tension straps and ropes.
1
Handling Aluminium Products
8/4/2019 Aluminium Roof Installation Guide
4/7
Installation
Assemble twin bolt and radius end clamp washer. Slide into ridge topap.
Assemble and secure radius end to ridge top cap with spiggot nutsupplied.
ow profile cresting. Assemble as shown.
all finial cresting. Assemble as shown.
08
09 10
11
7
emove protective film then fold up tab on flashing trim. Place flashingn roof and form to shape. Mark trim lines (dependant on roof style)
Trim Flashing
pply supplied Gutterbond to underside of flashing.
stall bar caps, securing flashing into place. Point around bar caps.
it flashing trim pushing firmly into place, ensuring intimate contact withlazing. Seal all interfaces between flashing and rain baffles.
Fit radius brush.
01 02
03 04
05
07
The half ridge end flashing detail should be folded as shown and fitted insimilar manner to that of the full ridge end.
nstallation
Discretly point the junctions between the capping gaskets and radiusend flashing as shown (use new uncut nozzle).
06
IMPORTANT
Half ridge end installation
8/4/2019 Aluminium Roof Installation Guide
5/7
Installation
Jack Rafter Situation
nock the lean to cloaking trim on with a deadblow hammer and timberock. It may require trimming at the eaves end - take care when trim-ing powder coated aluminium.
Lean To Cloaking Trim Installation
Slide the end cap up and off the fixing block and unscrew the fixing at the endof the glazing bar (reverse steps 05 and 06). Slide the glazing bar top capdown to release it from the spring loaded clip. To re-install repeat steps 1-6.
Removing The Glazing Bar Top Caps
rill a 6mm hole at the ridge end under the rain baffle wing . Use thefixing provided (CRN010) to attach the top cap to the glazing bar.
Valley Jack Rafter Fixing
nsure the clip is orientated as shown, with trigger towards the ridge.
osition the lazing bar top cap so the cut out sits in the below the jackfter fixing.
Tap the lazing bar top cap up until the cut out ts central to the jackrafter fixing
Eaves
End
Ridge
End
9
Appendix 1
Before commencing installation of the aluminium cappings, ensure that the spring clip retention
device is loaded and primed. Please see the images below which relate to the different bar
situations.
ABC001 - Clip reload sequenceTransoms, jack rafters, starters bar and hip bars without
jack rafters (factory pre-installed at 500mm ctrs)
ABC002 - Clip reload sequenceValley rafters and hip bars with jack rafters
(factory pre-installed at 250mm ctrs)
Clip disengaged Clip disengaged
8/4/2019 Aluminium Roof Installation Guide
6/7
surface damage is encountered, use 120-360 grit paper to prepare theurface. Wipe clean with white spirit.
Ensure the surface is dry apply a thin primer coat using a fine brush.
For added protection, a wax polish can be applied up to twice per year follow the polish manufacturers instructions carefully.
eneral cleaning can be undertaken by a wash with warm soapy water. Finally, apply an air drying top coat with a fine brush.
tubborn marks can be removed using a renovating cream like CIF orerhaps T-cut. Once dry, buffing can t ake place.
1 2
3 4
5 6
It should be noted that polyester powder coatings are not maintenance free the extent of
cleaning depends upon the local environment and on the attitude of the building owner. Think
cars here...if the building owner wants a finish like that, more regular cleaning is needed. All
paints will chalk to some extent and there wil l be a reduction in gloss level over time this can
be restored.
Cleaning and Maintenance
11
8/4/2019 Aluminium Roof Installation Guide
7/7www.ultraframe.co.uk
Ultraframe is a trading name ofUltraframe (UK) Ltd.
Ultraframe (UK) Ltd, Salthill Road, Clitheroe, Lancashire. BB7 1PE
?????????
01/10
ItisUltraframespolicytocontinuallyseektoimproveitsproducts,
processesandservices,
andwereservetherighttochangespecificationswithoutpriornotice.
Ultrafr
ameisatradingnameofUltraframe(UK)Limited.
top related