19/5/2011 B. Calpini CIMO World Meteorological Organization Working together in weather, climate and water Commission for Instruments and Methods of Observation:

Post on 01-Apr-2015

219 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

Transcript

19/5/2011 B. Calpini CIMO

World Meteorological OrganizationWorking together in weather, climate and water

Commission for

Instruments and Methods of Observation:

Report of the President of CIMO

WMO/OBS www.wmo.int

WMO

Bertrand CalpiniPresident of CIMO

Cg-XVICg-XVI(Geneva, May 2011)

19/5/2011 B. Calpini CIMO

Promote:– high quality observational data– world-wide compatibility

by:– Defining technical standards, – Testing and calibration– Performing instrument intercomparisons, – Implementing quality control procedures. – Increasing expertise and Capacity-building

for:– Improving quality of products and services

CIMO mission

19/5/2011 B. Calpini CIMO

In WMO High Priorities

• in the Global Framework for Climate Services (GFCS) by improving systematic in situ observations and monitoring of climate

• in WIGOS by improving the availability, usefulness, quality and utilization of observational data and products of all WMO observing systems (in conjunction with other tech commission such as CBS, JCOMM…)

19/5/2011 B. Calpini CIMO

• (a) Standardization and Intercomparisons;

• (b) Remote-sensing and New Technologies;

• (c) Capacity-building.

CIMO working structure

19/5/2011 B. Calpini CIMO

Traceability to SI units

• By publishing guidance on instrumentation for calibration laboratories

• By strengthening RICs centers performances by providing an Evaluation Scheme

• By co-chairing the WMO-BIPM 2010 workshop

19/5/2011 B. Calpini CIMO

Siting of observing stations

• QA observations relies also on proper siting and maintenance of instruments.– CIMO-XV approved a siting classification for

observing stations– Tool for assessing which station to be used for

climate services

• The CIMO siting classification together with ISO TC 146 to become a common WMO-ISO standard.

19/5/2011 B. Calpini CIMO

1. Rainfall Intensity

• Final report on the WMO CIMO webpage

19/5/2011 B. Calpini CIMO

19/5/2011 B. Calpini CIMO

Consequences @ MeteoSwiss

19/5/2011 B. Calpini CIMO

Rain security network in the Alps / 2010

19/5/2011 B. Calpini CIMO

Rain security network in the Alps / 2013

19/5/2011 B. Calpini CIMO

2. Temperature and RH

19/5/2011 B. Calpini CIMO

Field Intercomparison of Thermometer Screens/Shields and Humidity Measuring

Instruments (17*2 screens)

VEIG

LBOM

LLANLCOC

SCAE

SDAV

SSOCSYOUVDAV

VROT

VTHY VYOU

19/5/2011 B. Calpini CIMO

Field Intercomparison of Thermometer Screens/Shields and Humidity Measuring

Instruments

- 1 .5

-1

-0 .5

0

0 .5

1

1 .5

ATH

I1

ATH

I2

LBO

M

LCAS

LLAN

1

LLAN

2

LSO

C

SDAV1

SDAV2

SSO

C1

SSO

C2

SVAI1

SVAI2

SWIN

1

SWIN

2

SYO

U1

SYO

U2

VD

AV1

VD

AV2

VEIG

11

VEIG

12

VEIG

21

VFIS

1

VFIS

2

VRO

T1

VTH

Y1

VTH

Y2

VYO

U1

VYO

U2

Tem

per

atu

re d

iffer

ence

s w

ith

VE

IG22

(°C

)

3292

06

5031

24

5031

24

5031

24

5031

24

5031

24

2397

93

5031

24

5031

24

5031

24

5031

24

5031

24

4995

31

1120

4

4457

0

N um ber o f cases

19/5/2011 B. Calpini CIMO

Field Intercomparison of Thermometer Screens/Shields and Humidity Measuring

Instruments

- 1 8 0

-1 5 0

-1 2 0

-9 0

-6 0

-3 0

0

3 0

6 0

9 0

1 2 0

1 5 0

1 8 0

ATH

I1

ATH

I2

LBO

M

LCAS

LLAN

1

LLAN

2

LSO

C

SDAV1

SDAV2

SSO

C1

SSO

C2

SVAI1

SVAI2

SWIN

1

SWIN

2

SYO

U1

SYO

U2

VD

AV1

VD

AV2

VEIG

11

VEIG

12

VEIG

21

VFIS

1

VFIS

2

VRO

T1

VTH

Y1

VTH

Y2

VYO

U1

VYO

U2

Dai

ly T

x t

ime

diff

eren

ces

wit

h V

EIG

22 (

min

ute

s)

91 87 331

331

331

331

331

331

331

331

331

280

266

331

331

331

331

331

331

331

331

254

331

331

183

38 42 331

331

N um ber o f cases

Differences in the time of occurrence of daily maximum temperatures

19/5/2011 B. Calpini CIMO

Gardaia Results

• Even some low-cost screen appear with very good performance

• Consequences for climate services:– Maximum daily temperature delay: up to 3hrs – Maximum temperature error: up to 1.5deg

• Final report on the WMO CIMO webpage

19/5/2011 B. Calpini CIMO

8th WMO International Radiosonde Comparison.Yangjiang, Guangdong, China

12 July – 3 August 2010

Participants: 11 manufacturers from

China, Finland, France, Germany, Japan, Korea, South Africa, Switzerland, USA

3. Radiosonde

19/5/2011 B. Calpini CIMO

Tropical/subtropical moist conditions

Tropopause & 16kmTemperature >> -90deg

19/5/2011 B. Calpini CIMO

19/5/2011 B. Calpini CIMO

Temperature

19/5/2011 B. Calpini CIMO

Geopotential Height

19/5/2011 B. Calpini CIMO

Rel Humidity

19/5/2011 B. Calpini CIMO

Yangjiang Results

• Unprecedented performances achieved with QRS• No pressure sensor needed anymore for GPS radiosonde

with a direct impact on lowering the cost of radiosonde• Intercomparison results used to facilitate selection of

systems for national purposes, minimizing additional performance testing on a national level (WTO procedures).

• Recommendations on vendors to improve their operational radiosonde

>>> Final report on the WMO CIMO webpage

19/5/2011 B. Calpini CIMO27. September – 15. October 2010, PMOD/WRC Davos, Switzerland

4. Radiation

19/5/2011 B. Calpini CIMO

•87 participants

•40 countries

•99 pyrheliometers

19/5/2011 B. Calpini CIMO

(PAC3 and HF18748 not used in 2010 to define the WRR)

Results

Preliminary results communicated to participants

19/5/2011 B. Calpini CIMO

Financial and HR involved

• From NMHs and vendors:– TOT ca: 4 million CHF– Radiosonde China 2010: ca. 5’500 man-days

• The CIMO mission is achieved by supporting initiatives which by coordinating collective actions by Members with respect to observing systems produce results that exceed what each Member could produce unilaterally to meet their critical needs

19/5/2011 B. Calpini CIMO

Future plans:1. Solid Precipitation

19/5/2011 B. Calpini CIMO

• To improve estimates of solid precipitation / liquid water equivalent snowfall.

• To develop guidance on the accuracy and temporal resolution of solid preciptiation parameters

• In CIMO, SPICE positioned in the context of WIGOS, GFCS, GCW, and in collaboration with other relevant communities (GCOS, EC-PORS, Hydrology…)

Challenges

19/5/2011 B. Calpini CIMO

2. Weather Radar

The Radar Quality Control and Quantitative Precipitation Estimation (QPE) Intercomparison Project

19/5/2011 B. Calpini CIMO

Challenges

• to inter-compare different algorithms for radar quality control with a focus on Quantitative Precipitation Estimation QPE applications

• to develop a method to assess the overall quality of precipitation products from radars globally

19/5/2011 B. Calpini CIMO

vertical cross section

plan view

19/5/2011 B. Calpini CIMO

19/5/2011 B. Calpini CIMO

19/5/2011 B. Calpini CIMO

• (a) Standardization and Intercomparisons;

• (b) Remote-sensing and New Technologies;

• (c) Capacity-building.

CIMO working structure

19/5/2011 B. Calpini CIMO

Testbeds and Leadcenters

19/5/2011 B. Calpini CIMO

Friday April 16th 2010, 11pm local time:Volcanic plume over the Swiss Plateau

Saturday: April 17th 2010, 8 pm local time:« Dilution of the plume »

Sunday: April 18th 2010, 2 pm local time:« End of the event» and higher Mixing layer

Absolute scale: preliminary, based on first radiosonde in situ estimateETHZ radiosonde

Red saturated signal: the planetary boundary layer with intense « Mie scattering »

The Island volcanic eruption as seen by lidar

Federal Department of Home Affairs FDHAFederal Office of Meteorology and Climatology MeteoSwiss

19/5/2011 B. Calpini CIMO

(1) Testbeds are centers with experimental facilities to assess the capabilities of various remote-sensing technologies and to provide guidance on remote-sensing instrumentation from a variety of observing systems

(2) Lead centers are centers of excellence for instrument development and testing focused on a specific parameter

Testbeds and Leadcenters

19/5/2011 B. Calpini CIMO

• (a) Standardization and Intercomparisons;

• (b) Remote-sensing and New Technologies;

• (c) Capacity-building.

CIMO working structure

19/5/2011 B. Calpini CIMO

Capacity Building

•Intercomparisons•Training workshops•TECO + METEOREX 2008 St Petersburg•TECO + METEOREX 2010 Helsinki

19/5/2011 B. Calpini CIMO

Capacity Building

•Intercomparison results•Site Classification•…

•Solid Precipitation•Weather radar•New Part: Satellite Observations

CIMO new structure:

CIMO Guide Editorial Board

19/5/2011 B. Calpini CIMO

top related