7843‐009_01_Inv. to Bid
19‐Oct‐2018 RE: Quotation Request No. 7843‐009 Vic Firth/Newport, ME Mid‐South Engineering Project No. 7843.70.05.01 Main Office Renovation To Whom It May Concern: You are invited to submit a bid proposal for the equipment and/or materials and services described in the enclosed specifications, sketches, or drawings prepared by Mid‐South Engineering. Proposals shall be based on these documents, therefore, please examine them carefully before submitting your proposal. Written proposals will be accepted for consideration until, but no later than 4:00 P.M., Friday, November 2, 2018. E‐mail your quotation in accordance with the Instructions to Bidders. Bids received after this date may not be considered. There will be no public opening of bids. We request that you return the Bid Acknowledgement form by 4:00 P.M., Wednesday, October 24, 2018. Vic Firth reserves the right to demand a cost breakdown of unit prices, to accept or reject any and all proposals, and to waive any formality or technicality in any proposal which is to its best interest. If you have any questions regarding this request, please do not hesitate to contact me. Sincerely,
Ronald Rideout, P.E. RR/dlm Enclosures xc: Walter Goodine (MSECO/Orono, ME) w/e Neil Brackley (Vic Firth/Newport, ME) w/e Pierre Letarte (MSECO/Orono, ME) w/e Richard Saucier (MSECO/Orono, ME) w/e
Building Office Specifications 10/19/2018; Rev‐0
Mid‐South Engineering Co. Page 1 of 10 Mid‐South Engineering Quotation Request 7843‐009 for Main Office Renovation
1.0 GENERAL A. Scope of Work
Furnish all labor and materials to perform all operations necessary for the construction of the main office interior renovations
B. Codes The buildings shall conform, to all applicable State and Local building codes:
1. International Building Code, 2012 Edition 6. National Electric Code, latest Edition
2. International Fire Code, 2012 Edition 7. International Energy Conservation Code, 2009 Edition
3. International Plumbing Code, 2012 Edition
8. ASHRAE 90.1‐2007
4. International Mechanical Code, 2009 Edition
9. NFPA 101 Life safety Code, (Volumes I and II)
5. International Fuel & Gas Code, 2012 Edition
10. ADA Accessibility Guidelines (ADAAG) ‐ 2010
C. Delivery of Materials All materials shall be delivered, stored, and handled to prevent any damage by water or
breakage. D. Equal Materials All materials of equal quality may be substituted with prior approval of Owner. Final foundation design by the project Engineer shall be coordinated with Geotechnical report. 2.0 TENTATIVE SCHEDULE
Issue Bids 7843‐009 Friday, October 19, 2018
Receive Bids Friday, November 2, 2018
Evaluate Bids/Award PO, on or before Friday, January 4, 2018
Detailed Shop Drawings of Structural Steel to MSE Friday, March 1, 2019
Date work will commence Friday, May 3, 2019
Date work will be complete Friday, June 7, 2019
Building Office Specifications 10/19/2018; Rev‐0
Mid‐South Engineering Co. Page 2 of 10 Mid‐South Engineering Quotation Request 7843‐009 for Main Office Renovation
Bidder to provide a detailed schedule including delivery of approval drawings, delivery of building components, and time for building erection on foundations. The building supplier will be required to schedule the building erection in collaboration with other trades to allow for building erection that minimizes the impact to other trades. 3.0 FRAMING AND CARPENTRY A. Scope of Work Furnish labor and materials to perform all the rough and finish carpentry as shown on the
drawings. B. Materials
Item Description
1. Framing Lumber #2 and better kiln dried S.P.F.
2. Concealed Roof Sheathing 32/16 span rated structural panel, OSB or Plywood with radiant barrier facing, Exposure 1
C. General Framing
1. Size and spacing of framing are shown on drawings. 2. In addition to all framing operations normal to the fabrication and erection indicated on
the drawings, install all backing required for the work of other trades. 3. Set all horizontal or sloped members with crown up. 4. Do not notch, bore, or cut members for pipes, ducts, conduits, or other reasons except
as shown on the drawings or as specifically approved in advance by the Engineer or as code allows.
5. Headers, beams, and supports made from LVL, PSL, or solid sawn material built‐up are
indicated on drawings.
D. Blocking 1. Install all blocking required to support all items of finish such as hooks, grab bars,
shelving, etc. 2. Fire‐Block in the following specific locations: To cut off all concealed draft openings, both vertical and horizontal, between ceiling and
floor areas; in all stud walls at ceiling and floor levels including double stud, staggered stud walls, furred spaces, horizontally at intervals not exceeding 10‐feet; in all other locations where openings could afford passage for rodents or flames.
Building Office Specifications 10/19/2018; Rev‐0
Mid‐South Engineering Co. Page 3 of 10 Mid‐South Engineering Quotation Request 7843‐009 for Main Office Renovation
E. Draftstopping 1. Draftstopping shall be installed in combustible construction in attic areas and concealed
roof spaces every 3,000 square feet of horizontal area. 2. Draftstopping is not required in buildings equipped throughout with an automatic
sprinkler system. F. Stud Walls and Partitions 1. Studs Make all studs single length, unspliced, and platform frames. Stud size and spacing as
indicated on drawings. 2. Corners and Intersections Unless otherwise indicated on the drawings, frame all corners and intersections with
three (3) or more studs and all required bearing for wall finish. G. Alignment On all framing members to receive a finished wall or ceiling, align the finish subsurface to vary
not more than 1/8" from the plane of surfaces or adjacent framing and furring members. H. Wood Trusses
Wood trusses shall be supplied by a reputable truss manufacturer. Truss manufacturer’s design drawings and load calculations shall be submitted to project Engineer and Owner. See Submittal section. Contractor is responsible for supplying any known or anticipated special loading conditions and information to the truss manufacturer. Each truss shall be secured to the top plates with metal ties/clips which meet the loading conditions per code. Reference Snow Drift/Sliding diagram.
I. Aluminum Windows 1. All units to be aluminum framed and of the sizes and types as indicated on the drawings
and shall have double, insulating glazing, and Low‐E coating to meet the applicable energy code compliance. General Contractor shall present to Owner the brand, fabrication and installation details for the Owner's approval.
2. All window rough framed openings to be flashed on all opening surfaces with self‐
sticking elastomeric weather resistive membrane prior to installation of window unit. 3. All windows to have prefinished metal head flashing at minimum. Contractor to install
window units in a wall assembly which will prevent moisture intrusion behind the window unit or into the surrounding wood sheathing or structure and per manufacturer recommendations.
Building Office Specifications 10/19/2018; Rev‐0
Mid‐South Engineering Co. Page 4 of 10 Mid‐South Engineering Quotation Request 7843‐009 for Main Office Renovation
4. All window units to be back caulked on interior and all voids between rough framed opening and window unit to be filled with expandable spray foam and caulked on exterior if compatible with wall finish manufacturer installation requirements.
5. Prior to move‐in, all window frames shall be cleaned of any debris, stickers removed,
and glazing cleaned on interior and exterior. 6. Operable units: Include screens and all associated hardware. Hardware color or finish to
be determined by owner. J. Hollow Metal Doors and Frames Where called for on the drawings, furnish and install full flush commercial doors and arc‐welded
or knock‐down frames as follows: 1. Exterior doors shall be 1‐3/4" thick, 20 gauge insulated steel with steel frames of the
sizes indicated on the drawings. 2. Interior doors shall be 1‐3/4” or 1‐3/8" thick, 20‐gauge hollow steel with steel frames of
the sizes indicated on the drawings. 3. Vision lights shall be of sizes shown on the drawings and shall be double, insulated
glazing on exterior doors. 4. Metal thresholds shall be aluminum at all "locked" entrance doors as shown on the
drawings. 5. Install weatherstripping at all exterior doors. 6. All doors and frames shall be pre‐finished with a baked‐on prime paint, final paint color
of frames to be dark bronze. Paint color of doors to be determined. 7. Refer to drawings for location of any fire rated doors and frames. All rated doors and
frames to have attached label. Fire doors must be self‐latching, self‐closing, no hook‐backs or chains to keep open, use only listed fire door hardware. Fire doors with fusible link louvers must be U.L. listed and cannot be installed with fire exit hardware.
8. Frames shall be mortised and adequately reinforced for all hardware, including closers
where specified on drawings. 9. Frames installed in masonry walls shall be flush, 18 gauge, 4” head, with a minimum of 6
jamb anchors and 2 base anchors. Frames installed in wood or metal stud walls with gypsum board shall be 16 gauge, “wrapped” drywall frames with throat size to fit specific wall types, 8 anchors on each face of frame. Throat filler may be used for non‐standard wall conditions.
Building Office Specifications 10/19/2018; Rev‐0
Mid‐South Engineering Co. Page 5 of 10 Mid‐South Engineering Quotation Request 7843‐009 for Main Office Renovation
K. Door Hardware 1. Furnish all supervision, material, labor and equipment to supply and install the
following, but not limited: a. Locksets, Deadbolts, and Strike Plates (1” drive bolt) b. Keys c. Hinges d. Knobs/Levers e. Bumpers, (2) each door, if hinge bumper. 2. Style, color and finish shall be approved by the Owner. 3. All hardware to be as selected by Owner. 4. All exterior hardware to have a ten (10) year minimum warranty for finish. 5. Key all locksets and deadbolts alike. Determined by Owner. L. Storefront Doors and Windows Entrance System (Glass Entry) 1. Refer to drawings for detailed sizes and locations. 2. All units to be aluminum framed and of the sizes and types as indicated on the drawings
and shall have double, insulating glazing, and Low‐E coating to meet the applicable energy code compliance. General Contractor shall present to Owner the brand, fabrication and installation details for the Owner's approval.
3. All rough framed openings to be flashed on all opening surfaces with self‐sticking
elastomeric weather resistive membrane prior to installation of units or install units as recommended by the manufacturer.
4. All windows to have prefinished metal head flashing at minimum. Contractor to install
storefront units in a wall assembly which will prevent moisture intrusion behind the window unit or into the surrounding wood sheathing or structure, and per manufacturer recommendations.
5. All storefront units to be back caulked on interior and all voids between rough framed
opening and window unit to be filled with expandable spray foam. 6. Prior to move‐in, all frames shall be cleaned of any debris, stickers removed, and glazing
cleaned on interior and exterior.
Building Office Specifications 10/19/2018; Rev‐0
Mid‐South Engineering Co. Page 6 of 10 Mid‐South Engineering Quotation Request 7843‐009 for Main Office Renovation
M. Weather Barriers at Wall Assembly
1. Flexible Flashing around window and door openings.
2. Flexible flashing at all new roof to existing walls. 3. Metal flashing at head and sills of openings.
4. Base flashing at bottom of wall assembly.
5. Roof flashings such as valley’s crickets, drip edge, pipe boots, etc. (see roofing
specification sections) N. Caulk and Seal 1. General Eliminate holes, cracks, crevices, and gaps: a. Larger holes: (pipe openings, etc.) stuff steel wool inside, and then fill with
mixed cement, or quality butyl caulk. b. Smaller openings: should be caulked and or sealed using elastomeric silicone
sealant. 1) Throughout building Along/around baseboards, floor and wall joints, window and door
moldings, edges of electrical outlet covers, and radiator covers. 2) Pipes/wiring Around all water, electrical pipes, cable and/or other wires coming into
a unit. 3) Kitchen/bathroom: Around sink edges, where cabinets and countertops meet walls
(particularly under the sink), between cabinets and countertops. 2. Firestop Sealants a. Intumescent, for vertical or overhead surfaces, caulked, knifed or troweled. b. Elastomeric Sealant, a non‐halogenated latex‐based, highly elastomeric caulk
shall be installed to provide passive smoke and fire protection in construction joints.
Building Office Specifications 10/19/2018; Rev‐0
Mid‐South Engineering Co. Page 7 of 10 Mid‐South Engineering Quotation Request 7843‐009 for Main Office Renovation
O. Wood Trim Window trim 2 ½” colonial. P. Miscellaneous Steel 1. Miscellaneous structural steel as shown on the drawings shall conform to all required
codes and shall be furnished and installed by this contractor, unless otherwise noted. 2. All expansion anchors, connection bolts, lag screws, etc. shown on the drawings shall be
furnished and installed by this contractor. 3. All miscellaneous metals, such as stairways, handrails, piping, tubing, angles, channels,
plates, and decking, as shown on the drawings, shall be furnished and installed by this contractor.
Q. Clean Up 1. General Keep the premises in a neat, safe, and orderly condition at all times during execution of
this portion of the Work, free from accumulation of sawdust, cut‐ends, and debris. 2. Sweeping a. At the end of each working day, or more often if necessary, thoroughly sweep
all surfaces where refuse from this portion of the work has settled. b. Remove the refuse to the area of the job site set aside for its storage. c. Upon completion of this portion of the work, thoroughly broom clean all
surfaces. 4.0 INSULATION A. Insulation Location and Description
Item Description
1. Insulation, Walls Vapor retarder faced fiberglass batts having a thermal resistance of R‐11 or R‐19
2. Insulation, Ceiling/Roof Fiberglass batts having a thermal resistance of R‐38
B. General Refer to drawings for insulation locations.
Building Office Specifications 10/19/2018; Rev‐0
Mid‐South Engineering Co. Page 8 of 10 Mid‐South Engineering Quotation Request 7843‐009 for Main Office Renovation
5.0 METAL ROOFING A. General Furnish labor and material to perform all the roofing as shown on the drawings. B. Materials Roof panels shall be precision roll‐formed, 26‐gauge minimum or as noted on drawings, factory
painted. All roof systems shall be standing seam or concealed fastener roof system that closely matches the existing roof facade.
6.0 GYPSUM DRY WALL A. Product All gypsum panels shall be the product of one manufacturer and shall be tapered edge. All
gypsum board on walls shall be one layer, 5/8 inch, unless noted otherwise. Fire rated walls and partitions where indicated on drawings shall be one layer, 5/8” fire rated. Gypsum board ceilings shall be 5/8” if supporting framing is 16” on center.
B. Installation 1. General Install all panels plumb, level, and with all vertical joints on bearing. 2. Cutting When cutting gypsum drywall is required, cut by scoring and breaking or by sewing,
working from the face side. When cutting by scoring, cut through the face paper and then snap the panel back away
from the cut face; then break the back paper by snapping the gypsum board in the reverse direction or by cutting the back paper.
Smooth all cut ends and edges of panels as necessary to obtain a smooth joint. For cut‐outs in panels for pipes, fixtures, and other small openings, make holes and cut‐
outs by sawing or by such other method as will not fracture the core or tear the covering and with such accuracy that plates, escutcheons, or trim will cover the edges.
The use of "score‐and‐knockout" method will not be permitted.
Building Office Specifications 10/19/2018; Rev‐0
Mid‐South Engineering Co. Page 9 of 10 Mid‐South Engineering Quotation Request 7843‐009 for Main Office Renovation
C. Clean‐Up 1. General Keep the premises in a neat, safe, and orderly condition at all times during execution of
this portion of the Work, free from accumulation of sawdust, cut‐ends, and debris. 2. Sweeping a. At the end of each working day, or more often if necessary, thoroughly sweep
all surfaces where refuse from this portion of the work has settled. b. Remove the refuse to the area of the job site set aside for its storage. c. Upon completion of this portion of the work, thoroughly broom clean all
surfaces. 7.0 RUBBER BASE ‐ MATERIALS Rubber base: Roppe, 191 Camel. Use Henry 440 for adhesive or approved equal. 8.0 CARPET ‐ MATERIALS A. Bigelow or J + J Invision, Tufted, textured pattern loop, nylon roll goods, 22 oz. minimum. B. Flammability ASTM E 648 Class 1 C. Smoke Density ASTM E 662 less than 450 D. Static Propensity AATCC – 134 Under 3.5 KV E. ADA compliant for accessible routes. F. Adhesive XL Brands Gold Stix multipurpose adhesive.
Building Office Specifications 10/19/2018; Rev‐0
Mid‐South Engineering Co. Page 10 of 10 Mid‐South Engineering Quotation Request 7843‐009 for Main Office Renovation
9.0 ACOUSTIC CEILING TILE A. Toilet Rooms and Wet Areas Certainteed Vinylrock, Safetone Class A, trim edge, 24x48x1/2. B. OFFICES, SOUND ROOMS, and Hallways Certainteed Sand Micro, mineral fiber, Safetone Class A, reveal edge, 24x48x5/8, NRC .50. C. Ceiling Tile Suspension System Certainteed 15/16” Classic Stab or approved equal 10.0 ELECTRICAL A. Scope of Work 1. All electrical wiring, internal to the Office Building, shall be supplied and installed by
Electrical Contractor. 2. Receptacles and conduit for telephone system, speaker system, audio, audio/visual, fire
alarm system, and other low voltage systems will be supplied and installed by this contractor. Contractor to coordinate with Owner for specific equipment specifications.
3. Receptacles, cable, conduit, and wiring for data/network or fiber optic service will be
supplied and installed by this contractor. Server equipment, computers, peripherals, and racks to be supplied by Owner.
4. All underground conduit/cable installation, or overhead wiring, or service drops, on site
property outside of building, is by others, unless noted otherwise on drawings. 5. All exterior exit doors shall have exterior egress lighting, minimum one (1) foot‐candle
illumination level at ground. B. Code All electrical wiring shall conform to the latest edition of the National Electrical Code (N.E.C.)
and all applicable Local and State Codes. C. Fixtures
All lighting fixtures and equipment shall be as shown on the plans or the Contractor shall submit in his bid an allowance for all light fixtures.
Drawing List 19‐Oct‐2018; Rev‐0
Vic Firth Page 1 of 1 Mid‐South Quotation Request 7843‐009 for Main Office Renovation
Drawing Number Rev. Rev. Date Drawing Title
7843‐1000‐01‐AR002 E 10/19/2018 Partial Building Layout Northeast Section
7843‐1000‐01‐AR004 E 10/19/2018 Partial Building Layout Central Section
7843‐1200‐01‐AR001 A 10/19/2018 Main Office New Elevations
7843‐1300‐01‐AR001 A 10/19/2018 Environmental Equipment Mezzanine
Bid Form for: Quotation Request Number: Mid‐South Project Number:
Date: Revision:
Vendor Information
Name of Bidder: Address:
Telephone Number: Fax Number:
E‐Mail: Date:
Description Pricing (USD)
North East Section (7843‐1000‐01‐AR002)
Maine Office New Elevation (7843‐1200‐01‐AR001)
South Central Section (7843‐1000‐01‐AR004)
Materials:
Labor:
Subtotal:
Catwalk (7843‐1300‐01‐AR001)
Materials:
Labor:
Subtotal:
Environmental Equipment Mezzanine
(7843‐1300‐01‐AR001)
Materials: Labor:
Subtotal:
ElectricalMaterials:
Labor: Subtotal:
Sub‐Total Materials: Sub‐Total Labor:
Freight:
Total F.O.B. Job Site:
Total Number of Man‐Hours Required:
Main Office Renovation7843‐0097843.70.05.0119‐Oct‐180
$0.00
3. Complete delivery of services/equipment to site as specified.
$0.00
The undersigned, being familiar with all requirements of the contract documents as prepared by Mid‐South Engineering
Co., hereby agrees to enter into a contract to furnish all labor, materials, services, and equipment necessary for the
complete execution of all work in strict accordance with the drawings and specifications for the following considerations
and prices:
$0.00
1. To hold my bid open sixty (60) days from date of proposal.2. To start work on the project within the time limits specified.
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00$0.00
$0.00
$0.00
$0.00
7843‐009_Bid Form 1/6
Bid Form for: Quotation Request Number: Mid‐South Project Number:
Date: Revision:
Vendor Information
Name of Bidder: Address:
Telephone Number: Fax Number:
E‐Mail: Date:
Main Office Renovation7843‐0097843.70.05.0119‐Oct‐180
Schedule
1. Estimated time to mobilize after awarded.
2. Estimated construction/installation time.
3. Staffing and working hours ‐
Describe the anticipated work schedule and average
project staffing.
Proposed Payment Terms
Proposal Exceptions/Qualifications
7843‐009_Bid Form 2/6
Bid Form for: Quotation Request Number: Mid‐South Project Number:
Date: Revision:
Vendor Information
Name of Bidder: Address:
Telephone Number: Fax Number:
E‐Mail: Date:
Main Office Renovation7843‐0097843.70.05.0119‐Oct‐180
Contractor Information
1. Experience Modifier Rate (EMR)
2. State Contractor's License Number for
the State of (______________)
Include copy of License with Bid Form.
Expiration Date:
3. Safety ‐ Attach a copy of your current safety
program and policies for review by the Owner.
4. Drug Testing ‐ Attach a copy of your current drug
testing program and policies for review by the
Owner.
Bonding
If required, a Performance and Payment Bond will
be provided at a cost of:
Insurance
An up‐to‐date insurance certificate is to be
attached.
Can you comply with insurance requirementsas outlined in the Contract? Yes or No.
If yes, please submit either an insurance binder
and/or a Certificate of Insurance from the insuringcompany.
7843‐009_Bid Form 3/6
Bid Form for: Quotation Request Number: Mid‐South Project Number:
Date: Revision:
Vendor Information
Name of Bidder: Address:
Telephone Number: Fax Number:
E‐Mail: Date:
Main Office Renovation7843‐0097843.70.05.0119‐Oct‐180
Labor Billing Rates
Additional Work Craft Supervisory Billing Rate of Pay
1. Labor ‐ Additional labor will be performed at a $0.00cost to the Owner as shown on the Labor Billing $0.00Rates included in quotation. $0.00(Use additional sheets, if necessary) $0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00$0.00
2. Material ‐ Material costs will be actual expended
costs for material plus a percentage which includes
all costs including profit and overhead. Invoicing for
this payment must be supported by the Contractor's
actual invoice for material.
Material plus percentage:
7843‐009_Bid Form 4/6
Bid Form for: Quotation Request Number: Mid‐South Project Number:
Date: Revision:
Vendor Information
Name of Bidder: Address:
Telephone Number: Fax Number:
E‐Mail: Date:
Main Office Renovation7843‐0097843.70.05.0119‐Oct‐180
3. Additional equipment costs will be invoiced at Equipment Billing Rates
the rates as shown on the Equipment Billing Rates. Name of Billing Rate
(Use additional sheets, if necessary) Equipment $/Hour $/Week
$0.00 $0.00$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00$0.00 $0.00
4. Subcontractors ‐ Additional work performed by
Contractor's subcontractors shall be invoiced for
subcontractors actual invoice plus a percentage for
Contractor's total mark‐up.
Subcontractor's actual invoice plus percentage:
5. Work Authorization ‐ Additional work can only be
authorized by Purchaser or Purchaser'sRepresentative. Total costs will be established prior
to authorization where possible. Contractor musthave Purchaser or Purchaser's Representative sign
his approval for change order work on a daily basis.
7843‐009_Bid Form 5/6
Bid Form for: Quotation Request Number: Mid‐South Project Number:
Date: Revision:
Vendor Information
Name of Bidder: Address:
Telephone Number: Fax Number:
E‐Mail: Date:
Main Office Renovation7843‐0097843.70.05.0119‐Oct‐180
AddendumsAcknowledgement is hereby given for receipt of thefollowing bid addendums.
Addendum: Date:
Addendum:
Date:
Addendum:
Date:
Addendum:
Date:
Addendum:
Date:
Addendum:
Date:
Bid Acceptance
The undersigned hereby designates the office of
which "Notice to Proceed" and/or correspondence
should be mailed. Also, by signing below, equipment
and/or Contractor offers to sell the service or
equipment included herein. Failure to sign below willresult in automatic disqualification of proposal.
Name of Firm:
By (Signature): (Above Signature Typed):
Mailing Address:
Telephone Number: Fax Number:
E‐Mail: Date:
If different from above, show the address to which
purchase order and/or payments should be mailed:
7843‐009_Bid Form 6/6
Bid Package Acknowledgement Form
Vic Firth Page 1 of 1 Mid‐South Quotation Request 7843‐009 for Main Office Renovations
The Supplier/Contractor acknowledges receipt of Quotation Request 7843‐009 for Main Office Renovations regarding the project for the Relocation of Manufacturing Equipment from one Location to Another. The Supplier/Contractor further acknowledges that they have received and reviewed all contents of the Quotation Request as noted in the Table of Contents and either accepts or declines to quote as noted below.
Accept
Company Name
Date
Contact Name (Signed)
Contact Name (Printed)
Decline
Company Name
Date
Contact Name (Signed)
Contact Name (Printed)
Return this acknowledgement form by 4:00 P.M. Wednesday, October 24, 2018 via e‐mail to Mid‐South to the following individuals: 1. Ronald Rideout ‐ Engineer
E‐Mail: rrideout@mseco.com 2. Barbara Letarte ‐ Administrative Coordinator E‐Mail: bletarte@mseco.com
Instructions to Bidders 19‐Oct‐2018; Rev‐0
Vic Firth Page 1 of 4 Mid‐South Quotation Request 7843‐009 for Main Office Renovation
1.0 GENERAL The Invitation to Bid (cover letter) shall be considered a part of the Instructions to Bidders, which shall be considered a part of the contract documents. 2.0 EXAMINATION Bidders shall carefully examine contract documents, which include the drawings and/or specifications. Bidders will not be given extra payments for conditions that can be determined by examining the contract documents. Where installation or construction work is involved, the Bidder is invited to inspect the site. Extra payments will not be made for site conditions, which could be determined by inspection of the site. 3.0 QUESTIONS Submit all questions regarding purchasing, taxes, terms, etc., to: Neil Brackley Vic Firth Company 77 High St. Newport, ME 04953 Submit all questions concerning the drawings and specifications to: Ron Rideout With copy to: Mid‐South Engineering Co. Barbara Letarte rrideout@mseco.com Mid‐South Engineering Co. 207‐889‐5200 bletarte@mseco.com 207‐889‐5200
If a question is of major importance, a bulletin will be issued to all bidders.
4.0 CHANGES IN PLANS AND SPECIFICATIONS Any changes that may occur in the plans and specifications after awarding the contract will be made on a Contract Change Order.
Instructions to Bidders 19‐Oct‐2018; Rev‐0
Vic Firth Page 2 of 4 Mid‐South Quotation Request 7843‐009 for Main Office Renovation
5.0 SCHEDULE Proposals shall contain a guarantee of time required to complete delivery and/or installation after acceptance of order and review of preliminary drawings. If more than one shipment is required, then a schedule of such shipments shall be included in the proposal. Concurrent with the issuance of preliminary drawings for review, a date related schedule based on the fabrication and/or installation schedule shall also be issued. 6.0 PRICING A. Proposal The bidder shall submit his proposal in accordance with the attached breakdown for individual
items as shown on the enclosed Bid Form. The prices shown will be firm and not subject to escalation on either labor or material. B. Tax Terms Vic Firth Company The material and equipment to be purchased as a result of this bid package shall be subject to
Sales and/or Use Tax. The federal ID number for the Vic Firth Company will be provided to the successful bidder.
C. Terms of Payment The terms of payment will be a percentage down at the time the purchase order is issued,
followed by a percentage for each of the following: certified drawings, building delivery, erection complete, and final payment after satisfactory occupation.
7.0 SHIPMENT AND FREIGHT CHARGES All equipment shall be shipped F.O.B. Newport, ME with freight prepaid. Prepaid freight for buyer's account is to be shown as a separate cost on Sellers' invoice and supported by a copy of the prepaid freight bill. All shipping claims shall be the responsibility of the shipper. Equipment will be received at the job site by the Owner and remain the responsibility of the supplier until system is installed. The shipper shall contact Neil Brackley prior to shipment.
Instructions to Bidders 19‐Oct‐2018; Rev‐0
Vic Firth Page 3 of 4 Mid‐South Quotation Request 7843‐009 for Main Office Renovation
8.0 CHARGES FOR SUPERVISION When applicable, the proposal shall indicate the amount and type of start‐up supervision that is included and the cost of any additional supervision that may be requested by the Owner. 9.0 SPECIAL TOOLS Any special tools or fixtures of whatever nature required for installation, adjustment, maintenance or operation of the equipment shall be furnished with the equipment and/or services and their cost included in the price quoted. Said quote shall include a list of those special tools and/or services. 10.0 WARRANTIES Each proposal shall contain a statement of the warranty period from shipping date and from the initial operation date for goods and services offered. In no situation will said warranty period be less than twelve (12) months. 11.0 INSURANCE REQUIREMENTS The successful Contractor will be required to furnish insurance as outlined in General Conditions, attached as a part of this Quotation Request. If you cannot comply with these insurance requirements, your quote will not be accepted. Include with your quote a Certificate of Insurance and/or an insurance binder from insuring company. This document shall reflect that the required insurance can be acquired from the insurance company prior to the starting date of contract. The Contractor will include Owner and Engineer under the endorsement to waive the right of subrogation for workers compensation. The Contractor will also provide an insurance certificate that names Owner and Engineer as an additional insured under the Public Liability, Automobile Liability and Pollution Liability insurance coverage. 12.0 AWARDING OF CONTRACT The Owner reserves the right to award the contract on any basis deemed to be in the Owner's best interest. The Owner reserves the right to award additional work by either:
Instructions to Bidders 19‐Oct‐2018; Rev‐0
Vic Firth Page 4 of 4 Mid‐South Quotation Request 7843‐009 for Main Office Renovation
A. Negotiation with the original contractor, or B. Soliciting new bids covering such work on any basis in the Owner's best interest. 13.0 SUBMITTAL OF BIDS ‐ EQUIPMENT/MATERIAL E‐mail your quotation to the e‐mail address below. Hard copies are not required, but if supplied, shall be sent to: Ron Rideout MID‐SOUTH ENGINEERING 303 Main Street Orono, ME 04473 E‐Mail: rrideout@mseco.com and E‐Mail: bletarte@mseco.com, Administrative Assistant
When e‐mailing your quotation, RETURN THE BID FORM IN EXCEL FORMAT. You may also submit a
PDF of the bid form so that the signature page can be returned. 14.0 BID PACKAGE All plans, specifications, and documents from this bid package shall be returned to the Owner after the contract has been awarded. 15.0 DRAWINGS OF RECORD The successful bidder shall provide Engineer with "Certified/Issued for Construction" drawings in hard format which shall be considered the Drawings of Record. While e‐mailed copies of the originals are encouraged to facilitate the design process, Engineer will rely solely on Drawings of Record for design purposes and must have HARD COPIES prior to providing “Certified/Issued for Construction” drawings. A. E‐mailed drawings ARE encouraged to facilitate the design process. B. E‐mailed drawings WILL be accepted for information and review purposes only. C. E‐mailed drawings SHALL be submitted with only one (1) drawing per AutoCAD (.dwg) file. Zip
files will be accepted and are preferred. D. E‐mailed drawings SHALL be accompanied by the respective plotting set‐ups.
DOOR SCHEDULE
3'-0" x 7'-0" HOLLOW METAL DOORS (INTERIOR)
6'-0" x 7'-0" HOLLOW METAL DOORS (INTERIOR)
3'-0" x 7'-0" HOLLOW METAL DOORS INSULATED W/LIGHT (EXTERIOR)
4'-0" x 7'-0" HOLLOW METAL DOORS (INTERIOR)
1
2
3
4
12
3
4
3'-0"
7'-0" 7'-0" 7'-0" 7'-0"
6'-0" 3'-0"
4'-0"
9'-0"
A.F.F.
8'-0"
A.F.F.
1
HALL OFFICE
THIN CARPET
E/SIDE
BASE VINYL
E/SIDE
TYPICAL STUD DIETRICH 3-5/8", STE 20 GA.
T.O. WALL TO HAVE 20 GA. TRACK AND STUD.
PROVIDE R-38 INSULATION ON SUSPENDED CEILING.
SUSPENDED CEILING TO BE 2'x4' GRID.
WALLS TO HAVE R-11 INSULATION
WALLS TO HAVE 5/8" GYP.
WALL\CEILING ASSEMBLIES
TYPICAL OFFICE/HALL DETAIL
9'-0"
A.F.F.
8'-0"
A.F.F.
2
THIN SET TILE
FLOOR E/SIDE
BASE VINYL
E/SIDE
9'-10"
A.F.F.
7'-6"
A.F.F.
WALL\CEILING ASSEMBLIES
TYPICAL SOUND ROOM/LOBBY DETAIL
8'-0"
A.F.F.
3/4" WOOD
SHEATHING
BRIDGING
R-38
INSULATION
HANGERS
SUSPENDED
CEILING
SUSPENDED
ACOUSTICAL
CEILING
RECESSED
LIGHTING
5/8" GYP.
SOFFIT
R-19 INSULATION
TYPICAL STUD DIETRICH 6"
14 GA. @ 16" O.C.
5/8" GYP. E/SIDE
THIN CARPET
E/SIDE
9'-0"
A.F.F.
HALL
8'-0"
A.F.F.
ROOMS
MAIN
OFFICE
SPACES
WAREHOUSE
PROVIDE R-38
INSULATION
REPLACE
GRID/TILE
BASE VINYL
APPLY LAYER OF 3/8" GYP.
E/SIDE AT MAIN OFFICES.
ELSE DO NOTHING
EXISTING STUD
WALL W/GYP.
3
WALL\CEILING ASSEMBLIES
OFFICES/WAREHOUSE
10" 12GA JOISTS @ 16" O.C.
PROVIDE R-38
INSULATION
PROVIDE R-38
INSULATION
BRACE AS
REQ'D
CURVED WALL
SOFFIT.
W/CURVED TRACK
SHAPE TO
MATCH OUTSIDE
FACE OF
RECEPTION DESK
E'
D'
25'-10"
7'
8'
-
A
ASECTION
SCALE: 1/8"=1'-0"
FOLDING PARTITION WALL
SUPPORT STEEL PLAN VIEW
HSS 6x6x1/2
HSS 6x6x1/2
W124x53
4'-0"
4
5
°
38'-4 1/2"
19'-2 1/4"
19'-2 1/4"
4'
5'
6'
7'
8'
9'
10'
11'
G'
F'
E'
D'
C'
B'
A'
Ca
rt
42
x3
0
Table 96x36
Wire Rack
60x24
Wire Rack
60x24
Sta
mp
er
Pallet
40x48
Pa
lle
t
40
x4
8
Pa
lle
t
40
x4
8
Pa
lle
t
40
x4
8
De
sk
Fcab
Cabnt
36x30
Ca
rt
42
x3
0
Table 96x36
Ca
rt
42
x3
0
Ca
rt
42
x3
0
Table 96x36
Table 96x36
Ca
rt
42
x3
0
Ca
rt
42
x3
0
Table 96x36
Ca
rt
42
x3
0
Table 96x36
Pa
lle
t
40
x4
8
Ma
lle
t
Win
de
r
Table
48x30
Pallet
40x48
Pallet
40x48
Pallet
40x48
Cart
42x30
Wire Rack
60x24
DL
KS
Pallet
40x48
Cart
Jens
Desk
Cart
Wire Rack
60x24
Pa
lle
t
40
x4
8
Table 96x30
Ta
ble
9
6x3
0
Ha
nd
Strtn
Table
48x30
Table
60x30
Ta
ble
48
x3
0
Table
60x30
Table 72x30
Table 72x30Table 72x30
Table 72x30
Table 72x30
Table 72x30
Pa
lle
t
40
x4
8
Pa
lle
t
40
x4
8
Table 72x30
Table
60x30
Ta
ble
60
x3
0
Fca
b
Ta
ble
60
x3
0
Ta
ble
60
x3
0
Ta
ble
60
x3
0
Ta
ble
60
x3
0
Wire R
ack
60x24
Wire R
ack
60x24
Wire R
ack
60x24
Wire R
ack
60x24
Wire R
ack
60x24
Wire Rack
60x24
Desk
Desk
Cabnt
36x30
Table 72x30
Ta
ble
7
2x3
0
Pa
lle
t
40
x4
8
Die
Shelf
Pa
lle
t
40
x4
8
Pa
lle
t
40
x4
8
Clicker
Press
Clicker
Press
Frans
Desk
#
EW
F A
ID
EW
Plu
mb
ed
#
#
#
#
EW
EW
TE
L
TE
L
F AID
F A
ID
F A
ID
TE
L
Elec Panels
20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0"
20'-0"
20'-0"
20'-0"
20'-0"
20'-0"
20'-0"
MENS
9'-8"x 13'-3"
FIRE SPRINKLER ROOM
14'-0"
x 10'-0
1
2
"
WOMENS
9'-8"x 13'-3"
IT ROOM
9'-11"x 13'-7"
ELECT. ROOM
19'-11" x 9'-9"
SOUND ROOM
22'-3
1
2
"x 20'-0"
RECEPTION
21'-9"x 27'-4-1/2"
MENS
24'-4"x 8'-8"
WOMENS
24'-4"x 8'-8"
MAINT. CLOSET
21'-1"x 7'-7"
COMPRESSOR ROOM
ELECTRICAL
SERVICE
ENTRANCE
HYDRANT
CONNECTION AND
WATER GONG
VENDING MACHINES
WITH COUNTER
(NOT IN SCOPE)
EXECUTIVE OFFICE
11'-4"x 19'-8"
CONF. ROOM #1
19'-3"x 12'-1/2"
#1
11'-4"x 9'-3
1
4
"
#2
11'-4"x 9'-7"
#3
11'-4"x 9'-7"
#4
11'-4"x 9'-7"
#5
11'-4" x 9'-7"
#6
11'-4"x 8'-10
1
2
"
#7
10'-11"x 9'-0"
#8
10'-11"x 8'-0
1
4
"
#15
8'-6
1
2
"x
10'-0
1
2
"
#16
8'-6
1
2
" x
10'-0
1
2
"
#18
9'-11"x 9'-11"
LARGE CONFERENCE AREA
25'-10"x 38'-4
1
2
"
38'-4 1/2"
MATCH LINE
7843-1000-01-AR003
Pallet
40x48
Pallet
40x48
Pa
lle
t
40
x4
8
Pa
lle
t
40
x4
8
Pallet
COMPRESSOR ROOM
MATCH LINE
MATCH LINE
7843-1000-01-AR002
7843-1000-01-AR004
DIP TANK VAULT
(480 SQFT)
INSTRUMENT
STORAGE
9'-6"x7'-6
1
2
"
CLOS.
CONF. ROOM #3
15'-7"x 10'-0
1
2
"
#14
7'-11
1
2
"x
10'-0
1
2
"
FOLDING PARTITION WALLS
REF. FOLDING WALL
PARTITION SUPPORT
STEEL PLAN VIEW FOR
FRAMING
NEW 4'-0"X 5'-0"
CASEMENT WINDOWS
(TYP)
GLASS ENTRY
23'-8"
15 LOCKERS
FIRST AID
ROOM
21'-1"x 6'-1"
MATCH LINE
7843-1000-01-AR004
NEW CANOPY OVER RAMP WITH 5-12 PITCH
APPROX. 12" OVERHANG
NEW 4" THK
APPROX 5'W x 10'L
8'-1 3/4"
4'-0"
5'-0"
TABLE & CHAIR
STORAGE AREA
19'-11"x 14'-10
3
4
"
25'-10"
BREAK AREA
23'-8"x 38'-4
1
2
"
#9
10'-11"x 8'-1
3
4
"
#10
10'-11
1
2
"x 9' 0 "
#11
10'-11
1
2
"x 8'-0
1
4
"
#12
9'-6"x 9'-0"
#13
9'-6"x 8'-0
1
4
"
CLOS.
5'x4'
STORAGE
9'-6" x 8'-1
3
4
"
STORAGE
10'-11
1
2
" x 8'-1
3
4
"
25'-0"
30 LOCKERS
30 LOCKERS
30 LOCKERS
25 LOCKERS
2'-2"
3'-6"
5'-0"
1
1 1
1
1
1 1
11
1
1 1
1 1
1 1
1
1
1
1
1
1
1
1
1
1 1 1 1
1
1
1
1
1
1
1
44
1
1
1
2
2
2
1
1
3
3
1
3
3
3
3
3
1
1
2
3
1
3
3
1
1
1
3
1
1
3
2
2
2
2
3
FLOORING OPTIONS:
A. CARPET
SUSPENDED CEILING
W/12" INSULATION
MECH MEZZ
ABOVE WOOD
FLOORING OPTIONS:
A. CARPET
COLUMN WRAP
COLUMN WRAP
TABLE & CHAIRS
(NOT IN SCOPE)
CUBICLES
W/CHAIRS
(NOT IN SCOPE)
FLAT SCREEN TV
(NOT IN SCOPE)
NO FLOORING
11'-4" 21'-9" 15'-7"
14'-0"
7'-11 1/2" 8'-6 1/2" 8'-6 1/2" 8'-6 1/2"
19'-11"
#17
8'-6
1
2
" x
10'-0
1
2
"
8'-0 1/4"
4'-0"
9'-0"
7'-6 1/2"
12'-0 1/2"
13'-3"
3'-3"
10'-0 1/2"
9'-9"
11'-4"5'-0" 10'-11"
10'-11 1/2"
9'-6" 49'-6" 19'-11" 19'-7"
51'-3"
27'-4 1/2"
CORRIDOR
(C1)
5'-0" x
51'-3"
27'-2"
CORRIDOR (C2)
4'-0"x 27'-2"
22'-3 1/2"
19'-3"
20'-0"
5'-3"
9'-8"
9'-8"
16'-9"
20'-9 1/2"
39'-9 1/2"
CORRIDOR (C3)
20'-9-1/2"x 3'-3"
BREAK AREA
5'-3"x 13'-3"
CUBICLE ROOM
39-9
1
2
"x 29'-4
1
2
"
FLAT SCREEN TV
(NOT IN SCOPE)
29'-4 1/2"
9'-11" 6'-4" 24'-4"
38'-11"
7'-7"
8'-8"
6'-1"
8'-8"
6'-10 1/2"
8'-10 1/2"
9'-7"
9'-7"
9'-7"
9'-7"
9'-3 1/4"
19'-8"
19'-3 1/2"
RECEVING AREA
19'-3
1
2
"x 6'-10
1
2
"
2'-10"
21'-1"
21'-1"
LOCKER ROOM
21'-1"x 38'-11"
9'-11"
13'-7"
9'-7"
5'-2 1/2"
CORRIDOR (C4)
268 SQ.FT"
CORRIDOR (C5)
19'-11"x 8'-10
1
2
"
8'-10 1/2"
14'-10 3/4"
2
14'-10 3/4"
VENDING ROOM
19'-11"x 14'-10
3
4
"
UP
QUALITY
8X12
7843-1000-01-AR003
12'-0"
INV
AUDITOR
8X8
1
1
1
1
LIMITS OF FRAMED CEILING
14
13
12
21'-0"
13'-11 11/16"
18'-0"
20'-3"
W12x16
W12x16
W12x16
W12x40
W12x40
W12x40
W12x40
10'-11 1/2"
A
WOOD TRUSSES @ 2'-0" O.C.
5-12 CANOPY
PITCH DN
HSS 4x4x
1
4
"
(TYP. 3PL)
3
DESK & CHAIRS
NOT IN SCOPE
2
2
LIMITS OF FRAMED
CEILING ABOVE
CKD.
APP.
CURRENT REVISION
WWW. MSECO.COM
1658 Malvern Ave., Hot Springs, AR 71901
SCALE
DRN.
NO. DATE BY
DRAWING NO.
DESCRIPTION
200 MacKenan Dr., Cary, NC 27511
303 Main St., Orono, ME 04473
STATE
- - -
E 10/19/2018 CJB ISSUED FOR BIDS
ZILDJIAN COMPANY
NEWPORT
ME
PLANT
OVERALL AREA
ARCHITECHURAL, BUILDING
PARTIAL BUILDING LAYOUT NORTHEAST SECTION
7843 1000 01 AR0021/8" = 1'-0"
MKL 08/15/2018
RWR 10/19/2018
RWR 10/19/2018
KEY PLAN
NOTES:
1) EXISTING WALLS REQUIRE NEW FINISH AND DOOR LOCATIONS.
2) HATCHED WALLS REPRESENT NEW WALLS.
3) EXTERIOR WINDOWS ARE NEW WITH NEW OPENINGS AND LOCATIONS.
4) REFER TO FINISHING SPECIFICATION FOR MORE INFORMATION.
AR003AR002
AR004
AR005
AR007
AR006
7843-1200-01-AR001
2
7843-1200-01-AR001
1
W14x53
W14x53
NOT FOR
CONSTRUCTION
ISSUED FOR
BIDS
PAINT:
DRYWALL - (WALLS, CEILINGS, GYPSUM BOARD AND SIMILAR ITEMS). SEMI-GLOSS SYSTEM:
1. 1ST COAT: BENJAMIN MOORE ECO SPEC WB PRIMER N372 (0 G/L) MPI # 50,
X-GREEN 50, 149, X-GREEN 149, LEED V4 CHPS CERTIFIED.
2. 2ND COAT: BENJAMIN MOORE ECO SPEC WB SEMI-GLOSS N376 (0 G/L) MPI # 54,
X-GREEN 54, LEED V4, CHPS CERTIFIED.
3. 3RD COAT: BENJAMIN MOORE ECO SPEC WB SEMI-GLOSS N376 (0 G/L) MPI # 54,
X-GREEN 54, LEED V4, CHPS CERTIFIED.
FOLDING PARTITION:
THIS SECTION IS BASED ON THE PRODUCTS OF MODERNFOLD, INC. AT:
215 W. NEW ROAD
GREENFIELD, IN 46140
TEL: (800) 869-9685
FAX: (317) 468-6760
EMAIL: INFO@MODERNFOLD.COM
CONTINUOUSLY HINGED PANEL PARTITIONS, ELECTRIC OPERATION.
1. PRODUCT: ACOUSTI-SEAL 933E OPERABLE PARTITION BY MODERNFOLD, INC.,
ELECTRICALLY OPERATED SERIES OF CONTINUOUSLY HINGED PANELS, TOP SUPPORTED
WITH OPERABLE FLOOR SEALS.
2. HORIZONTAL TOP SEALS: CONTINUOUS CONTACT EXTRUDED VINYL BULB SHAPE WITH
PAIRS OF NON-CONTACTING VINYL FINGERS TO PREVENT DISTORTION WITHOUT THE
NEED FOR MECHANICALLY OPERATED PARTS.
SLIDING DOOR
MANUFACTURERS: AD SYSTEMS 2201 100TH ST. SW, EVERETT, WA 98204 | WEBSITE:
HTTP://SPECADSYSTEMS.COM | PHONE: 425-374-1360 | ATTN: ESTIMATING:
ESTIMATING@SPECADSYSTEMS.COM
1. INTERIOR SLIDING ALUMINUM-FRAMED DOORS AND PARTITIONS
2. MANUFACTURER: EXAMSLIDE™ HIGH PERFORMANCE BARN (SLIDING) DOOR SYSTEM BY AD SYSTEMS.3. FRAME PROFILES: EXTRUDED ALUMINUM FRAME “WRAP” FRAME WITH INTEGRAL VERTICAL JAMB FINISH:4. STANDARD HARDCOAT (KYNAR) FINISH IN LIGHT SEQUIN OR MEDIUM BRONZE, OTHER CUSTOM
HARDCOAT (KYNAR) COLOR OR CUSTOM POWDER COAT. CONSULT AD SYSTEMS FOR AVAILABILITY AND
COLOR CHARTS.
FLOOR TILE (LOBBY AND RECEPTION AREAS)
PROVIDE VINYL COMPOSITION TILE: EXCELON® FEATURE™ TILE, STRIPS & INSETSMANUFACTURED BY ARMSTRONG FLOORING, INC.
1. DESCRIPTION: TILE COMPOSED OF POLYVINYL CHLORIDE RESIN, PLASTICIZERS, FILLERS,
STABILIZERS AND PIGMENTS WITH COLORS AND TEXTURE DISPERSED UNIFORMLY
THROUGHOUT ITS ENTIRE THICKNESS.
2. VINYL COMPOSITION TILE SHALL CONFORM TO THE REQUIREMENTS OF ASTM
F 1066, “STANDARD SPECIFICATION FOR VINYL COMPOSITION FLOORTILE", CLASS 1, SOLID COLOR TILE.
3. PATTERN AND COLOR: IN [%COLOR%] [COLOR SELECTED FROM THE RANGE CURRENTLY
AVAILABLE FROM ARMSTRONG FLOORING, INC.]
4. SIZE: [12 IN. X 12 IN. (305 MM X 305 MM)] [2 IN. X 24 IN. (50.8 MM X 610 MM)]
[4 IN. X 24 IN.(101.6 MM X 610 MM)] [6IN. X 24 IN.(152.4 MM X 610 MM)].
5. THICKNESS:1/8"/0.125 IN. (3.2MM).
78
910
11
12
13
14
21'-0"
24'-6"
25'-0"
18'-0"
27'-0"
21'-0"
UP
ELECTRICAL SERVICE
ENTRANCE
EXISTING TRANSFORMER
SHIPPING
20X10
LACQUER VAULT B
24X24
(576 SQFT)
QUALITY
8X12
TOOL CRIB
24X36
(864 SQFT)
TIPPING
AREA
GRINDERS AREA
SECONDARY CELL
AREA
MATCH LINE
MATCH LINE
A
2
W12x16
W12x16
W12x16
W12x40
W12x40
W12x40
W12x40
10'-11 1/2"
A
WOOD TRUSSES @ 2'-0" O.C.
5-12 CANOPY
PITCH DN
HSS 4x4x
1
4
"
(TYP. 3PL)
7843-1000-01-AR003
KM SECONDARY
AREA
13'-0"
15'-0"
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
5'-0"
MATCH LINE
Pa
lle
t
40
x4
8
Pa
lle
t
40
x4
8
Pa
lle
t
40
x4
8
Pa
lle
t
40
x4
8
Pa
lle
t
40
x4
8
Pa
lle
t
40
x4
8
Pa
lle
t
40
x4
8
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
DOWELER
TABLE
AUTOMATIC
FEED BIN
DOWEL
SANDER
DOWELER
AUTOMATIC
FEED BIN
AUTOMATIC
FEED BIN
HYDRAULIC
TANK
CART
AUTOMATIC
FEED BIN
WEIGH ABLE
MOLDER/ DOWELS
STRETCH WRAPPER
10'-0"
25'-6"
CUSTOM PICKING
12'-0"
INV
AUDITOR
8X8
SHELVING
8X42.5
7'-0"
7'-0"
6'-11"
7'-0"
7'-1"
7'-0"
7'-0"
7'-0"
36'-0"
24'-0"
24'-5 1/2"
20'-0"
25'-6"
17'-4 1/2"
8'-0"
29'-0"
24'-0"
24'-0"
4'-0" 11'-0"
PEDESTRIAN WALKWAY
PEDESTRIAN WALKWAY
PEDESTRIAN WALKWAY
NEW TRANSFORMER
FORK TRUCK LANE
FORK TRUCK LANE
FORK TRUCK LANE
SHELVING
8X42.5
SHELVING
8X42.5
SHELVING
8X42.5
SHELVING
8X42.5
SHELVING
8X42.5
SHELVING
8X42.5
SHELVING
8X68
SLIDING DOOR
NEW ELECTRICAL ROOM
42'-0"
8'-0"
26'-1 1/2"
18'-0"
1
1
1
1
2
1
1
1
1
1
11
LIMITS OF FRAMED CEILING
ABOVE. USE
3
4
" WOOD
SHEATHING ON 10", 12GA
METAL JOISTS @ 16" O.C.
TOP OF WOOD SHEATHING
13' - 0" ABOVE FINISHED
FLOOR
4
4
6", 16 GA. METAL STUDS @ 16" O.C. WITH IMPACT
RESISTANT SHEETROCK ON VAULT SIDE ONLY.
REFERENCE DRAWING
7843-1000-01-AR002 FOR
DOOR SCHEDULE AND WALL
ASSEMBLY DETAILS.
SHELVING
BY
OWNER
CKD.
APP.
CURRENT REVISION
WWW. MSECO.COM
1658 Malvern Ave., Hot Springs, AR 71901
SCALE
DRN.
NO. DATE BY
DRAWING NO.
DESCRIPTION
200 MacKenan Dr., Cary, NC 27511
303 Main St., Orono, ME 04473
STATE
- - -
E 10/19/2018 CJB ISSUED FOR BIDS
ZILDJIAN COMPANY
NEWPORT
ME
PLANT
OVERALL AREA
ARCHITECHURAL, BUILDING
PARTIAL BUILDING LAYOUT SOUTH CENTRAL SECTION
7843 1000 01 AR0041/8" = 1'-0"
MKL 08/10/2018
RWR 10/19/2018
RWR 10/19/2018
KEY PLAN
AR003AR002
AR004
AR005
AR007
AR006
NOT FOR
CONSTRUCTION
ISSUED FOR
BIDS
SLIDING DOOR
MANUFACTURERS: AD SYSTEMS 2201 100TH ST. SW, EVERETT, WA 98204 | WEBSITE:
HTTP://SPECADSYSTEMS.COM | PHONE: 425-374-1360 | ATTN: ESTIMATING:
ESTIMATING@SPECADSYSTEMS.COM
1. INTERIOR SLIDING ALUMINUM-FRAMED DOORS AND PARTITIONS
2. MANUFACTURER: EXAMSLIDE™ HIGH PERFORMANCE BARN (SLIDING) DOOR SYSTEM BYAD SYSTEMS.
3. FRAME PROFILES: EXTRUDED ALUMINUM FRAME “WRAP” FRAME WITH INTEGRAL VERTICALJAMB FINISH:
4. STANDARD HARDCOAT (KYNAR) FINISH IN LIGHT SEQUIN OR MEDIUM BRONZE, OTHER
CUSTOM HARDCOAT (KYNAR) COLOR OR CUSTOM POWDER COAT. CONSULT AD SYSTEMS
FOR AVAILABILITY AND COLOR CHARTS.
NEW HSS 4x4x
1
4
"
(TYP. 3PL)
NEW CANOPY (BEYOND) WITH
STANDING SEAM METAL ROOF ON
WOOD TRUSSES.
(COLOR TO MATCH EXISTING)
CKD.
APP.
CURRENT REVISION
WWW. MSECO.COM
1658 Malvern Ave., Hot Springs, AR 71901
SCALE
DRN.
200 MacKenan Dr., Cary, NC 27511
303 Main St., Orono, ME 04473
- - -
A 10/19/2018 CJB ISSUED FOR BIDS
ZILDJIAN COMPANY
NEWPORT
ME
PLANT
MAIN OFFICES
ARCHITECTURAL, BUILDING
MAIN OFFICE NEW ELEVATIONS
7843 1200 01 AR001AS NOTED
CJB 10/10/2018
RWR 10/19/2018
RWR 10/19/2018
NOT FOR
CONSTRUCTION
ISSUED FOR
BIDS
CD
E
FG
56
7
8
ENVIRONMENTAL EQUIPMENT
MEZZANINE
OFFICE MEZZANINE
56x38.5 (2,156 SQ. FT)
CATWALK
CKD.
APP.
CURRENT REVISION
WWW. MSECO.COM
1658 Malvern Ave., Hot Springs, AR 71901
SCALE
DRN.
200 MacKenan Dr., Cary, NC 27511
303 Main St., Orono, ME 04473
- - -
A 10/19/2018 CJB ISSUED FOR BIDS
ZILDJIAN COMPANY
NEWPORT
ME
PLANT
MEZZANINE
ARCHITECTURAL, BUILDING
ENVIRONMENTAL EQUIPMENT MEZZANINE
7843 1300 01 AR0011/4" = 1' -0"
CJB 10/16/2018
RWR 10/19/2018
RWR 10/19/2018
NOT FOR
CONSTRUCTION
ISSUED FOR
BIDS
top related