(18.6.2016) CURRICULUM VITAE - Nurdin Syafii_Rev1
Post on 20-Feb-2017
426 Views
Preview:
Transcript
Jun 18, 2016 NURDIN SYAFII WA/: +6281310115613 : nurdin_syafii@yahoo.com skype: nurdin.syafii
Reference available on request Page 1
CURRICULUM VITAE
I. PERSONAL DATA
Name : NURDIN SYAFII
Gender : Male
Place / Date of Birth : Semarang, Indonesia / October 14th, 1973
Marital Status : Marriage
Religion : Moslem
Nationality : Indonesian
Permanent Resident : Republic of Indonesia
Phone : +6281513375548 OR +6281310115613
Email : nurdin_syafii@yahoo.com OR nurdin.syafii@gmail.com
IC Card No / KTP No : 2171071410739002
Passport No : B3959712
Tax no / NPWP No : 69.636.220.1-215.000
Address : Telaga Golf Sawangan, Block FV/29 Cluster France – Depok (West Java) INDONESIA 16519.
Phone & fax: +62-021-77883682 , mobile : 62-0815-11108533(attn:NurLaili – my elder sister )
II. EDUCATIONAL BACKGROUND
Sep,1994 ~ Feb,2000 Bandung Institute of Technology (ITB),Indonesia,<www.ee.itb.ac.id>,
Bachelor Degree of Electronics Engineering.CGPA 2.73 (out of 4). (Cert.
No. : 132042/K01/PP.3.6.1/I/02/ 2000)
Sep,1992 ~ Aug,1994 Surabaya Sepuluh November Institute of Technology (ITS),Indonesia,<www.its.ac.id>
Bachelor Degree of Physics Engineering, major Instrumentation. CGPA
2.74 (out of 4). (non graduated)
III. PROFESSIONAL ENG. REG.
Aug 3rd
, 2015 ~ Present PT. MultispecSinergindo Jakarta-Indonesia, “Certified ASNT Level 2
Ultrasonic Test-UT”. (Cert. No. : 1428/ UT/ N/ 15)
May 18th, 2013 ~ Present PT. MultispecSinergindo-Indonesia, “ CertifiedASNT Level 2 Radiographic
Interpreter”. (Cert. No. : 396/ RI/ N/ 13)
Feb 21th, 2011 ~ Present Ikbal-M-YosBatam-Indonesia, “ Certification Oil & Gas Electrical and
Instrument Inspector(MIGAS)”. (Cert. No. : 244/INST-
XIII/VII/2011)<www.ikbalmyos.com>
Aug 30th, 2010 ~ Present CSWIP 3.1 International Welding Inspector society. ( CSWIP Cert. No.
54480/2). TWI-UK<www.cswip.com>
Jun20th,2009 ~ Present Certified Welding Inspector society (MIGAS)( Cert. No. : 494/WI-
XVIII/VIII/2009)<www.ikbalmyos.com>
Feb, 2000 ~ Present PII (The Institution of Engineers, Indonesia )<www.pii.or.id>, active member
as Senior Engineer. (Cert. No. : 055/EL/VI/2000)
IV. COURSE AND TRAINING
Jun 18, 2016 NURDIN SYAFII WA/: +6281310115613 : nurdin_syafii@yahoo.com skype: nurdin.syafii
Reference available on request Page 2
Aug 3rd
, 2015 ~ Aug 15th, 2015 PT. Multispec Sinergindo Jakarta-Indonesia, “Certification ASNT Level 2
“ Ultrasonic Test-UT” (Cert. No. : 1428/ UT/ N/ 15)
Aug 20th , 2014 ~ Aug 21
th, 2014 QEDI International, “GO Completion Foundation Course and Database
Course (Green Field)” Jun 12
th, 2014 PT. PanduSelamatUtama, “ HSE Fundamental by BP”
Jun 11th , 2014 PT. WIKA EPC, “ WIKA Safety Induction mandatory”
Oct 04th, 2013 PT. Safetindo Perkasa-Indonesia, “ Sea Survival Course”. (Cert. No. : BSS/
SPOT/ 10124/ 2013)
Oct 02nd
, 2013 PT. TRATSI-Indonesia, “ HCP-Handover Certificate Package training for
Pertamina PHEONWJ”. (In house training)
May 06th, 2013 ~ May 19
th, 2013 PT. MultispecSinergindoCilegon-Indonesia, “ Certification ASNT Level 2
Radiographic Interpreter-RI”. (Cert. No. : 396/ RI/ N/ 13)
Feb 21th, 2011 ~ June, 2011 Ikbal-M-YosBatam-Indonesia, “ Certification Oil & Gas Electrical and
Instrument Inspector(MIGAS)”. (Cert. No. : 244/INST-
XIII/VII/2011)<www.ikbalmyos.com>
Aug 23th, 2010 ~ Aug 30th, 2010 TWI UK. Representative-Indonesia, “ Certification Welding Inspector
(CSWIP 3.1)”. ( CSWIP Cert. No. 54480/2). TWI-UK<www.cswip.com>
Oct 13th, 2008 ~ Jun 20th, 2009 Ikbal-M-YosBatam-Indonesia, “Certified Welding Inspector
Training(MIGAS)" (Cert. No. : 494/WI
XVIII/VIII/2009)<www.ikbalmyos.com>
Apr 03rd, 2007 ~ Apr 04th, 2007 BatamindoBatam-Indonesia, “Fire Fighting Training”
Feb 05th, 2007 ~ Mar 30th, 2007 BatamCollege -Indonesia, “English for Conversation & Business”
Jun 20th, 2003 ~ Nov 19th, 2003 PT. Samsung Indonesia, “Six Sigma Green Belt training”. (Cert. No: GB-
20031928-SEMCO)
Feb 5th, 2001 ~ Dec, 2001 Korea Productivity Consulting Indonesia (KPC), “Quality Management
Systems of ISO 9001:2000 training ”. (Cert. No: KPC/ID/ED/000011)
Apr 16th, 2001 ~ Apr 20th, 2001 PT. LG Electronics Display Devices Indonesia, “QC 7 tools methods
training”. (Cert. No. : LGEDI-SA-045)
Feb , 2000 ~ May , 2000 O'Brian Semarang-Indonesia, “English for Business ”.
Jun , 1997 Language Center of ITB-Indonesia, “TOEFL Practice Test” (score : 450).
V. QUALIFICATION & PERSONALITY
Strong Point :
Interpersonal skills, particular the ability to listen and understand co-worker,client problem and point of view committed
to being professional in work displaying in integrity at all time.
Have strong skill level of supervision, inspection, technical problem solving all QA/QC including technical problem.
Able to Work under pressure, flexible on duties to perform accept responsibility work long hour committed to going
extra mile to completed job correctly on time work well as team player or have worked on own or prepared to work in
busy/noisy and isolated area.
Language Skills :
English (excellence)
Bahasa Indonesia (Excellence)
Skills and competences :
Familiar with International Standard such as ISO 9000:1994 series, ISO 9001:2001, ISO 14000, QC 7 Tools, AQL,
TQM, 5S, and Lean.
Jun 18, 2016 NURDIN SYAFII WA/: +6281310115613 : nurdin_syafii@yahoo.com skype: nurdin.syafii
Reference available on request Page 3
Certified Six Sigma Green Belt (Ref. No. : 246/ SEMIN-HRD/ I/ 04). Experience in deploying improvement project
through Six sigma method (DMAIC), and Minitab statistical tools
Certified CSWIP 3.1( CSWIP Cert. No. 54480/2) from TWI United Kingdom
Certified Oil and Gas Instrument Inspector (Cert. No. : 244/INST-XIII/VII/2011) ,Conducted by IKBAL M-YOS ,
Certified by General Directorate Oil and Gas (MIGAS), Ministry of Mines and Energy Indonesia :
* Well conversant with Drawing (Drawing symbol, PFD, Loop diagram ,P&ID), procedure, Specification and
datasheet
* Well conversant selecting material refer to needs, instrument material support fabrication, installing instrument
support, installing tubing tray, installing tubing and instrument air sub header, installing hook up instrument,
testing tubing, hook-valve actuator, pneumatic system, wellhead control panel,
* Well conversant loop drawing, cause and effect diagram, Instrument Mechanical Completion
* Well conversant hazardous area, location and interpret symbol in oil and gas location/platform/plant
* Well conversant Support Fabrication and Support Installation
* Well conversant Cable tray installation, Cable pulling /Segregation, Cable gland, Cable testing, Cable
Termination
* Well conversant Equipment Installation (MCC),Grounding/ Earthing, Heat Tracing, Field bus, Vendor
package/ incoming,
* Well conversant Equipment Preservation, Hazardous Area and classification
* Well conversant with Punch list and Site Issue
Certified Welding Inspector (MIGAS) (Cert. No. : 494/WI-XVIII/VIII/2009), Conducted by IKBAL M-YOS ,
Certified by General Directorate Oil and Gas (MIGAS), Ministry of Mines and Energy Indonesia :
* Well conversant with Basic Welding, Welding machine, Inspection of Welding, Inspection tools, Welding
Design, Metallurgy for Welding, Blue print Reading and Welding Symbol.
* Well conversant with Destructive Test , Non Destructive Test (MPI,PT,UT,RI ANST Level II ) & Visual,
QSHE-Quality Management System of Welding, Corrosion and Protection, Safety and Instrumentation.
* Well conversant with AWS D1.1, ASME IX, ASME VIII, ABS Rules, ANSI B31.1, B31.3, API 1104, API
RP2A, API 650. API 598, API 6D, ASME B36.14
* Well conversant with Developing PQR and WPS, WQT, Platform Erection Inspection, Interpreting Radiographs,
Inspection and Quality Control.
* Well conversant with Welding processes especially GTAW,FCAW, SMAW, SAW and GMAW.
Certified NDE ASNT level 2 for RI (Cert. No. : 396/ RI/ N/ 13) , UT (Cert. No. : 1428/ UT/ N/ 15)
VI. WORKING EXPERIENCE
VI.A. WORK EXPERIENCE BY HISTORY
6.1. Feb 1
st , 2016 ~ Present PT. REKAYASA INDUSTRI (EPCC)
Position : QC Engineer - Mechanical Static
Project : "Banggai Ammonia Plant, Luwuk Sulawesi"
Client : PT. Panca Amara Utama (PAU)
Site : Banggai Luwuk, Sulawesi – Indonesia
Equipment in charge :
a. Tower (Process Condensate Stripper, HP/LP Ammonia Scrubber, HP/LP Flash Column, Ammonia Distillation
Column,CO2 Stripper & Absorber)
b. Reactor (Hydrotreater, Desulfulizer, Mercury Guard Bed, High/Low Temperature Shift Converter, Methanator,
Molecular Sieve Drier)
c. STHE (Shell & Tube Heat Exchanger)
d. Pressure Vessel (Closed cooling water expansion tank, Flare KO Drum, PA Reservoir & Surge Drum, IA Reservoir,
HP Nitrogen Reservoir, Steam Condensate Pit, LO Storage, Secondary Reformer Jacket Cooling Water Pit, Caustic
Jun 18, 2016 NURDIN SYAFII WA/: +6281310115613 : nurdin_syafii@yahoo.com skype: nurdin.syafii
Reference available on request Page 4
Dissolving Tank, Raw Gas Separator,CO2 Absorber KO Drum, LP Flash Reflux Drum)
e.Drum Package (Steam Drum, Methanator Effluent Separator, Feed Gas & Compressor KO Drum, MP Stream
Desuperheating Drum, NG Separator for Inlet Metering Unit, Ammonia Letdown Drum, Refrigerant Receiver, LTS
Start-up Separator, HP Steam Blow Down Drum, Oase Solution Sump, Natural Gas KO Drum, Ammonia Storage
Flare Drain Vessel, Ammonia Vapor/Liquid Separator)
f. Surface condenser & Vacuum System
g. Ammonia Separator
h. Secondary Reformer
i. Transfer Lines (Primary Reformer Effluent chamber and riser transition, KRES Effluent)
j. Fabrication & Erection Tank (Ammonia Storage, Diesel Oil, Potable Water, SWRO Product, OASE Solution
Storage, Fire Water, Polished Water, Desalinated Water)
6.2. Jul 18th
,2015 ~ Jan 31th
,2016 PT. TRIPATRA-SAMSUNG ENGINEERING CONSORTIUM (EPCC)
Position : Site QC Inspector - Piping
Project : “EPC-1 Banyu Urip Mobil Cepu Limited Project, Cepu Central Java”
Client : Exxon Mobil Cepu Limited (MCL)
Site : Banyu Urip Block, Cepu Central Java - Indonesia
6.3. June 16th
, 2014 ~ June 15th
,2015 PT. WIKA INDUSTRIAL PLANT (EPCC)
Position : Project QA/QC Manager
Project : “New Condensate & Diesel Tanks LNG Project (NCDT) – BP Tangguh Papua”
Client : British Petroleum (BP Berau Ltd.) as company
Site : Bintuni Tangguh, West Papua - Indonesia
6.4. Oct 1st, 2013 ~ June 16
th, 2014 PT. TRA-TSI CONSORTIUM (3
rd Party Inspection)
Position : Site QA/QC Coordinator ( Client Representative)
Project : "MRA-MMJ Reactivation and Topside Modification Offshore Project"
Client : Pertamina PHEONWJ (Pertamina Hulu Energi Offshore North West Java)
Site : Pertamina Hulu Energi Offshore North West Java - Indonesia
6.5. Mar, 2013 ~ Sep 30th
,2013 PT. TRIPATRA -SAMSUNG ENGINEERING CONSORTIUM (EPCC)
Position : Shop Fab. QC Inspector - Mechanical Static (Resident Inspector)
Project : “ EPC-1 Banyu Urip Mobil Cepu Limited project, Cepu Central Java”
Client : Exxon Mobile Cepu Limited (MCL)
Fabricator : PT.DIHI-Daekyung Cilegon, Indonesia
Equipment in charge :
a. Pressure vessel and column (Crude Oil Striper Coloumn) use exotic mat’l incolloy 825 (overlay)
b. STHE (Crude oil stripper feed exchanger, Crude oil stripper bottom exchanger, Crude oil feed heater),
c. KO Drum (Boot for HP and LP Flare warm)
6.5.1. Oct, 2012 ~ Feb ,2013 PT. TRIPATRA -SAMSUNG ENGINEERING CONSORTIUM (EPCC)
Position : QC Engineer - Mechanical Packaged
Project : “EPC-1 Banyu Urip Mobil Cepu Limited project, Cepu Central Java”
Client : Exxon Mobile Cepu Limited (MCL)
6.6. Jan, 2012 ~ Feb, 2013 PT. TRIPATRA (EPCC)
Jun 18, 2016 NURDIN SYAFII WA/: +6281310115613 : nurdin_syafii@yahoo.com skype: nurdin.syafii
Reference available on request Page 5
Position : Head Office QA/QC Coordinator
Project : “Perta-Samtan Gas project Prabumulih Palembang”
Client : PT. Pertamina Gas and Samtan Korea
Site : Prabumulih and Sei Gerong, Palembang South Sumatera - Indonesia
6.7. Mar, 2011 ~ Jan, 2012 PT. HEAT EXCHANGER INDONESIA (Fabricator)
Position : Shop Fab. QC Inspector - Structure
Project : "Flexible pipe manufacturing plant Tanjung Langsat project (reels and cradles)"
Client : Asiaflex Product Sdn Bhd & Technip
Fabricator : PT. Heat Exchanger Indonesia - Batam
Equipment in charge : Reels and craddles
6.8. Feb,2010 ~ Feb,2011 PT. INDOSPEC ASIA (3rd
Party Inspection)
Position : Site QC Inspector - Piping (Client Representative)
Project : "Pagerungan Bali north refurbishment VLP (very low pressure) compressor for LNG project"
Client : PT. Kangean Energy Indonesia (PT. KEI)
Site : Kangean Block, Kangean Island , Bali north sea - Indonesia
6.9. Apr,2009 ~ Feb,2010 PT. MUARO PRIMA UTAMA (Sub-Contractor)
Position : Shop Fab. QC Inspector - Mechanical Static
Project : " EPCC of 200,000 LPD Ethanol Plant in Chachoengsao, Thailand"
Owner : KNM Process System Sdn. Bhd for Impress Ethanol Co. Ltd
Fabricator : PT.Heat Exchanger Indonesia – Batam
Equipment in charge :
a. Pressure Vessels
b. Stripper Column
6.10. Nov, 2008 ~ Mar,2009 PT. MUARO PRIMA UTAMA (Sub-Contractor)
Position : Shop Fab. QC Inspector- Structure
Project : "BP Refinery Bulwer Island project"
Client : HEA Australia
Fabricator : PT. Heat Exchanger Indonesia - Batam
6.11. Apr,2008 ~ Nov,2008 PT. MUARO PRIMA UTAMA (Sub-Contractor)
Position : Shop Fab. QC Inspector - Piping
Project : "SEPC MEG (Foster Wheleer)"
Owner : Shell Eastern Petroleum (Pte) Ltd
Fabricator : PT. Rotary Engineering, Batam - Indonesia
6.12. Feb,2007 ~ Apr,2008 PT. MUARO PRIMA UTAMA (Sub-Contractor)
Position : Shop Fab. QC Inspector- Piping
Project : "Singapore Parallel Train (SPT) - Foster Wheleer"
Owner : Exxon mobile chemical asia pacific Pte. Ltd.
Fabricator : PT. Heat Exchanger Indonesia,Batam - Indonesia
6.13. Nov, 2004 ~ Dec, 2006 PT. SCHNEIDER ELECTRIC BATAM - INDONESIA
Jun 18, 2016 NURDIN SYAFII WA/: +6281310115613 : nurdin_syafii@yahoo.com skype: nurdin.syafii
Reference available on request Page 6
Position : QC Engineer
1st Project : “Reducing Sensing Range Reject (F/G) on Inductive sensor ref. 12 mm XS1type”
2nd
Project : “Reducing Hi-Pot Reject (F/G) on Inductive sensor ref. Diameter 08 mm (cable type)”.
Product in charge : Inductive sensor
6.14. Sep, 2002 ~ Nov, 2004 PT. SAMSUNG INDONESIA <www.samsung.co.id>
Position : Six Sigma Officer (Green Belt Level) (Ref. No. : 246/ SEMIN-HRD/ I/ 04)
1st Project (GB) : “Yellow Belt (Basic) Six Sigma Accomplished Education up to 100% of Total Employee”
2nd
Project (GB) : “Reducing Cost of consumable mineral Water by Implementing In-house Water Treatment”
6.15. Jun, 2000 ~ Sep,2002 PT. YEONG SHIN INDONESIA
Position : Assistant QA/QC Manager (Ref. No. : YSU(PGA)0210-001)
Position : Assistant ISO QMR
Project : “Setup for Quality Management System of ISO 9001:2001 in PT. Yeong Shin Indonesia”.
VI.B. WORK EXPERIENCE BY JOB FUNCTION
VI.B.1 QA/QC MANAGER (Total 1 year)
6.3. June 16th
, 2014 ~ June 15th
,2015 PT. WIKA INDUSTRIAL PLANT (EPCC)
Position : Project QA/QC Manager
Project : “New Condensate & Diesel Tanks LNG Project (NCDT) – BP Tangguh Papua”
Duties and Responsibilities : * Assist in determining the quality objectives and targets for the project.
* Assist the project management in development and implementation of project quality system on the project including
construction related work method statements & Inspection & Test Plans
* Induction of project personnel with respect to project quality system.
* Involvement in quality audits, including internal audit and conducting external audits on major subcontractors and suppliers
as necessary.
* Ensure that corrective and preventive actions are established after proper investigation of non-conformance and are
implemented effectively.
* Review the root cause analysis and lessons learnt and develop improvement plans.
* Coordinate, review and issue ITP’s for all work related to the project.
* Coordinate progressive preparation, compilation and review of records for MDR (Data Record Books) and issue to
COMPANY.
* Identify and process non-conformances, including obtaining COMPANY approval of proposed resolutions, ensuring
implementation of and monitoring effectiveness of agreed resolutions.
* Coordinate site QC reporting and distribution of reports to relevant personnel.
* Review subcontractor’s ITP’s and Quality Management Plans and monitor implementation and maintenance of plans.
* Analysis record of weekly weld quality statistics for inclusion in the QMS Management Review process.
* Analysis of recorded non-conformance analysis from audit results for inclusion in the QMS review process.
* Audit of both internal and external quality systems.
* Communicate all non-conformances to COMPANY Project Quality Representative.
* To manage of Implementing and overseeing the quality management system at the job site.
* To manage Establishment of detailed test and inspection procedures, including the procedure for notifying inspection and test
schedule and reporting the results of inspections.
Jun 18, 2016 NURDIN SYAFII WA/: +6281310115613 : nurdin_syafii@yahoo.com skype: nurdin.syafii
Reference available on request Page 7
* To manage and Assigning inspectors in accordance with field production activities.
* Maintaining inspector qualification records, including those for special processes.
* Review and approve of inspection and test procedures and inspection reports. Coordinate of inspection activities with
COMPANY Quality team
* Monitoring and controlling of QC inspectors activities to confirm that they comply with specified procedures.
* Coordination the resolution of equipment and materials quality problem and non conformances with field engineering and
construction supervisor.
* Implementation of project specific inspection and test plan.
* Coordination of subcontractor’s inspection activities, records and reports and subcontractors audits.
* Maintaining QC records during construction including QC records after turn over from subcontractors.
* Hold regular QC meeting with QC staff, subcontractor QC disciplines and COMPANY QC team.
* To monitor and maintain performance to achieve target of Key Performance Indicator
* Liaise with Handover coordinator for handover coordination and ITR completion
VI.B.2 QA/QC COORDINATOR (Total 1 year 11 months)
6.4. Oct 1st, 2013 ~ Jun 16
th, 2014 PT. TRA-TSI CONSORTIUM (3
rd Party Inspection)
Position : Site QA/QC Coordinator ( Client Representative)
Project : "MRA-MMJ Reactivation and Topside Modification Offshore Pertamina PHEONWJ Project"
Duties and Responsibilities : QA/QC Coordinator reports to Project Leader and is accountable for assuring that PHE Policies and all requirements of Quality
Plan are fully executed and properly documented by all Contractors and PHE personnel.
Major steps to fulfill this accountability include but are not limited to the following:
* Ensuring agreement with the Supervisors of their roles, responsibilities and accountabilities.
* Develop a clear understanding of the Quality Plan and processes.
* Executing Quality Plan and processes.
* Ensuring that all PHE and Contractor personnel are aware of their roles responsibilities and accountabilities.
* Identifying resources to fully execute Quality Plan.
* Notify Supervisors of any additional resources that are required to fully execute Quality Plan.
* Work closely with responsible engineers to coordinate the design review process.
* Be a focal point for review Contractor Quality Plans and Inspection & Test Plans.
* Review\close out non-conformance records.
* Use the non-conformance records to help identify probable failure modes of equipment.
* Categorizing risks with relevant engineers for specifying equipment/service.
* Conduct periodic Audits on Contractors.
* Maintain NCR and CAR database.
* Follow up on outstanding NCR’s and CAR’s.
* Maintain a high level of PHE presence at Contractors facilities during manufacturing processes.
* Assist Contractors and relevant PHE engineers in developing recovery plans for deficiencies during equipment
manufacturing or provisions of services.
* Ensuring that critical QC steps are witnessed.
* Advise the responsible engineer of factory acceptance tests (FAT). System integrity tests (SIT) – Commissioning procedures
and dates.
* Ensure that third party Inspectors are competent to:
- Participate in pre-manufacturing meetings.
- Witness and document Inspections and tests.
- Ensure that Calibration of measuring and test equipment is as per approved procedures.
- Maintain a filing system of records and certification as required.
- Compile the final documentation package.
- Ensure that all required equipment is correctly packed, manifested and shipped.
Jun 18, 2016 NURDIN SYAFII WA/: +6281310115613 : nurdin_syafii@yahoo.com skype: nurdin.syafii
Reference available on request Page 8
* Ensure document management system functions to meet the need of the quality process, retaining all certification and
contractor documentation and Inspection and test reports.
* Be a focal point for review of all quality documents from contractor
6.6. Jan, 2012 ~ Feb, 2013 PT. TRIPATRA (EPCC)
Position : Head Office QA/QC Coordinator
Project : “Perta-Samtan Gas project Prabumulih Palembang”
Duties and Responsibilities :
* Review procedure, specification and verification of compliance to applicable codes/rules.
* Updates internal department Database with all the information (Corrective Action Request-CAR, Non Conformity-NC etc.)
coming from the project and the site and preparing annual statistic analysis.
* Monitors the adequate close-out of NC
* Review Welding Procedure Specification (WPS), Inspection Test Plan (ITP), Welder Qualification Test (WQT).
* Review and analysis Weekly performance welder.
* Review Inspection Report (Mechanical, Piping, civil, Electrical and Instrument)
* Performs internal and external Project Audits related for documentation.
* Planning and implementation of the Quality Assurance activities within the project and coordination of the project Quality
Control activities implementation.
* Review all the material compliance with the specification.
* Witness Factory Acceptance test with the Contractor and Vendor.
* Review all document Factory Acceptance Test (FAT).
* Review Final document and dossier for certification to “MIGAS” (SKPI and SKPP).
* Assesses the Quality Control Plans of Contractors and identify any necessary corrective measures.
* Review a Quality Plan, Quality Control Plan and Project Quality Procedures which guarantee compliance with contractual
requirements and ISO Standards.
* Communicate with the contractor for arrange testing & inspection by third party company.
* Ensure all item/part are fabricated and complied as per specification and engineering drawing.
* Provides Project personnel with the necessary Quality training.
* Approves documents made by Quality Control Personnel.
* Arrange QA/QC Meeting with the Contractor.
* Discuss about QA/QC Issue and solving problem with the Contractor.
* Review Inspection Report (Mechanical, Piping, civil, painting, welding, etc)
* Prepared all procedure and verification of compliance to applicable codes/rules.
* Liaises with Clients about Quality matters.
* Initiates and promotes all necessary corrective actions for any failure identified with project quality system.
* Provides the necessary back-up to the Project Manager regarding contractual issues relating to Quality both during tender and
project execution phase.
* Prepare, arrange & witness for testing & inspection by third party company.
* Ensure all item/part are fabricated and complied as per specification and engineering drawing.
* Arrange QA/QC meeting with the vendor and client
* Discuss QA/QC Issue and solving Problem with all party.
* Prepared Weekly, monthly report to Project Manager.
VI.B.3 QC MECHANICAL (Total 2 years 4 months)
VI.B.3.1 QC Engineer- Mechanical (10 months)
6.1. Feb 1st , 2016 ~ Present PT. REKAYASA INDUSTRI (EPCC)
Position : QC Engineer - Mechanical Static
Jun 18, 2016 NURDIN SYAFII WA/: +6281310115613 : nurdin_syafii@yahoo.com skype: nurdin.syafii
Reference available on request Page 9
Project : "Banggai Ammonia Plant, Luwuk Sulawesi"
Duties and Responsibilities :
* Fulfill target of quality KPI which setup by Quality head/Manager.
* Coordination meeting with vendor and client regarding progress of project (KOM,PIM, quality issue meeting)
* Good understanding and interpretation of standard for mechanical (ASME II part A & D , ASME VIII, ASME IX, ASME
V,API 650,TEMA,etc)
* Review and approve vendor document as mention in vendor print document
* Review and approve regarding quality project document (ITP, Quality procedure/plan)
* Review project and vendor document refer to KBR specification
* Squad check with engineering department for any document review related with construction.
* Request TQ (technical query) for deviation issue
* Issue RFI for client and DISNAKER inspection
* Attend vendor or shop fabrication inspection local and oversea as per ITP
* Inspection all incoming materials, Fabrication and testing of equipment for mechanical static at vendor shop fabrication and
warehouse.
* Witness any Welder and WPS qualification (including mechanical test) which submitted by vendor and project construction
* Liase with other department (procurement and engineering ) regarding any quality issue and vendor documents
* Monitoring quality inspection progress status of mechancal static
* Issue IRN and IR after inspection
* Issue NCR for any Non conformance issue
* Closing any punchlist
* Prepare final document of MDR (dossier) for construction
6.5.1. Oct, 2012 ~ Feb ,2013 PT. TRIPATRA -SAMSUNG ENGINEERING CONSORTIUM (EPCC)
Position : QC Engineer - Mechanical Packaged
Project : “EPC-1 Banyu Urip Mobil Cepu Limited project, Cepu Central Java”
Duties and Responsibilities :
* Coordinate with vendor and client for progress of project regarding any quality issues of mechanical package attend any
coordination meeting (Kick off meeting, pre inspection meeting, quality issue meeting)
* Attend meeting regarding client specification
* Request technical query for deviation issue
* Review and approve document related with quality for mechanical package
* Attend vendor or shop fabrication inspection local and oversea
* Liase with other department ( procurement and engineering ) regarding any quality issue
* Issue IRN (Inspection Release Note) after inspection and making IR (Inspection report)
* Issue NCR for any Non conformance issue
* Closing any punchlist
* Prepare final document of MDR (dossier) for construction
* Monitoring progress of mechanical package which related with SKPP MIGAS
* Invite MIGAS to attend inspection,
* Create weekly quality report
* Squad check with engineering department for any document review related with construction.
* Review procedure, specification and verification of compliance to applicable codes/rules and client specification.
VI.B.3.2 Shop Fabrication QC Inspector - Mechanical Static (1 year 6 months)
6.5. Mar, 2013 ~ Sep 30th
,2013 PT. TRIPATRA -SAMSUNG ENGINEERING CONSORTIUM (EPCC)
Position : Shop Fab. QC Inspector - Mechanical Static (Resident Inspector)
Jun 18, 2016 NURDIN SYAFII WA/: +6281310115613 : nurdin_syafii@yahoo.com skype: nurdin.syafii
Reference available on request Page 10
Project : “ EPC-1 Banyu Urip Mobil Cepu Limited project, Cepu Central Java”
6.9. Apr,2009 ~ Feb,2010 PT. MUARO PRIMA UTAMA (Sub-Contractor)
Position : Shop Fab. QC Inspector - Mechanical Static
Project : " EPCC of 200,000 LPD Ethanol Plant in Chachoengsao, Thailand"
Duties and Responsibilities :
a. Drawing approval : to Confirm approval given (as built drawing)
b. Welding procedures : to Check WPS/ PQR against corresponding joint configuration, and Confirm approval given.
c. Welder/ welding operator : to check Welder qualification check for validity and range qualified.
d. Procedures: to Confirm approval given for NDE Procedures, Hydrostatic Test Procedure, Surface Preparation and Painting
Procedure, PWHT Procedure, PMI Procedure, Hardness test procedure, fabrication procedure
e. Pre-inspection meeting : to Review of order and specifications
f. Material receiving : All incoming material shall be checked against drawing and P/O for quality, dimension and certification
prior to acceptance, Including filler metal/ electrode, Non-conforming item to be quarantined
g. Material preparation/ pre-fabrication : to Check bevel preparations are as per detail drawing, Visual check for edge
lamination, Check heat numbers are properly transferred prior to cut plates and pipes.
h. Fabrication squence (PV and coloumn)
h.1 nozzles to flange; all long & circ. joints of shell barrels; and all nozzle to barrel
* Fit-up: to check i.e Mark, cut, edge prep and tack-weld nozzles to flanges
* Weld: Visual check for defect, Check welding parameter, Check welder qualification, Check welding consumable,
Welding inspection
* NDE: Witness and review NDE Examination
* Welds overlays : Visual check for defect, Check WPS and welding operators, PMI exam
h.2 Restoration weld overlay of shell barrels head and nozzles : Visual check for defect
h.3 Fit-up and weld, misc, name plate bracket items,lugs and weld sadles (if any), internal part (if any): Visual and
dimensional check
h.4 Weld repair : Visual check after weld repair and shall be performed by the same NDE method used to detect original
defect. MT after removal of temporary support.
h.5 All temp. attachment (after grinding), including arc strikes shall be examined by 100% MT or PT: Check NDE personnel
qualification and records.
i. Fabrication squence (STHE) - Additional tubesheet bundle
i.1 Tube bundle assy : Check cleanliness tubesheet, holes & tube ends, the edges are free of burns, check dimension,
tubesheet and baffles orientation, check tube projection.
i.2 Tube expasion rolled: check expanded length, check % expands.
i.3 Air test of reinforcing pads prior to insertion : Air test pressure (15 Psig),Check no bubbles/leakage
i.4 Internal insertion prior to bundle insertion : check cleanliness of internal surfaces, the exposed inside edges of neck shall
be rounded
i.5 Tube bundle insertion : check cleanliness of internal surfaces, check tube bundle orientation
j. Final visual inspection and dimensional check prior to hydrostatic test: Visual checks prior to hydro-test, Any sharp edges
shall be grind, Check cleanliness and exposed edge inside of nozzle neck shall be rounded, Check dimensional and welds size
as per drawing requirements.
k. Air test of reinforcing pads prior to pwht/ hydrotest : Air test pressure (15 Psig),Check no bubbles/leakage
l. Post Weld Heat Treatment (PWHT) of vessels : Check calibration, qualification quantity and location, Review PWHT chart
m. NDE after PWHT : Check NDE personnel qualification and records, examine as per NDE MAP
n. Hardness Test : Witness hardness examination, check calibration
o. Hydrostatic test : Check calibration certificate of PG & PR still valid, Check range of PG & PR, Temperature gauge
p. Drying after hydrostatic test: The vessel shall be drained completely and dried thoroughly after hydro test
q. Blasting and painting external : Check abrasive, surface profile, coating system, and environment, Ring grooved & raised
face surface of flanges shall be protected from blasting & paint, Check DFT after finish coat
r. Manufacturing Data Report (MDR) review: Documentation to be checked for complete-ness and clarity.
Jun 18, 2016 NURDIN SYAFII WA/: +6281310115613 : nurdin_syafii@yahoo.com skype: nurdin.syafii
Reference available on request Page 11
s. Preservation packing : Vessel component shall be kept dry, Flange gasket faces to be covered with plywood
t. Pre-shipment inspection : Check packing, central of gravity and all shipment mark, Vessel component shall be kept dry,
Flange gasket faces to be covered with plywood
VI.B.4 QC PIPING (Total 3 years 5 months)
VI.B.4.1 Site Installation QC Piping (1 year 6 months)
6.2. Jul 18th
,2015 ~ Jan 31th
,2016 PT. TRIPATRA-SAMSUNG ENGINEERING CONSORTIUM (EPCC)
Position : Site QC Inspector - Piping
Project : “EPC-1 Banyu Urip Mobil Cepu Limited Project, Cepu Central Java”
6.8. Feb,2010 ~ Feb,2011 PT. INDOSPEC ASIA (3rd
Party Inspection)
Position : Site QC Inspector - Piping (Client Representative)
Project : "Pagerungan Bali north refurbishment VLP (very low pressure) compressor for LNG project"
Duties and Responsibilities : a. Site meeting : to attend
b. Material receiving or prefabricated spools : to Verify release note, packing list, line no, spool no, protection, visual,
marking/tagging
c. Fabrication/Installation
* WPS available at work location: to confirm WPS Approved
* Welding consumable control: to check i.e Batch no, AWS Class, Baking Ovens, recycling of consumables by monitoring
of color coding
* Fit up: to check i.e Marking, orientation, Bevel, Gap, Heat no, Grades. Misalignment, and Dimensional verification
* Welding : to check i.e WPS, Welder/Welding operator, Welding visual/inspection (before, during and after)
* Welding parameter : to check each shift confirmation of welding parameter on each welding process.
d. Inspection and Examination
* Visual Welding : Inspection on weld metal and base metal surface
* NDE : to review and witness NDE examination (MPI,DPT,RT and UT), Audit of NDE equipment & personnel.
* PMI: to witness examination for SS, Alloy and any exotic material
e. Line Check: Print Navis location, visual check, walk down
f. Hydrostatic Test: to check/witness i.e approved test package dossier/documents, equipment and instrument (calibrated), test
media, holding time (duration and pressure drop)
g. Flushing/Blowing : to monitor activity
h. Flange Management: to check i.e Tags, flange surface, gasket type and size, tightening torque, leak test.
i. Piping re-instatement: measuring of dimension and distortion, elevation, slope, etc as per as-built drawing.
j. Golden weld joint (Additional) : inspection and monitoring, record weld parameter, record NDE, record TQ, update as built
dwg (redline dwg), closing RFI
j. Punchlist : survey/line check, close out punch list
k. Completion report/Handover: to Review Dossier/MDR
VI.B.4.1 Shop Fabrication QC Piping (1 year 11 months)
6.11. Apr,2008 ~ Nov,2008 PT. MUARO PRIMA UTAMA (Sub-Contractor)
Position : Shop Fab. QC Inspector - Piping
Project : "SEPC MEG (Foster Wheleer)"
6.12. Feb,2007 ~ Apr,2008 PT. MUARO PRIMA UTAMA (Sub-Contractor)
Jun 18, 2016 NURDIN SYAFII WA/: +6281310115613 : nurdin_syafii@yahoo.com skype: nurdin.syafii
Reference available on request Page 12
Position : Shop Fab. QC Inspector- Piping
Project : "Singapore Parallel Train (SPT) - Foster Wheleer"
Duties and Responsibilities : a. Attend Shop Pre-Inspection Meeting to confirm Inspection and Test Plan
b. To review and applied document procedure use for piping shop fabrication, such as :
* Fabrication drawing: to check i.e joint no, line no, spools no, drawing revision status
* WPS Qualification : to check i.e preliminary-WPS, material, and consumable certificate
* Welder/Welding Operator qualification: to check list of candidate, approved WPS, position, material sizes, welding
process and progression
* Bolt tensioning & torque procedure: to review and approval
*Approved paint system qualification:: to review and witness
* Blaster and painter qualification :to review and witness
* Hydrostatic procedure : to review
* Storage and preservation procedure : to review
c. Material receiving and inspection: to check i.e visual, dimensional, material grades, sizes, heat number, traceability and
damage
d. Fabrication
* Fit up: to check i.e marking orientation, bevel, gap, heat no, grades, misalignment, and dimensional verification
* Welding: to check i.e WPS, Welder/Welding operator, welding consumable, welding inspection (before, during & after
welding)
* Spool and sub spool identification : to check
* Welder/Welding operator qualification: to check i.e list of candidates, approved WPS, Position, material sizes, welding
process & progression
* Welding consumable control: to check i.e batch no, AWS Class, Oven
e. Inspection and Examination
* Visual welding: to check i.e Inspection on weld metal and base metal surface.
* NDE (RT,MPI,DPT) : to check i.e Review and witness Examination
* PMI: to check i.e Document of material, welding and NDE
f. Pipe Spool hydrostatic test: to check i.e calibrated equipment/instrument, the signed off of spool release notes.
g. Painting
* Painting system: to support qualification
* Blaster & Painter: to support qualification
* Paint : to support check i.e Review RAL no, batch no, expire date
* Surface preparation: to support check i.e Abrasive material, blotter test, abrasive conductivity, dust contamination, anchor
profile, level of cleanliness
* Paint Application: to support check/witness i.e Weather condition, induction time, POT Life, Viscocity, mixing ration
* Paint inspection: to support check/witness i.e Visual appearance, WFT, Interval paint time, DFT, adhesion test and holiday
test (if any)
h. Final inspection prior to dispatch: to check i.e marking/stamping, flange protection, spool preservation.
i. Completion report/handover: to Review Dossier/MDR
VI.B.5 QC STRUCTURE (Total 1 year 4 months)
VI.B.5 .1 Shop Fabrication QC Structure (1 year 4 months)
6.7. Mar, 2011 ~ Jan, 2012 PT. HEAT EXCHANGER INDONESIA (Fabricator)
Position : Shop Fab. QC Inspector - Structure
Project : "Flexible pipe manufacturing plant Tanjung Langsat project (reels and cradles)"
Jun 18, 2016 NURDIN SYAFII WA/: +6281310115613 : nurdin_syafii@yahoo.com skype: nurdin.syafii
Reference available on request Page 13
6.10. Nov, 2008 ~ Mar,2009 PT. MUARO PRIMA UTAMA (Sub-Contractor)
Position : Shop Fab. QC Inspector- Structure
Project : "BP Refinery Bulwer Island project"
Duties and Responsibilities :
* Drawings/ Approval : To confirm approval given for drawing (approve for construction and latest revision)
* Project Procedures : To confirm approval given for project procedure
* Material Receiving : All incoming material shall be checked against dwg and P/O for quality, dimension and certification
prior to acceptance, and NC item to be quarantined. UT check more 20 mm thick
* Material Preparation / Pre-Fabrication (including marking/ cutting) : Check bevel preparation are as per detail drawing,
check heat no transfer on materials
* Welding Procedures : to check WPS/ PQR against corresponding joint configuration, to confirm approval given.
* Welder / Welding Operator : Welder qualification check for validity and range qualified.
* Welding Consumable storage and Handling : Check holding / backing oven calibration temp. gauge, and check mill cert. of
electrode
* Fit-up : Check alignment, and level if applicable
* Welding : Check electrode storage and drying, check items are welded to specified WPS, check welder ID is marked near the
weld, check fillet sizes are as per drawing/ design, and visual check on welding prior to any NDT.
* Non-Destructive Examination :Refer to NDE Map, NDE Records and check NDE personnel qualification and records.
* NDT Procedures : Check NDT MT,PT,UT against corresponding joint configuration, and to confirm approval given.
* Final Visual Inspection and Dimensional Check : Visual check on welding, sharp edges grind smooth, check level and
dimensional
* Final Acceptance test : To turn the reel with 3 different speed (max 1.2 rpm) (for Reel & Cradle)
* Manufacturing Data reports (MDR) review : Documentation to be checked for completeness and clarity, check MDR for
correctness prior to client sign.
* Final Inspection prior to shipment : To check inside component shall be kept dry, check document for shipping
* Coordinates with the construction regarding punch list, NC and quality control activities
NOTE :
In general working experience in Oil and Gas Project (steel construction hot work), both shop fabrication and site installation
(green/brown field) all job function are closely related with WELDING INSPECTOR activity which mention below.
Duties and Responsibilities :
a. Before welding
* Check material refer to mill certificate in suitable condition (free from damage and contamination)
* Check WPS have been approved and available to welders (and inspector)
* Check welding equipment in suitable condition and calibrated as appropriate
* Check welding preparations in accordance with WPS (and/or drawing)
* Check welder qualification certificates are valid (in date)
* Check welding consumable those to be used as specified by the WPSs and being stored /controlled as specified by the QC
Procedure
* Check joint fit up in accordance with WPS/drawing tack welds are free from defects, contamination and damage
* Check preheat (if required) with Minimum temperature is in accordance with WPS
b. During welding
* Check site/field welding to Ensure weather condition will not affect welding
* Check welding process in accordance with WPS
* Check preheat (if required) with minimum temperature is being maintained in accordance with WPS
* Check inter pass temperature with maximum temperature in accordance with WPS
* Check welding consumable in accordance with WPS and being controlled as procedure
* Check welding parameter (current , volts, and travel speed) are in accordance with WPS
* Check root run are visually acceptable to code
* Check gouging/ grinding using approved method and to good workmanship standard
Jun 18, 2016 NURDIN SYAFII WA/: +6281310115613 : nurdin_syafii@yahoo.com skype: nurdin.syafii
Reference available on request Page 14
* Check inter run cleaning to good workmanship standard
* Check welder on the approval register/qualified for the WPS being used.
c. After welding
* Check weld identification make sure each weld is marked with the welder’s identification and is identified in accordance
with drawing/map
* Check weld appearance to ensure welds are suitable for all NDT (profile, cleanness, etc)
* Visually inspect welds and sentence in accordance with code.
* Dimensional survey to check dimension are in accordance with drawing/code
* Check drawing to ensure any modifications are included on as-built drawing
* To ensure all NDT is complete and reports are available for records
* Repairs monitor in accordance with the procedure
* Monitor PWHT for compliance with the procedure (check chart record)
* Pressure/load test (if required) to ensure test equipment is calibrated
* Monitor test to ensure compliance with procedure/code. Ensure reports/records are available
* To ensure all reports/records are completed and collated as required.
VI.B.6 QC ENGINEER /PRODUCT SPECIALIST (Total 1 year 2 months)
6.13. Nov, 2004 ~ Dec, 2006 PT. SCHNEIDER ELECTRIC BATAM - INDONESIA
Position : QC Engineer
1st Project : “Reducing Sensing Range Reject (F/G) on Inductive sensor ref. 12 mm XS1type”
2nd
Project : “Reducing Hi-Pot Reject (F/G) on Inductive sensor ref. Diameter 08 mm (cable type)”.
Duties and Responsibilities :
* Maintaining quality performance of Inductive sensor ie. supplier quality Issue, PCBA quality issue, in process quality issue,
outgoing quality issue, customer quality issue
* Deploying projects such as RoHS compliance, NPI pilot run, ECN implementation
* Strong root cause analysis for quality/design issue, and support pilot for NPI project
* Conduct process qualification, tester to tester correlation, external audit preparation
* Liaise and coordinating with other department about all related product issue
* Monitoring quality performance and send monthly report to conduct inter-department meeting
* Controlling , verification and analysis of daily reject and quality issue
* Maintain KPI’s of quality meet company goals i.e Cost of Non Quality (CNQ), Manufacturing Defect Record (MDR), Plant
Return Rate (PRR) and First Pass Yield (FPY)
* Maintaining quality performance of Inductive sensor including supplier quality Issue, PCBA quality issue, in process quality
issue, outgoing quality issue, customer quality issue
* Deploying projects such as RoHS compliance, support NPI project, ECN implementation
* Optimizing process and tester performance
* To apply six sigma method to reduce CNQ and to improve FPY.
VI.B.7 SIX SIGMA OFFICER (Total 1 year 3 months)
6.14. Sep, 2002 ~ Nov, 2004 PT. SAMSUNG INDONESIA <www.samsung.co.id>
Position : Six Sigma Officer (Green Belt Level) (Ref. No. : 246/ SEMIN-HRD/ I/ 04)
1st Project (GB) : “Yellow Belt (Basic) Six Sigma Accomplished Education up to 100% of Total Employee”
2nd
Project (GB) : “Reducing Cost of consumable mineral Water by Implementing In-house Water Treatment”
Duties and Responsibilities :
* Doing own Six Sigma project (GB Level)
* Join in Six Sigma department and committee as success team for socialize ,event, education and implementation of six sigma
Jun 18, 2016 NURDIN SYAFII WA/: +6281310115613 : nurdin_syafii@yahoo.com skype: nurdin.syafii
Reference available on request Page 15
management
* Socialization of goal from six sigma department and top management
* Deploying project leaders from all of departments to do six sigma project as per schedule
* Proactive to do basic six sigma education improvement internally so the graduation level up to 100% of total employee
* Preparing and making internal module for Six Sigma education (GB Module)
* Be part of GB and BB education and consultation
* Seriously focusing in monitoring progress for all of six sigma department projects and financial effect which drive by six
sigma department and top management.
* Reporting six sigma department activity and progress of projects to top management and head quarter
* Preparing all requirements of six sigma project including audit, standard, documents, project proposals, financial effect
calculation forms, etc
VI.B.8 ASSISTANT QA/QC MANAGER (Total 2 years 3 months)
6.15. Jun, 2000 ~ Sep,2002 PT. YEONG SHIN INDONESIA
Position : Assistant QA/QC Manager (Ref. No. : YSU(PGA)0210-001)
Position : Assistant ISO QMR
Project : “Setup for Quality Management System of ISO 9001:2001 in PT. Yeong Shin Indonesia”.
Duties and Responsibilities :
* Oversee and ensure products from manufacturing processes meet standard requirement
* Ensure all customer's product quality requirement are being fulfilled
* Execute quality improvement activities in line with ISO and other international standards
* Monitor supplier quality performance, IQA daily issue and feedback to supplier on improvement
* Coordinate and liaise with others departmental head / managers for implementation of Quality improvement activities
* Involve in Quality Management Project to improve quality output and reduce rejects
* Investigate and report to management on the quality issue or complaint raised by the customer
* Maintain and updated ISO 9001 and 14001 EMS requirement.
* Supporting setup of ISO 9001:2000
* Reporting progress of designing and deploying of ISO9001:2000 by ISO planning and scheduling to QMR
* Manage ISO documents control system
* Join in ISO Team as success team for socialize, event, education and implementation of ISO management
* Be part in transfer knowledge and education of ISO to all staffs who was driven by ISO consultant
* Be Part in audit issue as audit team from internally and externally audit and then reporting the results to QMR and top
management
VII. OTHER INFO
Expected salary is negotiable
top related