1. 1.History Of Indian Railway 2.Types of Traction System 3.Non Electric traction system coaches 4.System Of Track Electrification 5.Power Supply For.
Post on 21-Jan-2016
216 Views
Preview:
Transcript
1
PRESENTATION On
PRACTICAL TRAINING AT
PRESENTATION
ON
PRACTICAL TRAINING UNDERTAKEN AT
NORTH WESTERN RAILWAY JAIPUR
2
Contents :
1. History Of Indian Railway
2. Types of Traction System
3. Non Electric traction system coaches
4. System Of Track Electrification
5. Power Supply For Jaipur Railway Station
6. Control Panel
7. AC generator
8. Single Line Diagram of non AC coaches
9. AC System and AC coaches load.
10. Major Equipments.
11. Conclusion.
.
3
Indian Railway
Railway was introduced in madras in 1832. First train in Indian
Railway between Mumbai to Thana on 16th April 1853.Now 17
zones in Indian Railway one is NWR Jaipur and Jaipur Junction
established in 1875 and in 2002 it made a NWR zone .
One of India’s most famous and luxurious train The Palace On
Wheels stop at Jaipur.
Indian railway is second biggest electrified system in the world
after Russia. In India 21,000KM of total routes are electrified.
4
Types of Traction System
System of Traction :
1. Non Electric traction system
Ex. Direct steam engine drive.
2. Electric traction system.
a) Self-contained locomotives.
b) Electric Vehicle fed from distribution networks.
5
Non Electric Traction System
Advantages and Disadvantages of non electric traction system
over electric traction system-
Advantages : Disadvantages :
1. Capital cost. 1. Cleanliness.
2. Failure of power. 2. Starting time.
3. Interference to communication lines. 3. Braking.
4. Limitation. 4. limitation of fuel.
5. Problem of Regeration. 5. Maintenance cost.
6
Non Electric Traction System coaches
7
Coaches
On the self generating two tier air conditioned coaches, Chair cars
and compressor coaches, 2 brush less alternators of 18 KW capacities
each provided.
The DC outputs from the two alternators are paralleled with the
battery.
In mid on generating coaches usually 30KVA brush less alternator
used and generation is at 415V,3-phase,50 cycles. And in EOG
coaches power at 750V AC or 415V AC stepped down 110V AC.
Express trains having heavy load use EOG coaches. Both EOG and
MOG coaches the lights and fan are operated 110V AC.
Flow Chart
Alternator RRU & ERRU Battery Bank
Inverter Power Panel Control Panel
Equipments AC Plant
9
System of Track Electrification
The track electrification system are categorized into:
1. DC system.
2. Single phase AC system.
3. Three phase AC system.
4. Composite system
a) Single phase-Three phase system.
b) Single phase-Direct current system.
10
Power Supply For Jaipur Railway Station
The electrical power supplies arrangement for the station:
Light , fan , LED display and other electrical equipment.
To junction offices, DRM office and railway colonies.
The panels are:
o Loco colony panel.
o Station panel.
o Ganpati nagar panel.
11
Control Panel
12
AC Generator
13
Single Line Diagram of non AC Coaches
14
AC System and load in AC Coaches
Name of Motor
Motor Ratings
No. of Motors
Blower 1.5 HP 1
Compressor 7 HP 2
Condenser 1.5 HP 2
Motor types used in AC Coaches
15
Major Equipments
Rectifier Cum Regulator Unit : -
RRU is connected just beside the alternator to rectify the output of the
generator.
A magnetic amplifier is connected which convert the 3-phase input to
110V DC
A safety fuse of 10amp is connected to prevent the RRU box from
abnormal conditions.
The RRU has following functions:
1. To rectify the 3-phase AC output of the alternator through DC full wave bridge rectifier.
2. Regulator the voltage generated by the alternator at the set value.
3. Regulating the output current.
16
Major Equipments
Brushless Alternators : -
Induction type Alternators used in non AC coaches are
4.5KW/37.5A/120V DC.18KVA 2 unit in parallel with
RRU,battery, brush less alternators are used on AC coaches.
The brushless alternator with the help of static rectifier cum
regulator unit is capable of developing voltage from
minimum speed to maximum speed.
.
17
Major Equipments
Battery and Battery Charging Terminals: -
The output of the RRU is given to battery box to charge the battery .
In a non AC coaches a battery box consist of 18 cells(6V/120Ah
each) ,In AC coaches 2 battery box 56 cells(2V/1100Ah each) used.
BCT is provided for external charging of the batteries at stations or
maintenance lines.
Used Battery in train is VRLA (Valve Regulated Lead Acid) types
advantages -1. Topping up with water is not required.2. Periodical checking of specific gravity is not required.3. Regular maintenance to avoid sulphation of terminals and connections not required.
18
Major Equipments
Rotary Junction Box : -
Rotary Junction Box is provided inside the coaches.
It is used to arrange and control the power supply to various
circuit of the coaches (e.g. light, fan) with the help of rotary
switches and HRC fuses.
4 Rotary switches are connected in Rotary Junction Box:
1. The first switch is used to supply 70% light load in coach.
2. The second switch is used to supply 30% light load in coach.
3. The third switch is used to supply fan load in coach.
4. The fourth switch is known as EFT switch.
19
Major Equipments
Fluorescent Tube Light : -
It is a 2 feet long,18 Watt fluorescent tube light provided in
the coach for the sitting gallery light and 11watt for toilet
light.
It works at 110V DC supply.
It gives good light with 30% and 70% power supply.
20
Major Equipments
Emergency Feed Terminals : -
It is provided at the both end of the coach to feed the
additional supply to the adjacent coach in case of
emergency.
Supply from the healthy coach may be extended to
him/dark coach by connecting wire(1.5x2 meter) for supply
to the positive and negative terminals of the EFT.
21
22
SAVE ELECTRICITY
?
thank you
top related