School of Housing, Building & Planning - 2011 Building Plans Submission and Approval Process RBS 201- Building Surveying Studio 1 Dr. Amin Akhavan Tabassi Contents Construction…
L Building Quantities Explained IVOR H. SEELEY Formerly Emeritus Professor of Nottingham Trent University In collaboration with Roger Winfield Director of Studies Department…
Building Control (Amendment) Act 2007 and Regulations 2008: Underground Building Works – Requirements on PE(GEO) and AC (GEO) Building Engineering Division Building and…
Build It Right Ensure that your building works are authorised • Building works which do not require BCA approvals • What you should know about unauthorised building works…
LECTURE 1 MALAYSIAN STANDARD METHODS OF MEASUREMENT FOR CIVIL ENGINEERING WORKS (CESMM) -FUNDAMENTAL PRINCIPLES- Scope of civil engineering works Civil engineering is…
THE IMPLEMENTATION OF OSC 1 SUBMISSION City Hall Kuala Lumpur PAGE JUNE 2012 OSC 1 INTRODUCTION • OSC 1 Submission was introduced in June 2012. • To improve efficiency…
Item Description B - EXCAVATION Clearing site vegetation, including bushes, removing shrubs and top soil to a depth not exceeding 6" and removing away from site. Manual…
EXTENSION OF TIME CLAIMS IN HONG KONG Nicholas Longley Tanner De Witt August 2006 A version of this paper was given to the Hong Kong Institute of Construction Managers on…