VBHC-VAIBHAVA

FLAGSHIP PROJECT PROJECT NAME: VBHC VAIBHAVA PROJECT START DATE: 1ST AUGUST 2010 PROJECT COMPLETION DATE: 31ST DEC 2012 PROJECT COST: 110 crore PROJECT WORTH : 250 crore AREA : 21 acres UPCOMING PROJECTS : BHIWADI, KALYAN, CHENNAI, BANGALORE BLOCKS : A, B, C, D, E, F, G, H, J, K, L, M 7 STOREY BLOCK WITH EACH FLOOR HAVING 8 FLATS

FOUNDER: Jaithirth Rao Chairman BSc Loyola College, University of Madras - MBA, IIM, Ahmedabad - MBA, University of Chicago 20+ years with Citicorp in various capa - Founder, Chairman and Managing Director of MphasiS - Currently Executive Chairman, Value & Budget Housing Corporation

MISSION : To build 1 million homes in 10 years. Partner for construction technology: Western Form Inc, based out of Kansas

City, Missouri, USA FIRST FLAGSHIP PROJECT : VBHC VAIBHAVA ALSO STARTED SUJAYA CHAIN OF SCHOOL FOUNDATION

1. 2. 3. 4.

ANALYSIS OF WESTERN FORM EXECUTION WORK TRACKING SHEET. PROCESS MAPING OF THE PROCESS TO FIND OUT THE IDLE TIME. VIDEO ANALYSIS . ALLOCATION AND ACOUNTABILITY OF THE WORKER IN WESTERN FORM PANEL.

1. 2. 3. 4.

TO ASSIST THE COSTING DEPARTMENT IN CARRYING OUT CALCULATIONS FOR VARIOUS STRUCTURES. CEILING PAINTING WORK FOR COMMON AREA BETWEEN LIFT AND STAIRCASE. KOTA STONE FOR STAIRCASE FROM STILT TO TERRACE IN K BLOCK. WATER PROFFING FOR LIFT ROOM. BUILT UP AREA OF AN ELECTRICAL ROOM FOR K BLOCK

This was done to verify the bill produced by contractor and also to check between the planned work and the actual work.

Placing of Accessories 1 2%

Removal, cleaning, transferri ng, oiling and shuttering of Ext WP 13.5 30%

Pouring of concrete 8 17%

Removal, cleaning, transferri ng, oiling and shuttering of L P 7.5 16%

Removal, cleaning, transferri ng, oiling and shuttering of int WP 8.5 19%

leaning of apartments 1 2%

Remotion of cap braces, door aligners 3 7%

Remotion of doors and windows bulkheads ets 3 7%

FORM WORK WESTERN FORM TECHNOLOGY. ANALYSING THINGS AND FINDING SOLUTIONS HOW WORK CAN BE DONE EFFECTIVELY AT SITE. MESH WORK WEIGHT OF STEEL/METRE= (DIAMETER OF ROD)2 /1 2 BILLING Measurement up to GL (up to PCC, footings & column) Measurement from GL to stilt Measurement from 1st floor to 7th floor Finishing.

QUALITY SLUMP TEST PROCEDURE STRENGTH TEST OF CONCRETE BLOCK

ESTIMATION & COSTING WESTERN FORM REQUIRED ARE MADE OF THE SIZES IN SUCH A WAY THAT THE VARIETIES OF PANELS ARE LESS. ONLY THE DESIGN IS PROVIDED BY THE ARCHITECT. WESTERN FORMS PANEL ARE FIXED COST FOR 2000 REPETITIONS. LABOR COST IS CALCULATED AS

MUSTER ROLL LABOR CONTRACT LABOR

CONTRACTS INTERNAL COSTING IS DONE TENDERS ARE ACCEPTED FROM DIFFERENT VENDORS MINIMUM BIDDING VENDOR IS CONSIDERED & NEGOTIATIONS ARE DONE

PURCHASE BOQ IS PREPARED AND BOM IS MARDE FOR PURCHASE ENQUIRY IS GENERATED AMONG ELIGIBLE VENDORS & QUOTATIONS ARE RECEIVED. UPTO 10000: 1 VENDOR, 10000-100000: 3 VENDORS, ABOVE 100000: 5 VENDORS IF THE PURCHASE ORDER IS IN LARGE AMOUNT THEN THE COMPANY DIRECTLY DEALS WITH OEM. MARKETING

TRAINING FOR WESTERN FORM WORKERS TO ATTAIN 2000 REPETITIONS BY THE WESTERN FORM 4 FLATS A DAY NEED TO BE ACHIEVED. WORKERS NEED TO BE MADE ACCOUNTABLE SAME WORKER DOING THE SAME JOB POLICY PROJECT WORK DELAYED DUE TO RAIN. PROPER WORK DISTRIBUTION NEED TO BE DONE. THE WHOLE PROJECT NEED TO COORDINATE PROPERLY WITH EACH OTHER AND MUST BE READY FOR QUICKSET CONCRETE.