    cncno IDAHO OIL AND GAS CONSERVATION COMMISSION

    Application For Permit to Drill, Deepen or P lug BackAPPLICATION TO Drill ~J Deepen Q Plug Back C

    NAME OF COMPANY OR OPERATOR. Bridge Energy, Inc. Date 6/23/2010Address 1~D Lincoln Street, Suite 1110City: Denyer_____________________ Stale: QQ__ Zip Code: ~ 3_~_Telephone: 433831.9022Distance, in miles and direction from nearest town or post office: Approximately 1.2 mile east olNew Plymouth. ID

    DESCRIPTION OF WELL AND LEASEName of Lease. Tracy Trust Well Number: #3 2 Elevation (ground) 2245.8Well Location. Section. 2 Township:_7J~J_______________Range: 4W (or block and survey)

    (give footage from section lines): _2033 FSL 647 FWL (NW h SW /4Field and Reservoir i f wildcat, so state): Hamilton County: ayettNearest distance from proposed location to property or lease line: 78 feetDistance from proposed location to nearest drilling, completed or applied for on the same lease N/A feetProposed depth: 2.500 f t Rotary or cable tools: RotaryApprox date work will start: Sugus3t2OlO Number of acres in lease. 232 acresNumber of wells on lease, including this well, completed in or drilling to this reservoir:J______________________________If lease purchased with one or more wel ls dri lled, complete the following information

    Purchased from (name) N/AAddress of above N/AStatus of bond N/A_______________________________________________ ______________________________

    Remarks: (If this is an application to deepen or plug back, brief ly describe work to be done, giving present producing zoneand expected new producing zone) Survey plats and drilling prognosis are attached. exceptioniocation.isherebyiequeste&PJease directanyinquideslo.Ryanlvtorgan, P.E. (Centra Consi.ilting. Inc.) at 1-2flR~3&94OO.Eeeisase uz c

    c-nri 5,CERTIFICATE: I the undersigned, state that I am the C~n~qjtapt....______________________________________

    of Bridge Energy, lnc~_~ compar~ a~d that I amauthorized by said company to make this application and that this application was prepared under my su~5~vision anddirection and that the facts stated herein are true, correct and complete to the best of my knowledgeDate: if7 f ho Signature -Permit Number L~Co~~ I Approval Date: 8 ~ /OApproved by41S 11075-zoo/~NOTICE: Before sending in this form be sure that you have aLi~f atio~i quested See instructions on back.

    FORM P-ii IhI 2 9 ~~ Aulhorzed by Order No. 2JUN UI Rev. 08/14/07

    SOUTHWESTERN IDAHO AREADEPARTMENT nr I AMfl~

  • 8/12/2019 LU600026 Redacted

    2/19

    1

    I ~ I..~~ \~J

    ~ N

    EXHIBIT MAP OFTRACY TRUST 32 SITELying in a Portion of the Northwest 1/4 of the SouthwestSection 2, Township 7 North, Range 4 West of theCounty , Idaho 1/4 ofBoise Meridian, Fayette2010

    C-

    \_~ \

    r~ ~

    ~

    4110~ ~664

    aNO LV

    lyin \~:. -; CANAL780 _______

    ~, S-C

    ITI

    ~,

    . S.) I

    U~1/

    1. I 5,

    2 ~P\)V~\

    ~? ~

    ~I~? ,- ~

    ~ ~ ~I

    \ ~ ~ t,~2

    c]L

    NI ~ t;rti,9 ~

    DATE: June 28, 2010 FILE: 05340104 ESPINO SITE.dwgA

    SCALE: 1 ONE MILE

    Surveyors PlannersS 1103 West Main StreetMiddleton Idaho2085855858

  • 8/12/2019 LU600026 Redacted

    3/19

    IDAHO ST.

    EXHIBIT MAP OFTRACY TRUST 32 SITELying in a Portion of the NorthwestSection 2, Township 7 North,Boise Meridian, Payette

    NEY4SW1A

    1313.10

    CIV0~~~U)3~~2 13O7.24j ~ 13 7 23OUND 5/SIRON PIN _______________PEAS 247810 7/ N89271 3W 2614.47

    FOUND 5/SIRON PINPLS 797IDAHO WEST N,4D 83-GRID BEARINGSN435822.720

    DATE: Ju ne 28, 2010 FILE: 05340104 ESPINO SEC11ON.dwg

    Surveyors o Planners1103 West Main StreetMiddleton Idaho2085855858

    of the Southwest 1/4 ofRange 4 West of theCounty, IdahoS89l 2 5E

    FOUND BC IRON PIPEBENT WREBAR IN CENTER5277.44

    NFOUND 5/8IRON PIN2NO CAP

    r1 SCALE: 1 = 1000

    FOUND ILLEGIBLEALUMINUM CAP1318.97 S892733E2638.30

    coc0NDNW~ S

    1324.405jff~4 PINUmmc~

    tO0

    CLI)

    NCNC.0ND

    SE S WAPIN

    1/FOUND

    SE Is AVENUE/

    W1i64719.085NAVD 88 VERTICAL DATUMEL= 2245.8

    I

  • 8/12/2019 LU600026 Redacted

    4/19

    TOPOGRAPHIC MAP OFTRACY TRUST 32 SITELying in a Portion of the Northwest 1/4 of the Southwest 1/4 ofSection 2, Township 7 North, Range 4 West of theBoise Meridian, Payette County, Idaho2010

    WI 164719085NA ID 88 IERTIC/iL DATUMEL= 2245.8

    DATE: June 28, 2010 FILE: 05340104 ESPINO TOPO.dwg

    Surveyors Planners1103 West Mom StreetMiddleton Idaho2085855858

    iDAhO ST

    S892733E1318.97

    12 CULVERTSI

    U

    0~zN.[2r1

    /NSCALE: 1 = 200

    IDAHO WEST NAD 83 GRID BEARiNGSN435822.720

    A S

  • 8/12/2019 LU600026 Redacted

    5/19

    2enFEErmPRc~osED - WEb SMIE STATE1 8E0112)

    a

    EXISTING IFCMP CULVERTStCALE G 200 100 CLOSE

    BOUNDARYS FEET) DRAINAGE DITCH

    IINCHZOOFT 200

    ~NILEGEND WELLSITE BOUNDARYEDGE OFGRAVELDGEOFPAVEMENT i MrCONTOUR2241 5 CONTOUR1. WAlERW ll LOCATiON IS APPROXIWJED FROM DM0 BOUNDARYROJECT CLOSEST OF NEAREST WA

    DEPARTMENT OFWATER RESOURCESWEU. LOGDATA APPROXIMATE LSI-EETS. WElLS ARE O~Y LOCATEDTO TT-E NEARESTQUARTER SECTiON. W ll IS APPRO)WMTED BASED ONPROXMTYTORESL3ENT1AJ. STRUCTURE.2 . PROPERTYBOUNDAR IES AREBASEDON PAlETTE

    COUNTY ASSESSCMSTA3 PAR STRUCTURE~~~OJECTL ATION

    W~ITEWaLVICINITY MA.P0

  • 8/12/2019 LU600026 Redacted

    6/19

    Rig Specification Page of 3

    Return to Drilling Rig Inventories Summary

    P,ec,s,on D,iIirn~

    Convert to ImperialR ig # 194 Rig Type Super SingleTSuperintendent Mike Skuce Operation Centre Mid ContinentCategory Mechanical Rig Type Code SLLoads Winter include 14 Class Super Singlesboiler)Rated Vertical Depth (m) 3000 Horse Power Range C 1000Region U S North Rig Locator Status CompletedRated with Drill Pipe (mm) 102RIG LAYOUT DRAWINGNOTE To open the rig layout attachment, click on the icon below. If you do not have Adobe Acrobat Readerinstalledto view the PDF file, dick to download a free copyRig Layout PDF File Attachment

    Rig 94s1 -12 R ig Layout) . Approved pdtDRAWWORKS

    MIE M Auxiliary Brake Eaton 224 WCB Disc BrakeDrawworks National D600-PSD Rated Power kW (hp) 450 (600)Drawworks Capacity (daN) 133500 with Number of lines 8Drawworks Drive CAT C-18 1 ) Rating kW (hp) - Each 470 (630)Quantity)MAST

    Mast Type Slant Single Manufacturer Precision/QualitySta ti c Hook Load (daN) 133500 Mast Clear Height (m) 22,9Drill Line Size (mm) 25.4 Number o f l ines 8API SF2 (daN) 154900 API SF3 (daN) 103700

    SUBSTRUCTURESubstructure Type Trailer Manufacturer Rostel IndustriesFloor Height (~ ) 330-381 Kelly Bushing to Ground N/A(m)Clear Height (in) 2.60-3 10Rotary Capacity (daN) 133500 Setback Capacity (daN) No LimitThis Rig Type is Equipped with a Pipe ArmHOISTING AND ROTATING EQUIPMENT

    Recision/RosIeI PDCA7

    http://rnaiI.preeisiondriIling.com/precision/pdrig.nsf/33c4 I 823beaf9d2b872575c30057d73... 6 14 2010

  • 8/12/2019 LU600026 Redacted

    7/19

    Rig Specification Page 2 of 3

    Top Drive Model Top Drive Capacity (daN)Rotary Table Model lipTable Rotary Table Capaci ty (daN) 111300Rotary Table Clearance 521(mm)Power Wrench Model Rostel SST9O7O Max imum Diamete r (mm) 298MUD PUMPS AND MUD SYSTEM

    MUD PUMP IManufacturer & Model BPMMP - BSF-1000 (Triplex) Rated Power kW (hp) 750(1000)Stroke (mm) 254Mud Pump Drive Quantity) CAT C-32 1 ) Rating kW (hp) - Each 700(950)MUD PUMP 2Manufacturer & Model BPMMP - 8SF-bOO (Triplex) Rated Power kW Lip) 750(1000)Stroke (mm) 254Mud Pump Drive Quantity) CAT C-32 1 ) Rating kW (hp) - Each 700(950)

    MUD SYSTEMMud Tank Total Volume 50 # of Mud Tanks (m3)Premix Tank Volume (m3) 12 Pill Tank Volume (m3) 5Trip Tank Volume (m3) 3 TripTank Surface Area (m3) 2 Centrifugal Pump Quantity:2 Centrifugal Pump Size 5x6Shale Shaker Quantity Shale Shaker Brancit King Cobra LinearMotionAtmospheric Degasser Single - Atmospheric 762mm OD 102mm Inlet 03mm Vent LineAdditional InformationWELL CONTROL SYSTEM

    Annular Shatter Spher a Pressure Rating (kPa)Size (mm) 279Ram #1 Shatter LWS - Double Pressure Rating (kPa) 21000Size (mm) 279Trim Type Nace BOP Additional InfoniationAccumulator Manufacturer ECS. Remote Panel Type PLCAccumulator Volume I) 318 # of Stations: 5Accumulator PumpsChoke Manifold Style (mm) 51 x 76 x 51 Pressure Rating (kPa) 21000Well control equipment listed is rigs normal inventory Well control equipment is subject to change; Operator shouldconfrm current configuration and specific requirements with the Precision Drilling Contracts Representative.ELECTRICAL POWER

    Power Distribution Type ngle AC Diesel Generator with Distribution PanelPOWER GENERATIONPower GeneratorsQuantity Generator Drive -18 Generator Size (kW)MISCELLANEOUS EQUIPMENT

    Winterization Boiler w/Stearn Lines Pretabs Boiler Rating kW Lip) 125Rig ShelterFuel Tank Qty Total Fuel Tank Capacity 1)14200Water Tank Qty Total Water Tank Capaci ty 57000

    http: rnaiI.precisiondrilling.com precisionlpdrig.nsf 33c4 823beaf9d2b872575c30057d7L. 6 14 2010

  • 8/12/2019 LU600026 Redacted

    8/19

    Rig Specification Page 3 of 3

    I)Special Equipment Flare Tank, Hydraulic SOP Handler, Hydraulic Catwalk, Hydraulic Pipe Arm, Hydraulic PipeTable. Substructure Leveling Jacks, Power Tong, Hydraulic Pull Downs

    NOTES

    TUBULARSRig carnes sufficient tubular nventory of drill collars and drillpipe to dri ll 75% of rated depth Exact quantities anddescriptions of tubulars on the rig are available on request, Specific requirements for different types or quantitiesof BHA components and/or additional drilipipe above that normally carr ed as part o f the rig inventory, are to bediscussed with the Contracts Representative of Precision Drilling.

    Previous DocumentL~J ~JNext Document

    http: rnai{.precisiondrilling.corn precision pdrig nsf 33c4 I 823hea19d2h872575c30057c173... 6 14 2010

  • 8/12/2019 LU600026 Redacted

    9/19

    RIG LAYOUT

    WELL

    RIG 194SL

    TO CROWN ENDTo 8*01< or RIGTO DOG ROUSE SIDETO SUMP SIDE50503D20

    I I oclock50 in fromwell center

    04 IE: 26/03/07DEC Mo 8~ O4SLW,PPOOVCD 0? GSCI I

    IPRECIS~ R LU GCALGARY, ALBERTA, CANADA

    cWELLl.4m 6Dr,~

    PIPE MOLE

    FLARE PIT

    MINIMUM LOCATION SIZEFROM HOLE CENTER

    On Sm IOn 15m

  • 8/12/2019 LU600026 Redacted

    10/19

    BRIDGE RESOURCESTRACY TRUST 3-2WELLBORE DATA SHEET

    LEASE: Bridge Resources TOTAL DEPTH: 25000WELL: Tracey Trust 3-2 SURFACE LOCATION N43-58-22 720LOCATION Sect 2lTcwnship lNIRange 4W WI 1631-19 085

    P.yette County BOTTOM HOLE LOCATION: N43-58-22 720SPUD DATE Aogust WII6-47-t9.085OBJECTIVE Hamilton Sands ELEVATION: 22460ELEVATION(KB): 22639

    HOLE MUD FRACTUREFORMATION SIZE WEIGHT GRADIENTEVALUATION CASING SIZE COMMENTS (IN) TVD pp~ rpa) IBM16 Une PIpe-WeIded~ 82k No FIT 26 82ft 84 84

    Top of cmt-500ft

    12 114

    SONp waseppft-R111-Jss-s-rc 600.9 FT 600+0 8.6 0.4

    Mud LoggingEach i0*ilromCOtt 83/4

    Halibu non lacynuVoniesiwnIy.somcside wee ~es

    SBM

  • 8/12/2019 LU600026 Redacted

    11/19

    DRILLENG PROGNOSESBRIDGE ENERGY, LLCTracy Trust 3-2 (Hamilton Prospect)NW/4 SW/4 of Section 2-Township 7N-Range 4WPayette County, IdahoJuly 16, 2010

    GENERALNOTE: lhis well is to be drilled as a tight hole. Unauthorized personnel arc not to beallowed on the rig floor, and all information is to be kept confidential.Surface Location: 2033 FSL and 647 FWL (NWSW), Section 2 T7N R4WBottomhole Location: SameProposed TO/Objective:

    TI) 2500Elevation: 2,246 OL (ungraded); 2,264 KB (estimated).Drilling Rig: To be determined.MECHANICALCasing Design:SIZE INTERVAL LENGTH DESCRIPTION

    16 0- 60 82 Conductor 0.219 WT) 9-5/8 0 600+ 600 36#, 3-55, STC 21.9 8.18 7.045-1/2 0 2500 2,500 17#,J-55,STC 2.69 1.60 1.912-7/8 02500 2,500 6.5#,J-55,EUE 3.16 3.05 1.45NOTE: If mud weight exceeds 10.0 ppg at TO, casing design may be a ltered . Clean and drift all strings ofcasing prior to running. Remove all thread sealant (Kindex) prior to running. Unload productioncasing and tubing strings with a forklift.CEMENTCASING/HOLE SIZE CEMENT SLURRY ~ PPG YIELD16 -24 Cement to surface with 4 yds Redi-mix.9-5/8 - 12-1/4 Lead: Premium Light cement+2%CaC12

    + 1/4 pps flocele 100 12.0 2.27Tail: Class 0+2%CaCI2+ l/4ppsflocele 100 15.8 1.15

    NOTE: Precede cement with 50 bbl fresh water. Have 100 sx neat cement and one-inch tubing onlocation for topping-off. Cement volume has been calculated assuming 100% excess.

  • 8/12/2019 LU600026 Redacted

    12/19

    Drilling PrognosisHamilton ProspectTracy Trust 3-2Page TwoCASING/HOLE SIZE CEMENT SLURRY ff~j YIELD5 1/2 83/4 Class 0 cement containing fluidloss additive, bonding agent,and retarder as required. 300 15.8 1.15

    NOTE: Prior to cementing, slowly lower mud viscosity to 35-sec funnel viscosity. Circulate holefor I hour at this viscosity prior to cementing. Precede cement with 1000 gal mud flush and 30 bblfresh water spacer. Cement top contingent upon the presence of potentially productive intervals.Actual cement volume to be determined from caliper log. Run pilot tests on proposed cement withactual make-up water. Cement design may be altered depending on actual bottomholetemperatures and the presence of lost circulation. Do not move the casing (under anycircumstances) while setting the casing slips.CEMENTING ACCESSORIESSurface Casing: 1) Guide shoe with insert float located one joint above shoe.2) Top wiper plug (rubber).3) Centralizer with stop ring in middle of shoe joint.4) Centralizers over collars on first three connections, omitting float collar.5) Use a total of five centralizers.Production Casing: I) Differential-fill float collar located one joint above differential-fill floatshoe.2) Top and bottom wiper plug.

    3) Centralizer with stop-ring in the middle of shoe joint.4) Centralize through and 100 on either side of potentially productive intervals.Run at least 12 centralizers.5) Thread-lock all connections through float collar and use API casing dope on allremaining connections.6) Stage cementing tool may be run to ensure placement of cement across anyproductive intervals and fresh water sands.7) Centralize above and below stage cementing tool if run).WELLHEADCasing Head: 9-5/8 x 11 x 3,000 psi WP flanged casing head with two-2 LP outlets. Outletsequipped with one-2 3,000 psi WP bal l valve, and one-2 x 3,000 psi WP bull plug

    on the outlets.Tubing Head: 11 x 7-1/16 x 3,000 psi WP tubing head with two-2 LP threaded outlets. Outletsto be equipped with 2 x 3,000 psi WP ball valves.Upper Half: To be determined.

  • 8/12/2019 LU600026 Redacted

    13/19

    Drilling PrognosisHamilton ProspectTracy Trust 3-2Page ThreeMUD PROGRAMINTERVAL WItIGHT (PPG) VISCOSITY SEQ WL (CCS) 600 8.5-9.0 ppg 30-45 sec NCSpud well with fresh water viscosified with Pa c Regular. Circulate reserve pit to maintain clear water at thepump suction. Addition of lime and/or a selective flocculant may be made at the flowline to promote solidssettling in the reserve ph. Keep hole full and drill pipe moving at all times. Sweep hole with Super Sweepto insure the hole is clean prior to running surt~ce casing.INTERVAL WEIGHT (PPG) VISCOSITY SEQ WL (CCS1600+ 2500 8.5-9.8 ppg 28-34 sec tO cc s or lessAfter drilling our surface casing shoe, displace to Synthetic Base Mud, SBM. Reference SBM program forspecific maintenance, product concentrations, and mud treatment.Keep hole fill at all times. Monitor pit volume constantly as lost circulation and water flows should beexpected at all times. Sweep hole as dictated by hole conditions.Deviation tendencies in this area should not be severe; however, prudent drilling practices should beadhered to at all times. Surveys should be run at 500 ft intervals, unless otherwise indicated.WELL CONTROL EOULPMENTINTERVAL EOUIPMENT

    0 600+ None600+ 2500 II x 3,000 psi WP double-gate HOP with blind and 4-1/2 pipe rams. Rig should beequipped with upper and lower kelly cocks, as well as stabbing valve (have wrenchavailable at a ll times). BOP equ ipment will be tested after nipple-up and every 30days thereafter. Notil3 Idaho State field representative prior to testing). Close piperams daily and blind rams on trips, recording results on tour sheets.GEOLOGICALGeologist/Mud Logger: Geo logis t and mud logger with hotwire and chromatograph to be on location to

    from base of surface casing to TO. Noti prior to spud and after setting surfacecasing.Electric Logging: DIL-SFL-SP and BHC Sonic-GR-CAL to be run in tandem from base of surfacecasing to TO. LDT-CNL-GR-CAL may be run at the geologists discretion.

  • 8/12/2019 LU600026 Redacted

    14/19

    Drilling PrognosisHamilton ProspectTracy Trust 3-2Page FourGEOLOGICAL (CoNtinued)Formation Tops: Assumes KB elevation of 2,264 ft. DRILLFORMATION DEPTH SUB SEA

    0ands 4 40

    MISCELLENEOUSI. Pump carbide lag prior to running surface casing and prior to drilling out shoe. Pump efficiencieswill be calculated from this information. Run frequent carbide lags while drilling to determine degreeof hole washout.2. Monitor mud hydraulics closely. An in-gauge hole is extremely critical to achieve open-hole packer

    seats, interpretabJe logs, and a good cement bond.3. Water will be hauled or pumped from nearby sources.4. Reserve pit is to be l ined with a 12-mi synthetic liner.5. It is anticipated that a mud motor and PDC bit will be used from approximately 600 to TV.6. In general, the above prognosis is presented as a guideline only; and is subject to change as dictatedby hole conditions and geological interpretation.PERSONNEL OFFICE NUMBER CELL NUMBERVan Hall, Consulting Engineer 303-969-9610 303-618-1877Jeff Kim, Manager of Operations 303-831-9022 303-981-7443Ed Davies, President 303-831-9022 720-641-8737Ron Richards 303-83 1-9022

    Prepared by:

    Ron Richards for Bridge Energy Inc.

  • 8/12/2019 LU600026 Redacted

    15/19

    / ; t /

    it

    ~4N____frn~

    / 7 Ii g1

    frs~s SIUt _________________________________________________c 4yr,s 1NJA2C; jw ~ i1~ i,W~~--~ I/It nets

    _____ 11 / r ~ ______

    I . I ,Iici1 ~c~ n-jo 1VflN:X~l

    I

    -i3~~j -Jr r~_J~,J . 0 r ~ ti ~ Sn~~l Ut

    i I,

    .71 CQ:3P-P17n711 c-p. SrU.,--p~ -,w; ~os~p rIo:

    V

    S VOtni /Ji Wi ~li0

    3r cWIWLUJ

    a

    = -=~Ra~2bth

    .~L~:w ZiicLi

  • 8/12/2019 LU600026 Redacted

    16/19

    4 6 SM X 2 6 SM CHOKE MANIFOLD

    a

    ~ 21?1~ ~MC-,,E thL.)E 0 t~t4 Jfli ~~ flV~

    1 ~6 5I~ S~CE~ ~PCQ~

    .~ ~ ej,, sr~i r VAI yrr

    = ~~: _.?0- \j

    t ~

    (~RC3SS :~c SWAY 41 1~ 5MX ~ 5ry

  • 8/12/2019 LU600026 Redacted

    17/19

    RIG FLOORWHS, LLCGOP Schematic Nt) on Surface- Razorback Rig RIG FLOOR

    FROM GL to Boftorn of Rotary Beam is 167 114 I

    GROUND LEVEL

    TO P I~115~M I 27 Below CL

    REQ7/3012010

  • 8/12/2019 LU600026 Redacted

    18/19

    C~WACONSULTING INC.MEMORANDUMAugust 2. 2010To : Nancy Welbaum, DLFrom: Ryan V. Morgan; P.E., LEED APCc : Steve West; Jeff Hammel, E.IRe : Additional Information for Tracy Trust WellNancy,Per your request via email last Friday please find attached the additional information regarding distances from theproposed wel l to the additional features requestedClosest Gas Well 2600 (Veatch)Closest WaterWell 440 (Residential well located to the east)Closest Structure 4 (residential home located to the east)Please note that the distance to the production boundary is not supplied as this boundary s yet to be determinedShould yo u have additional questions please at us know

    cEN-rRA Consulting, Inc. 413 West Idaho Street, Suite 302, Boise, Idaho Tel: 208) 338-9400 Fax: 208) 338-3844 .~ centrainc corn

  • 8/12/2019 LU600026 Redacted

    19/19

    C~WACONSULTING INC.August 5,2010Nancy Welbaum8355 W. State StreetBoise, ID 83714Re: Tracy Trust Gas WellSpacing Exemption RequestDear Nancy,Bridge Energy Inc. is proposing the second well in Section 2, Township 7 North, Range 4 West, PayetteCounty, Idaho, and requests a spacing exemption due to the following:

    1. The first well drilled in the section, the Espino 1-2 well, was originally drilled to a depthsignificantly deeper than what has been proposed for the second well. However, the Espino 1-2well could not be completed at the deeper depth and was subsequently plugged back andcompleted in a depth similar to the proposed total depth for the Tracy well.2. Test results indicate that the first well, the Espino 1-2, is not currently capable of commercialproduction. Additional data is needed, which can only be acquired at this time from a subsequentwell in the section, to evaluate and recommend further work on the Espino well.3. The physical infrastructure necessary to produce any wells in this area does not currently exist,and production from more than one well in the section wil l not result from successful drilling andcompletion operations on the Tracy Trust 2-2 well.4. Furthermore, it is anticipated that Bridge will submit to the State Oil and Gas ConservationCommission a comprehensive petition for revised spacing of a production pool(s), uponevaluation of all test and production data gathered from all drilling and completion operations.This would occur after the additional test data is gathered but prior to establishment of theinfrastructure needed to produce gas from its operations.5. This would also necessitate the implementation of an established process through which theState Oil and Gas Commission would convene to consider such requests. Such process doesnot appear to be in place at the present time.

    Should you have any additional questions, please contact us at 208.338.9400Sincerely,

    tephen E. WestPresidentCc: Bridge Energy Inc1580 Lincoln St, Suite 1110Denver, CO 80203

    UNWA