Page 1: INTEGRATED SCAFFOLDING PROGRAM - AMECO Integrated Scaffolding Program.pdfscaffolding into pre-project planning. We have elevated scaffolding to a project discipline that involves pre-job

} Solving the problem of gaining cost and schedule control over scaffolding efforts is difficult, but AMECO has the solution.

} Most Challenging Indirect Construction CostSource: Construction Industry Institute (CII)

INTEGRATED SCAFFOLDING PROGRAMOne Company, One Call, Countless Solutions.

} Industry NeedAMECO has a better way to manage your scaffolding needs. Staying within budget is critical, and projects can not afford to absorb cost overruns that impact the bottom line. Contractors are now, more than ever, focused on managing their indirect construction costs, and scaffolding is on the top of their list. Scaffolding cost growth, driven mainly from increasing field craft hours, has resulted in significant cost impacts to many capital projects.

} The SolutionAMECO, in partnership with PERI, has developed an Integrated Scaffolding program that takes scaffolding management to the next level by incorporating scaffolding into pre-project planning.

We have elevated scaffolding to a project discipline that involves pre-job planning and scheduling. AMECO’s Integrated Scaffolding program uses advanced scaffolding design that reduces workforce requirements, innovative tracking technology to deliver only the scaffolding material needed, and leading technical expertise to deliver a scaffolding solution on time and on budget.

AMECO works with your engineering team before the project goes to field to develop a predictable, pre-planned scaffolding execution plan. Once onsite, AMECO delivers only the scaffolding needed, reducing onsite clutter and waste. Our experienced project management team is with you throughout the process, assisting your craft in scaffolding erection and disassembly.

Scaffolding (18)* ■■■■■■■■■■■■■■■■■■Field Supervision (9) ■■■■■■■■■Project Management (6) ■■■■■■Temporary Enclosures (5)*■■■■■Major Construction Equipment (3)* ■■■Small Tools Consumables (3)* ■■■Utilities to Trades (3) ■■■Communication Computers (2) ■■Mobilization Project Management (2) ■■Temporary Field Facilities (2) ■■Construction/Field Services (1) ■No Response (1) ■Temporary Roads and Parking (1) ■

* AMECO has a solution for this challenge. Ask about our other Indirect Services offerings.

Projects can achieve a 15 to 20 percent savings on labor costs due to innovative scaffold material, preplanning, and design capability of the program.

Page 2: INTEGRATED SCAFFOLDING PROGRAM - AMECO Integrated Scaffolding Program.pdfscaffolding into pre-project planning. We have elevated scaffolding to a project discipline that involves pre-job

© 2016 American Equipment Company, Inc. All Rights Reserved.

AMECO is a registered service mark of American Equipment Company, Inc.

All other marks are the property of their respective owners.

HOGV112516

} Integrated Scaffold Program Features• Preplanning and design results for increased cost control and

schedule predictability• Work packages for optimization of access and design• Innovative scaffold material executed onsite with two- to three-person crews

versus the traditional four- to five-person crews• Improved safety with only one scaffold original equipment manufacturer onsite• Fast assembly of scaffold material; 40 percent faster than tube and clamp

scaffolds and 20 to 25 percent more efficient than other system scaffolds (ring-lock, cup-loc, or pin-loc)

• Innovative equipment to reduce scaffold labor requirements• Reduced site congestion• Scaffolds that can be preplanned prior to construction mobilization

} Integrated Scaffold Program Benefits

Project Savings

• Projects can achieve 15 to 20 percent savings on labor costs due to innovative scaffold material, preplanning, and design capability of the program

Craft Retention

• Reduced scaffold weight• Increased productivity for sitework• Modular design providing ease

of installation

Applications

• Energy and chemicals projects• Industrial and infrastructure applications• Power plant projects• Maintenance and shutdown operations

Long Life Span• Material designed to last up to 20 years

within an industrial environment