YOU ARE DOWNLOADING DOCUMENT

Please tick the box to continue:

Transcript
Page 1: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.

INFORMATION ABOUT WATER INFORMATION ABOUT WATER CORRIDORCORRIDOR

DANUBE-ODER-ELBEDANUBE-ODER-ELBE

EU STRATEGY FOR THE DANUBE REGIONEU STRATEGY FOR THE DANUBE REGIONVIENNA/BRATISLAVA 19-21 APRIL 2010VIENNA/BRATISLAVA 19-21 APRIL 2010

Page 2: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.
Page 3: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.
Page 4: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.
Page 5: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.

Waterways for transport of the LNGWaterways for transport of the LNGDiversification of supply of strategic materials

Page 6: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.

Connectivity of Danube – Oder - ElbeConnectivity of Danube – Oder - Elbe

• Important transport project of IV. a VI. Transeuropian Important transport project of IV. a VI. Transeuropian transport corridors, connection to VII. Transeuropian transport corridors, connection to VII. Transeuropian transport corridor;transport corridor;

• Missing part of the network of the waterways according to Missing part of the network of the waterways according to EUROPEAN AGREEMENT ON MAIN INLAND WATERWAYSEUROPEAN AGREEMENT ON MAIN INLAND WATERWAYS OF OF INTERNATIONAL IMPORTANCE (AGN)INTERNATIONAL IMPORTANCE (AGN)

E20 – Elbe-Danube connectionE20 – Elbe-Danube connectionE30 – Oder-Danube connectionE30 – Oder-Danube connection

• Parametres of the waterway:Parametres of the waterway:Vb. navigation classVb. navigation classpush-tow formation 185 x 11,4 m, draught 2,8 mpush-tow formation 185 x 11,4 m, draught 2,8 mnavigation lock 190 x 12,5 x 4,0 mnavigation lock 190 x 12,5 x 4,0 mminimal width of the navigation way 40 mminimal width of the navigation way 40 m

• „„Blue book“ from 1998, revised 2006: D-O-E confirmed as a Blue book“ from 1998, revised 2006: D-O-E confirmed as a missing link by CZ, A, SK, PL and included in national missing link by CZ, A, SK, PL and included in national development plans;development plans;

Page 7: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.

EUROPIAN UNIONEUROPIAN UNION

• D-O-E connection is from 1993 in the list of TEN-T D-O-E connection is from 1993 in the list of TEN-T Network – Inland Waterways; Network – Inland Waterways;

• Paneuropian conference about inland navigation Paneuropian conference about inland navigation in Rotterdam 09/2000 recommend support effort in Rotterdam 09/2000 recommend support effort to realization connection D-O-E,to realization connection D-O-E,

Page 8: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.
Page 9: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.

Waterways of the Czech RepublicWaterways of the Czech Republic

Page 10: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.

Regulated river Morava downstream the town Hodonín, Regulated river Morava downstream the town Hodonín, running along riverrine forests represents practically ready-running along riverrine forests represents practically ready-made stretch of the water corridor D-O-E.made stretch of the water corridor D-O-E.

Page 11: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.

First km of the water corridor D-O-E at Lobau by Vienna. Now First km of the water corridor D-O-E at Lobau by Vienna. Now it is separated by antiflood dyke.it is separated by antiflood dyke.

Page 12: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.

First km of the water corridor D-O-E at Lobau by Vienna now.First km of the water corridor D-O-E at Lobau by Vienna now.

Page 13: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.

First km of the water corridor D-O-E at Děvín by Bratislava.First km of the water corridor D-O-E at Děvín by Bratislava.Confluence Morava and Danube.Confluence Morava and Danube.

Page 14: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.

First km of the water corridor D-O-E in Poland.First km of the water corridor D-O-E in Poland.Port of Kozle and Gliwice channel.Port of Kozle and Gliwice channel.

Page 15: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.

Connection of the Gliwice channel to the branch D-O in Poland.Connection of the Gliwice channel to the branch D-O in Poland.

Page 16: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.
Page 17: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.
Page 18: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.
Page 19: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.
Page 20: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.
Page 21: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.
Page 22: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.
Page 23: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.
Page 24: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.
Page 25: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.
Page 26: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.

Environmental aspects of the D-O-E Environmental aspects of the D-O-E ConnectionConnection

• Example: Example:

new trajectory of the corridor in the new trajectory of the corridor in the Oder protected landscape area;Oder protected landscape area;

newly designed shallow water zones;newly designed shallow water zones;

Page 27: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.
Page 28: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.
Page 29: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.
Page 30: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.
Page 31: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.

Importances of water corridor D-O-EImportances of water corridor D-O-E

• Protection against floodProtection against flood• Water retention in landscapeWater retention in landscape• Improvement of water balanceImprovement of water balance• Stabilization of ecosystemStabilization of ecosystem• Transeuropian waterwayTranseuropian waterway• Ecological transportEcological transport• Source and regulator of electric energySource and regulator of electric energy• EconomyEconomy• Increasing employmentIncreasing employment• Source of income from tourismSource of income from tourism• AgricultureAgriculture• Sport a recreationSport a recreation• Development of seatsDevelopment of seats• Europian investmentEuropian investment

Page 32: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.

Critical nodal point by the Hodonín. During dry periods the whole Critical nodal point by the Hodonín. During dry periods the whole discharge is led through a branch canal to the steam power plant. discharge is led through a branch canal to the steam power plant. Rest of the water is used for irrigation and water power plant stops Rest of the water is used for irrigation and water power plant stops working at all.working at all.

Page 33: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.

Costs of the ProjectCosts of the Project

• The whole water corridor D-O-EThe whole water corridor D-O-EDanube-Kozle-Pardubice … cca 510 kmDanube-Kozle-Pardubice … cca 510 km

8 880 600 000 €8 880 600 000 €

public funds of the countries on the waterwaypublic funds of the countries on the waterwayEuropean Union fundsEuropean Union fundsbank loansbank loansbondsbondsdirect implementation of projectdirect implementation of project

Page 34: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.

RevenuesRevenues

Even at extremely pessimistic assumptions, the value of IRR exceeds 10 %, i.e. higher than the level of 6 % that is deemed to be an admissible minimum at infrastructure investments. At optimistic assumptions it ranges around 20 %. It is therefore possible to say, without any overstatement, that a similar favourable effectiveness is demonstrated at few investments in the area of infrastructure.8 years after putting the first stage into operation, the value of the balance starts to be positive and after next 5 years all of the costs spent until then will have been paid back.Here, it is really possible to talk about effectiveness indicators attained only in a very few infrastructure projects.

Page 35: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.

Water corridor D-O-E in present Water corridor D-O-E in present timetime

Traffic load in western part of the Europe reach the critical values and has bad influence to transport capacity and environment.Czech Republic is situated in the centre of the Europe, on the commodity flow between N-W industrial producing centre and S-E consumption centre including India and China.Economical potencial is moving from Western Europe to Middle and Eastern Europe. This development would be faster than constructing of higher transport capacity in new EU members.Water corridor Danube-Oder-Elbe is high-quality offer how to improve european transport corridors with using combine transport and other benefits.

Special governmental commission revaluated land protection of the corridor D-O-E in urban plans with positive result!

Intergovernmental consultations are in progress in this time.

Page 36: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.

Plánované vodní dílo na Labi -Děčín

Page 37: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.
Page 38: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.
Page 39: INFORMATION ABOUT WATER CORRIDOR DANUBE-ODER-ELBE EU STRATEGY FOR THE DANUBE REGION VIENNA/BRATISLAVA 19-21 APRIL 2010.

Ing. Jan Kareis, Ph.D.Ing. Jan Kareis, Ph.D.

www.vodnicesty.czwww.vodnicesty.cz


Related Documents