YOU ARE DOWNLOADING DOCUMENT

Please tick the box to continue:

Transcript
  • VietDECOR - 1 -

    Company Profile

    Name of company : Viet Technologies Joint Stock Company

    Address : 317 Hoang Hoa Tham Str, Ba Dinh Dist, Hanoi.

    Corporate office : 5th Floor – 349 Hoang Hoa Tham Str, Ba Dinh Dist, Hanoi

    Tel : 844 – 3723 6666

    Fax : 844 – 3847 2060

    Email : contact@viettech.com.vn

    Website : www.viettech.com.vn / www.vietdecor.vn

    Business License : 0101312291

    Tax code : 0101312291

    General Director : Mr. Nguyen Tuan Anh

    Managing Director : Mr. Truong Duc Hieu

    Main Activity

    • Consultant and management for interior projects.

    • Interior design and decoration.

    • Turn key for interior project.

    • Supply built-in and loose furniture for office, hotel and service apartment

    projects.

    • Design, install and maintenance mechanical & electrical works.

  • VietDECOR - 2 -

    Our Partners Viet Tien Engineering Jsc

    Design, consult and maintenance all kind of M&E works.

    Supply and install:

    • Electrical, Air conditioning & mechanical ventilation system

    • Plumbing & sanitary system

    • Fire protection & detection system

    • Telecommunications and security service

    TAV Office Furniture Pte

    Design and supply furniture:

    • Office furniture: working table, cabinet, partition…

    • Furniture for children, internet table…

    Northern Dragon Trading Co. Ltd

    Supply office furniture

    Antrade Company Limited

    Supply Carpet flooring – InterfaceFLOR Brand

    Supply Vinyl Floor – Tarkett Brand

    America Indochina Management - AIM

    Supply imported office furniture, office system of Steelcase (USA) and

    Modernform (Thailand) brand.

    Supply office chair of Steelcase (USA) and Moflex (Thailand) brand.

    Supply Acoustic ceiling system and Vinyl floor of Armstrong (USA) brand.

    Supply carpet for commercials space of Monterey, C & A, Crossley (USA)

    brand.

    Amark Co., Ltd

    Supply office chair (Korea, Taiwan accessories, wrapping in Vietnam)

    The Forest Products Viet Nam New Zealand J/V Company

    Supply natural wood furniture.

  • VietDECOR - 3 -

    Supply natural timber door and door frame.

    RolaShades Pte Ltd - Singapore

    Motorized roller shades with corporate logo printed over day screen fabric.

    Chain-Lift roller shades with day screen fabric

    Motorized roller shades with dim-out fabric complete with side guide on both side.

    Motorized roller shades (outdoor) with day screens fabric complete with cable guide on both side.

    Dual motorized roller shades with day screen and blackout fabrics

  • VietDECOR - 4 -

    Organization Chart

    Project Dept.

    Director

    Account Dept.

    Tender and project management

    Admin Dept.

    Design team

    Project manager

    Work shop

    Interior design

    Mechanical & Electrical Design

    Site manager and supervisor

    Interior Team M&E Team

    Sales Dept.

    Quality control

    Board of Management

    Purchasing

    Project assistant

  • VietDECOR - 5 -

    Personal Particular

    Name : Truong Duc Hieu (Mr)

    Address : No 1, 41/49 Huynh Thuc Khang Street, Dong Da

    District, Hanoi, Vietnam

    Date of birth : February 28th 1975

    Marital status : Married Sex : Male

    Nationality : Vietnamese

    Education/ Qualification:

    Dec 2004 : Programme on Construction Project Management for Vietnam – By

    Association for Oversea Technical Scholarship (AOTS-Japan)

    June 2004 : Practical Technologies for Productivity – By Vietnam Japan Human

    Resources Cooperation Centre

    March 2002 : Human Resources Management by VJCC

    April 2001 : Construction Contract Preparation & Management by International

    practice

    1991 - 1996 : Graduated from Hanoi Architectural Institute

    Working experience:

    April 2006 to Present : Viet Technologies JSC

    Position held : Managing Director, Senior Project Director

    Duties & Responsibility :

    • Lead the tender, monitor and control project budget and quality

    • Check overall project schedule including equipment delivery for incorporation

    into the Consultant, Main Contractor and Owner master schedule for the whole

    project

    • Provide technical support to owner, consultant or main contractor

  • VietDECOR - 6 -

    • Assist owner to liaise with the authority on all submission of all necessary M&E

    service to the authority. Prepare, consolidate and finalize all variation claims

    with the consultant for final account settlement

    • Ensure all administrative documents have throughout the whole project for

    auditing

    List of project references and brief description: United Nation Office on Drug and Crime Office –

    UNODC

    Royal Club - (BIDV Tower)

    12/2010 – 1/2011

    4/2010 – 7/2010

    Australian Embassy Hanoi – Australian Agency for

    International Development – AusAID

    Sofitel Plaza Hotel Hanoi – Lobby Upgrade

    8/2008 -1/2009

    5/2008 – 7/2008

    Hoi An Conference room – Sofitel Plaza Hanoi

    Brasserie Westlake Restaurant – Sofitel Plaza Hanoi

    7/2006 - 10/2006

    6/2006 - 9/2006

    Centre for Women and Development – Hotel and

    Convention Centre

    Jan 2001 to April 2005: Sieu Chung Ky Co,Ltd

    (Shanghai Chong Kee Furniture & Construction

    Vietnam)

    Position Held: Deputy Director

    3/2006 - 3/2007

    American International Group – HoChiMinh Office

    Telenor Telecom Representative Hanoi Office

    9/2005 -10/2005

    5/2005

    Liberty Mutual Representative Hanoi Office

    Sofitel Plaza Hotel – Office rental space

    10/2003

    6/2003 – 9/2003

    New Gym room and Apartment Service Lobby

    American International Group – Representative Hanoi

    Office

    Westlake International Company – Hanoi Office

    2/2003 - 5/2003

    12/2002 -1/2003

    11/2001

  • VietDECOR - 7 -

    Unocal 76 Representative Hanoi Office

    Huawei Hanoi Office

    Position: Project Manager

    9/2001

    2000

    New York Life Representative – Hanoi office

    Position: Project Manager

    Jan 1997 to April 2001: Shanghai Chong Kee

    Furniture and Construction Pte - Singapore

    Position Held: Project Coordinator

    2000

    Meritus West Lake Hotel – Sofitel Plaza Hanoi Hotel

    Position: Project Co-ordinate.

    Hanoi Tower Centre. Position: Site Supervisor.

    5/1997 - 1/2000

    12/1996 - 5/1997

  • VietDECOR - 8 -

    Personal Particulars

    Name : Hoang Trong Ba

    Address : 69/560 Nguyen Van Cu Str., Long Bien, Ha Noi

    Date of Birth : 20 November 1981

    Marital status : Married Sex: Male

    Nationality : Vietnamese

    Education/Qualification

    July 2012 : Certification in Architect

    2000-2005 : Graduated from Hanoi Architectural Institute

    Working Experience

    December 2013 to Present : Viet Technologies., JSC

    Position Held : Project Manager, Senior Architect

    Duties & Responsibilities :

    • Conduct ID site meeting to resolve all technical problems. Ensure ID shop

    drawings are in order prior submission to the consultant;

    • Co-ordinate with project team to ensure proper integrating of ID services with

    other building trades;

    • Plan, co-ordinate and liaise with ID consultant and Architect on all related M&E

    technical and authority matters;

    • Conduct inspection to ensure all services installed and materials used are in

    accordance to drawing requirement and specification;

    • Response to owner’s compliant and rectify to the defects during Defect Liability

    Prior.

    List of project references & brief description :

    Henkel Office – Songhong Building – Thai Ha - Hanoi 12/2015

    Episerver Office – Song Hong Building – Thai Ha - Hanoi 11/2015

    Lavender Clinic & Spa – Coalimex 33 Trang Thi - Hanoi 9/2015

    Tam Anh Hospital – Hoang Nhu Tiep – Gia Lam - Hanoi 3/2015 – 9/2015

    Kinder World - @ Gamuda Garden – Yen So - Hanoi 12/2014 – 4/2015

  • VietDECOR - 9 -

    FCC Office – level 02 – CEO Building – Pham Hung - Hanoi 8/2014 - 9/2014

    The Kafe Village – 04 Ha Hoi – Hai Ba Trung - Hanoi 7/2014 - 9/2014

    DASAN Networks Rep Office – IPH Building – Xuan Thuy –

    Cau Giay - Hanoi 7/2014-8/2014

    GIG Office – VID I Tower – 115 Tran Hung Dao – Hai Ba

    Trung – Ha Noi 5/2014-6/2014

    Private apartment – no 1704B1 – Mandarin – Huynh Thuc

    Khang – Thanh Xuan - Hanoi 3/2014-6/2014

    Private apartment – no 2406B2 – Mandarin – Huynh Thuc

    Khang – Thanh Xuan - Hanoi 12/2013 – 2/2014

    January 2010 to April

    2013 : AAW Co,Ltd - Hanoi, Vietnam

    Position Held : Senior Architect

    List of project references & brief description:

    DEVYT Kindergarten and primary school, Tran Thai Tong St. 9/2011 - 12/2012

    Penthouse – 37 Phan Dinh Phung building 7/2012 -10/2012

    BL1205 – Vincom village 11/2011- 03/2012

    BL1007 – Vincom village 06/2011- 12/2011

    Feb. 2009 to Dec. 2009 : Serenity Holding , Hanoi, Vietnam

    Position Held : Architect

    List of project references & brief description:

    Cu chi resort and villas 11/2009- 12/2009

    Ninh Binh Conference Hall 07/2009- 10/2009

    Savico Building – HCM city 08/2009

    Lagi Resort – Binh Thuan 02/2009- 07/2009

    April 2007 to January

    2009 : Zen Architecture, Hanoi, Vietnam

  • VietDECOR - 10 -

    Position Held : Architect

    List of project references & brief description:

    Mr. Le Duy Chinh villa – Bo De – Long Bien 12/2009

    Mr. Dao Kien Quoc house – 194 Thuy Khue, Tay Ho 07/2008

    Office Building – 112 Nguyen Ngoc Nai - Thanh Xuan - Hanoi 11/2008

    May 2006 to April 2007 : ACT ARCHITECT (VN) Co.,Ltd.

    Position Held : Architect

    List of project references & brief description:

    Office and show room – 100 Thai Ha - Hanoi 11/2006

    Mrs. Le Thuy Thao villa – Nha Trang 09/2006

    Mrs. Nham house – 96 Lac Long Quan – Tay Ho- Hanoi 04/2007

    July 2005 to April 2006 :Alliance Architecture, Hanoi, Vietnam

    Position Held : Architect

    List of project references & brief description:

    Nha Trang Waterfront 08/2005

    Saigon Pearl Villas 12/2005

    Mrs. Sau villas 03/2006

  • VietDECOR - 11 -

    Personal Particulars

    Name : Nguyen Sy Thanh (Mr)

    Address : 4C, 172/67 Au Co Street, Tay Ho District, Hanoi, Vietnam

    Date of birth : March 9th 1979

    Marital status : Married

    Sex : Male

    Nationality : Vietnamese

    Education/ Qualification:

    June 2011 : Accomplished Construction Project Supervisor Certification

    Programme – National University of Civil Engineering (Hanoi)

    2005 - 2007 : Obtained Bachelor Degree of Business Administration/ Project

    Management – Hanoi University of Science and Technology

    Nov 2005 : Accomplished the Construction Project Management Course by

    Institute training on management and organization

    1996 - 2001 : Obtained Bachelor Degree of Civil Engineering – National

    University of Civil Engineering (Hanoi)

    Working experience: July 2011 to Present : Viet Technologies JSC

    Position held : Eng. Project Manager

    Duties & Responsibility :

    • Conduct ID site meeting to resolve all technical problems. Ensure ID shop

    drawings are in order prior submission to the consultant.

    • Co-ordinate with project team to ensure proper integrating of ID services with other building trades

    • Plan, co-ordinate and liaise with ID consultant and Architect on all related M&E technical and authority matters

    • Conduct inspection to ensure all services installed and materials used are in accordance to drawing requirement and specification

    • Response to owner’s compliant and rectify to the defects during Defect Liability Prior

    List of project references and brief description:

  • VietDECOR - 12 -

    Quang Trung Telecommunication Limited Company office –

    Hanoi Tower - Hanoi

    British Embassy – Central Building – Hanoi

    Hogan Lovells International LLP Office – Sentinel Place -

    Hanoi

    LUKOIL Overseas Vietnam B.V Office – Charm Vit Tower –

    Hanoi

    Indochina Telecom Office – New Tatco Building – Hanoi

    Mace Hanoi Office – BIDV Building

    10/2012 – 11/2012

    12/2012

    12/2011 – 1/2012

    10/2011 -11/2011

    6/2011 – 8/2011

    5/2011 – 6/2011

    Aug 2008 – June 2011 : Golden Indochina Company

    Position held : Assistant Project Manager

    Duties & Responsibility :

    • Assist the tendering. Tender preparation in collaboration with the experts

    and the suppliers

    • Assist in planning and specification analysis in order to provide clear,

    tractable and coordinated interpretations of the design/ drawings for

    construction

    • Negotiate with suppliers on their offer price to achieve budgetary cost.

    Prepare and arrange for them to agree and endorse on the contract

    documents

    • Provide technical engineering information to company employees and

    subcontractors to ensure that the projects complies with all engineering

    standards, codes, specifications and design instructions

    • Attend project coordination and owner/contractor/architect/engineer

    meetings as required

    • Keep an accurate risk tracking document with an associated mitigation plan

    • Track and report weekly on percent complete, budget burn, earned value.

    slippage, project effort and duration to complete and other key project

    metrics

    • Assist in evaluation of and solution to potential field problems, referring

    them to Project Manager

    • Developing and managing suppliers

    List of project references and brief description:

    Tender for bid: Meeting rooms and Conference rooms for the

    3/2011 – 5/2011

  • VietDECOR - 13 -

    first five floors of the EVN Tower – Hanoi

    The Royal Club – BIDV Tower – Hanoi

    Interior Design and Installation Project for the Head Office of

    BIDV – BIDV Tower - Hanoi

    4/2010 – 7/2010

    11/2009 – 4/2010

    Nov 2003 – Aug 2008 : AUSTNAM JSC – Members industrial

    investment group in Australia

    Position held : Site Manager

    Duties & Responsibility :

    • Scheduling and assigning duties to subordinates and subcontractors – ensures assignments are completed as directed and to standards

    • Optimizes planning, operations, and resources to ensure maximum capability is attained

    • Directing the implementation of assigned tasks within estimated time frames and budget constraints

    • Enforces work standards and review/resolves work discrepancies to ensure compliance with contract requirements

    • Communicate progress, risks, expectations, time lines, milestones and other key project metrics to clients and team members

    • Track and report weekly on percent complete, budget burn, slippage, project effort and duration to complete and other key project metrics

    List of project references and brief description: Austnam office – Hanoi

    Building Material Centre – 109 Truong Chinh – Hanoi

    3/2006 – 7/2006

    7/2006 – 12/2006

    Nov 2001 – Nov 2003 : VINACONCO4 - VINACONEX

    Position held : Site Supervisor

  • VietDECOR - 14 -

    Personal Particulars

    Name : Tran Huu Tho (Mr)

    Address : Unit 0610 , An Lac Building, 38 Hoang Ngan – Thanh

    Xuan - Hanoi, Vietnam

    Date of birth : March 13th , 1979

    Marital status : Married

    Sex : Male

    Nationality : Vietnamese

    Awards

    November 2004:

    • 3rd Prize of Vietnam Architectural Award co-organized by Ministry of

    Construction, Ministry of Information Cultural and Vietnam Association of

    Architect in 2004.

    November 2002:

    • The 1st Prize for excellent graduated project of the final year architecture

    student in the nationwide competition - Loa Thanh, co-organized by Ministry of

    Education and Training, Ministry of Construction, Vietnam Association of

    Architect and Communist Young Union in 2002

    • Creative Youth Honor of Communist Young Union in 2002

    • A - Class Creative Architecture Certificate of Vietnam Association of Architect in

    2002

    Education/Qualification

    • Dec 2007: Program on Construction Project Management - By National

    University of Construction Engineering and University of Cincinnati

    • 1997 – 2002 : Graduated from National University of Construction Engineering

    Working Experiences

    2009 – Up to Now: Viet Technologies JSC

    Position Held : Senior Design Architect – Design Manager

    • Mobiado Boutique – Somerset Grand Plaza - 49 Hai Ba Trung Str., Hanoi

  • VietDECOR - 15 -

    /Leader Architect in interior design

    • Baker & Mc Kenzie office – 10th Floor – Indochina Plaza – 239 Xuan Thuy

    - Cau Giay Dist. – Hanoi (Tender)

    • Techcombank – Corporate Banking Centre – 72 Tran Hung Dao – Hanoi/

    Leader Architect in interior design

    • BIDV Head office in Tran Quang Khai Str., Hoan Kiem (10.000m2)

    /Design Director in interior design

    • An Phu Investment Fund in Hang Chuoi Str, Hoan Kiem(100m2) /Leader

    Architect in interior design

    • Villa in Trung Yen Newtown, Cau Giay (400m2) /Leader Architect in

    interior design

    • Villa T5 in Ciputra (360m2) /Leader Architect in interior design

    • Mr. Khoi’s Apartment in Doc Ngu, Ba Dinh (120m2) /Leader Architect in

    interior design

    • Mr. Hiep’s Apartment in Song Da, My Dinh (120m2) /Leader Architect in

    interior design

    • Mr. Hiep’s Apartment in Song Da, My Dinh (120m2) /Leader Architect in

    interior design

    • Penthouse in 278 Thuy Khue Str, Ba Dinh (250m2) /Leader Architect in

    interior design

    • Mrs. Giang’s Apartment in Doc Ngu, Ba Dinh (160m2) /Leader Architect in

    interior design

    • Mrs. Hoa’s Villa in Dong Trieu, Quang Ninh /Leader Architect in

    architecture design

    • JAFA restaurant in Ciputra (300m2)/Leader Architect in interior design

    • Auberge Dang Trung Hotel in Sapa, Lao Cai /Leader Architect in

    architecture design

    • Penthouse in CT1 Pham Van Dong, Tu Liem (400m2) /Leader Architect in

    architecture and interior design

    • Mr. Cong’s Villa in Dich Vong, Cau Giay (500m2) /Leader Architect in

    architecture and interior design

    • Penthouse in 278 Thuy Khue Str, Ba Dinh (250m2) /Leader Architect in

    interior design

    • Villa T8 in Ciputra (360m2) /Leader Architect in interior design

    • Apartment 12A07 in 88 Lang Ha (130m2) /Leader Architect in interior

    design

  • VietDECOR - 16 -

    • Apartment 2503 in 88 Lang Ha (150m2) /Leader Architect in interior

    design

    • Shop London Diamond Gallery in Thi Sach, Hai Ba Trung /Leader

    Architect in interior design

    • Apartment 1101 P2 Ciputra (180m2) /Leader Architect in interior design

    • Techcombank Corporate Banking in Tran Hung Dao(250m2) /Leader

    Architect in interior design

    • Mr. Tam’s Villa in Xuan Phuong, Tu Liem (450m2) /Leader Architect in

    interior design

    2008 Megastar Land

    Senior Concept Design

    � Projects:

    • Thanh Xuan Lake Centre / Urban planning

    • Thac Ba Lake Eco Tourism / Urban planning

    • Hoa Binh 5star hotel / Assistant Architect in technical design

    2006-2007 Nortel

    Project Manager

    • Project: HT Mobile Tower / Management in deployment

    2003-2006 Gami Group, Hanoi (Real estate company)

    Project Manager, Team Leader, Architect, Site Architect

    � Projects:

    • Thanh Tri Commerce Center / Participating in Technical design

    • Thuy Tu Newtown, Lien Chieu Dist, Da Nang city (400ha) / Participating in

    urban planning

    • Cau Nghin Industrial Park, Thai Binh province / Chief architect in planning

    • Showroom Mercedes, 11 Pham Hung, Hanoi / Interior design

    • Gami Building, 11 Pham Hung, Hanoi / Technical design and supervisor

    • Tran Hung Dao Municipal Area, Thai Binh city (54ha) / Urban planning

    • Hung Vuong Newtown, Tuy Hoa city, Phu Yen province / Urban planning and

    technical design

    • The Orient Building, Binh Thanh Dist, HCMC (project) / Designing

  • VietDECOR - 17 -

    • Nam Chon Resort, Da Nang city (project) / Urban planning

    • Loan Lagoon Resort, Phu Yen province (project) / Urban planning

    • Nam La Newtown, Son La province (project) / Urban planning

    2001-2002 Design and Consultancy Investment Company, Hanoi

    Architect

    � Projects:

    • 28 floors Apartment Building, Thang Long International Village, Cau Giay Dist,

    Hanoi (project) / Designing

    • Dormitory of Hanoi Water Resources University, HCMC / Technical design

  • VietDECOR - 18 -

    Main Projects

    1. Sofitel Plaza Hanoi (Service Apartment Lobby and GYM room)

    No 1 Thanh Nien Road, Ba Dinh - Hanoi

    From Mar, 2003 to Jun, 2003.

    Scope of works:

    � New service apartment lobby: Fitting out and loose furniture.

    � Build new structure and fitting out for gym room – 4th Floors.

    � M&E Work.

    2. Brasserie Restaurant – Sofitel Plaza Hanoi

    No 1 Thanh Nien Road, Ba Dinh - Hanoi

    From Jun, 2006 to Sep, 2006.

    Interior designed by DPD Singapore.

    Scope of works:

    � Renovation all restaurants: fitting out works and built in furniture.

    � Supply loose furniture.

    � Electrical, Air con and Ventilation, Fire protection…

    � Supply and install lighting.

    3. Conference room (Hoi An room) - Sofitel Plaza Hanoi

    No 1 Thanh Nien Road, Ba Dinh - Hanoi

    From Jul, 2006 to Oct, 2006

    Architecture designed by Archetype Vietnam.

    Interior designed by Y2 Space Singapore.

    Scope of works:

    � Pre-structure, window and glass roof for new conference room.

    � Electrical, Aircon and Ventilation, Fire protection, Plumbing and Sanitary

    system, communication…

    � Supply lighting system.

    � All fitting out and built in furniture: Ceiling, floor and bench, decorative

    panel…

    � Motorized RolaShade for glass roof.

    4. VERTU Showroom

  • VietDECOR - 19 -

    - Melia Hanoi Hotel – 44 Ly Thuong Kiet – Hoan Kiem – Hanoi

    From Aug to Oct 2006

    - Sheraton Hotel & Tower – 88 Dong Khoi - HCMC

    - Vertu Store – Metropole Hanoi Hotel - 15 Ngo Quyen – Hanoi

    - Vertu Shop - Shopping Arcade Rex Hotel – 141 Nguyen Hue -

    HCMC

    From Jan, 2008 to Apr, 2008

    Designed by Shed Design – England.

    Scope of works:

    � Fitting out of works

    � Electrical, Aircon and Ventilation, Fire protection, Plumbing and Sanitary

    system, communication…

    � Supply lighting system.

    5. Hong Kong Shanghai Bank corporation - HSBC Hanoi office – with DWP

    (Design worldwide Partnership) – Pacific Building, Ly Thuong Kiet, Hoan

    Kiem, Hanoi.

    From Dec, 2007 to Apr 2008

    Scope of works:

    � Fitting out of works & loose furniture (1st floor, Mezz, 2nd floor)

    6. Federal Express in Noi Bai Airport – FedEx

    Federal Express Hanoi Office – 18th Floor – Charm Vit Tower – 117 Tran

    Duy Hung - Hanoi

    From Sep, 2008 to Dec 2008

    Scope of works:

    � Design and build (Ramp office, ware house & ACMX part store)

    � Fitting out of works & loose furniture.

    � M&E works.

    7. Australian Embassy Hanoi – Australian Agency for International

    Development – AusAID – No.8 Dao Tan, Ba Dinh, Hanoi

    From Nov, 2008 to Jan 2009

    Scope of works:

    � Design, documentation and Project management service.

  • VietDECOR - 20 -

    8. United Nation International School – UNIS – Tay Ho, Hanoi

    Scope of works:

    � Renovation work

    9. Japan External Trade Organization (JETRO) – Hanoi Office – 2th Floor, 63

    Ly Thai To, Hoan Kiem, Hanoi

    Scope of works:

    � Design

    � Fitting out, M&E and Furniture

    10. Nokia Siemens Networks Hanoi Office – NSN – 12Ath & 14th Floor,

    Handiresco Tower, 521 Kim Ma, Ba Dinh, Hanoi.

    Scope of works:

    � Design

    � Fitting out, M&E and Furniture

    11. Nagomi Dental Clinic – 3rd Floor, Indochina Plaza Hanoi, 239 Xuan

    Thuy, Cau Giay, Hanoi

    Scope of works:

    � Fitting out, M&E and Furniture

    12. Kinder World (Singapore international school) CORPORATE OFFICE –

    Gamuda Yen So, Hoang Mai, Hanoi

    � Design and built (fitting out and loose furniture)

    13. PVI Fitness – 19th Floor, PVI Tower, 168 Tran Thai Tong, Cau Giay, Ha

    Noi

    � Fitting out and lose furniture

    14. Tam Anh Hospital – Hoang Nhu Tiep – Gia Lam, Hanoi

    � Interior Design

    � Fitting out and lose furniture

  • VietDECOR - 21 -

    Other Projects

    Project list

    Scope of works

    Westlake International Company No 3 Pho Duc Chinh Str - Ba Dinh – Hanoi

    Design, fitting out of works, M&E works and supply loose furniture

    Sofitel Plaza Hanoi (Office space - 3rd floor)

    No 1 Thanh Nien Road, Ba Dinh - Hanoi.

    To convert 3rd Floor to office rental space.

    Liberty Mutual Inc. – Representative office

    Design, fitting out of works, M&E works and supply loose furniture

    World Vision Vietnam office – 16 Ham Long Hanoi.

    Design, fitting out of works, M&E works and supply loose furniture

    Other office at 3rd -Office space -

    Sofitel Plaza Hanoi. No 1 Thanh Nien Road, Ba Dinh - Hanoi.

    Fitting out, loose furniture and M&E works for office: AREVA T&D Office (France), ZIRCON Representative (Singapore); Polpharma (Poland), SHMITDH Representative (Hong Kong)…

    America International group - AIG 5th Floor , Hanoi Tower Centre, 49 Hai Ba Trung, Hanoi

    Fitting out of works, electrical, mechanical and communication

    International Organization for Migration (Hanoi office), Horizon Hotel, Cat Linh, Hanoi.

    Design, fitting out of works, M&E works and supply loose furniture.

    Centre for Women and Development – 20 Thuy Khue Hanoi (From Feb, 2006 to Apr, 2007). Corporate with SCK Furniture and Construction Jsc.

    Supply loose furniture for Lobby, restaurant, hotel room, office and training centre. Fitting out works and loose furniture for Conference room, meeting hall.

    Westlake International Company – May, 2007, 3rd Floor, Sofitel Plaza Hanoi.

    Fitting out of works and M&E works.

    ACCA Hanoi office –13th Floor, Unit 04 Pacific Place, 84 Ly Thuong Kiet, Hanoi.

    Design and build fitting out of works, loose furniture and M&E works.

    Universal Telecom Service - 4th Floor, Pacific Place, Hanoi.

    Fitting out of works and M&E works.

  • VietDECOR - 22 -

    Oracle Hanoi Office (11&15th Floor - 53 Quang Trung)

    Supply Roller Shade for all office

    Thang Loi Hotel – 200 Yen Phu

    Main lobby upgrade

    Tham& Wong Hanoi office –17th floor Hoa Binh Tower

    Office Design and Fitting out, M&E works and furniture.

    Quoc Viet – Juniper Distribution Hanoi Office – VCCI Building – 9 Dao Duy Anh

    Office Design and Fitting out, M&E works and furniture

    DuPont Hanoi office – Sofitel Plaza Hanoi Office Design and Fitting out, M&E works and furniture

    J.A.F.A Restaurant & Bar – Ciputra Hanoi Renovation: Design and built

    Royal Club – BIDV Tower – 194 Tran Quang Khai – Hanoi

    Fitting out, joinery works and build in furniture

    Show Flat The Bay View – Ha Long Fitting out and M&E works

    Chartis Hanoi Office – Hanoi Tower – Renovation

    Furniture, Fitting out and M&E works

    Sky City Apartment Lobby A and B– 88 Lang Ha

    Design and Built

    United Nation Office on Drugs and Crime – UNODC – Level 3 Sentinel Building – 41 Ly Thai To- Hoan Kiem- Hanoi

    Design and Built ( Fitting out, M&E and loose furniture)

    TechcomBank – Corporate Banking Center – Level 3 – 72 Tran Hung Dao

    Interior Design

    Tam Dao Golf and Resort – Hanoi

    Office

    Level 5 – Grand Plaza Building

    Design and Built

    Indochina Telecom – iTelecom - Hanoi Office – Level 7,8,9,10 - 21 Lang Ha

    Design and Built ( Fitting out and Furniture)

    Mace Hanoi Office – Level 13 – BIDV Tower – 141 Tran Quang Khai – Hoan Kiem - Hanoi

    Design and Built ( Fitting out, M&E and loose furniture)

    Hanotex Hanoi Office – Level 3 - 88 Lang Ha – Sky City Building

    Design and Built ( Fitting out, M&E and loose furniture)

    LUKOIL Hanoi Office – Level 12 - Grand Plaza Hanoi – Tran Duy Hung

    Design and Built ( Fitting out, M&E and loose furniture)

  • VietDECOR - 23 -

    Hogan Lovells International LLP Hanoi Office – Sentinel Place – Hanoi

    Design and Built (Fitting out, M&E and loose furniture)

    PVB Hanoi Office – Oriental Building – Hanoi

    Design and Built (Fitting out, M&E and loose furniture)

    Chinese Restaurant – 8th Floor – Keangnam Hanoi Landmark 72 – Pham Hung road – Hanoi

    Supply loose furniture

    Vpresso coffee shop – 72nd Floor – Keangnam Hanoi Landmark 72 – Pham Hung road – Hanoi Vpresso coffee shop - The Manor urban areas – Me Tri – My Dinh – Hanoi Coffee Training Center Vpresso – Level 10 Keangnam Hanoi Landmark 72 - Pham Hung – Hà Nội

    Design and Built (Fitting out, M&E and supply counters) Design and Built (Fitting out, M&E and supply counters)

    Design and Built, supply furniture

    VietCAM showroom – Douala City – Cameroon

    Interior design

    Mobiado Boutique – shop 24 Somerset – 49 Hai Ba Trung – Hanoi & L2-34 Vincom A Tower – 171 Dong Khoi – Dist. 1 – HCM City

    Interior Design

    Miluxe Glasses Salon – L2-34 Vincom A Tower – 171 Dong Khoi – Dist. 1 – HCM City

    Design and Built (Fitting out, M&E) and loose furniture

    Quang Trung Telecommunication Limited Company office – 4th Floor – Hanoi Tower – 49 Hai Ba Trung - Hanoi

    Pantry refurbishment & Supply working chair

    British Embassy – 4th Floor – Central Building – 31 Hai Ba Trung – Hanoi

    Renovation pantry area & supply working chairs

    Miluxe Boutique – L2-14 – Trang Tien Plaza – 24 Hai Ba Trung - Hanoi

    Design and built (fitting out, M&E and loose furniture)

    Karen Millen shop – Vincom Centre, 191 Ba Trieu str., Hai Ba Trung dist., Hanoi

    Design, fit out, m&e and supply furniture

    Kitchen Pandara - Unit 07&08 – Pho Truc

    zone – Ecopark urban – Xuan Quan – Van

    Giang – Hung Yen.

    Design and built (fitting out, M&E, supply loose furniture and decoration)

  • VietDECOR - 24 -

    Crepe House - Grid X25-X26 and Y24-Y25

    – B2 Royal City Ha Noi

    Design and built (fitting out, M&E)

    PVI office for BOP Management & BOB

    Management – Lot VP2, Tran Thai Tong Str., Cau Giay dist., Hanoi

    Design and built (fitting out, M&E and loose furniture)

    Geniee Office – Unit 8, 6th Floor, Indochina Plaza, 239 Xuan Thuy, Cau Giay dist., Hanoi

    Nature Republic Store – 238 Le Hoan, TP. Thanh Hoa Chemonics office - 6th Floor, VID Tower, 115 Tran Hung Dao, Hoan Kiem, Hanoi

    Design and built (fitting out, M&E and loose furniture) Design and built (fitting out, M&E and loose furniture Design and built (fitting out, M&E and loose furniture

    Aim Star Network – 3rd Floor & 8th Floor Indochina Plaza, 239 Xuan Thuy, Cau Giay dist., Hanoi

    Design and built (fitting out, M&E and loose furniture)

    Dasan Network Inc. Hanoi Office -13th Floor Indochina Plaza, 239 Xuan Thuy, Cau Giay dist., Hanoi

    Toyota Thang Long – Showroom Lexus, Duong Dinh Nghe, My Dinh, Tu Liem, Ha Noi

    Geniee Office – 14th Floor, Indochina Plaza, 239 Xuan Thuy, Cau Giay dist., Hanoi

    Kinder World ( Singapore international school) CORPORATE OFFICE – Gamuda Yen So, Hoang Mai, Hanoi Vertu Shop – Metropole hotel, 15 Ngo Quyen, Hoan Kiem, Hanoi SAISHUNKAN HANOI office - 14th Hoa Binh Tower, 106 Hoang Quoc Viet, Cau Giay, Hanoi Gangnang clinic – 52 Le Dai Hanh – Hai Ba Trung – Hanoi Hogan Lovells Hanoi office - 6th Floor, Sentinel place – 41A Ly Thai To – Hoan Kiem – Hanoi EPIServer office – 165 Thai Ha – Dong Da – Ha Noi

    Design and built (fitting out, M&E and loose furniture) Fitting out, supply loose furniture Design and built (fitting out, M&E and loose furniture Design and built (fitting out and loose furniture) Design and built (fitting out, M&E and loose furniture) Design and built (fitting out, M&E and loose furniture) Fitting out, supply loose furniture Office extension and upgrade Design and built

  • VietDECOR - 25 -

    Henkel Hanoi Office – 165 Thai Ha – Dong Da – Ha Noi PVI Fitness - 19th Floor, PVI Tower, 168 Tran Thai Tong - Cau Giay – Hanoi

    Design and built Fitting out and loose furniture

    And other projects…

  • VietDECOR - 26 -

    Scope of Service - Design and Construction procedure

    Phase 1 – Design Brief & Analysis / Schematic Layout / Space Planning

    • Step 1: To study the organization chart, preliminary discussions focus on the

    Client’s aspiration and design intent of the project.

    • Step 2: Involves a detailed analysis of project scope, study the concepts and

    evolution of the schematic layout plan.

    • Step 3: Involves the layout plan along with clear design and functional criteria

    in context of concept planning. To present 3 dimension Perspective.

    • Step 4: To propose the budgetary costing base on layout plan and standard

    materials.

    Approval of Phase 1 is critical in order to proceed to Phase 2. Any amendment of

    Phase 1 at this stage shall be implemented during Phase 2.

    Phase 2 – Concept Development

    • Step 1:

    Base on the approved layout plan submitted at Phase 1, we will develop

    relevant presentation materials comprising of:

    - Two dimension of update layouts;

    - Two dimension of relevant interior elevations to demonstrate design concepts

    being proposed;

    - Electrical and Mechanical plan (Electrical, Air condition and ventilation, Fire

    protection, Data and Telephone or other special required...);

    - Mood composition expressing general finishes and materials in respect of

    design concept.

    • Step 2:

    Base on the approved design concepts and mood composition by the Client, the

    Designer will develop relevant presentation materials comprising of:

    - Materials board specifying floor, wall and partition, ceiling finishes in general;

    - Revised layout plan where appropriate.

    • Step 3: To submit Bill of Quantity base on materials board which Client

    approved and the Contract.

    Phase 3 – Specification and Details.

  • VietDECOR - 27 -

    During this phase, all detail drawings shall prepare for construction and

    fabrication step. Detail Drawings for construction as follows:

    - Floor drawing;

    - Wall elevation (Indicated lighting position);

    - Ceiling drawing (Indicated lighting position);

    - Door and door panel details;

    - Wall features details;

    - Fixture details for built in furniture;

    - Furniture details or Picture of furniture;

    - Accessories, Finishes & Fittings;

    - M&E Drawings.

    Phase 4 – Construction.

    Depend on a complicated of each project, the phase 4 could be start together

    with phase 3 for reduce the working time schedule.

    • Contractor arrange the setting works on clear plan on site, all position of dry

    wall partition, door and glass partition, working table will be marked on floor

    (scale 1:1)

    • After setting works complete, the Contractor will explain for the Client what is

    present on floor is exactly will built up for these project. The Client should

    approve this plan before Contractor start doing the installation of all partition.

    • To proceed brick works, plastering works, drywall installation or features wall

    frame and finishes.

    • To proceed ceiling suspended system.

    • On this step, the contractor will take carefully the measurement for fabrication

    or order the materials and furniture, especially in imported materials.

    • To proceed the painting work for wall and ceiling or other finishing works.

    • The M&E works such as: electrical, Air conditional, ventilation, Fire protection,

    communication or other security system to carry out and co-ordinate closely

    with interior decoration works.

    • All fixture wall or built in furniture must be protect carefully avoid scratches or

    damages.

    When the construction plan is clean and clear, the contractor to proceed final

    finishing works remain as:

  • VietDECOR - 28 -

    • To lay carpet, wooden floor or granite floor.

    • To install all built in furniture and loose furniture

    • To install curtain, blind, other furnishing and artworks.

    Phase 5 - Inspection and Hand over

    When the works completed, we will inform Client for inspection, after the

    inspection, Client will issue by writing List of Defect to the Contractor or any

    amendment of Client, Contractor will arrange schedule and resubmit to the Client for

    approval.

    These defect works will carry out after working hour or on Saturday or Sunday.

    Maintenance service will carry out according to the maintenance term.

    Our warranty and maintenance:

    Warranty Period: 12 months and next 6 months for maintenance service...

    Other equipment supplies by Manufacturer are warranted accordingly to

    warranty term and condition in the manufacturer policy.

    VietTECH will arrange technical worker to maintain the work request from client

    within 24 hours. The replacement equipment will be fixed in the soonest time in order

    to meet the clients satisfaction.

    Also, we understand that our clients concern is the maintenance work after the

    warranty period, in fact, all of our clients are very happy with our provided

    equipment’s and service after the project has been handed over.

  • VietDECOR - 29 -

    Materials Sources

    Production, materials

    name Sources / Origin

    Manufacture / Brand

    Dealer

    Office furniture Thailand, China, Malaysia, Vietnam

    AIM/Steel Case, Modern Form, Marryfair, Table

    Metal furniture Vietnam, Thailand Godrej, Leedco, KienHang, Xuan Hoa, Hoa Phat

    Office chair USA, Thailand, Malaysia, Singapore, Vietnam

    AIM/Steelcase, Moflex, Benel, Gamma, BigMore, Marryfair, Herman Miller

    Veneers ply, and plywood (Oak, Beech, Cherry, Teak, Xoan, Doi...)

    Vietnam, Indonesia, Malaysia, China.

    Nature Timber (Doi, Tro,Goi, Xoan, Bach Tung, Oak, Teak, Beech)

    Vietnam, Lao, Indonesia, Russia...

    Laminate/ Formica China, Malaysia, Thailand, Singapore

    Wilsonat ( Thailand) Formica ( Thailand) Laminate ( Malaysia)

    Paint (Interior and exterior)

    Viet Nam Nippon, Dulux ICI, Kova

    Wall covering Singapore, Taiwan, Korea and China.

    UMI Carpeting Pte Ltd, Goodrich Wall covering & Carpet Pte Ltd (Singapore)

    Fabric Thai Land, Indonesia, Singapore, Vietnam

    Carpet flooring

    Australia, Singapore, Belgium, Thailand, USA, China, Indonexia

    Interface, Tandus, Heritage, Carpet Inter

    Vinyl flooring Korea, China, Switzerland Aroma Flooring, Galaxy, Armstrong, Tarkett

    Architecture Hardware Singapore, Germany, Austria, Korea, China, Thailand

    Hafele, Blum, Zikon, Dah Ling hardware Co.,Ltd

  • VietDECOR - 30 -

    Acoustic ceiling board and suspended ceiling system

    Singapore, Thailand, USA , Korea, China, Vietnam

    Daiken, LA Plaster Board, Thai Gypsum Board, Armstrong, USG, Vinh Tuong.

    Marble/ Granite Vietnam, Italy, China, India

    Granida, VinaStone, Vicostone...

    Laminate flooring, natural timber flooring.

    Vietnam, Germany, Thailand ,China

    Pergo, Picenza, Kronotex...

    Melamine Face cheap Board MFC (18mm, 25mm thick)

    Malaysia, Germany, Vietnam

    Mieco MFC

    Curtain and blind Vietnam, Taiwan, Australia, Singapore, China, USA.

    Uniline , RolarShade, Hunter Douglass, Star Blind.

    Glass: normal glass, laminate glass, tempered glass and back painted glass.

    Vietnam, Singapore, France, Japan, Malaysia...

    Vijaco, Tungquang, GlassKote...

    Air condition and accessories.

    Thailand, Japan/ Malaysia / Singapore / Viet Nam

    Daikin / Carrier / Toshiba/ LG / General/ Ree

    Communications Vietnam, Malaysia, Thailand, China

    AMP/ Krone/ Clipsal

    Lighting and accessories Vietnam, Germany, France, Japan, China, Thailand.

    Sino/ Clipsal/ Legrand, Siemens/Taya/ ABB/ Ligman/ Gaginni/NVC

  • Anh profile.pdfCompany Profile VietTECH 2009_Eng.pdfbia.pdfCompany Profile VietTECH 2008_Eng.pdf

    Image - hosonangluc.pdf


Related Documents