A Steel, Mines , Cement & Power conglomerate operating in Orissa, Jharkhand, Meghalaya, Maharashtra, Karnataka & West Bengal
Presently a Group having turnover exceeding Rs 5000 Crores
One of the fastest expanding groups in the eastern Region having marketing outlets in India & overseas.
The Group has presence in mining sector at a global level including South Africa, Tanzania, Mozambique, Brazil & Indonesia.
Date Of MoU : 26th Feb, 2004 Location : Kandra ( Dist. Seraikella Kharsawan) Total Land Required : 1584 acres Purchased land : 511 acres ( including CA land) Land acquisition : 265 acres Govt. land : 318.64 acres Coal Linkage : 2,40,000 tons for DRI & CPP
Contd.
Water : Agreement with Water Res Deptt signed in 2005 Water being withdrawn and Cess being paid regularly
Environmental Clearance: Obtained vide letter no. J-11011/899/2007-IA II (I) on 12th March 2009.
Power : 33 kv Power Supply is operational . 132 Kv line completed and awaiting synchronization.
Railway siding : Commissioned and operational. Installed capacity : Phase 1 Completed Investment made : Rs 629 Crores Employment : 2000 persons ( Direct + Indirect)
out of which majority are tribals & local population.
A View of Cooling Tower & SMS
Railway siding View
SMS & New Project site
SMS : Billet dispatch bay
WHRB & ESP of DRI
Kiln 2 of DRI Plant
Railway siding : Another view
Administrative Office Building
30 MW Captive Power Plant
1.2mtpa Pellet Plant
Iron Ore Grinding Building Pelletization Plant
Thickener of Pelletization Plant
Current Status
Phase 1 completed Plant fully operational
– 2 x 350 tpd DRI Units– 30 MW CPP– SMS 2,50,000 tons per annum– Coal washery 500,000 tons per annum– Captive Railway siding – Intake Well for water– 132 KV transmission line – 12, 00000 tons per year Iron Ore Beneficiation & – Pelletisation plant Commissioned
Coal Block Allotted : North Dhadhu
North Dhadhu Coal block was allotted to M/s AAPL, Electrosteel, Jharkhand Ispat & Pawanjay steel & Power through block allotment letter dated 13.01.06.
Geological report was procured from CMPDIL on 29.12.08 Mining Lease application was filed at DMO office, Latehar on 20.06.09.
The same was forwarded by DMO to Director (Mines & Geology) Jharkhand on 26.04.09.
Mining Plan prepared and submitted to MOC. It is in advanced stage of approval.
Plot details of 8 villages within block have been collected from concerned office.
Application for Govt. land (149 Ha) already submitted to DC, Latehar. Socio-economic survey of the villages is being conducted by Nav Bharat
Jagriti Kendra samiti and preliminary report has been submitted.
MILESTONES OF POWER PLANT
ACTIVITY DATES STATUS
ZERO DATE OF PROJECT 19.05.09/31.07.09 19.05.09/31.07.09
BOILER ERECTION START 20.03.10/20.05.10 23.03.10BOILER DRUM LIFTING 30.07.10/30.09.10 27.08.10BOILER HYDRAULIC TEST (NON-DRAINABLE) 30.04.11/30.06.11BOILER LIGHT UP 30.09.11/30.11.11TG BOX UP 24.08.11/24.10.11STEAM BLOWING OPERATION 24.09.11/24.11.11SYNCHRONIZATION (OIL) 24.11.11/24.01.11COAL FIRING 30.11.11/30.01.11COMMERCIAL OPERATION 31.01.12/31.03.12
CLEARANCES OBTAINED ON
CONSTRUCTION POWER 19.08.2008
GANESHPUR COAL BLOCK ALLOCATION 30.06.2009
WATER : ALLOCATION 29.08.09
ENVIRONMENTAL CLEARANCE - UNIT 1 29.08.2009
LONG TERM OPEN ACCESS AGREEMENT WITH PGCIL 03.09.2009
JHARKHAND STATE POLLUTION CONTROL BOARD 10.11.2009
CHIMNEY HEIGHT(275 M) CLEARANCE 23.08.2010
MOEF - TOR CLEARANCE FOR U 2, 3 & 4 29.10.2010
PGCIL CLEARANCE FOR TWO BAYS EXTENSION WITH PGCIL 25.11.2010
RAIL SIDING CLEARANCE 29.11.2010
CLEARANCE STATUS
ESP-1 Erection
PHB - 1
SITE PHYSICAL PROGRESS
Boiler– 1
ESP – 1 :
SITE PHYSICAL PROGRESS
ESP Control Room
SITE PHYSICAL PROGRESS
TG – 1
SITE PHYSICAL PROGRESS
Power House Bldg.#1
SITE PHYSICAL PROGRESS
AHP-Compressor Room
Civil & Structural Work of Main Plant & BoPs (Unit-1):
SITE PHYSICAL PROGRESS
Fly Ash Silo
SITE PHYSICAL PROGRESS
Silo Utility Bldg
SITE PHYSICAL PROGRESS
Chimney
CORPORATE SOCIAL RESPONSIBILITY
“Backbone to corporate sustainability”
Dimensions of CSR
Education
Culture
Health
Infrastructure Utilities
Women Empowerment & Capacity Building
Sports
Infrastructure
Women Empowerment & Capacity Building
Utilities
Health
Education
Sports
Culture