Top Banner
Gas Turbine Engines For Gas Pipelines
20

Zorya Gas Turbines

Oct 27, 2015

Download

Documents

Roozbeh P

Zorya Gas Turbines
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Zorya Gas Turbines

Gas Turbine Engines For Gas Pipelines

Page 2: Zorya Gas Turbines

IN THE MARINE, POWER AND GAS INDUSTRYIN THE MARINE, POWER AND GAS INDUSTRY

“ZORYA-MASHPROEKT”Nikolaev, Ukraine

“ZORYA-MASHPROEKT”Nikolaev, Ukraine

The State Enterprise “Zorya-Mashproekt” Gas Turbine Reasearch & Production Complex has a 50-years experience in designing & production gas turbines for Navies, commercial and passenger vessels, power plants and gas piping units and drivers for production equipments. The turbines developed for marine application have been excellently proven on land. Since 1953 over 3000 marine & industrial gas turbines have been produced and supplied. Thousands of varies reduction gears for different class displacement ships, hovercrafts & hydrofoils also for industrial application have been produced.

Ships of 20 countries worldwide, over 60 power stations, more than 100 gas pipelines compressor stations in Russia, Ukraine, Kazakhstan, Belarus, Czechia, Canada, Azerbaijan, Iran and other countries are equipped with Zorya-Mashproekt gas turbines. The total power of the turbines exceeds 24 million kW and total firing time over 26 million hours.

According to GAZPROM statistics, the gas pumping units (GPU) driven by our gas turbines have been acknowledged most reliable comparing to driven by another companies. They have highest mean value of technical utilization coefficient, maximum time between failure and the highest availability factor.

Owing to the constant work on support and upgrade of the technical level, the of-time of many turbines exceeded 80000 firing hours without factory repair. UGT16000 (DR59) second generation leading turbine have accumulated over 35000 hours, UGT25000 fourth generation turbine over 28000 hours, UGT10000 fourth generation turbine has been put in to trial-commercial operation at Kirovogradskaya compressor station (Ukraine) in 2002.

“Zorya-Mashproekt” gas turbines were created for naval applications; they are also adjusted for working off-shore, on floating & stationary oil & gas platforms.

Page 3: Zorya Gas Turbines

FROM PROJECT THROUGH DELIVERYFROM PROJECT THROUGH DELIVERY

The specialist of «Mashproekt» (Scientific Research & Experimental-Design Works Center) is constantly working at creating new & upgrading early-developed gas turbines widely using modern sophisticated CAD\CAM systems.

“Zorya-Mashproekt” facilities & laboratories have been equipped with up-to-date tools, equipment & technologies, the personnel there is well trained. High-temperature steel & alloy precision casting, precise isothermal & impulse extrusion, electro-beam welding, electro-beam & plasma coatings, laser cutting, electric methods of metal treatment-these make an incomplete list of advanced technologies applied at the enterprise.

Possessing tooling allows realizing on time & qualitative production preparation.

Gas turbines parts & assembling operational development & testing are held on the test-beds of the Scientific Research Department. 11 test-beds for full-scaled turbines & units testing are situated on the main territory, & 5 test-beds are in Kaborga village where is a marine test station, & a special loading gas ring for testing GPU is built.

The specialist of the complex perform contract supervision, adjustment & alignment, guaranteed maintenance of prototype & stock-produced items on-site of the customer, and also after-sale maintenance through the whole service life.

33

Page 4: Zorya Gas Turbines

GAS TURBINE ENGINESFOR GAS PIPELINES COMPRESSORS DRIVEGAS TURBINE ENGINESFOR GAS PIPELINES COMPRESSORS DRIVE

“Zorya-Mashproekt” turbines for gas pumping incorporate merits of aviation engines (light weight & overall dimensions, easy transportation, ability fo replacement of the whole unit or its module), as well as reliability & long service life of industrial engines.

The turbines are 3-shaft design: low- and high-pressure compressors driven by own axial turbines, unified for each turbine type and a free power turbine. The combustion chamber is can-annular type.

Each type of the gas turbine has several modifications different in speed, power turbine rotation direction and support construction, which allow to use them as part of domestic and import gas pumping units without gearings.

“Zorya-Mashproekt” gas turbines are adopted for lubrication by same lubrication oil as driven compressor what permits to simplify the compressor stations lubricating system. As a rule, the turbines are equipped with electrical starting devices.

FeaturesFeatures

1 - Variable geometry inlet guide vane2 - Low pressure compressor (LPC)3 - High pressure compressor (HPC)4 - Combustion chamber (CC)5 - High pressure turbine (HPT)6 - Low pressure turbine (LPT)7 - Power turbine (PT)8 - Auxiliary drive gearbox9 - Electric starter10 - Frame

Page 5: Zorya Gas Turbines

UGT 3000 (DE76)UGT 3000 (DE76)

Compressor - axial, 8 stages LPC,

9 stages HPC.

Pressure ratio - 13,5.

Combustion chamber - can-annular

reverse flow with 9 combustion 0liners, TIT - 1020 C.

Gas generator turbines - axial, single

stage LPT and HPT.

3-stage power turbine speed - 9700 rpm.

Start - electric motors AC U=380 V,

N= 70 kW.

Compressor - axial, 8 stages LPC,

9 stages HPC.

Pressure ratio - 14/15,3.

Combustion chamber - can-annular

reverse flow with 10 combustion оliners, TIT - 1015 - 1100 C.

Gas generator turbines - axial, single

stage LPT and HPT.

Power turbine speed - 3000, 4800,

5400, 8200, 9700 rpm.

Start - electric motors AC U=380 V, N=70 kW.

UGT 6000, UGT 6000+(DT71, DV71) UGT 6000, UGT 6000+(DT71, DV71)

Power, kW

Efficiency, %3Heat rate, nm /kW-hr

Exhaust gas mass flow, kg/sec

0Ambient air temperature, C

Effic

ien

cy, %

Po

we

r, M

W

0Exhaust gas temperature, C

Dimensions (LxWxH), m

Weight, ton

0Ambient air temperature, C

Effic

ien

cy, %

0Ambient air temperature, C

0Ambient air temperature, C

Po

we

r, M

W

0Exhaust gas temperature, C

Dimensions (LxWxH), m

Weight, ton

EngineEngine

Power, kW

Efficiency, %3Heat rate, nm /kW-hr

Exhaust gas mass flow, kg/sec

Note: ISO condition

Page 6: Zorya Gas Turbines

UGT 10000 (DN70, DI70, DU70)UGT 10000 (DN70, DI70, DU70)

Compressor - axial, 9 stages LPC,

9 stages HPC.

Pressure ratio - 19,5.

Combustion chamber - can-annular

reverse flow with 10 combustion 0liners, TIT - 1200 C.

Gas generator turbines - axial, single

stage LPT and HPT.

Power turbine speed - 3600, 4800, 6500 rpm.

Start - electric motors AC U=380 V,

N= 70 kW.

Power, kW

Efficiency, %3Heat rate, nm /kW-hr

Exhaust gas mass flow, kg/sec

0Exhaust gas temperature, C

Dimensions (LxWxH), m

Weight, ton

Po

we

r, M

W

Effic

ien

cy, %

0Ambient air temperature, C

0Ambient air temperature, C

Compressor - axial, 9 stages LPC,

10 stages HPC.

Pressure ratio - 19,6.

Combustion chamber - can-annular

reverse flow with 16 combustion оliners, TIT - 1075 1160 C.

Gas generator turbines - axial, single

stage LPT and HPT.0Power turbine speed - 3 00, 5300 rpm.

Start - electric motors AC U=380 V, N= 2 х 70 kW.

Power, kW

Efficiency, %3Heat rate, nm /kW-hr

Exhaust gas mass flow, kg/sec

0Exhaust gas temperature, C

Dimensions (LxWxH), m

Weight, ton

Engine Engine

0Ambient air temperature, C

66

UGT 15000, UGT 15000+ (DB90, DG90, DA91)UGT 15000, UGT 15000+ (DB90, DG90, DA91)

0Ambient air temperature, C

Po

we

r, M

W

Effic

ien

cy, %

Page 7: Zorya Gas Turbines

4

8

12

16

20

24

-35 -25 -15 -5 5 15 25 35 4524

26

28

30

32

34

-35 -25 -15 -5 5 15 25 35 45

o

10

15

20

25

30

35

-35 -25 -15 -5 5 15 25 35 45

22

26

30

34

38

42

-35 -25 -15 -5 5 15 25 35 45

Power turbine - axial, 3 stages.

Power turbine speed - 5300 rpm.

Start - electric motors AC U=380 V,

N=3 x 70 kW.

Compressor - axial, 7 stages LPC,

9 stages HPC.

Pressure ratio - 12,8.

Gas generator turbines - axial, 2

stage LPT and HPT.

Combustion chamber - can-annular 0with 10 combustion liners, TIT - 865 C.

0Ambient air temperature, C

Po

we

r, M

W

Effic

ien

cy, %

Power, kW

Efficiency, %3Heat rate, nm /kW-hr

Exhaust gas mass flow, kg/sec

0Exhaust gas temperature, C

Dimensions (LxWxH), m

Weight, ton

0Ambient air temperature, C

Power, kW

Efficiency, %3Heat rate, nm /kW-hr

Exhaust gas mass flow, kg/sec

0Exhaust gas temperature, C

Dimensions (LxWxH), m

Weight, ton

o

0Ambient air temperature, C 0Ambient air temperature, C

Po

we

r, M

W

Effic

ien

cy, %

Compressor - axial, 9 stages LPC,

9 stages HPC.

Pressure ratio - 21.0

Combustion chamber - can-annular

reverse flow with 16 combustion 0liners, TIT - 1245 C.

Gas generator turbines - axial, single

stage LPT and HPT.

Power turbine speed - 3600, 4850 rpm.

Start - electric motors AC U=380 V,

N=3 x 70 kW.

UGT 16000 (DG 59)UGT 16000 (DG 59)

UGT 25000 (DG80, DI80, DN80, DU80)UGT 25000 (DG80, DI80, DN80, DU80)

Page 8: Zorya Gas Turbines

DE76 gas turbine modification with speed 9700 rpm was developed for the direct drive “Prague Energo” 3RSC56/3RSD56 centrifugal compressor without gearbox. This unit is used for gas pumping in and out at underground gas storage in Czech.

The turbine has absolutely new two channel burners for NOx reduction and a special cage design with many layer sound isolation. The DE76E gas turbine can be used also in “URAL GPU-3C” compressor set developed by “ISKRA SPE”, Perm, Russia.

“ZORYA-MASHPROEKT” Gas Turbines For New & Modernized Gas Pumping Units

“ZORYA-MASHPROEKT” Gas Turbines For New & Modernized Gas Pumping Units

Gas pumping unit driven by DE76E at Stramberkunderground gas storage engine room

Gas pumping unit GPA-C-6,3S with Dt71 gas turbine

The UGT6000 (DT71) gas turbine engine is used in GPU-C-6,3C unit produced by the “FRUNZE” company as serial production. It is also used to replace NK-12ST aeroderivated engine while upgrading GT-750-6 gas pumping units.

This gas turbine is possible to be used for upgrading GTN-6 and GT-6-750 units produced by Russian company “Turbomotorworks”.

There is UGT6000+ boosted version with rated power up to 8MW.

Experience of using “Zorya-Mashproekt” gas turbines as integrated parts of gas pumping units achieves over 25 years. To date most of the gas pumping units based on the DR59 gas turbine has exhausted their service life. The specialists of the company have developed the concept of using the third & fourth generation gas turbines in gas pumping units of compressor stations under construction & modernization for drive replacement, both domestic & foreign ones.

34 modernization projects have been developed for gas pumping units in operation. They include replacement of out-of-date drives with exhausted life by modern, more economical “Zorya-Mashproekt” gas turbines. As a result of such reconstruction, at the working compressor station the modern technical level is being provided something nonstop. The greatest economical effect attributes to the upgrading of the working compressor shops in the conditions, when the new shop construction is either impossible or extremely difficult (in the mountainous pipeline sections, frozen grounds of the Extreme North, in the swamped territories when there are problems with land a purchasing).

“Zorya-Mashproekt” performs projects of on-site drive adjustment in the units under upgrading. It also prepares equipment sets document necessary for gas pumping units upgrading. They include field changing of the equipment available on site (blowers, supports, air intake devises, exhausters, serving the auxiliary equipment). By the customer's desire, the experts of the company can perform automatic control system engineer's project of the units under upgrading. To increase independence of the compressor stations work when the outer power source is off & with the purpose to decrease cost on buying electric power, “Zorya-Mashproekt” suggests using free space after out-of-date engines removed for construction own power station for providing compressor station uninterruptible power supply. “Zorya-Mashproekt” offers power stations with rated power 2.5, 6, 16 MW as well as turbo-expander generating sets.

Page 9: Zorya Gas Turbines

The UGT10000 fourth generation gas turbine has been developed with several modifications:

DN70L with 4-stage left-rotated power turbine and rated speed 4800 rpm for GTC-10-2, GTC-10-4 and GTU-10 gas pumping units upgrading;

DI70P with 3-stage right-rotated power turbine and rated speed 6500 rpm for GTC-10I gas pumping units upgrading;

DI70L with 3-stage left-rotated power turbine and rated speed 6500 rpm for GT-750-6 gas pumping units upgrading;

DU70L gas turbine with modernized flowing part to the power of 16MW by means of steam injection with 4-stage left-rotated power turbine and rated speed 4800 rpm is used in “Aquarius” GPU-16K unit.

GTK-10-4 gas pumping unit modernizationGTK-10-4 gas pumping unit modernization

Air inlet Conteiner Intermediate bearing

Gas compressor

Gas compressor lubricating oil tank

Air for gas turbine cooling

Modernized gas pumping unit GTK-10-4 with DN70L gas turbine at CS Kirovogradskaya, Ukraine

GTK-10-I gas pumping unit modernization via replacing old MS3002 by new one DI70P gas turbine

GTK-10-I gas pumping unit modernization via replacing old MS3002 by new one DI70P gas turbine

Auxiliary mechanism gearbox

Auxiliary alternator

Air inlet modernization

Exhaust gas ventDI70P

Auxiliary mechanism gearbox

Auxiliary mechanism gearbox

Modernized GTK-10-4 gas pumping unit with air inlet chamber and lubricating oil unit in the assembling workshop

Container with gas turbine is manufactured with highest noise insulation degree. Turboblock and air inlet unit integral design gives opportunity to reduce building and assembly jobs period.

Gas compressor lubricating is integrated with gas turbine lubricating oil system, this design gives opportunity to exclude electrically driven pump.

One of the features of this upgrading is the new gas turbine “building in” the acting design scheme of the original unit maintaining all of its functions including house generating drive & united lubricating oil system.

Frequency converter provides constancy of the frequency of the electrical energy produced by the house generator. This converter is used also for gas turbine starter control and provides smooth gas pumping unit starting.

Page 10: Zorya Gas Turbines

The UGT 15000 gas turbine engine has the following modifications:

DG90L, DG90L2 with power turbine frequency 5300 rpm of left rotation to be used in new GPUs of compressor shops:

GPA-C-16S - developed by "Frunze" company (Sumy, Ukraine);

GPA-16 "Ural" - developed by "Iskra" company ((Perm, Russia);

GPA-16 "Volga" (Kazan, Russia);GPA-16 "Neva" (St. Peterburg, Russia);while upgrading GPUs increasing the drive

power:GTK-10-4 (GTK-10-2) developed by NZL (St.

Peterburg, Russia)GPU-10 developed bu "Zorya"-"Mashproekt"

(Nikolayev, Ukraine),GPU-16 developed by "Frunze" company (Sumy,

Ukraine).- DG90P with power turbine speed of 5300 rpm

of right rotation for upgrading Coberra-183 imported units by Cooper -Rolls company.

The main pattern of DG90P engine was installed in 1994 at Bogandinskaya compressor station (Surgutgasprom) as a part of Coberra-182 upgraded unit.

Two compressor shops were upgraded with DG90P engines at Bogandinskaya and Turtasskaya compressor stations.

Some compressor stations with actual efficiency of no more then 20% were upgraded with DG90L2 engine (Surgutgasprom & Volgotransgas companies).

GPU-10 (GPU10-01) upgrading is held by means replacing DR59L second generation engine rating at 10 MW & efficiency of 27% with DG90L rating at 16 MW.

While upgrading new DG90L installation provided housed in the finished serial block from the reserve recourse stock.

They perform upgrading or replacement of the blower supercharger, complex air cleaner, gas exhaust path, automatic control system, as well as ventilation, fuel & lubrication systems changes.

At Vyngapurovskaya compressor station there's also a shop equipped with upgraded GPU16-16S units powered by DG90L2.

DG90L2 engnes as part of new gas pumping units are used by gas transportation & production companies of Ukraine, Russia, Belarus, Turkistan (over 50 engines? As well as to power ammonia compressors at Odessa Port Plant (two engines).

"Zorya"-"Mashproekt" has totally produced over 140 UGT15000 engines in different modifications. The leading engines at Surgutgasprom compressor station have accumulated over 37.00 fire hours.

The gas pumping unit diagram

Gas pumping unit GPA-16C driven by UGT15000 gas turbine

Container with ammonia compressordriven by UGT15000 gas turbine

at Odessa Port Plant

Luboil unit

Inlet air filter

Gas turbineengine

Noise killer

GTE cooler GTE containerSupercharger

Page 11: Zorya Gas Turbines

Sofievskaya compressor station, Ukraine Modernized GPA-25/76 gas pumping in the Sofievskaya compressor station

engine room

Gas pumping unit GPA-26/76 modernization project with using of DN80L gas turbine

Gas pumping unit GPU-16A

Bt their design & parameters turbines of UGT16000 family (DR59, DJ59) are of the second generation, but they have proved themselves as the most reliable at the gas pumping stations.

10MW DR59 with efficiency of 28% is used in GPU-10 & GPU-10-01. “Zorya-Mashproekt” and “KRTZ VOSKHOD” have produced 536 turbines totally. The leading DR59 turbines have accumulated over 100000 firing hours.

DJ59 with efficiency 30% and rated power 16MW is used in GPU-16 developed by Ukrainian company “FRUNZE”. Totally over 120 units like this have been manufactured.

Beginning in 1992, DH59L2 have been widely used for replacing out-of-date drives while upgrading GTC-10-4 & GPU-25/76 units developed by “Nevskiy Zavod” from St. Petersburg, Russia, and replacing COBERRA-182 gas generator from Cooper-Rolls” company. 33 DJ59L2 turbines are working in the upgraded units at 9 compressor stations of “Permtransgas” ltd and “Vologotransgas” ltd companies.

UGT25000 fourth generation gas turbine also has several versions of power turbines in speed & rotation direction:

DN80L with speed of 3300 rpm is used for upgrading GPU-25/76 at Ukrainian & Russian gas pipelines as well as at underground gas storages in Gasli (Uzbekistan).

DI80P with speed of 4850 rpm & right rotation is intended to replace MS5003 engines (manufactured by General Electric) in GTC-25I units produced Nuovo Pignone.

DU80L with speed 4850-5000 rpm and left rotation is intended for “URAL GPU-C-25” and GPU-25C gas pumping units manufactured by Russian company “ISKRA” and Ukrainian company “FRUNZE”.

Over 40 DN80L gas turbines have been produced and leading turbine has been accumulated over 28000 firing hours.

Page 12: Zorya Gas Turbines

It increases efficiency & power of the units, decreasing contaminant emission in combustion products. Thus, 16MW gas pumping unit GPU-16K driven by UGT10000 gas turbine working in a heat recovery unit of “Aquarius” type with energetic & ecological steam injections and water recovery from combustion products. First GPU-16K is in service at Stavischi compressor station, “Cherkassytransgas”, Ukraine.

The merits of the «Aquarius» are high efficiency up to 43% in ISO condition and low emission. The Nox emission levels for 25MW installation equal to 25 ppm at rated power and for 16MW installation they are 35 ppm. CO emissions amount to 30 ppm.

The steam generated in the waste heat recovery boiler is used for generating additional power and for Nox/CO suppression down to 25/30 ppm.

In the contact condenser, which is installed at the top of the waste heat recovery boiler water condensation and recovery out of the steam and gas mixture occur. The “Aquarius” type installations are capable of generating additional fresh water as a result of chemical reaction by fuel burning in the gas turbine when the cooling water in the installation inlet is lower than 30 centigrade.

An experimental 25 MW “Aquarius” installation has been successfully operates since 1995 and has accumulated over 10000 working hours at the “Zorya-Mashproekt” test facility.

Gas pumping unit GPU-16K at Stavischy compressor stationUGT10000 (DU70L) gas turbine with STIG

Ecological STIG

EnergeticalSTIG

“AQUARIUS”

Installation Diagram

“AQUARIUS”

Installation Diagram

1 - gas turbine2 - waste heat recovery boiler3 - contact condenser4 - condensate collector5 - condensate cleaning unit6 - feed water tank 7 - water cooler8 - pump9 - gas compressor

Air

Fuel

Ecological STIG

EnergeticalSTIG

Exhaust gas

Condansate

Cooling water

Steam-Gas Mix

Feed water

Sophisticated Cycle Installations

For Gas Pumping

Sophisticated Cycle Installations

For Gas Pumping

Page 13: Zorya Gas Turbines

In November 1996 Open JSC “GASTURBOSERVICE” - Interregional Center on overhaul and maintenance of Zorya-Mashproekt gas turbine engines being used in gas pumping units was created. Its founders are: “Surgutgasprom” Ltd., Open JSC “Turbomotorworks” and GTR PC “Zorya-Mashproekt”.

Available up-to-date technology, highly precise equipment and skilled personnel provide qualitative repair and maintenance of products, being operated in Russia. Moreover, time of repair and transportation charges are being reduced, customs expenses are being excluded.

Among the Customers of Open JSC “Gasturboservice”are: Yamburggasdobycha, Tumentransgas, Severgasprom, Permtransgas, Uraltransgas, Bashtransgas, Samaratransgas, Tattransgas, etc.

Open JSC “Gasturboservice” performs the repair and maintenance of DR59L, DJ59L, DC59 gas turbine engines for gas pumping units and autonomous power plants.In future Open JSC “Gasturboservice” plans to carry out the repair and maintenance of “Zorya-Mashproekt” third and fourth generation gas turbine engines.

Interregional Center “GASTURBOSERVICE” on the repair of gas pumping units

Interregional Center “GASTURBOSERVICE” on the repair of gas pumping units

Center address:1, Khutoryanskiy Square, Tyumen-625014, RussiaTel/Fax: (3452) 21-34-74, 21-60-46, 21-09-37(095) 719-60-99, e-mail: [email protected]

Page 14: Zorya Gas Turbines

New and up-dating gas pumping unitswith "Zorya”-“Mashproekt" gas turbinesNew and up-dating gas pumping unitswith "Zorya”-“Mashproekt" gas turbines

Engine Type Model Speed, rpmPower, MW Units Type

Efficiency, %(at station)

Initial New

Coberra-182

Coberra-182

DE76

DT71

DN70L

DI70P

DI70L

DU70L

DG90L2

DG90P1

DG90P1

DJ59L2

DN80L

DI80P

DU80L

GPA-3S "Ural'

GPA-C-6,3GT-6-750-6GT-6-750GTN-6

GTK-10-2GTK-10-4

GPU-10GPU-10-1

GTK-10I

GT-750-6

GPU-16K"Vodoley"

GTK-10-2GTK-10-4GPA-C-16SGPU-16SGPA-C-16S "Ural"GPA-16 "Volga"GPA-16 "Neva"GPU-16A

GPA STD 12,5

GPA-16

GTK-10-4

GPA25/16

GPA25/16

GTK25I

GPA-C-25S

GPA-25S "Ural"

Page 15: Zorya Gas Turbines

REFERENCE LISTREFERENCE LIST

DR59 for GPU-10, GPU-10-01 DR59 for GPU-10, GPU-10-01

LocationBeginning ofoperation

Number of gas turbines

Bashtransgas. Total number 48 GPU, total power 480 MWCS Urgala, BashkortostanCS Arkaulovo, BashkortostanCS Polyanzkaya, BashkortostanCS Sharan, Bashkortostan

198019801982-831982-83

88

1616

RUSSIA. Total number 284 GPU, total power 2840 MWRUSSIA. Total number 284 GPU, total power 2840 MW

Volgotransgas. Total number 6 GPU, total power 60 MW

CS Yavasskaya, Mordovia 61995

Kavkaztransgas. Total number 21 GPU, total power 210 MWCS Artezianskaya, KalmykiyaCS Zenzelinskaya, Astrakhan regionCS Zamyanskaya, Astrakhan region

777

Lentransgas. Total number 9 GPU, total power 90 MW OPCS Torzhok, Torzhok townCS Pikalevo, Leningrad regionCS Volhovskaya, Leningrad region

333

198819911995

197819941995

Permtransgas. Total number 8 GPU, total power 80 MW

CS Gremyachinskaya, Perm region1990 8

Samaratransgas. Total number 24 GPU, total power 240 MW

CS Sokovka, Orenburg region 24

19811981198119811995

CS Nyuksenitsa, Vologda regionCS Privodino, Arkhangelsk region CS Urdoma, Arkhangelsk region CS Yubileinaya, Vologda regionCS Sheksna, Arkhangelsk region

88884

Severgasprom. Total number 36 GPU, total power 360 MW

Surgutgasprom. Total number 4 GPU, total power 40 MW

CS Karasulinsraya, Tyumen region

1990

1996 4

1997 5

Tomsktransgas. Total number 5 GPU, total power 50 MW

CS Kozhurlinskaya Novosibirsk region

1982-831982-831984-861985198519901992-20021993

Tyumentransgas. Total number 91 GPU, total power 910 MW

CS Peregrebnoe, Tyumen regionCS Lyalinskaya, Ekaterinburg regionCS Bobrovskaya, Tyumen regionCS Purovskaya, Tyumen regionCS Sosnovskaya, Tyumen regionCS N. Komsomolskaya, Tyumen regionCS Tayozhnaya, Tyumen regionCS N. Ivdelskaya, Ekaterinburg region

1616141214 6 6 7

1981

Uraltransgas. Total number 8 GPU, total power 80 MW

CS Dolmatovskaya, Kurgans region 8

Сhechensgas. Total number 3 GPU, total power 30 MW

CS Chervlennaya, Chechnya1990 8

1981

UKRAINE. Total number 44 GPU, total power 440 MWUKRAINE. Total number 44 GPU, total power 440 MW

Donbastransgas. Total number 8 GPU, total power 80 MW

CS Novopskov, Lugansk region 8

7

7

7

Kievtransgas. Total number 21 GPU, total power 210 MW

CS Romnenskaya, Sumy region

CS Zenkovskaya, Sumy region

CS Reshetilovskaya, Poltava region

1987-98

1987

1987

1515

Page 16: Zorya Gas Turbines

LocationBeginning ofoperation

Number of gas turbines

KAZAKHSTAN. Total number 22 GPU, total power 220 MW

CS Gusyatinskaya, Ternopol region

CS Akkolskaya, Kaspi areaCS Redutskaya, Kaspi areaCS Taimanskaya, Kaspi area

Cherkassytransgas. Total number 7 GPU, total power 70 MW Cherkassytransgas. Total number 7 GPU, total power 70 MW

KAZAKHSTAN. Total number 22 GPU, total power 220 MW

UKRAINE. Total number 8 GPU, total power 128 MWUKRAINE. Total number 8 GPU, total power 128 MW

Prikarpattransgas. Total number 8 GPU, total power 80 MW CS Golyatinskaya, Zakarpatie regionPrikarpattransgas. Total number 8 GPU, total power 80 MW

8

7

787

1991

1996

199819981991

UGT16000 (DJ59) UGT16000 (DJ59)

LocationBeginning ofoperation

Number of gas turbines

RUSSIA. Total number 133 GPU, total power 2128 MWRUSSIA. Total number 133 GPU, total power 2128 MW

Volgotransgas, 22 GPU, total power 352 MW

CS Vyatskaya, Kirov region

CS Morkinskaya, Maryi El Republic

CS Pilnenskaya, Gorky region

Volgotransgas, 22 GPU, total power 352 MW

8 (3 modernization GPA-25/76)

8 (3 modernization GPA-25/76)

6 (GPU-16)

7 (3 modernization GPA-25/76)

5 (GPU-16)

8 (GPU-16)

10 (GPU-16)

5 (modernization GTK-10-4)

5 (GPU-16)

5 (GPU-16)

3 (modernization GTK-10-4)

9 (6 modernization GTK-10-4, 3 modernization GPA-25/76)

10 (GPU-16)

5 (GPU-16)

5 (GPU-16)

5 (GPU-16)

5 (GPU-16)

5 (GPU-16)

5 (GPU-16)

4 (GPU-16)

4 (GPU-16)

3 (GPU-16)

4 (GPU-16)

5 (GPU-16)

Permtransgas, 48 GPU, total power 768 MW

CS Dobryanskaya, Perm region

CS Ocherskaya, Perm region

CS N. Kungurskaya, Perm region

CS Almaznaya, Perm region

CS Agryzskaya, Perm region

CS Vavolzhskaya, Perm region

CS Igrinskaya, Perm region

CS Ordinskaya, Perm region

Permtransgas, 48 GPU, total power 768 MW

Tattransgas, 9 GPU, total power 144 MW

CS Shemordan, Tatarstan

Tattransgas, 9 GPU, total power 144 MW

Tumentransgas, 10 GPU, total power 160 MW

CS N. Komsomolskaya, Tumen region

Tumentransgas, 10 GPU, total power 160 MW

Yamburggasdobycha, 30 GPU, total power 480 MW

DCS-1, Yamburg

DCS-6, Yamburg

DCS-2, Yamburg

DCS-5, Yamburg

DCS-3, Yamburg

DCS-7, Yamburg

Yamburggasdobycha, 30 GPU, total power 480 MW

Kievtransgas, 4 GPU, total power 64 MW

CS Grebenkovskaya, Poltava region

Kievtransgas, 4 GPU, total power 64 MW

Cherkassytransgas, 4 GPU, total power 64 MW

CS Stavishchenskaya, Kiev region

Cherkassytransgas, 4 GPU, total power 64 MW

IRAN. Total number 12 GPU, total power 192 MWIRAN. Total number 12 GPU, total power 192 MW

CS X-1, near Farrashband town

CS X-2, near Nur Abad city

CS X-4, near Zarin Shahr city

1995

1995

1998

1991-1994

1991

1992-1993

1993-1994

1994

1994

1996

1997--2000

1995-1997

1990-2002

1995

1995

1997

1997

1998

2000

1996

1997

1995

1996-2000

1998-2000

DR59 (prolongation)DR59 (prolongation)

Page 17: Zorya Gas Turbines

UGT6000 (DT71)UGT6000 (DT71)

UGT3000 (DЕ76)UGT3000 (DЕ76)

Location

Beginning ofoperation

Number of gas turbines

LocationBeginning ofoperation

Number of gas turbines

CZECH, 1 GPU, power 3 MW CZECH, 1 GPU, power 3 MW

1995 CS Shtremberg 1 (3RS56/3RD56)

RUSSIA. Total number 3 GPU, total power 18,9 MW

Mostransgas, Total number 3 GPU, total power 18,9 MWCS Gavrilov Yam, Yaroslavl regionCS Oktyabrskaya, Stavropol territoryCS Tchaplyginskaya, Lipetsk region

RUSSIA. Total number 3 GPU, total power 18,9 MW

Mostransgas, 1 (modernisation GPA-C-6,3S)1 (modernisation GPA-C-6,3S)1 (modernisation GPA-C-6,3S)

199519951996

UKRAINE. Total namber 16 GPU, total power 100,8 MW

CS Diranka, Poltava regionKievtransgas, 7GPU, total power 44,1 MW

UKRAINE. Total namber 16 GPU, total power 100,8 MW

Kievtransgas, 7GPU, total power 44,1 MW7 (GPA-C-6,3S)1995

2001Prikarpattransgas 7 GPU, total power 18,9 MW

Kharkovtransgas, 2 GPU, total power 12,6 MW

CS Yzhgorodskaya, Zakarpatie region

CS Kupyanskaya, Khharkov region

Prikarpattransgas 7 GPU, total power 18,9 MW

Kharkovtransgas, 2 GPU, total power 12,6 MW

,

1993

7 (GPA-C-6,3S)

2 (modernization GPA-C-6,3S)

Number of gas turbinesLocation

Beginning ofoperation

UKRAINE. Total namber 2 GPU, total power 26 MW

CherkassyCS Stavishchenskaya, Kiev region

CS Kirovogradskaya

transgas, 1 GPU, power 16 MW

Cherkassytransgas 1 GPU, power 10 MW

UKRAINE. Total namber 2 GPU, total power 26 MW

transgas, 1 GPU, power 16 MW

Cherkassytransgas 1 GPU, power 10 MW

1 DU70 (GPU-16K "Vodoley"

1 DN (modernization GTK-10-4)

2002

2002

UGT10000 (DN70, DU70)UGT10000 (DN70, DU70)

CS Stavishchenskaya, Kiev region

Page 18: Zorya Gas Turbines

UGT25000 (DN80) UGT25000 (DN80)

Russia. Total number 15 GPU, total power 375 MW

UKRAINE. Total number 8 GPU, total power 200 MW

2002 CS Agryzskaya, Perm region 3 (modernization GTK-25/76)

2002 CS Ordinskaya, Perm region 3 (modernization GTK-25/76)

2002 CS Tayozhnaya-4, Tyumen region 3 (modernization GTK-25/76)

2002 CS Tayozhnaya-5, Tyumen region 3 (modernization GTK-25/76)

2002 CS N.Komsomolskaya,Tyumen region 3 (modernization GTK-25/76)

1998 CS Romnenskaya, Sumy region 3 (modernization GTK-25/76)

1998 CS Grebenkovskaya, Poltava region 2 (modernization GTK-25/76)

1995 CS Sofievskaya, Cherkassy region 1 (modernization GTK-25/76)

1998 CS Barskaya, Vinnitsa region 2 (modernization GTK-25/76)

Permtransgas, 6 GPU, total power 150 MW

Tyumentransgas, 9 GPU, total power 225 MW

Kievtransgas, 4 GPU, total power 100 MW

Cherkassytransgas, 4 GPU, total power 100 MW

Russia. Total number 15 GPU, total power 375 MW

UKRAINE. Total number 8 GPU, total power 200 MW

Permtransgas, 6 GPU, total power 150 MW

Tyumentransgas, 9 GPU, total power 225 MW

Kievtransgas, 4 GPU, total power 100 MW

Cherkassytransgas, 4 GPU, total power 100 MW

Number of gas turbines

Number of gas turbines

Beginning of operationBeginning

of operation LocationLocation

Number of gas turbines

Number of gas turbines

Beginning of operationBeginning

of operation LocationLocation

RUSSIA. Total number 66 GPU total power 1056 MW

UKRAINE. Total number 6 GPU total power 96 MW

BELARUS. Total number 5 GPU total power 80 MW

1

Volgotransgas, 5 GPU total power 80 MW

Noyabrskgasdobycha, 10 GPU total power 160 MW

Surgutgasprom, 33 GPU total power 528 MW

Yamburggasdobycha, 18 GPU total power 288 MW

Prikarpattransgas, 4 GPU total power 64 MW

1997 CS Zavolzhskaya, Chuvashiya 5 (modernization GTK-10-4)

1998 CS Komsomolskaya, Tyumen region 6

2002 CS Gubkinskaya, Tyumen region 4

1991 CS Bogandinskaya, Tyumen region 5 (modernization GTK Coberra-182)

1995-2002 CS Turtasskaya, Tyumen region 5 (modernization GTK-10-4)

5 (modernization GTK Coberra-182)

1997 CS Vyngapurovskaya-3, Tyumen region 6

1996 CS Demyanskaya, Tyumen region 6 (modernization GTK-10-4)

2001 CS Vyngapurovskaya-1, Tyumen region 6 (modernization GTK-10-4)

2002 DKS-1, Yamburg 6

2002 DKS-3, Yamburg 6

2002 DKS-6, Yamburg 6

2001 CS Tarutinskaya, Odessa region 3

2001 CS Dolyna, Ivano-Frankovsk region 1

1999 Odessa Port Plant 2 "Coberra"

999 CS Nesvizh, Minsk region 5

RUSSIA. Total number 66 GPU total power 1056 MW

Volgotransgas, 5 GPU total power 80 MW

Noyabrskgasdobycha, 10 GPU total power 160 MW

Surgutgasprom, 33 GPU total power 528 MW

Yamburggasdobycha, 18 GPU total power 288 MW

Prikarpattransgas, 4 GPU total power 64 MW

UKRAINE. Total number 6 GPU total power 96 MW

BELARUS. Total number 5 GPU total power 80 MW

UGT 15000 (DG90)UGT 15000 (DG90)

Page 19: Zorya Gas Turbines

SRDP GC “Zorya”-”Mashproekt”

also offers:

Industrial and marine gas turbine engines

Gas turbine propulsion plants

Gas turbine power plants

Gas pumping units

Fuel and pneumatic equipment for gas turbine engines

Waste heat recovery boilers

Another tailor-made industrial equipment

SRDP GC “Zorya”-”Mashproekt”

also offers:

1919

Page 20: Zorya Gas Turbines

Everybody need reliable machines and reliable partners.We make reliable machines.

GTR&PC “Zorya”-”Mashproekt”42a Oktyabrsky prospektNikolaev, 54018, Ukraine.

Tel. +38 0512 50-90-40, 50-25-61, 55-69-92, Fax +38 0512 50-90-50, 55-68-68