A sustainable mobility policy for events in the city centre of Antwerp
Ecomm 2010 – Graz
www.traject.be | 10/04/23 | page 2www.antwerpen.be
Setting
►Antwerp is Belgium's second largest city
►The city of Antwerp has about 480.000 inhabitants
►Antwerp and his districts
www.traject.be | 10/04/23 | page 3www.antwerpen.be
www.traject.be | 10/04/23 | page 4www.antwerpen.be
Events in Antwerp
►Antwerp is an active and lively city
►However, the exact number of events in Antwerp is unknown ► No accurate knowledge of events organized on private locations
► No permission needed
►Number of events on public space is known► Permission needed
► Approximately 2700 applications per year
► 90% are small events (<500 visitors)
► About 100 events attract over 1000 visitors
www.traject.be | 10/04/23 | page 5www.antwerpen.be
Events in Antwerp - Evolution
►Rising number of events every year► 2008 2107 applications
► 2009 2628 applications
► 2010 already 1897 requests
►All annual returning events attract individually more visitors each year
►More and more events occur simultaneously
(same day, same weekend)
www.traject.be | 10/04/23 | page 6www.antwerpen.be
Events in Antwerp - Locations
►Event locations on public space – squares in the historical city
►Private event locations
►Events that form a track through the city► Antwerp 10 Miles & Marathon
► The Giants from Royale Du Luxe
► Passage of the Tour de France 2010
► Antwerp Triathlon
www.traject.be | 10/04/23 | page 7www.antwerpen.be
www.traject.be | 10/04/23 | page 8www.antwerpen.be
Events in Antwerp – (Mobility) Challenges
Policy Document 2006:
Local authority promotes
Antwerp as an event city
“Antwerp is a Dazzling City”
An event director was appointed in 2007
Boom in number of events
Mobility Management was “forgotten”
www.traject.be | 10/04/23 | page 9www.antwerpen.be
Events in Antwerp – (Mobility) Challenges
►The impact of the events put pressure on the city concerning:► Congestion (accessibility of the city or event area)
► Lack off parking spaces
► Dissatisfaction with the organizers
► Small-scale traffic
► Increasing nuisance for residents
► Environmental impact
► Unsafe traffic situations
► Complaints from inhabitants
www.traject.be | 10/04/23 | page 10www.antwerpen.be
Events in Antwerp – Case 10M & Marathon
►Every last Sunday in April
►This year on the 25th of April 2010► 25th edition
► 27.000 participants
► 30.000 visitors
►Besides the 10M and Marathon there were 9 other events in Antwerp happening at the same time
www.traject.be | 10/04/23 | page 11www.antwerpen.be
Events in Antwerp – Case 10M & Marathon
►Since 2008 the track of the 10M & Marathon ran from left bank to right bank and back using both tunnels of the motorway network.
►Most participants have to cross the Scheld to get to the start► Motorways could not be used by motorized traffic during certain hours
► 1 pedestrian tunnel available
► 1 cyclist tunnel available (very low capacity)
► 1 canal touring boat available
► A tram tunnel with high capacity
www.traject.be | 10/04/23 | page 12www.antwerpen.be
Events in Antwerp – Case 10M & Marathon
►2008 (number of participants in 2008 was 15.000)► Only police was involved (permission process)
► Police took traffic management measures but had no many alternatives to reroute car traffic
► The public transport company was faced with the problem of interrupted bus lanes because of the marathon track and could not bring people to their destination
►Consequences:► Some 1000 participants missed the start
► Inhabitants of Antwerp felt hostaged
► On the motorway network around Antwerp congestion ran up to 3 hours
► The organizers of the other events were displeased
www.traject.be | 10/04/23 | page 13www.antwerpen.be
Events in Antwerp – Case 10M & Marathon
► 2009 (number of participants in 2009 was 25.000)► The aim was to prevent congestion and turn the bad public opinion about the
event into a positive one► Police and the public transport company were both involved ► Police took traffic management measures but still had no many alternatives to
reroute car traffic► The public transport company and organizer of the event had made a new track
that avoided bus and tram lanes (traffic management) as much as possible
► Consequences:► Because of the high increase in participants there was not only chaos on the
roads but also chaos in the pedestrian tunnel, cyclist tunnel and on the touring boat
► Inhabitants of Antwerp still felt hostaged ► There was not much improvement compared to 2008
www.traject.be | 10/04/23 | page 14www.antwerpen.be
Events in Antwerp
www.traject.be | 10/04/23 | page 15www.antwerpen.be
Events in Antwerp – (Mobility) Challenges
►The Antwerp 10M & Marathon is not an isolated case
►The local authority acknowledges the lack of mobility management and is convinced that it can help to solve and prevent mobility problems caused by events
► the local authority of Antwerp wants a coherent policy for all types of events
► Study agency Traject was appointed by the city government to define a mobility policy for events in the city centre
www.traject.be | 10/04/23 | page 16www.antwerpen.be
Traject – mobility management
►Independent consultancy specialized in mobility management since 1992
►11 experts, 2 offices (Ghent & Brussels)
►A user oriented approach of transport and mobility
►Working for different types of clients: ► Private companies
► Public sector: authorities, administrations, schools,
► commercial centres or poles of attraction, tourist attractions, events,...
www.traject.be | 10/04/23 | page 17www.antwerpen.be
Traject – mobility management
►Relevant experiences in mobility management for leisure traffic:
► Studies and surveys on sustainable transport to tourist attractions in Belgium and in Europe
European projects: www.smash-events-com, www.iee-stream.com
► Mobility plans and consultancy for large events The Tall Ships Races (1 million visitors), Rock Werchter (320 000 visitors),
Antwerp Book Fair (175 000 visitors), Tomorrowland (90 000 visitors)
► Creating a mobility policy for events in city centres Brussels Capital Region, Cities of Antwerp and Ghent
www.traject.be | 10/04/23 | page 18www.antwerpen.be
A sustainable mobility policy for events in Antwerp
►A mobility plan for every event in the city
► Mobility as an important theme in the planning of the event, from the beginning
► Obtaining commitment of event organizers
► Creating chances for mobility management
www.traject.be | 10/04/23 | page 19www.antwerpen.be
Phase 1: inventory
►Overview of events and mobility plans
► Inventory A survey among 50 events and event locations
Overview of the existing situation Overview of the difficulties they are dealing with Overview of measures already taken
Conclusions Some very good examples and best practices Lack of facts and figures from the organizers Lack of knowledge and know-how Role of the city administration and services is not very clear
www.traject.be | 10/04/23 | page 20www.antwerpen.be
Phase 2: introduction of mobility management
►Encouraging event organizers
► Facilitating A manual for event organizers
Background information on the importance of mobility management for events How to set up a mobility plan for events List of possible measures Best practices in Antwerp Contacts in Antwerp
Support from the city administration and services Inventory of services and contacts Bottom-up & top-down
www.traject.be | 10/04/23 | page 21www.antwerpen.be
Phase 2: introduction of mobility management
►Coaching of 4 events in 2010 ► Guiding 4 event organizers in setting up a mobility plan based on the
manual
► Setting up partnerships for future events
►Implementing regulations► Evaluation of events based on
Number of visitors Impact on the traffic Mobility needs
www.traject.be | 10/04/23 | page 22www.antwerpen.be
Case: Antwerp 10 Miles & Marathon 2010
►Basic ideas in the mobility plan 2010► Accessibility and traffic information
For visitors & participants For inhabitants For people travelling a longer distance
► Inquiry on visitors and participants Where do they come from? Modal split Opinion about the mobility measures
► Spread of the arriving visitors Using different train stations P&R facilities
www.traject.be | 10/04/23 | page 23www.antwerpen.be
Zwijndrecht
Antwerpen-Berchem
Antwerpen-Centraal
Antwerpen-Dam
Antwerpen-Zuid
www.traject.be | 10/04/23 | page 24www.antwerpen.be
Case: Antwerp 10 Miles & Marathon 2010
►Basic ideas in the mobility plan 2010► Encouraging cycling
Secured bike parks on the right bank at every crossing point Discouraging river crossing by bike
► Public transport Encouraging the presale of tickets for PT Spread of the arriving visitors & participants
► Private transport Encouraging the use of coaches P&R facilities on a distance
www.traject.be | 10/04/23 | page 25www.antwerpen.be
M
M
www.traject.be | 10/04/23 | page 26www.antwerpen.be
Conclusions
►The results of the inquiry were an eye opener for the city administration
► Action plan for 2010: Focus on mobility management
Mobility scan incorporated in the demand of permit Event organizers will be evaluated on the efforts they make
An action plan for the main event locations in Antwerp Best practices in mobility management per location
Inhabitants and other traffic coming through Antwerp as target groups in the mobility plans
www.traject.be | 10/04/23 | page 27www.antwerpen.be
Conclusions
►Important partners started working together or joined the City of Antwerp in working out mobility plans for events
► B-Rail (national railway company) involved in organization of events in Antwerp
► Cooperation between De Lijn (trams & busses in Flanders) and B-Rail
► Cooperation with the Flemish Traffic Control Centre for large events
www.traject.be | 10/04/23 | page 28www.antwerpen.be
Conclusions
►A framework for mobility management for events in Antwerp is necessary
► What’s the role & responsibility of the organizer?
► What’s the role of the city’s administration and services?
► Which services can the mobility partners supply for event organizers?