Page 1: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Workmanship and Tests During Construction

Phase

Presented by:Er. Bhagawan Shrestha

Page 2: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Specification

• Definition:A detailed description of the particulars of some projected work in building, engineering, or the like, giving the dimensions, materials, quantities etc, of the work, together with directions to be followed by builders or constructor.

Page 3: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Back ground

• Prevailing Specification approved on July 2001 and enforced to use.

• Contains 31 sections including blank Section 300.

Page 4: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

DOR SPECIFICATIONS• SECTION 100 - GENERAL

• SECTION 200– SITE CLEARANCE

• Section 500 deals with QUALITY CONTROL

• Section 600 deals with MATERIALS AND TESTING OF MATERIALS

• Section 700 deals with PIPE DRAINS , PIPE CULVERTS AND CONCRETE CHANNELS

• Section 900 deals with EARTHWORKS

Page 5: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Section 500 –Quality Control contains:

• 501 SCOPE • 502 CONTRACTOR RESPONSIBLE FOR THE • QUALITY OF THE WORKS• 503 QUALITY CONTROL SYSTEM• 504 QUALITY ASSURANCE PLAN• 505 TESTING PROCEDURES AND SETS OF • TESTS • 506 LABORATORY TRIALS• 507 SITE TRIALS• 508 CONTROL TESTING DURING CONSTRUCTION• 509 ACCEPTANCE TESTS FOR COMPLETED • WORKS OR PARTS OF THE WORKS• 510 SCHEDULE OF TESTS• 511 LABORATORY

Page 6: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

General

All materials incorporated and all workmanship performed shall be strictly in conformity with the requirements of the Specifications and the Contractor shall be responsible for the quality of the works in the entire construction within the contract.

Page 7: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Testing Procedures and Set of Tests

• For ensuring quality of work, materials and workmanship be subjected to testing in accordance with procedures, sets of tests and frequencies as specified in Specifications

• Specified testing frequencies are not restrictive• Engineer directs for the tests to be carried out as

frequently as deemed necessary• Where no specific testing procedure mentioned in

Specifications, tests be carried out as per prevalent accepted engineering practice or directions of Engineer

Page 8: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Laboratory Trials

• Laboratory trials/mixes be carried out by Contractor on materials proposed to be used in works in their natural state.

• laboratory trials establish a relationship between specified requirements of end product and properties which can be determined in field for purpose of construction control.

Page 9: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Site Trials

• Materials, used for laboratory trial, composition of which meets specified requirements and is accepted by Engineer, shall then be used in site trials

• Contractor shall submit the proposal for the site trials to the Engineer at least two weeks before

Page 10: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Site Trials(contd.)

• Site trials for laying and compaction shall be carried out by Contractor on all earthworks and pavement materials proposed for works using same equipment and methods proposed for use in works.

Page 11: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Site Trials(contd.)

• Site trials for concrete mixes as specified shall be carried out by Contractor to demonstrate suitability of his mixing equipment. During site trials, compliance with Specifications for weighing equipment, storage of ingredients, means of transport for concrete, placing, compaction and curing shall be checked by Engineer. During the site trial a full scale sequence including placing and compaction of concrete shall be carried out on a part of works which will represent particular difficulties due to presence of reinforcement, obstructions or others.

Page 12: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Site Trials(contd.)

Site trials demonstrates:I. suitability of materials,II. suitability of equipment for laying and

compacting materials to specified density, and

III. confirmation of achievement of other requirement of completed works.

Page 13: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Site Trials(contd.)

• Each site trial (for earthworks & pavement) to be at least 100 m long and to full width and to the specified depth of materials.

• Site trial be carried out at least 21 days ahead of commencement of related works.

Page 14: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Site Trials(contd.)

Data to be recorded for each site trial:i. Composition and grading of material before site

trial,ii. Composition and grading of material including

bitumen content,

iii. Moisture content at compaction and Optimum Moisture content for that specified compaction,

Page 15: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Site Trials(contd.)

iv. Equipment details like type, size and tyre pressures, frequency of vibration and number of passes made by compaction equipment,

v. Maximum dry density measured on sample before site trials (Lab. Test),

vi. Density achieved,vii. Compacted thickness of the layer

Page 16: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Site Trials(contd.)

• Contractor conducts 8 sets of tests on each 100m length of trial section for each level of compaction effort.

• If all eight sets of results meet specified requirements for material and workmanship, site trial be deemed successful.

• Data recorded in trial becomes agreed basis on which particular material be provided and processed to achieve specified requirements.

Page 17: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

CONTROL TESTING DURING CONSTRUCTION

• All earthworks, pavement layers, and backfill to drainage and other structures shall be subject to control testing (process control) including, if required, testing by the Engineer in accordance with the Conditions of Contract and Clause 503.

• The tests to be carried out and their frequency for the quality control of the works are detailed in the relevant Sections of these Specifications

Page 18: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Testing Schedule (Example)

PART OR COMPONENT

OF THE WORKS

Section/Clause

No of Specification

TESTS FREQUENCY

PIPE DRAINS, PIPE CULVERTS AND CONCRETE CHANNELS

700

MATERIALS FOR RE-FILLING THE TRENCHES

701 Identification : Gradation, Plasticity

Index, CBR

In-Situ Density (95%

MDD)

As specified or required by the Engineer

Page 19: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Testing Schedule (Example)EARTHWORKS FILL MATERIAL

COMPACTION

900

1. Material Identification, MDD, OMC, CBR

2. MC

3. Field Density

1. For each new source and in every 1500 m3

2. For each new source and in every 250 m3

3. One test per 250m2 of each layer

Page 20: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Acceptance testing

• Contractor requests, in writing for Engineer's approval for each layer of each section of earthwork, pavement construction and backfill

• Such request be accompanied by tests results required by Specifications.

• Engineer inspects section for any visible defects including, heaving material (visible during compaction), segregation, and for uniformity of mixing and compaction

Page 21: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Acceptance testing (contd.)

• If visual aspects satisfactory Engineer tests Section of works submitted and informs Contractor in writing of results of tests specifying acceptance or rejection of section or layer concerned

• Work on a layer in no circumstances commences until preceding layer been approved and accepted by Engineer in writing.

Page 22: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Acceptance testing (contd.)

• Contractor fully responsible for protecting and maintaining condition of work submitted for approval.

• any layer left unprotected for more than 24 hours subsequent to approval shall again be subject to construction control testing, and tolerance checks.

• Contractor responsible for making good any subsequent damage due to traffic, ingress of water or any other reason

Page 23: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Section 600 contains

• 601 SCOPE • 602 QUALITY OF MATERIALS

• 603 SOURCES OF MATERIALS

• 604 INSPECTION AND ACCEPTANCE OF MATERIALS

• 605 MATERIALS AND MANUFACTURED ARTICLES

• 606 DEFECTIVE MATERIALS

Page 24: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Section 600

Table 6.3 : Classes of Material Quality

MATERIAL LAA AIV SSS Degradability

Flakiness Crushing

CLASSES % ACV Test Test Index Ratio % % % %

A <25 <20 <12 <5 <20 100B <30 <20 <12 <5 <25 100

C1 <35 <25 <12 <5 <25 80C

C2* <30 <20 <12 <5 <25 -D1 <40 <30 <12 <5 <30 60

D D2* <35 <20 <12 <5 <30 -E1 >35 & <50 <25 <18 <10 - -

E E2 >40 & <50 <30 <18 <10 - -E3 >50 <30 <18 - - -

Page 25: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Table 6.4: Tests Procedures Applicable to Disturbed/Undistributed Samples of Soils and Gravels

Page 26: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Tests Test procedure

Determination of :

i) Moisture Content IS 2720 Part 2 (Oven-drying method)

ii) Liquid Limit IS 2720 Part 5 (Cone Penetrometer or by Casagrande Apparatus) ApparatusaP

iii) Plastic Limit IS 2720 Part 5

iv) Plasticity Index IS 2720 Part 5

v) Linear Shrinkage IS 2720 Part 20

vi) Specific Gravity of Particles IS 2720 Part 3

vii) Particle Size Distribution IS 2720 Part 4

viii) Organic Matter Content IS 2720 Part 22

ix ) Total Sulphate Content IS 2720 Part 27

x) pH Value IS 2720 Part 26 (Electrometric Method)

xi) Mica Content - Manual mineralogical counting

xii) Density-Moisture Content relationship (2.5 kg rammer)

IS 2720 Part 7

xiii) Density-Moisture Content relationship (4.9 kg rammer)

IS 2720 Part 8

xiv) California Bearing Ratio IS 2720 Part 16

xv) Sand Equivalent IS 2720 Part 37 (Mechanical Shaker or Manual Shaker method)

xvi) Field Dry Density IS 2720 Part 28/Part 29

xvii) Unconfined compression test IS2720 Part 10xviii) Consolidation test IS2720 Part 15xix) Direct shear test IS2720 Part 13xx) Triaxial test IS2720 Part 11,12xxi) Hydrometer analysis IS 2720 Part 4xxii) Vane shear test IS 2720 Part 30

Page 27: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Table 6.5 : Tests Procedures Applicable to Stone Aggregate and Fillers

Page 28: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Tests Test Procedure

Determination of:

i) Particle Size Distribution (Gradation)

IS 2386 Part 1

ii) Clay, Silt, Dust in Aggregates IS 2386 Part 2

iii) Flakiness Index IS 2386 Part 1

iv) Specific Gravity IS 2386 Part 3

v) Moisture Content IS 2386 Part 3

vi) Bulk Density,Voids & Bulking IS 2386 Part 3

vii) Soluble Chloride Content BS 812 Part 117

viii) Mica Content Manual mineralogical counting

ix) Water Absorption 1S 2386 Part 3

x) Crushing Ratio Manual counting & weighing

xi) Los Angeles Abrasion IS 2386 Part 4

xii) AIV - ACV IS 2386 Part 4

xiii) Polished Stone Value IS 2386 Part 4

xiv) Degradability Test NFP 94 - 067

xv) Sodium Sulphate Soundness IS 2386 Part 5

xvi) Alkali Aggregate Reactivity Test IS 2386 Part 7

xvii) Bitumen Adhesiveness (Vialit Test)

NFP-98-274-1

xviii) Deleterious Substances IS 2386 Part 2

xix) Sand Equivalent IS 2720 Part 37

xx) Crushing Strength of stone IS 2386 Part 4

Page 29: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Table 6.11: Tests Procedure Applicable to Straight run Bitumen

Tests Test ProcedureDetermination of :

i) Penetration ASTM D 5ii) Softening point (Ring and Ball) ASTM D 36iii) Flash and fire points ( open cup) ASTM D 92iv) Loss on heating ASTM D 6/D1754v) Ductility ASTM D 113vi) Water Content ASTM D1461/D95vii) Solubility in Trichloroethylene ASTM D 2042viii) Specific gravity ASTM D70 ix) Penetration of residue from loss

on heatingASTM D5

Page 30: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Tests Test Procedure Determination of :

i) Kinematic viscosity ASTM D 2170 ii) (a) Flash point (Tag open cup) (RC-MC) ASTM D 3143

(b) Flash point ( open cup) (SC) ASTM D 92 iii) Penetration ASTM D 5 iv) Specific gravity by hydrometer method ASTM D 3142 v) Asphalt residue of 100 pen (SC) ASTM D 243 vi) Water content ASTM D 95 vii) Distillation ASTM D 402 viii) Penetration of residue from distillation ASTM D 5ix) Ductility of residue from distillation ASTM D 113x) Solubility of residue from distillation ASTM D 2042

Table 6.12: Tests Procedure Applicable to cutback Bitumen

Page 31: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Table 6.13: Tests Procedure Applicable to Bitumen EmulsionTest Test Procedures

Determination of :(i)(ii)(iii)(iv)(v)(vi)(vii)(viii)(ix)(x)

Residue on 0.710 mm sieve Residue on 0.150 mm sieve Stability to mixing with coarse aggregateStability to mixing with cement Binder content Engler viscosity Redwood II viscosityStorage stability (short period) Storage stability (long period) Particle charge

BS 434 Part I, Appendix C1

" " " C2 " " " D1

" " " D2

" " " E" " " F1

" " " F2

" " " H1

" " " H2

" " " J

Page 32: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

S.N. Physical characteristics OPC / PSC

HSPC Test Procedure 

i) Fineness, m2/kg: (by Blaine's Air Permeability method)

225 225 IS-4031Part 2  

ii) Setting Time :  (a) Minimum Initial Setting Time (minutes)

45 45IS 4031 Part 5

(b) Maximum Final Setting Time (minutes)

600 600 

iii) Soundness by Lechatelier method, mm, maximum

10 10 IS 4031 Part 3 

iv) Compressive Strength :  Minimum Average Compressive Strength of three mortar cube(N/mm²)  

(a) 3 days 16 27  (b) 7 days 22 37 IS 4031 Part 6  (c) 28 days 33 53  

Table 6.6: Requirements on the Physical Characteristics of Cement

Page 33: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

CONCRETE

The minimum frequency of sampling of concrete of each grade shall be as following:For 1-5 m3 quantity of work - 1 no. of sampleFor 5-20 m3 quantity of work - 2 no. of sampleFor 20 m3 and more quantity of work - 3 no. of sample plus one additional for each 20m3 or part thereof.

At least one sample shall be taken from each shifts of work.

Page 34: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

S.N. Specifications Penetration Grade

60/70 80/100 180/200

i) Penetration, at 25°C (100g-5s), in 0.1 mm 60-70 80-100 180-200

ii) Softening point (Ring and Ball), °C 44-54 41-51 33-42

iii) Flash point ( open cup), °C (min) 250 225 200

iv) Ductility at 25°C, cm (min) 100 100 100

v) Loss on heating (5 h at 163°C) % (max) 0.2 0.5 0.5

vi) Penetration of residue from loss on heating at 25°C (100 -5s) % of initial pen (min)

80 80 80

vii) Specific Gravity at 25°C 1.01-1.06 1.00-1.05 1.00-1.05

viii) Water, % by weight (max) 0.2 0.2 0.2

ix) Solubility in tricloroethylene, % by weight (min)

99.0 99.5 99.5

The number of tests and criteria for conformity shall be as per IS 73.

Table 6.14: Specification for Straight run Bitumen

Page 35: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Table 6.15: Tests Procedure Applicable to Bituminous MixturesTests Test Procedure

Determination of :

i) Moisture and volatile distillates ASTM D 1461

ii) Quantitative extraction of bitumen ASTM D 2172

iii) Specific gravity of compacted mixture ASTM D 1188 & D 2726

iv) Recovery of bitumen from solution ASTM D 1856

v) Coating and stripping ASTM D 1664

vi) Degree of particle coating ASTM D 2489

vii) Maximum specific gravity ASTM D 2041

viii) Degree of pavement compaction AASHTO T230

ix) stability ASTM D1559

Page 36: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

2401 GABIONS

• Gabions shall consist of steel wire mesh crates. Steel wire shall be mild steel wire complying with NS 169-2045.

• Weight of deposition of zinc shall be in accordance with NS 163-2045. Zinc coating shall be uniform and be able to withstand minimum number of dips and adhesion test specified as per NS 163-2045

• Wire shall be woven into hexagonal mesh with minimum of 3 twists

Page 37: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

2401 GABIONS (Contd.)

• Selvedge wire at least 3 gauges heavier than mesh wire

• Gabion wire shall be tested for mass, uniformity and adhesion of zinc coating and tensile strength of the wire itself.

Page 38: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Section 1200 (Contd.)

• 1201 MECHANICALLY STABLE SUBBASE CONTAINS:

1. Scope

2. Sources of Materials

3. Material Requirements- (a) Gravel , (b) Sand, Silty and Clayey Sands, (c ) All Materials4. Compaction Trials

5. Laying and Compaction

Page 39: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Section 1200 (Contd.)6. Proof Rolling

7. Setting out and Tolerances

8. Drainage of Subgrade and Subbase

9. Testing – (a) Process Control, (b) Routine Inspection and Testing

10. Measurement

11. Payment

Page 40: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Mechanically Stable Sub base (Example)

Tests One test in every Min. no of tests per section

Materials:GradationPlasticity IndexMaximum Dry Density and Optimum Moisture Content

Workmanship:Field Density and Moisture Content

200 m3 or part of it and change in source" " " "1000 m3 " " "

500 m2

222

2

Construction Tolerances:Surface LevelsThicknessWidth

10 m25 m200 m

---

Table 12 .2 : Minimum Testing Frequency

Page 41: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Construction & Workmanship Tests

• Earthwork in cutting/Sugradea) Detern of Insitu MCb) Detern of Insitu Density

c) Horizontal Alignment d) Surface Levele) Surface regularity

Page 42: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

Construction & Workmanship Tests

• Granular Sub basea) Gradation of In situ materialsb) LL/PL –PI of In situ materialsc) AIV of In situ materialsd) Detern of In situ MCe) Detern of In situ Density

f) Compacted thicknessg) Horizontal Alignment h) Surface Leveli) Surface regularity

Page 43: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

• Construction Control Testing/Process Control Testing

Unless otherwise directed, values given in these Specifications are minimum values for the properties of materials and the workmanship. They shall be considered satisfactory, if all results of the tests, taken at the frequencies specified, are at least equal to the values given in the relevant Section of these Specifications

Page 44: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.

THE END

THANK YOU

Page 45: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.
Page 46: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.
Page 47: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.
Page 48: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.
Page 49: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.
Page 50: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.
Page 51: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.
Page 52: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.
Page 53: Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.