Page 1: Toyota production-system-bussiness-case-studies-plan-19345
Page 2: Toyota production-system-bussiness-case-studies-plan-19345
Page 3: Toyota production-system-bussiness-case-studies-plan-19345

Topic Outline

Introducing Toyota Australia&

Her Supply Chain Management

By Cong Xue

Page 4: Toyota production-system-bussiness-case-studies-plan-19345

History of Toyota Australia

• Toyota Motor Corporation Australia (TMCA) is a subsidiary of Toyota Motor Corporation (TMC).

• Toyota Australia’s origins go back to 1958.• The commercial vehicle business became

Thesis Toyota in 1971• In 1988, Toyota’s local operations were unified

to form Toyota Motor Corporation Australia• Toyota Australia currently build two models—the

Camry and Avalon series.

Page 5: Toyota production-system-bussiness-case-studies-plan-19345

Toyota Australia Current Business

• Toyota Australia is the second largest vehicle manufacturer in Australia.

• Toyota Australia has exported over 60,000 cars to over 20 different commercial locations worldwide in 2003.

• Toyota is a people oriented organization that sees the development of its staff as a foundation stone for future business prosperity.

• Toyota has long been recognized as one of the most efficient manufacturers in the world

Page 6: Toyota production-system-bussiness-case-studies-plan-19345

Business Context

The business context of Toyota Australia is actually link tothe operating environment that consists of a number offactors.

– The global industry operating environment; – Automotive investment trends; – Policy environment; – International market access; – Australian industry operating environment; and – Government policy environment.

Page 7: Toyota production-system-bussiness-case-studies-plan-19345

Toyota Australia’s supply network

The basic of Toyota Australia’s supply network:

– Supplier Association– Effect of “knowledge sharing network” on

supply chain coordination– Upstream and downstream entities

Page 8: Toyota production-system-bussiness-case-studies-plan-19345

Suppliers Association

• The key to Toyota’s success would appear to be their highly effective supplier integration process that over the past 50 years has enabled the excellence of their internal “hoshin kanri” strategic management, cross functional process based management and Toyota Production System to be shared directly with their direct suppliers.

Page 9: Toyota production-system-bussiness-case-studies-plan-19345

Effect of “knowledge sharing network”

• The effects of knowledge sharing network on the coordination of supply chain and product customization forms the basis of Toyota Production System (TPS).

• The aim is to have members identify themselves as part of an interdependent economic network.

Page 10: Toyota production-system-bussiness-case-studies-plan-19345

The Upstream problems

After a series of research, few critical factors were identified:

– Bundled outsourcing– Logistic challenge – Import of vehicle components

Page 11: Toyota production-system-bussiness-case-studies-plan-19345

Bundled Outsourcing

• One of the important characteristics of Toyota Japan suppliers system in terms of the inter-firm tasking portioning is that the outsourcing ratio is high not only in manufacturing but also in product development.

• There is a difference in terms assembly process and the level of hierarchy in supplier.

• Without bundled Outsourcing, it has first changed the internal process of the supply chain and most importantly, the number of first tier suppliers decreases and many of the suppliers ascended to the higher tiers and the hierarchy of the parts markers.

Page 12: Toyota production-system-bussiness-case-studies-plan-19345

Logistic Challenge

• One advantage of localization is closer relationships facilitate collaborative problem solving.

• Longer supply lines required faster order processing, and this was done electronically.

• Essentially, electronic kanban cards were identical in function to the physical kanban cards used by Toyota in Japan.

Page 13: Toyota production-system-bussiness-case-studies-plan-19345

Import of Vehicle Components

• In the case of Toyota Australia, only 79 per cent of components are local content, with the balance relying on imports.

• This has been highlighted as one of the critical factors in terms of supply chain due to the fact the it affects the supply chain coordination as well as the upstream entities.

Page 14: Toyota production-system-bussiness-case-studies-plan-19345

Upstream Entities

At current, Toyota Australia has an extensive local supplier base from its 98 component suppliers and 300 general suppliers.

In general, suppliers may be broadly classified into three categories:

– Parts suppliers (Key component/ low assets specificity component)

– Raw materials suppliers – Suppliers of equipment and tools

Page 15: Toyota production-system-bussiness-case-studies-plan-19345

Downstream Entities

In general, Toyota Australia has the following downstream entities:

– Warehouse facilities in all major states – Distributors in all major states – Dealer network of over 285 outlets across

Australia

Page 16: Toyota production-system-bussiness-case-studies-plan-19345

Internal entities To build a car, the internal entities of the supply

chain which includes all of the in-house processes used in transforming the inputs from the suppliers are as follows:

– Production of Engines (Once completed, the engines head straight for the final assembly)

– Pressing of steel panels and parts – Welding of car shells – Painting of car shells – Final Assembly

Page 17: Toyota production-system-bussiness-case-studies-plan-19345

Topic Outline

Toyota’s Australia &

Her Current IT Setup

By Simon Chew

Page 18: Toyota production-system-bussiness-case-studies-plan-19345

Topic Outline

IT Solution for Toyota Motor Corporation

(TMC)

Page 19: Toyota production-system-bussiness-case-studies-plan-19345

IT Solution for TMC

• Enterprise Resource Planning System (ERP)

• E-Marketplace

• TradeMatrix system

Page 20: Toyota production-system-bussiness-case-studies-plan-19345

IT Solution for TMC

Enterprise Resource Planning System (ERP)

Page 21: Toyota production-system-bussiness-case-studies-plan-19345

Enterprise Resource Planning System

Why ERP?

Page 22: Toyota production-system-bussiness-case-studies-plan-19345

Enterprise Resource Planning System

• One of the largest automotive companies in the world

• Total of 51 overseas manufacturing companies in 26 countries / locations

• Overseas network consisting of more than 160 importers / distributors and numerous dealers.

Page 23: Toyota production-system-bussiness-case-studies-plan-19345

Enterprise Resource Planning System

• SAP Automotive ERP Suit • Main means of information flow between

Toyota and its counterparts worldwide.• Tighter collaboration links • With SAP, gain:

– Outstanding strategic,– Operational,– Financial,– Marketing positions

Page 24: Toyota production-system-bussiness-case-studies-plan-19345

IT Solution for TMC

E-Marketplace

Page 25: Toyota production-system-bussiness-case-studies-plan-19345

TMC E-Marketplace

• iStarXchange • Initiative with i2 Technologies Inc.• Allow subscripted members able to view a single

catalogue to:– view information on parts – checking the prices and availability– conduct transaction online– forecasting supply and demand – delivery cycle

• Improved forecasting • Enhancing the planning• Enhance deployment and replenishment of the inventory

Page 26: Toyota production-system-bussiness-case-studies-plan-19345

IT Solution for TMC

TradeMatrix system

Page 27: Toyota production-system-bussiness-case-studies-plan-19345

TradeMatrix system

• Initiative with i2 Technologies Inc • Automates with equipment manufacturer

and suppliers in terms of : – site’s inventory management – warehousing – Logistic and shipping

Page 28: Toyota production-system-bussiness-case-studies-plan-19345

Topic Outline

IT Solution for Toyota Motor Corporation

Australia (TMCA)

Page 29: Toyota production-system-bussiness-case-studies-plan-19345

IT Solution for TMCA

• Main SAP Automotive suit ERP system• BEA Web-logic Integration 8.1 (Integrated

within the SAP automotive suit)• Electronic “Kanban”-Card System• Participant of iStarXchange • Major Player in Australian Automotive

Network eXchange (AANX)

Page 30: Toyota production-system-bussiness-case-studies-plan-19345

IT Solution for TMCA

Main SAP Automotive Suit ERP System

Page 31: Toyota production-system-bussiness-case-studies-plan-19345

Main SAP Automotive Suit (ERP)

• Main means of information flow between Toyota Australia and its counterparts worldwide.

• Tighter collaboration links between TMCA and TMC– Logistic and shipping– Overall Value Chain

Page 32: Toyota production-system-bussiness-case-studies-plan-19345

IT Solution for TMCA

BEA Web-logic Integration 8.1

Page 33: Toyota production-system-bussiness-case-studies-plan-19345

BEA Web-logic Integration 8.1

• Integrated within the SAP automotive suit• Main IT Backbone of TMCA• Based on Open Standard• Allow connection to their numerous

partners in the value chain via an assortment of systems in Australia

• Integrate the systems and processes that connects Toyota Australia and its trading partners

Page 34: Toyota production-system-bussiness-case-studies-plan-19345

BEA Web-logic Integration 8.1

• Functions:– Electronic proof of delivery – Online accounts payable status for suppliers– Fleet management integration– The Toyota Vehicle Order Processing

System (TVOPS)– Advance Shipping Notice for vehicle

deliveries– Vehicles inventory synchronization

Page 35: Toyota production-system-bussiness-case-studies-plan-19345

BEA Web-logic Integration 8.1

Customised BEA Application

Page 36: Toyota production-system-bussiness-case-studies-plan-19345

BEA Web-logic Integration 8.1Financial management functions

Page 37: Toyota production-system-bussiness-case-studies-plan-19345

IT Solution for TMCA

SAP vs BEA

Page 38: Toyota production-system-bussiness-case-studies-plan-19345

SAP vs BEA

1st Tier/ 2nd Tier

Suppliers

End Customer

Dealers

Warehouse/ Parts Centers

Manufacturing Plants

International collaboration

Raw Material Suppliers

SAP/BEA

Page 39: Toyota production-system-bussiness-case-studies-plan-19345

IT Solution for TMCA

Electronic “Kanban”-Card System

Page 40: Toyota production-system-bussiness-case-studies-plan-19345

Electronic “Kanban”-Card System

• Identical in function to the physical “kanban” cards used by Toyota in Japan

• 4 main purpose:– Sole means of requesting new parts – Send for every order shipment – Send to a specific supplier plant – Establishing the mix and volume criteria for

assessing if an order was correct

Page 41: Toyota production-system-bussiness-case-studies-plan-19345

Electronic “Kanban”-Card System

“Kanban”= Card (Japanese)

Page 42: Toyota production-system-bussiness-case-studies-plan-19345

Electronic “Kanban”-Card System

SYSTEM

PARTSSUPPLIER

TOYOTA(TMCA)

PlanningPlanning

Despatching

AccountsReceivable

AccountsPayable

Receiving

Material Requirements Forcast

Remittance Advice

BANKING

OrdersForecasts

ProductionLine

Kanban Sorting

Delivery Docket

Delivery Docket

Goods

Kanbans

Kanbans

ANSI X12 830

EDIFACT REMADV

EFTEFT

Page 43: Toyota production-system-bussiness-case-studies-plan-19345

IT Solution for TMCA

Participant of iStarXchange

Page 44: Toyota production-system-bussiness-case-studies-plan-19345

Participant of iStarXchange

• Main e-marketplace between TMCA and its counterparts worldwide

• Allow subscripted members able to view a single catalogue to:– view information on parts – checking the prices and availability– conduct transaction online– forecasting supply and demand – delivery cycle

• Improved forecasting outside Australia• Enhancing the planning outside Australia• Enhance deployment and replenishment of the inventory

Page 45: Toyota production-system-bussiness-case-studies-plan-19345

IT Solution for TMCA

Australian Automotive Network eXchange (AANX)

Page 46: Toyota production-system-bussiness-case-studies-plan-19345

Australian Automotive Network eXchange

• Four major car manufacturers in Australia are involved

• Numerous service providers and non-key suppliers

• Provides IP based Extranets for the automotive industry in Australia

• Operates as a virtual point network (VPN)• Allows users to send date to each other in

a reliable and secure manner

Page 47: Toyota production-system-bussiness-case-studies-plan-19345

Australian Automotive Network eXchange

• Main components:

– A network that is based on available Internet technology

– Operated by agreed and standardized service levels.– Demonstrating proactive management of trading

partner connections– Practice the best standard of security and privacy for

transactions and interoperability between service providers

Page 48: Toyota production-system-bussiness-case-studies-plan-19345

Australian Automotive Network eXchange

• Benefits includes:– Pervasive supply chain communications– Rapid application deployment across the

supply chain– Lower cost of EDI– Faster Business Cycles– Simpler integration into trading partners' and

customers' online e-business systems and strategies

Page 49: Toyota production-system-bussiness-case-studies-plan-19345

Australian Automotive Network eXchange

TradingPartner

TradingPartner

AANXO Monitor

CASP Keytrust

Community Directory &

Authentication

FirewallHardware Gateway

Router

Permanent Connection

Firewall Hardware Gateway

Router

Permanent Connection

Dialup trading Partner

IBM Compatible

Laptop Computer

Modem

Modem

Software Gateway

ConnectEquant

Exchange Point

AANX Framework

Page 50: Toyota production-system-bussiness-case-studies-plan-19345

IT Solution for TMCA

Problem Statement

Page 51: Toyota production-system-bussiness-case-studies-plan-19345

IT Solution for TMCA

Weaknesses • Lack of alternatives in the domestic supplier

base and risk of currency exposure• Problems arising in linear supply chain• Over-reliance on forecast planning for

production• Lack of Vertical industrial relations environment

Page 52: Toyota production-system-bussiness-case-studies-plan-19345

IT Solution for TMCA

Lack of alternatives in the domestic supplier base and risk of currency

exposure

Page 53: Toyota production-system-bussiness-case-studies-plan-19345

IT Solution for TMCA

• TMCA’s supplier agreements have to be obtained with the approval of the TMC

• Import costs and extended time taken for components to arrive in Australia hinder TMCA’s JIT system.

• Currency exposure will cause too great a financial risk for TMCA

• Components also take longer to arrive the plant • Affect on the overall production costs and time taken to

produce a “locally produced” Toyota cars

Lack of alternatives in the domestic supplier base and risk of currency exposure

Page 54: Toyota production-system-bussiness-case-studies-plan-19345

IT Solution for TMCA

Problems arising in linear supply chain

Page 55: Toyota production-system-bussiness-case-studies-plan-19345

IT Solution for TMCA

• Dispersed geographical location of the TMCA supply chain infrastructure

• Cannot currently communicate and interact with other members further downstream

• No collaborate in spite of TMCA’s involvement with the AANX network

• Escalate problems with ongoing redundant supplier delivery expenses

Problems arising in linear supply chain

Page 56: Toyota production-system-bussiness-case-studies-plan-19345

IT Solution for TMCA

Over-reliance on forecast planning for production

Page 57: Toyota production-system-bussiness-case-studies-plan-19345

IT Solution for TMCA

Over-reliance on forecast planning for production

SYSTEM

PARTSSUPPLIER

TOYOTA(TMCA)

PlanningPlanning

Despatching

AccountsReceivable

AccountsPayable

Receiving

Material Requirements Forcast

Remittance Advice

BANKING

OrdersForecasts

ProductionLine

Kanban Sorting

Delivery Docket

Delivery Docket

Goods

Kanbans

Kanbans

ANSI X12 830

EDIFACT REMADV

EFTEFT

Page 58: Toyota production-system-bussiness-case-studies-plan-19345

IT Solution for TMCA

Lack of Vertical industrial relations environment

Page 59: Toyota production-system-bussiness-case-studies-plan-19345

IT Solution for TMCA

• Currently industrial relationships with automotive manufacturers in terms of sharing suppliers

• Current AANX network relying on the freight company to do all the logistics planning

• Automotive shipments require specialised vehicle transport ships

Lack of Vertical industrial relations environment

Page 60: Toyota production-system-bussiness-case-studies-plan-19345

IT Solution for TMCA

Business Goals

Page 61: Toyota production-system-bussiness-case-studies-plan-19345

IT Solution for TMCA

Business Goals1. Provide a comprehensive domestic

supplier base 2. Provide initiatives for a non-linear, hub-

based supply chain system 3. Provide real-time updates on demand

and supply allocation 4. Vertical industry logistics collaboration

Page 62: Toyota production-system-bussiness-case-studies-plan-19345

IT Solution for TMCA

Solutions Overview

Page 63: Toyota production-system-bussiness-case-studies-plan-19345

IT Solution for TMCA

Goal 1: Provide a comprehensive domestic supplier baseSolution: Implementation of a supplier website

Goal 2: Provide initiatives for a non-linear, hub-based supply chain system Solution: An agent-based e-marketplace initiative.

Goal 3: Provide real-time updates on demand and supply allocationSolution: Real-time tracking function module incorporated into the current

electronic BEA system

Goal 4: Vertical industry logistics collaborationSolution: An intelligent logistic coordinating agent in the form of a

collaborative e-logistics hub.

Page 64: Toyota production-system-bussiness-case-studies-plan-19345

Solution 1

Solution 1Implementation of a supplier website

By Joseph Baez

Page 65: Toyota production-system-bussiness-case-studies-plan-19345

Solution Description

• Goal 1 – Provide a Comprehensive Domestic Supplier Base

SOLUTION: Implementation of a supplier web site– U.S. version of Toyota supplier web site

• Toyota Supplier.comwww.toyotasupplier.com

Page 66: Toyota production-system-bussiness-case-studies-plan-19345

Supplier Website

Page 67: Toyota production-system-bussiness-case-studies-plan-19345

Supplier Website• TMCA focused on core competencies in

– high-end design– engineering and– system integration

• Toyota Australia needs highly focusedcore competency oriented suppliers.

• Small and diverse companies though have the ability to display such potential to add– Innovation– Flexibility and– Strength to TMCA’s supply base.

Page 68: Toyota production-system-bussiness-case-studies-plan-19345

• TMCA first has to open its doors to the domestic market suppliers– Invest in their new concept of supply base

• Target: 100% domestic suppliers

• Supplier-centric web site– Provide – opportunities

to expand TMCAsupplier network.

Supplier Website

Page 69: Toyota production-system-bussiness-case-studies-plan-19345

Supplier Website

Figure 6. Access Flow From ToyotaAustralia Suppliers web site

Page 70: Toyota production-system-bussiness-case-studies-plan-19345

Reasoning behind Goal 1 – The Business Needs

• Many of TMCA’s car components have to be imported due to the lack of domestic suppliers

– Application of the “right part at the right place at the right time” concept or JIT to lack the optimal efficiency throughout the TMCA supply chain.

• The implementation of a comprehensive domestic supplier base is essential.

• Provision of collaborative web site linking current TMCA online presence which provides similar functions to the Toyota supplier’s web site currently in use in North America

– Allowing TMCA to have comprehensive overview of their current suppliers.– Also reducing the red-tape involved to be part of the TMCA supply chain; and

most importantly– Provides TMCA with a channel to disseminate important supplier related

information to its upstream entities.

Supplier Website

Page 71: Toyota production-system-bussiness-case-studies-plan-19345

• Web site functions– Potential suppliers will be able to acquire information on the requirements of

becoming part of TMCA’s supplier network• Potential suppliers need only to download/complete an online form

to join the network• Information such as

– Supplier’s guide– Community activities; and– Any core information about TMCA’s current supplier’s network can be obtained from the

website.

– Connection links provided to domestic e-Marketplace• Registered e-Marketplace members:

– Able to enjoy the privileges on what the e-Marketplace is offering• To be discussed in Solution 2

• New opportunities for potential suppliers as well as existing suppliers who possess the capabilities to improve TMCA’soverall supply chain process using this proposedcollaborative web site.

Supplier Website

Page 72: Toyota production-system-bussiness-case-studies-plan-19345

Solution 2

An agent-based e-marketplace initiative

Page 73: Toyota production-system-bussiness-case-studies-plan-19345

Solution Description

• Goal 2 – Provide initiatives for a non-linear,hub-based supply chain system

SOLUTION: Agent-Oriented Domestic e-Marketplace

Page 74: Toyota production-system-bussiness-case-studies-plan-19345

Agent Oriented Domestic Marketplace

Figure 7: Logical concept of the Domestic e-Marketplace

Page 75: Toyota production-system-bussiness-case-studies-plan-19345

Agent Oriented Domestic Marketplace

General Overview• Proposed e-Marketplace functions

– Will be able to support a broader base of services given further growth in e-Market infrastructure

– Baseline interaction and directory services– Specialty market services, such as:

• Dynamic trading;• Cooperative supply chain integration

and management– Enables and facilitates the relationship between

business participants• Suppliers and service providers; and• Supporting systems

Page 76: Toyota production-system-bussiness-case-studies-plan-19345

Agent Oriented Domestic Marketplace

• Proposed e-Marketplace functions (contd.)– Many-to-many relationships supported between TMCA

and these business partners.– Enables both TMCA and suppliers to leverage

economies of scale in their trading relationships– Allows access to a more liquid marketplace

• Further allows the use of dynamic pricing models– e.g. Auctions (one of the services provided in

the proposed e-marketplace)– Improve the economic efficiency of the market

where uncertainty about prices and demands are common.

Page 77: Toyota production-system-bussiness-case-studies-plan-19345

Agent Oriented Domestic MarketplaceIntegration with existing systems

• e-Marketplace architecture accommodates and supports interfaces to the existing business models of the participant entities through cooperative supply-chain integration and management– To provide smooth and effective integration at the business

level

• There is a need for well-accepted interoperability standards, which must be meshed for supply chain integration to meet business demands.

• e-Marketplace corresponds with the supply chain with flexibility and agility in responding to customer demand shifts without conflicts in resource utilization.

Page 78: Toyota production-system-bussiness-case-studies-plan-19345

Integration with existing systems (contd.) • Fundamental objective improve coordination within

and between various participant business entities in thesupply-chain

• The increased coordination can lead to:– Reduction in lead times and costs– Alignment of interdependent

decision-making processes– Improvement in the overall performance of each

participant in the chain as well as the supply chain itself.

Agent Oriented Domestic Marketplace

Page 79: Toyota production-system-bussiness-case-studies-plan-19345

Agent Oriented Domestic Marketplace

Integration with existing systems (contd.)

Figure 8: Logical concept of system Integration.

Page 80: Toyota production-system-bussiness-case-studies-plan-19345

Agent Oriented Domestic Marketplace

Agent-Oriented e-Marketplace• Handles complex and non-deterministic interactions

usually involved in e-Marketplace– E.g. Auctions and ad-hoc service integrations

• Components of proposed e-Market system for TMCA will be able to change its configuration to participate in different, often simultaneous roles in e-Marketplaces.– Completes tasks that would be manually impossible.

• e-Marketplace agents play several roles– Will be able to coordinate, cooperatively or

competitively, with the other agents, including HR

Page 81: Toyota production-system-bussiness-case-studies-plan-19345

Figure 9: The architecture of the e-Auction within the proposed e-Marketplace

Agent Oriented Domestic Marketplace

Page 82: Toyota production-system-bussiness-case-studies-plan-19345

Agent Oriented Domestic Marketplace

Agents for the proposed e-Marketplace: • User interface agents

– support and collaborate with users in the same work environment to achieve the users’ goals

• Business-specific service agents– Specialists that provide a collection of business-services available in

the e-Marketplace– Performing the functionality of a business service is typically the

cooperative integration of several agents including:• business-specific service agents; and• market service agents

– Acts as a representative in the e-Marketplace for some functionality that is based on legacy applications or libraries, such as a product catalogue web site

Page 83: Toyota production-system-bussiness-case-studies-plan-19345

Agent Oriented Domestic Marketplace

Agents for the proposed e-Marketplace (contd.) • Market service agents:

– Specialises in providing a collection of functions for generice-Businesses in e-Marketplace environments in which a single entity (usually an agent) can perform its tasks in the e-Marketplace.

– Market services (value-added and core services) are horizontal,i.e., services that are used in several business domains by several business entities.

• Integration service agents– Also provide a collection of integration functions for a cooperative distributed

system in which a single entity (agent, component, object, etc.)can perform its tasks.

– Used by several distributed entities. E.g. a brokering agent provides a capability-based integration service in the e-Marketplace.

• Another type of integration agent provides view-integration,which is a service to merge and map the description of business-objects (e.g., source schemas) in the e-Marketplace supported by the business ontology into an integrated view or schema

Page 84: Toyota production-system-bussiness-case-studies-plan-19345

Agent Oriented Domestic MarketplaceReasoning behind Goal 2 – The Business Needs• The acquisition process of parts, materials and supplies from

TMCA’s 100+ suppliers can be slow, expensive and ineffective

• A “milk run” system could be possible within thesegroups of suppliers.

– No coordination among suppliers have been established Currently a missed opportunity

• Current electronic Kanban (card) system is the only existing mechanism for ordering supplies between TMCA and its suppliers;

• A linear supply chain is not able to efficiently support the JIT productions as significant collaboration among entities within the supply chain.

• For these reasons an agent-based e-marketplace initiativewill be suitable

– TMCA will be able to eliminate its existing linear supply chain system to permit supplier collaboration and integration.

Page 85: Toyota production-system-bussiness-case-studies-plan-19345

Topic Outline

Solution 3

Real Time Inventory Tracking Module

By Nurhazman Abdul Aziz

Page 86: Toyota production-system-bussiness-case-studies-plan-19345

Solution 3 :Real Time Inventory Tracking Module

Why did introduce this module?

• GOAL 3: Provide real-time updates on demand and supply allocation

• Solution: Real-time tracking function module incorporated into the current electronic BEA system

Page 87: Toyota production-system-bussiness-case-studies-plan-19345

General Overview

• A complete modular solution,• reduce the bullwhip effect which causes

shifts in orders up and down the supply chain,

• eliminating any stockpiling cause by the current forecast method of determining the quantity of components needed for the productions.

Page 88: Toyota production-system-bussiness-case-studies-plan-19345

General Overview

• to provide process visibility across the value chain, giving suppliers greater control over the process and

• ensure synchronization of information with all partners regardless of size or geographic location.

Page 89: Toyota production-system-bussiness-case-studies-plan-19345

Graphical Overview

Page 90: Toyota production-system-bussiness-case-studies-plan-19345

The Real Time Inventory Tracking Module

• To be incorporated into the BEA system, which comprises of 4 agents

– Forecast Agent– Inventory Agent– Order Agent– Multi - Tier Visibility Agent

Page 91: Toyota production-system-bussiness-case-studies-plan-19345

Details of the Desired Agents to be work as

Forecast Agent • enables suppliers to rapidly align demand and supply in the mid-to-long-

term planning horizon, • allowing customers and their partners to arrive at a consensus forecast or

plan.• provides alerts and notifications of demand supply mismatches and • can support a single-phase or two-phase commit planning process.

Inventory Agent • enables suppliers to align demand and supply by providing visibility to

inventory status levels at multiple internal and external locations, as well as in-transit positions, enabling optimal levels of inventory.

• allows partners to exchange key inventory-related information, such as demand-pull requests and target inventory levels

• can be used to track supplier compliance to contract obligations such as min/max inventory levels.

• exception alerts can be configured to flag any inventory-level violations.

Page 92: Toyota production-system-bussiness-case-studies-plan-19345

Details of the Desired Agents to be work as

Order Agent• enables suppliers to manage and track the entire purchase order lifecycle

through TMCA’s supply process. • Suppliers can manage and track, in real-time, the complete end-to-end

process for discrete, replenishment, demand pull and/or blanket purchase orders from order creation through shipment, receipt, invoicing and payment.

Multi-Tier Visibility Module • allows TMCA to extend their demand/supply planning, order management

and inventory management workflows beyond their first-tier partners to provide visibility to the processes executed between tier two, three and four partners.

• allows to monitor demand/supply disconnects and exceptions throughout the extended supply chain,

• providing tools to help identify the impact of problems identified multiple tiers away.

Page 93: Toyota production-system-bussiness-case-studies-plan-19345

A Suitable Scenario

• The interest of this system is focused on a complete solution to provide a real-time updates on the demand and supply allocation.

• one of the distributors of TMCA has just received an order of purchase of a locally made Toyota Camry.

• logs the order into the current BEA system, the information will immediately be sent Toyota Vehicle Order Processing System (TVOPS).

• the real-time inventory module will acquire the new order information and be analysed.

• sent to the respective suppliers to be updated onto their own system.

• With such message flow, suppliers can get their supply ready for the next delivery to meet the JIT production in the shortest possible time needed.

Page 94: Toyota production-system-bussiness-case-studies-plan-19345

Topic Outline

Solution 4

An agent-based transport and logistics coordination system

Page 95: Toyota production-system-bussiness-case-studies-plan-19345

Solution 4

An agent-based transport and logistics coordination system

Why did introduce this module?

• Goal 4: Vertical industry logistics collaboration

• Solution: An intelligent logistic coordinating agent in the form of a

collaborative e-logistics hub.

Page 96: Toyota production-system-bussiness-case-studies-plan-19345

General Overview

• An agent-based transport and logistics coordination system (collaborative e-market), are designed to accomplish transport and logistic coordination tasks among different automotive manufacturers in Australia.

• Consist of 4 generic roles agents in supply chain:• Distribution Hub Agent • Logistics Coordinator Agent, • Manufacturer Agent • Transporter Agent.

Page 97: Toyota production-system-bussiness-case-studies-plan-19345

Framework for agent based supply chain coordination

The Distribution Centers of individual automotive manufacturers will send their distribution requirement (DRP) to a Logistics Coordinator who will transform the DRP into transport and manufacturing requirements.

These requirements will be broadcast to the available transporters and manufacturer’s plants so that they could work on their bids.

After the bids are received, the logistics coordinator will work on a global optimized solution before committing the distribution centers.

Page 98: Toyota production-system-bussiness-case-studies-plan-19345

Logistic Optimisation within Australia

How does the logistics optimisation works within Australia:

• Based on ordered demand established, the Distribution Hub Agent calculates the distribution requirements.

• pass the DRP to the Logistics Coordinator Agent by pre-defined data interface. logistics coordinator splits the requirement into manufacturing and transportation requirements.

• Logistics Coordinator Agent divides the distribution requirements based on a historical knowledge base.

• In this database, the records show for a product, how long it will take for the Manufacturing Plants to produce a specific quantity, and how long it will take for the Transporters to deliver as shown in Table next

Page 99: Toyota production-system-bussiness-case-studies-plan-19345

Logistic Optimisation within Australia

5. In the first round of coordination, the “Price” afforded by the Distribution Center is not given to the Manufacturing Plants and the Transporters.

6. Instead, the Logistics Coordinator waits for the service providers to bid with price.

Page 100: Toyota production-system-bussiness-case-studies-plan-19345

Logistic Optimisation within Australia

• The Transporter Agents perform local optimization using their own data on routes, schedules and consignments.

• The Manufacturer Agents will perform local optimization using data on inventory, capacity and processing times.

• The results of the optimization will be transferred to the Logistics Coordinator Agent for global optimization.

Page 101: Toyota production-system-bussiness-case-studies-plan-19345

Global Optimisation

• After the Manufacturer and Transporter Agents finish local optimization process, they will commit the orders back to the Logistics Coordinator Agent.

• to combine the respective commitments to produce joint commitments by summing up price and lead times (for Q1, Q2 and Q3 respectively)

Page 102: Toyota production-system-bussiness-case-studies-plan-19345

Global Optimisation

• The optimization searching process is to find the optimal point (see Figure 12) which with acceptable difference with that of the customer requirement (with quantity, price and due date).

• If the point identified is still not acceptable, a boundary box will be defined around the optimal point to set the lower and upper limits so that a second round of bidding can be done. This process will be repeated until the solution converges.

Page 103: Toyota production-system-bussiness-case-studies-plan-19345

A Suitable Scenario• The interest of this system is focused on improving the current logistic

demand to provide customers with the fastest delivery of their vehicles.• wish to send 20 cars to a country. • not feasible for TMCA to ship the cars.• With the system, TMCA invites other automotive manufacturers to join

collaborative e-logistic marketplace.• individual automotive manufacturers will submit their orders to the e-

marketplace.• Together with the shipping information provided by the freight companies,

the system will conduct an optimization searching process based on manufacturer’s requirements (quantity, designation, price and due-date) and the shipping details until the search has reached a optimal point when is feasible for the shipment to be made to the country or even nearby ports with the least time needed for the vehicles to arrive to their final designations.

Page 104: Toyota production-system-bussiness-case-studies-plan-19345

Integrating the four solutions in a big solutions

Page 105: Toyota production-system-bussiness-case-studies-plan-19345

Integrating is made possible• In order to overcome the weaknesses as previously identified, the team have provide

with individual solution to address each weakness.

• the proposed solutions are based on open standards means that is inherently easy to modify.

• designed to be flexible,

• allows the stakeholders to decide on which system is to be integrated and which system to be run alone.

• Additionally, exposing functionality and data as services across the enterprise also helps TMCA reduce overhead by eliminating the need for infrastructure duplication.

• the messaging-oriented nature of these solutions enables the team to link sales, marketing, manufacturing, and financial applications in real-time, which improves customer service by making up-to-the-minute information accessible across our value chain.

• Therefore, the team strongly suggests the implementation of the integrated solution.

Page 106: Toyota production-system-bussiness-case-studies-plan-19345

Topic Outline

Financial Analysis

By Loh How Whay

Page 107: Toyota production-system-bussiness-case-studies-plan-19345

Financial Analysis

• Increased ROI on Existing System

– Toyota’s WebLogic platform

– WebLogic development environment is built on the standards-based Java 2 Enterprise Edition (J2EE) platform

Page 108: Toyota production-system-bussiness-case-studies-plan-19345

Financial AnalysisDevelopment Cost

Team of developers required by TMCA:Team of developers required by TMCA: 11 Project LeaderProject Leader 2 2 System Analysts System Analysts 10 10 ProgrammersProgrammers SALARIES AND WAGES

Team member Salary/wages for project

Project Leader $50,000.00

Senior system analyst $35,000.00

System analyst $30,000.00

Programmer analysts $60,000.00

Programmers $160,000.00

System programmers $50,000.00

Total salaries and wages $385,000.00

Page 109: Toyota production-system-bussiness-case-studies-plan-19345

Financial Analysis

Development Costs GraphDevelopment Costs Graph

SUMMARY OF DEVELOPMENT COST

Expenses Amount

Salaries/wages $385,000.00

Equipment/installation $100,000.00

Trainning $200,000.00

Facilities $120,000.00

Utilities $70,000.00

miscellaneous $100,000.00

Licenses $10,000.00

Support Staff $50,000.00

Total $1,035,000.00

Page 110: Toyota production-system-bussiness-case-studies-plan-19345

Financial Analysis

SUMMARY OF ANNUAL OPERATING COSTS

Recurring expense Amount

Connectivity $50,000.00

Equipment/installation $20,000.00

Programming support $80,000.00

Training & ongoing assistance $120,000.00

Advertising $50,000.00

Total recuring costs $320,000.00

Annual Operating Costs Annual Operating Costs GraphGraph

Page 111: Toyota production-system-bussiness-case-studies-plan-19345

Financial Analysis

Sample Benefits GraphSample Benefits Graph

SAMPLE BENEFITS

Benefits/cost saving Amount

Increased localization of parts $300,000.00

Efficiency and flexibility in dealing with suppliers. $200,000.00

Reduced shipping costs $250,000.00

Increased sales of cars/parts $1,300,000.00

Other savings $100,000.00

Total annual benefits $2,150,000.00

Page 112: Toyota production-system-bussiness-case-studies-plan-19345

Topic Outline

Net Present Value&

Return of Investment

Page 113: Toyota production-system-bussiness-case-studies-plan-19345

NPV & ROI

Page 114: Toyota production-system-bussiness-case-studies-plan-19345

Topic Outline

Financial Challenge

Page 115: Toyota production-system-bussiness-case-studies-plan-19345

Financial Challenge• PROJECT COST

– Professional constraint programmers + months of development time– Significant investment amount from TMCA.

• THE NEED TO TRAIN INTERNAL AND EXTERNAL USERS– Company staff, suppliers, customers, automotive manufacturers, etc.

• PROPER INFRASTRUCTURE NEEDS TO BE PROVIDED– Users need to be capable of operating the system

with minimal technical support– Requires a significant amount of time and money

• Crucial to ensure project success.

• THE NEED TO RETAIN SYSTEM EXPERTS– None of required skills currently available to develop/support the system

• PREPARING FOR POSSIBLE OUTCOMES – Toyota should be prepared for project failure– A contingency plan

• fallback to other alternatives e.g. AANX.

Page 116: Toyota production-system-bussiness-case-studies-plan-19345

Topic Outline

Organisational Challenge

Page 117: Toyota production-system-bussiness-case-studies-plan-19345

Organisational Challenge

• COLLABORATION WITH PROJECT TEAM– IT staff to work closely with the development team

• Business requirements and project goals to be met– Constant communication between the development team and TMCA staff

• COLLABORATION WITH AUTOMOTIVE MANUFACTURERS, SUPPLIERS & CUSTOMERS

– Crucial requirements need to be identified → successful solution – Effective system use by users

• FOSTERING NEW RELATIONSHIPS– Marketplace will open up to potential customers and business partners

• Vertical/Horizontal industry • Requires better customer & supplier relationship management

• ADVERTISING THE NEW SYSTEM– Internal and external users mist be informed of new system

• E.g. automotive manufacturers, suppliers & customers

Page 118: Toyota production-system-bussiness-case-studies-plan-19345

Organisational Challenge

• TRAINING USERS WITH NEW SKILLS & KNOWLEDGE– TMCA Needs to provide proper training methods to both internal and

externalusers of the system;

– USERS: Internal staff, suppliers, manufacturers & customers.

• ACHIEVING GLOBAL REACH– International market remains major challenge for TMCA

• CONVINCING TMC TO ADOPT THE SYSTEM – Pressure on TMCA for successful and reusable implementation

• MONOPOLY ISSUES– Blackbox method– Solution 4 will be an optional solution which requires careful

consideration

Page 119: Toyota production-system-bussiness-case-studies-plan-19345

Financial Feasibility

• 6 months to develop and deploy→ Complexity

• Benefits– Shipping cost reduction;– Higher percentage of parts localization;– Increased profitability;– increased efficiency;– etc.

Page 120: Toyota production-system-bussiness-case-studies-plan-19345

Topic Seminar

Cost Benefit Analysis

Page 121: Toyota production-system-bussiness-case-studies-plan-19345

CostCategories of Cost Significant Major Minor

Development/maintenance costs X

Getting existing suppliers to use the system X

Reduction of shipping cost X

Attracting new suppliers X

Disruptions to staff X

Additional staff to handle the system X

Threat of competitors taking advantage of similar technology andachieving similar efficiency improvements.

X

Page 122: Toyota production-system-bussiness-case-studies-plan-19345

BenefitsCategories of Benefits Significant Major Minor

Increased localization of parts X

Expanded sales and customer base X

Efficiency and flexibility in dealing with suppliers. X

Gaining experience that would assist with future e-commerce ventures. X

Increasing the business’ competitive advantage X

Suppliers remain loyal due the range of services offered X

Page 123: Toyota production-system-bussiness-case-studies-plan-19345

Organizational Feasibility

• New solution to work in tandem with the existing system– Phased installation

• Ensures that organisational operations will not be affected dramatically during implementation.

• Relationship between Toyota & suppliers improved→ higher degrees of collaboration

→ System Introduction Highly Feasible

Page 124: Toyota production-system-bussiness-case-studies-plan-19345

Conclusion

• The study is being conduct in procedural manner. • Focus on current supply chain and what the current IT

setup exist• Weakness were identified based on overall supply chain

process• Goal are set to close the current gap of inefficiency

identified.• Based on each goals, solutions are derived.• To prove worthiness of each solution, illustrates in terms

of business needs are provided. • Other factors, such as challenges and financial, have

proofed feasible for these proposed solutions to be implemented.

Page 125: Toyota production-system-bussiness-case-studies-plan-19345

Q & A Session