Toronto District School Board. Facilities Services Department. North Toronto Collegiate Institute. Status Quo. Description of what action is necessary to maintain the Status Quo of the building. General Maintenance Repairs. Condition of Major Building Components. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Toronto District School Board

Toronto District School BoardFacilities Services Department

North Toronto Collegiate InstituteStatus Quo

Page 2: Toronto District School Board

Description of what action is necessary to maintain the Status Quo of the building.

Page 3: Toronto District School Board

•General Maintenance Repairs

•Condition of Major Building Components

•Critical Maintenance Program

•Barrier Free Accessibility

Page 4: Toronto District School Board

General Maintenance Repairs:

•Roof Leaks•Plumbing Repairs•Heating Plant Repairs

•Masonry Disintegration

•Electrical Repairs

•Exterior Site Maintenance (e.g.. Fencing, drainage etc.)

•2000 repairs addressed over the past 4 years

Page 5: Toronto District School Board

Condition of Major Building Components

•The Ministry of Education conducted a Building Condition Survey of TDSB Schools in 2003

•Investigation confirms the need to spend substantial funding immediately

Page 6: Toronto District School Board

Example of regular maintenance requirements

Page 7: Toronto District School Board

Facility Services prioritizes emergency work to ensure the safety of students and staff.

Examples of Precast Concrete Deterioration

Page 8: Toronto District School Board

Two Restorative options were reviewed:

a. Traditional Restoration

b. Application of Fiber Reinforced Polymers (FRPs), as a temporary solution.

Page 9: Toronto District School Board

Exterior Façade after temporary repairs were completed.

Post repair detail North Elevation Post Repairs

Page 10: Toronto District School Board

This temporary solution:

• Restored Structural integrity of precast elements.

• Provided substantial cost savings.

• Avoided program disruption.

•Assured the safety of students and staff.

Page 11: Toronto District School Board

•Students and staff are kept safe

Over the next five years more than $6M will be needed to ensure that:

•Essential services to the building are maintained

•The general condition of the school in 2008 is not significantly worse than in 2003

Critical Maintenance Program:

Page 12: Toronto District School Board

•Approximately $700M backlog to date exists for all TDSB facilities.

•The Board only receives $40M annually from the Ministry of Education to address all renewal needs.

•Severe competition for funding will limit amount allocated to NTCI.

•School will be in worse condition in 5 years than at present.

Page 13: Toronto District School Board

Barrier Free Accessibility

•Currently the school is not wheelchair accessible.

•No plans to upgrade the accessibility under the status quo

•Cost to upgrade barrier free would exceed $500,000

Page 14: Toronto District School Board

Change in level Cafeteria Level/ 2nd Flr. Change in level Auditorium Level/ 1stFlr.

North Entrance 1

Page 15: Toronto District School Board

Pros:

•Students can remain in existing accommodation during construction.

Page 16: Toronto District School Board

Cons:•Continuous maintenance required.

•Lack of students pride for their facility.

•Barrier Free Access remains non-existent

•Poor working and learning environment for students and staff.

•Deterioration encourages vandalism.

•Poor building condition will result in re-evaluation of closure within 5-years.

•Potential closure of the building would result in redirection of the student body.

Page 17: Toronto District School Board

Inadequate Provincial funds will limit renewal work at North Toronto Collegiate