Calibrate Hastings HFC-203 Flow Controller Type CONTINUOUS Document No. 6-PCD-521 Rev/Mod E-2 Release Date 02/21/2017 Page 1 of 15 Tank Farm Maintenance Procedure CALIBRATION USQ # GCX-2 CHANGE HISTORY ( LAST 5 REV-MODS ) Rev-Mod Release Date Justification: Summary of Changes E-2 02/21/2017 Inconsequential change Reference removal of TO-060-006 and update records statement. E-1 04/18/2016 Request from the SY Team instrument technicians for isolation the flow control valves to assist with field performance. Section 4.2 added a H-14 drawing, added step 5.1.2 for valve isolation, modified step 5.1.3 and step 5.1.25, and added step 5.1.26 to open the isolated valve. Changed step 3.1.2 to read as "Contact IH for appropriate Sample Plan". E-0 03/15/2016 Periodic Review Struck Steps 5.1.5-5.1.23. Added New Steps 5.1.6 – 5.1.21 to incorporate Hastings 400 Power Supply. Add Special Inst. prior to 5.1. Reword Steps 3.1.3, 5.4.1, 5.4.3, 5.7.1, & 5.7.2, reword 2nd Note after 5.0, changed Note prior to Step 5.3.1 to Special Inst. Removed Notes from Section 5.9.IH review Procedure for applicability of JHA and TFC-PLN-43 when opening GEMS Cabinet D-4 04/13/2015 Company driven due to a new piece of equipment is being used for calibration. Update section 4.1. Modify steps 5.1.7 and 5.1.15, delete old steps 5.1.8 and 5.1.11, and added steps 5.1.8, 5.1.9, and 5.1.14. D-3 03/19/2015 Operations request Deleted reference to TO-060-010 and POR03 Table of Contents Page 1.0 PURPOSE AND SCOPE ................................................................................................................ 3 1.1 Purpose................................................................................................................................ 3 1.2 Scope ................................................................................................................................... 3 2.0 INFORMATION............................................................................................................................. 3 3.0 PRECAUTIONS AND LIMITATIONS......................................................................................... 3 3.1 Personnel Safety.................................................................................................................. 3 3.2 Radiation and Contamination Control ................................................................................ 3 3.3 Environmental ..................................................................................................................... 3 4.0 PREREQUISITES .......................................................................................................................... 4 4.1 Special Tools, Equipment, and Supplies............................................................................. 4 4.2 Performance Documents ..................................................................................................... 4 5.0 PROCEDURE ................................................................................................................................. 5
15
Embed
Tank Farm Maintenance Procedure CALIBRATION USQ # GCX-2 Library/011819... · review Procedure for applicability of JHA and TFC-PLN-43 when opening GEMS ... 3.1.1 Lockouts and tag-outs
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Calibrate Hastings HFC-203 Flow Controller
Type
CONTINUOUS Document No.
6-PCD-521 Rev/Mod
E-2 Release Date
02/21/2017 Page
1 of 15
Tank Farm Maintenance Procedure CALIBRATION
USQ # GCX-2
CHANGE HISTORY ( LAST 5 REV-MODS )
Rev-Mod Release Date Justification: Summary of Changes
E-2 02/21/2017 Inconsequential change Reference removal of TO-060-006 and update records
statement.
E-1 04/18/2016
Request from the SY Team
instrument technicians for
isolation the flow control valves
to assist with field performance.
Section 4.2 added a H-14 drawing, added step 5.1.2 for valve
isolation, modified step 5.1.3 and step 5.1.25, and added step
5.1.26 to open the isolated valve. Changed step 3.1.2 to read as
"Contact IH for appropriate Sample Plan".
E-0 03/15/2016 Periodic Review
Struck Steps 5.1.5-5.1.23. Added New Steps 5.1.6 – 5.1.21 to
incorporate Hastings 400 Power Supply.
Add Special Inst. prior to 5.1. Reword Steps 3.1.3, 5.4.1, 5.4.3,
5.7.1, & 5.7.2, reword 2nd Note after 5.0, changed Note prior to
Step 5.3.1 to Special Inst. Removed Notes from Section 5.9.IH
review Procedure for applicability of JHA and TFC-PLN-43
when opening GEMS Cabinet
D-4 04/13/2015
Company driven due to a new
piece of equipment is being used
for calibration.
Update section 4.1. Modify steps 5.1.7 and 5.1.15, delete old
steps 5.1.8 and 5.1.11, and added steps 5.1.8, 5.1.9, and 5.1.14.
D-3 03/19/2015 Operations request Deleted reference to TO-060-010 and POR03
Table of Contents Page
1.0 PURPOSE AND SCOPE ................................................................................................................ 3