Top Banner
BDI: 32,66% Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI 19000 CUSTOS INTERSINDICAIS E DIVERSOS 19901 ADMINISTRAÇÃO LOCAL UN 19100 MOBILIZAÇÃO DE CANTEIRO DE OBRAS UN 19101 DESMOBILIZAÇÃO DE CANTEIRO DE OBRAS UN 19304 MONTAGEM/DESMONTAGEM DE USINA DE CONCRETO TIPO PAREDE COM SILOS HORIZONTAL P/ 03 AGREGADOS, INCLUSIVE MECANICO(PESADO) UN 21.743,43 28.844,83 21.743,43 28.844,83 21.743,43 28.844,83 21.743,43 28.844,83 21.743,43 28.844,83 19355 MONTAGEM / DESMONTAGEM DE CENTRAL DE BRITAGEM UN 8.738,17 11.592,06 8.738,17 11.592,06 8.738,17 11.592,06 8.738,17 11.592,06 8.738,17 11.592,06 19508 MOBILIZACAO DE EQUIPAMENTOS UN 110.820,60 147.014,61 110.820,60 147.014,61 110.820,60 147.014,61 110.820,60 147.014,61 110.820,60 147.014,61 B000000000 MAO DE OBRA B010000000 MAO DE OBRA - HORISTAS B010000001 AJUDANTE DE ARMADOR H 8,90 11,81 13,25 17,58 14,34 19,02 13,76 18,25 13,86 18,39 B010000004 AJUDANTE DE ASSENTADOR H 8,90 11,81 13,25 17,58 14,34 19,02 13,76 18,25 13,86 18,39 B010000007 AJUDANTE DE CADASTRISTA H 8,90 11,81 13,25 17,58 14,34 19,02 13,76 18,25 13,86 18,39 B010000010 AJUDANTE DE CARPINTEIRO H 8,90 11,81 13,25 17,58 14,34 19,02 13,76 18,25 13,86 18,39 B010000013 AJUDANTE DE DESENHISTA H 8,90 11,81 13,25 17,58 14,34 19,02 13,76 18,25 13,86 18,39 B010000016 AJUDANTE DE ELETRICISTA H 8,90 11,81 13,25 17,58 14,34 19,02 13,76 18,25 13,86 18,39 B010000019 AJUDANTE DE ENCANADOR H 8,90 11,81 13,25 17,58 14,34 19,02 13,76 18,25 13,86 18,39 B010000022 AJUDANTE DE MONTADOR H 8,90 11,81 13,25 17,58 14,34 19,02 13,76 18,25 13,86 18,39 B010000025 AJUDANTE DE NIVELADOR H 8,90 11,81 13,25 17,58 14,34 19,02 13,76 18,25 13,86 18,39 B010000028 AJUDANTE DE PINTOR H 8,90 11,81 13,25 17,58 14,34 19,02 13,76 18,25 13,86 18,39 B010000031 AJUDANTE DE SOLDADOR H 8,90 11,81 13,25 17,58 14,34 19,02 13,76 18,25 13,86 18,39 B010000034 AJUDANTE DE TELHADISTA H 8,90 11,81 13,25 17,58 14,34 19,02 13,76 18,25 13,86 18,39 B010000037 ARMADOR H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70 B010000040 ASSENTADOR H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70 B010000043 BLASTER H 13,71 18,19 20,40 27,06 22,07 29,28 21,18 28,10 21,34 28,31 B010000046 CADASTRISTA H 9,04 11,99 13,44 17,83 14,55 19,30 13,96 18,52 14,06 18,65 B010000049 CALCETEIRO H 11,70 15,52 17,40 23,08 18,83 24,98 18,07 23,97 18,21 24,16 B010000050 CAPATAZ DE AR COMPRIMIDO H 11,31 15,00 16,82 22,31 18,20 24,14 17,47 23,18 17,60 23,35 B010000052 CARPINTEIRO H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70 B010000055 DESENHISTA H 10,62 14,09 15,80 20,96 17,09 22,67 16,40 21,76 16,53 21,93 B010000058 ELETRICISTA H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70 B010000061 ENCANADOR H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70 B010000064 ENCARREGADO H 16,84 22,34 25,05 33,23 27,11 35,96 26,02 34,52 26,21 34,77 B010000067 FEITOR H 16,99 22,54 25,27 33,52 27,35 36,28 26,25 34,82 26,44 35,08 B010000070 IMPERMEABILIZADOR H 12,93 17,15 19,23 25,51 20,81 27,61 19,97 26,49 20,12 26,69 B010000073 JARDINEIRO H 10,17 13,49 15,13 20,07 16,37 21,72 15,71 20,84 15,83 21,00 B010000076 ASFALTADOR H 11,51 15,27 17,13 22,72 18,53 24,58 17,78 23,59 17,92 23,77 B010000079 MARCENEIRO H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70 B010000082 MARROEIRO H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70 B010000085 MONTADOR H 13,47 17,87 20,04 26,59 21,68 28,76 20,81 27,61 20,96 27,81 B010000086 MONTADOR INDUSTRIAL H 15,87 21,05 23,61 31,32 25,55 33,89 24,52 32,53 24,70 32,77 B010000088 NIVELADOR H 16,71 22,17 24,86 32,98 26,90 35,69 25,81 34,24 26,01 34,50 B010000091 PEDREIRO H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70 B010000094 PINTOR H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70 B010000097 SERVENTE H 7,82 10,37 11,64 15,44 12,60 16,72 12,09 16,04 12,18 16,16 B010000098 SERVENTE PRATICO H 8,25 10,94 12,28 16,29 13,29 17,63 12,75 16,91 12,84 17,03 B010000100 SOLDADOR H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70 B010000101 MACARIQUEIRO H 16,92 22,45 25,16 33,38 27,23 36,12 26,13 34,66 26,33 34,93 B010000103 TELHADISTA H 11,18 14,83 16,63 22,06 17,99 23,87 17,27 22,91 17,40 23,08 B010000106 TOPOGRAFO H 19,11 25,35 28,43 37,72 30,77 40,82 29,53 39,17 29,75 39,47 B010000109 SERRALHEIRO H 11,92 15,81 17,74 23,53 19,19 25,46 18,42 24,44 18,56 24,62 B010000112 MARTELETEIRO H 9,76 12,95 14,52 19,26 15,71 20,84 15,08 20,01 15,19 20,15 B010000113 MERGULHADOR PROFISSIONAL H 131,22 174,08 195,21 258,97 211,25 280,24 202,71 268,92 204,24 270,94 B010000115 OPERADOR DE MOTO SERRA OU OUTROS EQUIPAMENTOS LEVES H 12,98 17,22 19,32 25,63 20,90 27,73 20,06 26,61 20,21 26,81 B010000118 MARTELETEIRO H 9,76 12,95 14,52 19,26 15,71 20,84 15,08 20,01 15,19 20,15 B010000121 TRABALHADOR RURAL H 7,82 10,37 11,64 15,44 12,60 16,72 12,09 16,04 12,18 16,16 B010000125 VIGILANCIA H 8,25 10,94 12,28 16,29 13,29 17,63 12,75 16,91 12,84 17,03 B010001049 OPERADOR DE MAQUINAS E EQUIPAMENTOS H 13,88 18,41 20,65 27,39 22,34 29,64 21,44 28,44 21,60 28,65 B019000001 TRATORISTA H 11,66 15,47 17,35 23,02 18,77 24,90 18,02 23,91 18,15 24,08 B019000002 OPERADOR DE PA CARREGADEIRA H 11,66 15,47 17,35 23,02 18,77 24,90 18,02 23,91 18,15 24,08 B019722401 COORDENADOR H 107,82 143,03 160,40 212,79 173,58 230,27 166,57 220,97 167,82 222,63 B019722402 BIOLOGO H 71,87 95,34 106,92 141,84 115,70 153,49 111,03 147,29 111,86 148,39 B019722403 TECNICO DE CAMPO H 13,26 17,59 19,73 26,17 21,35 28,32 20,49 27,18 20,64 27,38 B019722404 DIGITADOR H 11,07 14,69 16,46 21,84 17,81 23,63 17,09 22,67 17,22 22,84 B019722405 AUXILIAR ADMINISTRATIVO H 11,38 15,10 16,93 22,46 18,32 24,30 17,58 23,32 17,72 23,51 B019722406 AUXILIAR ADMINISTRATIVO H 11,38 15,10 16,93 22,46 18,32 24,30 17,58 23,32 17,72 23,51 B019722410 CONSULTOR SOCIOAMBIENTAL H 306,52 406,63 455,99 604,92 493,46 654,62 473,51 628,16 477,08 632,89 B019800099 AUXILIAR ADMINISTRATIVO (TRABALHO SOCIAL) H 11,38 15,10 16,93 22,46 18,32 24,30 17,58 23,32 17,72 23,51 B020000000 MAO DE OBRA PARA SERVICOS OPERACIONAIS E COMERCIAL - HORISTAS B020001000 OP - AGENTE OPERACIONAL H 12,67 16,81 18,84 24,99 20,39 27,05 19,57 25,96 19,72 26,16 B020001001 OP - AGENTE DE MANUTENCAO H 12,57 16,68 18,71 24,82 20,24 26,85 19,43 25,78 19,57 25,96 B020001004 OP - AGENTE DE MEDICAO (PITOMETRIA) H 13,10 17,38 19,48 25,84 21,08 27,96 20,23 26,84 20,38 27,04 B020001007 OP - AGENTE DE SERVICOS H 8,70 11,54 12,94 17,17 14,01 18,59 13,44 17,83 13,54 17,96 B020001010 OP - AGENTE DE SISTEMA H 12,67 16,81 18,84 24,99 20,39 27,05 19,57 25,96 19,72 26,16 B020001013 OP - DESENHISTA / CADISTA H 10,62 14,09 15,80 20,96 17,09 22,67 16,40 21,76 16,53 21,93 B020001016 OP - DESENHISTA / COPISTA H 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 B020001019 OP - ELETRICISTA H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70 B020001022 OP - LEITURISTA (I) H 9,35 12,40 13,91 18,45 15,05 19,97 14,45 19,17 14,56 19,32 B020001025 OP - LEITURISTA (M) H 10,53 13,97 15,66 20,77 16,94 22,47 16,26 21,57 16,38 21,73 B020001028 OP - MECANICO H 12,69 16,83 18,87 25,03 20,42 27,09 19,60 26,00 19,75 26,20 B020001031 OP - MONITOR DE SERVICOS H 14,21 18,85 21,15 28,06 22,88 30,35 21,96 29,13 22,12 29,34 B020001034 OP - MOTORISTA H 12,43 16,49 18,48 24,52 20,00 26,53 19,19 25,46 19,34 25,66 B020001037 OP - OPERADOR DE EQUIPAMENTO PESADO H 14,36 19,05 21,37 28,35 23,12 30,67 22,19 29,44 22,36 29,66 B020001046 OP - MOTORISTA (VEICULO PESADO - HIDROJATO) H 13,26 17,59 19,73 26,17 21,35 28,32 20,49 27,18 20,64 27,38 B020001049 OP - OPERADOR K-500 / COMPRESSOR / M.PNE H 14,36 19,05 21,37 28,35 23,12 30,67 22,19 29,44 22,36 29,66 B020001052 OP - OPERADOR DE PROCESSOS ETA H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70 B020001055 OP - OPERADOR DE ETA PEQUENA H 9,02 11,97 13,41 17,79 14,52 19,26 13,93 18,48 14,03 18,61 B020001058 OP - OPERADOR DE ETA MEDIA H 9,91 13,15 14,74 19,55 15,95 21,16 15,31 20,31 15,43 20,47 B020001061 OP - OPERADOR DE ETA GRANDE H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70 B020001064 OP - OPERADOR DE SISTEMAS (ETA'S / ETE'S) H 8,70 11,54 12,94 17,17 14,01 18,59 13,44 17,83 13,54 17,96 B020001067 OP - SOLDADOR H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70 B020001070 OP - SUPERVISOR DE CAMPO H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70 B020001073 OP - FISCAL DE CAMPO H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70 B020001076 OP - MECANICO INDUSTRIAL H 12,69 16,83 18,87 25,03 20,42 27,09 19,60 26,00 19,75 26,20 B020001079 OP - MECANICO MONTADOR H 12,69 16,83 18,87 25,03 20,42 27,09 19,60 26,00 19,75 26,20 B020001082 OP - JATISTA H 7,99 10,60 11,89 15,77 12,87 17,07 12,35 16,38 12,44 16,50 B020001085 OP - ELETRICISTA INDUSTRIAL H 16,32 21,65 24,28 32,21 26,27 34,85 25,21 33,44 25,40 33,70 B020001088 OP - ELETRICISTA MONTADOR H 12,67 16,81 18,84 24,99 20,39 27,05 19,57 25,96 19,72 26,16 B020001091 OP - TECNICO EM AUTOMACAO H 40,03 53,10 59,56 79,01 64,45 85,50 61,84 82,04 62,31 82,66 B020002000 TECNICO OPERACIONAL E DE SUPORTE B020002001 OP - TECNICO OPERACIONAL (OPERACAO E MANUTENCAO) H 18,20 24,14 27,08 35,92 29,30 38,87 28,12 37,30 28,33 37,58 B020002004 OP - TECNICO DE SEGURANCA DO TRABALHO H 18,20 24,14 27,08 35,92 29,30 38,87 28,12 37,30 28,33 37,58 B020002007 OP - AUXILIAR MECANICO H 7,86 10,43 11,69 15,51 12,66 16,79 12,14 16,10 12,24 16,24 B020002010 OP - TECNICO ELETROMECANICO H 35,06 46,51 52,16 69,20 56,44 74,87 54,16 71,85 54,57 72,39 B020002013 OP - TECNICO ELETROTECNICO H 19,43 25,78 28,90 38,34 31,28 41,50 30,02 39,82 30,24 40,12 B020002016 OP - TORNEIRO MECANICO H 12,69 16,83 18,87 25,03 20,42 27,09 19,60 26,00 19,75 26,20 B020002019 OP - TECNICO EM AGRIMENSURA H 18,20 24,14 27,08 35,92 29,30 38,87 28,12 37,30 28,33 37,58 B020002022 OP - TECNICO EM TELECOMUNICACOES H 18,20 24,14 27,08 35,92 29,30 38,87 28,12 37,30 28,33 37,58 B020002025 OP - TECNICO INSTRUMENTISTA H 18,20 24,14 27,08 35,92 29,30 38,87 28,12 37,30 28,33 37,58 B020002028 OP - TECNICO EM QUIMICA H 18,20 24,14 27,08 35,92 29,30 38,87 28,12 37,30 28,33 37,58 B020002031 OP - AUXILIAR TECNICO (OPERACAO / MANUTENCAO) H 12,69 16,83 18,87 25,03 20,42 27,09 19,60 26,00 19,75 26,20 B020002034 OP - TECNICO DE NIVEL MEDIO H 18,20 24,14 27,08 35,92 29,30 38,87 28,12 37,30 28,33 37,58 B020002040 OP - AUXILIAR DE PRODUCAO H 8,25 10,94 12,28 16,29 13,29 17,63 12,75 16,91 12,84 17,03 B020002043 OP - SUPERVISOR GERAL H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70 B020002046 OP - SUPERVISOR DE ETA'S / ETE'S H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70 B020002049 OP - ALMOXARIFE H 14,27 18,93 21,23 28,16 22,97 30,47 22,04 29,24 22,21 29,46 B020002052 OP - AUXILIAR DE ALMOXARIFE H 7,82 10,37 11,64 15,44 12,60 16,72 12,09 16,04 12,18 16,16 B020002055 OP - ENCARREGADO DE EQUIPES H 16,84 22,34 25,05 33,23 27,11 35,96 26,02 34,52 26,21 34,77 B020002058 OP - PEDREIRO / ENCANADOR / ARTIFICE (M) H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70 B020002061 OP - PEDREIRO / ENCANADOR / ARTIFICE (I) H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70 B020002064 OP - SERVENTE PRATICO (AUXILIAR DE PRODUCAO) H 8,25 10,94 12,28 16,29 13,29 17,63 12,75 16,91 12,84 17,03 B020002065 OP - SERVENTE PRATICO (AUXILIAR DE PRODUCAO) H 8,25 10,94 12,28 16,29 13,29 17,63 12,75 16,91 12,84 17,03 B020002067 OP - SERVENTE - (M) H 7,82 10,37 11,64 15,44 12,60 16,72 12,09 16,04 12,18 16,16 B020002068 OP - SERVENTE - (I) H 7,82 10,37 11,64 15,44 12,60 16,72 12,09 16,04 12,18 16,16 B020002069 OP - SERVENTE PRATICO - (M) H 8,25 10,94 12,28 16,29 13,29 17,63 12,75 16,91 12,84 17,03 B020002070 OP - COLETOR DE AMOSTRAS H 11,23 14,90 16,71 22,17 18,08 23,98 17,35 23,02 17,48 23,19 B020002076 OP - LABORATORISTA H 16,32 21,65 24,28 32,21 26,27 34,85 25,21 33,44 25,40 33,70 B020002079 OP - AUXILIAR DE LABORATORIO H 9,15 12,14 13,61 18,06 14,73 19,54 14,13 18,74 14,24 18,89 ITENS COMPOSTOS PARA CADA EMPREENDIMENTO INDIVIDUALMENTE ITENS COMPOSTOS PARA CADA EMPREENDIMENTO INDIVIDUALMENTE Tabela de Preços Para Serviços de Expansão / Operação / Manutenção Desonerada de 2016 Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção de Água e seus desdobramentos. BASICO EMBASA 2016 OPERAÇÃO - ÁGUA SINTRACOM SINTEPAV SINDTICCC SITICCAN H=86,29% M=50,23% H=189,95% M=153,89% H=177,13% M=141,08% H=199,90% M=163,85% H=187,78% M=151,73% Legenda: Serviços Exclusivos da Operação e Manutenção Serviços comuns a Operação e Expansão Página: 1 de 59
59

Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

Aug 07, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

19000 CUSTOS INTERSINDICAIS E DIVERSOS

19901 ADMINISTRAÇÃO LOCAL UN

19100 MOBILIZAÇÃO DE CANTEIRO DE OBRAS UN

19101 DESMOBILIZAÇÃO DE CANTEIRO DE OBRAS UN

19304MONTAGEM/DESMONTAGEM DE USINA DE CONCRETO TIPO PAREDE COM SILOS HORIZONTAL P/

03 AGREGADOS, INCLUSIVE MECANICO(PESADO)UN 21.743,43 28.844,83 21.743,43 28.844,83 21.743,43 28.844,83 21.743,43 28.844,83 21.743,43 28.844,83

19355 MONTAGEM / DESMONTAGEM DE CENTRAL DE BRITAGEM UN 8.738,17 11.592,06 8.738,17 11.592,06 8.738,17 11.592,06 8.738,17 11.592,06 8.738,17 11.592,06

19508 MOBILIZACAO DE EQUIPAMENTOS UN 110.820,60 147.014,61 110.820,60 147.014,61 110.820,60 147.014,61 110.820,60 147.014,61 110.820,60 147.014,61

B000000000 MAO DE OBRA

B010000000 MAO DE OBRA - HORISTASB010000001 AJUDANTE DE ARMADOR H 8,90 11,81 13,25 17,58 14,34 19,02 13,76 18,25 13,86 18,39B010000004 AJUDANTE DE ASSENTADOR H 8,90 11,81 13,25 17,58 14,34 19,02 13,76 18,25 13,86 18,39B010000007 AJUDANTE DE CADASTRISTA H 8,90 11,81 13,25 17,58 14,34 19,02 13,76 18,25 13,86 18,39B010000010 AJUDANTE DE CARPINTEIRO H 8,90 11,81 13,25 17,58 14,34 19,02 13,76 18,25 13,86 18,39B010000013 AJUDANTE DE DESENHISTA H 8,90 11,81 13,25 17,58 14,34 19,02 13,76 18,25 13,86 18,39B010000016 AJUDANTE DE ELETRICISTA H 8,90 11,81 13,25 17,58 14,34 19,02 13,76 18,25 13,86 18,39B010000019 AJUDANTE DE ENCANADOR H 8,90 11,81 13,25 17,58 14,34 19,02 13,76 18,25 13,86 18,39B010000022 AJUDANTE DE MONTADOR H 8,90 11,81 13,25 17,58 14,34 19,02 13,76 18,25 13,86 18,39B010000025 AJUDANTE DE NIVELADOR H 8,90 11,81 13,25 17,58 14,34 19,02 13,76 18,25 13,86 18,39B010000028 AJUDANTE DE PINTOR H 8,90 11,81 13,25 17,58 14,34 19,02 13,76 18,25 13,86 18,39B010000031 AJUDANTE DE SOLDADOR H 8,90 11,81 13,25 17,58 14,34 19,02 13,76 18,25 13,86 18,39B010000034 AJUDANTE DE TELHADISTA H 8,90 11,81 13,25 17,58 14,34 19,02 13,76 18,25 13,86 18,39B010000037 ARMADOR H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70B010000040 ASSENTADOR H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70B010000043 BLASTER H 13,71 18,19 20,40 27,06 22,07 29,28 21,18 28,10 21,34 28,31B010000046 CADASTRISTA H 9,04 11,99 13,44 17,83 14,55 19,30 13,96 18,52 14,06 18,65B010000049 CALCETEIRO H 11,70 15,52 17,40 23,08 18,83 24,98 18,07 23,97 18,21 24,16B010000050 CAPATAZ DE AR COMPRIMIDO H 11,31 15,00 16,82 22,31 18,20 24,14 17,47 23,18 17,60 23,35B010000052 CARPINTEIRO H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70B010000055 DESENHISTA H 10,62 14,09 15,80 20,96 17,09 22,67 16,40 21,76 16,53 21,93B010000058 ELETRICISTA H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70B010000061 ENCANADOR H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70B010000064 ENCARREGADO H 16,84 22,34 25,05 33,23 27,11 35,96 26,02 34,52 26,21 34,77B010000067 FEITOR H 16,99 22,54 25,27 33,52 27,35 36,28 26,25 34,82 26,44 35,08B010000070 IMPERMEABILIZADOR H 12,93 17,15 19,23 25,51 20,81 27,61 19,97 26,49 20,12 26,69B010000073 JARDINEIRO H 10,17 13,49 15,13 20,07 16,37 21,72 15,71 20,84 15,83 21,00B010000076 ASFALTADOR H 11,51 15,27 17,13 22,72 18,53 24,58 17,78 23,59 17,92 23,77B010000079 MARCENEIRO H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70B010000082 MARROEIRO H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70B010000085 MONTADOR H 13,47 17,87 20,04 26,59 21,68 28,76 20,81 27,61 20,96 27,81B010000086 MONTADOR INDUSTRIAL H 15,87 21,05 23,61 31,32 25,55 33,89 24,52 32,53 24,70 32,77B010000088 NIVELADOR H 16,71 22,17 24,86 32,98 26,90 35,69 25,81 34,24 26,01 34,50B010000091 PEDREIRO H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70B010000094 PINTOR H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70B010000097 SERVENTE H 7,82 10,37 11,64 15,44 12,60 16,72 12,09 16,04 12,18 16,16B010000098 SERVENTE PRATICO H 8,25 10,94 12,28 16,29 13,29 17,63 12,75 16,91 12,84 17,03B010000100 SOLDADOR H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70B010000101 MACARIQUEIRO H 16,92 22,45 25,16 33,38 27,23 36,12 26,13 34,66 26,33 34,93B010000103 TELHADISTA H 11,18 14,83 16,63 22,06 17,99 23,87 17,27 22,91 17,40 23,08B010000106 TOPOGRAFO H 19,11 25,35 28,43 37,72 30,77 40,82 29,53 39,17 29,75 39,47B010000109 SERRALHEIRO H 11,92 15,81 17,74 23,53 19,19 25,46 18,42 24,44 18,56 24,62B010000112 MARTELETEIRO H 9,76 12,95 14,52 19,26 15,71 20,84 15,08 20,01 15,19 20,15B010000113 MERGULHADOR PROFISSIONAL H 131,22 174,08 195,21 258,97 211,25 280,24 202,71 268,92 204,24 270,94B010000115 OPERADOR DE MOTO SERRA OU OUTROS EQUIPAMENTOS LEVES H 12,98 17,22 19,32 25,63 20,90 27,73 20,06 26,61 20,21 26,81B010000118 MARTELETEIRO H 9,76 12,95 14,52 19,26 15,71 20,84 15,08 20,01 15,19 20,15B010000121 TRABALHADOR RURAL H 7,82 10,37 11,64 15,44 12,60 16,72 12,09 16,04 12,18 16,16B010000125 VIGILANCIA H 8,25 10,94 12,28 16,29 13,29 17,63 12,75 16,91 12,84 17,03B010001049 OPERADOR DE MAQUINAS E EQUIPAMENTOS H 13,88 18,41 20,65 27,39 22,34 29,64 21,44 28,44 21,60 28,65B019000001 TRATORISTA H 11,66 15,47 17,35 23,02 18,77 24,90 18,02 23,91 18,15 24,08B019000002 OPERADOR DE PA CARREGADEIRA H 11,66 15,47 17,35 23,02 18,77 24,90 18,02 23,91 18,15 24,08B019722401 COORDENADOR H 107,82 143,03 160,40 212,79 173,58 230,27 166,57 220,97 167,82 222,63B019722402 BIOLOGO H 71,87 95,34 106,92 141,84 115,70 153,49 111,03 147,29 111,86 148,39B019722403 TECNICO DE CAMPO H 13,26 17,59 19,73 26,17 21,35 28,32 20,49 27,18 20,64 27,38B019722404 DIGITADOR H 11,07 14,69 16,46 21,84 17,81 23,63 17,09 22,67 17,22 22,84B019722405 AUXILIAR ADMINISTRATIVO H 11,38 15,10 16,93 22,46 18,32 24,30 17,58 23,32 17,72 23,51B019722406 AUXILIAR ADMINISTRATIVO H 11,38 15,10 16,93 22,46 18,32 24,30 17,58 23,32 17,72 23,51B019722410 CONSULTOR SOCIOAMBIENTAL H 306,52 406,63 455,99 604,92 493,46 654,62 473,51 628,16 477,08 632,89

B019800099 AUXILIAR ADMINISTRATIVO (TRABALHO SOCIAL) H 11,38 15,10 16,93 22,46 18,32 24,30 17,58 23,32 17,72 23,51

B020000000 MAO DE OBRA PARA SERVICOS OPERACIONAIS E COMERCIAL - HORISTASB020001000 OP - AGENTE OPERACIONAL H 12,67 16,81 18,84 24,99 20,39 27,05 19,57 25,96 19,72 26,16B020001001 OP - AGENTE DE MANUTENCAO H 12,57 16,68 18,71 24,82 20,24 26,85 19,43 25,78 19,57 25,96B020001004 OP - AGENTE DE MEDICAO (PITOMETRIA) H 13,10 17,38 19,48 25,84 21,08 27,96 20,23 26,84 20,38 27,04B020001007 OP - AGENTE DE SERVICOS H 8,70 11,54 12,94 17,17 14,01 18,59 13,44 17,83 13,54 17,96B020001010 OP - AGENTE DE SISTEMA H 12,67 16,81 18,84 24,99 20,39 27,05 19,57 25,96 19,72 26,16B020001013 OP - DESENHISTA / CADISTA H 10,62 14,09 15,80 20,96 17,09 22,67 16,40 21,76 16,53 21,93B020001016 OP - DESENHISTA / COPISTA H 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85B020001019 OP - ELETRICISTA H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70B020001022 OP - LEITURISTA (I) H 9,35 12,40 13,91 18,45 15,05 19,97 14,45 19,17 14,56 19,32B020001025 OP - LEITURISTA (M) H 10,53 13,97 15,66 20,77 16,94 22,47 16,26 21,57 16,38 21,73B020001028 OP - MECANICO H 12,69 16,83 18,87 25,03 20,42 27,09 19,60 26,00 19,75 26,20B020001031 OP - MONITOR DE SERVICOS H 14,21 18,85 21,15 28,06 22,88 30,35 21,96 29,13 22,12 29,34B020001034 OP - MOTORISTA H 12,43 16,49 18,48 24,52 20,00 26,53 19,19 25,46 19,34 25,66B020001037 OP - OPERADOR DE EQUIPAMENTO PESADO H 14,36 19,05 21,37 28,35 23,12 30,67 22,19 29,44 22,36 29,66B020001046 OP - MOTORISTA (VEICULO PESADO - HIDROJATO) H 13,26 17,59 19,73 26,17 21,35 28,32 20,49 27,18 20,64 27,38B020001049 OP - OPERADOR K-500 / COMPRESSOR / M.PNE H 14,36 19,05 21,37 28,35 23,12 30,67 22,19 29,44 22,36 29,66B020001052 OP - OPERADOR DE PROCESSOS ETA H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70B020001055 OP - OPERADOR DE ETA PEQUENA H 9,02 11,97 13,41 17,79 14,52 19,26 13,93 18,48 14,03 18,61B020001058 OP - OPERADOR DE ETA MEDIA H 9,91 13,15 14,74 19,55 15,95 21,16 15,31 20,31 15,43 20,47B020001061 OP - OPERADOR DE ETA GRANDE H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70B020001064 OP - OPERADOR DE SISTEMAS (ETA'S / ETE'S) H 8,70 11,54 12,94 17,17 14,01 18,59 13,44 17,83 13,54 17,96B020001067 OP - SOLDADOR H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70B020001070 OP - SUPERVISOR DE CAMPO H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70B020001073 OP - FISCAL DE CAMPO H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70B020001076 OP - MECANICO INDUSTRIAL H 12,69 16,83 18,87 25,03 20,42 27,09 19,60 26,00 19,75 26,20B020001079 OP - MECANICO MONTADOR H 12,69 16,83 18,87 25,03 20,42 27,09 19,60 26,00 19,75 26,20B020001082 OP - JATISTA H 7,99 10,60 11,89 15,77 12,87 17,07 12,35 16,38 12,44 16,50B020001085 OP - ELETRICISTA INDUSTRIAL H 16,32 21,65 24,28 32,21 26,27 34,85 25,21 33,44 25,40 33,70B020001088 OP - ELETRICISTA MONTADOR H 12,67 16,81 18,84 24,99 20,39 27,05 19,57 25,96 19,72 26,16

B020001091 OP - TECNICO EM AUTOMACAO H 40,03 53,10 59,56 79,01 64,45 85,50 61,84 82,04 62,31 82,66

B020002000 TECNICO OPERACIONAL E DE SUPORTEB020002001 OP - TECNICO OPERACIONAL (OPERACAO E MANUTENCAO) H 18,20 24,14 27,08 35,92 29,30 38,87 28,12 37,30 28,33 37,58B020002004 OP - TECNICO DE SEGURANCA DO TRABALHO H 18,20 24,14 27,08 35,92 29,30 38,87 28,12 37,30 28,33 37,58B020002007 OP - AUXILIAR MECANICO H 7,86 10,43 11,69 15,51 12,66 16,79 12,14 16,10 12,24 16,24B020002010 OP - TECNICO ELETROMECANICO H 35,06 46,51 52,16 69,20 56,44 74,87 54,16 71,85 54,57 72,39B020002013 OP - TECNICO ELETROTECNICO H 19,43 25,78 28,90 38,34 31,28 41,50 30,02 39,82 30,24 40,12B020002016 OP - TORNEIRO MECANICO H 12,69 16,83 18,87 25,03 20,42 27,09 19,60 26,00 19,75 26,20B020002019 OP - TECNICO EM AGRIMENSURA H 18,20 24,14 27,08 35,92 29,30 38,87 28,12 37,30 28,33 37,58B020002022 OP - TECNICO EM TELECOMUNICACOES H 18,20 24,14 27,08 35,92 29,30 38,87 28,12 37,30 28,33 37,58B020002025 OP - TECNICO INSTRUMENTISTA H 18,20 24,14 27,08 35,92 29,30 38,87 28,12 37,30 28,33 37,58B020002028 OP - TECNICO EM QUIMICA H 18,20 24,14 27,08 35,92 29,30 38,87 28,12 37,30 28,33 37,58B020002031 OP - AUXILIAR TECNICO (OPERACAO / MANUTENCAO) H 12,69 16,83 18,87 25,03 20,42 27,09 19,60 26,00 19,75 26,20B020002034 OP - TECNICO DE NIVEL MEDIO H 18,20 24,14 27,08 35,92 29,30 38,87 28,12 37,30 28,33 37,58B020002040 OP - AUXILIAR DE PRODUCAO H 8,25 10,94 12,28 16,29 13,29 17,63 12,75 16,91 12,84 17,03B020002043 OP - SUPERVISOR GERAL H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70B020002046 OP - SUPERVISOR DE ETA'S / ETE'S H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70B020002049 OP - ALMOXARIFE H 14,27 18,93 21,23 28,16 22,97 30,47 22,04 29,24 22,21 29,46B020002052 OP - AUXILIAR DE ALMOXARIFE H 7,82 10,37 11,64 15,44 12,60 16,72 12,09 16,04 12,18 16,16B020002055 OP - ENCARREGADO DE EQUIPES H 16,84 22,34 25,05 33,23 27,11 35,96 26,02 34,52 26,21 34,77B020002058 OP - PEDREIRO / ENCANADOR / ARTIFICE (M) H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70B020002061 OP - PEDREIRO / ENCANADOR / ARTIFICE (I) H 12,44 16,50 18,51 24,56 20,03 26,57 19,22 25,50 19,37 25,70B020002064 OP - SERVENTE PRATICO (AUXILIAR DE PRODUCAO) H 8,25 10,94 12,28 16,29 13,29 17,63 12,75 16,91 12,84 17,03B020002065 OP - SERVENTE PRATICO (AUXILIAR DE PRODUCAO) H 8,25 10,94 12,28 16,29 13,29 17,63 12,75 16,91 12,84 17,03B020002067 OP - SERVENTE - (M) H 7,82 10,37 11,64 15,44 12,60 16,72 12,09 16,04 12,18 16,16B020002068 OP - SERVENTE - (I) H 7,82 10,37 11,64 15,44 12,60 16,72 12,09 16,04 12,18 16,16B020002069 OP - SERVENTE PRATICO - (M) H 8,25 10,94 12,28 16,29 13,29 17,63 12,75 16,91 12,84 17,03B020002070 OP - COLETOR DE AMOSTRAS H 11,23 14,90 16,71 22,17 18,08 23,98 17,35 23,02 17,48 23,19B020002076 OP - LABORATORISTA H 16,32 21,65 24,28 32,21 26,27 34,85 25,21 33,44 25,40 33,70B020002079 OP - AUXILIAR DE LABORATORIO H 9,15 12,14 13,61 18,06 14,73 19,54 14,13 18,74 14,24 18,89

ITENS COMPOSTOS PARA CADA

EMPREENDIMENTO

INDIVIDUALMENTE

ITENS COMPOSTOS PARA CADA EMPREENDIMENTO INDIVIDUALMENTE

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

Página: 1 de 59

Page 2: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

B020002082 OP - ASSISTENTE DE LABORATORIO H 9,33 12,38 13,88 18,41 15,02 19,93 14,42 19,13 14,53 19,28B020002085 OP - ATENDENTE DE USUARIO H 8,72 11,57 12,97 17,21 14,04 18,63 13,47 17,87 13,57 18,00B020002088 OP - AGENTE DE SERVICO COMERCIAL H 8,72 11,57 12,97 17,21 14,04 18,63 13,47 17,87 13,57 18,00B020002091 OP - ANALISTA DE CONSUMO (I) H 9,50 12,60 14,13 18,74 15,29 20,28 14,68 19,47 14,79 19,62

B020002097 OP - ANALISTA DE CONSUMO (M) H 9,50 14,13 18,74 15,29 20,28 14,68 19,47 14,79 19,62B020002100 OP - CADASTRISTA H 9,04 11,99 13,44 17,83 14,55 19,30 13,96 18,52 14,06 18,65

B020003000 AGENTE ADMINISTRATIVOB020003001 OP - AGENTE DE SERVICO ADMINISTRATIVO H 8,72 11,57 12,97 17,21 14,04 18,63 13,47 17,87 13,57 18,00B020003004 OP - AGENTE DE SERVICO DE COMUNICACAO H 8,72 11,57 12,97 17,21 14,04 18,63 13,47 17,87 13,57 18,00B020003007 OP - ASSISTENTE ADMINISTRATIVO H 10,90 14,46 16,21 21,50 17,54 23,27 16,84 22,34 16,96 22,50B020003010 OP - AUXILIAR ESCRITORIO H 10,67 14,15 15,88 21,07 17,18 22,79 16,49 21,88 16,61 22,03B020003013 OP - AGENTE TECNICO ADMINISTRATIVO H 12,78 16,95 19,01 25,22 20,57 27,29 19,74 26,19 19,89 26,39B020003028 OP - DIGITADOR H 11,07 14,69 16,46 21,84 17,81 23,63 17,09 22,67 17,22 22,84B020003031 OP - SECRETARIA H 18,20 24,14 27,08 35,92 29,30 38,87 28,12 37,30 28,33 37,58B020003034 OP - AUXILIAR ADMINISTRATIVO H 11,38 15,10 16,93 22,46 18,32 24,30 17,58 23,32 17,72 23,51B020003040 OP - ZELADOR H 7,94 10,53 11,81 15,67 12,78 16,95 12,26 16,26 12,35 16,38B020003043 OP - VIGIA H 8,05 10,68 11,97 15,88 12,96 17,19 12,43 16,49 12,53 16,62

B020004000 PROFISSIONAL DE NIVEL SUPERIORB020004007 OP - ASSISTENTE SOCIAL - AS5 H 78,13 103,65 116,23 154,19 125,78 166,86 120,69 160,11 121,61 161,33

B020004999 PERICULOSIDADEB020005000 INSALUBRIDADE - 40% - SALARIO MINIMO H 655,74 869,90 975,50 1.294,10 1.055,65 1.400,43 1.012,99 1.343,83 1.020,62 1.353,95

B020005001 INSALUBRIDADE - 20% - SALARIO MINIMO H 327,87 487,75 647,05 527,82 700,21 506,49 671,91 510,31 676,98B020005002 INSALUBRIDADE - 10% - SALARIO MINIMO H 163,94 217,48 243,87 323,52 263,91 350,10 253,25 335,96 255,16 338,50

B020005100 PERICULOSIDADE 30%B020005119 PE - ELETRICISTA MES 821,32 1.089,56 1.221,81 1.620,85 1.322,20 1.754,03 1.268,76 1.683,14 1.278,33 1.695,83B020005128 PE - MECANICO MES 837,30 1.110,76 1.245,59 1.652,40 1.347,93 1.788,16 1.293,46 1.715,90 1.303,21 1.728,84

B020005167 PE - SOLDADOR MES 821,32 1.089,56 1.221,81 1.620,85 1.322,20 1.754,03 1.268,76 1.683,14 1.278,33 1.695,83B020005213 PE - ELETROTECNICO MES 1.282,38 1.701,21 1.907,71 2.530,77 2.064,45 2.738,70 1.981,02 2.628,02 1.995,96 2.647,84

B020006000HORAS EXTRAS TIPO 50% (dias normais), TIPO 70% (dias de sabado)e 110% (domingos e feriados)

- CALCULO FEITO PARA HORISTAS 220H/MB020006100 HORA EXTRA AGENTE OPERACIONALB020006101 HE-TP.50% - AGENTE DE MANUTENCAO H 18,87 25,03 28,07 37,24 30,38 40,30 29,15 38,67 29,37 38,96B020006104 HE-TP.50% - AGENTE DE MEDICAO (PITOMETRIA) H 19,65 26,07 29,24 38,79 31,64 41,97 30,36 40,28 30,59 40,58B020006107 HE-TP.50% - AGENTE DE SERVICOS H 13,06 17,33 19,43 25,78 21,02 27,89 20,17 26,76 20,33 26,97B020006134 HE-TP.50% - MOTORISTA H 18,63 24,71 27,71 36,76 29,99 39,78 28,78 38,18 29,00 38,47

B020006137HE-TP.50% - OPERADOR DE EQUIPAMENTO PESADO (HIGH -VELOCIT / RETRO / MUNCK) H 20,83 27,63 30,98 41,10 33,53 44,48 32,17 42,68 32,42 43,01

B020006149 HE-TP.50% - OPERADOR K-500/COMPRESSOR/M.P H 21,55 28,59 32,06 42,53 34,70 46,03 33,30 44,18 33,55 44,51B020006170 HE-TP.50% - SUPERVISOR DE CAMPO H 18,67 24,77 27,77 36,84 30,05 39,86 28,84 38,26 29,05 38,54B020006176 HE-TP.50% - MECANICO INDUSTRIAL H 19,04 25,26 28,32 37,57 30,65 40,66 29,41 39,02 29,63 39,31B020006179 HE-TP.50% - MECANICO MONTADOR H 19,04 25,26 28,32 37,57 30,65 40,66 29,41 39,02 29,63 39,31B020006182 HE-TP.50% - JATISTA H 12,00 15,92 17,85 23,68 19,31 25,62 18,53 24,58 18,67 24,77B020006185 HE-TP.50% - ELETRICISTA INDUSTRIAL H 24,48 32,48 36,41 48,30 39,41 52,28 37,81 50,16 38,10 50,54B020006188 HE-TP.50% - ELETRICISTA MONTADOR H 19,00 25,21 28,27 37,50 30,59 40,58 29,35 38,94 29,57 39,23B020006191 HE-TP.50% - TECNICO EM AUTOMACAO H 60,06 79,68 89,35 118,53 96,69 128,27 92,78 123,08 93,48 124,01B020006231 HE-TP.50% - AUXILIAR TECNICO(OPERACAO/MANUTENCAO/SERVICOS) H 19,04 25,26 28,32 37,57 30,65 40,66 29,41 39,02 29,63 39,31B020006240 HE-TP.50% - AUXILIAR DE PRODUCAO H 12,39 16,44 18,43 24,45 19,94 26,45 19,14 25,39 19,28 25,58B020006258 HE-TP.50% - PEDREIRO / ENCANADOR / ARTIFICE (M) H 18,67 24,77 27,77 36,84 30,05 39,86 28,84 38,26 29,05 38,54B020006261 HE-TP.50% - PEDREIRO / ENCANADOR / ARTIFICE (I) H 18,67 24,77 27,77 36,84 30,05 39,86 28,84 38,26 29,05 38,54B020006264 HE-TP.50% - SERVENTE PRATICO (AUX.PRODUCAO/MANUTENCAO) H 12,39 16,44 18,43 24,45 19,94 26,45 19,14 25,39 19,28 25,58B020006267 HE-TP.50% - SERVENTE H 11,74 15,57 17,46 23,16 18,89 25,06 18,13 24,05 18,27 24,24B020006268 HE-TP.50% - SERVENTE (I) H 11,74 15,57 17,46 23,16 18,89 25,06 18,13 24,05 18,27 24,24B020006269 HE-TP.50% - SERVENTE PRATICO H 12,39 18,43 24,45 19,94 26,45 19,14 25,39 19,28 25,58B020006340 HE-TP.50% - ZELADOR H 11,90 15,79 17,71 23,49 19,16 25,42 18,39 24,40 18,53 24,58B020006343 HE-TP.50% - VIGIA H 12,39 16,44 18,43 24,45 19,94 26,45 19,14 25,39 19,28 25,58

B020007000 HORAS EXTRAS TIPO 70% (dias de sabado)B020007119 HE-TP.70% - ELETRICISTA H 21,16 28,07 31,48 41,76 34,07 45,20 32,69 43,37 32,94 43,70B020007128 HE-TP.70% - MECANICO H 21,57 28,61 32,09 42,57 34,73 46,07 33,32 44,20 33,58 44,55B020007134 HE-TP.70% - MOTORISTA H 21,11 28,00 31,40 41,66 33,98 45,08 32,61 43,26 32,85 43,58

B020007137HE-TP.70% - OPERADOR DE EQUIPAMENTO PESADO (HIGH -VELOCIT / RETRO / MUNCK) H 23,60 31,31 35,11 46,58 38,00 50,41 36,46 48,37 36,74 48,74

B020007149 HE-TP.70% - OPERADOR K 500/COMPRESSOR/MP H 24,42 32,40 36,33 48,20 39,32 52,16 37,73 50,05 38,01 50,42B020007173 HE-TP.70% - FISCAL DE CAMPO H 21,16 28,07 31,48 41,76 34,07 45,20 32,69 43,37 32,94 43,70B020007176 HE-TP.70% - MECANICO INDUSTRIAL H 21,57 28,61 32,09 42,57 34,73 46,07 33,32 44,20 33,58 44,55B020007179 HE-TP.70% - MECANICO MONTADOR H 21,57 28,61 32,09 42,57 34,73 46,07 33,32 44,20 33,58 44,55B020007182 HE-TP.70% - JATISTA H 13,58 18,02 20,20 26,80 21,86 29,00 20,98 27,83 21,14 28,04B020007185 HE-TP.70% - ELETRICISTA INDUSTRIAL H 27,74 36,80 41,26 54,74 44,66 59,25 42,85 56,84 43,17 57,27B020007188 HE-TP.70% - ELETRICISTA MONTADOR H 21,54 28,57 32,04 42,50 34,67 45,99 33,27 44,14 33,52 44,47B020007191 HE-TP.70% - TECNICO EM AUTOMACAO H 68,05 90,28 101,24 134,30 109,55 145,33 105,13 139,47 105,92 140,51B020007216 HE-TP.70% - TORNEIRO MECANICO H 21,57 28,61 32,09 42,57 34,73 46,07 33,32 44,20 33,58 44,55B020007231 HE-TP.70% - AUXILIAR TECNICO (OPERACAO/MANUTENCAO/SERVICOS) H 21,57 28,61 32,09 42,57 34,73 46,07 33,32 44,20 33,58 44,55B020007234 HE-TP.70% - TECNICO DE NIVEL MEDIO H 30,94 41,05 46,03 61,06 49,81 66,08 47,80 63,41 48,16 63,89B020007240 HE-TP.70% - AUXILIAR DE PRODUCAO H 14,03 18,61 20,87 27,69 22,58 29,95 21,67 28,75 21,83 28,96B020007258 HE-TP.70% - PEDREIRO/ENCANADOR/ARTIFICE (M) H 21,16 28,07 31,48 41,76 34,07 45,20 32,69 43,37 32,94 43,70B020007264 HE-TP.70% - SERVENTE PRATICO (AUX.OPERACAO/MANUTENCAO) H 14,03 18,61 20,87 27,69 22,58 29,95 21,67 28,75 21,83 28,96B020007267 HE-TP.70% - SERVENTE - (M) H 13,30 17,64 19,79 26,25 21,41 28,40 20,55 27,26 20,70 27,46B020007268 HE-TP.70% - SERVENTE PRATICO - (M) H 14,03 18,61 20,87 27,69 22,58 29,95 21,67 28,75 21,83 28,96

B020007334 HE-TP.70% - AUXILIAR ADMINISTRATIVO H 19,36 28,79 38,19 31,16 41,34 29,90 39,67 30,13 39,97B020007340 HE-TP.70% - ZELADOR H 13,49 17,90 20,06 26,61 21,71 28,80 20,84 27,65 20,99 27,85B020007343 HE-TP.70% - VIGIA H 14,03 18,61 20,87 27,69 22,58 29,95 21,67 28,75 21,83 28,96B020007407 HE-TP.70% - ASSISTENTE SOCIAL - AS5 H 132,82 176,20 197,59 262,12 213,83 283,67 205,19 272,21 206,73 274,25

B020008000 HORAS EXTRAS TIPO 110% (domingos e feriados)B020008119 HE-TP.110% - ELETRICISTA H 26,14 34,68 38,88 51,58 42,08 55,82 40,38 53,57 40,68 53,97B020008128 HE-TP.110% - MECANICO H 26,64 35,34 39,63 52,57 42,89 56,90 41,15 54,59 41,46 55,00B020008134 HE-TP.110% - MOTORISTA H 26,08 34,60 38,80 51,47 41,99 55,70 40,29 53,45 40,59 53,85

B020008137HE-TP.110% - OPERADOR DE EQUIPAMENTO PESADO (HIGH -VELOCIT / RETRO / MUNCK) H 29,15 38,67 43,37 57,53 46,93 62,26 45,04 59,75 45,38 60,20

B020008149 HE-TP.110% - OPERADOR K-500 H 30,16 40,01 44,87 59,52 48,55 64,41 46,59 61,81 46,94 62,27B020008173 HE-TP.110% - FISCAL DE CAMPO H 26,14 34,68 38,88 51,58 42,08 55,82 40,38 53,57 40,68 53,97B020008176 HE-TP.110% - MECANICO INDUSTRIAL H 26,64 35,34 39,63 52,57 42,89 56,90 41,15 54,59 41,46 55,00B020008179 HE-TP.110% - MECANICO MONTADOR H 26,64 35,34 39,63 52,57 42,89 56,90 41,15 54,59 41,46 55,00B020008182 HE-TP.110% - JATISTA H 16,78 22,26 24,97 33,13 27,02 35,84 25,93 34,40 26,12 34,65B020008185 HE-TP.110% - ELETRICISTA INDUSTRIAL H 34,28 45,48 50,99 67,64 55,18 73,20 52,95 70,24 53,35 70,77B020008188 HE-TP.110% - ELETRICISTA MONTADOR H 26,60 35,29 39,57 52,49 42,83 56,82 41,09 54,51 41,40 54,92B020008191 HE-TP.110% - TECNICO EM AUTOMACAO H 84,07 111,53 125,07 165,92 135,34 179,54 129,88 172,30 130,85 173,59B020008216 HE-TP.110% - TORNEIRO MECANICO H 26,64 35,34 39,63 52,57 42,89 56,90 41,15 54,59 41,46 55,00B020008231 HE-TP.110% - AUXILIAR TECNICO (OPERACAO/MANUTENCAO/SERVICOS) H 26,64 35,34 39,63 52,57 42,89 56,90 41,15 54,59 41,46 55,00B020008234 HE-TP.110% - TECNICO DE NIVEL MEDIO H 38,23 50,72 56,87 75,44 61,54 81,64 59,05 78,34 59,50 78,93B020008240 HE-TP.110% - AUXILIAR DE PRODUCAO H 17,34 23,00 25,80 34,23 27,92 37,04 26,79 35,54 26,99 35,80B020008258 HE-TP.110% - PEDREIRO/ENCANADOR/ARTIFICE (M) H 26,14 34,68 38,88 51,58 42,08 55,82 40,38 53,57 40,68 53,97B020008264 HE-TP.110% - SERVENTE PRATICO (AUX.MANUTENCAO/OPERACAO) H 17,34 23,00 25,80 34,23 27,92 37,04 26,79 35,54 26,99 35,80

B020008267 HE-TP.110% - SERVENTE - (M) H 16,43 24,44 32,42 26,45 35,09 25,38 33,67 25,57 33,92B020008268 HE-TP.110% - SERVENTE PRATICO - (M) H 17,34 23,00 25,80 34,23 27,92 37,04 26,79 35,54 26,99 35,80B020008334 HE-TP.110% - AUXILIAR ADMINISTRATIVO H 23,90 31,71 35,56 47,17 38,48 51,05 36,92 48,98 37,20 49,35B020008340 HE-TP.110% - ZELADOR H 16,67 22,11 24,80 32,90 26,84 35,61 25,76 34,17 25,95 34,43B020008343 HE-TP.110% - VIGIA H 17,34 23,00 25,80 34,23 27,92 37,04 26,79 35,54 26,99 35,80

B020010000 ADICIONAL NOTURNOB020010101 AN - AGENTE DE MANUTENCAO H 5,03 6,67 7,48 9,92 8,10 10,75 7,77 10,31 7,83 10,39B020010134 AN - MOTORISTA H 4,97 6,59 7,40 9,82 8,01 10,63 7,68 10,19 7,74 10,27B020010137 AN - OPERADOR EQUIPAMENTO PESADO (HIGH -VELOCIT / RETRO / MUNCK) H 5,55 7,36 8,26 10,96 8,94 11,86 8,58 11,38 8,64 11,46B020010149 AN - OPERADOR K-500/COMPRESOR / M.NEUM H 5,74 7,61 8,54 11,33 9,24 12,26 8,86 11,75 8,93 11,85B020010176 AN - MECANICO INDUSTRIAL H 5,07 6,73 7,54 10,00 8,16 10,83 7,83 10,39 7,89 10,47B020010179 AN - MECANICO MONTADOR H 5,07 6,73 7,54 10,00 8,16 10,83 7,83 10,39 7,89 10,47B020010182 AN - JATISTA H 3,20 4,25 4,77 6,33 5,16 6,85 4,95 6,57 4,99 6,62B020010185 AN - ELETRICISTA INDUSTRIAL H 6,52 8,65 9,70 12,87 10,50 13,93 10,07 13,36 10,15 13,46B020010188 AN - ELETRICISTA MONTADOR H 5,07 6,73 7,54 10,00 8,16 10,83 7,83 10,39 7,89 10,47B020010191 AN - TECNICO EM AUTOMACAO H 16,02 21,25 23,83 31,61 25,79 34,21 24,75 32,83 24,94 33,09

B020010258 AN - PEDREIRO/ENCANADOR/ARTIFICE (M) H 4,97 7,40 9,82 8,01 10,63 7,68 10,19 7,74 10,27B020010261 AN - PEDREIRO/ENCANADOR/ARTIFICE (I) H 4,97 6,59 7,40 9,82 8,01 10,63 7,68 10,19 7,74 10,27B020010267 AN - SERVENTE - (M) H 3,13 4,15 4,66 6,18 5,04 6,69 4,83 6,41 4,87 6,46B020010268 AN - SERVENTE - (I) H 3,13 4,15 4,66 6,18 5,04 6,69 4,83 6,41 4,87 6,46B020010343 AN - VIGIA H 3,30 4,38 4,91 6,51 5,31 7,04 5,09 6,75 5,13 6,81B029010267 AN - SERVENTE PRATICO - (M) (MRR/RMS) H 3,30 4,38 4,91 6,51 5,31 7,04 5,09 6,75 5,13 6,81

B500000000 MAO DE OBRA - MENSALISTA

B510000000 GERENCIA DE CONTRATOB510000001 GERENTE DE CONTRATO MES 18.687,29 24.790,56 29.988,23 39.782,39 32.820,62 43.539,83 31.313,00 41.539,83 31.581,68 41.896,26

B520000000 GERENCIA DE ENGENHARIA

B520000100 SALA TECNICA

Página: 2 de 59

Page 3: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

B520000101 GERENTE DE ENGENHARIA MES 18.623,88 24.706,44 29.886,47 39.647,39 32.709,25 43.392,09 31.206,74 41.398,86 31.474,51 41.754,08B520000104 ENGENHEIRO OU ARQUITETO (OBRA) MES 11.237,20 14.907,27 18.032,78 23.922,29 19.735,98 26.181,75 18.829,40 24.979,08 18.990,97 25.193,42B520000107 TECNICO EM PLANEJAMENTO MES 3.234,90 4.291,42 5.191,18 6.886,62 5.681,48 7.537,05 5.420,50 7.190,84 5.467,01 7.252,54B520000110 TECNICO EM MEDICOES MES 3.234,90 4.291,42 5.191,18 6.886,62 5.681,48 7.537,05 5.420,50 7.190,84 5.467,01 7.252,54B520000113 ESTAGIARIO MES 2.348,32 3.115,28 3.768,44 4.999,21 4.124,37 5.471,39 3.934,92 5.220,06 3.968,68 5.264,85B520000116 DESENHISTA/CADISTA MES 1.882,23 2.496,97 3.020,49 4.006,98 3.305,78 4.385,45 3.153,93 4.184,00 3.180,99 4.219,90

B520000119 DIGITADOR MES 1.963,21 3.150,43 4.179,36 3.447,99 4.574,10 3.289,61 4.364,00 3.317,83 4.401,43B520000122 PROGRAMADOR MES 6.978,38 9.257,52 11.198,48 14.855,90 12.256,18 16.259,05 11.693,19 15.512,19 11.793,52 15.645,28

B520000200 TOPOGRAFIA E LABORATORIOB520000201 TOPOGRAFO MES 3.389,95 4.497,11 5.439,99 7.216,69 5.953,80 7.898,31 5.680,31 7.535,50 5.729,05 7.600,16B520000204 NIVELADOR MES 2.964,64 3.932,89 4.757,47 6.311,26 5.206,82 6.907,37 4.967,64 6.590,07 5.010,27 6.646,62

B520000207 AUXILIAR DE TOPOGRAFO MES 2.600,33 4.172,85 5.535,70 4.566,98 6.058,56 4.357,19 5.780,25 4.394,58 5.829,85B520000210 LABORATORISTA MES 2.896,16 3.842,05 4.647,59 6.165,49 5.086,55 6.747,82 4.852,90 6.437,86 4.894,54 6.493,10B520000213 AUXILIAR DE LABORATORISTA MES 1.622,23 2.152,05 2.603,25 3.453,47 2.849,13 3.779,66 2.718,26 3.606,04 2.741,58 3.636,98B520000216 SERVENTE DE LABORATORIO MES 1.388,13 1.841,49 2.227,58 2.955,11 2.437,97 3.234,21 2.325,99 3.085,66 2.345,94 3.112,12

B530000000 GERENCIA DE QUALIDADEB530000001 GERENTE DE QUALIDADE MES 18.623,88 24.706,44 29.886,47 39.647,39 32.709,25 43.392,09 31.206,74 41.398,86 31.474,51 41.754,08B530000003 ENGENHEIRO DE QUALIDADE MES 11.237,20 14.907,27 18.032,78 23.922,29 19.735,98 26.181,75 18.829,40 24.979,08 18.990,97 25.193,42B530000007 TECNICO DE QUALIDADE MES 3.234,90 4.291,42 5.191,18 6.886,62 5.681,48 7.537,05 5.420,50 7.190,84 5.467,01 7.252,54B530000010 INSPETOR MES 3.234,90 4.291,42 5.191,18 6.886,62 5.681,48 7.537,05 5.420,50 7.190,84 5.467,01 7.252,54

B540000000 GERENCIA ADMINISTRATIVA FINANCEIRAB540000050 AUXILIAR DE SEGURANCA MES 2.165,33 2.872,53 3.474,78 4.609,64 3.802,98 5.045,03 3.628,29 4.813,29 3.659,42 4.854,59B540000051 MEDICO MES 10.221,39 13.559,70 16.402,67 21.759,78 17.951,91 23.815,00 17.127,28 22.721,05 17.274,24 22.916,01B540000052 MECANICO DE EQUIPAMENTOS PESADOS MES 2.818,25 3.738,69 4.522,56 5.999,63 4.949,72 6.566,30 4.722,35 6.264,67 4.762,87 6.318,42B540000057 ENGENHEIRO MECANICO MES 11.237,20 14.907,27 18.032,78 23.922,29 19.735,98 26.181,75 18.829,40 24.979,08 18.990,97 25.193,42B540000058 ENGENHEIRO DE PLANEJAMENTO MES 14.002,08 18.575,16 22.469,69 29.808,29 24.591,95 32.623,68 23.462,32 31.125,11 23.663,64 31.392,18B540000060 ENGENHEIRO ELETRICISTA MES 11.237,20 14.907,27 18.032,78 23.922,29 19.735,98 26.181,75 18.829,40 24.979,08 18.990,97 25.193,42B540000061 ENGENHEIRO GEOTECNICO MES 11.237,20 14.907,27 18.032,78 23.922,29 19.735,98 26.181,75 18.829,40 24.979,08 18.990,97 25.193,42B540000062 AUXILIAR DE TOPOGRAFO MES 2.600,33 3.449,60 4.172,85 5.535,70 4.566,98 6.058,56 4.357,19 5.780,25 4.394,58 5.829,85

B540000100 ADMINISTRACAO DE ESCRITORIOB540000101 GERENTE ADMINISTRATIVO FINANCEIRO MES 18.623,88 24.706,44 29.886,47 39.647,39 32.709,25 43.392,09 31.206,74 41.398,86 31.474,51 41.754,08B540000104 ENCARREGADO ADMINISTRATIVO FINANCEIRO MES 2.987,77 3.963,58 4.794,60 6.360,52 5.247,45 6.961,27 5.006,41 6.641,50 5.049,36 6.698,48B540000107 AUXILIAR DE SUPRIMENTO MES 1.894,64 2.513,43 3.040,40 4.033,39 3.327,57 4.414,35 3.174,72 4.211,58 3.201,96 4.247,72B540000110 AUXILIAR DE ESCRITORIO MES 1.894,64 2.513,43 3.040,40 4.033,39 3.327,57 4.414,35 3.174,72 4.211,58 3.201,96 4.247,72B540000113 SECRETARIA/DATILOGRAFA MES 3.229,04 4.283,64 5.181,77 6.874,14 5.671,19 7.523,40 5.410,68 7.177,81 5.457,11 7.239,40B540000116 RECEPCIONISTA/TELEFONISTA MES 1.544,33 2.048,71 2.478,25 3.287,65 2.712,33 3.598,18 2.587,73 3.432,88 2.609,94 3.462,35B540000119 AUXILIAR DE SERVICOS EXTERNOS MES 1.398,90 1.855,78 2.244,86 2.978,03 2.456,89 3.259,31 2.344,03 3.109,59 2.364,15 3.136,28

B540000200 SETOR PESSOALB540000201 ENCARREGADO DE PESSOAL MES 2.987,77 3.963,58 4.794,60 6.360,52 5.247,45 6.961,27 5.006,41 6.641,50 5.049,36 6.698,48B540000204 AUXILIAR DE PESSOAL MES 2.019,39 2.678,92 3.240,60 4.298,98 3.546,67 4.705,01 3.383,75 4.488,88 3.412,79 4.527,41

B540000300 ALMOXARIFADO E SUPRIMENTOSB540000301 GERENTE DE SUPRIMENTOS MES 18.623,88 24.706,44 29.886,47 39.647,39 32.709,25 43.392,09 31.206,74 41.398,86 31.474,51 41.754,08B540000304 ENCARREGADO DE SUPRIMENTOS MES 2.987,77 3.963,58 4.794,60 6.360,52 5.247,45 6.961,27 5.006,41 6.641,50 5.049,36 6.698,48B540000307 ALMOXARIFE MES 2.531,47 3.358,25 4.062,34 5.389,10 4.446,03 5.898,10 4.241,80 5.627,17 4.278,20 5.675,46B540000310 COMPRADOR MES 2.049,66 2.719,08 3.289,17 4.363,41 3.599,84 4.775,55 3.434,48 4.556,18 3.463,95 4.595,28B540000313 AUXILIAR DE SUPRIMENTO/ALMOXARIFE MES 1.398,87 1.855,74 2.244,82 2.977,98 2.456,84 3.259,24 2.343,98 3.109,52 2.364,10 3.136,22B540000316 SERVENTE DE CARGA E DESCARGA MES 1.388,13 1.841,49 2.227,58 2.955,11 2.437,97 3.234,21 2.325,99 3.085,66 2.345,94 3.112,12

B540000319 FERRAMENTEIRO MES 1.398,87 1.855,74 2.244,82 2.977,98 2.456,84 3.259,24 2.343,98 3.109,52 2.364,10 3.136,22

B540000400 SERVICOS GERAIS, ALOJAMENTO, REFEITORIO E TRANSPORTESB540000401 ENCARREGADOS DE SERVICOS GERAIS MES 2.987,77 3.963,58 4.794,60 6.360,52 5.247,45 6.961,27 5.006,41 6.641,50 5.049,36 6.698,48B540000404 AUXILIAR DE SERVICOS GERAIS MES 1.401,23 1.858,87 2.248,60 2.982,99 2.460,98 3.264,74 2.347,94 3.114,78 2.368,08 3.141,49B540000407 ENCARREGADOS DE ALOJAMENTOS MES 2.987,77 3.963,58 4.794,60 6.360,52 5.247,45 6.961,27 5.006,41 6.641,50 5.049,36 6.698,48B540000410 ENCARREGADO DE REFEITORIO MES 2.987,77 3.963,58 4.794,60 6.360,52 5.247,45 6.961,27 5.006,41 6.641,50 5.049,36 6.698,48B540000413 COZINHEIRA MES 1.658,81 2.200,58 2.661,96 3.531,36 2.913,38 3.864,89 2.779,55 3.687,35 2.803,40 3.718,99B540000416 AJUDANTE COZINHEIRA MES 1.579,82 2.095,79 2.535,20 3.363,20 2.774,65 3.680,85 2.647,19 3.511,76 2.669,91 3.541,90

B540000419 ENCARREGADOS DE TRANSPORTES MES 2.987,77 3.963,58 4.794,60 6.360,52 5.247,45 6.961,27 5.006,41 6.641,50 5.049,36 6.698,48B540000422 MOTORISTA DE VEICULO PESADO MES 2.351,94 3.120,08 3.774,25 5.006,92 4.130,73 5.479,83 3.940,98 5.228,10 3.974,80 5.272,97B540000425 MOTORISTA DE VEICULO LEVE MES 2.202,90 2.922,37 3.535,08 4.689,64 3.868,96 5.132,56 3.691,24 4.896,80 3.722,92 4.938,83B540000428 VIGILANTE DIURNO MES 1.464,47 1.942,77 2.350,10 3.117,64 2.572,06 3.412,09 2.453,91 3.255,36 2.474,97 3.283,30B540000431 VIGILANTE NOTURNO MES 2.118,21 2.810,02 3.399,18 4.509,35 3.720,23 4.935,26 3.549,34 4.708,55 3.579,80 4.748,96

B540000500 SERVICOS SSHMTB540000501 ENGENHEIRO DE SEGURANCA MES 11.237,20 14.907,27 18.032,78 23.922,29 19.735,98 26.181,75 18.829,40 24.979,08 18.990,97 25.193,42B540000504 SUPERVISOR DE SEGURANCA MES 6.978,39 9.257,53 11.198,50 14.855,93 12.256,20 16.259,07 11.693,21 15.512,21 11.793,55 15.645,32B540000507 MEDICO MES 10.221,39 13.559,70 16.402,67 21.759,78 17.951,91 23.815,00 17.127,28 22.721,05 17.274,24 22.916,01B540000510 ENFERMEIRO MES 7.778,79 10.319,34 12.482,93 16.559,85 13.661,94 18.123,93 13.034,38 17.291,41 13.146,22 17.439,78B540000513 AUXILIAR DE ENFERMAGEM MES 2.206,17 2.926,71 3.540,33 4.696,60 3.874,72 5.140,20 3.696,73 4.904,08 3.728,45 4.946,16B540000516 ASSISTENTE SOCIAL - AS5 MES 13.861,42 18.388,56 22.243,97 29.508,85 24.344,91 32.295,96 23.226,62 30.812,43 23.425,92 31.076,83B549000507 MEDICO DO TRABALHO MES 10.221,39 13.559,70 16.402,67 21.759,78 17.951,91 23.815,00 17.127,28 22.721,05 17.274,24 22.916,01

B550000000 GERENCIA DE PRODUCAO

B550000100 COORDENACAOB550000101 GERENTE DE PRODUCAO MES 18.623,88 24.706,44 29.886,47 39.647,39 32.709,25 43.392,09 31.206,74 41.398,86 31.474,51 41.754,08B550000102 ENGENHEIRO DE PRODUCAO P-1 MES 14.912,70 19.783,19 23.931,00 31.746,86 26.191,28 34.745,35 24.988,18 33.149,32 25.202,59 33.433,76B550000104 ENGENHEIRO DE PRODUCAO P-2 MES 11.359,19 15.069,10 18.228,54 24.181,98 19.950,23 26.465,98 19.033,81 25.250,25 19.197,13 25.466,91B550000107 ENGENHEIRO DE PRODUCAO P-3 MES 11.237,20 14.907,27 18.032,78 23.922,29 19.735,98 26.181,75 18.829,40 24.979,08 18.990,97 25.193,42B550000110 ENGENHEIRO DE SEGURANCA - P1 H 67,78 89,92 108,78 144,31 119,05 157,93 113,58 150,68 114,56 151,98B550000113 MESTRE DE OBRAS MES 4.039,96 5.359,41 6.483,08 8.600,45 7.095,40 9.412,76 6.769,47 8.980,38 6.827,56 9.057,44B550000116 APONTADOR MES 1.747,87 2.318,72 2.804,87 3.720,94 3.069,79 4.072,38 2.928,78 3.885,32 2.953,91 3.918,66

B550000200 CENTRAIS DE PRODUCAOB550000201 CONTRA-MESTRE DE ARMACAO MES 3.635,96 4.823,46 5.834,76 7.740,39 6.385,86 8.471,48 6.092,52 8.082,34 6.144,80 8.151,69B550000204 CONTRA-MESTRE DE FORMA MES 3.635,96 4.823,46 5.834,76 7.740,39 6.385,86 8.471,48 6.092,52 8.082,34 6.144,80 8.151,69B550000207 CONTRA-MESTRE DE CONCRETO MES 3.635,96 4.823,46 5.834,76 7.740,39 6.385,86 8.471,48 6.092,52 8.082,34 6.144,80 8.151,69B550000210 CONTRA-MESTRE DE BRITAGEM MES 3.635,96 4.823,46 5.834,76 7.740,39 6.385,86 8.471,48 6.092,52 8.082,34 6.144,80 8.151,69B550000213 CONTRA-MESTRE DE USINA DE SOLOS MES 3.635,96 4.823,46 5.834,76 7.740,39 6.385,86 8.471,48 6.092,52 8.082,34 6.144,80 8.151,69B550000216 CONTRA-MESTRE DE USINA DE ASFALTO MES 3.635,96 4.823,46 5.834,76 7.740,39 6.385,86 8.471,48 6.092,52 8.082,34 6.144,80 8.151,69

B550000300 FRENTES DE SERVICOSB550000301 CABO DE TURMA DE CARPINTEIROS MES 2.689,00 3.567,23 4.315,14 5.724,46 4.722,70 6.265,13 4.505,77 5.977,35 4.544,43 6.028,64B550000303 CABO DE TURMA DE SERVENTES MES 2.689,00 3.567,23 4.315,14 5.724,46 4.722,70 6.265,13 4.505,77 5.977,35 4.544,43 6.028,64B550000304 CABO DE TURMA DE PEDREIROS MES 2.689,00 3.567,23 4.315,14 5.724,46 4.722,70 6.265,13 4.505,77 5.977,35 4.544,43 6.028,64B550000307 CABO DE TURMA DE ARMADOR MES 2.689,00 3.567,23 4.315,14 5.724,46 4.722,70 6.265,13 4.505,77 5.977,35 4.544,43 6.028,64

B550000310 ENCARREGADO DE INSTALACOES ELETRICAS MES 2.987,77 3.963,58 4.794,60 6.360,52 5.247,45 6.961,27 5.006,41 6.641,50 5.049,36 6.698,48B550000313 ENCARREGADO DE INSTALACOES HIDRO-SANITARIAS MES 2.987,77 3.963,58 4.794,60 6.360,52 5.247,45 6.961,27 5.006,41 6.641,50 5.049,36 6.698,48B550000314 ENCARREGADO DE BRITAGEM MES 2.987,77 3.963,58 4.794,60 6.360,52 5.247,45 6.961,27 5.006,41 6.641,50 5.049,36 6.698,48B550000316 ENCARREGADO DE TERRAPLANAGEM MES 2.987,77 3.963,58 4.794,60 6.360,52 5.247,45 6.961,27 5.006,41 6.641,50 5.049,36 6.698,48B550000319 ENCARREGADO DE PAVIMENTACAO MES 2.987,77 3.963,58 4.794,60 6.360,52 5.247,45 6.961,27 5.006,41 6.641,50 5.049,36 6.698,48B550000322 ENCARREGADO DE JAZIDAS DE SOLO E DESMONTE DE ROCHA MES 2.987,77 3.963,58 4.794,60 6.360,52 5.247,45 6.961,27 5.006,41 6.641,50 5.049,36 6.698,48B550000325 ENCARREGADO DE MANUTENCAO MES 2.987,77 3.963,58 4.794,60 6.360,52 5.247,45 6.961,27 5.006,41 6.641,50 5.049,36 6.698,48B550000328 ENCARREGADO DE INSTALACOES MECANICAS MES 2.987,77 3.963,58 4.794,60 6.360,52 5.247,45 6.961,27 5.006,41 6.641,50 5.049,36 6.698,48B550000331 ENCARREGADO FINANCEIRO MES 2.987,77 3.963,58 4.794,60 6.360,52 5.247,45 6.961,27 5.006,41 6.641,50 5.049,36 6.698,48B550000334 ENCARREGADO DE MONTAGEM MES 2.987,77 3.963,58 4.794,60 6.360,52 5.247,45 6.961,27 5.006,41 6.641,50 5.049,36 6.698,48

B550000400 APOIO DE PRODUCAO/CANTEIROB550000401 ELETRICISTA MES 2.207,78 2.928,84 3.542,91 4.700,02 3.877,54 5.143,94 3.699,42 4.907,65 3.731,17 4.949,77B550000404 ENCANADOR MES 2.207,78 2.928,84 3.542,91 4.700,02 3.877,54 5.143,94 3.699,42 4.907,65 3.731,17 4.949,77B550000407 SERVENTE MES 1.388,13 1.841,49 2.227,58 2.955,11 2.437,97 3.234,21 2.325,99 3.085,66 2.345,94 3.112,12B550000408 SERVENTE DE LIMPEZA MES 1.501,71 1.992,17 2.409,86 3.196,92 2.637,47 3.498,87 2.516,32 3.338,15 2.537,91 3.366,79B559000001 ENG. FLORESTAL / AGRONOMO H 51,08 67,76 81,97 108,74 89,71 119,01 85,59 113,54 86,32 114,51B559710301 ENGENHEIRO DE PLANEJAMENTO MES 14.002,08 18.575,16 22.469,69 29.808,29 24.591,95 32.623,68 23.462,32 31.125,11 23.663,64 31.392,18

B560000000 MAO DE OBRA DE OFICINA E MANUTENCAO

B560000001 ENGENHEIRO MECANICO MES 11.359,19 15.069,10 18.228,54 24.181,98 19.950,23 26.465,98 19.033,81 25.250,25 19.197,13 25.466,91B560000004 TECNICO DE MANUTENCAO MES 3.229,04 4.283,64 5.181,77 6.874,14 5.671,19 7.523,40 5.410,68 7.177,81 5.457,11 7.239,40B560000007 ENCARREGADO DE MANUTENCAO MES 2.987,77 3.963,58 4.794,60 6.360,52 5.247,45 6.961,27 5.006,41 6.641,50 5.049,36 6.698,48B560000010 ENCARREGADO DE OFICINA MES 2.987,77 3.963,58 4.794,60 6.360,52 5.247,45 6.961,27 5.006,41 6.641,50 5.049,36 6.698,48B560000013 ENCARREGADO DE LUBRIFICACAO MES 2.987,77 3.963,58 4.794,60 6.360,52 5.247,45 6.961,27 5.006,41 6.641,50 5.049,36 6.698,48B560000016 ENCARREGADO DE ELETRICA DE OFICINA MES 2.804,70 3.720,72 4.500,82 5.970,79 4.925,92 6.534,73 4.699,65 6.234,56 4.739,97 6.288,04B560000019 MECANICO DE EQUIPAMENTOS LEVES MES 2.247,22 2.981,16 3.606,20 4.783,98 3.946,80 5.235,82 3.765,50 4.995,31 3.797,81 5.038,17B560000022 MECANICO DE EQUIPAMENTOS PESADOS MES 2.818,25 3.738,69 4.522,56 5.999,63 4.949,72 6.566,30 4.722,35 6.264,67 4.762,87 6.318,42B560000023 ELETRICISTA DE OFICINA MES 2.207,78 2.928,84 3.542,91 4.700,02 3.877,54 5.143,94 3.699,42 4.907,65 3.731,17 4.949,77B560000026 SOLDADOR MES 2.207,78 2.928,84 3.542,91 4.700,02 3.877,54 5.143,94 3.699,42 4.907,65 3.731,17 4.949,77B560000029 MACARIQUEIRO MES 3.001,54 3.981,84 4.816,68 6.389,81 5.271,62 6.993,33 5.029,46 6.672,08 5.072,62 6.729,34B560000032 SERRALHEIRO MES 2.115,24 2.806,08 3.394,41 4.503,02 3.715,01 4.928,33 3.544,36 4.701,95 3.574,77 4.742,29B560000035 TORNEIRO MES 2.250,75 2.985,84 3.611,86 4.791,49 3.953,00 5.244,05 3.771,42 5.003,17 3.803,78 5.046,09B560000038 LUBRIFICADOR MES 2.250,75 2.985,84 3.611,86 4.791,49 3.953,00 5.244,05 3.771,42 5.003,17 3.803,78 5.046,09B560000041 BORRACHEIRO MES 2.250,75 2.985,84 3.611,86 4.791,49 3.953,00 5.244,05 3.771,42 5.003,17 3.803,78 5.046,09B560000044 PINTOR OFICINA MES 2.207,78 2.928,84 3.542,91 4.700,02 3.877,54 5.143,94 3.699,42 4.907,65 3.731,17 4.949,77B560000047 AJUDANTE MES 1.579,82 2.095,79 2.535,20 3.363,20 2.774,65 3.680,85 2.647,19 3.511,76 2.669,91 3.541,90

B570000000 MAO DE OBRA PARA SERVICOS OPERACIONAIS E COMERCIAL - MENSALISTAB570001000 AGENTE OPERACIONAL MES 2.247,44 2.981,45 3.606,56 4.784,46 3.947,20 5.236,36 3.765,88 4.995,82 3.798,19 5.038,68B570001001 AGENTE DE MANUTENCAO MES 2.230,92 2.959,54 3.580,04 4.749,28 3.918,17 5.197,84 3.738,19 4.959,08 3.770,27 5.001,64B570001004 AGENTE DE MEDICAO (PITOMETRIA) MES 2.323,46 3.082,30 3.728,54 4.946,28 4.080,70 5.413,46 3.893,26 5.164,80 3.926,66 5.209,11

Página: 3 de 59

Page 4: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

B570001007 AGENTE DE SERVICOS MES 1.543,46 2.047,55 2.476,86 3.285,80 2.710,79 3.596,13 2.586,27 3.430,95 2.608,47 3.460,40B570001010 AGENTE DE SISTEMA MES 2.247,44 2.981,45 3.606,56 4.784,46 3.947,20 5.236,36 3.765,88 4.995,82 3.798,19 5.038,68B570001013 DESENHISTA / CADISTA MES 1.882,23 2.496,97 3.020,49 4.006,98 3.305,78 4.385,45 3.153,93 4.184,00 3.180,99 4.219,90B570001016 DESENHISTA / COPISTA MES 1.618,01 2.146,45 2.596,48 3.444,49 2.841,72 3.769,83 2.711,18 3.596,65 2.734,45 3.627,52B570001019 ELETRICISTA MES 2.207,78 2.928,84 3.542,91 4.700,02 3.877,54 5.143,94 3.699,42 4.907,65 3.731,17 4.949,77B570001022 LEITURISTA (I) MES 1.659,14 2.201,02 2.662,49 3.532,06 2.913,96 3.865,66 2.780,11 3.688,09 2.803,96 3.719,73B570001025 LEITURISTA (M) MES 1.867,36 2.477,24 2.996,62 3.975,32 3.279,66 4.350,80 3.129,00 4.150,93 3.155,85 4.186,55B570001028 MECANICO MES 2.250,75 2.985,84 3.611,86 4.791,49 3.953,00 5.244,05 3.771,42 5.003,17 3.803,78 5.046,09B570001031 MONITOR DE SERVICOS MES 2.521,76 3.345,37 4.046,77 5.368,45 4.428,99 5.875,50 4.225,54 5.605,60 4.261,80 5.653,70B570001034 MOTORISTA MES 2.202,90 2.922,37 3.535,08 4.689,64 3.868,96 5.132,56 3.691,24 4.896,80 3.722,92 4.938,83B570001037 OPERADOR DE EQUIPAMENTO PESADO MES 2.462,27 3.266,45 3.951,30 5.241,79 4.324,50 5.736,88 4.125,85 5.473,35 4.161,26 5.520,33B570001040 OPERADOR DE RETRO / MUNCK / EQUIPAMENTO PESADO MES 2.462,27 3.266,45 3.951,30 5.241,79 4.324,50 5.736,88 4.125,85 5.473,35 4.161,26 5.520,33B570001046 MOTORISTA (VEICULO PESADO - HIDROJATO) MES 2.351,94 3.120,08 3.774,25 5.006,92 4.130,73 5.479,83 3.940,98 5.228,10 3.974,80 5.272,97B570001049 OPERADOR K-500 / COMPRESSOR / M.PNEUM. MES 2.548,20 3.380,44 4.089,20 5.424,73 4.475,42 5.937,09 4.269,84 5.664,37 4.306,48 5.712,98B570001052 OPERADOR DE PROCESSOS ETA - MEDIA MES 2.207,78 2.928,84 3.542,91 4.700,02 3.877,54 5.143,94 3.699,42 4.907,65 3.731,17 4.949,77B570001055 OPERADOR DE ETA PEQUENA MES 1.599,65 2.122,10 2.567,02 3.405,41 2.809,47 3.727,04 2.680,42 3.555,85 2.703,42 3.586,36B570001058 OPERADOR DE ETA MEDIA MES 1.758,29 2.332,55 2.821,60 3.743,13 3.088,10 4.096,67 2.946,25 3.908,50 2.971,53 3.942,03B570001061 OPERADOR DE ETA GRANDE MES 2.207,78 2.928,84 3.542,91 4.700,02 3.877,54 5.143,94 3.699,42 4.907,65 3.731,17 4.949,77B570001064 OPERADOR DE SISTEMAS - ETE MES 1.543,46 2.047,55 2.476,86 3.285,80 2.710,79 3.596,13 2.586,27 3.430,95 2.608,47 3.460,40B570001067 SOLDADOR MES 2.207,78 2.928,84 3.542,91 4.700,02 3.877,54 5.143,94 3.699,42 4.907,65 3.731,17 4.949,77B570001070 SUPERVISOR DE CAMPO MES 2.207,78 2.928,84 3.542,91 4.700,02 3.877,54 5.143,94 3.699,42 4.907,65 3.731,17 4.949,77B570001073 FISCAL DE CAMPO MES 2.207,78 2.928,84 3.542,91 4.700,02 3.877,54 5.143,94 3.699,42 4.907,65 3.731,17 4.949,77B570001076 MECANICO INDUSTRIAL MES 2.250,75 2.985,84 3.611,86 4.791,49 3.953,00 5.244,05 3.771,42 5.003,17 3.803,78 5.046,09B570001079 MECANICO MONTADOR MES 2.250,75 2.985,84 3.611,86 4.791,49 3.953,00 5.244,05 3.771,42 5.003,17 3.803,78 5.046,09B570001082 JATISTA MES 1.417,87 1.880,95 2.275,31 3.018,43 2.490,22 3.303,53 2.375,83 3.151,78 2.396,21 3.178,81B570001085 ELETRICISTA INDUSTRIAL MES 2.895,23 3.840,81 4.646,09 6.163,50 5.084,92 6.745,65 4.851,34 6.435,79 4.892,97 6.491,01B570001088 ELETRICISTA MONTADOR MES 2.247,44 2.981,45 3.606,56 4.784,46 3.947,20 5.236,36 3.765,88 4.995,82 3.798,19 5.038,68B570001091 TECNICO EM AUTOMACAO MES 7.102,57 9.422,27 11.397,78 15.120,29 12.474,30 16.548,41 11.901,29 15.788,25 12.003,41 15.923,72

B570002000 TECNICO OPERACIONAL E DE SUPORTEB570002001 TECNICO OPERACIONAL (OPERACAO E MANUTENCAO) SANEAMENTO MES 3.229,04 4.283,64 5.181,77 6.874,14 5.671,19 7.523,40 5.410,68 7.177,81 5.457,11 7.239,40B570002004 TECNICO DE SEGURANCA DO TRABALHO MES 3.229,04 4.283,64 5.181,77 6.874,14 5.671,19 7.523,40 5.410,68 7.177,81 5.457,11 7.239,40B570002007 AUXILIAR MECANICO MES 1.394,74 1.850,26 2.238,19 2.969,18 2.449,58 3.249,61 2.337,06 3.100,34 2.357,11 3.126,94B570002010 TECNICO ELETROMECANICO MES 6.220,12 8.251,61 9.981,68 13.241,70 10.924,45 14.492,38 10.422,63 13.826,66 10.512,06 13.945,30B570002013 TECNICO ELETROTECNICO MES 3.447,18 4.573,03 5.531,82 7.338,51 6.054,30 8.031,63 5.776,20 7.662,71 5.825,76 7.728,45B570002016 TORNEIRO MECANICO MES 2.250,75 2.985,84 3.611,86 4.791,49 3.953,00 5.244,05 3.771,42 5.003,17 3.803,78 5.046,09B570002019 TECNICO EM AGRIMENSURA MES 3.229,04 4.283,64 5.181,77 6.874,14 5.671,19 7.523,40 5.410,68 7.177,81 5.457,11 7.239,40B570002022 TECNICO EM TELECOMUNICACOES MES 3.229,04 4.283,64 5.181,77 6.874,14 5.671,19 7.523,40 5.410,68 7.177,81 5.457,11 7.239,40B570002025 TECNICO INSTRUMENTISTA MES 3.229,04 4.283,64 5.181,77 6.874,14 5.671,19 7.523,40 5.410,68 7.177,81 5.457,11 7.239,40B570002028 TECNICO EM QUIMICA MES 3.229,04 4.283,64 5.181,77 6.874,14 5.671,19 7.523,40 5.410,68 7.177,81 5.457,11 7.239,40B570002031 AUXILIAR TECNICO (OPERACAO / MANUTENCAO) SANEAMENTO MES 2.250,75 2.985,84 3.611,86 4.791,49 3.953,00 5.244,05 3.771,42 5.003,17 3.803,78 5.046,09B570002034 TECNICO DE NIVEL MEDIO MES 3.229,04 4.283,64 5.181,77 6.874,14 5.671,19 7.523,40 5.410,68 7.177,81 5.457,11 7.239,40B570002040 AUXILIAR DE PRODUCAO MES 1.464,47 1.942,77 2.350,10 3.117,64 2.572,06 3.412,09 2.453,91 3.255,36 2.474,97 3.283,30B570002043 SUPERVISOR GERAL MES 2.207,78 2.928,84 3.542,91 4.700,02 3.877,54 5.143,94 3.699,42 4.907,65 3.731,17 4.949,77B570002046 SUPERVISOR DE ETA'S / ETE'S MES 2.207,78 2.928,84 3.542,91 4.700,02 3.877,54 5.143,94 3.699,42 4.907,65 3.731,17 4.949,77B570002049 ALMOXARIFE MES 2.531,47 3.358,25 4.062,34 5.389,10 4.446,03 5.898,10 4.241,80 5.627,17 4.278,20 5.675,46B570002052 AUXILIAR DE ALMOXARIFE MES 1.388,13 1.841,49 2.227,58 2.955,11 2.437,97 3.234,21 2.325,99 3.085,66 2.345,94 3.112,12B570002055 ENCARREGADO DE EQUIPES MES 2.987,77 3.963,58 4.794,60 6.360,52 5.247,45 6.961,27 5.006,41 6.641,50 5.049,36 6.698,48B570002058 PEDREIRO / ENCANADOR / ARTIFICE (M) MES 2.207,78 2.928,84 3.542,91 4.700,02 3.877,54 5.143,94 3.699,42 4.907,65 3.731,17 4.949,77B570002061 PEDREIRO / ENCANADOR / ARTIFICE (I) MES 2.207,78 2.928,84 3.542,91 4.700,02 3.877,54 5.143,94 3.699,42 4.907,65 3.731,17 4.949,77B570002064 SERVENTE PRATICO (AUXILIAR DE PRODUCAO / MANUTENCAO) - (M) MES 1.464,47 1.942,77 2.350,10 3.117,64 2.572,06 3.412,09 2.453,91 3.255,36 2.474,97 3.283,30B570002065 SERVENTE PRATICO (AUXILIAR DE PRODUCAO / MANUTENCAO) - (I) MES 1.464,47 1.942,77 2.350,10 3.117,64 2.572,06 3.412,09 2.453,91 3.255,36 2.474,97 3.283,30B570002067 SERVENTE - (M) MES 1.388,13 1.841,49 2.227,58 2.955,11 2.437,97 3.234,21 2.325,99 3.085,66 2.345,94 3.112,12B570002068 SERVENTE - (I) MES 1.388,13 1.841,49 2.227,58 2.955,11 2.437,97 3.234,21 2.325,99 3.085,66 2.345,94 3.112,12B570002070 COLETOR DE AMOSTRAS MES 1.992,95 2.643,85 3.198,17 4.242,69 3.500,23 4.643,41 3.339,45 4.430,11 3.368,10 4.468,12B570002076 LABORATORISTA MES 2.896,16 3.842,05 4.647,59 6.165,49 5.086,55 6.747,82 4.852,90 6.437,86 4.894,54 6.493,10B570002079 AUXILIAR DE LABORATORIO MES 1.622,23 2.152,05 2.603,25 3.453,47 2.849,13 3.779,66 2.718,26 3.606,04 2.741,58 3.636,98B570002082 ASSISTENTE DE LABORATORIO MES 1.654,66 2.195,07 2.655,30 3.522,52 2.906,10 3.855,23 2.772,60 3.678,13 2.796,40 3.709,70B570002085 ATENDENTE DE USUARIO MES 1.546,77 2.051,95 2.482,16 3.292,83 2.716,60 3.603,84 2.591,81 3.438,30 2.614,05 3.467,80B570002088 AGENTE DE SERVICO COMERCIAL MES 1.546,77 2.051,95 2.482,16 3.292,83 2.716,60 3.603,84 2.591,81 3.438,30 2.614,05 3.467,80B570002091 ANALISTA DE CONSUMO / CADASTRO - (I) MES 1.685,58 2.236,09 2.704,92 3.588,35 2.960,40 3.927,27 2.824,41 3.746,86 2.848,65 3.779,02B570002097 ANALISTA DE CONSUMO/CADASTRO - (M) MES 1.685,58 2.236,09 2.704,92 3.588,35 2.960,40 3.927,27 2.824,41 3.746,86 2.848,65 3.779,02B570002100 CADASTRISTA MES 1.602,95 2.126,47 2.572,32 3.412,44 2.815,28 3.734,75 2.685,96 3.563,19 2.709,01 3.593,77B570002501 TECNICO ELETROTECNICO SENIOR MES 4.826,05 6.402,24 7.744,55 10.273,92 8.476,02 11.244,29 8.086,68 10.727,79 8.156,06 10.819,83

B570003000 AGENTE ADMINISTRATIVOB570003001 AGENTE DE SERVICO ADMINISTRATIVO MES 1.546,77 2.051,95 2.482,16 3.292,83 2.716,60 3.603,84 2.591,81 3.438,30 2.614,05 3.467,80B570003004 AGENTE DE SERVICO DE COMUNICACAO MES 1.546,77 2.051,95 2.482,16 3.292,83 2.716,60 3.603,84 2.591,81 3.438,30 2.614,05 3.467,80B570003007 ASSISTENTE ADMINISTRATIVO MES 1.932,54 2.563,71 3.101,23 4.114,09 3.394,14 4.502,67 3.238,23 4.295,84 3.266,02 4.332,70B570003010 AUXILIAR ESCRITORIO MES 1.894,64 2.513,43 3.040,40 4.033,39 3.327,57 4.414,35 3.174,72 4.211,58 3.201,96 4.247,72B570003013 AGENTE TECNICO ADMINISTRATIVO MES 2.267,27 3.007,76 3.638,38 4.826,67 3.982,02 5.282,55 3.799,11 5.039,90 3.831,71 5.083,15B570003028 DIGITADOR MES 1.963,21 2.604,39 3.150,43 4.179,36 3.447,99 4.574,10 3.289,61 4.364,00 3.317,83 4.401,43B570003031 SECRETARIA MES 3.229,04 4.283,64 5.181,77 6.874,14 5.671,19 7.523,40 5.410,68 7.177,81 5.457,11 7.239,40B570003034 AUXILIAR ADMINISTRATIVO MES 2.019,39 2.678,92 3.240,60 4.298,98 3.546,67 4.705,01 3.383,75 4.488,88 3.412,79 4.527,41B570003040 ZELADOR MES 1.407,96 1.867,80 2.259,40 2.997,32 2.472,80 3.280,42 2.359,21 3.129,73 2.379,46 3.156,59B570003043 VIGIA MES 1.464,47 1.942,77 2.350,10 3.117,64 2.572,06 3.412,09 2.453,91 3.255,36 2.474,97 3.283,30

B570004000 PROFISSIONAL DE NIVEL SUPERIORB570004007 ASSISTENTE SOCIAL - AS5 MES 13.861,42 18.388,56 22.243,97 29.508,85 24.344,91 32.295,96 23.226,62 30.812,43 23.425,92 31.076,83B570004008 PROFISSIONAL NIVEL SUPERIOR - P3 MES 8.473,96 11.241,56 13.598,50 18.039,77 14.882,88 19.743,63 14.199,23 18.836,70 14.321,07 18.998,33B570004020 SECRETARIO EXECUTIVO MES 5.668,31 7.519,58 9.096,17 12.066,98 9.955,30 13.206,70 9.498,00 12.600,05 9.579,50 12.708,16B570004030 ASSISTENTE ADMINISTRATIVO NU MES 5.442,89 7.220,54 8.734,42 11.587,08 9.559,39 12.681,49 9.120,28 12.098,96 9.198,54 12.202,78

B570004999 INSALUBRIDADEB570005000 INSALUBRIDADE - 40% - SALARIO MINIMO MES 528,81 701,52 848,60 1.125,75 928,75 1.232,08 886,09 1.175,49 893,69 1.185,57

B570005001 INSALUBRIDADE - 20% - SALARIO MINIMO MES 264,40 350,75 424,30 562,88 464,38 616,05 443,04 587,74 446,85 592,79B570005002 INSALUBRIDADE - 10% - SALARIO MINIMO MES 132,20 175,38 212,15 281,44 232,19 308,02 221,52 293,87 223,42 296,39

B570005100 PERICULOSIDADE 30%B570005119 PE - ELETRICISTA MES 662,33 878,65 1.062,87 1.410,00 1.163,26 1.543,18 1.109,83 1.472,30 1.119,35 1.484,93B570005128 PE - MECANICO MES 675,22 895,75 1.083,56 1.437,45 1.185,90 1.573,21 1.131,43 1.500,96 1.141,13 1.513,82B570005167 PE - SOLDADOR MES 662,33 878,65 1.062,87 1.410,00 1.163,26 1.543,18 1.109,83 1.472,30 1.119,35 1.484,93B570005176 PE - MECANICO INDUSTRIAL MES 675,22 895,75 1.083,56 1.437,45 1.185,90 1.573,21 1.131,43 1.500,96 1.141,13 1.513,82B570005179 PE - MECANICO MONTADOR MES 675,22 895,75 1.083,56 1.437,45 1.185,90 1.573,21 1.131,43 1.500,96 1.141,13 1.513,82B570005182 PE - JATISTA MES 425,36 564,28 682,59 905,52 747,06 991,05 712,75 945,53 718,86 953,64B570005185 PE - ELETRICISTA INDUSTRIAL MES 868,57 1.152,24 1.393,83 1.849,05 1.525,48 2.023,70 1.455,40 1.930,73 1.467,89 1.947,30B570005188 PE - ELETRICISTA MONTADOR MES 674,23 894,43 1.081,97 1.435,34 1.184,16 1.570,91 1.129,76 1.498,74 1.139,46 1.511,61B570005191 PE - TECNICO EM AUTOMACAO MES 2.130,77 2.826,68 3.419,33 4.536,08 3.742,29 4.964,52 3.570,39 4.736,48 3.601,02 4.777,11B570005207 PE - AUXILIAR MECANICO MES 418,42 555,08 671,46 890,76 734,88 974,89 701,12 930,11 707,13 938,08B570005210 PE - ELETROMECANICO MES 1.866,04 2.475,49 2.994,50 3.972,50 3.277,33 4.347,71 3.126,79 4.148,00 3.153,62 4.183,59B570005213 PE - ELETROTECNICO MES 1.034,15 1.371,90 1.659,55 2.201,56 1.816,29 2.409,49 1.732,86 2.298,81 1.747,73 2.318,54B570005216 PE - TORNEIRO MECANICO MES 675,22 895,75 1.083,56 1.437,45 1.185,90 1.573,21 1.131,43 1.500,96 1.141,13 1.513,82B570005225 PE - TECNICO INSTRUMENTACAO MES 1.291,62 1.713,46 2.072,71 2.749,66 2.268,48 3.009,37 2.164,27 2.871,12 2.182,84 2.895,76

B570006000HORAS EXTRAS TIPO 50% (dias normais), TIPO 70% (dias de sabado) e 110% (domingos e

feriados) - CALCULO FEITO PARA MENSALISTAS (44 HS. X 4,35 SEM.=191,4 H/M)B570006100 HORA EXTRA AGENTE OPERACIONALB570006101 HE-TP.50% - AGENTE DE MANUTENCAO H 15,22 20,19 24,42 32,40 26,73 35,46 25,50 33,83 25,72 34,12B570006104 HE-TP.50% - AGENTE DE MEDICAO (PITOMETRIA) H 15,85 21,03 25,43 33,74 27,84 36,93 26,56 35,23 26,79 35,54B570006107 HE-TP.50% - AGENTE DE SERVICOS H 10,53 13,97 16,90 22,42 18,50 24,54 17,65 23,41 17,80 23,61B570006110 HE-TP.50% - AGENTE DE SISTEMA H 15,32 20,32 24,59 32,62 26,91 35,70 25,68 34,07 25,90 34,36B570006119 HE-TP.50% - ELETRICISTA H 15,05 19,97 24,16 32,05 26,44 35,08 25,22 33,46 25,44 33,75B570006128 HE-TP.50% - MECANICO H 15,35 20,36 24,64 32,69 26,97 35,78 25,73 34,13 25,95 34,43B570006131 HE-TP.50% - MONITOR DE SERVICOS H 17,20 22,82 27,60 36,61 30,21 40,08 28,82 38,23 29,07 38,56B570006134 HE-TP.50% - MOTORISTA H 15,02 19,93 24,11 31,98 26,39 35,01 25,17 33,39 25,39 33,68B570006137 HE-TP.50% - OPERADOR EQUIPAMENTO PESADO H 16,80 22,29 26,95 35,75 29,50 39,13 28,14 37,33 28,38 37,65B570006146 HE-TP.50% - MOTORISTA (VEICULO PESADO HIDROJATO) H 16,03 21,27 25,72 34,12 28,15 37,34 26,86 35,63 27,09 35,94B570006149 HE-TP.50% - OPERADOR K 500/COMPRESSOR H 17,38 23,06 27,89 37,00 30,53 40,50 29,13 38,64 29,38 38,98B570006152 HE-TP.50% - OPERADOR DE PROCESSOS ETA H 15,05 19,97 24,16 32,05 26,44 35,08 25,22 33,46 25,44 33,75B570006155 HE-TP.50% - OPERADOR ETA PEQUENA H 10,91 14,47 17,50 23,22 19,16 25,42 18,28 24,25 18,43 24,45B570006158 HE-TP.50% - OPERADOR ETA MEDIA H 11,99 15,91 19,24 25,52 21,06 27,94 20,09 26,65 20,26 26,88B570006161 HE-TP.50% - OPERADOR ETA GRANDE H 15,05 19,97 24,16 32,05 26,44 35,08 25,22 33,46 25,44 33,75B570006167 HE-TP.50% - SOLDADOR H 15,05 19,97 24,16 32,05 26,44 35,08 25,22 33,46 25,44 33,75B570006170 HE-TP.50% - SUPERVISOR DE CAMPO H 15,05 19,97 24,16 32,05 26,44 35,08 25,22 33,46 25,44 33,75B570006173 HE-TP.50% - FISCAL DE CAMPO H 15,05 19,97 24,16 32,05 26,44 35,08 25,22 33,46 25,44 33,75B570006176 HE-TP.50% - MECANICO INDUSTRIAL H 15,35 28,23 24,64 32,69 26,97 35,78 25,73 34,13 25,95 34,43B570006179 HE-TP.50% - MECANICO MONTADOR H 15,35 20,36 24,64 32,69 26,97 35,78 25,73 34,13 25,95 34,43B570006182 HE-TP.50% - JATISTA H 9,67 12,83 15,53 20,60 16,99 22,54 16,21 21,50 16,35 21,69B570006185 HE-TP.50% - ELETRICISTA INDUSTRIAL H 19,74 26,19 31,68 42,03 34,67 45,99 33,08 43,88 33,36 44,26B570006188 HE-TP.50% - ELETRICISTA MONTADOR H 15,32 20,32 24,59 32,62 26,91 35,70 25,68 34,07 25,90 34,36B570006191 HE-TP.50% - TECNICO EM AUTOMACAO H 48,43 64,25 77,72 103,10 85,07 112,85 81,16 107,67 81,85 108,58B570006207 HE-TP.50% - AUXILIAR MECANICO H 9,51 12,62 15,26 20,24 16,70 22,15 15,93 21,13 16,07 21,32B570006210 HE-TP.50% - TECNICO ELETROMECANICO H 42,41 56,26 68,06 90,29 74,48 98,81 71,06 94,27 71,67 95,08B570006213 HE-TP.50% - TECNICO ELETROTECNICO H 23,51 31,19 37,73 50,05 41,29 54,78 39,40 52,27 39,73 52,71

Página: 4 de 59

Page 5: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

B570006216 HE-TP.50% - TORNEIRO MECANICO H 15,35 20,36 24,64 32,69 26,97 35,78 25,73 34,13 25,95 34,43B570006231 HE-TP.50% - AUXILIAR TECNICO(OPERACAO/MANUTENCAO/SERVICOS) H 15,35 20,36 24,64 32,69 26,97 35,78 25,73 34,13 25,95 34,43B570006234 HE-TP.50% - TECNICO NIVEL MEDIO H 22,02 29,21 35,34 46,88 38,68 51,31 36,90 48,95 37,22 49,38B570006240 HE-TP.50% - AUXILIAR DE PRODUCAO H 9,99 13,25 16,03 21,27 17,55 23,28 16,74 22,21 16,88 22,39

B570006243 HE-TP.50% - SUPERVISOR GERAL H 15,05 19,97 24,16 32,05 26,44 35,08 25,22 33,46 25,44 33,75B570006246 HE-TP.50% - SUPERVISOR DE ETA E ETE H 15,05 19,97 24,16 32,05 26,44 35,08 25,22 33,46 25,44 33,75B570006249 HE-TP.50% - ALMOXARIFE H 17,26 22,90 27,70 36,75 30,32 40,22 28,92 38,37 29,17 38,70B570006255 HE-TP.50% - ENCARREGADO DE EQUIPE H 20,37 27,02 32,69 43,37 35,78 47,47 34,13 45,28 34,43 45,67B570006256 HE-TP.50% - ENCARREGADO DE EQUIPE (MRR / RMS) H 20,37 27,02 32,69 43,37 35,78 47,47 34,13 45,28 34,43 45,67B570006258 HE-TP.50% - PEDREIRO / ENCANADOR / ARTIFICE (M) H 15,05 19,97 24,16 32,05 26,44 35,08 25,22 33,46 25,44 33,75B570006260 HE-TP.50% - PEDREIRO / ENCANADOR / ARTIFICE (I) H 15,05 19,97 24,16 32,05 26,44 35,08 25,22 33,46 25,44 33,75B570006264 HE-TP.50% - SERVENTE PRATICO (AUX.PRODUCAO/MANUTENCAO) H 9,99 13,25 16,03 21,27 17,55 23,28 16,74 22,21 16,88 22,39B570006267 HE-TP.50% - SERVENTE - (M) H 9,46 12,55 15,19 20,15 16,62 22,05 15,86 21,04 16,00 21,23B570006268 HE-TP.50% - SERVENTE - (I) H 9,46 12,55 15,19 20,15 16,62 22,05 15,86 21,04 16,00 21,23B570006270 HE-TP.50% - COLETOR DE AMOSTRAS H 13,60 18,04 21,82 28,95 23,88 31,68 22,78 30,22 22,98 30,49B570006276 HE-TP.50% - LABORATORISTA H 19,74 26,19 31,68 42,03 34,67 45,99 33,08 43,88 33,36 44,26B570006279 HE-TP.50% - AUXILIAR DE LABORATORIO H 11,06 14,67 17,74 23,53 19,42 25,76 18,53 24,58 18,69 24,79B570006282 HE-TP.50% - ASSISTENTE DE LABORATORIO H 11,28 14,96 18,11 24,02 19,82 26,29 18,90 25,07 19,07 25,30B570006301 HE-TP.50% - AGENTE DE SERVICOS ADMINISTRATIVO H 10,55 14,00 16,92 22,45 18,52 24,57 17,67 23,44 17,82 23,64B570006340 HE-TP.50% - ZELADOR H 9,60 12,74 15,41 20,44 16,86 22,37 16,09 21,34 16,22 21,52B570006343 HE-TP.50% - VIGIA H 9,99 13,25 16,03 21,27 17,55 23,28 16,74 22,21 16,88 22,39

B570007000 HORAS EXTRAS TIPO 70% (dias de sabado)B570007101 HE-TP.70% - AGENTE DE MANUTENCAO H 17,25 22,88 27,68 36,72 30,29 40,18 28,90 38,34 29,15 38,67B570007104 HE-TP.70% - AGENTE DE MEDICAO (PITOMETRIA) H 17,95 23,81 28,81 38,22 31,53 41,83 30,08 39,90 30,34 40,25B570007107 HE-TP.70% - AGENTE DE SERVICOS H 11,93 15,83 19,14 25,39 20,95 27,79 19,99 26,52 20,16 26,74B570007110 HE-TP.70% - AGENTE DE SISTEMA H 17,37 23,04 27,87 36,97 30,50 40,46 29,10 38,60 29,35 38,94B570007119 HE-TP.70% - ELETRICISTA H 17,07 22,65 27,39 36,34 29,97 39,76 28,60 37,94 28,84 38,26B570007128 HE-TP.70% - MECANICO H 17,40 23,08 27,92 37,04 30,55 40,53 29,15 38,67 29,40 39,00B570007131 HE-TP.70% - MONITOR DE SERVICOS H 19,48 25,84 31,27 41,48 34,22 45,40 32,65 43,31 32,93 43,68B570007134 HE-TP.70% - MOTORISTA H 17,02 22,58 27,31 36,23 29,89 39,65 28,52 37,83 28,77 38,17B570007137 HE-TP.70% - OPERADOR EQUIPAMENTO PESADO H 19,03 25,25 30,54 40,51 33,43 44,35 31,89 42,31 32,17 42,68B570007146 HE-TP.70% - MOTORISTA (VEICULO PESADO HIDROJATO) H 18,18 24,12 29,17 38,70 31,93 42,36 30,46 40,41 30,72 40,75B570007149 HE-TP.70% - OPERADOR K 500/COMPRESSOR H 19,70 26,13 31,61 41,93 34,59 45,89 33,00 43,78 33,28 44,15B570007152 HE-TP.70% - OPERADOR DE PROCESSOS ETA / ETE H 17,07 22,65 27,39 36,34 29,97 39,76 28,60 37,94 28,84 38,26B570007155 HE-TP.70% - OPERADOR DE ETA PEQUENA H 12,36 16,40 19,84 26,32 21,71 28,80 20,72 27,49 20,90 27,73B570007158 HE-TP.70% - OPERADOR DE ETA MEDIA H 13,58 18,02 21,79 28,91 23,85 31,64 22,76 30,19 22,95 30,45B570007161 HE-TP.70% - OPERADOR DE ETA GRANDE H 17,07 22,65 27,39 36,34 29,97 39,76 28,60 37,94 28,84 38,26B570007164 HE-TP.70% - OPERADOR DE SISTEMA (ETA E ETE) H 11,93 15,83 19,14 25,39 20,95 27,79 19,99 26,52 20,16 26,74B570007167 HE-TP.70% - SOLDADOR H 17,07 22,65 27,39 36,34 29,97 39,76 28,60 37,94 28,84 38,26B570007170 HE-TP.70% - SUPERVISOR DE CAMPO H 17,07 22,65 27,39 36,34 29,97 39,76 28,60 37,94 28,84 38,26B570007173 HE-TP.70% - FISCAL DE CAMPO H 17,07 22,65 27,39 36,34 29,97 39,76 28,60 37,94 28,84 38,26B570007176 HE-TP.70% - MECANICO INDUSTRIAL H 17,40 23,08 27,92 37,04 30,55 40,53 29,15 38,67 29,40 39,00B570007179 HE-TP.70% - MECANICO MONTADOR H 17,40 23,08 27,92 37,04 30,55 40,53 29,15 38,67 29,40 39,00B570007182 HE-TP.70% - JATISTA H 10,95 14,53 17,57 23,31 19,23 25,51 18,35 24,34 18,51 24,56B570007185 HE-TP.70% - ELETRICISTA INDUSTRIAL H 22,37 29,68 35,90 47,62 39,29 52,12 37,48 49,72 37,80 50,15B570007188 HE-TP.70% - ELETRICISTA MONTADOR H 17,37 23,04 27,87 36,97 30,50 40,46 29,10 38,60 29,35 38,94B570007191 HE-TP.70% - TECNICO EM AUTOMACAO H 54,88 72,80 88,07 116,83 96,38 127,86 91,96 121,99 92,75 123,04B570007204 HE-TP.70% - TECNICO SEGURANCA DO TRABALHO H 24,95 33,10 40,04 53,12 43,83 58,14 41,81 55,47 42,17 55,94B570007207 HE-TP.70% - AUXILIAR MECANICO H 10,77 14,29 17,29 22,94 18,92 25,10 18,05 23,95 18,20 24,14B570007210 HE-TP.70% - TECNICO ELETROMECANICO H 48,06 63,76 77,12 102,31 84,41 111,98 80,53 106,83 81,22 107,75B570007213 HE-TP.70% - TECNICO ELETROTECNICO H 26,64 35,34 42,74 56,70 46,78 62,06 44,63 59,21 45,01 59,71B570007216 HE-TP.70% - TORNEIRO MECANICO H 17,40 23,08 27,92 37,04 30,55 40,53 29,15 38,67 29,40 39,00B570007231 HE-TP.70% - AUXILIAR TECNICO (OPERACAO/MANUTENCAO/SERVICOS) H 17,40 23,08 27,92 37,04 30,55 40,53 29,15 38,67 29,40 39,00B570007234 HE-TP.70% - TECNICO DE NIVEL MEDIO H 24,95 33,10 40,04 53,12 43,83 58,14 41,81 55,47 42,17 55,94B570007240 HE-TP.70% - AUXILIAR DE PRODUCAO H 11,31 15,00 18,15 24,08 19,87 26,36 18,96 25,15 19,12 25,36B570007243 HE-TP.70% - SUPERVISOR GERAL H 17,07 22,65 27,39 36,34 29,97 39,76 28,60 37,94 28,84 38,26B570007246 HE-TP.70% - SUPERVISOR DE ETA E ETE H 17,07 22,65 27,39 36,34 29,97 39,76 28,60 37,94 28,84 38,26B570007249 HE-TP.70% - ALMOXARIFE H 19,56 25,95 31,39 41,64 34,35 45,57 32,78 43,49 33,06 43,86B570007255 HE-TP.70% - ENCARREGADO DE EQUIPE H 23,09 30,63 37,05 49,15 40,55 53,79 38,69 51,33 39,02 51,76B570007256 HE-TP.70% - ENCARREGADO DE EQUIPE (MRR / RMS) H 23,09 30,63 37,05 49,15 40,55 53,79 38,69 51,33 39,02 51,76B570007258 HE-TP.70% - PEDREIRO/ENCANADOR/ARTIFICE (M) H 17,07 22,65 27,39 36,34 29,97 39,76 28,60 37,94 28,84 38,26B570007261 HE-TP.70% - PEDREIRO/ENCANADOR/ARTIFICE (I) H 17,07 22,65 27,39 36,34 29,97 39,76 28,60 37,94 28,84 38,26B570007264 HE-TP.70% - SERVENTE PRATICO (AUX.OPERACAO/MANUTENCAO) - (M) H 11,31 15,00 18,15 24,08 19,87 26,36 18,96 25,15 19,12 25,36B570007265 HE-TP.70% - SERVENTE PRATICO (AUX.OPERACAO/MANUTENCAO) - (I) H 11,31 15,00 18,15 24,08 19,87 26,36 18,96 25,15 19,12 25,36B570007267 HE-TP.70% - SERVENTE - (M) H 10,73 14,23 17,21 22,83 18,84 24,99 17,97 23,84 18,13 24,05B570007268 HE-TP.70% - SERVENTE - (I) H 10,73 14,23 17,21 22,83 18,84 24,99 17,97 23,84 18,13 24,05B570007270 HE-TP.70% - COLETOR DE AMOSTRA H 15,40 20,43 24,71 32,78 27,04 35,87 25,80 34,23 26,02 34,52B570007276 HE-TP.70% - LABORATORISTA H 22,38 29,69 35,92 47,65 39,31 52,15 37,51 49,76 37,83 50,19B570007279 HE-TP.70% - AUXILIAR DE LABORATORIO H 12,53 16,62 20,11 26,68 22,01 29,20 20,99 27,85 21,17 28,08B570007282 HE-TP.70% - ASSISTENTE DE LABORATORIO H 12,78 16,95 20,52 27,22 22,45 29,78 21,42 28,42 21,61 28,67B570007285 HE-TP.70% - ATENDENTE DO USUARIO H 11,96 15,87 19,19 25,46 21,00 27,86 20,04 26,59 20,21 26,81B570007301 HE-TP.70% - AGENTE DE SERVICOS ADMINISTRATIVO H 11,96 15,87 19,19 25,46 21,00 27,86 20,04 26,59 20,21 26,81B570007334 HE-TP.70% - AUXILIAR ADMINISTRATIVO H 15,61 20,71 25,05 33,23 27,41 36,36 26,15 34,69 26,38 35,00B570007340 HE-TP.70% - ZELADOR H 10,88 14,43 17,45 23,15 19,10 25,34 18,23 24,18 18,38 24,38B570007343 HE-TP.70% - VIGIA H 11,31 15,00 18,15 24,08 19,87 26,36 18,96 25,15 19,12 25,36B570007407 HE-TP.70% - ASSISTENTE SOCIAL - AS6 H 60,06 79,68 96,38 127,86 105,49 139,94 100,64 133,51 101,51 134,66B570007408 HE-TP.80% - AGENTE DE MANUTENCAO H 18,25 24,21 29,29 38,86 32,06 42,53 30,59 40,58 30,85 40,93B570007409 HE-TP.80% - AGENTE DE MEDICAO (PITOMETRIA) H 19,00 25,21 30,50 40,46 33,38 44,28 31,84 42,24 32,12 42,61B570007410 HE-TP.80% - AGENTE DE SERVICOS H 12,63 16,75 20,27 26,89 22,19 29,44 21,17 28,08 21,35 28,32B570007411 HE-TP.80% - AGENTE DE SISTEMA H 18,39 24,40 29,51 39,15 32,30 42,85 30,81 40,87 31,08 41,23B570007412 HE-TP.80% - ELETRICISTA H 18,06 23,96 28,98 38,44 31,71 42,07 30,26 40,14 30,52 40,49B570007413 HE-TP.80% - MECANICO H 18,42 24,44 29,56 39,21 32,35 42,92 30,86 40,94 31,13 41,30B570007414 HE-TP.80% - MONITOR DE SERVICOS H 20,63 27,37 33,10 43,91 36,23 48,06 34,56 45,85 34,86 46,25B570007415 HE-TP.80% - MOTORISTA H 18,03 23,92 28,93 38,38 31,66 42,00 30,21 40,08 30,47 40,42B570007416 HE-TP.80% - OPERADOR EQUIPAMENTO PESADO H 20,15 26,73 32,33 42,89 35,38 46,94 33,76 44,79 34,05 45,17B570007417 HE-TP.80% - MOTORISTA (VEICULO PESADO HIDROJATO) H 19,24 25,52 30,88 40,97 33,80 44,84 32,25 42,78 32,52 43,14B570007418 HE-TP.80% - OPERADOR K 500/COMPRESSOR H 20,85 27,66 33,46 44,39 36,62 48,58 34,94 46,35 35,24 46,75B570007419 HE-TP.80% - OPERADOR DE PROCESSOS ETA / ETE H 18,06 23,96 28,98 38,44 31,71 42,07 30,26 40,14 30,52 40,49B570007420 HE-TP.80% - OPERADOR DE ETA PEQUENA H 13,09 17,37 21,00 27,86 22,98 30,49 21,93 29,09 22,11 29,33B570007421 HE-TP.80% - OPERADOR DE ETA MEDIA H 14,39 19,09 23,10 30,64 25,28 33,54 24,12 32,00 24,32 32,26B570007422 HE-TP.80% - OPERADOR DE ETA GRANDE H 18,06 23,96 28,98 38,44 31,71 42,07 30,26 40,14 30,52 40,49B570007423 HE-TP.80% - OPERADOR DE SISTEMA (ETA E ETE) H 12,63 16,75 20,27 26,89 22,19 29,44 21,17 28,08 21,35 28,32B570007424 HE-TP.80% - SOLDADOR H 18,06 23,96 28,98 38,44 31,71 42,07 30,26 40,14 30,52 40,49B570007425 HE-TP.80% - SUPERVISOR DE CAMPO H 18,06 23,96 28,98 38,44 31,71 42,07 30,26 40,14 30,52 40,49B570007426 HE-TP.80% - FISCAL DE CAMPO H 18,06 23,96 28,98 38,44 31,71 42,07 30,26 40,14 30,52 40,49B570007427 HE-TP.80% - MECANICO INDUSTRIAL H 18,42 24,44 29,56 39,21 32,35 42,92 30,86 40,94 31,13 41,30B570007428 HE-TP.80% - MECANICO MONTADOR H 18,42 24,44 29,56 39,21 32,35 42,92 30,86 40,94 31,13 41,30B570007429 HE-TP.80% - JATISTA H 11,60 15,39 18,61 24,69 20,37 27,02 19,43 25,78 19,60 26,00B570007430 HE-TP.80% - ELETRICISTA INDUSTRIAL H 23,69 31,43 38,02 50,44 41,61 55,20 39,70 52,67 40,04 53,12B570007431 HE-TP.80% - ELETRICISTA MONTADOR H 18,39 24,40 29,51 39,15 32,30 42,85 30,81 40,87 31,08 41,23B570007432 HE-TP.80% - TECNICO EM AUTOMACAO H 58,11 77,09 93,25 123,71 102,06 135,39 97,37 129,17 98,20 130,27B570007433 HE-TP.80% - TECNICO SEGURANCA DO TRABALHO H 26,43 35,06 42,41 56,26 46,41 61,57 44,28 58,74 44,66 59,25B570007434 HE-TP.80% - AUXILIAR MECANICO H 11,42 15,15 18,32 24,30 20,05 26,60 19,13 25,38 19,30 25,60B570007435 HE-TP.80% - TECNICO ELETROMECANICO H 50,90 67,52 81,68 108,36 89,39 118,58 85,29 113,15 86,02 114,11B570007436 HE-TP.80% - TECNICO ELETROTECNICO H 28,20 37,41 45,25 60,03 49,52 65,69 47,25 62,68 47,66 63,23B570007437 HE-TP.80% - TORNEIRO MECANICO H 18,42 24,44 29,56 39,21 32,35 42,92 30,86 40,94 31,13 41,30B570007438 HE-TP.80% - AUXILIAR TECNICO (OPERACAO/MANUTENCAO/SERVICOS) H 18,42 24,44 29,56 39,21 32,35 42,92 30,86 40,94 31,13 41,30B570007439 HE-TP.80% - TECNICO DE NIVEL MEDIO H 26,43 35,06 42,41 56,26 46,41 61,57 44,28 58,74 44,66 59,25B570007440 HE-TP.80% - AUXILIAR DE PRODUCAO H 11,99 15,91 19,24 25,52 21,06 27,94 20,09 26,65 20,26 26,88B570007441 HE-TP.80% - SUPERVISOR GERAL H 18,06 23,96 28,98 38,44 31,71 42,07 30,26 40,14 30,52 40,49B570007442 HE-TP.80% - SUPERVISOR DE ETA E ETE H 18,06 23,96 28,98 38,44 31,71 42,07 30,26 40,14 30,52 40,49B570007443 HE-TP.80% - ALMOXARIFE H 20,72 27,49 33,24 44,10 36,38 48,26 34,71 46,05 35,01 46,44

B570007444 HE-TP.80% - ENCARREGADO DE EQUIPE H 24,44 32,42 39,22 52,03 42,93 56,95 40,96 54,34 41,31 54,80B570007445 HE-TP.80% - PEDREIRO/ENCANADOR/ARTIFICE (M) H 18,06 23,96 28,98 38,44 31,71 42,07 30,26 40,14 30,52 40,49B570007446 HE-TP.80% - PEDREIRO/ENCANADOR/ARTIFICE (I) H 18,06 23,96 28,98 38,44 31,71 42,07 30,26 40,14 30,52 40,49B570007447 HE-TP.80% - SERVENTE PRATICO (AUX.OPERACAO/MANUTENCAO) - (M) H 11,99 15,91 19,24 25,52 21,06 27,94 20,09 26,65 20,26 26,88B570007448 HE-TP.80% - SERVENTE PRATICO (AUX.OPERACAO/MANUTENCAO) - (I) H 11,99 15,91 19,24 25,52 21,06 27,94 20,09 26,65 20,26 26,88B570007449 HE-TP.80% - SERVENTE - (M) H 11,36 15,07 18,23 24,18 19,95 26,47 19,03 25,25 19,19 25,46B570007450 HE-TP.80% - SERVENTE - (I) H 11,36 15,07 18,23 24,18 19,95 26,47 19,03 25,25 19,19 25,46B570007451 HE-TP.80% - COLETOR DE AMOSTRA H 16,30 21,62 26,16 34,70 28,63 37,98 27,31 36,23 27,55 36,55B570007452 HE-TP.80% - LABORATORISTA H 23,69 31,43 38,02 50,44 41,61 55,20 39,70 52,67 40,04 53,12B570007453 HE-TP.80% - AUXILIAR DE LABORATORIO H 13,28 17,62 21,31 28,27 23,32 30,94 22,25 29,52 22,44 29,77B570007454 HE-TP.80% - ASSISTENTE DE LABORATORIO H 13,54 17,96 21,72 28,81 23,77 31,53 22,68 30,09 22,88 30,35B570007455 HE-TP.80% - ATENDENTE DO USUARIO H 12,65 16,78 20,30 26,93 22,22 29,48 21,20 28,12 21,38 28,36B570007456 HE-TP.80% - AGENTE DE SERVICOS ADMINISTRATIVO H 12,65 16,78 20,30 26,93 22,22 29,48 21,20 28,12 21,38 28,36B570007457 HE-TP.80% - AUXILIAR ADMINISTRATIVO H 16,53 21,93 26,52 35,18 29,02 38,50 27,69 36,73 27,93 37,05B570007458 HE-TP.80% - ZELADOR H 11,52 15,28 18,49 24,53 20,24 26,85 19,31 25,62 19,47 25,83B570007459 HE-TP.80% - VIGIA H 11,99 15,91 19,24 25,52 21,06 27,94 20,09 26,65 20,26 26,88

Página: 5 de 59

Page 6: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

B570007460 HE-TP.80% - ASSISTENTE SOCIAL - AS6 H 63,59 84,36 102,05 135,38 111,69 148,17 106,56 141,36 107,47 142,57B570007461 HE-TP.80% - ENCARREGADO DE EQUIPE (MRR / RMS) H 24,44 32,42 39,22 52,03 42,93 56,95 40,96 54,34 41,31 54,80

B570008000 HORAS EXTRAS TIPO 110% (domingos e feriados)B570008014 HE-TP.80% - MONITOR DE SERVICOS H 20,63 27,37 33,10 43,91 36,23 48,06 34,56 45,85 34,86 46,25B570008101 HE-TP.110% - AGENTE DE MANUTENCAO H 21,30 28,26 34,19 45,36 37,41 49,63 35,70 47,36 36,00 47,76B570008104 HE-TP.110% - AGENTE DE MEDICAO (PITOMETRIA) H 22,17 29,41 35,58 47,20 38,94 51,66 37,16 49,30 37,47 49,71B570008107 HE-TP.110% - AGENTE DE SERVICO H 14,74 19,55 23,65 31,37 25,88 34,33 24,69 32,75 24,91 33,05B570008110 HE-TP.110% - AGENTE DE SISTEMA H 21,45 28,46 34,43 45,67 37,68 49,99 35,95 47,69 36,26 48,10B570008119 HE-TP.110% - ELETRICISTA H 21,08 27,96 33,82 44,87 37,02 49,11 35,32 46,86 35,62 47,25B570008128 HE-TP.110% - MECANICO H 21,48 28,50 34,47 45,73 37,73 50,05 36,00 47,76 36,31 48,17B570008131 HE-TP.110% - MONITOR DE SERVICO H 24,07 31,93 38,62 51,23 42,27 56,08 40,33 53,50 40,67 53,95B570008134 HE-TP.110% - MOTORISTA H 21,03 27,90 33,75 44,77 36,94 49,00 35,24 46,75 35,54 47,15B570008137 HE-TP.110% - OPERADOR EQUIPAMENTO PESADO H 23,51 31,19 37,73 50,05 41,29 54,78 39,40 52,27 39,73 52,71B570008146 HE-TP.110% - MOTORISTA (VEICULO PESADO HIDROJATO) H 22,44 29,77 36,02 47,78 39,42 52,29 37,61 49,89 37,93 50,32B570008149 HE-TP.110% - OPERADOR K 500/COMPRESSOR H 24,32 32,26 39,03 51,78 42,72 56,67 40,76 54,07 41,10 54,52B570008152 HE-TP.110% - OPERADOR DE PROCESSOS (ETA/ETE) H 21,08 27,96 33,82 44,87 37,02 49,11 35,32 46,86 35,62 47,25B570008155 HE-TP.110% - OPERADOR DE ETA PEQUENA H 15,26 20,24 24,49 32,49 26,81 35,57 25,58 33,93 25,80 34,23B570008158 HE-TP.110% - OPERADOR DE ETA MEDIA H 16,78 22,26 26,93 35,73 29,47 39,09 28,12 37,30 28,36 37,62B570008161 HE-TP.110% - OPERADOR DE ETA GRANDE H 21,08 27,96 33,82 44,87 37,02 49,11 35,32 46,86 35,62 47,25B570008164 HE-TP.110% - OPERADOR DE SISTEMA (ETA/ETE) H 14,74 19,55 23,65 31,37 25,88 34,33 24,69 32,75 24,91 33,05B570008167 HE-TP.110% - SOLDADOR H 21,08 27,96 33,82 44,87 37,02 49,11 35,32 46,86 35,62 47,25B570008170 HE-TP.110% - SUPERVISOR DE CAMPO H 21,08 27,96 33,82 44,87 37,02 49,11 35,32 46,86 35,62 47,25B570008173 HE-TP.110% - FISCAL DE CAMPO H 21,08 27,96 33,82 44,87 37,02 49,11 35,32 46,86 35,62 47,25B570008176 HE-TP.110% - MECANICO INDUSTRIAL H 21,48 28,50 34,47 45,73 37,73 50,05 36,00 47,76 36,31 48,17B570008179 HE-TP.110% - MECANICO MONTADOR H 21,48 28,50 34,47 45,73 37,73 50,05 36,00 47,76 36,31 48,17B570008182 HE-TP.110% - JATISTA H 13,54 17,96 21,72 28,81 23,77 31,53 22,68 30,09 22,88 30,35B570008185 HE-TP.110% - ELETRICISTA INDUSTRIAL H 27,64 36,67 44,36 58,85 48,55 64,41 46,32 61,45 46,72 61,98B570008188 HE-TP.110% - ELETRICISTA MONTADOR H 21,45 28,46 34,43 45,67 37,68 49,99 35,95 47,69 36,26 48,10B570008191 HE-TP.110% - TECNICO EM AUTOMACAO H 67,80 89,94 108,80 144,33 119,08 157,97 113,61 150,72 114,58 152,00B570008207 HE-TP.110% - AUXILIAR MECANICO H 13,31 17,66 21,36 28,34 23,38 31,02 22,30 29,58 22,49 29,84B570008210 HE-TP.110% - TECNICO ELETROMECANICO H 59,37 78,76 95,27 126,39 104,27 138,32 99,48 131,97 100,34 133,11B570008213 HE-TP.110% - TECNICO ELETROTECNICO H 32,90 43,65 52,80 70,04 57,78 76,65 55,13 73,14 55,60 73,76B570008216 HE-TP.110% - TORNEIRO MECANICO H 21,48 28,50 34,47 45,73 37,73 50,05 36,00 47,76 36,31 48,17B570008231 HE-TP.110% - AUXILIAR TECNICO (OPERACAO/MANUTENCAO/SERVICOS) H 21,48 28,50 34,47 45,73 37,73 50,05 36,00 47,76 36,31 48,17B570008234 HE-TP.110% - TECNICO DE NIVEL MEDIO H 30,83 40,90 49,47 65,63 54,14 71,82 51,65 68,52 52,10 69,12B570008240 HE-TP.110% - AUXILIAR DE PRODUCAO H 13,99 18,56 22,44 29,77 24,56 32,58 23,44 31,10 23,64 31,36B570008243 HE-TP.110% - SUPERVISOR GERAL H 21,08 27,96 33,82 44,87 37,02 49,11 35,32 46,86 35,62 47,25B570008246 HE-TP.110% - SUPERVISOR DE ETA E ETE H 21,08 27,96 33,82 44,87 37,02 49,11 35,32 46,86 35,62 47,25B570008249 HE-TP.110% - ALMOXARIFE H 24,16 32,05 38,77 51,43 42,43 56,29 40,48 53,70 40,83 54,17B570008255 HE-TP.110% - ENCARREGADO DE EQUIPE H 28,51 37,82 45,76 60,71 50,08 66,44 47,78 63,38 48,19 63,93B570008256 HE-TP.110% - ENCARREGADO DE EQUIPE (MRR / RMS) H 28,51 37,82 45,76 60,71 50,08 66,44 47,78 63,38 48,19 63,93B570008258 HE-TP.110% - PEDREIRO/ENCANADOR/ARTEFICE (M) H 21,08 27,96 33,82 44,87 37,02 49,11 35,32 46,86 35,62 47,25B570008261 HE-TP.110% - PEDREIRO/ENCANADOR/ARTEFICE (I) H 21,08 27,96 33,82 44,87 37,02 49,11 35,32 46,86 35,62 47,25B570008264 HE-TP.110% - SERVENTE PRATICO (AUX.MANUTENCAO/OPERACAO) - (M) H 13,99 18,56 22,44 29,77 24,56 32,58 23,44 31,10 23,64 31,36B570008265 HE-TP.110% - SERVENTE PRATICO (AUX.MANUTENCAO/OPERACAO) - (I) H 13,99 18,56 22,44 29,77 24,56 32,58 23,44 31,10 23,64 31,36B570008267 HE-TP.110% - SERVENTE - (M) H 13,25 17,58 21,26 28,20 23,27 30,87 22,20 29,45 22,39 29,70B570008268 HE-TP.110% - SERVENTE - (I) H 13,25 17,58 21,26 28,20 23,27 30,87 22,20 29,45 22,39 29,70B570008270 HE-TP.110% - COLETOR DE AMOSTRAS H 19,02 25,23 30,52 40,49 33,40 44,31 31,87 42,28 32,14 42,64B570008276 HE-TP.110% - LABORATORISTA H 27,64 36,67 44,36 58,85 48,55 64,41 46,32 61,45 46,72 61,98B570008279 HE-TP.110% - AUXILIAR DE LABORATORIO H 15,49 20,55 24,86 32,98 27,20 36,08 25,95 34,43 26,18 34,73B570008282 HE-TP.110% - ASSITENTE DE LABORATORIO H 15,79 20,95 25,34 33,62 27,73 36,79 26,46 35,10 26,68 35,39B570008285 HE-TP.110% - ATENDENTE DO USUARIO H 14,77 19,59 23,70 31,44 25,94 34,41 24,75 32,83 24,96 33,11B570008301 HE-TP.110% - AGENTE DE SERVICOS ADMINISTRATIVO H 14,77 19,59 23,70 31,44 25,94 34,41 24,75 32,83 24,96 33,11B570008334 HE-TP.110% - AUXILIAR ADMINISTRATIVO H 19,27 25,56 30,93 41,03 33,85 44,91 32,30 42,85 32,57 43,21B570008340 HE-TP.110% - ZELADOR H 13,45 17,84 21,58 28,63 23,61 31,32 22,53 29,89 22,72 30,14B570008343 HE-TP.110% - VIGIA H 13,99 18,56 22,44 29,77 24,56 32,58 23,44 31,10 23,64 31,36B570008344 HE-TP.150% - AGENTE DE MANUTENCAO H 25,36 33,64 40,69 53,98 44,54 59,09 42,49 56,37 42,86 56,86B570008345 HE-TP.150% - AGENTE DE MEDICAO (PITOMETRIA) H 26,41 35,04 42,38 56,22 46,38 61,53 44,25 58,70 44,63 59,21B570008346 HE-TP.150% - AGENTE DE SERVICO H 17,55 23,28 28,16 37,36 30,82 40,89 29,40 39,00 29,65 39,33B570008347 HE-TP.150% - AGENTE DE SISTEMA H 25,54 33,88 40,98 54,36 44,85 59,50 42,79 56,77 43,16 57,26B570008348 HE-TP.150% - ELETRICISTA H 25,09 33,28 40,26 53,41 44,06 58,45 42,04 55,77 42,40 56,25B570008349 HE-TP.150% - MECANICO H 25,58 33,93 41,06 54,47 44,93 59,60 42,87 56,87 43,24 57,36B570008350 HE-TP.150% - MONITOR DE SERVICO H 28,66 38,02 46,00 61,02 50,34 66,78 48,03 63,72 48,44 64,26B570008351 HE-TP.150% - MOTORISTA H 25,03 33,20 40,16 53,28 43,96 58,32 41,94 55,64 42,30 56,12B570008352 HE-TP.150% - OPERADOR EQUIPAMENTO PESADO H 27,99 37,13 44,91 59,58 49,16 65,22 46,90 62,22 47,30 62,75B570008353 HE-TP.150% - MOTORISTA (VEICULO PESADO HIDROJATO) H 26,73 35,46 42,89 56,90 46,94 62,27 44,78 59,41 45,17 59,92B570008354 HE-TP.150% - OPERADOR K 500/COMPRESSOR H 28,96 38,42 46,48 61,66 50,87 67,48 48,53 64,38 48,95 64,94B570008355 HE-TP.150% - OPERADOR DE PROCESSOS (ETA/ETE) H 25,09 33,28 40,26 53,41 44,06 58,45 42,04 55,77 42,40 56,25B570008356 HE-TP.150% - OPERADOR DE ETA PEQUENA H 18,18 24,12 29,17 38,70 31,93 42,36 30,46 40,41 30,72 40,75B570008357 HE-TP.150% - OPERADOR DE ETA MEDIA H 19,98 26,51 32,06 42,53 35,09 46,55 33,48 44,41 33,77 44,80B570008358 HE-TP.150% - OPERADOR DE ETA GRANDE H 25,09 33,28 40,26 53,41 44,06 58,45 42,04 55,77 42,40 56,25B570008359 HE-TP.150% - OPERADOR DE SISTEMA (ETA/ETE) H 17,55 23,28 28,16 37,36 30,82 40,89 29,40 39,00 29,65 39,33B570008360 HE-TP.150% - SOLDADOR H 25,09 33,28 40,26 53,41 44,06 58,45 42,04 55,77 42,40 56,25B570008361 HE-TP.150% - SUPERVISOR DE CAMPO H 25,09 33,28 40,26 53,41 44,06 58,45 42,04 55,77 42,40 56,25B570008362 HE-TP.150% - FISCAL DE CAMPO H 25,09 33,28 40,26 53,41 44,06 58,45 42,04 55,77 42,40 56,25B570008363 HE-TP.150% - MECANICO INDUSTRIAL H 25,58 33,93 41,06 54,47 44,93 59,60 42,87 56,87 43,24 57,36B570008364 HE-TP.150% - MECANICO MONTADOR H 25,58 33,93 41,06 54,47 44,93 59,60 42,87 56,87 43,24 57,36B570008365 HE-TP.150% - JATISTA H 16,12 21,38 25,87 34,32 28,31 37,56 27,01 35,83 27,24 36,14B570008366 HE-TP.150% - ELETRICISTA INDUSTRIAL H 32,90 43,65 52,80 70,04 57,78 76,65 55,13 73,14 55,60 73,76B570008367 HE-TP.150% - ELETRICISTA MONTADOR H 25,54 33,88 40,98 54,36 44,85 59,50 42,79 56,77 43,16 57,26B570008368 HE-TP.150% - TECNICO EM AUTOMACAO H 80,72 107,08 129,53 171,83 141,77 188,07 135,25 179,42 136,42 180,97B570008369 HE-TP.150% - AUXILIAR MECANICO H 15,85 21,03 25,43 33,74 27,84 36,93 26,56 35,23 26,79 35,54B570008370 HE-TP.150% - TECNICO ELETROMECANICO H 70,68 93,76 113,43 150,48 124,14 164,68 118,44 157,12 119,46 158,48B570008371 HE-TP.150% - TECNICO ELETROTECNICO H 39,18 51,98 62,87 83,40 68,81 91,28 65,65 87,09 66,21 87,83B570008372 HE-TP.150% - TORNEIRO MECANICO H 25,58 33,93 41,06 54,47 44,93 59,60 42,87 56,87 43,24 57,36B570008373 HE-TP.150% - AUXILIAR TECNICO (OPERACAO/MANUTENCAO/SERVICOS) H 25,58 33,93 41,06 54,47 44,93 59,60 42,87 56,87 43,24 57,36B570008374 HE-TP.150% - TECNICO DE NIVEL MEDIO H 36,70 48,69 58,90 78,14 64,46 85,51 61,50 81,59 62,03 82,29B570008375 HE-TP.150% - AUXILIAR DE PRODUCAO H 16,65 22,09 26,71 35,43 29,23 38,78 27,89 37,00 28,13 37,32B570008376 HE-TP.150% - SUPERVISOR GERAL H 25,09 33,28 40,26 53,41 44,06 58,45 42,04 55,77 42,40 56,25

B570008377 HE-TP.150% - SUPERVISOR DE ETA E ETE H 25,09 33,28 40,26 53,41 44,06 58,45 42,04 55,77 42,40 56,25B570008378 HE-TP.150% - ALMOXARIFE H 28,77 38,17 46,17 61,25 50,53 67,03 48,21 63,96 48,62 64,50B570008379 HE-TP.150% - ENCARREGADO DE EQUIPE H 33,95 45,04 54,48 72,27 59,63 79,11 56,89 75,47 57,38 76,12B570008380 HE-TP.150% - PEDREIRO/ENCANADOR/ARTEFICE (M) H 25,09 33,28 40,26 53,41 44,06 58,45 42,04 55,77 42,40 56,25B570008381 HE-TP.150% - PEDREIRO/ENCANADOR/ARTEFICE (I) H 25,09 33,28 40,26 53,41 44,06 58,45 42,04 55,77 42,40 56,25B570008382 HE-TP.150% - SERVENTE PRATICO (AUX.MANUTENCAO/OPERACAO) - (M) H 16,65 22,09 26,71 35,43 29,23 38,78 27,89 37,00 28,13 37,32B570008383 HE-TP.150% - SERVENTE PRATICO (AUX.MANUTENCAO/OPERACAO) - (I) H 16,65 22,09 26,71 35,43 29,23 38,78 27,89 37,00 28,13 37,32B570008384 HE-TP.150% - SERVENTE - (M) H 15,77 20,92 25,31 33,58 27,70 36,75 26,43 35,06 26,66 35,37B570008385 HE-TP.150% - SERVENTE - (I) H 15,77 20,92 25,31 33,58 27,70 36,75 26,43 35,06 26,66 35,37B570008386 HE-TP.150% - COLETOR DE AMOSTRAS H 22,65 30,05 36,35 48,22 39,79 52,79 37,96 50,36 38,29 50,80B570008387 HE-TP.150% - LABORATORISTA H 32,92 43,67 52,82 70,07 57,81 76,69 55,15 73,16 55,63 73,80B570008388 HE-TP.150% - AUXILIAR DE LABORATORIO H 18,43 24,45 29,58 39,24 32,37 42,94 30,89 40,98 31,15 41,32B570008389 HE-TP.150% - ASSITENTE DE LABORATORIO H 18,81 24,95 30,18 40,04 33,03 43,82 31,52 41,81 31,79 42,17B570008390 HE-TP.150% - ATENDENTE DO USUARIO H 17,58 23,32 28,21 37,42 30,87 40,95 29,45 39,07 29,71 39,41B570008391 HE-TP.150% - AGENTE DE SERVICOS ADMINISTRATIVO H 17,58 23,32 28,21 37,42 30,87 40,95 29,45 39,07 29,71 39,41B570008392 HE-TP.150% - AUXILIAR ADMINISTRATIVO H 22,96 30,46 36,84 48,87 40,32 53,49 38,46 51,02 38,79 51,46B570008393 HE-TP.150% - ZELADOR H 16,00 21,23 25,68 34,07 28,10 37,28 26,81 35,57 27,04 35,87B570008394 HE-TP.150% - VIGIA H 16,65 22,09 26,71 35,43 29,23 38,78 27,89 37,00 28,13 37,32B570008950 HE-TP.150% - MONITOR DE SERVICOS H 28,66 38,02 46,00 61,02 50,34 66,78 48,03 63,72 48,44 64,26

B570010000ADICIONAL NOTURNO - MAO DE OBRA PARA SERVICOS OPERACIONAIS /COMERCIAIS (o calculo

corresponde para cada cargo 40% do valor da horaB570010100 AN - AGENTE OPERACIONALB570010101 AN - AGENTE DE MANUTENCAO MES 892,37 1.183,82 1.432,02 1.899,72 1.567,27 2.079,14 1.495,28 1.983,64 1.508,11 2.000,66B570010104 AN - AGENTE DE MEDICAO (PITOMETRIA) MES 929,38 1.232,92 1.491,42 1.978,52 1.632,28 2.165,38 1.557,30 2.065,91 1.570,67 2.083,65B570010107 AN - AGENTE DE SERVICOS MES 617,39 819,03 990,74 1.314,32 1.084,32 1.438,46 1.034,51 1.372,38 1.043,39 1.384,16B570010110 AN - AGENTE DE SISTEMA MES 898,98 1.192,59 1.442,62 1.913,78 1.578,88 2.094,54 1.506,35 1.998,32 1.519,28 2.015,48B570010113 AN - DESENHISTA/CADISTA MES 752,89 998,78 1.208,20 1.602,80 1.322,31 1.754,18 1.261,57 1.673,60 1.272,40 1.687,97B570010116 AN - DESENHISTA (COPISTA) MES 647,79 859,36 1.039,54 1.379,05 1.137,72 1.509,30 1.085,46 1.439,97 1.094,77 1.452,32B570010119 AN - ELETRICISTA MES 883,11 1.171,53 1.417,16 1.880,00 1.551,02 2.057,58 1.479,77 1.963,06 1.492,47 1.979,91B570010122 AN - LEITURISTA (I) MES 663,66 880,41 1.065,00 1.412,83 1.165,58 1.546,26 1.112,04 1.475,23 1.121,58 1.487,89B570010125 AN - LEITURISTA (M) MES 746,94 990,89 1.198,65 1.590,13 1.311,86 1.740,31 1.251,60 1.660,37 1.262,34 1.674,62B570010128 AN - MECANICO MES 900,30 1.194,34 1.444,74 1.916,59 1.581,20 2.097,62 1.508,57 2.001,27 1.521,51 2.018,44B570010131 AN - MONITOR DE SERVICO MES 1.008,70 1.338,14 1.618,71 2.147,38 1.771,59 2.350,19 1.690,22 2.242,25 1.704,72 2.261,48B570010134 AN - MOTORISTA MES 881,16 1.168,95 1.414,03 1.875,85 1.547,59 2.053,03 1.476,50 1.958,72 1.489,17 1.975,53B570010137 AN - OPERADOR DE EQUIPAMENTOS PESADOS MES 984,91 1.306,58 1.580,52 2.096,72 1.729,80 2.294,75 1.650,34 2.189,34 1.664,50 2.208,13B570010146 AN - MOTORISTA (VEICULO PESADO - HIDROJATO) MES 940,77 1.248,03 1.509,69 2.002,75 1.652,28 2.191,91 1.576,38 2.091,23 1.589,91 2.109,17B570010149 AN - OPERADOR K500/COMPRESSOR/MPNEUM MES 1.019,28 1.352,18 1.635,68 2.169,89 1.790,17 2.374,84 1.707,94 2.265,75 1.722,59 2.285,19B570010152 AN - OPERADOR DE PROCESSOS ETA MES 883,11 1.171,53 1.417,16 1.880,00 1.551,02 2.057,58 1.479,77 1.963,06 1.492,47 1.979,91B570010155 AN - OPERADOR DE ETA PEQUENA MES 639,86 848,84 1.026,81 1.362,17 1.123,79 1.490,82 1.072,17 1.422,34 1.081,37 1.434,55

Página: 6 de 59

Page 7: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

B570010158 AN - OPERADOR DE ETA MEDIA MES 703,32 933,02 1.128,64 1.497,25 1.235,24 1.638,67 1.178,50 1.563,40 1.188,61 1.576,81B570010161 AN - OPERADOR DE ETA GRANDE MES 883,11 1.171,53 1.417,16 1.880,00 1.551,02 2.057,58 1.479,77 1.963,06 1.492,47 1.979,91B570010164 AN - OPERADOR DE SISTEMA (ETA`S E ETE`S) MES 617,39 819,03 990,74 1.314,32 1.084,32 1.438,46 1.034,51 1.372,38 1.043,39 1.384,16B570010167 AN - SOLDADOR MES 883,11 1.171,53 1.417,16 1.880,00 1.551,02 2.057,58 1.479,77 1.963,06 1.492,47 1.979,91B570010170 AN - SUPERVISOR DE CAMPO MES 883,11 1.171,53 1.417,16 1.880,00 1.551,02 2.057,58 1.479,77 1.963,06 1.492,47 1.979,91B570010173 AN - FISCAL DE CAMPO MES 883,11 1.171,53 1.417,16 1.880,00 1.551,02 2.057,58 1.479,77 1.963,06 1.492,47 1.979,91B570010176 AN - MECANICO INDUSTRIAL MES 900,30 1.194,34 1.444,74 1.916,59 1.581,20 2.097,62 1.508,57 2.001,27 1.521,51 2.018,44B570010179 AN - MECANICO MONTADOR MES 900,30 1.194,34 1.444,74 1.916,59 1.581,20 2.097,62 1.508,57 2.001,27 1.521,51 2.018,44B570010182 AN - JATISTA MES 567,15 752,38 910,13 1.207,38 996,09 1.321,41 950,33 1.260,71 958,49 1.271,53B570010185 AN - ELETRICISTA INDUSTRIAL MES 1.158,09 1.536,32 1.858,44 2.465,41 2.033,97 2.698,26 1.940,54 2.574,32 1.957,19 2.596,41B570010188 AN - ELETRICISTA MONTADOR MES 898,98 1.192,59 1.442,62 1.913,78 1.578,88 2.094,54 1.506,35 1.998,32 1.519,28 2.015,48B570010191 AN - TECNICO EM AUTOMACAO MES 2.841,03 3.768,91 4.559,11 6.048,12 4.989,72 6.619,36 4.760,52 6.315,31 4.801,36 6.369,48

B570010200 AN - TECNICO OPERACIONAL E DE SUPORTEB570010201 AN - TECNICO OPERACIONAL (OPERACAO E MANUTENCAO MES 1.291,62 1.713,46 2.072,71 2.749,66 2.268,48 3.009,37 2.164,27 2.871,12 2.182,84 2.895,76B570010204 AN - TECNICO SEGURANCA DO TRABALHO MES 1.291,62 1.713,46 2.072,71 2.749,66 2.268,48 3.009,37 2.164,27 2.871,12 2.182,84 2.895,76B570010207 AN - AUXILIAR MECANICO MES 557,89 740,10 895,27 1.187,67 979,83 1.299,84 934,82 1.240,13 942,85 1.250,78B570010210 AN - TECNICO ELETROMECANICO MES 2.488,05 3.300,65 3.992,67 5.296,68 4.369,78 5.796,95 4.169,05 5.530,66 4.204,82 5.578,11B570010213 AN - TECNICO ELETROTECNICO MES 1.378,87 1.829,21 2.212,73 2.935,41 2.421,72 3.212,65 2.310,48 3.065,08 2.330,30 3.091,38B570010216 AN - TORNEIRO MECANICO MES 900,30 1.194,34 1.444,74 1.916,59 1.581,20 2.097,62 1.508,57 2.001,27 1.521,51 2.018,44B570010219 AN - TECNICO EM AGRIMENSURA MES 1.291,62 1.713,46 2.072,71 2.749,66 2.268,48 3.009,37 2.164,27 2.871,12 2.182,84 2.895,76B570010222 AN - TECNICO EM TELECOMUNICACOES MES 1.291,62 1.713,46 2.072,71 2.749,66 2.268,48 3.009,37 2.164,27 2.871,12 2.182,84 2.895,76B570010225 AN - TECNICO INSTRUMENTISTA MES 1.291,62 1.713,46 2.072,71 2.749,66 2.268,48 3.009,37 2.164,27 2.871,12 2.182,84 2.895,76B570010228 AN - TECNICO EM QUIMICA MES 1.291,62 1.713,46 2.072,71 2.749,66 2.268,48 3.009,37 2.164,27 2.871,12 2.182,84 2.895,76B570010231 AN - AUXILIAR TECNICO (OPERACAO/MANUTENCAO) MES 900,30 1.194,34 1.444,74 1.916,59 1.581,20 2.097,62 1.508,57 2.001,27 1.521,51 2.018,44B570010234 AN - TECNICO DE NIVEL MEDIO MES 1.291,62 1.713,46 2.072,71 2.749,66 2.268,48 3.009,37 2.164,27 2.871,12 2.182,84 2.895,76B570010240 AN - AUXILIAR DE PRODUCAO MES 585,79 777,11 940,04 1.247,06 1.028,83 1.364,85 981,57 1.302,15 989,99 1.313,32B570010243 AN - SUPERVISOR GERAL MES 883,11 1.171,53 1.417,16 1.880,00 1.551,02 2.057,58 1.479,77 1.963,06 1.492,47 1.979,91B570010246 AN - SUPERVISOR DE ETA`S E ETE`S MES 883,11 1.171,53 1.417,16 1.880,00 1.551,02 2.057,58 1.479,77 1.963,06 1.492,47 1.979,91B570010249 AN - ALMOXARIFE MES 1.012,58 1.343,29 1.624,93 2.155,63 1.778,40 2.359,23 1.696,71 2.250,86 1.711,27 2.270,17B570010252 AN - AUXILIAR DE ALMOXARIFE MES 555,25 736,59 891,03 1.182,04 975,19 1.293,69 930,39 1.234,26 938,38 1.244,85B570010255 AN - ENCARREGADO DE EQUIPES MES 1.195,11 1.585,43 1.917,84 2.544,21 2.098,98 2.784,51 2.002,56 2.656,60 2.019,75 2.679,40B570010258 AN - PEDREIRO/ENCANADOR/ARTIFICE (M) MES 883,11 1.171,53 1.417,16 1.880,00 1.551,02 2.057,58 1.479,77 1.963,06 1.492,47 1.979,91B570010261 AN - PEDREIRO/ENCANADOR/ARTIFICE (I) MES 883,11 1.171,53 1.417,16 1.880,00 1.551,02 2.057,58 1.479,77 1.963,06 1.492,47 1.979,91B570010264 AN - SERVENTE PRATICO (AUX.PRODUC/MANUT) - (M) MES 585,79 777,11 940,04 1.247,06 1.028,83 1.364,85 981,57 1.302,15 989,99 1.313,32B570010265 AN - SERVENTE PRATICO (AUX.PRODUC/MANUT) - (I) MES 585,79 777,11 940,04 1.247,06 1.028,83 1.364,85 981,57 1.302,15 989,99 1.313,32B570010267 AN - SERVENTE - (M) MES 555,25 736,59 891,03 1.182,04 975,19 1.293,69 930,39 1.234,26 938,38 1.244,85B570010268 AN - SERVENTE - (I) MES 555,25 736,59 891,03 1.182,04 975,19 1.293,69 930,39 1.234,26 938,38 1.244,85B570010270 AN - COLETOR DE AMOSTRAS MES 797,18 1.057,54 1.279,27 1.697,08 1.400,09 1.857,36 1.335,78 1.772,05 1.347,24 1.787,25B570010276 AN - LABORATORISTA MES 1.158,47 1.536,83 1.859,04 2.466,20 2.034,63 2.699,14 1.941,17 2.575,16 1.957,82 2.597,24B570010279 AN - AUXILIAR DE LABORATORIO MES 648,89 860,82 1.041,30 1.381,39 1.139,65 1.511,86 1.087,30 1.442,41 1.096,63 1.454,79B570010282 AN - ASSISTENTE DE LABORATORIO MES 661,87 878,04 1.062,13 1.409,02 1.162,44 1.542,09 1.109,05 1.471,27 1.118,56 1.483,88B570010285 AN - ATENDENTE DE USUARIO MES 618,71 820,78 992,86 1.317,13 1.086,64 1.441,54 1.036,72 1.375,31 1.045,62 1.387,12B570010288 AN - AGENTE DE SERVICO COMERCIAL MES 618,71 820,78 992,86 1.317,13 1.086,64 1.441,54 1.036,72 1.375,31 1.045,62 1.387,12B570010291 AN - ANALISTA DE CONSUMO/CADASTRO (I) MES 674,23 894,43 1.081,97 1.435,34 1.184,16 1.570,91 1.129,76 1.498,74 1.139,46 1.511,61B570010297 AN - ANALISTA DE CONSUMO/CADASTRO (M) MES 674,23 894,43 1.081,97 1.435,34 1.184,16 1.570,91 1.129,76 1.498,74 1.139,46 1.511,61B570010298 AN - CADASTRISTA MES 641,18 850,59 1.028,93 1.364,98 1.126,11 1.493,90 1.074,38 1.425,27 1.083,60 1.437,50

B570010300 AN - AGENTE ADMINISTRATIVOB570010301 AN - AGENTE DE SERVICO ADMINISTRATIVO MES 618,71 820,78 992,86 1.317,13 1.086,64 1.441,54 1.036,72 1.375,31 1.045,62 1.387,12B570010304 AN - AGENTE DE SERVICO DE COMUNICACAO MES 618,71 820,78 992,86 1.317,13 1.086,64 1.441,54 1.036,72 1.375,31 1.045,62 1.387,12B570010307 AN - ASSISTENTE ADMINISTRATIVO MES 773,01 1.025,48 1.240,48 1.645,62 1.357,64 1.801,05 1.295,28 1.718,32 1.306,39 1.733,06B570010310 AN - AUXILIAR ESCRITORIO MES 757,87 1.005,39 1.216,18 1.613,38 1.331,04 1.765,76 1.269,90 1.684,65 1.280,80 1.699,11B570010313 AN - AGENTE TECNICO ADMINISTRATIVO MES 906,91 1.203,11 1.455,35 1.930,67 1.592,81 2.113,02 1.519,64 2.015,95 1.532,68 2.033,25B570010328 AN - DIGITADOR MES 785,28 1.041,75 1.260,17 1.671,74 1.379,20 1.829,65 1.315,84 1.745,59 1.327,13 1.760,57B570010331 AN - SECRETARIA MES 1.291,62 1.713,46 2.072,71 2.749,66 2.268,48 3.009,37 2.164,27 2.871,12 2.182,84 2.895,76B570010334 AN - AUXILIAR ADMINISTRATIVO MES 807,76 1.071,57 1.296,24 1.719,59 1.418,67 1.882,01 1.353,50 1.795,55 1.365,12 1.810,97B570010340 AN - ZELADOR MES 563,18 747,11 903,76 1.198,93 989,12 1.312,17 943,69 1.251,90 951,78 1.262,63B570010343 AN - VIGIA MES 585,79 777,11 940,04 1.247,06 1.028,83 1.364,85 981,57 1.302,15 989,99 1.313,32

B570010400 AN - PROFISSIONAL DE NIVEL SUPERIORB570010407 AN - ASSISTENTE SOCIAL - AS6 MES 2.879,37 3.819,77 4.620,64 6.129,74 5.057,05 6.708,68 4.824,76 6.400,53 4.866,16 6.455,45B570010539 HE-TP.80% - TECNICO DE NIVEL MEDIO H 26,43 35,06 42,41 56,26 46,41 61,57 44,28 58,74 44,66 59,25B570011374 HE-TP.150% - TECNICO DE NIVEL MEDIO H 36,70 48,69 58,90 78,14 64,46 85,51 61,50 81,59 62,03 82,29B579000001 TECNICO EM SEGURANCA DO TRABALHO MES 3.229,04 4.283,64 5.181,77 6.874,14 5.671,19 7.523,40 5.410,68 7.177,81 5.457,11 7.239,40B579000002 TECNICO EM INFORMATICA MES 3.229,04 4.283,64 5.181,77 6.874,14 5.671,19 7.523,40 5.410,68 7.177,81 5.457,11 7.239,40

B579000003 MOTORISTA DE VEICULO PESADO(ONIBUS) MES 2.351,94 3.120,08 3.774,25 5.006,92 4.130,73 5.479,83 3.940,98 5.228,10 3.974,80 5.272,97B579000004 MOTORISTA DE VEICULO LEVE MES 2.202,90 2.922,37 3.535,08 4.689,64 3.868,96 5.132,56 3.691,24 4.896,80 3.722,92 4.938,83B579001054 OPERADOR INDUSTRIAL (ECP) MES 2.872,83 3.811,10 4.610,15 6.115,82 5.045,58 6.693,47 4.813,81 6.386,00 4.855,11 6.440,79B579005154 PERICULOSIDADE - OPERADOR INDUSTRIAL (ECP) MES 861,85 1.143,33 1.383,05 1.834,75 1.513,68 2.008,05 1.444,15 1.915,81 1.456,54 1.932,25B579010154 AN - OPERADOR INDUSTRIAL (ECP) MES 1.206,59 1.600,66 1.936,26 2.568,64 2.119,14 2.811,25 2.021,79 2.682,11 2.039,14 2.705,12B579500003 TECNICO EM ENFERMAGEM MES 3.231,64 4.287,09 5.185,94 6.879,67 5.675,76 7.529,46 5.415,04 7.183,59 5.461,50 7.245,23B579701303 AUXILIAR TECNICO DE ENGENHARIA MES 3.234,90 4.291,42 5.191,18 6.886,62 5.681,48 7.537,05 5.420,50 7.190,84 5.467,01 7.252,54B579703010 ESTAGIARIO H 13,48 17,88 21,62 28,68 23,67 31,40 22,58 29,95 22,77 30,21B579710302 SECRETARIA/TELEFONISTA MES 3.229,04 4.283,64 5.181,77 6.874,14 5.671,19 7.523,40 5.410,68 7.177,81 5.457,11 7.239,40B579722401 ARQUEOLOGO COORDENADOR H 78,57 104,23 126,08 167,26 137,99 183,06 131,65 174,65 132,78 176,15B579722402 ARQUEOLOGO DE CAMPO E LABORATORIO H 61,08 81,03 98,02 130,03 107,28 142,32 102,35 135,78 103,23 136,94B579722403 AUXILIAR (CAMPO/PESCADOR) H 6,01 7,97 9,64 12,79 10,55 14,00 10,07 13,36 10,16 13,48B579722404 TECNICO (CAMPO) H 10,70 14,19 17,16 22,76 18,79 24,93 17,92 23,77 18,08 23,98B579722405 MEDICO VETERINARIO H 57,96 76,89 93,01 123,39 101,79 135,03 97,12 128,84 97,95 129,94B579722406 TECNICO AMBIENTAL H 40,38 53,57 64,80 85,96 70,92 94,08 67,67 89,77 68,25 90,54B579722407 MATEIRO H 6,31 8,37 10,13 13,44 11,08 14,70 10,57 14,02 10,66 14,14B579722408 CONTINUO (VIVERISTAS) H 6,31 8,37 10,13 13,44 11,08 14,70 10,57 14,02 10,66 14,14B579722409 AJUDANTE (MOTOSSERRISTA/CARGA/DESCARGA) H 7,18 9,52 11,52 15,28 12,61 16,73 12,03 15,96 12,14 16,10B579722411 COORDENADOR AMBIENTAL H 126,00 167,15 202,19 268,23 221,29 293,56 211,13 280,09 212,94 282,49

B590000000 RELACAO DE SERVICO PARA CONSULTORIA - RECURSOS HUMANOS -B590000001 CONSULTOR INTERNACIONAL H 321,36 426,32 515,69 684,11 564,40 748,73 538,48 714,35 543,10 720,48B590000004 CONSULTOR NACIONAL H 247,19 327,92 396,67 526,22 434,14 575,93 414,20 549,48 417,75 554,19B590000007 COORDENADOR (P0) H 128,37 170,30 206,00 273,28 225,46 299,10 215,10 285,35 216,95 287,81B590000010 ENGENHEIRO SENIOR (P1) H 67,78 89,92 108,78 144,31 119,05 157,93 113,58 150,68 114,56 151,98B590000013 ENGENHEIRO MEDIO (P2) H 51,63 68,49 82,86 109,92 90,69 120,31 86,52 114,78 87,26 115,76B590000016 ENGENHEIRO JUNIOR (P3) H 51,08 67,76 81,97 108,74 89,71 119,01 85,59 113,54 86,32 114,51B590000019 TECNICO SENIOR H 21,17 28,08 33,97 45,06 37,18 49,32 35,47 47,05 35,77 47,45B590000022 TECNICO MEDIO H 17,65 23,41 28,33 37,58 31,00 41,12 29,58 39,24 29,83 39,57B590000025 TECNICO JUNIOR H 14,71 19,51 23,60 31,31 25,83 34,27 24,64 32,69 24,86 32,98B590000028 AUXILIAR TECNICO H 10,23 13,57 16,42 21,78 17,97 23,84 17,14 22,74 17,29 22,94B590000031 PROJETISTA H 57,00 75,62 91,47 121,34 100,10 132,79 95,51 126,70 96,33 127,79B590000034 DESENHISTA PROJETISTA H 8,56 11,36 13,74 18,23 15,04 19,95 14,35 19,04 14,47 19,20B590000037 DESENHISTA COPISTA H 7,36 9,76 11,81 15,67 12,93 17,15 12,33 16,36 12,44 16,50B590000040 SECRETARIA SENIOR H 21,14 28,04 33,92 45,00 37,12 49,24 35,42 46,99 35,72 47,39B590000043 SECRETARIA MEDIO H 17,61 23,36 28,25 37,48 30,92 41,02 29,50 39,13 29,76 39,48B590000046 SECRETARIA JUNIOR H 14,68 19,47 23,55 31,24 25,78 34,20 24,59 32,62 24,81 32,91B590000049 ARQUITETO SENIOR - P2 H 52,67 69,87 84,52 112,12 92,51 122,72 88,26 117,09 89,01 118,08B590000052 ARQUITETO MEDIO - P3 H 44,48 59,01 71,38 94,69 78,13 103,65 74,54 98,88 75,18 99,73B590000055 ARQUITETO JUNIOR - P4 H 38,79 51,46 62,25 82,58 68,13 90,38 65,00 86,23 65,55 86,96B590000058 TOPOGRAFO SENIOR H 20,03 26,57 32,14 42,64 35,17 46,66 33,56 44,52 33,84 44,89B590000061 TOPOGRAFO MEDIO H 15,41 20,44 24,73 32,81 27,07 35,91 25,83 34,27 26,05 34,56B590000064 TOPOGRAFO JUNIOR H 13,10 17,38 21,02 27,89 23,01 30,53 21,95 29,12 22,14 29,37B590000067 GEOLOGO SENIOR - P2 H 98,69 130,92 158,37 210,09 173,32 229,93 165,36 219,37 166,78 221,25B590000070 GEOLOGO MEDIO - P3 H 83,45 110,70 133,92 177,66 146,57 194,44 139,84 185,51 141,04 187,10B590000073 GEOLOGO JUNIOR - P4 H 64,90 86,10 104,15 138,17 113,98 151,21 108,75 144,27 109,68 145,50B590000076 ECONOMISTA SENIOR H 62,90 83,44 100,94 133,91 110,47 146,55 105,40 139,82 106,30 141,02B590000079 ECONOMISTA MEDIO H 56,61 75,10 90,84 120,51 99,42 131,89 94,85 125,83 95,67 126,92B590000082 ECONOMISTA JUNIOR H 45,29 60,08 72,69 96,43 79,55 105,53 75,90 100,69 76,55 101,55B590000085 ENGENHEIRO CHEFE DE PROJETO (P1) H 67,78 89,92 108,78 144,31 119,05 157,93 113,58 150,68 114,56 151,98B590000088 ENGENHEIRO RESIDENTE H 51,63 68,49 82,86 109,92 90,69 120,31 86,52 114,78 87,26 115,76B590000091 ANALISTA DE SISTEMAS SENIOR - P2 H 98,69 130,92 158,37 210,09 173,32 229,93 165,36 219,37 166,78 221,25B590000094 ANALISTA DE SISTEMAS MEDIO - P3 H 83,45 110,70 133,92 177,66 146,57 194,44 139,84 185,51 141,04 187,10B590000097 ANALISTA DE SISTEMAS JUNIOR - P4 H 64,90 86,10 104,15 138,17 113,98 151,21 108,75 144,27 109,68 145,50B590000100 DIGITADOR SENIOR H 12,84 17,03 20,61 27,34 22,56 29,93 21,52 28,55 21,71 28,80B590000103 DIGITADOR MEDIO H 10,71 14,21 17,19 22,80 18,81 24,95 17,95 23,81 18,10 24,01

B590000106 DIGITADOR JUNIOR H 8,92 11,83 14,32 19,00 15,67 20,79 14,95 19,83 15,08 20,01B590000109 PROGRAMADOR DE COMPUTADOR SENIOR H 55,95 74,22 89,78 119,10 98,26 130,35 93,74 124,36 94,55 125,43B590000112 PROGRAMADOR DE COMPUTADOR MEDIO H 27,76 36,83 44,55 59,10 48,76 64,69 46,52 61,71 46,92 62,24B590000115 PROGRAMADOR DE COMPUTADOR JUNIOR H 14,41 19,12 23,12 30,67 25,30 33,56 24,14 32,02 24,35 32,30B590000118 OPERADOR DE MICROCOMPUTADOR H 27,76 36,83 44,55 59,10 48,76 64,69 46,52 61,71 46,92 62,24B590000121 DATILOGRAFO H 8,04 10,67 12,90 17,11 14,12 18,73 13,47 17,87 13,58 18,02B590000124 SERVENTE H 6,31 8,37 10,13 13,44 11,08 14,70 10,57 14,02 10,66 14,14B590000127 CONTINUO H 6,31 8,37 10,13 13,44 11,08 14,70 10,57 14,02 10,66 14,14B590000128 MOTORISTA H 10,02 13,29 16,08 21,33 17,60 23,35 16,79 22,27 16,93 22,46B590000129 PINTOR LETRISTA H 10,04 13,32 16,10 21,36 17,63 23,39 16,82 22,31 16,96 22,50

Página: 7 de 59

Page 8: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

B590000132 ASSISTENTE SOCIAL - AS5 H 63,01 83,59 101,11 134,13 110,66 146,80 105,58 140,06 106,48 141,26B590000136 TECNICO AGRICOLA H 14,68 19,47 23,55 31,24 25,78 34,20 24,59 32,62 24,81 32,91B590000140 TRABALHADOR RURAL H 6,31 8,37 10,13 13,44 11,08 14,70 10,57 14,02 10,66 14,14B599000001 BIOLOGO H 57,96 76,89 93,01 123,39 101,79 135,03 97,12 128,84 97,95 129,94B599500013 CONSULTOR SOCIOAMBIENTAL (P3) H 52,88 70,15 84,86 112,58 92,88 123,21 88,61 117,55 89,37 118,56B599800001 DIARISTA DE LIMPEZA DIA 68,79 91,26 110,39 146,44 120,82 160,28 115,27 152,92 116,26 154,23B599800002 INSTRUTOR (NIVEL MEDIO/TECNICO) H 53,66 71,19 86,11 114,23 94,25 125,03 89,92 119,29 90,69 120,31B599800003 INSTRUTOR (NIVEL SUPERIOR) H 128,37 170,30 206,00 273,28 225,46 299,10 215,10 285,35 216,95 287,81B599800004 MOBILIZADOR H 10,29 13,65 16,51 21,90 18,07 23,97 17,24 22,87 17,39 23,07B599800052 GERENTE DE CONTRATO SOCIOAMBIENTAL H 62,24 82,57 99,88 132,50 109,31 145,01 104,29 138,35 105,19 139,55

20000 SERVICOS PRELIMINARES

20100 DEMOLICAO

20101DEMOLICAO MANUAL DE ALVEN.DE TIJOLO MACICO,INCL.REMOCAO E CARREG.MANUAL DO

EXPURGOm3 43,61 57,85 64,91 86,11 70,27 93,22 67,44 89,47 67,93 90,12

29101DEMOLICAO MANUAL DE ALVEN.DE TIJOLO MACICO,INCL.REMOCAO E CARREG.MANUAL DO

EXPURGO (MRR / RMS)m3 45,25 60,03 67,38 89,39 72,91 96,72 69,95 92,80 70,47 93,49

20104DEMOLICAO MANUAL DE ALVEN.DE TIJOLO MACICO,C/ REAPROVEITAMENTO, INCL. REMOCAO E

EMPILHAMENTO MANUAL DO MATERIAL.m3 52,68 69,89 78,40 104,01 84,87 112,59 81,45 108,05 82,05 108,85

20107DEMOLICAO MANUAL DE ALVEN.DE BLOCO CERAMICO, INCL. REMOCAO E CARREG. MANUAL DO

EXPURGOm3 39,08 51,84 58,17 77,17 62,97 83,54 60,44 80,18 60,87 80,75

29107DEMOLICAO MANUAL DE ALVEN.DE BLOCO CERAMICO, INCL. REMOCAO E CARREG. MANUAL DO

EXPURGO (MRR / RMS)m3 39,89 52,92 59,38 78,77 64,27 85,26 61,68 81,82 62,11 82,40

20110 DEMOLICAO MANUAL DE ALVEN.DE COBOGO,INCL.REMOCAO E CARREG.MANUAL DO EXPURGO m2 24,3 32,24 36,17 47,98 39,16 51,95 37,58 49,85 37,85 50,21

20113 DEMOLICAO MANUAL DE ALVEN.DE PEDRA,INCL.REMOCAO E CARREG.MANUAL DO EXPURGO. m3 70,45 93,46 104,85 139,09 113,50 150,57 108,91 144,48 109,72 145,55

29113DEMOLICAO MANUAL DE ALVEN.DE PEDRA,INCL.REMOCAO E CARREG.MANUAL DO EXPURGO

(MRR / RMS).m3 72,07 95,61 107,25 142,28 116,09 154,00 111,38 147,76 112,20 148,84

20116DEMOLICAO MANUAL DE REVEST.EM AZULEJO, PEDRA NATURAL, GRANITO OU MAT. SIM., INCL.

REMOCAO E CARREG. MANUAL DO EXPURGOm2 11,36 15,07 16,92 22,45 18,31 24,29 17,57 23,31 17,71 23,49

20119DEMOLICAO MANUAL DE REVEST.EM ARGAMASSA DE CIMENTO E AREIA,INCL.REMOCAO E

CARREG.MANUAL DO EXPURGOm2 4,94 6,55 7,36 9,76 7,96 10,56 7,64 10,14 7,70 10,21

20125DEMOLICAO MANUAL DE PISO CIMENTADO SOBRE LASTRO DE CONCRETO

SIMPLES/CALCETAMENTO, INCL. REMOCAO E CARREG. MANUAL DO EXPURGOm2 8,98 11,91 13,37 17,74 14,46 19,18 13,88 18,41 13,98 18,55

29125DEMOLICAO MANUAL DE PISO CIMENTADO SOBRE LASTRO DE CONCRETO

SIMPLES/CALCETAMENTO, INCL. REMOCAO E CARREG. MANUAL DO EXPURGO (MRR / RMS)m2 9,27 12,30 13,80 18,31 14,93 19,81 14,33 19,01 14,43 19,14

20128DEMOLICAO MANUAL DE PISO REVESTIDO C/ LADRILHO, INCL. REMOCAO E CARREG. MANUAL DO

EXPURGO.m2 10,09 13,39 15,02 19,93 16,25 21,56 15,60 20,69 15,71 20,84

20129DEMOLICAO MANUAL DE PISO REVESTIDO C/ PEDRA, INCL. REMOCAO E CARREG. MANUAL DO

EXPURGO.m2 8,75 11,61 13,02 17,27 14,09 18,69 13,52 17,94 13,61 18,06

20130DEMOLICAO MANUAL DE PISO REVESTIDO C/ GRANITO, INCL. REMOCAO E CARREG. MANUAL DO

EXPURGO.m2 10,23 13,57 15,24 20,22 16,49 21,88 15,82 20,99 15,95 21,16

20131DEMOLICAO MANUAL DE PISO REVESTIDO C/ TACO, INCL. REMOCAO E CARREG. MANUAL DO

EXPURGO.m2 10,37 13,76 15,45 20,50 16,72 22,18 16,04 21,28 16,17 21,45

20134DEMOLICAO MANUAL DE PISO EM MADEIRA,ASSOALHO,INCL.REMOCAO E CARREG.MANUAL DO

EXPURGO.m2 9,51 12,62 14,16 18,78 15,31 20,31 14,70 19,50 14,80 19,63

20137DEMOLICAO MANUAL DE COBERTURA EM TELHA CERAMICA, C/ APROVEITAMENTO, INCL.

REMOCAO E EMPILHAMENTO MANUAL DO MATERIAL.m2 3,83 5,08 5,71 7,57 6,17 8,19 5,92 7,85 5,97 7,92

20140DEMOLICAO MANUAL DE COBERTURA EM TELHA ONDULADA DE CIMENTO AMIANTO, INCL.

REMOCAO E CARREG. MANUAL DO EXPURGO.m2 4,62 6,13 6,86 9,10 7,43 9,86 7,13 9,46 7,18 9,52

20143DEMOLICAO MANUAL DE ESTRUTURA DE MADEIRA P/TELHADO,INCL. REMOCAO E CARREG.

MANUAL DO EXPURGO.m2 17,07 22,65 25,40 33,70 27,49 36,47 26,38 35,00 26,57 35,25

20146 RETIRADA MANUAL DE FORRO DE MADEIRA,INCL.REMOCAO E CARREG.MANUAL DO EXPURGO. m2 4,48 5,94 6,67 8,85 7,22 9,58 6,93 9,19 6,97 9,25

20149RETIRADA MANUAL DE ESQUADRIA DE MADEIRA, INCL. REMOCAO E CARREG. MANUAL DO

EXPURGO.m2 9,55 12,67 14,20 18,84 15,38 20,40 14,75 19,57 14,86 19,71

20150 RETIRADA MANUAL DO TAPUME E BARRACAO m2 5,69 7,55 8,48 11,25 9,17 12,16 8,80 11,67 8,87 11,77

20152RETIRADA MANUAL DE ESQUADRIA METALICA, INCL. REMOCAO E CARREG. MANUAL DO

EXPURGO.m2 10,4 13,80 15,48 20,54 16,75 22,22 16,08 21,33 16,20 21,49

20155 DEMOLICAO MANUAL DE CONCRETO SIMPLES, INCL. REMOCAO E CARREG. MANUAL DO EXPURGO. m3 137,13 181,92 204,12 270,79 220,94 293,10 212,00 281,24 213,59 283,35

29155DEMOLICAO MANUAL DE CONCRETO SIMPLES, INCL. REMOCAO E CARREG. MANUAL DO EXPURGO

(MRR / RMS).m3 141,4 187,58 210,45 279,18 227,77 302,16 218,54 289,92 220,12 292,01

20158 DEMOLICAO MANUAL DE CONCRETO ARMADO,INCL.REMOCAO E CARREG.MANUAL DO EXPURGO. m3 350,54 465,03 521,72 692,11 564,70 749,13 541,86 718,83 545,94 724,24

29158DEMOLICAO MANUAL DE CONCRETO ARMADO,INCL.REMOCAO E CARREG.MANUAL DO EXPURGO

(MRR / RMS).m3 360,22 477,87 536,12 711,22 580,23 769,73 556,72 738,54 560,79 743,94

20161DEMOLICAO MANUAL DE CONCRETO CICLOPICO, INCL. REMOCAO E CARREG. MANUAL DO

EXPURGOm3 272,34 361,29 405,32 537,70 438,70 581,98 420,96 558,45 424,14 562,66

20164DEMOLICAO MECANICA DE CONCRETO ARMADO C/ COMPRESSOR E MARTELETE PNEUMATICO

INCL. REMOCAO E CARREG. MANUAL DO EXPURGOm3 72,57 96,27 92,05 122,11 96,95 128,61 94,36 125,18 94,81 125,77

20167DEMOLICAO MECANICA DE CONCRETO SIMPLES C/ COMPRESSOR E MARTELETE PNEUMATICO

INCL. REMOCAO E CARREG. MANUAL DO EXPURGOm3 91,28 121,09 114,58 152,00 120,44 159,78 117,34 155,66 117,88 156,38

20200 REMOCAO / RECOMPOSICAO

20201REMOCAO E RECOMPOSICAO DE CERCA EM MOUROES DE MADEIRA, C/ REAPROVEITAMENTO DO

MATERIALm 6,54 8,68 9,73 12,91 10,53 13,97 10,11 13,41 10,19 13,52

20204REMOCAO E RECOMPOSICAO DE CERCA EM MOUROES DE CONCRETO, C/ REAPROVEITAMENTO

DO MATERIALm 11,24 14,91 16,71 22,17 18,09 24,00 17,36 23,03 17,49 23,20

20207REMOCAO DE CERCA E MOUROES DE MADEIRA OU CONCRETO, SEM REAPROVEITAMENTO DO

MATERIALm 6,99 9,27 10,39 13,78 11,26 14,94 10,80 14,33 10,87 14,42

20300 PREPARO DO TERRENO / LIMPEZA DE AREAS

20301 LIMPEZA MANUAL DO TERRENO, INCL. RASPAGEM, JUNTAMENTO E QUEIMA DO MATERIAL. m2 2,08 2,76 3,08 4,09 3,34 4,43 3,20 4,25 3,23 4,28

20304DESMATAMENTO E LIMPEZA MECANIZADA DO TERRENO

C/TRATOR,INCL.RASPAGEM,JUNTAMENTO E QUEIMA DO MATERIAL, S/ CORTES DE ARVORESm2 0,55 0,73 0,62 0,82 0,64 0,85 0,63 0,84 0,63 0,84

20307DESMATAMENTO E LIMPEZA MECANIZADA DO TERRENO

C/TRATOR,INCL.RASPAGEM,JUNTAMENTO E QUEIMA DO MATERIAL, C/ CORTES DE ARVORES C/

DIAMETRO>30 cm,C/ 01 ARVORE P/CADA 25 m2

m2 1,28 1,70 1,66 2,20 1,76 2,33 1,71 2,27 1,72 2,28

20308DESMATAMENTO E LIMPEZA MECANIZADA DO TERRENO

C/TRATOR,INCL.RASPAGEM,JUNTAMENTO E QUEIMA DO MATERIAL, C/ CORTES DE ARVORES C/

DIAMETRO>30 cm,C/ 01 ARVORE P/CADA 20 m2

m2 1,61 2,14 2,09 2,77 2,21 2,93 2,14 2,84 2,15 2,85

20310 DESMATAMENTO MANUAL DE TERRENO m2 1,88 2,49 2,79 3,70 3,02 4,01 2,90 3,85 2,92 3,87

20313 REGULARIZACAO MANUAL DE TERRENO m2 0,39 0,52 0,58 0,77 0,63 0,84 0,60 0,80 0,61 0,81

20316 REGULARIZACAO MECANIZADA DE TERRENO m2 0,35 0,46 0,42 0,56 0,44 0,58 0,43 0,57 0,43 0,57

20319 LIMPEZA DE RUAS APOS EXEC. DE OBRAS EM S.A.A.'s E S.E.S.'s m 0,69 0,92 0,92 1,22 0,98 1,30 0,95 1,26 0,95 1,26

20322LIMPEZA MANUAL DO TERRENO, EM AREAS DE ETA'S E ETE'S INCL. RASPAGEM, JUNTAMENTO E

EXPURGO DO MATERIAL.ha 491,20 651,63 644,00 854,33 682,40 905,27 662,00 878,21 665,60 882,98

20400 DESTOCAMENTO / ROCAGEM

20401 CORTE DE ARVORE COM DESTOCAMENTO MANUAL,C/DIAMETRO ATE 15cm un 30,03 39,84 44,54 59,09 48,19 63,93 46,25 61,36 46,59 61,81

20404 CORTE DE ARVORE COM DESTOCAMENTO MANUAL,C/DIAMETRO ENTRE 15 E 30cm un 33,15 43,98 49,20 65,27 53,23 70,61 51,09 67,78 51,47 68,28

20407ROCAGEM EM CAPOEIRA DENSA A MACHADO,INCL.RASPAGEM,MANUAL,JUNTAMENTO,QUEIMA DO

MATERIAL E REMOCAO MANUAL DOS RESIDUOS P/FORA DA AREA ROCADA.m2 4,14 5,49 6,17 8,19 6,68 8,86 6,41 8,50 6,46 8,57

29407ROCAGEM EM CAPOEIRA DENSA A MACHADO,INCL.RASPAGEM,MANUAL,JUNTAMENTO,QUEIMA DO

MATERIAL E REMOCAO MANUAL DOS RESIDUOS P/FORA DA AREA ROCADA. (MRR / RMS)m2 4,30 5,70 6,42 8,52 6,94 9,21 6,65 8,82 6,71 8,90

20410ROCAGEM EM CAPOEIRA FINA A FOICE, INCL. RASPAGEM MANUAL, JUNTAMENTO, QUEIMA E

REMOCAO MANUAL DOS RESIDUOS P/FORA DA AREA ROCADAm2 2,08 2,76 3,08 4,09 3,34 4,43 3,20 4,25 3,23 4,28

29410ROCAGEM EM CAPOEIRA FINA A FOICE, INCL. RASPAGEM MANUAL, JUNTAMENTO, QUEIMA E

REMOCAO MANUAL DOS RESIDUOS P/FORA DA AREA ROCADA (MRR / RMS)m2 2,16 2,87 3,20 4,25 3,47 4,60 3,33 4,42 3,35 4,44

20413DESMATAMENTO E LIMPEZA MECANIZADA DO TERRENO C/ROCADEIRA

INCL.RASPAGEM,JUNTAMENTO E QUEIMA DO MATERIAL, S/ CORTES DE ARVORESm2 0,40 0,53 0,56 0,74 0,59 0,78 0,57 0,76 0,58 0,77

20416DESMATAMENTO E DESTOCAMENTO DE ARVORES C/LIMPEZA DO TERRENO INCLUSIVE

RASPAGEM, JUNTAMENTO, QUEIMA E ATERRO DO MATERIAL EXCEDENTEha 1.223,24 1.622,75 1.337,84 1.774,78 1.366,64 1.812,98 1.351,34 1.792,69 1.354,04 1.796,27

20419LIMPEZA MECANICA DO TERRENO COM TRATOR, INCLUSIVE RASPAGEM, JUNTAMENTO, QUEIMA E

ATERRO DO MATERIAL EXCEDENTEha 771,44 1.023,39 840,20 1.114,61 857,30 1.137,29 848,12 1.125,12 849,74 1.127,27

29000 SERVICOS NAO CODIFICADOS

29003 RETIRADA E RECOLOCACAO DE PLACAS DE CONCRETO DE ESCADARIA DRENANTE m2 14,21 18,85 19,60 26,00 20,95 27,79 20,23 26,84 20,35 27,00

29004 RETIRADA E RECOLOCACAO DE CALHAS DE ESCADARIA DRENANTE m 21,71 28,80 27,10 35,95 28,45 37,74 27,73 36,79 27,85 36,95

29501 LIMPEZA MECANICA DO TERRENO COM TRATOR, INCLUSIVE RASPAGEM, JUNTAMENTO, QUEIMA E

ATERRO DO MATERIAL EXCEDENTEM2 0,51 0,68 0,52 0,69 0,52 0,69 0,52 0,69 0,52 0,69

29701 LIMPEZA MECANICA DO TERRENO COM TRATOR, INCLUSIVE RASPAGEM, M2 0,51 0,68 0,52 0,69 0,52 0,69 0,52 0,69 0,52 0,69

Página: 8 de 59

Page 9: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

30000 TRANSITO E SEGURANCA

30100 SINALIZACAO

30101PLACA DE SINALIZACAO E ADVERTENCIA,INCL.FORNEC.,TRANSP.,INSTAL.E REMOCAO P/OUTRO

LOCAL DA OBRA (DP0301)m2 50,05 66,40 51,41 68,20 51,74 68,64 51,55 68,39 51,59 68,44

39101PLACA DE SINALIZACAO E ADVERTENCIA,INCL.FORNEC.,TRANSP.,INSTAL.E REMOCAO P/OUTRO

LOCAL DA OBRA (DP0301) (MRR / RMS)m2 50,05 66,40 51,41 68,20 51,74 68,64 51,55 68,39 51,59 68,44

30104CONE C/ FAIXA REFLETORA P/DESVIO DE TRAFEGO E/OU REDUCAO DA AREA DE CIRCULACAO,

INCL. FORNEC. E REMOCAO P/ OUTRO LOCAL DA OBRA (DP0301-02)un 1,31 1,74 1,35 1,79 1,36 1,80 1,35 1,79 1,35 1,79

39104CONE C/ FAIXA REFLETORA P/DESVIO DE TRAFEGO E/OU REDUCAO DA AREA DE CIRCULACAO,

INCL. FORNEC. E REMOCAO P/ OUTRO LOCAL DA OBRA (DP0301-02) (MRR / RMS)un 1,31 1,74 1,35 1,79 1,36 1,80 1,36 1,80 1,36 1,80

30107REDUTOR DE VELOCIDADE EM CONCRETO SIMPLES (TIPO QUEBRA-MOLA), INCL. FORNEC. DE

MAT., IMPLANTACAO E RETIRADA APOS EXEC. DAS OBRAS (DP0301-03)m 430,92 571,66 520,05 689,90 542,38 719,52 530,48 703,73 532,62 706,57

30110PLACA DE IDENTIFICACAO DA OBRA PADRAO EMBASA,INCL.FORNEC.,TRANSP. E INST. (DP0301-

04)m2 245,02 325,04 262,89 348,75 267,37 354,69 264,99 351,54 265,42 352,11

39110PLACA DE IDENTIFICACAO DA OBRA PADRAO EMBASA,INCL.FORNEC.,TRANSP. E INST. (DP0301-

04) (MRR / RMS)m2 245,5 325,68 263,62 349,72 268,15 355,73 265,72 352,50 266,17 353,10

30114TAPUME P/ BLOQUEIO LATERAL,CENTRAL OU TOTAL INCL.FORNEC.,TRANSP.,INSTAL.E REMOCAO

P/OUTRO LOCAL DA OBRA (DP0301-05/11)m 19,27 25,56 19,70 26,13 19,80 26,27 19,74 26,19 19,76 26,21

39114TAPUME P/ BLOQUEIO LATERAL,CENTRAL OU TOTAL INCL.FORNEC.,TRANSP.,INSTAL.E REMOCAO

P/OUTRO LOCAL DA OBRA (DP0301-05/11) (MRR / RMS)m 19,29 25,59 19,72 26,16 19,81 26,28 19,76 26,21 19,77 26,23

30117LUMINOSO DE BLOQUEIO OU SINALIZADOR C/ SUPORTE ANTI-FURTO C/PROTETOR EM METAL

GALVANIZADO, INCL.FORNEC.,TRANSP.,INSTAL.E REMOCAO P/OUTRO LOCAL DA OBRA (DP0301-

12)

un 13,09 17,37 13,47 17,87 13,57 18,00 13,52 17,94 13,53 17,95

30120 SINALIZACAO HORIZONTAL (DP0301-05/10) m 9,03 11,98 12,07 16,01 12,83 17,02 12,42 16,48 12,50 16,58

30200 TAPUMES E CERCAS DE PROTECAO

30201TAPUME EM CHAPA DE MADEIRA COMPENSADA P/ ISOLAR O LOCAL DAS OBRAS, INCL. FORNEC.,

INSTAL. E PINTURA PADRAO EMBASA (DP0302-01)m2 13,91 18,45 16,53 21,93 17,19 22,80 16,83 22,33 16,90 22,42

30204TAPUME EM CHAPA DE ACO P/ ISOLAR O LOCAL DAS OBRAS, INCL. FORNEC., INSTAL. E PINTURA

PADRAO EMBASA (DP0302-01)m2 13,65 18,11 16,27 21,58 16,93 22,46 16,57 21,98 16,64 22,07

30300 ESCORAMENTOS DE PROTECAO

30301 ESCORAMENTO EM MADEIRA DE TUBULACOES EXISTENTES m3 1714,68 2.274,69 1.813,58 2.405,90 1.838,38 2.438,79 1.825,18 2.421,28 1.827,58 2.424,47

30304 ESCORAMENTO METALICO DE TUBULACOES EXISTENTES kg 2,39 3,17 2,49 3,30 2,52 3,34 2,50 3,32 2,50 3,32

30307 ESCORAMENTO METALICO DE ARVORES un 57,08 75,72 66,97 88,84 69,45 92,13 68,13 90,38 68,37 90,70

30310 ESCORAMENTO METALICO DE POSTES C/ ALTURA ATE 7,00m un 112,02 148,61 131,80 174,85 136,76 181,43 134,12 177,92 134,60 178,56

30313 ESCORAMENTO METALICO DE POSTES C/ ALTURA > 7,00m un 216,44 287,13 246,11 326,49 253,55 336,36 249,59 331,11 250,31 332,06

30316 ESCORAMENTO EM MADEIRA DE MURO OU PAREDE EXISTENTE m2 43,55 57,77 45,77 60,72 46,31 61,43 46,02 61,05 46,08 61,13

30400 PASSADICOS PROVISORIOS

30401 PASSADICO EM MADEIRA DE LEI,COM CORRIMAO,P/PEDESTRES (DP0304-01) m2 40,58 53,83 49,40 65,53 51,61 68,47 50,43 66,90 50,64 67,18

30404 PASSADICO METALICO P/ VEICULOS (DP0304-02) m2 67,09 89,00 73,95 98,10 75,67 100,38 74,75 99,16 74,92 99,39

39000 SERVICOS NAO CODIFICADOS

39001CERCA DE PROTECAO S/ SINALIZACAO LUMINOSA P/ ABERTURA DE VALA C/TELA PVC,

VERGALHAO COMO SUPORTE INCL. FORNEC., TRANP., INSTAL. E REMOCAO P/ OUTRO LOCAL DA

OBRA (UTILIZACAO 10X).

m2 1,02 1,35 1,40 1,86 1,50 1,99 1,45 1,92 1,46 1,94

39207CERCA DE PROTECAO S/ SINALIZACAO LUMINOSA P/ ABERTURA DE VALA C/ MONTANTES A CADA

3,0m E TELA PVC, INCL. FORNEC., TRANP., INSTAL. E REMOCAO P/ OUTRO LOCAL DA

OBRA(DP0302-02) (UTILIZACAO 10X)

m 3,13 4,15 4,29 5,69 4,58 6,08 4,42 5,86 4,44 5,89

39907CERCA DE PROTECAO S/ SINALIZACAO LUMINOSA P/ ABERTURA DE VALA C/ MONTANTES A CADA

3,0m E TELA PVC, INCL. FORNEC., TRANP., INSTAL. E REMOCAO P/ OUTRO LOCAL DA

OBRA(DP0302-02) (UTILIZACAO 10X) (MRR / RMS)

m 1,54 2,04 1,96 2,60 2,06 2,73 2,00 2,65 2,02 2,68

39210

CERCA DE PROTECAO C/SINALIZACAO LUMINOSA(CORDA LUMINOSA OU

SINALIZADOR),P/ABERT.DE VALAS,C/MONTANTES A CADA 3m,E TELA

PVC,INCL.FORNEC.TRANP.INSTAL.E REMOCAO P/OUTRO LOCAL DA OBRA(DP0302-02)(USO 10x)

m 9,84 13,05 11,00 14,59 11,30 14,99 11,13 14,77 11,15 14,79

39999

CERCA DE PROTECAO C/SINALIZACAO LUMINOSA(CORDA LUMINOSA OU

SINALIZADOR),P/ABERT.DE VALAS,C/MONTANTES A CADA 3m,E TELA

PVC,INCL.FORNEC.TRANP.INSTAL.E REMOCAO P/OUTRO LOCAL DA OBRA(DP0302-02)(USO 10x)

(MRR / RMS)

m 9,84 13,05 11,00 14,59 11,30 14,99 11,13 14,77 11,15 14,79

39213

CERCA DE PROTECAO S/SINALIZACAO LUMINOSA P/FECHAMENTO DE PV's,C/MONTANTES A CADA

3,0m E FITA PLASTICA,INCL.FORNEC.,TRANSP.,INSTAL.E REMOCAO P/OUTRO LOCAL DA

OBRA(DP0302-02)(USO DA FITA 1X)

m 2,19 2,91 2,77 3,67 2,91 3,86 2,83 3,75 2,84 3,77

39501 CONFECCAO DE PLACA DE SINALIZACAO TOTAL REFLETIVA(4 S 06 203 01 + 4 S 06 202 11)SICRO2 M2 389,94 517,29 389,94 517,29 389,94 517,29 389,94 517,29 389,94 517,29

39502CONFECCAO DE PLACA DE SINALIZACAO TOTAL REFLETIVA INCLUSIVE SUPORTE E TRAVESSA(4 S

06 203 01 + 4 S 06 202 11)SICRO2M2 328,54 435,84 328,54 435,84 328,54 435,84 328,54 435,84 328,54 435,84

40000 SERVICOS TOPOGRAFICOS PARA LOCACAO E CADASTRO DE OBRAS

40100 CADASTROS

40101 CADASTRO COMPLETO DE ADUTORA, INTERCEPTOR OU EMISSARIO m 0,33 0,44 0,53 0,70 0,58 0,77 0,55 0,73 0,56 0,74

40104 CADASTRO COMPLETO DE REDE DE DISTRIBUICAO DE AGUA m 0,22 0,29 0,35 0,46 0,38 0,50 0,36 0,48 0,36 0,48

40107 CADASTRO COMPLETO DE REDE COLETORA DE ESGOTOS DE SISTEMA CONVENCIONAL m 0,22 0,29 0,35 0,46 0,38 0,50 0,36 0,48 0,36 0,48

40110 CADASTRO COMPLETO DE REDE COLETORA DE ESGOTOS DE SISTEMA CONDOMINIAL m2 0,61 0,81 0,98 1,30 1,07 1,42 1,03 1,37 1,03 1,37

40113 CADASTRO DE LIGACOES DOMICILIARES (NOVAS) EM REDES DE AGUA/ESGOTO un 0,97 1,29 1,56 2,07 1,70 2,26 1,63 2,16 1,64 2,18

40116 CADASTRO DE LIGACOES DOMICILIARES (EXISTENTES) EM REDES DE AGUA / ESGOTO un 0,97 1,29 1,56 2,07 1,70 2,26 1,63 2,16 1,64 2,18

40119 CADASTRO DE OBRAS CIVIS m2 1,00 1,33 1,60 2,12 1,75 2,32 1,67 2,22 1,69 2,24

40122 CADASTRO E LEVANTAMENTO DE AREAS P/ DESAPROPRIACAO m2 1,00 1,33 1,60 2,12 1,75 2,32 1,67 2,22 1,69 2,24

40125 CADASTRO DE RAMAIS PREDIAIS EM REDES DE ESGOTO un 0,97 1,29 1,56 2,07 1,70 2,26 1,63 2,16 1,64 2,18

40200 GABARITOS

40201 GABARITO P/ EDIFICACOES m2 6,70 8,89 8,05 10,68 8,38 11,12 8,21 10,89 8,24 10,93

49000 SERVICOS NAO CODIFICADOS

49001 CONFECCAO DE PLANTA CADASTRAL, EM CAD, TAMANHO A2 un 31,43 41,70 50,44 66,91 55,21 73,24 52,67 69,87 53,12 70,47

49002 CONFECCAO DE PLANTA CADASTRAL, EM CAD, TAMANHO A1 un 47,06 62,43 75,51 100,17 82,64 109,63 78,85 104,60 79,52 105,49

49003 CONFECCAO DE PLANTA CADASTRAL, EM CAD, TAMANHO A0 un 62,68 83,15 100,58 133,43 110,08 146,03 105,03 139,33 105,93 140,53

50000 MOVIMENTO DE TERRA E ROCHA

50100ESCAVACOES DE VALAS P/ ADUTORAS E REDES DE DISTRIBUICAO DE AGUA (APLICA-SE P/

LINHAS DE RECALQUE DE ESGOTO)

50101 ESCAV. MANUAL DE VALAS - AGUA - EM SOLO DE 1a CAT.EXECUTADA C/ PROFUND. ATE 1,50m m3 22,74 30,17 33,84 44,89 36,64 48,61 35,15 46,63 35,41 46,97

50104ESCAV. MANUAL DE VALAS - AGUA - EM SOLO DE 1a CAT.EXECUTADA ENTRE AS PROFUND. DE

1,51m E 3,00mm3 27,83 36,92 41,41 54,93 44,83 59,47 43,02 57,07 43,33 57,48

50107ESCAV. MANUAL DE VALAS - AGUA - EM SOLO DE 1a CAT.EXECUTADA ENTRE AS PROFUND. DE

3,01m E 4,50mm3 31,04 41,18 46,19 61,28 50,00 66,33 47,97 63,64 48,32 64,10

50110ESCAV. MANUAL DE VALAS - AGUA - EM SOLO DE 1a CAT.EXECUTADA C/ PROFUND. ACIMA DE

4,50mm3 36,43 48,33 54,22 71,93 58,69 77,86 56,32 74,71 56,74 75,27

50113 ESCAV. MANUAL DE VALAS - AGUA - EM SOLO DE 2a CAT.EXECUTADA C/ PROFUND. ATE 1,50m m3 37,55 49,81 55,89 74,14 60,50 80,26 58,05 77,01 58,48 77,58

50116ESCAV. MANUAL DE VALAS - AGUA - EM SOLO DE 2a CAT.EXECUTADA ENTRE AS PROFUND. DE

1,51 E 3,00mm3 42,33 56,15 62,99 83,56 68,19 90,46 65,43 86,80 65,91 87,44

50119ESCAV. MANUAL DE VALAS - AGUA - EM SOLO DE 2a CAT.EXECUTADA ENTRE AS PROFUND. DE

3,01 E 4,50mm3 46,63 61,86 69,39 92,05 75,12 99,65 72,08 95,62 72,61 96,32

50122ESCAV. MANUAL DE VALAS - AGUA - EM SOLO DE 2a CAT.EXECUTADA C/ PROFUND. ACIMA DE

4,50mm3 53,13 70,48 79,06 104,88 85,58 113,53 82,12 108,94 82,73 109,75

50125 ESCAV. MANUAL DE VALAS - AGUA - EM LAMA EXECUTADA C/ PROFUND. ATE 1,50m m3 31,62 41,95 47,06 62,43 50,94 67,58 48,88 64,84 49,24 65,32

50128 ESCAV. MANUAL DE VALAS - AGUA - EM LAMA EXECUTADA ENTRE AS PROFUND. DE 1,51 E 3,00m m3 36,78 48,79 54,74 72,62 59,26 78,61 56,86 75,43 57,29 76,00

50131 ESCAV. MANUAL DE VALAS - AGUA - EM LAMA EXECUTADA ENTRE AS PROFUND. DE 3,01 E 4,50m m3 41,01 54,40 61,03 80,96 66,06 87,64 63,39 84,09 63,86 84,72

50134 ESCAV. MANUAL DE VALAS - AGUA - EM LAMA EXECUTADA C/ PROFUND. ACIMA DE 4,50m m3 44,30 58,77 65,93 87,46 71,36 94,67 68,48 90,85 68,98 91,51

50137ESCAV. MECANIZ. DE VALAS - AGUA - EM SOLO DE 1a CAT. EXECUTADA ENTRE AS PROFUND. DE

0 A 2,00mm3 4,57 6,06 4,80 6,37 4,86 6,45 4,83 6,41 4,83 6,41

50140ESCAV. MECANIZ. DE VALAS - AGUA - EM SOLO DE 1a CAT. EXECUTADA ENTRE AS PROFUND. DE

2 A 4,00mm3 4,96 6,58 5,21 6,91 5,27 6,99 5,24 6,95 5,24 6,95

50143ESCAV. MECANIZ. DE VALAS - AGUA - EM SOLO DE 1a CAT. EXECUTADA P/ PROFUND. ACIMA DE

4,00mm3 3,04 4,03 3,16 4,19 3,19 4,23 3,17 4,21 3,18 4,22

50146ESCAV. MECANIZ. DE VALAS - AGUA - EM SOLO DE 2a CAT. EXECUTADA ENTRE AS PROFUND. DE

0 A 2,00mm3 6,27 8,32 6,59 8,74 6,67 8,85 6,63 8,80 6,63 8,80

50149ESCAV. MECANIZ. DE VALAS - AGUA - EM SOLO DE 2a CAT. EXECUTADA ENTRE AS PROFUND. DE

0 A 4,00mm3 7,34 9,74 7,71 10,23 7,80 10,35 7,76 10,29 7,76 10,29

Página: 9 de 59

Page 10: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

50152ESCAV. MECANIZ. DE VALAS - AGUA - EM SOLO DE 2a CAT. EXECUTADA P/ PROFUND. ACIMA DE

4,00mm3 4,88 6,47 5,06 6,71 5,10 6,77 5,08 6,74 5,08 6,74

50155ESCAV. DE VALAS - AGUA - EM ROCHA BRANDA EXECUTADA ENTRE AS PROFUND. DE 0 A 2,00m,

C/USO DE ROMPEDOR PNEUMATICOm3 33,76 44,79 42,31 56,13 44,46 58,98 43,32 57,47 43,52 57,73

50158ESCAV. DE VALAS - AGUA - EM ROCHA BRANDA EXECUTADAENTRE AS PROFUND. DE 2 A 4,00m,

C/ USO DE ROMPEDOR PNEUMATICOm3 39,59 52,52 50,99 67,64 53,86 71,45 52,34 69,43 52,61 69,79

50161ESCAV. DE VALAS - AGUA - EM ROCHA BRANDA EXECUTADA C/ PROFUND. ACIMA DE 4,00 m, C/

USO DE ROMPEDOR PNEUMATICOm3 45,43 60,27 59,68 79,17 63,26 83,92 61,36 81,40 61,69 81,84

50164ESCAV. DE VALAS - AGUA - EM ROCHA SA, EXECUTADA ENTRE AS PROFUND.DE 0 A 2,00 m,C/ USO

DE EXPLOSIVO,INCL.PROTECAOm3 156,31 207,36 216,13 286,72 231,16 306,66 223,18 296,07 224,59 297,94

50167ESCAV. DE VALAS - AGUA - EM ROCHA SA, EXECUTADA ENTRE AS PROFUND.DE 2 A 4,00 m,C/ USO

DE EXPLOSIVO,INCL.PROTECAOm3 168,33 223,31 233,91 310,31 250,38 332,15 241,64 320,56 243,18 322,60

50170ESCAV. DE VALAS - AGUA - EM ROCHA SA, EXECUTADA C/ PROFUND.ACIMA DE 4,00 m,C/USO DE

EXPLOSIVO,INCL.PROTECAOm3 180,27 239,15 251,60 333,77 269,52 357,55 260,00 344,92 261,68 347,14

50187ESCAV. DE VALAS - AGUA - EM ROCHA SA, A FRIO, EXECUTADA ENTRE AS PROFUND. DE 0 A 2,00

m, COM ARGAMASSA EXPANSIVA.m3 174,68 231,73 217,15 288,07 227,83 302,24 222,15 294,70 223,15 296,03

50190ESCAV. DE VALAS - AGUA - EM ROCHA SA, A FRIO, EXECUTADA ENTRE AS PROFUND. DE 2 A 4,00

m, COM ARGAMASSA EXPANSIVA.m3 193,40 256,56 239,69 317,97 251,32 333,40 245,14 325,20 246,23 326,65

50200 ESCAVACOES DE VALAS P/ REDES COLETORAS DE ESGOTO SANITARIO E DRENAGEM PLUVIAL

50201 ESCAV. MANUAL DE VALAS - ESGOTO - EM SOLO DE 1a CAT. EXECUTADA C/ PROFUND. ATE 1,50m m3 25,11 33,31 37,37 49,58 40,45 53,66 38,82 51,50 39,11 51,88

59201ESCAV. MANUAL DE VALAS - ESGOTO - EM SOLO DE 1a CAT. EXECUTADA C/ PROFUND. ATE 1,50m

(MRR / RMS)m3 26,02 34,52 38,73 51,38 41,91 55,60 40,22 53,36 40,51 53,74

50204ESCAV. MANUAL DE VALAS - ESGOTO - EM SOLO DE 1a CAT. EXECUTADA ENTRE AS PROFUND. DE

1,51 E 3,00mm3 30,59 40,58 45,52 60,39 49,27 65,36 47,29 62,73 47,64 63,20

59204ESCAV. MANUAL DE VALAS - ESGOTO - EM SOLO DE 1a CAT. EXECUTADA ENTRE AS PROFUND. DE

1,51 E 3,00m (MRR / RMS)m3 31,69 42,04 47,14 62,54 51,03 67,70 48,97 64,96 49,32 65,43

50207ESCAV. MANUAL DE VALAS - ESGOTO - EM SOLO DE 1a CAT. EXECUTADA ENTRE AS PROFUND. DE

3,01 E 4,50mm3 34,20 45,37 50,90 67,52 55,10 73,10 52,87 70,14 53,27 70,67

59207ESCAV. MANUAL DE VALAS - ESGOTO - EM SOLO DE 1a CAT. EXECUTADA ENTRE AS PROFUND. DE

3,01 E 4,50m (MRR / RMS)m3 35,39 46,95 52,68 69,89 57,02 75,64 54,70 72,57 55,10 73,10

50210ESCAV. MANUAL DE VALAS - ESGOTO - EM SOLO DE 1a CAT. EXECUTADA C/ PROFUND. ACIMA DE

4,50mm3 39,99 53,05 59,52 78,96 64,43 85,47 61,82 82,01 62,28 82,62

50213 ESCAV. MANUAL DE VALAS - ESGOTO - EM SOLO DE 2a CAT. EXECUTADA C/ PROFUND. ATE 1,50m m3 41,35 54,85 61,53 81,63 66,61 88,36 63,91 84,78 64,39 85,42

50216ESCAV. MANUAL DE VALAS - ESGOTO - EM SOLO DE 2a CAT. EXECUTADA ENTRE AS PROFUND. DE

1,51 E 3,00mm3 46,99 62,34 69,94 92,78 75,70 100,42 72,64 96,36 73,19 97,09

50219ESCAV. MANUAL DE VALAS - ESGOTO - EM SOLO DE 2a CAT. EXECUTADA ENTRE AS PROFUND. DE

3,01 E 4,50mm3 51,30 68,05 76,34 101,27 82,64 109,63 79,30 105,20 79,88 105,97

50222ESCAV. MANUAL DE VALAS - ESGOTO - EM SOLO DE 2a CAT. EXECUTADA C/ PROFUND. ACIMA DE

4,50mm3 58,50 77,61 87,07 115,51 94,26 125,05 90,44 119,98 91,11 120,87

50225 ESCAV. MANUAL DE VALAS - ESGOTO - EM LAMA EXECUTADA C/ PROFUND. ATE 1,50m m3 34,87 46,26 51,89 68,84 56,17 74,52 53,90 71,50 54,29 72,02

59225ESCAV. MANUAL DE VALAS - ESGOTO - EM LAMA EXECUTADA C/ PROFUND. ATE 1,50m (MRR /

RMS)m3 36,11 47,90 53,74 71,29 58,16 77,16 55,81 74,04 56,20 74,55

50228ESCAV. MANUAL DE VALAS - ESGOTO - EM LAMA EXECUTADA ENTRE AS PROFUND. DE 1,51 E

3,00mm3 40,42 53,62 60,16 79,81 65,12 86,39 62,49 82,90 62,95 83,51

59228ESCAV. MANUAL DE VALAS - ESGOTO - EM LAMA EXECUTADA ENTRE AS PROFUND. DE 1,51 E

3,00m (MRR / RMS)m3 41,85 55,52 62,28 82,62 67,41 89,43 64,68 85,80 65,14 86,41

50231ESCAV. MANUAL DE VALAS - ESGOTO - EM LAMA EXECUTADA ENTRE AS PROFUND. DE 3,01 E

4,50mm3 45,13 59,87 67,16 89,09 72,70 96,44 69,76 92,54 70,28 93,23

50234 ESCAV. MANUAL DE VALAS - ESGOTO - EM LAMA EXECUTADA C/ PROFUND. ACIMA DE 4,50m m3 48,65 64,54 72,41 96,06 78,37 103,97 75,21 99,77 75,77 100,52

50237ESCAV. MECANIZ. DE VALAS - ESGOTO - EM SOLO DE 1a CAT. EXECUTADA ENTRE AS PROFUND.

DE 0 A 2,00mm3 4,66 6,18 4,94 6,55 5,01 6,65 4,97 6,59 4,98 6,61

59237ESCAV. MECANIZ. DE VALAS - ESGOTO - EM SOLO DE 1a CAT. EXECUTADA ENTRE AS PROFUND.

DE 0 A 2,00m (MRR / RMS)m3 4,69 6,22 4,97 6,59 5,05 6,70 5,01 6,65 5,01 6,65

50240ESCAV. MECANIZ. DE VALAS - ESGOTO - EM SOLO DE 1a CAT. EXECUTADA ENTRE AS PROFUND.

DE 2 A 4,00mm3 5,06 6,71 5,36 7,11 5,43 7,20 5,39 7,15 5,40 7,16

59240ESCAV. MECANIZ. DE VALAS - ESGOTO - EM SOLO DE 1a CAT. EXECUTADA ENTRE AS PROFUND.

DE 2 A 4,00m (MRR / RMS)m3 5,08 6,74 5,40 7,16 5,48 7,27 5,44 7,22 5,44 7,22

50243ESCAV. MECANIZ. DE VALAS - ESGOTO - EM SOLO DE 1a CAT. EXECUTADA ENTRE AS PROFUND.

DE 4 A 6,00mm3 3,09 4,10 3,23 4,28 3,26 4,32 3,25 4,31 3,25 4,31

59243ESCAV. MECANIZ. DE VALAS - ESGOTO - EM SOLO DE 1a CAT. EXECUTADA ENTRE AS PROFUND.

DE 4 A 6,00m (MRR / RMS)m3 3,10 4,11 3,24 4,30 3,28 4,35 3,26 4,32 3,27 4,34

50246ESCAV. MECANIZ. DE VALAS - ESGOTO - EM SOLO DE 1a CAT. EXECUTADA C/ PROFUND. ACIMA

DE 6,00mm3 8,02 10,64 8,23 10,92 8,28 10,98 8,25 10,94 8,26 10,96

50249ESCAV. MECANIZ. DE VALAS - ESGOTO - EM SOLO DE 2a CAT. EXECUTADA ENTRE AS PROFUND.

DE 0 A 2,00mm3 6,40 8,49 6,77 8,98 6,86 9,10 6,81 9,03 6,82 9,05

59249ESCAV. MECANIZ. DE VALAS - ESGOTO - EM SOLO DE 2a CAT. EXECUTADA ENTRE AS PROFUND.

DE 0 A 2,00m (MRR / RMS)m3 6,43 8,53 6,82 9,05 6,92 9,18 6,87 9,11 6,87 9,11

50252ESCAV. MECANIZ. DE VALAS - ESGOTO - EM SOLO DE 2a CAT. EXECUTADA ENTRE AS PROFUND.

DE 2 A 4,00mm3 7,50 9,95 7,94 10,53 8,05 10,68 7,99 10,60 8,00 10,61

59252ESCAV. MECANIZ. DE VALAS - ESGOTO - EM SOLO DE 2a CAT. EXECUTADA ENTRE AS PROFUND.

DE 2 A 4,00m (MRR / RMS)m3 7,54 10,00 8,00 10,61 8,12 10,77 8,05 10,68 8,06 10,69

50255ESCAV. MECANIZ. DE VALAS - ESGOTO - EM SOLO DE 2a CAT. EXECUTADA ENTRE AS PROFUND.

DE 4 A 6,00mm3 4,95 6,57 5,17 6,86 5,23 6,94 5,20 6,90 5,20 6,90

59255ESCAV. MECANIZ. DE VALAS - ESGOTO - EM SOLO DE 2a CAT. EXECUTADA ENTRE AS PROFUND.

DE 4 A 6,00m (MRR / RMS)m3 4,97 6,59 5,20 6,90 5,25 6,96 5,22 6,92 5,23 6,94

50258ESCAV. MECANIZ. DE VALAS - ESGOTO - EM SOLO DE 2a CAT. EXECUTADA C/ PROFUND. ACIMA

DE 6,00mm3 10,69 14,18 10,97 14,55 11,04 14,65 11,00 14,59 11,01 14,61

50259ESCAV. MECANIZ. DE VALAS - EM SOLO ROCHA EM DECOMPOSICAO - EXECUTADA ENTRE AS

PROFUND. DE 0 A 2,00mm3 12,19 16,17 12,65 16,78 12,76 16,93 12,70 16,85 12,71 16,86

59259ESCAV. MECANIZ. DE VALAS - EM SOLO ROCHA EM DECOMPOSICAO - EXECUTADA ENTRE AS

PROFUND. DE 0 A 2,00m (MRR / RMS)m3 12,22 16,21 12,71 16,86 12,83 17,02 12,76 16,93 12,78 16,95

50261ESCAV. DE VALAS - ESGOTO - EM ROCHA BRANDA EXECUTADA ENTRE AS PROFUND. DE 0 A 2,00

m, C/ USO DE ROMPEDOR PNEUMATICOm3 37,26 49,43 47,53 63,05 50,10 66,46 48,73 64,65 48,98 64,98

59261ESCAV. DE VALAS - ESGOTO - EM ROCHA BRANDA EXECUTADA ENTRE AS PROFUND. DE 0 A 2,00

m, C/ USO DE ROMPEDOR PNEUMATICO (MRR / RMS)m3 38,13 50,58 48,82 64,76 51,49 68,31 50,06 66,41 50,31 66,74

50264ESCAV. DE VALAS - ESGOTO - EM ROCHA BRANDA EXECUTADA ENTRE AS PROFUND. DE 2 A 4,00

m, C/ USO DE ROMPEDOR PNEUMATICOm3 44,26 58,72 57,93 76,85 61,37 81,41 59,54 78,99 59,86 79,41

59264ESCAV. DE VALAS - ESGOTO - EM ROCHA BRANDA EXECUTADA ENTRE AS PROFUND. DE 2 A 4,00

m, C/ USO DE ROMPEDOR PNEUMATICO (MRR / RMS)m3 45,41 60,24 59,65 79,13 63,22 83,87 61,31 81,33 61,64 81,77

50267ESCAV. DE VALAS - ESGOTO - EM ROCHA BRANDA EXECUTADA ENTRE AS PROFUND. DE 4 A 6,00

m, C/ USO DE ROMPEDOR PNEUMATICOm3 51,22 67,95 68,29 90,59 72,58 96,28 70,30 93,26 70,70 93,79

50270ESCAV. DE VALAS - ESGOTO - EM ROCHA BRANDA EXECUTADA C/ PROFUND. ACIMA DE 6,00 m, C/

USO DE ROMPEDORPNEUMATICOm3 59,97 79,56 81,33 107,89 86,69 115,00 83,84 111,22 84,35 111,90

50273ESCAV. DE VALA - ESGOTO - EM ROCHA SA, EXECUTADA ENTRE AS PROFUND. DE 0 A 2,00 m, C/

USO DE EXPLOSIVO, INCL. PROTECAOm3 156,74 207,93 216,61 287,35 231,65 307,31 223,66 296,71 225,07 298,58

50276ESCAV. DE VALA - ESGOTO - EM ROCHA SA, EXECUTADA ENTRE AS PROFUND. DE 2 A 4,00 m, C/

USO DE EXPLOSIVO, INCL. PROTECAOm3 168,78 223,90 234,40 310,96 250,88 332,82 242,13 321,21 243,67 323,25

50279ESCAV. DE VALA - ESGOTO - EM ROCHA SA, EXECUTADA ENTRE AS PROFUND.DE 4 A 6,00 m, C/

USO DE EXPLOSIVO, INCL. PROTECAOm3 181,02 240,14 252,39 334,82 270,32 358,61 260,80 345,98 262,48 348,21

50282ESCAV. DE VALA - ESGOTO - EM ROCHA SA, EXECUTADA C/ PROFUND. ACIMA DE 6,00 m, C/ USO

DE EXPLOSIVO, INCL. PROTECAOm3 192,71 255,65 269,83 357,96 289,21 383,67 278,92 370,02 280,73 372,42

50287ESCAV. DE VALA - ESGOTO - EM ROCHA SA, A FRIO, EXECUTADA ENTRE AS PROFUND. DE 0 A

2,00 m, COM ARGAMASSA EXPANSIVA.m3 185,52 246,11 233,28 309,47 245,29 325,40 238,91 316,94 240,04 318,44

50290ESCAV. DE VALA - ESGOTO - EM ROCHA SA, A FRIO, EXECUTADA ENTRE AS PROFUND. DE 2 A

4,00 m, COM ARGAMASSA EXPANSIVA.m3 205,27 272,31 257,35 341,40 270,44 358,77 263,49 349,55 264,71 351,16

50300 ESCAVACOES DE POCOS E CAVAS DE FUNDACAO

50301ESCAV. MANUAL DE POCOS E CAVAS DE FUNDACAO EM SOLO DE 1a CAT. EXECUTADA C/

PROFUND. ATE 1,50mm3 14,08 18,68 20,95 27,79 22,68 30,09 21,76 28,87 21,92 29,08

50304ESCAV. MANUAL DE POCOS E CAVAS DE FUNDACAO EM SOLO DE 1a CAT. EXECUTADA ENTRE AS

PROFUND. DE 1,51m E 3,00mm3 19,16 25,42 28,52 37,83 30,87 40,95 29,62 39,29 29,84 39,59

50307ESCAV. MANUAL DE POCOS E CAVAS DE FUNDACAO EM SOLO DE 1a CAT. EXECUTADA ENTRE AS

PROFUND. DE 3,01m E 4,50mm3 22,68 30,09 33,76 44,79 36,54 48,47 35,06 46,51 35,32 46,86

50310ESCAV. MANUAL DE POCOS E CAVAS DE FUNDACAO EM SOLO DE 1a CAT. EXECUTADA C/

PROFUND. ACIMA DE 4,50mm3 26,20 34,76 38,99 51,72 42,21 56,00 40,50 53,73 40,80 54,13

50313ESCAV. MANUAL DE POCOS E CAVAS DE FUNDACAO EM SOLO DE 2a CAT. EXECUTADA C/

PROFUND. ATE 1,50mm3 20,88 27,70 31,08 41,23 33,64 44,63 32,28 42,82 32,52 43,14

50316ESCAV. MANUAL DE POCOS E CAVAS DE FUNDACAO EM SOLO DE 2a CAT. EXECUTADA ENTRE AS

PROFUND. DE 1,51m E 3,00mm3 24,40 32,37 36,32 48,18 39,31 52,15 37,72 50,04 38,00 50,41

50319ESCAV. MANUAL DE POCOS E CAVAS DE FUNDACAO EM SOLO DE 2a CAT. EXECUTADA ENTRE AS

PROFUND. DE 3,01m E 4,50mm3 27,92 37,04 41,55 55,12 44,98 59,67 43,16 57,26 43,48 57,68

50322ESCAV. MANUAL DE POCOS E CAVAS DE FUNDACAO EM SOLO DE 2a CAT. EXECUTADA C/

PROFUND. ACIMA DE 4,50mm3 31,44 41,71 46,79 62,07 50,65 67,19 48,60 64,47 48,96 64,95

Página: 10 de 59

Page 11: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

50325ESCAV. MANUAL DE POCOS E CAVAS DE FUNDACAO EM LAMA EXECUTADA C/ PROFUND. ATE

1,50mm3 27,37 36,31 40,74 54,05 44,10 58,50 42,32 56,14 42,63 56,55

50328ESCAV. MANUAL DE POCOS E CAVAS DE FUNDACAO EM LAMA EXECUTADA ENTRE AS PROFUND.

DE 1,51 E 3,00mm3 31,51 41,80 46,91 62,23 50,78 67,36 48,72 64,63 49,09 65,12

50331ESCAV. MANUAL DE POCOS E CAVAS DE FUNDACAO EM LAMA EXECUTADA ENTRE AS PROFUND.

DE 3,01 E 4,50mm3 34,72 46,06 51,68 68,56 55,94 74,21 53,68 71,21 54,08 71,74

50334ESCAV. MANUAL DE POCOS E CAVAS DE FUNDACAO EM LAMA EXECUTADA C/ PROFUND. ACIMA

DE 4,50mm3 36,99 49,07 55,06 73,04 59,60 79,07 57,19 75,87 57,61 76,43

50337ESCAV. MECANIZ. DE POCOS E CAVAS DE FUNDACAO EM SOLO DE 1a CAT. EXECUTADA ENTRE AS

PROFUND. DE 0 A 2,00mm3 3,05 4,05 3,21 4,26 3,24 4,30 3,22 4,27 3,23 4,28

50340ESCAV. MECANIZ. DE POCOS E CAVAS DE FUNDACAO EM SOLO DE 1a CAT. EXECUTADA ENTRE AS

PROFUND. DE 2 A 4,00mm3 3,81 5,05 4,00 5,31 4,05 5,37 4,02 5,33 4,03 5,35

50343ESCAV. MECANIZ. DE POCOS E CAVAS DE FUNDACAO EM SOLO DE 1a CAT. EXECUTADA ENTRE AS

PROFUND. DE 4 A 6,00mm3 2,85 3,78 2,96 3,93 2,98 3,95 2,97 3,94 2,97 3,94

50346ESCAV. MECANIZ. DE POCOS E CAVAS DE FUNDACAO EM SOLO DE 1a CAT. EXECUTADA P/

PROFUND.ACIMA DE 6,00mm3 6,18 8,20 6,32 8,38 6,35 8,42 6,33 8,40 6,34 8,41

50349ESCAV. MECANIZ. DE POCOS E CAVAS DE FUNDACAO EM SOLO DE 2a CAT. EXECUTADA ENTRE AS

PROFUND. DE 0 A 2,00mm3 3,81 5,05 4,00 5,31 4,05 5,37 4,02 5,33 4,03 5,35

50352ESCAV. MECANIZ. DE POCOS E CAVAS DE FUNDACAO EM SOLO DE 2a CAT. EXECUTADA ENTRE AS

PROFUND. DE 2 A 4,00mm3 5,34 7,08 5,60 7,43 5,67 7,52 5,64 7,48 5,64 7,48

50355ESCAV. MECANIZ. DE POCOS E CAVAS DE FUNDACAO EM SOLO DE 2a CAT. EXECUTADA ENTRE AS

PROFUND. DE 4 A 6,00mm3 4,57 6,06 4,74 6,29 4,79 6,35 4,76 6,31 4,77 6,33

50358ESCAV. MECANIZ. DE POCOS E CAVAS DE FUNDACAO EM SOLO DE 2a CAT. EXECUTADA ENTRE AS

PROFUND. ACIMA DE 6,00mm3 9,72 12,89 9,93 13,17 9,98 13,24 9,95 13,20 9,96 13,21

50361ESCAV. DE POCOS E CAVAS DE FUNDACAO EM ROCHA BRANDA EXECUTADA ENTRE AS PROFUND.

DE 0 A 2,00 m, C/ USO DE ROMPEDOR PNEUMATICOm3 33,76 44,79 42,31 56,13 44,46 58,98 43,32 57,47 43,52 57,73

50364ESCAV. DE POCOS E CAVAS DE FUNDACAO EM ROCHA BRANDA EXECUTADA ENTRE AS PROFUND.

DE 2 A 4,00 m, C/ USO DE ROMPEDOR PNEUMATICOm3 39,59 52,52 50,99 67,64 53,86 71,45 52,34 69,43 52,61 69,79

50367ESCAV. DE POCOS E CAVAS DE FUNDACAO EM ROCHA BRANDA EXECUTADA ENTRE AS PROFUND.

DE 4 A 6,00 m, C/ USO DE ROMPEDOR PNEUMATICOm3 45,43 60,27 59,68 79,17 63,26 83,92 61,36 81,40 61,69 81,84

50370ESCAV. DE POCOS E CAVAS DE FUNDACAO EM ROCHA BRANDA EXECUTADA C/ PROFUND. ACIMA

DE 6,00 m, C/ USO DE ROMPEDOR PNEUMATICOm3 52,72 69,94 70,54 93,58 75,01 99,51 72,64 96,36 73,06 96,92

50373ESCAV. DE POCOS E CAVAS DE FUNDACAO EM ROCHA SA, EXECUTADA ENTRE AS PROFUND. DE 0

A 2,00 m, C/ USO DE EXPLOSIVO, INCL. PROTECAOm3 75,27 99,85 104,32 138,39 111,62 148,08 107,75 142,94 108,43 143,84

50376ESCAV. DE POCOS E CAVAS DE FUNDACAO EM ROCHA SA, EXECUTADA ENTRE AS PROFUND. DE 2

A 4,00 m, C/ USO DE EXPLOSIVO, INCL. PROTECAOm3 81,43 108,03 113,37 150,40 121,39 161,04 117,13 155,38 117,89 156,39

50379ESCAV. DE POCOS E CAVAS DE FUNDACAO EM ROCHA SA, EXECUTADA ENTRE AS PROFUND.DE 4

A 6,00 m, C/ USO DE EXPLOSIVO, INCL. PROTECAOm3 87,50 116,08 122,33 162,28 131,08 173,89 126,43 167,72 127,25 168,81

50382ESCAV. DE POCOS E CAVAS DE FUNDACAO EM ROCHA SA, EXECUTADA C/ PROFUND. ACIMA DE

6,00 m, C/ USO DE EXPLOSIVO, INCL. PROTECAOm3 105,81 140,37 149,29 198,05 160,22 212,55 154,41 204,84 155,44 206,21

50400 ATERROS DE VALAS / POCOS / CAVAS DE FUNDACAO

50401EXEC. DE ATERRO EM VALAS/POCOS/CAVAS DE FUNDACAO C/ SOLO PROVENIENTE DAS

ESCAVACOES, INCL. LANCAM., ESPALHAM., COMPACT. C/ PLACA VIBRAT., SOQUETE PNEUMATICO

OU SOQUETE MANUAL

m3 8,26 10,96 12,08 16,03 13,04 17,30 12,53 16,62 12,62 16,74

59401EXEC. DE ATERRO EM VALAS/POCOS/CAVAS DE FUNDACAO C/ SOLO PROVENIENTE DAS

ESCAVACOES, INCL. LANCAM., ESPALHAM., COMPACT. C/ PLACA VIBRAT., SOQUETE PNEUMATICO

OU SOQUETE MANUAL (MRR / RMS)

m3 8,59 11,40 12,56 16,66 13,56 17,99 13,02 17,27 13,12 17,40

50402EXEC. DE ATERRO EM VALAS/POCOS/CAVAS DE FUNDACAO C/ SOLO OU AREIA PROVENIENTE DE

JAZIDAS, INCL. LANCAM., ESPALHAM., COMPACT. C/ PLACA VIBRAT., SOQUETE PNEUMATICO OU

SOQUETE MANUAL

m3 8,26 10,96 12,08 16,03 13,04 17,30 12,53 16,62 12,62 16,74

50404EXEC. DE ATERRO EM VALAS/POCOS/CAVAS DE FUNDACAO C/ FORNEC. DE AREIA, INCL.

LANCAM., ESPALHAM., COMPACT. C/ PLACA VIBRATORIA, SOQUETE PNEUMATICO OU SOQUETE

MANUAL - DMT=20KM

m3 78,53 104,18 79,05 104,87 79,19 105,05 79,12 104,96 79,13 104,97

59404EXEC. DE ATERRO EM VALAS/POCOS/CAVAS DE FUNDACAO C/ FORNEC. DE AREIA, INCL.

LANCAM., ESPALHAM., COMPACT. C/ PLACA VIBRATORIA, SOQUETE PNEUMATICO OU SOQUETE

MANUAL - DMT=20KM (MRR / RMS)

m3 78,58 104,24 79,11 104,95 79,26 105,15 79,18 105,04 79,20 105,07

50407EXEC. DE ATERRO EM VALAS/POCOS/CAVAS DE FUNDACAO, C/ FORNEC. DE SOLO, INCL.

LANCAM., ESPALHAM., COMPACT. C/PLACA VIBRATORIA, SOQUETE PNEUMATICO OU SOQUETE

MANUAL - DMT=20KM

m3 32,69 43,37 33,21 44,06 33,35 44,24 33,28 44,15 33,29 44,16

50500 ENVOLTORIAS E BERCOS P/ VALAS

50501EXEC. DE ENVOLTORIA OU BERCO DE AREIA EM VALAS, INCL. LANCAM., ESPALHAM. E COMPACT.

C/PLACA VIBRATORIA, SOQUETE PNEUMATICO OU SOQUETE MANUAL , C/ FORNEC. DO MAT. -

DMT=20KM

m3 78,53 104,18 79,05 104,87 79,19 105,05 79,12 104,96 79,13 104,97

50504EXEC. DE ENVOLTORIA OU BERCO DE BRITA EM VALAS, INCL. LANCAM., ESPALHAM. E COMPACT.

C/PLACA VIBRATORIA, SOQUETE PNEUMATICO OU SOQUETE MANUAL , C/ FORNEC. DO MAT. -

DMT=20KM

m3 72,46 96,13 73,07 96,93 73,24 97,16 73,16 97,05 73,17 97,07

50507EXEC. DE ENVOLTORIA OU BERCO DE SOLO-CIMENTO EM VALAS, INCL. LANCAM., ESPALHAM. E

COMPACT. C/ PLACA VIBRATORIA, SOQUETE PNEUMATICO OU SOQUETE MANUAL , C/ FORNEC.

DO MAT. - DMT=20KM

m3 252,90 335,50 283,75 376,42 291,52 386,73 287,41 381,28 288,13 382,23

50510EXEC. DE BERCO OU ENVELOPAMENTO C/ CONCRETO SIMPLES, INCL. FORNEC. DE MAT.,

PRODUCAO, TRANSP. MANUAL., LANC. VERT., ADENS., CURA E FORMAm3 277,60 368,26 326,00 432,47 338,16 448,60 331,70 440,03 332,84 441,55

50600 TERRAPLENAGEM

50601 EXPLORACAO DE JAZIDA DE SOLO m3 2,66 3,53 2,71 3,60 2,73 3,62 2,72 3,61 2,72 3,61

50604 EXPLORACAO DE JAZIDA DE AREIA EM DEPOSITOS SECOS m3 2,60 3,45 2,65 3,52 2,66 3,53 2,66 3,53 2,66 3,53

50607 EXPLORACAO DE JAZIDA DE AREIA EM DEPOSITOS SUBMERSOS m3 1,43 1,90 1,81 2,40 1,90 2,52 1,85 2,45 1,86 2,47

50610 EXPLORACAO DE PEDREIRA m3 18,72 24,83 19,02 25,23 19,08 25,31 19,04 25,26 19,06 25,28

50613ESCAV. E TRANSP. ATE 30 m C/ TRATOR DE ESTEIRAS C/ LAMINA, P/ EMPILHAMENTO EM MAT.

DE 1a CATm3 1,35 1,79 1,38 1,83 1,39 1,84 1,38 1,83 1,38 1,83

50616ESCAV. E TRANSP. DE 30,01 ATE 60 m C/ TRATOR DE ESTEIRAS C/ LAMINA, P/ EMPILHAMENTO

EM MAT. DE 1a CATm3 1,28 1,70 1,31 1,74 1,32 1,75 1,32 1,75 1,32 1,75

50619ESCAV. E TRANSP. DE 60,01 ATE 100 m C/ TRATOR DE ESTEIRAS C/ LAMINA, P/ EMPILHAMENTO

EM MAT. DE 1a CATm3 3,83 5,08 3,92 5,20 3,94 5,23 3,93 5,21 3,93 5,21

50622ESCAV. E TRANSP. ATE 30 m C/ TRATOR DE ESTEIRAS C/ LAMINA, P/ EMPILHAMENTO, EM MAT.

DE 2a CAT., CUJO DESMONTE SE DA C/ USO INTENSIVO DE ESCARIFICACAO PESADA, CONF.

CLASSIF. DNER

m3 2,46 3,26 2,49 3,30 2,49 3,30 2,49 3,30 2,49 3,30

50625ESCAV. E TRANSP. DE 30,01 ATE 60 m C/ TRATOR DE ESTEIRAS C/ LAMINA, P/ EMPILHAMENTO,

EM MAT. DE 2a CAT., CUJO DESMONTE SE DA C/ USO INTENSIVO DE ESCARIFICACAO PESADA,

CONF. CLASSIF. DNER

m3 2,75 3,65 2,77 3,67 2,78 3,69 2,77 3,67 2,77 3,67

50628ESCAV. E TRANSP. DE 60,01 ATE 100 m C/ TRATOR DE ESTEIRAS C/ LAMINA, P/ EMPILHAMENTO,

EM MAT. DE 2a CAT., CUJO DESMONTE SE DA C/ USO INTENSIVO DE ESCARIFICACAO PESADA,

CONF. CLASSIF. DNER

m3 5,09 6,75 5,18 6,87 5,20 6,90 5,19 6,89 5,19 6,89

50631ESCAV. E TRANSP. ATE 30m C/ TRATOR DE ESTEIRAS C/ LAMINA, P/ EMPILHAMENTO, EM MAT.

DE 2a CAT., CUJO DESMONTE SE DA C/ USO COMBINADO DE EXPL. E ESCARIFICACAO PESADA,

CONF. CLASSIF. DNER

m3 18,02 23,91 19,08 25,31 19,34 25,66 19,21 25,48 19,23 25,51

50634ESCAV. E TRANSP. DE 30,01 ATE 60m C/ TRATOR DE ESTEIRAS C/LAMINA, P/ EMPILHAMENTO, EM

MAT. DE 2a CAT.,CUJO DESMONTE SE DA C/USO COMBINADO DE EXPL. E ESCARIFICACAO

PESADA,CONF.CLASSIF.DNER

m3 19,01 25,22 20,06 26,61 20,33 26,97 20,19 26,78 20,21 26,81

50637ESCAV. E TRANSP. DE 60,01 ATE 100m C/ TRATOR DE ESTEIRAS C/LAMINA, P/EMPILHAMENTO,

EM MAT. DE 2a CAT.,CUJO DESMONTE SE DA C/USO COMBINADO DE EXPL.E ESCARIFICACAO

PESADA,CONF.CLASSIF.DNER

m3 19,22 25,50 20,29 26,92 20,55 27,26 20,42 27,09 20,44 27,12

50640DESMONTE DE ROCHA (3a CATEG.-CLASSIF. DNER) C/ USO DE EXPLOSIVO E OPERACAO DE

EMPILHAMENTO C/ TRATOR DE ESTEIRAS C/ LAMINAm3 19,68 26,11 19,97 26,49 20,04 26,59 20,00 26,53 20,02 26,56

50643 ESCAVACAO EM LAMA C/ ESCAVADEIRA HIDRAULICA, INCLUSIVE CARGA E DESCARGA m3 4,86 6,45 4,86 6,45 4,86 6,45 4,86 6,45 4,86 6,45

50646 ESCAVACAO EM LAMA C/ ESCAVADEIRA A CABO , INCLUSIVE CARGA E DESCARGA m3 5,38 7,14 5,38 7,14 5,38 7,14 5,38 7,14 5,38 7,14

50649COMPACTACAO DE ATERRO INCL. DESTORROAMENTO, UMIDEC., HOMOGENEIZ. E COMPAC.

MECANIZ. C/ ROLOm3 1,10 1,46 1,10 1,46 1,10 1,46 1,10 1,46 1,10 1,46

50652COMPACTACAO DE ATERRO P/ DIQUES LATERAIS DE LAGOAS, INCL. DESTORROAMENTO,

UMIDEC., HOMOGENEIZ. E COMPAC. MECANIZ. C/ ROLOm3 2,46 3,26 2,95 3,91 3,07 4,07 3,00 3,98 3,01 3,99

50655COMPACTACAO DE ATERRO P/ FUNDO DE LAGOAS, INCL. DESTORROAMENTO, UMIDEC.,

HOMOGENEIZ. E COMPAC. MECANIZ. C/ ROLOm3 2,29 3,04 2,78 3,69 2,90 3,85 2,83 3,75 2,84 3,77

50658 REGULARIZACAO DE TALUDES POR PROCESSO MECANICO m2 0,12 0,16 0,12 0,16 0,12 0,16 0,12 0,16 0,12 0,16

50661 REGULARIZACAO DE TALUDES POR PROCESSO MANUAL m2 1,76 2,33 2,62 3,48 2,84 3,77 2,72 3,61 2,74 3,63

50664 PRE-FISSURAMENTO OU FOGO DE CONTORNO m2 13,98 18,55 14,24 18,89 14,30 18,97 14,27 18,93 14,27 18,93

50700 ESCAVACAO P/ OBRAS DE BARRAGENS

50701 EXPLORACAO DE JAZIDA DE SOLO m3 2,62 3,48 2,67 3,54 2,68 3,56 2,68 3,56 2,68 3,56

50704 EXPLORACAO DE JAZIDA DE AREIA EM DEPOSITOS SECOS m3 2,07 2,75 2,12 2,81 2,13 2,83 2,13 2,83 2,13 2,83

50707 EXPLORACAO DE JAZIDA DE AREIA EM DEPOSITOS SUBMERSOS m3 7,41 9,83 7,79 10,33 7,88 10,45 7,83 10,39 7,84 10,40

50710 EXPLORACAO DE PEDREIRA m3 14,49 19,22 14,79 19,62 14,85 19,70 14,81 19,65 14,83 19,67

50713ESCAV. E TRANSP. ATE 30 m C/ TRATOR DE ESTEIRAS C/ LAMINA, P/ EMPILHAMENTO EM MAT.

DE 1a CATm3 1,38 1,83 1,41 1,87 1,42 1,88 1,41 1,87 1,41 1,87

50716 ESCAV., CARGA E TRANSP. C/ MOTO-SCRAPER DE 30 A 200m EM MAT. DE 1a CAT. m3 4,76 6,31 4,82 6,39 4,84 6,42 4,83 6,41 4,83 6,41

50719 ESCAV., CARGA E TRANSP. C/ MOTO-SCRAPER DE 200,01 A 500m EM MAT. DE 1a CAT. m3 5,22 6,92 5,29 7,02 5,31 7,04 5,30 7,03 5,30 7,03

50722 ESCAV., CARGA E TRANSP. C/ MOTO-SCRAPER DE 500,01 A 900m EM MAT. DE 1a CAT. m3 10,76 14,27 10,83 14,37 10,85 14,39 10,84 14,38 10,84 14,38

Página: 11 de 59

Page 12: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

50725 ESCAV., CARGA E TRANSP. C/ MOTO-SCRAPER DE 900,01 A 1400m EM MAT. DE 1a CAT. m3 14,46 19,18 14,53 19,28 14,55 19,30 14,54 19,29 14,54 19,29

50728ESCAV. E TRANSP. ATE 30 m C/ TRATOR DE ESTEIRAS C/ LAMINA, P/ EMPILHAMENTO, EM MAT.

DE 2a CAT., CUJO DESMONTE SE DA C/ USO INTENSIVO DE ESCARIFICACAO PESADA, CONF.

CLASSIF. DNER

m3 2,46 3,26 2,49 3,30 2,49 3,30 2,49 3,30 2,49 3,30

50731ESCAV. E TRANSP. ATE 30 m C/ TRATOR DE ESTEIRAS C/ LAMINA, P/ EMPILHAMENTO, EM MAT.

DE 2a CAT., CUJO DESMONTE SE DA C/ USO COMBINADO DE EXPLOSIVO E ESCARIFICACAO

PESADA, CONF. CLASSIF. DNER

m3 17,28 22,92 18,34 24,33 18,60 24,67 18,47 24,50 18,49 24,53

50734 ESCAV., CARGA E TRANSP. C/ MOTO-SCRAPER DE 30 A 200m EM MAT. DE 2a CAT. m3 8,65 11,48 8,75 11,61 8,77 11,63 8,76 11,62 8,76 11,62

50737 ESCAV., CARGA E TRANSP. C/ MOTO-SCRAPER DE 200,01 A 500m EM MAT. DE 2a CAT. m3 7,99 10,60 8,09 10,73 8,11 10,76 8,10 10,75 8,10 10,75

50740 ESCAV., CARGA E TRANSP. C/ MOTO-SCRAPER DE 500,01 A 900m EM MAT. DE 2a CAT. m3 13,38 17,75 13,48 17,88 13,50 17,91 13,49 17,90 13,49 17,90

50743 ESCAV., CARGA E TRANSP. C/ MOTO-SCRAPER DE 900,01 A 1400m EM MAT. DE 2a CAT. m3 16,95 22,49 17,05 22,62 17,07 22,65 17,06 22,63 17,06 22,63

50746DESMONTE DE ROCHA (3a. CATEG.-CLASS. DNER)C/ USO DE EXPLOSIVO E OPERACAO DE

EMPILHAMENTO C/ TRATOR DE ESTEIRAS C/ LAMINAm3 19,68 26,11 19,97 26,49 20,04 26,59 20,00 26,53 20,02 26,56

50749 ESCAV. EM LAMA C/ ESCAVADEIRA A CABO, INCLUSIVE CARGA E DESCARGA m3 5,38 7,14 5,38 7,14 5,38 7,14 5,38 7,14 5,38 7,14

50752 ESCAV. EM LAMA C/ ESCAVADEIRA HIDRAULICA, INCLUSIVE CARGA E DESCARGA m3 4,86 6,45 4,86 6,45 4,86 6,45 4,86 6,45 4,86 6,45

50755 ESCAVACAO DE ESTOQUE EM ROCHA, INCLUSIVE CARGA E DESCARGA m3 5,58 7,40 5,68 7,54 5,71 7,57 5,69 7,55 5,70 7,56

50758 ESCAVACAO DE ESTOQUE EM SOLO, INCLUSIVE CARGA E DESCARGA m3 2,06 2,73 2,11 2,80 2,12 2,81 2,11 2,80 2,12 2,81

50761 REGULARIZACAO DE TALUDES POR PROCESSO MECANICO m2 0,12 0,16 0,12 0,16 0,12 0,16 0,12 0,16 0,12 0,16

50764 REGULARIZACAO DE TALUDES POR PROCESSO MANUAL m2 1,76 2,33 2,62 3,48 2,84 3,77 2,72 3,61 2,74 3,63

50767 PRE-FISSURAMENTO OU FOGO DE CONTORNO m2 13,93 18,48 14,19 18,82 14,25 18,90 14,22 18,86 14,22 18,86

50800 ATERROS P/ OBRAS DE BARRAGENS

50801COMPACTACAO DE ATERRO P/ BARRAGEM C/ SOLO, INCL. DESTORROAMENTO, UMIDECIM.,

HOMOGENEIZ. E COMPACT. C/ ROLOm3 1,10 1,46 1,10 1,46 1,10 1,46 1,10 1,46 1,10 1,46

50804COMPACTACAO DE ATERRO JUNTO A ESTRUTURAS C/ SOLO, INCL. DESTORROAMENTO,

UMIDECIM., HOMOGENEIZ. E COMPACT. C/ PLACA VIBRATORIA OU SOQUETE PNEUMATICOm3 1,43 1,90 1,92 2,55 2,04 2,71 1,97 2,61 1,98 2,63

50807COMPACTACAO DE ATERRO P/ ENSECADEIRAS C/ SOLO, INCL. DESTORROAMENTO, UMIDECIM.,

HOMOGENEIZ. E COMPACT. C/ ROLOm3 1,13 1,50 1,20 1,59 1,21 1,61 1,20 1,59 1,20 1,59

50810 EXEC. DE ATERRO DE PONTA C/ SOLO m3 2,20 2,92 2,25 2,98 2,26 3,00 2,26 3,00 2,26 3,00

50813 EXEC. DE ATERRO DE PONTA C/ AREIA m3 1,86 2,47 1,91 2,53 1,92 2,55 1,91 2,53 1,91 2,53

50816 EXEC. DE ATERRO DE PONTA C/ ROCHA m3 6,50 8,62 6,63 8,80 6,66 8,84 6,64 8,81 6,64 8,81

50900 ENROCAMENTO P/ OBRAS DE BARRAGENS

50901 EXEC. DE ENROCAMENTO P/ MACICO DE BARRAGEM, INCL. ESPALHAMENTO E COMPACTACAO m3 8,88 11,78 9,21 12,22 9,29 12,32 9,24 12,26 9,25 12,27

50904EXEC. DE ENROCAMENTO P/ RIP-RAP, DRENO DE PE E CANAL DE RESTITUICAO, C/ FORNEC. DO

MAT.m3 57,93 76,85 58,30 77,34 58,39 77,46 58,35 77,41 58,35 77,41

51000 TRANSICOES / FILTROS E TRATAMENTOS P/ OBRAS DE BARRAGENS

51001EXEC. DE TRANSICAO EM BRITA P/ RIP-RAP E DRENOS C/ MAT. PROVENIENTE DAS ESCAVACOES

OBRIGATORIAS,BRITADO NO CANTEIRO, INCL. LANC. E COMPACTACAOm3 41,38 54,89 43,59 57,83 44,15 58,57 43,85 58,17 43,91 58,25

51002EXEC. DE TRANSICAO EM BRITA P/ RIP-RAP E DRENOS C/ MAT. PROVENIENTE DE

JAZIDA,BRITADO EM CANTEIRO INCL. LANC. E COMPACTACAOm3 53,49 70,96 55,77 73,98 56,33 74,73 56,03 74,33 56,09 74,41

51003EXEC. DE TRANSICAO EM BRITA P/ RIP-RAP E DRENOS C/ FORNEC. DE MAT.,INCL. LANC. E

COMPACTACAOm3 66,76 88,56 67,13 89,05 67,22 89,17 67,18 89,12 67,18 89,12

51004EXEC. DE TRANSICAO EM AREIA P/ RIP-RAP E DRENOS C/ MAT. PROVENIENTE DAS ESCAVACOES

OBRIGATORIAS, INCL. LANC. E COMPACTACAOm3 9,30 12,34 13,12 17,40 14,08 18,68 13,57 18,00 13,66 18,12

51005EXEC. DE TRANSICAO EM AREIA P/ RIP-RAP E DRENOS C/ MAT. PROVENIENTE DE JAZIDA,INCL.

LANC. E COMPACTACAOm3 11,37 15,08 15,24 20,22 16,21 21,50 15,70 20,83 15,79 20,95

51006EXEC. DE TRANSICAO EM AREIA P/ RIP-RAP E DRENOS C/ FORNEC. DE MAT.,INCL. LANC. E

COMPACTACAOm3 85,38 113,27 89,20 118,33 90,16 119,61 89,65 118,93 89,74 119,05

51007EXEC. DE TAPETE DRENANTE DE AREIA, C/ MAT. PROVENIENTE DAS ESCAVACOES

OBRIGATORIAS, INCL. LANC., ESPALHAMENTO E COMPACTACAOm3 9,30 12,34 13,12 17,40 14,08 18,68 13,57 18,00 13,66 18,12

51008EXEC. DE TAPETE DRENANTE DE AREIA, C/ MAT. PROVENIENTE DE JAZIDAS, INCL. LANC.,

ESPALHAMENTO E COMPACTACAOm3 11,37 15,08 15,24 20,22 16,21 21,50 15,70 20,83 15,79 20,95

51009EXEC. DE TAPETE DRENANTE DE AREIA, C/ FORNEC. MAT., INCL. LANC., ESPALHAMENTO E

COMPACTACAOm3 85,38 113,27 89,20 118,33 90,16 119,61 89,65 118,93 89,74 119,05

51010EXEC. DE FILTRO VERTICAL OU INCLINADO DE AREIA, C/ MAT. PROVENIENTE DAS ESCAVACOES

OBRIGATORIAS, INCL LANC., ESPALHAMENTO E COMPACTACAOm3 9,30 12,34 13,12 17,40 14,08 18,68 13,57 18,00 13,66 18,12

51011EXEC. DE FILTRO VERTICAL OU INCLINADO DE AREIA, C/ MAT. PROVENIENTE DE JAZIDA, INCL

LANC., ESPALHAMENTO E COMPACTACAOm3 11,37 15,08 15,24 20,22 16,21 21,50 15,70 20,83 15,79 20,95

51012EXEC. DE FILTRO VERTICAL OU INCLINADO DE AREIA, C/FORNEC. DE MAT., INCL. LANC.,

ESPALHAMENTO E COMPACTACAOm3 85,38 113,27 89,20 118,33 90,16 119,61 89,65 118,93 89,74 119,05

51013 TRATAMENTO DA FUNDACAO EM SOLO P/ ATERRO m2 0,59 0,78 0,62 0,82 0,63 0,84 0,62 0,82 0,62 0,82

51016 TRATAMENTO DA FUNDACAO EM ROCHA P/ ATERRO m2 37,75 50,08 51,44 68,24 54,89 72,82 53,06 70,39 53,38 70,81

51019 TRATAMENTO DA FUNDACAO EM ROCHA P/ ESTRUTURA DE CONCRETO m2 36,23 48,06 48,04 63,73 51,02 67,68 49,43 65,57 49,71 65,95

51022 EXEC. DE CONCRETO DENTAL P/ REGULARIZACAO m3 399,18 529,55 447,88 594,16 460,10 610,37 453,60 601,75 454,77 603,30

51025 ESCAVACAO DE FENDAS E FALHAS m3 451,80 599,36 617,32 818,94 658,92 874,12 636,82 844,81 640,72 849,98

51028 PERFURACAO DESTRUTIVA EM ROCHA C/ EQUIP. A ROTO PERCUSSAO D=2.1/2" A 3" m 27,56 36,56 29,00 38,47 29,36 38,95 29,16 38,68 29,20 38,74

51031 INJECAO DE ARGAMASSA DE CIMENTO, AREIA E ADITIVOS kg 2,73 3,62 2,82 3,74 2,84 3,77 2,83 3,75 2,83 3,75

51034 INJECAO DE CALDA DE CIMENTO E ADITIVOS P/ CONSOLIDACAO DE SOLO kg 2,59 3,44 2,65 3,52 2,67 3,54 2,66 3,53 2,66 3,53

51037EXEC. DE ACABAMENTO DA LAJE DO VERTEDOURO E OUTRAS SUPERFICIES ACABADAS EM

CONCRETOm2 64,71 85,84 87,80 116,48 93,60 124,17 90,51 120,07 91,07 120,81

51100 SERVICOS ESPECIAIS EM OBRAS DE TERRA

51101 DRAGAGEM C/ DRAGA FLUTUANTE DE SUCCAO E RECALQUE m3 18,43 24,45 19,52 25,90 19,79 26,25 19,65 26,07 19,67 26,09

59000 SERVICOS NAO CODIFICADOS

59643ESCAVACAO MECANIZADA DE VALAS EM LAMA C/ RETROESCAVADEIRA, INCLUSIVE CARGA E

DESCARGA ATE H=2,0mm3 8,16 10,83 8,39 11,13 8,45 11,21 8,42 11,17 8,42 11,17

59644ESCAVACAO MECANIZADA DE VALAS EM LAMA C/ RETROESCAVADEIRA, INCLUSIVE CARGA E

DESCARGA ENTRE AS PROF. DE 2,01 A 4,00mm3 9,79 12,99 10,07 13,36 10,14 13,45 10,10 13,40 10,11 13,41

59645ESCAVACAO MECANIZADA DE VALAS EM LAMA C/ RETROESCAVADEIRA, INCLUSIVE CARGA E

DESCARGA P/PROF. DE 4,01 A 6,00m.m3 11,70 15,52 12,03 15,96 12,11 16,07 12,07 16,01 12,08 16,03

59646ESCAVACAO MECANIZADA DE VALAS EM LAMA C/ RETROESCAVADEIRA, INCLUSIVE CARGA E

DESCARGA P/PROF. ACIMA DE 6,00m.m3 13,61 18,06 13,99 18,56 14,09 18,69 14,04 18,63 14,05 18,64

59701 DESMONTE DE ROCHA INCLUSIVE MOVIMENTACAO DE MATERIAIS m3 32,36 42,93 32,45 43,05 32,47 43,07 32,46 43,06 32,46 43,06

59501FORNECIMENTO E APLICACAO DE CHUMBADORES NA BACIA DE DISSIPACAO EM ACO CA-50

DN25MMm 126,25 167,48 132,23 175,42 133,73 177,41 132,93 176,34 133,08 176,54

59502FORNECIMENTO E APLICACAO DE CHUMBADORES NA BACIA DE DISSIPACAO EM ACO CA-50

DN32MMm 126,25 167,48 132,23 175,42 133,73 177,41 132,93 176,34 133,08 176,54

59511 PERFURACAO PARA DRENO SUB-HORIZONTAL MAT 1A CAT (DNIT) m 143,62 190,53 143,62 190,53 143,62 190,53 143,62 190,53 143,62 190,5359512 PERFURACAO PARA DRENO SUB-HORIZONTAL MAT 2A CAT (DNIT) m 259,11 343,74 259,11 343,74 259,11 343,74 259,11 343,74 259,11 343,7459513 BOCA SAIDA PARA DRENO SUB-HORIZONTAL - BSD 04 (DNIT) un 13,34 17,70 13,34 17,70 13,34 17,70 13,34 17,70 13,34 17,7059514 DRENO SUB-HORIZONTAL - DSH 01 (DNIT) m 52,24 69,30 52,24 69,30 52,24 69,30 52,24 69,30 52,24 69,30

60000 TRANSPORTE DE SOLO, ROCHA E AGREGADOS

60100 CARGA / DESCARGA / ESPALHAMENTO DE MATERIAIS

60101 CARGA E DESCARGA DE ROCHA m3 2,04 2,71 2,13 2,83 2,15 2,85 2,14 2,84 2,14 2,84

60104 CARGA E DESCARGA DE SOLO m3 1,11 1,47 1,14 1,51 1,15 1,53 1,15 1,53 1,15 1,53

60107 CARGA E DESCARGA DE ENTULHO m3 0,79 1,05 0,79 1,05 0,79 1,05 0,79 1,05 0,79 1,05

60108 CARGA E DESCARGA DE LAMA m3 4,05 5,37 4,21 5,58 4,25 5,64 4,23 5,61 4,23 5,61

60110CARGA E TRANSP. MANUAL HORIZONTAL EM CARRO DE MAO, DE MATERIAIS A GRANEL, P/

DISTANCIAS ATE 30mm3 11,73 15,56 17,46 23,16 18,90 25,07 18,14 24,06 18,27 24,24

69110CARGA E TRANSP. MANUAL HORIZONTAL EM CARRO DE MAO, DE MATERIAIS A GRANEL, P/

DISTANCIAS ATE 30m (MRR / RMS)m3 12,21 16,20 18,19 24,13 19,68 26,11 18,87 25,03 19,02 25,23

60113CARGA E TRANSP. MANUAL HORIZONTAL EM CARRO DE MAO, DE MATERIAIS A GRANEL, P/

DISTANCIAS DE 30m A 60mm3 20,33 26,97 30,26 40,14 32,76 43,46 31,43 41,70 31,67 42,01

69113CARGA E TRANSP. MANUAL HORIZONTAL EM CARRO DE MAO, DE MATERIAIS A GRANEL, P/

DISTANCIAS DE 30m A 60m (MRR / RMS)m3 21,17 28,08 31,52 41,81 34,11 45,25 32,72 43,41 32,96 43,72

60116CARGA E TRANSP. MANUAL HORIZONTAL EM CARRO DE MAO, DE MATERIAIS A GRANEL, P/

DISTANCIAS DE 60m A 100mm3 24,24 32,16 36,08 47,86 39,06 51,82 37,48 49,72 37,76 50,09

69116CARGA E TRANSP. MANUAL HORIZONTAL EM CARRO DE MAO, DE MATERIAIS A GRANEL, P/

DISTANCIAS DE 60m A 100m (MRR / RMS)m3 25,24 33,48 37,57 49,84 40,67 53,95 39,01 51,75 39,29 52,12

60117CARGA E TRANSP. MANUAL HORIZONTAL EM CARRO DE MAO, DE MATERIAIS A GRANEL, P/

DISTANCIAS DE 100m A 200mm3 31,28 41,50 46,56 61,77 50,40 66,86 48,36 64,15 48,72 64,63

69117CARGA E TRANSP. MANUAL HORIZONTAL EM CARRO DE MAO, DE MATERIAIS A GRANEL, P/

DISTANCIAS DE 100m A 200m (MRR / RMS)m3 32,57 43,21 48,48 64,31 52,47 69,61 50,34 66,78 50,70 67,26

60118CARGA E TRANSP. MANUAL HORIZONTAL EM CARRO DE MAO, DE MATERIAIS A GRANEL, P/

DISTANCIAS DE 200m A 500mm3 62,56 82,99 93,12 123,53 100,80 133,72 96,72 128,31 97,44 129,26

69118CARGA E TRANSP. MANUAL HORIZONTAL EM CARRO DE MAO, DE MATERIAIS A GRANEL, P/

DISTANCIAS DE 200m A 500m (MRR / RMS)m3 65,14 86,41 96,96 128,63 104,94 139,21 100,68 133,56 101,40 134,52

60119 CARGA MANUAL DE ENTULHO OU SOLO EM CAMINHAO BASCULANTE, INCL. DESCARGA m3 14,63 19,41 16,80 22,29 17,35 23,02 17,06 22,63 17,11 22,70

60120MOMENTO EXCEDENTE DE TRANSPORTE MANUAL DE MATERIAIS A GRANEL (EXCEDENTE A

100m)m3xm 4,54 6,02 6,75 8,95 7,31 9,70 7,01 9,30 7,06 9,37

60122 ESPALHAMENTO MECANICO DE ROCHA EM BOTA-FORA m3 0,95 1,26 0,99 1,31 1,00 1,33 0,99 1,31 0,99 1,31

Página: 12 de 59

Page 13: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

60125 ESPALHAMENTO MECANICO DE SOLO EM BOTA-FORA m3 0,92 1,22 0,98 1,30 0,99 1,31 0,98 1,30 0,98 1,30

60128 ESPALHAMENTO MANUAL DE ENTULHO EM BOTA-FORA m3 11,73 15,56 17,46 23,16 18,90 25,07 18,14 24,06 18,27 24,24

60928 ESPALHAMENTO MECANICO DE ENTULHO EM BOTA-FORA m3 1,23 1,63 1,30 1,72 1,32 1,75 1,31 1,74 1,31 1,74

60200 MOMENTO DE TRANSPORTE P/ MATERIAIS

60201 MOMENTO DE TRANSPORTE DE ROCHA, EM CAMINHAO BASCULANTE m3xkm 0,65 0,86 0,65 0,86 0,65 0,86 0,65 0,86 0,65 0,86

60204 MOMENTO DE TRANSPORTE DE SOLO, EM CAMINHAO BASCULANTE m3xkm 0,48 0,64 0,48 0,64 0,48 0,64 0,48 0,64 0,48 0,64

60207 MOMENTO DE TRANSPORTE DE ENTULHO, EM CAMINHAO BASCULANTE m3xkm 0,48 0,64 0,48 0,64 0,48 0,64 0,48 0,64 0,48 0,64

60210 MOMENTO DE TRANSPORTE DE LAMA, EM CAMINHAO BASCULANTE m3xkm 1,35 1,79 1,35 1,79 1,35 1,79 1,35 1,79 1,35 1,79

69000 SERVICOS NAO CODIFICADOS

69001 TRANSPORTE VERTICAL DE MATERIAL ESCAVADO H<=10m m3 53,18 70,55 79,15 105,00 85,68 113,66 82,21 109,06 82,82 109,87

69002COLETA, TRANSPORTE E DISPOSICAO FINAL EM ATERRO SANITARIO, DE MATEIRAL

INSALUBRE(SOLO CONTAMINADO POR ESGOTO DOMESTICO OU LODO) COM CAMINHAO

COMPACTADOR DMT ATE 25KM (RMS)

TON 81,43 105,49 81,48 108,09 81,50 108,12 81,49 108,10 81,50 108,12

69003COLETA, TRANSPORTE E DISPOSICAO FINAL EM ATERRO SANITARIO, DE MATEIRAL

INSALUBRE(SOLO CONTAMINADO POR ESGOTO DOMESTICO OU LODO) COM CAMINHAO

POLIGUINDASTE DMT ATE 25KM (RMS)

TON 92,18 119,40 92,23 122,35 92,25 122,38 92,24 122,37 92,25 122,38

69004 CARGA E DESCARGA DE EXPURGO INSALUBRE (RMS) TON 0,96 1,42 1,01 1,34 1,03 1,37 1,02 1,35 1,03 1,37

69005COLETA, TRANSPORTE E DISPOSICAO FINAL EM ATERRO SANITARIO, DE MATEIRAL

INSALUBRE(SOLO CONTAMINADO POR ESGOTO DOMESTICO OU LODO) COM VEICULO TIPO ROLL

ON ROLL DMT ATE 25KM (RMS)

TON 99,93 129,42 99,98 132,63 100,00 132,66 99,99 132,65 100,00 132,66

69006COLETA, TRANSPORTE E DISPOSICAO FINAL EM ATERRO SANITARIO, DE MATEIRAL

INSALUBRE(SOLO CONTAMINADO POR ESGOTO DOMESTICO OU LODO) COM CAMINHAO

COMPACTADOR DMT ATE 50KM (RMS)

TON 91,18 118,10 91,23 121,03 91,25 121,05 91,24 121,04 91,25 121,05

69007COLETA, TRANSPORTE E DISPOSICAO FINAL EM ATERRO SANITARIO, DE MATEIRAL

INSALUBRE(SOLO CONTAMINADO POR ESGOTO DOMESTICO OU LODO) COM CAMINHAO

POLIGUINDASTE DMT ATE 50KM (RMS)

TON 112,68 145,91 112,73 149,55 112,75 149,57 112,74 149,56 112,75 149,57

69008COLETA, TRANSPORTE E DISPOSICAO FINAL EM ATERRO SANITARIO, DE MATEIRAL

INSALUBRE(SOLO CONTAMINADO POR ESGOTO DOMESTICO OU LODO) COM VEICULO TIPO ROLL

ON ROLL DMT ATE 50KM (RMS)

TON 128,18 165,96 128,23 170,11 128,25 170,14 128,24 170,12 128,25 170,14

69009DESCARTE DE MATERIAL INSALUBRE (SOLO CONTAMINADO COM ESGOTO DOMESTICO OU LODO)

EM ATERRO SANITARIO COM EMISSAO DE COMPROVANTE (RMS)TON 70,72 91,46 70,72 93,82 70,72 93,82 70,72 93,82 70,72 93,82

69905 MOMENTO DE TRANSPORTE DE EXPURGO INSALUBRE, EM CAMINHAO COMPACTADOR(RMS) m3xkm 0,39 0,50 0,39 0,52 0,39 0,52 0,39 0,52 0,39 0,52

69906 MOMENTO DE TRANSPORTE DE EXPURGO INSALUBRE, EM CAMINHAO POLIGUINDASTE(RMS) m3xkm 0,82 1,06 0,82 1,09 0,82 1,09 0,82 1,09 0,82 1,09

69907 MOMENTO DE TRANSPORTE DE EXPURGO INSALUBRE, EM VEICULO TIPO ROLL ON ROLL(RMS) m3xkm 1,13 1,46 1,13 1,50 1,13 1,50 1,13 1,50 1,13 1,50

70000 ESCORAMENTO

70100 ESCORAMENTO DESCONTINUO

70101ESCORAMENTO DESCONTINUO EM MADEIRA C/ PONTALETEAMENTO, EXECUTADO C/ PROFUND.

ATE 1,50mm2 7,92 10,51 9,57 12,70 9,98 13,24 9,76 12,95 9,80 13,00

70104ESCORAMENTO DESCONTINUO EM MADEIRA, TIPO ABERTO, EXECUTADO C/ PROFUND. ATE

1,50mm2 25,59 33,95 32,52 43,14 34,25 45,44 33,32 44,20 33,50 44,44

70300 ESCORAMENTO CONTINUO COM BLINDAGEM METALICA

70201ESCORAMENTO CONTINUO EM MADEIRA (TIPO CANCOEIRA), EXECUTADO NAS PROFUND.ATE

3,00 m, EM SOLO S/ PRESENCA DE AGUAm2 44,11 58,52 53,71 71,25 56,11 74,44 54,83 72,74 55,06 73,04

79201ESCORAMENTO CONTINUO EM MADEIRA (TIPO CANCOEIRA), EXECUTADO NAS PROFUND.ATE

3,00 m, EM SOLO S/ PRESENCA DE AGUA (MRR / RMS)m2 44,56 59,11 54,37 72,13 56,83 75,39 55,52 73,65 55,75 73,96

70222 ESCORAMENTO CONTINUO C/ ESTACAS METALICAS, EXECUTADO NAS PROFUND.ATE 3,00 m m2 42,80 56,78 52,98 70,28 55,54 73,68 54,18 71,88 54,42 72,19

79222ESCORAMENTO CONTINUO C/ ESTACAS METALICAS, EXECUTADO NAS PROFUND.ATE 3,00 m (MRR

/ RMS)m2 43,18 57,28 53,55 71,04 56,16 74,50 54,77 72,66 55,01 72,98

70225ESCORAMENTO CONTINUO C/ ESTACAS METALICAS, EXECUTADO NAS PROFUND. ACIMA DE 3,00

mm2 76,39 101,34 93,67 124,26 98,00 130,01 95,69 126,94 96,11 127,50

79225ESCORAMENTO CONTINUO C/ ESTACAS METALICAS, EXECUTADO NAS PROFUND. ACIMA DE 3,00

m (MRR / RMS)m2 76,96 102,10 94,51 125,38 98,90 131,20 96,56 128,10 96,98 128,65

70237 ESCORAMENTO MISTO METALICO / MADEIRA - TIPO HAMBURGUES C/ PRANCHADA HORIZONTAL m2 91,28 121,09 108,55 144,00 112,88 149,75 110,57 146,68 110,99 147,24

70300 ESCORAMENTO CONTINUO COM BLINDAGEM METALICA

70301ESCORAMENTO CONTINUO COM BLINDAGEM METALICA PARA VALAS - COM REUTILIZACAO DE

ATE 2.000 VEZES - PROFUNDIDADES ATE 2,0Mm2 22,20 29,45 25,19 33,42 25,95 34,43 25,55 33,89 25,63 34,00

70305ESCORAMENTO CONTINUO COM BLINDAGEM METALICA PARA VALAS - COM REUTILIZACAO DE

ATE 2.000 VEZES - PROFUNDIDADES ATE 4,0Mm2 24,23 32,14 27,85 36,95 28,76 38,15 28,28 37,52 28,36 37,62

70309ESCORAMENTO CONTINUO COM BLINDAGEM METALICA PARA VALAS - COM REUTILIZACAO DE

ATE 2.000 VEZES - PROFUNDIDADES ATE 6,0Mm2 25,49 33,82 29,67 39,36 30,72 40,75 30,16 40,01 30,27 40,16

79000 SERVICOS NAO CODIFICADOS

79003ESCORAMENTO CONTINUO COM BLINDAGEM METALICA PARA VALAS - COM REUTILIZACAO DE

ATE 2.000 VEZES - PROFUNDIDADES ATE 4,0M (COM CAMINHÃO GUINDASTE MUNCK)m2 23,84 31,63 27,46 36,43 28,37 37,64 27,89 37,00 27,97 37,11

80000 ESGOTAMENTO

80100 ESGOTAMENTO C/ BOMBAS

80101 ESGOTAMENTO C/ CONJUNTO MOTO-BOMBA DE SUPERFICIE E SUBMERSA. h 1,57 2,08 1,59 2,11 1,59 2,11 1,59 2,11 1,59 2,11

80104 CUSTO ADICIONAL POR m3 ESCAVADO, P/ ESGOTAMENTO DE VALA m3 2,25 2,98 3,20 4,25 3,44 4,56 3,31 4,39 3,34 4,43

80200 REBAIXAMENTO DE LENCOL FREATICO

80201REBAIXAMENTO DE LENCOL FREATICO C/ PONTEIRAS FILTRANTES EM VALAS, ESTAGIO SIMPLES,

CRAVACAO DE PONTEIRA C/ JATEAMENTO DE AGUAm 11,85 15,72 14,28 18,94 14,89 19,75 14,56 19,32 14,63 19,41

89201REBAIXAMENTO DE LENCOL FREATICO C/ PONTEIRAS FILTRANTES EM VALAS, ESTAGIO SIMPLES,

CRAVACAO DE PONTEIRA C/ JATEAMENTO DE AGUA (MRR / RMS)m 11,99 15,91 14,50 19,24 15,12 20,06 14,79 19,62 14,86 19,71

80204REBAIXAMENTO DE LENCOL FREATICO C/ PONTEIRAS FILTRANTES EM VALAS, ESTAGIO DUPLO,

CRAVACAO DE PONTEIRA C/ JATEAMENTO DE AGUAm 27,24 36,14 32,44 43,03 33,75 44,77 33,06 43,86 33,18 44,02

80213REBAIXAMENTO DE LENCOL FREATICO C/ PONTEIRAS FILTRANTES EM AREAS ATE 150M2 - (AREA

M2)x(QTD DIAS)m2xd 18,44 24,46 18,99 25,19 19,13 25,38 19,05 25,27 19,06 25,28

89213REBAIXAMENTO DE LENCOL FREATICO C/ PONTEIRAS FILTRANTES EM AREAS ATE 150M2 - (AREA

M2)x(QTD DIAS) (MRR / RMS)m2xd 18,44 24,46 19,00 25,21 19,14 25,39 19,06 25,28 19,07 25,30

89000 SERVICOS NAO CODIFICADOS

89207REBAIXAMENTO DE LENCOL FREATICO C/ PONTEIRAS FILTRANTES EM AREAS - (AREA

M2)x(PONTERIAS/M2)x(QTD DIAS)ptxd 39,09 51,86 39,64 52,59 39,78 52,77 39,70 52,67 39,71 52,68

90000 ESTRUTURAS E FUNDACOES

90100 CONCRETO CONVENCIONAL

90101CONCRETO C/ CONSUMO MIN. DE CIMENTO DE 150Kg/m3, INCL. FORNEC. DE MAT., PRODUCAO,

LANC., ADENS. E CURAm3 290,27 385,07 348,28 462,03 362,85 481,36 355,10 471,08 356,48 472,91

90104CONCRETO C/ CONSUMO MIN. DE CIMENTO DE 250Kg/m3, INCL. FORNEC. DE MAT., PRODUCAO,

LANC., ADENS. E CURAm3 326,08 432,58 384,08 509,52 398,65 528,85 390,91 518,58 392,29 520,41

90107CONCRETO C/ CONSUMO MIN. DE CIMENTO DE 300Kg/m3, INCL. FORNEC. DE MAT., PRODUCAO,

LANC., ADENS. E CURAm3 388,99 516,03 451,94 599,54 467,75 620,52 459,34 609,36 460,84 611,35

90110CONCRETO C/ FUNCAO HIDRAULICA, CONS. MIN. DE CIMENTO DE 340Kg/m3, INCL. FORNEC. DE

MAT., PRODUCAO, LANC., ADENS. E CURAm3 406,26 538,94 469,21 622,45 485,02 643,43 476,62 632,28 478,11 634,26

90113 CONCRETO FCK=15MPa, INCL. FORNEC. DOS MAT., PRODUCAO, LANC., ADENS. E CURA m3 392,26 520,37 444,17 589,24 457,20 606,52 450,27 597,33 451,52 598,99

99713CONCRETO FCK=15MPa, INCL. FORNEC. DOS MAT., PRODUCAO, LANC., ADENS. E CURA ( MRR /

RMS)m3 395,61 524,82 449,17 595,87 462,59 613,67 455,43 604,17 456,68 605,83

90114CONCRETO FCK=15MPa, COM GRAVILHAO, C/ CONSUMO MINIMO DE CIMENTO 300kg/m3,

INCL.FORNEC.DOS MAT.,PRODUCAO, LANC., E CURAm3 390,27 517,73 445,57 591,09 459,46 609,52 452,08 599,73 453,40 601,48

90116 CONCRETO FCK=18MPa, INCL. FORNEC. DOS MAT., PRODUCAO, LANC., ADENS. E CURA m3 396,51 526,01 444,60 589,81 456,68 605,83 450,26 597,31 451,41 598,84

90119 CONCRETO FCK=20MPa, INCL. FORNEC. DOS MAT., PRODUCAO, LANC.,ADENS. E CURA m3 412,92 547,78 461,01 611,58 473,09 627,60 466,67 619,08 467,82 620,61

90122 CONCRETO FCK=22MPa, INCL. FORNEC. DOS MAT., PRODUCAO, LANC.,ADENS. E CURA m3 421,59 559,28 469,68 623,08 481,75 639,09 475,33 630,57 476,49 632,11

90125 CONCRETO FCK=25MPa, INCL. FORNEC. DOS MAT., PRODUCAO, LANC.,ADENS. E CURA m3 435,47 577,69 483,56 641,49 495,63 657,50 489,21 648,99 490,37 650,52

99125CONCRETO FCK=25MPa, INCL. FORNEC. DOS MAT., PRODUCAO, LANC.,ADENS. E CURA (MRR /

RMS)m3 438,50 581,71 488,08 647,49 500,51 663,98 493,88 655,18 495,03 656,71

90126 CONCRETO FCK=30MPa, INCL. FORNEC. DOS MAT., PRODUCAO, LANC.,ADENS. E CURA m3 488,58 648,15 536,67 711,95 548,74 727,96 542,32 719,44 543,48 720,98

99926CONCRETO FCK=30MPa, INCL. FORNEC. DOS MAT., PRODUCAO, LANC.,ADENS. E CURA (MRR /

RMS)m3 491,61 652,17 541,19 717,94 553,62 734,43 546,99 725,64 548,14 727,16

90127 CONCRETO FCK=40MPa, INCL. FORNEC. DOS MAT., PRODUCAO, LANC.,ADENS. E CURA m3 515,03 683,24 574,15 761,67 589,00 781,37 581,11 770,90 582,51 772,76

90128 BLOCO DE ANCORAGEM EM CONCRETO SIMPLES, INCL. FORMA, ESCORAMENTO E DESFORMA m3 754,72 1.001,21 912,59 1.210,64 952,25 1.263,25 931,21 1.235,34 934,94 1.240,29

Página: 13 de 59

Page 14: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

90131BLOCO DE ANCORAGEM EM CONCRETO ARMADO, INCL. FORMA, ACO, ESCORAMENTO E

DESFORMAm3 885,62 1.174,86 1.067,36 1.415,96 1.112,94 1.476,43 1.088,88 1.444,51 1.093,20 1.450,24

90134BLOCO DE ANCORAGEM EM CONCRETO ARMADO 30MPA, PARA LINHAS SUB AQUATICAS, INCL.

FORMA, ACO, ESCORAMENTO, DESFORMA E ADITIVOm3 2.302,64 3.054,68 2.705,44 3.589,04 2.806,28 3.722,81 2.753,01 3.652,14 2.762,77 3.665,09

90140 CONCRETO FCK=20MPa, USINADO, BOMBEADO, INCLUSIVE ADENSAMENTO E CURA m3 477,18 633,03 490,89 651,21 494,33 655,78 492,50 653,35 492,83 653,79

90143 CONCRETO FCK=22MPa, USINADO, BOMBEADO, INCLUSIVE ADENSAMENTO E CURA m3 485,43 643,97 499,14 662,16 502,58 666,72 500,75 664,29 501,08 664,73

90146 CONCRETO FCK=25MPa, USINADO, BOMBEADO, INCLUSIVE ADENSAMENTO E CURA m3 498,65 661,51 512,36 679,70 515,80 684,26 513,97 681,83 514,30 682,27

90149 CONCRETO FCK=30MPa, USINADO, BOMBEADO, INCLUSIVE ADENSAMENTO E CURA m3 549,23 728,61 562,94 746,80 566,38 751,36 564,55 748,93 564,88 749,37

90152 CONCRETO FCK=40MPa, USINADO, BOMBEADO, INCLUSIVE ADENSAMENTO E CURA m3 552,92 733,50 566,63 751,69 570,07 756,25 568,24 753,83 568,57 754,26

90200 CONCRETO CICLOPICO

90201CONCRETO CICLOPICO C/ CONCRETO PRIMARIO C/ CONS. MIN. DE CIMENTO DE 150kg/m3 E 30%

DE PEDRA DE MAO, INCL. FORNEC. DOS MAT., PRODUCAO, LANC., ADENS. E CURAm3 259,47 344,21 308,15 408,79 320,36 424,99 313,86 416,37 315,04 417,93

90204CONCRETO CICLOPICO C/ CONCRETO PRIMARIO C/ CONS. MIN. DE CIMENTO DE 200kg/m3 E 30%

DE PEDRA DE MAO, INCL. FORNEC. DOS MAT., PRODUCAO, LANC., ADENS. E CURAm3 286,09 379,53 334,76 444,09 346,98 460,30 340,48 451,68 341,65 453,23

90207CONCRETO CICLOPICO C/ CONCRETO PRIMARIO C/ CONS. MIN. DE CIMENTO DE 250kg/m3 E 30%

DE PEDRA DE MAO, INCL. FORNEC. DOS MAT., PRODUCAO, LANC., ADENS. E CURAm3 313,59 416,01 362,27 480,59 374,48 496,79 367,98 488,16 369,15 489,71

90210CONCRETO CICLOPICO C/ CONCRETO PRIMARIO C/ CONS. MIN. DE CIMENTO DE 300kg/m3 E 30%

DE PEDRA DE MAO, INCL. FORNEC. DOS MAT., PRODUCAO, LANC. ADENS. E CURAm3 341,29 452,76 389,97 517,33 402,19 533,55 395,68 524,91 396,86 526,47

90300 CONCRETO COMPACTADO C/ ROLO ( CCR )

90301CONCRETO COMPACTADO C/ ROLO, FCK DE PROJETO, CONS. DE CIMENTO DE 60 Kg/m3, INCL.

FORNEC. DE MAT., PRODUCAO, LANC., ESPALHAM., ADENS., PROTECAO E CURAm3 112,87 149,73 114,36 151,71 114,73 152,20 114,54 151,95 114,57 151,99

90304CONCRETO COMPACTADO C/ ROLO, FCK DE PROJETO, CONS. DE CIMENTO DE 80Kg/m3, INCL.

FORNEC. DE MAT., PRODUCAO, LANC., ESPALHAM., ADENS., PROTECAO E CURAm3 134,97 179,05 136,75 181,41 137,20 182,01 136,96 181,69 137,00 181,74

90307CONCRETO COMPACTADO C/ ROLO, FCK DE PROJETO, CONS. DE CIMENTO DE 100Kg/m3, INCL.

FORNEC. DE MAT., PRODUCAO, LANC., ESPALHAM., ADENS., PROTECAO E CURAm3 146,52 194,37 148,66 197,21 149,20 197,93 148,91 197,54 148,97 197,62

90310CONCRETO COMPACTADO C/ ROLO, FCK DE PROJETO, CONS. DE CIMENTO DE 120Kg/m3, INCL.

FORNEC. DE MAT., PRODUCAO, LANC., ESPALHAM., ADENS., PROTECAO E CURAm3 163,35 216,70 165,91 220,10 166,55 220,95 166,21 220,49 166,28 220,59

90313CONCRETO COMPACTADO C/ ROLO, FCK DE PROJETO, CONS. DE CIMENTO DE 140Kg/m3, INCL.

FORNEC. DE MAT., PRODUCAO, LANC., ESPALHAM., ADENS., PROTECAO E CURAm3 180,43 239,36 183,51 243,44 184,28 244,47 183,87 243,92 183,94 244,01

90316ARGAMASSA C/ CONSUMO DE CIMENTO DE 350 kg/m3, P/ JUNTAS DE CAMADAS DE CONCRETO

ROLADO (SELO) E P/ BERCO (CONTATO C/ A FUNDACAO), INCL. FORNEC. DE MAT., PRODUCAO,

LANC. E ESPALHAM.

m3 345,77 458,70 388,94 515,97 399,79 530,36 394,02 522,71 395,04 524,06

90319CONCRETO COMPACT.A ROLO CCR C/fck=6MPa CL G,INCL. ARGAMASSA P/SELO C/fck=12MPa CL

D,E CONCRETO P/REG.SUPERF.ROCHOSA CL E,(FORNEC.DOSAGEM

PROD.TRANSP.LANCAM.ADENS,CURA REPARO E CONTROLE.QUAL.(ET-07/02)

M3 138,31 183,48 143,85 190,83 145,23 192,66 144,50 191,69 144,63 191,87

90345 PLACAS DE CONCRETO PARA PROTECAO TALUDES

90349 PROTECAO DE TALUDE COM PLACAS DE CONCRETO E=5cm m2 57,33 76,05 68,41 90,75 71,18 94,43 69,72 92,49 69,99 92,85

90350 PROTECAO DE TALUDE COM PLACAS DE CONCRETO E=7cm m2 68,40 90,74 81,25 107,79 84,48 112,07 82,79 109,83 83,09 110,23

90351 PROTECAO DE TALUDE COM PLACAS DE CONCRETO E=10cm m2 96,28 127,73 114,03 151,27 118,46 157,15 116,13 154,06 116,55 154,62

90400 CONCRETO PROJETADO

90401CONCRETO PROJETADO P/ GRANDES ESPESSURAS FCK=20MPa, INCL. FORNEC. DOS MAT.,

PRODUCAO, LIMPEZA E TRATAMENTO DA SUPERFICIE, APLICACAO E CURAm3 1.016,20 1.348,09 1.177,37 1.561,90 1.217,82 1.615,56 1.196,31 1.587,02 1.200,17 1.592,15

90404CONCRETO PROJETADO P/ GRANDES ESPESSURAS FCK=25MPa, INCL. FORNEC. DOS MAT.,

PRODUCAO, LIMPEZA E TRATAMENTO DA SUPERFICIE, APLICACAO E CURAm3 1.044,11 1.385,12 1.205,28 1.598,92 1.245,73 1.652,59 1.224,21 1.624,04 1.228,08 1.629,17

90500 ARGAMASSA PROJETADA

90501ARGAMASSA PROJETADA P/ PEQUENAS ESPESSURAS FCK=20MPa, INCL. FORNEC. DOS MAT.,

PRODUCAO, LIMPEZA E TRATAMENTO DA SUPERFICIE, APLICACAO E CURAm2 45,62 60,52 52,47 69,61 54,19 71,89 53,28 70,68 53,44 70,89

90504ARGAMASSA PROJETADA P/ PEQUENAS ESPESSURAS FCK=25MPa, INCL. FORNEC. DOS MAT.,

PRODUCAO, LIMPEZA E TRATAMENTO DA SUPERFICIE, APLICACAO E CURAm2 48,32 64,10 55,17 73,19 56,89 75,47 55,98 74,26 56,14 74,48

90600 ARMADURA P/ CONCRETO

90601 ACO CA-50, INCL. FORNEC., CORTE, DOBR. E COLOCACAO NAS PECAS kg 5,59 7,42 6,40 8,49 6,60 8,76 6,50 8,62 6,52 8,65

99701 ACO CA-50, INCL. FORNEC., CORTE, DOBR. E COLOCACAO NAS PECAS (MRR / RMS) kg 5,62 7,46 6,45 8,56 6,65 8,82 6,54 8,68 6,56 8,70

90604 ACO CA-60, INCL. FORNEC., CORTE, DOBR. E COLOCACAO NAS PECAS kg 5,75 7,63 6,56 8,70 6,76 8,97 6,66 8,84 6,68 8,86

99704 ACO CA-60, INCL. FORNEC., CORTE, DOBR. E COLOCACAO NAS PECAS (MRR / RMS) kg 5,78 7,67 6,61 8,77 6,81 9,03 6,70 8,89 6,72 8,91

90607 TELAS DE ACO CA-60, INCL. FORNEC., CORTE, E COLOCACAO NAS PECAS kg 5,40 7,16 5,45 7,23 5,46 7,24 5,45 7,23 5,45 7,23

90700 FORMA P/ RESERVATORIO APOIADO

90701 FORMA PLANA EM COMP. RESINADO P/ RESERV. APOIADO - E=12MM ATE 3X m2 34,83 46,21 41,23 54,70 42,84 56,83 41,98 55,69 42,14 55,90

90704 FORMA PLANA EM COMP. PLASTIFICADO P/ RESERV. APOIADO - E=12MM ATE 3X m2 37,91 50,29 44,31 58,78 45,92 60,92 45,06 59,78 45,22 59,99

90707 FORMA CURVA EM COMP. RESINADO P/ RESERV. APOIADO - E=6MM ATE 2X m2 68,17 90,43 87,95 116,67 92,91 123,25 90,27 119,75 90,75 120,39

90710 FORMA CURVA EM COMP. PLASTIFICADO P/ RESERV. APOIADO - E=6MM ATE 3X m2 88,71 117,68 113,44 150,49 119,64 158,71 116,34 154,34 116,94 155,13

90800 FORMA P/ RESERVATORIO ELEVADO

90801 FORMA PLANA EM COMP. RESINADO P/ RESERV. ELEVADO (CUBA) - E=12MM ATE 3X m2 39,77 52,76 48,58 64,45 50,79 67,38 49,61 65,81 49,82 66,09

90804 FORMA PLANA EM COMP. PLASTIFICADO P/ RESERV. ELEVADO (CUBA) E=12MM ATE 3X m2 42,85 56,84 51,66 68,53 53,87 71,46 52,69 69,90 52,90 70,18

90807 FORMA CURVA EM COMP. RESINADO P/ RESERV. ELEVADO (CUBA) - E=6MM ATE 2X m2 93,42 123,93 118,15 156,74 124,35 164,96 121,05 160,58 121,65 161,38

90810 FORMA CURVA EM COMP. PLASTIFICADO P/ RESERV. ELEVADO (CUBA) - E=6MM ATE 3X m2 94,22 124,99 118,95 157,80 125,15 166,02 121,85 161,65 122,45 162,44

90813 FORMA PLANA EM COMP.RESINADO P/RESERV.ELEVADO (VIGAS/PILARES) - E=12MM ATE 3X m2 39,77 52,76 48,58 64,45 50,79 67,38 49,61 65,81 49,82 66,09

90816FORMA PLANA EM COMP. PLASTIFICADO P/ RESERV. ELEVADO (VIGAS/PILARES) - E=12MM ATE

3Xm2 42,85 56,84 51,66 68,53 53,87 71,46 52,69 69,90 52,90 70,18

90900 FORMA P/ EDIFICACOES

90901 FORMA PLANA EM MADEIRA COMUM P/ FUNDACAO m2 49,69 65,92 59,08 78,38 61,44 81,51 60,19 79,85 60,41 80,14

90904 FORMA PLANA EM COMP. RESINADO P/ FUNDACAO - E=12MM ATE 3X m2 29,93 39,71 36,33 48,20 37,94 50,33 37,08 49,19 37,24 49,40

90905 FORMA PLANA EM COMP. RESINADO P/ FUNDACAO - E=12MM ATE 8X m2 31,18 41,36 39,39 52,25 41,44 54,97 40,35 53,53 40,55 53,79

99905 FORMA PLANA EM COMP. RESINADO P/ FUNDACAO - E=12MM ATE 8X (MRR / RMS) m2 31,31 41,54 39,57 52,49 41,65 55,25 40,55 53,79 40,75 54,06

90907 FORMA PLANA EM COMP. RESINADO P/ ESTRUTURA E=12 ATE 3X m2 34,83 46,21 41,23 54,70 42,84 56,83 41,98 55,69 42,14 55,90

90910 FORMA PLANA EM COMP. PLASTIFICADO P/ ESTRUTURA - E=12MM ATE 5X m2 24,88 33,01 30,15 40,00 31,47 41,75 30,78 40,83 30,90 40,99

90913 FORMA CURVA EM COMP. RESINADO P/ ESTRUTURAS - E=6MM ATE 2X m2 83,95 111,37 108,68 144,17 114,88 152,40 111,58 148,02 112,18 148,82

90916 FORMA CURVA EM COMP. PLASTIFICADO P/ ESTRUTURAS - E=6MM ATE 3X m2 84,75 112,43 109,48 145,24 115,68 153,46 112,38 149,08 112,98 149,88

91000 FORMA P/ ESTRUTURAS DIVERSAS

91001 FORMA EM COMP. RESINADO P/ CORTINAS - E=12MM ATE 5X m2 58,28 77,31 78,06 103,55 83,02 110,13 80,38 106,63 80,86 107,27

91004 FORMA EM COMP. PLASTIFICADO P/ CORTINAS - E=12MM ATE 5X m2 60,86 80,74 80,64 106,98 85,60 113,56 82,96 110,05 83,44 110,69

91100 FORMAS ESPECIAIS

91101FORMA DESLIZANTE, EM CHAPA COMP.PLASTIFICADA, INCL.REUTILIZACAO DA FORMA E DE

TODOS OS EQUIPAMENTOS DE DESLOCAMENTOm2 60,99 80,91 79,52 105,49 84,16 111,65 81,70 108,38 82,14 108,97

91104 FORMA TEMPORARIAMENTE FIXA P/ VERTEDOUROS DE BARRAGENS m2 65,87 87,38 86,78 115,12 92,02 122,07 89,23 118,37 89,74 119,05

91107FORMA TREPANTE, EM CHAPA COMP., PLASTIFICADA, INCL. REUTILIZACAO DA FORMA E DE

TODOS OS EQUIPAMENTOS DE DESLOCAMENTOm2 69,96 92,81 92,87 123,20 98,61 130,82 95,55 126,76 96,10 127,49

91110 FORMA PERDIDA EM COMPENSADO RESINADO m2 77,74 103,13 98,65 130,87 103,89 137,82 101,10 134,12 101,61 134,80

91113 FORMA PARA PARAMENTOS DE BARRAGENS EM CONCRETO ROLADO m2 65,87 87,38 86,78 115,12 92,02 122,07 89,23 118,37 89,74 119,05

91200 CIMBRAMENTO

91201 CIMBRAMENTO P/ RESERVATORIOS APOIADOS m3 32,86 43,59 40,76 54,07 42,75 56,71 41,69 55,31 41,87 55,54

91204 CIMBRAMENTO P/ RESERVATORIOS ELEVADOS (CUBA) m3 38,14 50,60 47,01 62,36 49,23 65,31 48,04 63,73 48,25 64,01

91207 CIMBRAMENTO P/ RESERVATORIOS ELEVADOS (VIGAS E PILARES) m3 38,14 50,60 47,01 62,36 49,23 65,31 48,04 63,73 48,25 64,01

91210 CIMBRAMENTO P/ EDIFICACOES m3 19,82 26,29 25,55 33,89 26,99 35,80 26,22 34,78 26,35 34,96

91300 SERVICOS DE PROTENSAO P/ ESTRUTURAS DE RESERVATORIO APOIADO C/ CAP. DE 8700 m3

91301CORDOALHA P/ LAJE DE FUNDO, INCL. BAINHA, ANCORAGEM, PROTENSAO, INJECAO E DEMAIS

SERVICOS E MAT. NECESSARIOSkg 16,09 21,34 16,87 22,38 17,07 22,65 16,96 22,50 16,98 22,53

91304CORDOALHA P/ PAREDE VERTICAL, INCL. BAINHA, ANCORAGEM, PROTENSAO, INJECAO E DEMAIS

SERVICOS E MAT. NECESSARIOSkg 19,81 26,28 20,59 27,31 20,79 27,58 20,68 27,43 20,70 27,46

91307CORDOALHA P/LAJE DE COBERTURA,INCL. BAINHA, ANCORAGEM, PROTENSAO, INJECAO E

DEMAIS SERVICOS E MAT. NECESSARIOSkg 19,97 26,49 20,75 27,53 20,95 27,79 20,84 27,65 20,86 27,67

91400 LAJES PRE-FABRICADAS DE CONCRETO

91401 FORNEC. E ASSENT. DE LAJE PRE-FABRICADA P/ FORRO, e=8cm m2 50,09 66,45 55,38 73,47 56,69 75,20 55,98 74,26 56,13 74,46

91404 FORNEC. E ASSENT. DE LAJE PRE-FABRICADA P/ PISO, e=12cm m2 68,37 90,70 78,39 103,99 80,91 107,34 79,56 105,54 79,81 105,88

91500 TUBULOES DE CONCRETO

91501 ESCAVACAO MANUAL P/ BASE E FUSTE DE TUBULAO A CEU ABERTO S/ REVESTIMENTO m3 202,60 268,77 301,50 399,97 326,30 432,87 313,10 415,36 315,50 418,54

91504ESCAVACAO DE BASE P/ TUBULAO A AR COMPRIMIDO, INCL. MOB., INST. E DESMOB. DE

EQUIPAMENTOSm3 676,85 897,91 788,81 1.046,44 816,89 1.083,69 802,01 1.063,95 804,65 1.067,45

Página: 14 de 59

Page 15: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

91507FORNEC. E CRAVACAO DE CAMISA METALICA,INCL. A ESCAVACAO DO FUSTE, MOB., INST. E

DESMOB. DE EQUIPAMENTOSm3 477,55 633,52 477,55 633,52 477,55 633,52 477,55 633,52 477,55 633,52

91510 LANCAMENTO DE CONCRETO EM TUBULAO A AR COMPRIMIDO m3 79,43 105,37 118,21 156,82 127,94 169,73 122,77 162,87 123,69 164,09

91600 ESTACAS DE MADEIRA

91601CRAVACAO DE ESTACA DE MADEIRA, D=22cm, CAPAC. DE 6 A 8 TON., EM TERRENO FAVORAVEL,

INCL. FORNEC. DE MAT.,MOB.,INST. E DESMOB. DE EQUIPAMENTOSm 18,76 24,89 21,28 28,23 21,92 29,08 21,58 28,63 21,64 28,71

91604CRAVACAO DE ESTACA DE MADEIRA, D=22cm, CAPAC. DE 6 A 8 TON., EM TERRENO POUCO

FAVORAVEL, INCL. FORNEC. DE MAT.,MOB.,INST. E DESMOB. DE EQUIPAMENTOSm 27,12 35,98 31,32 41,55 32,38 42,96 31,82 42,21 31,92 42,35

91700 ESTACAS METALICAS

91701CRAVACAO DE ESTACA METALICA TR 25, INCL. FORNEC. DE MAT.,MOB., INST. E DESMOB. DE

EQUIPAMENTOSm 132,54 175,83 133,56 177,18 133,81 177,51 133,68 177,34 133,70 177,37

91704CRAVACAO DE ESTACA METALICA 2 TR 25, INCL. FORNEC. DE MAT.,MOB.,INST. E DESMOB. DE

EQUIPAMENTOSm 263,00 348,90 264,02 350,25 264,27 350,58 264,14 350,41 264,16 350,43

91707CRAVACAO DE ESTACA METALICA TR 32, INCL. FORNEC. DE MAT., MOB.,INST. E DESMOB. DE

EQUIPAMENTOSm 217,65 288,73 218,67 290,09 218,92 290,42 218,79 290,25 218,81 290,27

91710CRAVACAO DE ESTACA METALICA 2 TR 32, INCL. FORNEC. DE MAT., MOB.,INST.,E DESMOB. DE

EQUIPAMENTOSm 424,60 563,27 425,62 564,63 425,87 564,96 425,74 564,79 425,76 564,81

91713 EMENDA (SOLDA DE TOPO) DE ESTACA METALICA PERFIL SIMPLES, INCL. FORNEC. DE MAT. un 127,98 169,78 146,12 193,84 150,66 199,87 148,24 196,66 148,68 197,24

91716 EMENDA (SOLDA DE TOPO) DE ESTACA METALICA PERFIL DUPLO, INCL. FORNEC. DE MAT. un 193,58 256,80 226,56 300,55 234,82 311,51 230,42 305,68 231,22 306,74

91719 CORTE DE ESTACA METALICA PERFIL SIMPLES un 24,21 32,12 32,33 42,89 34,36 45,58 33,28 44,15 33,47 44,40

91722 CORTE DE ESTACA METALICA PERFIL DUPLO un 48,20 63,94 64,44 85,49 68,52 90,90 66,35 88,02 66,74 88,54

91800 ESTACAS DE CONCRETO PRE-MOLDADAS

91801CRAVACAO DE ESTACA PRE-MOLDADA DE CONCRETO ARMADO,D=20cm, INCL. FORNEC. DE

MAT., MOB.,INST. E DESMOB. DE EQUIPAMENTOSm 115,99 153,87 127,44 169,06 130,31 172,87 128,81 170,88 129,09 171,25

91804CRAVACAO DE ESTACA PRE-MOLDADA DE CONCRETO ARMADO,D=25cm, INCL. FORNEC. DE

MAT., MOB., INST. E DESMOB. DE EQUIPAMENTOSm 127,65 169,34 139,71 185,34 142,71 189,32 141,15 187,25 141,44 187,63

91807CRAVACAO DE ESTACA PRE-MOLDADA DE CONCRETO ARMADO,D=30cm, INCL. FORNEC. DE

MAT., MOB., INST. E DESMOB. DE EQUIPAMENTOSm 160,98 213,56 178,08 236,24 182,33 241,88 180,14 238,97 180,54 239,50

91810CRAVACAO DE ESTACA PRE-MOLDADA DE CONCRETO ARMADO,D=35cm, INCL. FORNEC. DE

MAT., MOB., INST. E DESMOB. DE EQUIPAMENTOSm 190,95 253,31 211,83 281,01 217,01 287,89 214,33 284,33 214,84 285,01

91813CRAVACAO DE ESTACA PRE-MOLDADA DE CONCRETO ARMADO,D=40cm, INCL. FORNEC. DE

MAT., MOB., INST. E DESMOB. DE EQUIPAMENTOSm 222,64 295,35 247,41 328,21 253,57 336,39 250,40 332,18 250,99 332,96

91900 ESTACAS DE CONCRETO MOLDADAS IN LOCO

91901 ESTACA DE CONCRETO SIMPLES, D=20cm m 24,60 32,63 31,74 42,11 33,52 44,47 32,58 43,22 32,74 43,43

91904 ESTACA DE CONCRETO SIMPLES, D=25cm m 31,91 42,33 40,65 53,93 42,84 56,83 41,68 55,29 41,88 55,56

91907 ESTACA DE CONCRETO SIMPLES, D=30cm m 48,24 64,00 62,69 83,16 66,32 87,98 64,40 85,43 64,73 85,87

91909 ESTACA DE CONCRETO ARMADO, D=10cm m 18,31 24,29 24,66 32,71 26,25 34,82 25,42 33,72 25,57 33,92

91910 ESTACA DE CONCRETO ARMADO, D=20cm m 28,12 37,30 35,77 47,45 37,68 49,99 36,68 48,66 36,85 48,89

91913 ESTACA DE CONCRETO ARMADO, D=25cm m 37,39 49,60 46,92 62,24 49,31 65,41 48,05 63,74 48,27 64,03

91916 ESTACA DE CONCRETO ARMADO, D=30cm m 56,12 74,45 71,71 95,13 75,63 100,33 73,57 97,60 73,92 98,06

91917ESTACA TIPO HELICE CONTINUA DN30, PERFURACAO, LANCAMENTO DE CONCRETO E FERRAGEM -

PROFUNDIDADE ATE 20MM 110,14 146,11 118,06 156,62 120,02 159,22 119,01 157,88 119,20 158,13

91918ESTACA TIPO HELICE CONTINUA DN40, PERFURACAO, LANCAMENTO DE CONCRETO E FERRAGEM -

PROFUNDIDADE ATE 20MM 162,90 216,10 176,97 234,77 180,47 239,41 178,66 237,01 179,00 237,46

91919ESTACA TIPO HELICE CONTINUA DN50, PERFURACAO, LANCAMENTO DE CONCRETO E FERRAGEM -

PROFUNDIDADE ATE 20MM 230,86 306,26 252,84 335,42 258,31 342,67 255,49 338,93 256,02 339,64

91920ESTACA TIPO HELICE CONTINUA DN60, PERFURACAO, LANCAMENTO DE CONCRETO E FERRAGEM -

PROFUNDIDADE ATE 20MM 314,20 416,82 345,91 458,88 353,81 469,36 349,73 463,95 350,50 464,97

91921ESTACA TIPO HELICE CONTINUA DN70, PERFURACAO, LANCAMENTO DE CONCRETO E FERRAGEM -

PROFUNDIDADE ATE 20MM 411,82 546,32 454,90 603,47 465,62 617,69 460,08 610,34 461,13 611,74

91922ESTACA TIPO HELICE CONTINUA DN80, PERFURACAO, LANCAMENTO DE CONCRETO E FERRAGEM -

PROFUNDIDADE ATE 20MM 524,95 696,40 581,21 771,03 595,23 789,63 587,98 780,01 589,35 781,83

91923ESTACA TIPO HELICE CONTINUA DN90, PERFURACAO, LANCAMENTO DE CONCRETO E FERRAGEM -

PROFUNDIDADE ATE 20MM 653,23 866,57 724,43 961,03 742,16 984,55 733,00 972,40 734,75 974,72

91924ESTACA TIPO HELICE CONTINUA DN30, PERFURACAO, LANCAMENTO DE CONCRETO E FERRAGEM -

PROFUNDIDADE A PARTIR DE 21MM 150,04 199,04 157,96 209,55 159,92 212,15 158,91 210,81 159,10 211,06

91925ESTACA TIPO HELICE CONTINUA DN40, PERFURACAO, LANCAMENTO DE CONCRETO E FERRAGEM -

PROFUNDIDADE A PARTIR DE 21MM 202,80 269,03 216,87 287,70 220,37 292,34 218,56 289,94 218,90 290,39

91926ESTACA TIPO HELICE CONTINUA DN50, PERFURACAO, LANCAMENTO DE CONCRETO E FERRAGEM -

PROFUNDIDADE A PARTIR DE 21MM 270,76 359,19 292,74 388,35 298,21 395,61 295,39 391,86 295,92 392,57

91927ESTACA TIPO HELICE CONTINUA DN60, PERFURACAO, LANCAMENTO DE CONCRETO E FERRAGEM -

PROFUNDIDADE A PARTIR DE 21MM 354,10 469,75 385,81 511,82 393,71 522,30 389,63 516,88 390,40 517,90

91928ESTACA TIPO HELICE CONTINUA DN70, PERFURACAO, LANCAMENTO DE CONCRETO E FERRAGEM -

PROFUNDIDADE A PARTIR DE 21MM 451,72 599,25 494,80 656,40 505,52 670,62 499,98 663,27 501,03 664,67

91929ESTACA TIPO HELICE CONTINUA DN80, PERFURACAO, LANCAMENTO DE CONCRETO E FERRAGEM -

PROFUNDIDADE A PARTIR DE 21MM 564,85 749,33 621,11 823,96 635,13 842,56 627,88 832,95 629,25 834,76

91930ESTACA TIPO HELICE CONTINUA DN90, PERFURACAO, LANCAMENTO DE CONCRETO E FERRAGEM -

PROFUNDIDADE A PARTIR DE 21MM 693,13 919,51 764,33 1.013,96 782,06 1.037,48 772,90 1.025,33 774,65 1.027,65

91947ESTACA TIPO RAIZ DN30, PERFURACAO, LANCAMENTO DE CONCRETO E FERRAGEM -

PROFUNDIDADE ATE 20MM 389,45 516,64 397,37 527,15 399,33 529,75 398,32 528,41 398,51 528,66

91948ESTACA TIPO RAIZ DN40, PERFURACAO, LANCAMENTO DE CONCRETO E FERRAGEM -

PROFUNDIDADE ATE 20MM 442,21 586,64 456,28 605,30 459,78 609,94 457,97 607,54 458,31 607,99

91949ESTACA TIPO RAIZ DN50, PERFURACAO, LANCAMENTO DE CONCRETO E FERRAGEM -

PROFUNDIDADE ATE 20MM 510,17 676,79 532,15 705,95 537,62 713,21 534,80 709,47 535,33 710,17

91950ESTACA TIPO RAIZ DN60, PERFURACAO, LANCAMENTO DE CONCRETO E FERRAGEM -

PROFUNDIDADE ATE 20MM 593,51 787,35 625,22 829,42 633,12 839,90 629,04 834,48 629,81 835,51

91951ESTACA TIPO RAIZ DN70, PERFURACAO, LANCAMENTO DE CONCRETO E FERRAGEM -

PROFUNDIDADE ATE 20MM 691,13 916,85 734,21 974,00 744,93 988,22 739,39 980,87 740,44 982,27

91952ESTACA TIPO RAIZ DN80, PERFURACAO, LANCAMENTO DE CONCRETO E FERRAGEM -

PROFUNDIDADE ATE 20MM 804,26 1.066,93 860,52 1.141,57 874,54 1.160,16 867,29 1.150,55 868,66 1.152,36

91953ESTACA TIPO RAIZ DN90, PERFURACAO, LANCAMENTO DE CONCRETO E FERRAGEM -

PROFUNDIDADE ATE 20MM 932,54 1.237,11 1.003,74 1.331,56 1.021,47 1.355,08 1.012,31 1.342,93 1.014,06 1.345,25

91954ESTACA TIPO RAIZ DN30, PERFURACAO, LANCAMENTO DE CONCRETO E FERRAGEM -

PROFUNDIDADE A PARTIR DE 21MM 469,25 622,51 477,17 633,01 479,13 635,61 478,12 634,27 478,31 634,53

91955ESTACA TIPO RAIZ DN40, PERFURACAO, LANCAMENTO DE CONCRETO E FERRAGEM -

PROFUNDIDADE A PARTIR DE 21MM 522,01 692,50 536,08 711,16 539,58 715,81 537,77 713,41 538,11 713,86

91956ESTACA TIPO RAIZ DN50, PERFURACAO, LANCAMENTO DE CONCRETO E FERRAGEM -

PROFUNDIDADE A PARTIR DE 21MM 589,97 782,65 611,95 811,81 617,42 819,07 614,60 815,33 615,13 816,03

91957ESTACA TIPO RAIZ DN60, PERFURACAO, LANCAMENTO DE CONCRETO E FERRAGEM -

PROFUNDIDADE A PARTIR DE 21MM 673,31 893,21 705,02 935,28 712,92 945,76 708,84 940,35 709,61 941,37

91958ESTACA TIPO RAIZ DN70, PERFURACAO, LANCAMENTO DE CONCRETO E FERRAGEM -

PROFUNDIDADE A PARTIR DE 21MM 770,93 1.022,72 814,01 1.079,87 824,73 1.094,09 819,19 1.086,74 820,24 1.088,13

91959ESTACA TIPO RAIZ DN80, PERFURACAO, LANCAMENTO DE CONCRETO E FERRAGEM -

PROFUNDIDADE A PARTIR DE 21MM 884,06 1.172,79 940,32 1.247,43 954,34 1.266,03 947,09 1.256,41 948,46 1.258,23

91960ESTACA TIPO RAIZ DN90, PERFURACAO, LANCAMENTO DE CONCRETO E FERRAGEM -

PROFUNDIDADE A PARTIR DE 21MM 1.012,34 1.342,97 1.083,54 1.437,42 1.101,27 1.460,94 1.092,11 1.448,79 1.093,86 1.451,11

92000 JUNTAS DE DILATACAO

92001 FORNEC. E INST. DE JUNTA SIM. FUGENBAND O-12 m 124,04 164,55 140,53 186,43 144,66 191,91 142,46 188,99 142,86 189,52

92004 FORNEC. E INST. DE JUNTA SIM. FUGENBAND O-22 m 144,95 192,29 150,68 199,89 152,11 201,79 151,35 200,78 151,49 200,97

92007 FORNEC. E INST. DE JUNTA SIM. FUGENBAND O-35/6 m 522,01 692,50 541,54 718,41 546,43 724,89 543,82 721,43 544,30 722,07

92010 FORNEC. E INST. DE JUNTA SIM. FUGENBAND O-35/10 m 535,15 709,93 554,68 735,84 559,57 742,33 556,96 738,86 557,44 739,50

93000 ESTRUTURA METALICA

93005FABRICACAO E MONTAGEM DE ESTRUTURA METALICA, INCLUINDO PRIMER ANTI-CORROSIVO,

SEM FORNECIMENTO DE MATERIALKG 12,97 17,21 17,46 23,16 18,58 24,65 17,98 23,85 18,09 24,00

93006FORNECIMENTO, FABRICACAO E MONTAGEM DE ESTRUTURA METALICA, INCLUINDO PRIMER

ANTI-CORROSIVO, COM FORNECIMENTO DE MATERIALKG 16,40 21,76 20,89 27,71 22,01 29,20 21,41 28,40 21,52 28,55

93007MONTAGEM DE ESTRUTURA METALICA, INCLUINDO PRIMER ANTI-CORROSIVO, SEM

FORNECIMENTO DE MATERIALKG 5,25 6,96 7,66 10,16 8,25 10,94 7,94 10,53 8,00 10,61

93008FABRICACAO DE ESTRUTURA METALICA, INCLUINDO PRIMER ANTI-CORROSIVO, SEM

FORNECIMENTO DE MATERIALKG 7,72 10,24 9,80 13,00 10,33 13,70 10,04 13,32 10,09 13,39

93010FORNECIMENTO, FABRICACAO E MONTAGEM DE FLUTUANTE METALICA, INCLUINDO PRIMER ANTI-

CORROSIVO, COM FORNECIMENTO DE MATERIALKG 16,40 21,76 20,89 27,71 22,01 29,20 21,41 28,40 21,52 28,55

94000 SERVICOS DE PROTENSAO PARA ESTRUTURAS DE CONCRETO

94001CONFECCAO E COLOCACAO DE CABOS HORIZONTAIS P/ PAREDES COM ATE 4 CORDOALHAS DE

ATE 15,2MM, INCLUINDO BAINHA E PURGADORESKG 13,06 17,33 13,65 18,11 13,80 18,31 13,72 18,20 13,73 18,21

94002CONFECCAO E COLOCACAO DE CABOS VERTICAIS P/ PAREDES COM ATE 4 CORDOALHAS DE ATE

15,2MM, INCLUINDO BAINHA E PURGADORESKG 12,73 16,89 13,32 17,67 13,47 17,87 13,39 17,76 13,40 17,78

94101PROTENSAO DE CABOS HORIZONTAIS P/ PAREDES, INCLUINDO ANCORAGEM, PROTENSAO,

INJECAO, DEMAIS SERVICOS, MATERIAIS E EQUIPAMENTOS NECESSARIOSCABO 556,39 738,11 578,42 767,33 583,94 774,65 581,00 770,75 581,54 771,47

94102PROTENSAO DE CABOS VERTICIAIS P/ PAREDES, INCLUINDO ANCORAGEM, PROTENSAO,

INJECAO, DEMAIS SERVICOS, MATERIAIS E EQUIPAMENTOS NECESSARIOSCABO 392,57 520,78 414,60 550,01 420,12 557,33 417,18 553,43 417,72 554,15

99000 SERVICOS NAO CODIFICADOS

Página: 15 de 59

Page 16: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

99001 EXECUCAO DE SOLO-CIMENTO PARA REPAVIMENTACAO, C/ FORNEC. DO MAT. m3 241,50 320,37 272,32 361,26 280,07 371,54 275,96 366,09 276,68 367,04

99002 CONCRETO ARMADO PARA FUNDACOES m3 1.356,63 1.799,71 1.565,69 2.077,04 1.617,86 2.146,25 1.590,80 2.110,36 1.595,83 2.117,03

99003 EXECUCAO DE SOLO-CIMENTO PARA REVESTIMENTO DE TALUDE TRACO 1.10 m2 21,25 28,19 23,96 31,79 24,65 32,70 24,28 32,21 24,35 32,30

99015 LIXAMENTO DE FERRAGEM m2 3,95 5,24 5,47 7,26 5,85 7,76 5,65 7,50 5,68 7,54

99016 TRATAMENTO DE FERRAGEM COM PRIMER A BASE DE ZINCO kg 43,94 58,29 56,08 74,40 59,12 78,43 57,50 76,28 57,80 76,68

99017 PONTE DE ADERENCIA COM ADESIVO EPOXI kg 51,61 68,47 63,75 84,57 66,79 88,60 65,17 86,45 65,47 86,85

99018 ARGAMASSA ADITIVADA COM LATEX SBR kg 2,70 3,58 2,91 3,86 2,96 3,93 2,93 3,89 2,94 3,90

99019 FORNECIMENTO E APLICACAO DE GROUT COM PEDRISCO m3 382,87 507,92 441,64 585,88 456,40 605,46 448,56 595,06 449,96 596,92

99020FORMA CURVA EM COMP. PLASTIFICADO P/ ESTRUTURAS REVESTIDA INTERNAMENTE COM

CHAPA ZINCADAm2 87,69 116,33 112,42 149,14 118,62 157,36 115,32 152,98 115,92 153,78

99021 EXECUCAO DE SOLO-CIMENTO PARA REVESTIMENTO DE TALUDE TRACO 1:6 m3 322,50 427,83 353,32 468,71 361,07 479,00 356,96 473,54 357,68 474,50

99022 EXECUCAO DE SOLO-CIMENTO PARA REVESTIMENTO DE TALUDE TRACO 1:6 ESP.8CM m2 28,38 37,65 31,09 41,24 31,77 42,15 31,41 41,67 31,48 41,76

99023 EXECUCAO DE SOLO-CIMENTO PARA REVESTIMENTO DE TALUDE TRACO 1:6 ESP.10CM m2 35,48 47,07 38,87 51,56 39,72 52,69 39,27 52,10 39,34 52,19

99025 EXECUCAO DE SOLO-CIMENTO PARA REVESTIMENTO DE TALUDE TRACO 1:4 m3 393,24 521,67 424,06 562,56 431,81 572,84 427,70 567,39 428,42 568,34

99026 EXECUCAO DE SOLO-CIMENTO PARA REVESTIMENTO DE TALUDE TRACO 1:4 ESP.8CM m2 34,61 45,91 37,32 49,51 38,00 50,41 37,64 49,93 37,70 50,01

99027 EXECUCAO DE SOLO-CIMENTO PARA REVESTIMENTO DE TALUDE TRACO 1:4 ESP.10CM m2 43,26 57,39 46,65 61,89 47,50 63,01 47,05 62,42 47,13 62,52

99050 FORMA PLANA EM COMP. PLASTIFICADO P/ MURETA m2 105,00 139,29 122,80 162,91 127,26 168,82 124,89 165,68 125,32 166,25

99501 FORMA PLANA EM CHAPA DE MADEIRA COMPENSADA PLASTIFICADA E=18MM m2 59,72 79,22 68,51 90,89 70,71 93,80 69,53 92,24 69,75 92,53

99503FORNECIMENTO, MONTAGEM E ASSENTAMENTO DE ESCADA DE MARINHEIRO EM FIBRA DE

VIDR0 CONFORME PROJETOun 182.087,95 241.557,87 182.087,95 241.557,87 182.087,95 241.557,87 182.087,95 241.557,87 182.087,95 241.557,87

99504 FORNEC. E INST. DE JUNTA SIM. FUGENBAND 0-22 M 167,00 221,54 183,49 243,42 187,62 248,90 185,42 245,98 185,82 246,51

99510 FORNEC. E INST. DE JUNTA SIM. FUGENBAND 0-35/10 M 535,15 709,93 554,68 735,84 559,57 742,33 556,96 738,86 557,44 739,50

99553 PECAS DE DESGASTE DO BRITADOR 80M3/H CJH 159,37 211,42 159,37 211,42 159,37 211,42 159,37 211,42 159,37 211,42

99555 LIMPEZA CAMADA VEGETAL EM JAZIDA (CONST. E RESTR.) M3 0,86 1,14 0,92 1,22 0,94 1,25 0,92 1,22 0,92 1,22

99556 EXPURGO DE JAZIDA (CONSV) M3 4,66 6,18 4,98 6,61 5,05 6,70 5,01 6,65 5,02 6,66

99560 AREIA EXTRAIDA C/ ESCAVADEIRA HIDRAULICA M3 8,44 11,20 9,01 11,95 9,15 12,14 9,07 12,03 9,08 12,05

99561 ROCHA P/ BRITAGEM COM PERFURATRIZ MANUAL M3 25,42 33,72 26,38 35,00 26,61 35,30 26,47 35,12 26,49 35,14

99587 PEDRA DE MAO PRODUZIDA DE JAZIDA (DIST MAX TRANSP 10KM) M3 28,75 38,14 29,88 39,64 30,16 40,01 30,01 39,81 30,03 39,84

99590EXEC. DE TRANSICAO EM BRITA P/ RIP-RAP E DRENOS C/ FORNEC. DE MAT.,INCL. LANC. E

COMPACTACAOM3 48,27 64,03 50,14 66,52 50,65 67,19 50,42 66,89 50,45 66,93

99601 FORNECIMENTO DE AGUA (DMT=2KM) M3 6,72 8,91 6,72 8,91 6,72 8,91 6,72 8,91 6,72 8,91

99603 CARGA, DESCARGA E TRANSPORTE DE ROCHA DETONADA DMT=2,0KM (ME M3 2,01 2,67 2,07 2,75 2,09 2,77 2,08 2,76 2,08 2,76

99618 TRATAMENTO DA FUNDACAO EM ROCHA P/ ESTRUTURA DE CONCRETO m2 35,77 47,45 47,58 63,12 50,56 67,07 48,97 64,96 49,25 65,34

99619EXEC. DE FILTRO VERTICAL OU INCLINADO DE AREIA, C/FORNEC. DE MAT., INCL. LANC.,

ESPALHAMENTO E COMPACTACAOm3 30,07 39,89 30,73 40,77 30,90 40,99 30,80 40,86 30,80 40,86

99621ESCAVACAO EM 3A CAT (FUNDACAO EM BARRAGEM, SANGRADOURO E PEDREIRA) USO DE

PERFURATRIZ SOBRE CARRETA (MEDICAO IN SITU)m3 101,65 134,85 103,05 136,71 103,40 137,17 103,22 136,93 103,25 136,97

99622 TRATAMENTO DA FUNDACAO EM ROCHA P/ ESTRUTURA DE CONCRETO m2 35,77 47,45 47,58 63,12 50,56 67,07 48,97 64,96 49,25 65,34

99623EXEC. DE FILTRO VERTICAL OU INCLINADO DE AREIA, C/FORNEC. DE MAT., INCL. LANC.,

ESPALHAMENTO E COMPACTACAOm3 39,03 51,78 43,01 57,06 44,12 58,53 43,61 57,85 43,70 57,97

99635 USINAGEM EM CENTRAL DE CONCRETO CONVENCIONAL (CCV) M3 15,69 20,81 16,67 22,11 16,92 22,45 16,80 22,29 16,81 22,30

99636 USINAGEM EM CENTRAL DE CONCRETO COMPACTADO COM ROLO (CCR) M3 15,03 19,94 15,62 20,72 15,77 20,92 15,69 20,81 15,71 20,84

99637 TRANSPORTE LOCAL C/ BETONEIRA EM RODOVIA NAO PAVIMENTADA TxKM 1,11 1,47 1,11 1,47 1,11 1,47 1,11 1,47 1,11 1,47

99638 ESCAV. E CARGA DE AREIA DE JAZIDA, C/ TRANSPORTE C/ DMT=21,5 M3 22,27 29,54 22,61 29,99 22,70 30,11 22,64 30,03 22,64 30,03

99640 TRANSPORTE LOCAL C/ BASCULANTE P/ ROCHA EM RODOVIA NAO PAVIM TxKM 0,51 0,68 0,51 0,68 0,51 0,68 0,51 0,68 0,51 0,68

99647 APLICACAO DE CCR M3 9,77 12,96 10,39 13,78 10,54 13,98 10,46 13,88 10,47 13,89

99649 LANCAMENTO E ADENSAMENTO DE CONCRETO CONVENCIONAL M3 17,69 23,47 26,06 34,57 28,16 37,36 27,05 35,88 27,24 36,14

99670 HIDROSSEMEADURA m2 0,80 1,06 0,80 1,06 0,80 1,06 0,80 1,06 0,80 1,06

99671ESCAVACAO EM PEDREIRA, INCLUSIVE CARGA, TRANSPORTE E DESCARGA DO MATERIAL

ROCHOSO, COM DMT=3,00KMm3 122,33 162,28 123,16 163,38 123,36 163,65 123,25 163,50 123,27 163,53

99672 INJECAO DE BETONITA, INCLUSIVE FORNECIMENTO DE MATERIAIS kg 26,81 35,57 28,72 38,10 29,20 38,74 28,95 38,41 28,99 38,46

99673 EXECUCAO DOS DRENOS PROFUNDOS DN 3", CONFORME PROJETO m 79,92 106,02 79,92 106,02 79,92 106,02 79,92 106,02 79,92 106,02

99674EXEC. DE RECOMPOSICAO DE CAMADA DE TRANSICAO EM CASCALHO NA PRE-ENSECADEIRA DE

MONTANTE, C. DE MAT.,INCL. LANC. E COMPACTACAOm3 48,27 64,03 50,14 66,52 50,65 67,19 50,42 66,89 50,45 66,93

99675MONTAGEM DE COMPORTA TIPO STOP-LOG COM ABERTURA LIVRE DE LxH=4,00m x 3,00 x

Hs=19,44m.c.a x HCONCRETO= 20,00Mun 23.978,80 31.810,28 31.863,28 42.269,83 33.862,08 44.921,44 32.799,12 43.511,31 32.987,00 43.760,55

99676MONTAGEM DE GRADE METALICA VERTICAL MOVEL COM ABERTURA LIVRE DE LxH=4,00m x 3,00

x Hs=3,00m.c.a x HCONCRETO= 20,00Mun 11.596,00 15.383,25 15.182,40 20.140,97 16.100,96 21.359,53 15.612,32 20.711,30 15.698,64 20.825,82

99677MONTAGEM, INSTALACAO E CALIBRACAO DE VALVULA DISPERSORA TIPO "HOWELL BUNGER"

DN500x18,69m.c.a, CONFORME PROJETOun 26.596,00 35.282,25 35.017,96 46.454,83 37.150,68 49.284,09 36.015,92 47.778,72 36.217,16 48.045,68

99678MONTAGEM E INSTALACAO DE TALHA MANUAL E TROLLEY MECANICO, CAPACIDADE 3,0T,

ALTURA DE ELEVACAO DE 25,00Mun 3.157,82 4.189,16 3.552,38 4.712,59 3.651,26 4.843,76 3.598,70 4.774,04 3.607,82 4.786,13

99684CONCRETO COMPACTADO C/ ROLO USINADO, CONS. MIN. CIMENTO 120KG/M3, COM BRITA

PROVENIENTE DA PEDREIRA (DMT=2KM), INCL. LANCAMENTO, FORNEC. MAT. PRODUCAO,

ESPALHAM., ADENS. E CURA, SEM FORNEC. DA BRITA

m3 148,67 197,23 152,24 201,96 153,20 203,24 152,74 202,62 152,82 202,73

99685CONCRETO CONVENCIONAL FCK=15MPA BRITA DA BRITAGEM DA PEDREIRA, AREIA COMERCIAL

DMT=2,0KM, SEM FORNEC. DA BRITAm3 232,70 308,70 236,06 313,16 236,96 314,35 236,52 313,77 236,60 313,87

99686

EXEC. DE ATERRO COMPACTADO DO MACICO OU ENSECADEIRA INCL. TRATAMENTO DAS

LIGACOES DE CAMADAS, COM FORNEC. DE AGUA, HOMOGENEIZACAO E/OU AERACAO

DMT=2,0KM (MEDICAO PELA SECAO DE PROJETO OU ENSECADEIRA)

m3 3,27 4,34 3,41 4,52 3,44 4,56 3,42 4,54 3,42 4,54

99687CONCRETO CONVENCIONAL FCK=20MPA BRITA DA BRITAGEM DA PEDREIRA, AREIA COMERCIAL

DMT=2,0KM, SEM FORNEC. DA BRITAm3 283,46 376,04 286,82 380,50 287,72 381,69 287,28 381,11 287,36 381,21

99688CONCRETO CONVENCIONAL FCK=30MPA BRITA DA BRITAGEM DA PEDREIRA, AREIA COMERCIAL

DMT=2,0KM, SEM FORNEC. DA BRITAm3 389,30 516,45 392,66 520,90 393,56 522,10 393,12 521,51 393,20 521,62

99689CONCRETO C/ CONSUMO MIN. DE CIMENTO DE 300Kg/m3, PRODUZIDO EM CENTRALINCL.

FORNEC. DE MAT., PRODUCAO, LANC., ADENS. E CUR, SEM FORNEC. DA BRITAm3 275,90 366,01 279,26 370,47 280,16 371,66 279,72 371,08 279,80 371,18

99690CONCRETO C/ CONSUMO MIN. DE CIMENTO DE 250Kg/m3, PRODUZIDO EM CENTRALINCL.

FORNEC. DE MAT., PRODUCAO, LANC., ADENS. E CURA, SEM FORNEC. DA BRITAm3 248,90 330,19 252,26 334,65 253,16 335,84 252,72 335,26 252,80 335,36

99691CONCRETO COMPACTADO C/ ROLO USINADO, CONS. MIN. CIMENTO 100KG/M3, COM BRITA

PROVENIENTE DA PEDREIRA (DMT=2KM), INCL. LANCAMENTO, FORNEC. MAT. PRODUCAO,

ESPALHAMENTO, ADENS. E CUR, SEM FORNEC. DA BRITA

m3 137,87 182,90 141,44 187,63 142,40 188,91 141,94 188,30 142,02 188,40

99698 ESCAV. E CARGA DE AREIA DE JAZIDA, C/ TRANSPORTE C/ DMT=3,00 8,95 11,87 9,29 12,32 9,38 12,44 9,32 12,36 9,32 12,36

99699 AREIA PRODUZIDA EM CENTRAL DE BRITAGEM 80M3/H COM ROCHA PROV 37,98 50,38 40,13 53,24 40,67 53,95 40,39 53,58 40,43 53,63

99707 FORMA CURVA EM CHAPA DE MADEIRA COMPENSADA RESINADA 21MM, PA 31,41 41,67 41,96 55,66 44,60 59,17 43,18 57,28 43,45 57,64

99501 FORMA PLANA EM CHAPA DE MADEIRA COMPENSADA PLASTIFICADA E=18MM.(84222-SINAPI m2 59,72 79,22 68,51 90,89 70,71 93,80 69,53 92,24 69,75 92,53

99501FORMA PLANA EM CHAPA DE MADEIRA COMPENSADA PLASTIFICADA E=18MM.(84222-SINAPI m2 59,72 79,22 68,51 90,89 70,71 93,80 69,53 92,24 69,75 92,53

99502

FORNEC, INST E LEITURA DE QUATORZE PIEZOMETROS ELETRICOS INCL LEITORA, CABOS E

ACESSORIOS, 8 MEDIDORES TRIORTOGONAIS ELETRICOS, 3 MEDIDORES DE VAZAO ELETRICOSun 163.840,79 217.351,19 163.840,79 217.351,19 163.840,79 217.351,19 163.840,79 217.351,19 163840,79 217.351,19

99513FORMA PARA PARAMENTOS DE BARRAGENS EM CONCRETO ROLADO (COMPENSADO 18MM) m2 43,23 57,35 53,12 70,47 55,60 73,76 54,28 72,01 54,52 72,33

99559 AREIA PROVENIENTE DE JAZIDA (DIST MAX TRANSP 10KM) m3 24,84 32,95 24,97 33,13 25,10 33,30 25,10 33,30 25,1 33,30

99575CONCRETO C/ CONSUMO MIN. DE CIMENTO DE 150Kg/m3, PRODUZIDO EM CENTRALINCL.

FORNEC. DE MAT., PRODUCAO, LANC., ADENS. E CURAm3 237,21 314,68 274,12 363,65 283,49 376,08 278,57 369,55 279,44 370,71

99589EXEC. DE ENROCAMENTO P/ RIP-RAP, DRENO DE PE E CANAL DE RESTITUICAO, C/ FORNEC. DO

MAT. C/ PEDRA PROVENIENTE DE JAZIDAm3 40,32 53,49 41,88 55,56 42,32 56,14 42,13 55,89 42,15 55,92

99591EXEC. DE TRANSICAO EM AREIA P/ RIP-RAP E DRENOS C/ FORNEC. DE MAT.,INCL. LANC. E

COMPACTACAOm3 41,92 55,61 45,97 60,98 47,16 62,56 46,65 61,89 46,74 62,01

99602ESCAVACAO EM 3A CAT (EM PEDREIRA, VERTEDOURO, CANAL DE DESVIO) USO DE PERFURATRIZ

SOBRE CARRETA (MEDICAO IN SITU)m3 96,03 127,39 96,41 127,90 96,51 128,03 96,45 127,95 96,46 127,96

99604ESCAVACAO CUIDADOSA EM ROCHA, 3ª CAT., COM USO DE EXPLOSIVO, 0,40KG/M, COM MALHA

ADENSADA E USO PERFURATRIZ, COM CARGA, TRANSPORTE E DESCARGA, P/ APROVEITAMENTO

NA OBRA (BRITAGEM/ENROCAM.), DMT=1,5KM

m3 39,51 52,41 41,81 55,47 42,39 56,23 42,09 55,84 42,14 55,90

99604

ESCAVACAO CUIDADOSA EM ROCHA, 3ª CAT., COM USO DE EXPLOSIVO, 0,40KG/M, COM MALHA

ADENSADA E USO PERFURATRIZ, COM CARGA, TRANSPORTE E DESCARGA, P/ APROVEITAMENTO

NA OBRA (BRITAGEM/ENROCAM.), DMT=1,5KM

m3 39,51 52,41 41,81 55,47 42,39 56,23 42,09 55,84 42,14 55,90

99606

BRITA PRODUZIDA EM CENTRAL DE BRITAGEM 80M3/H COM ROCHA PROVENIENTE DA

EXPLORACAO DE PEDREIRA. DMT=2,0KM DA CENTRAL DE BRITAGEMm3 40,45 53,66 42,60 56,51 43,14 57,23 42,86 56,86 42,9 56,91

99615

ARGAMASSA C/ CONSUMO DE CIMENTO DE 350 kg/m3, P/ JUNTAS DE CAMADAS DE CONCRETO

ROLADO (SELO) E P/ BERCO (CONTATO C/ A FUNDACAO), INCL. FORNEC. DE MAT., PRODUCAO,

LANC. E ESPALHAM.

m3 314,89 417,73 320,06 424,59 321,46 426,45 320,78 425,55 320,91 425,72

99618 TRATAMENTO DA FUNDACAO EM ROCHA P/ ESTRUTURA DE CONCRETO m2 35,77 47,45 47,58 63,12 50,56 67,07 48,97 64,96 49,25 65,3499618 TRATAMENTO DA FUNDACAO EM ROCHA P/ ESTRUTURA DE CONCRETO m2 35,77 47,45 47,58 63,12 50,56 67,07 48,97 64,96 49,25 65,34

99619EXEC. DE FILTRO VERTICAL OU INCLINADO DE AREIA, C/FORNEC. DE MAT., INCL. LANC.,

ESPALHAMENTO E COMPACTACAOm3 30,07 39,89 30,73 40,77 30,90 40,99 30,80 40,86 30,8 40,86

99619EXEC. DE FILTRO VERTICAL OU INCLINADO DE AREIA, C/FORNEC. DE MAT., INCL. LANC.,

ESPALHAMENTO E COMPACTACAOm3 30,07 39,89 30,73 40,77 30,90 40,99 30,80 40,86 30,8 40,86

Página: 16 de 59

Page 17: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

99624

BRITA PRODUZIDA EM CENTRAL DE BRITAGEM 80M3/H COM ROCHA PROVENIENTE DA

EXPLORACAO DE PEDREIRA COM USO DE PERFURATRIZ, DMT=2,0KM DA CENTRAL DE BRITAGEMM3 76,49 101,47 78,12 103,63 78,52 104,16 78,32 103,90 78,35 103,94

99630 ABAFAMENTO COM MANTA DE BORRACHA BLASMAT E=30CM M2 67,77 89,90 70,36 93,34 71,03 94,23 70,68 93,76 70,74 93,84

99631ABAFAMENTO DE AREA DE DETONACAO COM USO DE CAMADA DE AREIA (03), COM ALTURA DE

1,00M, ENTRE AS MANTAS GEOTEXTILM2 71,19 94,44 75,13 99,67 76,18 101,06 75,65 100,36 75,73 100,46

99632 DESMONTE DE ROCHA A FRIO DN 1,00M, COM UTILIZACAO DE ROMPEDOR HIDRAULICO M2 26,25 34,82 27,58 36,59 27,92 37,04 27,74 36,80 27,77 36,84

99633 FORCIMENTO E ASSENTAMENTO DE MANTA GEOTEXTIL RT-31 OU EQUIVALENTE M2 16,24 21,54 16,93 22,46 17,10 22,68 17,01 22,57 17,02 22,58

99641 RECOMPOSICAO DE ENROCAMENTO NA ENSECADEIRA (PRE-ENSECADEIRA DE MONTANTE) M3 6,69 8,87 6,83 9,06 6,86 9,10 6,84 9,07 6,85 9,09

99646FORNECIMENTO, DOSAGEM, PRODUCAO, TRANSPORTE, ADENSAMENTO, CURA, REPARO E

CONTROLE DE QUALIDADE DO CONCRETO ROLADO (CCR), C/ FCK=6MPa, AOS 180 DIAS, JAZIDA

DE AREIA A 21,5KM

M3 145,87 193,51 149,27 198,02 150,13 199,16 149,67 198,55 149,74 198,65

99648FORNECIMENTO, DOSAGEM, PRODUCAO, TRANSPORTE, ADENSAMENTO, CURA, PREPARO E

CONTROLE DE QUALIDADE DO CONCRETO CONVENCIONAL LATERALA GALERIA DE DRENAGEM,

C/ FCK=9MPa

M3 156,86 208,09 167,18 221,78 169,77 225,22 168,41 223,41 168,63 223,70

99650FORNECIMENTO, DOSAGEM, PRODUCAO, TRANSPORTE, ADENSAMENTO, CURA, PREPARO E

CONTROLE DE QUALIDADE DO CONCRETO CONVENCIONAL LATERALA GALERIA DE DRENAGEM,

C/ FCK=15MPa

M3 262,11 347,72 273,74 363,14 276,66 367,02 275,13 364,99 275,38 365,32

99651FORNECIMENTO, LANCAMENTO E ADENSAMENTO DE CONCRETO USINADO E BOMBEADO,

FCK=30MPaM3 328,24 435,44 342,47 454,32 346,04 459,06 344,15 456,55 344,48 456,99

99652FORNECIMENTO, LANCAMENTO E ADENSAMENTO DE CONCRETO USINADO E BOMBEADO,

FCK=30MPa AOS 28 DIAS, COM JAZIDA DE AREIA A 21,5KM E BRITA DE CENTRAL DE BRITAGEMM3 288,78 383,10 300,40 398,51 303,32 402,38 301,79 400,35 302,04 400,69

99653FORNECIMENTO, LANCAMENTO E ADENSAMENTO DE CONCRETO USINADO E BOMBEADO,

FCK=30MPaM3 211,31 280,32 223,09 295,95 226,06 299,89 224,49 297,81 224,75 298,15

99655 BASE PARA PAVIMENTACAO COM BRITA CORRIDA, INCLUSIVE COMPACTACAO M3 59,94 79,52 63,13 83,75 63,93 84,81 63,52 84,27 63,58 84,35

99656FORNEC. E ASSENT. DE CALHAS DE CORTE PRE-MOLDADA DE CONCRETO DN=400, INCLUSIVE

ESCAV. MECANICA DE 1ª CAT., REATERRO E COMPACTACAO DA VALAm 39,98 53,04 44,15 58,57 45,20 59,96 44,64 59,22 44,74 59,35

99657FORNEC. E ASSENT. DE CALHAS DE CORTE PRE-MOLDADA DE CONCRETO DN=800, INCLUSIVE

ESCAV. MECANICA DE 1ª CAT., REATERRO E COMPACTACAO DA VALAm 107,14 142,13 118,23 156,84 121,02 160,55 119,54 158,58 119,8 158,93

99658FORNECIMENTO, DOSAGEM, PRODUCAO, TRANSPORTE, ADENSAMENTO, CURA, REPARO E

CONTROLE DE QUALIDADE DO CONCRETO CONVENCIONAL DE REGULARIZACAO, C/ FCK=15MPaM3 247,50 328,33 259,16 343,80 262,10 347,70 260,56 345,66 260,8 345,98

99659 ARGAMASSA DE BERCO E SELO (CIMENTO/AREIA GROSSA) TR. 1:3 m3 345,58 458,45 369,80 490,58 375,90 498,67 372,65 494,36 373,22 495,11

99660FORNECIMENTO, DOSAGEM, PRODUCAO, TRANSPORTE, ADENSAMENTO, CURA, PREPARO E

CONTROLE DE QUALIDADE DO CONCRETO ROLADO (CCR), C/ FCK=6MPa, AOS 180 DIAS, JAZIDA

DE AREIA A 7,5KM

M3 141,93 188,28 145,58 193,13 146,58 194,45 146,11 193,83 146,18 193,92

99661ARGAMASSA DE SELO COM RESISTENCIA MINIMA DE 12MPa AOS 90 DIAS, COM AREIA ARTIFICIAL

(CIMENTO/AREIA GROSSA) TR. 1:3m3 364,44 483,47 390,83 518,48 397,46 527,27 393,95 522,61 394,57 523,44

99662ESCAVACAO EM FUNDACAO DE MATERIAL DE 2ª CATEGORIA, INCLUSIVE CARGA, DESCARGA,

TRANSPORTE E DESCARGA DE MATERIAIS E TRATAMENTO EM BOTA-FORA, COM DMT=1,50KMm3 15,64 20,75 16,81 22,30 17,11 22,70 16,95 22,49 16,98 22,53

99663ESCAVACAO EM FUNDACAO DE MATERIAL DE 2ª CATEGORIA, INCLUSIVE CARGA, DESCARGA,

TRANSPORTE E DESCARGA DE MATERIAIS E TRATAMENTO EM BOTA-FORA, COM DMT=1,00KMm3 15,40 20,43 16,57 21,98 16,87 22,38 16,71 22,17 16,74 22,21

99664ESCAVACAO EM FUNDACAO DE MATERIAL DE 1ª CATEGORIA, INCLUSIVE CARGA, DESCARGA,

TRANSPORTE E DESCARGA DE MATERIAIS E TRATAMENTO EM BOTA-FORA, COM DMT=1,50KMm3 12,26 16,26 12,38 16,42 12,41 16,46 12,39 16,44 12,4 16,45

99665REMOCAO DA ENSECADEIRA (ESCAV. EM MATERIAL DE 1ª CATEGORIA, INCLUSIVE CARGA,

DESCARGA, TRANSPORTE E DESCARGA DE MATERIAIS E TRATAMENTO EM BOTA-FORA, COM

DMT=1,50KM

m3 11,81 15,67 11,93 15,83 11,96 15,87 11,94 15,84 11,95 15,85

99666 ATERRO COMPACTADO COM CONTROLE, COM ESCALONAMENTO m3 38,25 50,74 39,51 52,41 39,83 52,84 39,65 52,60 39,67 52,63

99667EXECUCAO DE ATERRO COMPACTADO, INCLUSIVE TRATAMENTO DE LIGACAO ENTRE CAMADAS,

COM JAZIDA DMT=3,0KM, HOMOGENEIZACAO, UMEDECIMENTO OU AERACAOm3 21,49 28,51 22,23 29,49 22,43 29,76 22,31 29,60 22,32 29,61

99670 HIDROSSEMEADURA M2 0,80 1,06 0,80 1,06 0,80 1,06 0,80 1,06 0,8 1,0699670 HIDROSSEMEADURA M2 0,80 1,06 0,80 1,06 0,80 1,06 0,80 1,06 0,8 1,06

99671ESCAVACAO EM PEDREIRA, INCLUSIVE CARGA, TRANSPORTE E DESCARGA DO MATERIAL

ROCHOSO, COM DMT=3,00KMm3 122,33 162,28 123,16 163,38 123,36 163,65 123,25 163,50 123,27 163,53

99671ESCAVACAO EM PEDREIRA, INCLUSIVE CARGA, TRANSPORTE E DESCARGA DO MATERIAL

ROCHOSO, COM DMT=3,00KMm3 122,33 162,28 123,16 163,38 123,36 163,65 123,25 163,50 123,27 163,53

99672 INJECAO DE BETONITA, INCLUSIVE FORNECIMENTO DE MATERIAIS KG 26,81 35,57 28,72 38,10 29,20 38,74 28,95 38,41 28,99 38,4699672 INJECAO DE BETONITA, INCLUSIVE FORNECIMENTO DE MATERIAIS KG 26,81 35,57 28,72 38,10 29,20 38,74 28,95 38,41 28,99 38,46

99673 EXECUCAO DOS DRENOS PROFUNDOS DN 3", CONFORME PROJETO M 79,92 106,02 79,92 106,02 79,92 106,02 79,92 106,02 79,92 106,0299673 EXECUCAO DOS DRENOS PROFUNDOS DN 3", CONFORME PROJETO M 79,92 106,02 79,92 106,02 79,92 106,02 79,92 106,02 79,92 106,02

99674EXEC. DE RECOMPOSICAO DE CAMADA DE TRANSICAO EM CASCALHO NA PRE-ENSECADEIRA DE

MONTANTE, C. DE MAT.,INCL. LANC. E COMPACTACAOm3 48,27 64,03 50,14 66,52 50,65 67,19 50,42 66,89 50,45 66,93

99674EXEC. DE RECOMPOSICAO DE CAMADA DE TRANSICAO EM CASCALHO NA PRE-ENSECADEIRA DE

MONTANTE, C. DE MAT.,INCL. LANC. E COMPACTACAOm3 48,27 64,03 50,14 66,52 50,65 67,19 50,42 66,89 50,45 66,93

99675MONTAGEM DE COMPORTA TIPO STOP-LOG COM ABERTURA LIVRE DE LxH=4,00m x 3,00 x

Hs=19,44m.c.a x HCONCRETO= 20,00MUNID 23.978,80 31.810,28 31.863,28 42.269,83 33.862,08 44.921,44 32.799,12 43.511,31 32987 43.760,55

99676MONTAGEM DE GRADE METALICA VERTICAL MOVEL COM ABERTURA LIVRE DE LxH=4,00m x 3,00

x Hs=3,00m.c.a x HCONCRETO= 20,00MUNID 11.596,00 15.383,25 15.182,40 20.140,97 16.100,96 21.359,53 15.612,32 20.711,30 15698,64 20.825,82

99676MONTAGEM DE GRADE METALICA VERTICAL MOVEL COM ABERTURA LIVRE DE LxH=4,00m x 3,00

x Hs=3,00m.c.a x HCONCRETO= 20,00MUNID 11.596,00 15.383,25 15.182,40 20.140,97 16.100,96 21.359,53 15.612,32 20.711,30 15698,64 20.825,82

99677MONTAGEM, INSTALACAO E CALIBRACAO DE VALVULA DISPERSORA TIPO "HOWELL BUNGER"

DN500x18,69m.c.a, CONFORME PROJETOUNID 26.596,00 35.282,25 35.017,96 46.454,83 37.150,68 49.284,09 36.015,92 47.778,72 36217,16 48.045,68

99677MONTAGEM, INSTALACAO E CALIBRACAO DE VALVULA DISPERSORA TIPO "HOWELL BUNGER"

DN500x18,69m.c.a, CONFORME PROJETOUNID 26.596,00 35.282,25 35.017,96 46.454,83 37.150,68 49.284,09 36.015,92 47.778,72 36217,16 48.045,68

99678MONTAGEM E INSTALACAO DE TALHA MANUAL E TROLLEY MECANICO, CAPACIDADE 3,0T,

ALTURA DE ELEVACAO DE 25,00MUNID 3.157,82 4.189,16 3.552,38 4.712,59 3.651,26 4.843,76 3.598,70 4.774,04 3607,82 4.786,13

99678MONTAGEM E INSTALACAO DE TALHA MANUAL E TROLLEY MECANICO, CAPACIDADE 3,0T,

ALTURA DE ELEVACAO DE 25,00MUNID 3.157,82 4.189,16 3.552,38 4.712,59 3.651,26 4.843,76 3.598,70 4.774,04 3607,82 4.786,13

99679EXECUCAO DE MONITORAMENTO SISMOGRAFICO DAS DETONACOES E CONFECCAO DE LAUDO

TECNICOUNID 7.633,39 10.126,46 7.633,39 10.126,46 7.633,39 10.126,46 7.633,39 10.126,46 7633,39 10.126,46

99680FORNEC. E INSTALACAO DE PIEZOMETRO DE TUBO ABERTO VERTICAIS, INCLUINDO

PERFURACAO, ENSAIOS DE PERDA D'AGUA, MANOMETRO (2KGF/CM2) E PECAS, CONFORME

PROJETO

UNID 3.189,86 4.231,67 3.189,86 4.231,67 3.189,86 4.231,67 3.189,86 4.231,67 3189,86 4.231,67

99681 FORNEC. E INSTALACAO DE MEDIDOR TRIORTOGONAL DE JUNTAS, CONFORME PROJETO UNID 1.966,73 2.609,06 1.966,73 2.609,06 1.966,73 2.609,06 1.966,73 2.609,06 1966,73 2.609,06

99682 CAIXA DE INSPECAO, CONFORME PROJETO UNID 100,09 132,78 100,09 132,78 100,09 132,78 100,09 132,78 100,09 132,78

99683FORNECIMENTO E INSTALACAO DE RESERVATORIO DE POLIETILENO CAPACIDADE DE 500L UNID 284,31 377,17 343,39 455,54 358,19 475,17 350,31 464,72 351,71 466,58

99750 CONSULTORIA GEOLOGICA E GEOTECNICA MES 8.882,10 11.782,99 14.253,30 18.908,43 15.598,80 20.693,37 14.882,40 19.742,99 15010,2 19.912,53

99751 CONSULTORIA EM CONCRETO EXCLUSIVE CONTROLE TECNOLOGICO MES 11.183,70 14.836,30 16.854,75 22.359,51 18.445,35 24.469,60 17.598,90 23.346,70 17749,05 23.545,89

99772

EXEC. DE ATERRO COMPACTADO DO MACICO OU ENSECADEIRA INCL. TRATAMENTO DAS

LIGACOES DE CAMADAS, COM FORNEC. DE AGUA, HOMOGENEIZACAO E/OU AERACAO

DMT=2,0KM (MEDICAO PELA SECAO DE PROJETO OU ENSECADEIRA)

M3 3,27 4,34 3,41 4,52 3,44 4,56 3,42 4,54 3,42 4,54

99774CONCRETO CONVENCIONAL FCK=30MPA BRITA DA BRITAGEM DA PEDREIRA, AREIA COMERCIAL

DMT=2,0KM, SEM FORNEC. DA BRITAM3 454,52 602,97 457,88 607,42 458,78 608,62 458,34 608,03 458,42 608,14

99776CONCRETO C/ CONSUMO MIN. DE CIMENTO DE 300Kg/m3, PRODUZIDO EM CENTRALINCL.

FORNEC. DE MAT., PRODUCAO, LANC., ADENS. E CUR, SEM FORNEC. DA BRITAM3 275,90 366,01 279,26 370,47 280,16 371,66 279,72 371,08 279,8 371,18

99778CONCRETO COMPACTADO C/ ROLO USINADO, CONS. MIN. CIMENTO 100KG/M3, COM BRITA

PROVENIENTE DA PEDREIRA (DMT=2KM), INCL. LANCAMENTO, FORNEC. MAT. PRODUCAO,

ESPALHAMENTO, ADENS. E CUR, SEM FORNEC. DA BRITA

M3 137,78 182,78 141,44 187,63 142,40 188,91 141,94 188,30 142,02 188,40

100000 CAIXAS, TAMPAS E POCOS DE VISITA

100100 POCOS DE VISITA / INSPECAO / LIMPEZA P/ S.E.S.'s E DRENAGEM

100101PV EM ANEL DE CONCRETO PRE-MOLDADO DN=0,60m, EM PROFUND. ATE 1,20m, C/ FORNEC.

MAT., S/ FORNEC.E ASSENT.DE TAMPAO (PV TIPO I) DP1001-01un 331,58 439,87 380,09 504,23 392,27 520,39 385,80 511,80 386,96 513,34

109101PV EM ANEL DE CONCRETO PRE-MOLDADO DN=0,60m, EM PROFUND. ATE 1,20m, C/ FORNEC.

MAT., S/ FORNEC.E ASSENT.DE TAMPAO (PV TIPO I) DP1001-01 (MRR / RMS)un 334,08 443,19 383,80 509,15 396,28 525,71 389,63 516,88 390,79 518,42

100104PV EM ANEL DE CONCRETO PRE-MOLDADO DN=0,80m, C/ LAJE DE RED., EM PROFUND. ATE

1,80m, C/ FORNEC.DO MAT., S/ FORNEC. E ASSENT. DE TAMPAO (PV TIPO II) DP1001-02un 950,32 1.260,69 1.037,43 1.376,25 1.059,30 1.405,27 1.047,68 1.389,85 1.049,75 1.392,60

109104PV EM ANEL DE CONCRETO PRE-MOLDADO DN=0,80m, C/ LAJE DE RED., EM PROFUND. ATE

1,80m, C/ FORNEC.DO MAT., S/ FORNEC. E ASSENT. DE TAMPAO (PV TIPO II) DP1001-02 (MRR /

RMS)

un 954,87 1.266,73 1.044,18 1.385,21 1.066,58 1.414,93 1.054,64 1.399,09 1.056,71 1.401,83

100107PV EM ANEL DE CONCRETO PRE-MOLDADO DN=1,10m, C/ LAJE DE RED., ENTRE PROFUND. DE

1,00 E 1,80m, C/ FORNEC. MAT., S/ FORNEC. E ASSENT. DE TAMPAO (PV TIPO III) DP1001-03un 1.060,08 1.406,30 1.152,42 1.528,80 1.175,55 1.559,48 1.163,25 1.543,17 1.165,47 1.546,11

109107PV EM ANEL DE CONCRETO PRE-MOLDADO DN=1,10m, C/ LAJE DE RED., ENTRE PROFUND. DE

1,00 E 1,80m, C/ FORNEC. MAT., S/ FORNEC. E ASSENT. DE TAMPAO (PV TIPO III) DP1001-03

(MRR / RMS)

un 1.065,39 1.413,35 1.160,09 1.538,98 1.183,88 1.570,54 1.171,18 1.553,69 1.173,43 1.556,67

Página: 17 de 59

Page 18: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

100110PV EM ANEL DE CONCRETO PRE-MOLDADO DN=1,10m,C/ LAJE DE RED.E CHAMINE ,ENTRE

PROFUND.DE 1,81 E 3,50m,C/ FORNEC. MAT.,S/ FORNEC.E ASSENT.DE TAMPAO (PV TIPO IV)

DP1001-04

un 1.807,19 2.397,42 1.958,45 2.598,08 1.996,40 2.648,42 1.976,20 2.621,63 1.979,86 2.626,48

109110PV EM ANEL DE CONCRETO PRE-MOLDADO DN=1,10m,C/ LAJE DE RED.E CHAMINE ,ENTRE

PROFUND.DE 1,81 E 3,50m,C/ FORNEC. MAT.,S/ FORNEC.E ASSENT.DE TAMPAO (PV TIPO IV)

DP1001-04 (MRR / RMS)

un 1.815,65 2.408,64 1.970,76 2.614,41 2.009,72 2.666,09 1.988,94 2.638,53 1.992,58 2.643,36

100113PV EM ANEL DE CONCRETO PRE-MOLDADO DN=1,10m,C/LAJE DE RED.E CHAMINE ,ENTRE

PROFUND.DE 3,51 E 5,00m,C/ FORNEC. MAT.,S/ FORNEC.E ASSENT.DE TAMPAO (PV TIPO V)

DP1001-05

un 2.863,84 3.799,17 3.150,62 4.179,61 3.222,48 4.274,94 3.184,22 4.224,19 3.191,12 4.233,34

109113PV EM ANEL DE CONCRETO PRE-MOLDADO DN=1,10m,C/LAJE DE RED.E CHAMINE ,ENTRE

PROFUND.DE 3,51 E 5,00m,C/ FORNEC. MAT.,S/ FORNEC.E ASSENT.DE TAMPAO (PV TIPO V)

DP1001-05 (MRR / RMS)

un 2.877,17 3.816,85 3.169,97 4.205,28 3.243,40 4.302,69 3.204,22 4.250,72 3.211,24 4.260,03

100116PV EM CONCRETO ARMADO "IN LOCO", SECAO INTERNA 1,10 X 1,10m, EM PROFUND. ATE 2,50m,

C/ FORNEC. MAT., S/ FORNEC. E ASSENT. DE TAMPAO (PV TIPO VI) DP1001-06un 1.768,20 2.345,69 2.054,20 2.725,10 2.125,91 2.820,23 2.088,08 2.770,05 2.095,09 2.779,35

100119PV EM CONCRETO ARMADO "IN LOCO", SECAO INTERNA 1,10X1,10m,C/CHAMINE E LAJE DE

RED.,ENTRE PROFUND.DE 2,51 E 4,50m, C/ FORN. MAT.,S/ FORNEC/ASSENT. TAMPAO (PV TIPO

VII) DP1001-07

un 2.969,67 3.939,56 3.403,29 4.514,80 3.511,96 4.658,97 3.454,39 4.582,59 3.464,96 4.596,62

100122PV EM CONCRETO ARMADO "IN LOCO", SECAO INTERNA 1,10X1,10m,C/CHAMINE E LAJE DE

RED.,ENTRE PROFUND.DE 4,51 E 6,00m,C/ FORNEC. MAT.,S/ FORNEC. E ASSENT. DE TAMPAO (PV

TIPO VII) DP1001-07

un 3.390,48 4.497,81 3.872,63 5.137,43 3.993,45 5.297,71 3.929,59 5.212,99 3.941,38 5.228,63

100125PV EM CONCRETO ARMADO "IN LOCO", SECAO INTERNA 1,30 X 1,30m, EM PROFUND. ATE 2,70m,

C/ FORNEC. MAT., S/ FORNEC. E ASSENT. DE TAMPAO (PV TIPO VI) DP1001-06un 2.327,89 3.088,18 2.700,47 3.582,44 2.793,83 3.706,29 2.744,56 3.640,93 2.753,72 3.653,08

100128PV EM CONCRETO ARMADO "IN LOCO", SECAO INTERNA 1,30X1,30m,C/CHAMINE E LAJE DE

RED.,ENTRE PROFUND.DE 2,71 E 4,50m, C/ FORNEC. DO MAT., S/ FORNEC. E ASSENT. DE

TAMPAO (PV TIPO VIII) DP1001-08

un 3.235,70 4.292,48 3.664,86 4.861,80 3.772,46 5.004,55 3.715,52 4.929,01 3.726,01 4.942,92

100131PV EM CONCRETO ARMADO "IN LOCO", SECAO INTERNA 1,30X1,30m,C/CHAMINE E LAJE DE

RED.,ENTRE PROFUND.DE 4,51 E 6,00m, C/ FORNEC. DO MAT., S/ FORNEC. E ASSENT. DE

TAMPAO (PV TIPO VIII)DP1001-08

un 4.035,97 5.354,12 4.616,59 6.124,37 4.762,14 6.317,45 4.685,18 6.215,36 4.699,41 6.234,24

100134PV EM CONCRETO ARMADO "IN LOCO", SECAO INTERNA 1,50X1,50m,C/CHAMINE E LAJE DE

RED.,ENTRE PROFUND.DE 2,71 E 4,50m, C/ FORNEC. DO MAT., S/ FORNEC. E ASSENT. DE

TAMPAO (PV TIPO VIII) DP1001-08

un 4.285,77 5.685,50 4.901,84 6.502,78 5.056,30 6.707,69 4.974,63 6.599,34 4.989,72 6.619,36

100137PV EM CONCRETO ARMADO "IN LOCO", SECAO INTERNA 1,50X1,50m,C/CHAMINE E LAJE DE

RED.,ENTRE PROFUND.DE 4,51 E 6,00m, C/ FORNEC. DO MAT.,S/ FORNEC. E ASSENT. DE

TAMPAO (PV TIPO VIII) DP1001-08

un 5.886,15 7.808,57 6.771,61 8.983,22 6.993,57 9.277,67 6.876,30 9.122,10 6.898,04 9.150,94

100138PV EM CONCRETO ARMADO "IN LOCO", SECAO INTERNA 1,50X1,50m,C/CHAMINE E LAJE DE RED.,

C/ PROFUND.ACIMA DE 6,00m, C/ FORNEC.DO MAT.,S/ FORNEC. E ASSENT. DE TAMPAO (PV TIPO

VIII) DP1001-09

un 6.941,13 9.208,10 8.005,09 10.619,55 8.271,78 10.973,34 8.130,92 10.786,48 8.157,06 10.821,16

100140PV EM ALVEN. DE TIJOLO MACICO DN=1,00m, EM PROFUND. ATE 1,80m, C/ FORNEC.DO MAT., S/

FORNEC. E ASSENT. DE TAMPAO (PV TIPO X) DP1001-10un 1.172,34 1.555,23 1.388,34 1.841,77 1.442,56 1.913,70 1.413,78 1.875,52 1.418,98 1.882,42

100143PV EM ALVEN. DE TIJOLO MACICO DN=1,00m, C/ CHAMINE EM ANEL DE CONCRETO PRE-

MOLD.,ENTRE PROFUND.1,81 E 2,50m,C/ FORNEC.DO MAT.,S/ FORNEC. E ASSENT. DE TAMPAO

(PV TIPO XI)DP1001-11

un 1.324,04 1.756,47 1.563,45 2.074,07 1.623,58 2.153,84 1.591,66 2.111,50 1.597,42 2.119,14

100146PV EM ALVEN. DE TIJOLO MACICO DN=1,20m, EM PROFUND. ATE 1,80m, C/ FORNEC. DO MAT., S/

FORNEC. E ASSENT. DE TAMPAO (PV TIPO X) DP1001-10un 1.436,50 1.905,66 1.694,68 2.248,16 1.759,43 2.334,06 1.725,07 2.288,48 1.731,30 2.296,74

100149PV EM ALVEN. DE TIJOLO MACICO DN=1,20m,C/ CHAMINE EM ANEL DE CONCRETO PRE-

MOLD.,ENTRE PROFUND.1,81 E 2,50m, C/ FORNEC.DO MAT.,S/ FORNEC. E ASSENT. DE

TAMPAO(PV TIPO XI) DP1001-11

un 1.595,79 2.116,98 1.879,65 2.493,54 1.950,89 2.588,05 1.913,06 2.537,87 1.919,89 2.546,93

100152PV EM ALVEN. DE TIJOLO MACICO DN=1,50m, EM PROFUND. ATE 1,80m, C/ FORNEC. DO MAT., S/

FORNEC. E ASSENT. DE TAMPAO (PV TIPO X) DP1001-10un 1.917,55 2.543,82 2.247,79 2.981,92 2.330,64 3.091,83 2.286,66 3.033,48 2.294,63 3.044,06

100155PV EM ALVEN. DE TIJOLO MACICO DN=1,50m, C/ CHAMINE EM ANEL DE CONCR.PRE-

MOLD.,ENTRE PROFUND.1,81 E 2,50m, C/ FORNEC. DO MAT.,S/ FORNEC. E ASSENT. DE TAMPAO

(PV TIPO XI) DP1001-11

un 2.082,73 2.762,95 2.440,24 3.237,22 2.530,02 3.356,32 2.482,35 3.293,09 2.490,98 3.304,53

100158POCO INSPECAO/LIMP. EM ALVEN. DE TIJOLO MACICO DN=0,60m, EM PROFUND. ATE 1,60m, C/

FORNEC. DO MAT., S/ FORNEC. E ASSENT. DE TAMPAO (PI TIPO I) DP1001-12un 652,16 865,16 771,25 1.023,14 801,12 1.062,77 785,25 1.041,71 788,14 1.045,55

100161POCO INSPECAO/LIMP. MAT.PLAST.,SIMILAR TIL RADIAL REDE/TIGRE DN

150mmXDL=200mm,C/TUBO PVC DN=200mm /L=6,00m,BERCO CONCRETO ,TAMPAO P/TIL

EMBUT.EM LAJE CONCR., C/ FORNEC.DO MAT., S/ FORNEC. ANEL

un 573,04 760,19 605,68 803,50 613,90 814,40 609,55 808,63 610,31 809,64

100164POCO INSPECAO/LIMP. MAT.PLAST.,SIMILAR TIL RADIAL REDE/TIGRE DN=150mmXDL=200mm,C/

TUBO PVC DN=200mm /L=6,00m,BERCO AREIA,TAMPAO P/TIL EMBUT.EM LAJE CONCR., C/

FORNE. DO MAT., S/ FORNEC.ANEL

un 514,75 682,87 533,38 707,58 538,08 713,82 535,60 710,53 536,02 711,08

100167POCO INSPECAO/LIMP. MAT.PLAST.,SIMILAR TIL RADIAL REDE/TIGRE

DN=300mmXDL=250mm,C/TUBO PVC DN=250mm /L=6,00m,BERCO CONCRETO , TAMPAO P/TIL

EMBUT.EM LAJE CONCR.C/ FORNEC. DO MAT., S/ FORNEC.ANEL

un 850,01 1.127,62 903,91 1.199,13 917,47 1.217,12 910,28 1.207,58 911,54 1.209,25

100170POCO INSPECAO/LIMP. MAT.PLAST.,SIMILAR TIL RADIAL REDE/TIGRE DN=300mmXDL=250mm,C/

TUBO PVC DN=250mm /L=6,00m,BERCO DE AREIA, TAMPAO P/TIL EMBUT.EM LAJE CONCR., C/

FORNEC. DO MAT.,S/ FORNEC.ANEL

un 791,72 1.050,30 831,61 1.103,21 841,65 1.116,53 836,33 1.109,48 837,25 1.110,70

100200 CAIXAS DE DESCARGAS / VENTOSAS / PROT. DE HIDROMETRO / REG. DE MANOBRA P/ S.A.A.'s

100201

CAIXA P/DESCARGA E/OU VENTOSA EM ALVEN.TIJOLO MACICO ,SECAO INTERNA

1,30x1,10m,h<=1,30m,P/LINHA PRINCIPAL.C/50mm<=DN<=300mm,S/FORNEC.MAT.HIDRAULICO

(CRV TIPO I) DP1002-01/02

un 1.093,13 1.450,15 1.328,93 1.762,96 1.388,13 1.841,49 1.356,80 1.799,93 1.362,50 1.807,49

100202

CAIXA P/DESCARGA E/OU VENTOSA EM ALVEN.TIJOLO MACICO ,SECAO INTERNA

1,30x1,30m,h<=1,30m,P/LINHA PRINCIPAL.C/50mm<=DN<=300mm,S/FORNEC.MAT.HIDRAULICO

(CRV TIPO I) DP1002-01/02

un 1.230,18 1.631,96 1.495,81 1.984,34 1.562,51 2.072,83 1.527,22 2.026,01 1.533,59 2.034,46

100204

CAIXA P/DESCARGA E/OU VENTOSA EM ALVEN.TIJOLO MACICO ,SECAO INTERNA

1,80x1,10m,h<=1,30m,P/LINHA PRINCIPAL.C/350mm<=DN<=500mm,S/FORNEC.MAT.HIDRAULICO

(CRV TIPO II) DP1002-01/02

un 1.366,89 1.813,32 1.660,70 2.203,08 1.734,42 2.300,88 1.695,40 2.249,12 1.702,46 2.258,48

100205

CAIXA P/DESCARGA E/OU VENTOSA EM ALVEN.TIJOLO MACICO ,SECAO INTERNA

1,20x1,25m,h<=2,00m,P/LINHA PRINCIPAL.C/350mm<=DN<=500mm,S/FORNEC.MAT.HIDRAULICO

(CRV TIPO II) DP1002-01/02

un 2.029,47 2.692,29 2.471,90 3.279,22 2.582,97 3.426,57 2.524,15 3.348,54 2.534,80 3.362,67

100207CAIXA P/DESCARGA E/OU VENTOSA, EM CONCRETO ARMADO, SECAO INTERNA 1,30 X 1,10 m,

h<=2,00m, P/ LINHA PRINCIPAL C/ 50mm<=DN<= 300mm, S/FORNEC. MAT.HIDRAULICO (CRV

TIPO III) DP1002-03/04

un 2.234,39 2.964,14 2.642,84 3.505,99 2.745,20 3.641,78 2.691,17 3.570,11 2.701,12 3.583,31

100208CAIXA P/DESCARGA E/OU VENTOSA, EM CONCRETO ARMADO,CIRCULAR, SECAO INTERNA 1,20m,

h<1,60m, C/ DN>400mm, S/FORNEC. MAT.HIDRAULICOun 893,82 1.185,74 1.069,84 1.419,25 1.113,96 1.477,78 1.090,64 1.446,84 1.094,93 1.452,53

100209CAIXA P/DESCARGA E/OU VENTOSA, EM CONCRETO ARMADO,CIRCULAR, SECAO INTERNA 1,00m,

h<1,30m, C/ DN>400mm, S/FORNEC. MAT.HIDRAULICOun 788,01 1.045,37 940,94 1.248,25 979,27 1.299,10 959,01 1.272,22 962,73 1.277,16

100210CAIXA P/DESCARGA E/OU VENTOSA, EM CONCRETO ARMADO, SECAO INTERNA 1,80 X 1,10m,

h<=2,00m, P/ LINHA PRINCIPAL C/350mm<=DN<=500mm, S/ FORNEC.MAT. HIDRAULICO (CRV

TIPO IV) DP1002-03/04

un 2.733,50 3.626,26 3.234,26 4.290,57 3.359,77 4.457,07 3.293,53 4.369,20 3.305,73 4.385,38

100213CAIXA P/DESCARGA E/OU VENTOSA, EM CONCRETO ARMADO, SECAO INTERNA 1,90 X 1,20m,

h<=2,30m, P/ LINHA PRINCIPAL C/600mm <=DN <=700mm, S/ FORNEC. MAT. HIDRAULICO (CRV

TIPO IV) DP1002-03/04

un 3.333,39 4.422,08 3.945,16 5.233,65 4.098,46 5.437,02 4.017,54 5.329,67 4.032,44 5.349,43

100216CAIXA P/DESCARGA E/OU VENTOSA, EM CONCRETO ARMADO, SECAO INTERNA 2,30X1,20m,

h<=2,70m, P/ LINHA PRINCIPAL C/ 800mm <=DN<=1000mm, S/ FORNEC.MAT. HIDRAULICO (CRV

TIPO VI) DP1002-03/04

un 4.282,95 5.681,76 5.073,16 6.730,05 5.271,20 6.992,77 5.166,67 6.854,10 5.185,91 6.879,63

100237CAIXA P/ REGISTRO DE MANOBRA C/ CABECOTE EM ALVEN.DE TIJOLO MACICO,P/LINHA

C/DN<=50mm,S/FORNEC. MAT.HIDRAULICO (CRM TIPO I) DP1002-10un 234,29 310,81 283,96 376,70 296,44 393,26 289,81 384,46 290,99 386,03

100240CAIXA P/ REGISTRO DE MANOBRA C/CABECOTE EM ALVEN. DE TIJOLO MACICO, P/ LINHA

C/75mm<=DN<=100mm, S/ FORNEC. MAT. HIDRAULICO (CRM TIPO II) DP1002-10un 349,69 463,90 424,10 562,61 442,77 587,38 432,88 574,26 434,67 576,63

100243CAIXA P/ REGISTRO DE MANOBRA C/CABECOTE EM ALVEN. DE TIJOLO MACICO,P/ LINHA

C/150mm<=DN<=200mm,S/ FORNEC. MAT. HIDRAULICO (CRM TIPO III) DP1002-10un 544,93 722,90 661,39 877,40 690,63 916,19 675,15 895,65 677,96 899,38

100300 CAIXA DE PASSAGEM / RECEPCAO / BOCA DE LOBO / LIGACAO PREDIAL P/ S.E.S's E DRENAGEM

100301CAIXA DE PASSAGEM/RECEPCAO EM ALVEN. DE TIJOLO MACICO, TAMPA EM CONCRETO ARMADO,

SECAO INTERNA 0,60 X 0,60m, h<=1,30 m (CP TIPO I/CR TIPO I) DP1003-01/02un 516,51 685,20 627,75 832,77 655,65 869,79 640,86 850,16 643,55 853,73

100302CAIXA DE PASSAGEM/RECEPCAO EM ALVEN. DE TIJOLO MACICO, TAMPA EM CONCRETO ARMADO,

SECAO INTERNA 0,70 X 0,70m, h<=0,80 m (CP TIPO I/CR TIPO I) DP1003-01/02un 451,51 598,97 545,00 723,00 568,44 754,09 556,03 737,63 558,31 740,65

100303CAIXA DE PASSAGEM/RECEPCAO EM ALVEN. DE TIJOLO MACICO, TAMPA EM CONCRETO ARMADO,

SECAO INTERNA 0,80 X 0,80m, h<=1,00 m (CP TIPO I/CR TIPO I) DP1003-01/02un 605,73 803,56 732,66 971,95 764,51 1.014,20 747,65 991,83 750,76 995,96

100304CAIXA DE PASSAGEM/RECEPCAO EM ALVEN. DE TIJOLO MACICO,TAMPA EM CONCRETO ARMADO,

SECAO INTERNA 0,80 X 0,80m, h<=1,30 m (CP TIPO II / CR TIPO II) DP1003-01/02un 714,97 948,48 868,02 1.151,52 906,41 1.202,44 886,09 1.175,49 889,80 1.180,41

100307CAIXA DE PASSAGEM/RECEPCAO EM ALVEN. DE TIJOLO MACICO, TAMPA EM CONCRETO ARMADO,

SECAO INTERNA 1,00 X 1,00m, h<=1,30 m (CP TIPO III / CR TIPO III) DP1003-01/02un 934,32 1.239,47 1.133,04 1.503,09 1.182,90 1.569,24 1.156,48 1.534,19 1.161,33 1.540,62

Página: 18 de 59

Page 19: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

100310CAIXA DE PASSAGEM/RECEPCAO EM ALVEN. DE TIJOLO MACICO , TAMPA EM CONCRETO

ARMADO, SECAO INTERNA 1,20 X 1,20m, h<=1,30 m (CP TIPO IV / CR TIPO IV) DP1003-01/02un 1.094,81 1.452,37 1.331,03 1.765,74 1.390,32 1.844,40 1.358,97 1.802,81 1.364,66 1.810,36

100313CAIXA DE RECEP.(BOCA DE LOBO) EM ALVEN.TIJOLO MACICO, P/ VIAS, C/GRELHA DE FºFº,SECAO

INTERNA 0,25x 0,85m,h<=1,30m,INCL.FORNEC.DO MAT.,S/FORNEC.DA GRELHA (CR TIPO V)

DP1003-03

un 368,34 488,64 455,71 604,54 477,64 633,64 465,99 618,18 468,11 620,99

100316CAIXA DE RECEP.(BOCA DE LOBO) EM ALVEN.DE TIJOLO MACICO,P/PASSEIO C/ TAMPA DE

CONCRETO ARMADO SECAOINTERNA 0,40x1,00m,h<=1,30m,INCL.FORNEC.DO MAT.(CR TIPO

VI)DP1003-04

un 528,03 700,48 648,92 860,86 679,26 901,11 663,18 879,77 666,10 883,65

100319CAIXA P/LIGACAO PREDIAL DE ESGOTO SANITARIO,PRE-MOLDADA DE CONCRETO ARMADO,

e=0,07m SECAO INTERNA 0,40X0,54m E h=0,40 m , S/ FORNEC. E ASSENT. DE TAMPA (CLP

TIPO I) DP1003-05

un 77,36 102,63 85,57 113,52 87,63 116,25 86,54 114,80 86,75 115,08

100322CAIXA P/LIGACAO PREDIAL DE ESGOTO SANITARIO,PRE-MOLDADA DE CONCRETO ARMADO,

e=0,07 m,SECAO INTERNA DE 0,40X0,54m E 0,41 m <= h < =0,80m, S/ FORNEC.E ASSENT.DE

TAMPA (CLP TIPO II) DP1003-05

un 133,32 176,86 147,40 195,54 150,91 200,20 149,07 197,76 149,43 198,23

100325CAIXA P/LIGACAO PREDIAL DE ESGOTO SANITARIO,PRE-MOLDADA DE CONCRETO ARMADO,

e=0,07 m, SECAO INTERNA DE 0,40X0,54m E 0,81 m <= h < =1,20m, S/ FORNEC.E ASSENT.DE

TAMPA (CLP TIPO III) DP1003-05

un 189,24 251,05 209,18 277,50 214,17 284,12 211,56 280,66 212,05 281,31

100327CAIXA P/LIGACAO PREDIAL DE ESGOTO SANITARIO, EM ANEL DE CONCRETO PRE MOLDADO

DN=0,40m, e=7cm, EM PROFUND. ATE 0,40m, INCL. TAMPA DE CONCR. ARMADO C/ e=0,07m (CLP

TIPO IV) DP1003-06

un 71,32 94,61 85,47 113,38 89,02 118,09 87,14 115,60 87,48 116,05

100328CAIXA P/LIGACAO PREDIAL DE ESGOTO SANITARIO, EM ANEL DE CONCRETO PRE MOLDADO

DN=0,40m, e=7cm, EM PROFUND. ATE 0,60m, INCL. TAMPA DE CONCR. ARMADO C/ e=0,07m (CLP

TIPO IV) DP1003-06

un 104,51 138,64 122,13 162,02 126,55 167,88 124,20 164,76 124,62 165,32

100329CAIXA P/LIGACAO PREDIAL DE ESGOTO SANITARIO, EM ANEL DE CONCRETO PRE MOLDADO

DN=0,40m, e=7cm, EM PROFUND. DE 0,60m ATE 0,80m INCL. TAMPA DE CONCR. ARMADO C/

e=0,07m (CLP TIPO IV) DP1003-06

un 143,88 190,87 167,75 222,54 173,73 230,47 170,56 226,26 171,12 227,01

109329CAIXA P/LIGACAO PREDIAL DE ESGOTO SANITARIO, EM ANEL DE CONCRETO PRE MOLDADO

DN=0,40m, e=7cm, EM PROFUND. DE 0,60m ATE 0,80m INCL. TAMPA DE CONCR. ARMADO C/

e=0,07m (CLP TIPO IV) DP1003-06 (MRR / RMS)

un 145,25 192,69 169,74 225,18 175,89 233,34 172,60 228,97 173,19 229,75

100330CAIXA P/LIGACAO PREDIAL DE ESGOTO SANITARIO, EM ANEL DE CONCRETO PRE MOLDADO

DN=0,60m, e=7cm, EM PROFUND. ATE 0,60m, INCL. TAMPA DE CONCR. ARMADO C/ e=0,07m (CLP

TIPO IV) DP1003-06

un 158,36 210,08 180,32 239,21 185,83 246,52 182,92 242,66 183,43 243,34

100331CAIXA P/LIGACAO PREDIAL DE ESGOTO SANITARIO, EM ANEL DE CONCRETO PRE MOLDADO

DN=0,60m, e=7cm, EM PROFUND. DE 0,61m ATE 0,80m, INCL. TAMPA DE CONCR. ARMADO C/

e=0,07m (CLP TIPO V) DP1003-06

un 207,63 275,44 234,38 310,93 241,11 319,86 237,56 315,15 238,19 315,98

100333CAIXA P/ LIGACAO PREDIAL DE ESGOTO SANITARIO, EM ANEL DE CONCRETO DN=0,60m,

e=10cm, EM PROFUND. DE 0,81m ATE 1,20m, INCL. TAMPA DE CONCR. ARMADO C/ e=0,07m

(CLP TIPO VI) DP1003-06

un 261,02 346,27 293,49 389,34 301,65 400,17 297,33 394,44 298,11 395,47

100334DISPOSITIVO DE PASSAGEM P/ESGOT.SANITARIO,SIMILAR TIL DE PASSAGEM REDE BBB JE

TIGRE,DN 200mm, C/ TUBO PVC DN150mm/L=6.00mm, TAMPAO P/ TIL DL 150mm, EMBUT.EM LAJE

DE CONCR., C/FORNEC. DO MAT. E ANEL

un 430,29 570,82 459,63 609,75 467,03 619,56 463,11 614,36 463,79 615,26

100337DISPOSITIVO DE PASSAGEM P/ ESGOT. SANITARIO, SIMILAR TIL DE PASSAGEM REDE BBB JE DA

TIGRE, DN 250mm,C/TUBO PVC 150m/L=6.00m, TAMPAO P/ TIL DL 150mm, EMBUT. EM LAJE

CONCR., C/FORNEC. DO MAT. E ANEL

un 483,34 641,20 519,59 689,29 528,68 701,35 523,84 694,93 524,75 696,13

100340DISPOSITIVO DE PASSAGEM P/ ESGOT. SANITARIO, SIMILAR TIL DE PASSAGEM REDE BBB JE

TIGRE, DN 100mm, C/ TUBO PVC DN100mm/L=6,00m,TAMPAO P/TIL DL100mm, EMBUT. EM LAJE

DE CONCR, C/ FORNEC. DO MAT. E ANEL

un 143,11 189,85 157,42 208,83 161,02 213,61 159,11 211,08 159,45 211,53

100344CAIXA P/LIGACAO PREDIAL DE ESGOTO SANITARIO,EM ALVENARIA DE TIJOLO MACICO, e=0,15m

SECAO INTERNA 0,40X0,54m E h=0,40 m , C/ FORNEC. E ASSENT. DE TAMPA DE CONCRETOun 246,14 326,53 290,21 384,99 301,27 399,66 295,42 391,90 296,50 393,34

100347CAIXA P/LIGACAO PREDIAL DE ESGOTO SANITARIO,EM ALVENARIA DE TIJOLO MACICO, e=0,15m

SECAO INTERNA 0,40X0,54m E 0.40<h<0,80 m , C/ FORNEC. E ASSENT. DE TAMPA DE

CONCRETO

un 333,20 442,02 395,35 524,47 410,94 545,15 402,70 534,22 404,22 536,24

100350CAIXA P/ LIGACAO PREDIAL DE ESGOTO SANITARIO, EM ANEL DE CONCRETO DN=0,80m,

e=10cm, EM PROFUND. DE 1,21m ATE 1,80m, INCL. TAMPA DE CONCR. ARMADO C/ e=0,10cm

(CLP TIPO VI) DP1003-06

un 831,19 1.102,66 888,60 1.178,82 902,99 1.197,91 895,34 1.187,76 896,70 1.189,56

100370RECUPERACAO DE PAREDE DE CAIXA P/LIGACAO PREDIAL DE ESGOTO SANITARIO,EM

ALVENARIA DE TIJOLO MACICO, e=0,15mm2 73,20 97,11 94,24 125,02 99,51 132,01 96,71 128,30 97,21 128,96

100372RECUPERACAO DE PAREDE DE CAIXA P/LIGACAO PREDIAL DE ESGOTO SANITARIO,EM

CONCRETO, e=0,07mm2 43,09 57,16 57,04 75,67 60,54 80,31 58,67 77,83 59,01 78,28

100373RECUPERACAO DE PAREDE DE CAIXA P/LIGACAO PREDIAL DE ESGOTO SANITARIO,EM

CONCRETO, e=0,10mm2 52,87 70,14 68,56 90,95 72,50 96,18 70,40 93,39 70,78 93,90

100374 RECUPERACAO DA ALMOFADA DA CAIXA P/LIGACAO PREDIAL DE ESGOTO SANITARIO un 18,66 24,75 25,32 33,59 26,99 35,80 26,10 34,62 26,26 34,84

100377EXECUCAO DE LIGACAO INTRA DOMICILIAR DE ESGOTO SANITARIO, EM RAMAL DE ESGOTO

EXISTENTE C/DN 100 A DN150mm TIPO SERRA-SERRAun 21,73 28,83 30,79 40,85 33,07 43,87 31,86 42,27 32,08 42,56

100380EXECUCAO DE LIGACAO INTRA DOMICILIAR CURTA INCLUINDO RECUPERACAO DA CAIXA,

EXECUCAO DA ALMOFADA E CHUMBAMENTO DA TUBULACAO E TAMPAun 45,97 60,98 63,84 84,69 68,32 90,63 65,94 87,48 66,37 88,05

100400 TAMPAS / TAMPOES / GRELHAS

100401EXEC. E ASSENT. DE TAMPA CIRCULAR EM CONCRETO ARMADO P/ VISITA, C/DN=600 mm E

e=10cm SEM CAIXILHOun 48,40 64,21 58,85 78,07 61,47 81,55 60,09 79,72 60,34 80,05

100402EXEC. E ASSENT. DE TAMPA CIRCULAR EM CONCRETO ARMADO P/ VISITA, C/DN=800 mm E

e=10cm S/CAIXILHOun 63,56 84,32 75,55 100,22 78,56 104,22 76,99 102,13 77,27 102,51

100403EXEC. E ASSENT. DE TAMPA CIRCULAR EM CONCRETO ARMADO P/ VISITA, C/DN=1100mm E

e=10cm S/CAIXILHOun 105,21 139,57 123,32 163,60 127,86 169,62 125,49 166,48 125,91 167,03

100404EXEC. E ASSENT. DE TAMPA CIRCULAR EM CONCRETO ARMADO P/ VISITA, C/ DN=600 mm E

e=7cm COM CAIXILHOun 51,02 67,68 58,27 77,30 60,08 79,70 59,14 78,46 59,30 78,67

100405EXEC. E ASSENT. DE TAMPA CIRCULAR EM CONCRETO ARMADO P/ VISITA, C/ DN=400 mm E

e=7cm S/CAIXILHOun 27,08 35,92 33,67 44,67 35,33 46,87 34,46 45,71 34,61 45,91

100406EXEC. E ASSENT. DE TAMPA CIRCULAR EM CONCRETO ARMADO P/ VISITA, C/ DN=600 mm E

e=7cm S/CAIXILHOun 40,39 53,58 48,92 64,90 51,06 67,74 49,94 66,25 50,14 66,52

100407FORNEC. E ASSENT. DE TAMPAO EM FoFo P/ REGISTRO DE MANOBRA (28 X 28cm), EM PASSEIO,

SIMILAR T-16 SIMPLES PESADOun 56,12 74,45 60,12 79,76 61,12 81,08 60,60 80,39 60,69 80,51

100410FORNEC. E ASSENT. DE TAMPAO ARTICULADO EM FoFo P/ REGISTRO DE HIDRANTE (25 X 33cm)

SIMILAR T-19un 67,00 88,88 72,01 95,53 73,27 97,20 72,60 96,31 72,72 96,47

100413FORNEC. E ASSENT. DE TAMPAO ARTICULADO EM FoFo P/ CAIXA DE INSPECAO SANITARIA, (55 X

41,5cm) SIMILAR T-27un 47,99 63,66 54,01 71,65 55,53 73,67 54,72 72,59 54,87 72,79

100416FORNEC. E ASSENT. DE TAMPAO ARTICULADO EM FoFo P/ CAIXA DE INSPECAO SANITARIA, (57,4

X 49,9cm) SIMILAR T-33un 78,49 104,12 84,53 112,14 86,04 114,14 85,23 113,07 85,38 113,27

100419FORNEC. E ASSENT. DE TAMPA RETANGULAR DE CONCRETO ARMADO P/CAIXA DE INSPECAO

SANITARIA (59 X 45cm) e= 7cmun 37,10 49,22 47,75 63,35 50,41 66,87 49,01 65,02 49,27 65,36

100422FORNEC. E ASSENT. DE TAMPAO ARTICULADO EM FoFo P/ PV's, DN=600mm, CARGA 5 ton.,

DIMENS. CONF. NBR 10158un 551,10 731,09 559,45 742,17 561,54 744,94 560,44 743,48 560,64 743,75

100425FORNEC. E ASSENT. DE TAMPAO ARTICULADO EM FoFo P/ PV's, DN=600mm, CARGA 12,5 ton.,

DIMENS. CONF. NBR 10158un 382,18 507,00 391,52 519,39 393,86 522,49 392,62 520,85 392,84 521,14

100428FORNEC. E ASSENT. DE TAMPAO ARTICULADO EM FoFo P/ PV's, DN=600mm, CARGA 30 ton.,

DIMENS. CONF. NBR 10158un 463,58 614,99 473,91 628,69 476,50 632,12 475,13 630,31 475,38 630,64

100429 FORNEC. E ASSENT. DE TAMPAO EM FoFo P/ PV's, DN=900mm, CARGA 40 ton., TIPO TD-900 un 1.196,50 1.587,28 1.212,05 1.607,91 1.215,95 1.613,08 1.213,87 1.610,32 1.214,25 1.610,82

100431 FORNEC. E ASSENT. DE GRELHA SIMPLES EM FoFo P/ BOCA DE LOBO (89 X 29cm), SIMILAR GR-95 un 161,05 213,65 168,50 223,53 170,37 226,01 169,39 224,71 169,57 224,95

100434 FORNEC. E ASSENT. DE GRELHA SIMPLES EM FoFo P/ BOCA DE LOBO (89 X 29cm), SIMILAR GR-135 un 214,74 284,87 222,19 294,76 224,06 297,24 223,08 295,94 223,26 296,18

100437FORNEC. E ASSENT. DE GRELHA EM FERRO CHATO BATIDO DE 1/2" C/ ESPACAMENTO DE 0,05m

P/ CANALETAS E CAIXAS DE DRENAGEM, INCL. PINTURA ANTI-CORROSIVA E A OLEO EM DUAS

DEMAOS

m2 200,19 265,57 215,12 285,38 218,84 290,31 216,85 287,67 217,22 288,16

100440FORNEC. E ASSENT. DE GRELHA EM FERRO CHATO REDONDO DE 1/2" C/ ESPACAMENTO DE

0,05m P/ CANALETAS E CAIXAS DE DRENAGEM, C/ PINTURA ANTI-CORROSIVA E A OLEO EM DUAS

DEMAOS

m2 146,59 194,47 161,52 214,27 165,24 219,21 163,25 216,57 163,62 217,06

100443FORNEC. E ASSENT. DE TAMPA METALICA EM CHAPA DE ACO XADREZ COM SUPORTE PARA

TRAFEGOm2 469,94 623,42 499,16 662,19 506,45 671,86 502,57 666,71 503,28 667,65

100500 TUBOS DE QUEDA

100501ASSENT. DE TUBO DE QUEDA EXTERNO (TIPOS I E II), EM PROFUNDIDADE DE 1,21 A 2,00 m, C/

ENVOLTORIA DE CONCRETO, C/ FORNECIMENTO DO MAT. HIDRAULICO (DP1005-01)un 659,91 875,44 751,42 996,83 774,39 1.027,31 762,18 1.011,11 764,36 1.014,00

100504ASSENT. DE TUBO DE QUEDA EXTERNO (TIPO I E II),EM PROFUNDIDADE DE 2,01 A 3,50 m, C/

ENVOLTORIA DE CONCRETO, C/ FORNECIMENTO DO MAT. HIDRAULICO (DP1005-01)un 1.201,50 1.593,91 1.410,77 1.871,53 1.463,28 1.941,19 1.435,36 1.904,15 1.440,35 1.910,77

100507ASSENT. DE TUBO DE QUEDA EXTERNO (TIPO I E II), EM PROFUNDIDADE ACIMA DE 3,50 m, C/

ENVOLTORIA DE CONCRETO, C/ FORNECIMENTO DO MAT. HIDRAULICO (DP1005-01)un 3.087,44 4.095,80 3.715,71 4.929,26 3.873,09 5.138,04 3.789,27 5.026,85 3.804,32 5.046,81

100510ASSENT. DE TUBO DE QUEDA, INTERNO, EM PROFUNDIDADE DE 1.21 A 2.00m, C/ ENVOLTORIA

DE CONCRETO, C/ FORNECIMENTO DO MAT. HIDRAULICO (DP1005-01)un 190,70 252,98 201,80 267,71 204,59 271,41 203,10 269,43 203,37 269,79

100513ASSENT. DE TUBO DE QUEDA, INTERNO, EM PROFUNDIDADEDE 2.01 A 3,50 m, C/ ENVOLTORIA

DE CONCRETO, C/ FORNECIMENTO DO MAT. HIDRAULICO (DP1005-01)un 231,86 307,59 246,15 326,54 249,74 331,31 247,83 328,77 248,18 329,24

Página: 19 de 59

Page 20: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

100516ASSENT. DE TUBO DE QUEDA, INTERNO, EM PROFUNDIDADEACIMA DE 3,50 m, C/ ENVOLTORIA

DE CONCRETO, C/ FORNECIMENTO DO MAT. HIDRAULICO (DP1005-01)un 306,69 406,85 329,35 436,92 335,02 444,44 332,01 440,44 332,56 441,17

100600 TUBO AEREO

100601ASSENTAMENTO DE TUBO AEREO D=50mm EXTERNO, C/FORNEC. DO MATERIAL HIDRAULICO

C/ENVOLTORIA, INCLUSIVE TUBO PVC.m 57,32 76,04 78,02 103,50 83,20 110,37 80,45 106,72 80,95 107,39

100602ASSENTAMENTO DE TUBO AEREO D=50mm EXTERNO, C/FORNEC. DO MATERIAL HIDRAULICO

S/ENVOLTORIA, INCLUSIBE TUBO PVC.m 22,54 29,90 31,17 41,35 33,33 44,22 32,18 42,69 32,39 42,97

100603ASSENTAMENTO DE TUBO AEREO D=75mm EXTERNO, C/FORNEC. DO MATERIAL HIDRAULICO

C/ENVOLTORIA, INCLUSIVE TUBO PVC.m 59,04 78,32 79,74 105,78 84,92 112,65 82,17 109,01 82,67 109,67

100604ASSENTAMENTO DE TUBO AEREO D=75mm EXTERNO, C/FORNEC. DO MATERIAL HIDRAULICO

S/ENVOLTORIA, INCLUSIVE TUBO PVC.m 24,26 32,18 32,89 43,63 35,05 46,50 33,90 44,97 34,11 45,25

100605ASSENTAMENTO DE TUBO AEREO D=100mm EXTERNO, C/FORNEC. DO MATERIAL HIDRAULICO

C/ENVOLTORIA, INCLUSIVE TUBO PVC.m 67,49 89,53 88,58 117,51 93,85 124,50 91,05 120,79 91,55 121,45

100606ASSENTAMENTO DE TUBO AEREO D=100mm EXTERNO, C/FORNEC. DO MATERIAL HIDRAULICO

S/ENVOLTORIA, INCLUSIVE TUBO PVC.m 25,94 34,41 34,96 46,38 37,21 49,36 36,01 47,77 36,22 48,05

100607ASSENTAMENTO DE TUBO AEREO D=150mm EXTERNO, C/FORNEC. DO MATERIAL HIDRAULICO E

COM ENVOLTORIA, INCLUSIVE TUBO PVC.m 70,99 94,18 92,08 122,15 97,35 129,14 94,55 125,43 95,05 126,09

100608ASSENTAMENTO DE TUBO AEREO D=150mm EXTERNO, C/FORNEC. DO MATERIAL HIDRAULICO

S/ENVOLTORIA, INCLUSIVE TUBO PVC.m 36,39 48,27 45,50 60,36 47,77 63,37 46,56 61,77 46,78 62,06

109000 SERVICOS NAO CODIFICADOS

109001 FORNEC. E ASSENT. DE TAMPA DE VISITA METALICA 0.80x0.80cm un 496,45 658,59 496,45 658,59 496,45 658,59 496,45 658,59 496,45 658,59

109010CAIXA DE PASSAGEM/RECEPCAO EM ALVEN. DE TIJOLO MACICO , TAMPA EM CONCRETO

ARMADO, SECAO INTERNA 3,20 X 2,10m, h=1,50m e=20cmun 4.314,72 5.723,91 5.196,44 6.893,60 5.417,65 7.187,05 5.300,55 7.031,71 5.321,69 7.059,75

109011 TAMPA METALICA EM CHAPA 3/8" m2 497,00 659,32 528,26 700,79 536,09 711,18 531,92 705,65 532,67 706,64

109012CAIXA P/DESCARGA E/OU VENTOSA EM ALVEN. DE TIJOLO MACICO , TAMPA EM CONCRETO,

SECAO INTERNA 1,20 X 1,25m, h=2,00m P/LINHA PRINCIPAL COM 350<=DN<=500mm

S/FORNEC.DE MAT.HIDRAULICO

un 2.114,73 2.805,40 2.572,59 3.412,80 2.687,49 3.565,22 2.626,62 3.484,47 2.637,64 3.499,09

109013CAIXA DE PASSAGEM/RECEPCAO EM ALVEN. DE TIJOLO MACICO , TAMPA EM CONCRETO

ARMADO, SECAO INTERNA 0,50 x 0,50m x 0,50m e=15cm E FUNDO DE BRITAun 285,67 378,97 365,85 485,34 385,96 512,01 375,31 497,89 377,23 500,43

109014CAIXA DE PASSAGEM/RECEPCAO EM ALVEN. DE TIJOLO MACICO , TAMPA EM CONCRETO

ARMADO, SECAO INTERNA 0,30 x 0,30m x 0,30m e=15cm E FUNDO DE BRITAun 149,20 197,93 190,72 253,01 201,14 266,83 195,63 259,52 196,62 260,84

109015FORNEC.E ASSENT.DE TAMPAS METALICAS EM CHAPA XADREZ 1/4" COM CANTONEIRAS DE 1/2",

PORTA CADEADO E PINTURA ANTICORROSIVA EM 2 DEMAOSm2 469,68 623,08 520,52 690,52 533,22 707,37 526,45 698,39 527,67 700,01

109019 RECUPERACAO DE CAIXAS DE PASSAGEM COM CANALETAS, LIMPEZA E VEDACAO un 23,18 30,75 30,68 40,70 32,57 43,21 31,56 41,87 31,75 42,12

109021FORNECIMENTO E ASSENTAMENTO DE CAIXILHO PARA CAIXA DN 0,40m PARA RECUPERACAO DE

CAIXAS DANIFICADAS.UN 21,60 28,65 23,34 30,96 23,77 31,53 23,54 31,23 23,59 31,29

109022FORNECIMENTO E ASSENTAMENTO DE CAIXILHO PARA CAIXA DN 0,60m PARA RECUPERACAO DE

CAIXAS DANIFICADAS.UN 26,86 35,63 29,55 39,20 30,22 40,09 29,86 39,61 29,93 39,71

109023CAIXA DE PASSAGEM/RECEPCAO EM ALVEN. DE TIJOLO MACICO , TAMPA EM CONCRETO

ARMADO, SECAO INTERNA 1,00 x 1,00m x 1,00m e=15cm E FUNDO DE BRITAun 942,87 1.250,81 1.210,81 1.606,26 1.278,06 1.695,47 1.242,42 1.648,19 1.248,88 1.656,76

110000 DRENAGEM, CONTENCOES E REFORCO DE SOLO

110100 CALHAS PRE-MOLDADAS DE CONCRETO (1/2 CANA)

110101 FORNEC. E ASSENT. DE CALHA PRE-MOLDADA DE CONCRETO DN=200 mm m 19,68 26,11 22,46 29,80 23,16 30,72 22,78 30,22 22,84 30,30

110104 FORNEC. E ASSENT. DE CALHA PRE-MOLDADA DE CONCRETO DN=300 mm m 23,26 30,86 26,66 35,37 27,52 36,51 27,07 35,91 27,15 36,02

119104 FORNEC. E ASSENT. DE CALHA PRE-MOLDADA DE CONCRETO DN=300 mm (MRR / RMS) m 23,42 31,07 26,91 35,70 27,78 36,85 27,31 36,23 27,40 36,35

110107 FORNEC. E ASSENT. DE CALHA PRE-MOLDADA DE CONCRETO DN=400 mm m 30,48 40,43 34,46 45,71 35,46 47,04 34,94 46,35 35,03 46,47

110110 FORNEC. E ASSENT. DE CALHA PRE-MOLDADA DE CONCRETO DN=500 mm m 37,28 49,46 44,21 58,65 45,94 60,94 45,02 59,72 45,19 59,95

119110 FORNEC. E ASSENT. DE CALHA PRE-MOLDADA DE CONCRETO DN=500 mm (MRR / RMS) m 37,67 49,97 44,81 59,44 46,59 61,81 45,64 60,55 45,81 60,77

110113 FORNEC. E ASSENT. DE CALHA PRE-MOLDADA DE CONCRETO DN=600 mm m 54,02 71,66 61,95 82,18 63,95 84,84 62,89 83,43 63,09 83,70

119113 FORNEC. E ASSENT. DE CALHA PRE-MOLDADA DE CONCRETO DN=600 mm (MRR / RMS) m 54,50 72,30 62,65 83,11 64,69 85,82 63,61 84,39 63,79 84,62

110116 FORNEC. E ASSENT. DE CALHA PRE-MOLDADA DE CONCRETO DN=800 mm m 96,33 127,79 109,04 144,65 112,24 148,90 110,55 146,66 110,84 147,04

110119 FORNEC. E ASSENT. DE CALHA PRE-MOLDADA DE CONCRETO DN=1000 mm m 95,36 126,50 111,03 147,29 114,98 152,53 112,88 149,75 113,25 150,24

110200 TUBOS DE CONCRETO C/ JUNTA ARGAMASSADA P/ AGUAS PLUVIAIS

110201FORNEC. E ASSENT. DE TUBO DE CONCRETO SIMPLES C-1, MF, REJUNT. C/ ARGAMASSA, DN = 150

mm.m 23,56 31,25 28,36 37,62 29,55 39,20 28,91 38,35 29,04 38,52

110204FORNEC. E ASSENT. DE TUBO DE CONCRETO SIMPLES C-1, MF, REJUNT. C/ ARGAMASSA, DN = 200

mm.m 26,65 35,35 32,14 42,64 33,54 44,49 32,79 43,50 32,93 43,68

110207FORNEC. E ASSENT. DE TUBO DE CONCRETO SIMPLES C-1, MF, REJUNT. C/ ARGAMASSA, DN = 300

mm.m 43,59 57,83 50,16 66,54 51,82 68,74 50,95 67,59 51,10 67,79

110210FORNEC. E ASSENT. DE TUBO DE CONCRETO SIMPLES C-1, MF, REJUNT. C/ ARGAMASSA, DN = 400

mm.m 46,86 62,16 55,25 73,29 57,36 76,09 56,25 74,62 56,44 74,87

110213FORNEC. E ASSENT. DE TUBO DE CONCRETO SIMPLES C-1, MF, REJUNT. C/ ARGAMASSA, DN = 500

mm.m 53,15 70,51 58,43 77,51 59,76 79,28 59,05 78,34 59,18 78,51

110216FORNEC. E ASSENT. DE TUBO DE CONCRETO SIMPLES C-1, MF, REJUNT. C/ ARGAMASSA, DN = 600

mm.m 60,89 80,78 66,90 88,75 68,40 90,74 67,60 89,68 67,75 89,88

110219FORNEC. E ASSENT. DE TUBO DE CONCRETO ARMADO CA-1, PB, REJUNT. C/ ARGAMASSA, DN =

300 mm.m 71,73 95,16 78,47 104,10 80,16 106,34 79,27 105,16 79,42 105,36

110222FORNEC. E ASSENT. DE TUBO DE CONCRETO ARMADO CA-1, PB, REJUNT. C/ ARGAMASSA, DN =

400 mm.m 54,59 72,42 59,09 78,39 60,22 79,89 59,63 79,11 59,73 79,24

110225FORNEC. E ASSENT. DE TUBO DE CONCRETO ARMADO CA-1, PB, REJUNT. C/ ARGAMASSA, DN =

500 mm.m 104,46 138,58 110,00 145,93 111,40 147,78 110,65 146,79 110,79 146,97

110228FORNEC. E ASSENT. DE TUBO DE CONCRETO ARMADO CA-1, PB, REJUNT. C/ ARGAMASSA, DN =

600 mm.m 98,75 131,00 105,34 139,74 106,98 141,92 106,10 140,75 106,27 140,98

110231FORNEC. E ASSENT. DE TUBO DE CONCRETO ARMADO CA-1, PB, REJUNT. C/ ARGAMASSA, DN =

800 mm.m 241,63 320,55 250,46 332,26 252,67 335,19 251,50 333,64 251,71 333,92

110234FORNEC. E ASSENT. DE TUBO DE CONCRETO ARMADO CA-1, PB, REJUNT. C/ ARGAMASSA, DN =

1000 mm.m 331,18 439,34 343,44 455,61 346,50 459,67 344,87 457,50 345,17 457,90

110237FORNEC. E ASSENT. DE TUBO DE CONCRETO ARMADO CA-1, PB, REJUNT. C/ ARGAMASSA, DN =

1200 mm.m 366,60 486,33 380,41 504,65 383,88 509,26 382,03 506,80 382,36 507,24

110240FORNEC. E ASSENT. DE TUBO DE CONCRETO ARMADO CA-1, PB, REJUNT. C/ ARGAMASSA, DN =

1500 mm.m 635,34 842,84 652,26 865,29 656,50 870,91 654,24 867,91 654,66 868,47

110243FORNEC. E ASSENT. DE TUBO DE CONCRETO ARMADO CA-2, PB, REJUNT. C/ ARGAMASSA, DN =

300 mm.m 71,75 95,18 75,23 99,80 76,10 100,95 75,65 100,36 75,72 100,45

110246FORNEC. E ASSENT. DE TUBO DE CONCRETO ARMADO CA-2, PB, REJUNT. C/ ARGAMASSA, DN =

400 mm.m 84,76 112,44 89,64 118,92 90,87 120,55 90,22 119,69 90,34 119,85

110249FORNEC. E ASSENT. DE TUBO DE CONCRETO ARMADO CA-2, PB, REJUNT. C/ ARGAMASSA, DN =

500 mm.m 117,40 155,74 123,33 163,61 124,82 165,59 124,02 164,52 124,17 164,72

110252FORNEC. E ASSENT. DE TUBO DE CONCRETO ARMADO CA-2, PB, REJUNT. C/ ARGAMASSA, DN =

600 mm.m 150,87 200,14 157,83 209,38 159,57 211,69 158,64 210,45 158,81 210,68

110255FORNEC. E ASSENT. DE TUBO DE CONCRETO ARMADO CA-2, PB, REJUNT. C/ ARGAMASSA, DN =

800 mm.m 219,56 291,27 230,56 305,86 233,32 309,52 231,85 307,57 232,12 307,93

110258FORNEC. E ASSENT. DE TUBO DE CONCRETO ARMADO CA-2, PB, REJUNT. C/ ARGAMASSA, DN =

1000 mm.m 443,72 588,64 459,02 608,94 462,85 614,02 460,81 611,31 461,18 611,80

110261FORNEC. E ASSENT. DE TUBO DE CONCRETO ARMADO CA-2, PB, REJUNT. C/ ARGAMASSA, DN =

1200 mm.m 619,25 821,50 640,78 850,06 646,18 857,22 643,30 853,40 643,83 854,10

110264FORNEC. E ASSENT. DE TUBO DE CONCRETO ARMADO CA-2, PB, REJUNT. C/ ARGAMASSA, DN =

1500 mm.m 552,59 733,07 584,90 775,93 593,01 786,69 588,70 780,97 589,48 782,00

110267FORNEC. E ASSENT. DE TUBO DE CONCRETO ARMADO CA-3, PB, REJUNT. C/ ARGAMASSA, DN =

600 mm.m 166,68 221,12 174,41 231,37 176,34 233,93 175,31 232,57 175,50 232,82

110270FORNEC. E ASSENT. DE TUBO DE CONCRETO ARMADO CA-3, PB, REJUNT. C/ ARGAMASSA, DN =

800 mm.m 272,02 360,86 283,78 376,46 286,73 380,38 285,16 378,29 285,44 378,66

110273FORNEC. E ASSENT. DE TUBO DE CONCRETO ARMADO CA-3, PB, REJUNT. C/ ARGAMASSA, DN =

1000 mm.m 444,89 590,19 460,77 611,26 464,74 616,52 462,62 613,71 463,01 614,23

110276FORNEC. E ASSENT. DE TUBO DE CONCRETO ARMADO CA-3, PB, REJUNT. C/ ARGAMASSA, DN =

1200 mm.m 621,20 824,08 643,69 853,92 649,33 861,40 646,33 857,42 646,87 858,14

110279FORNEC. E ASSENT. DE TUBO DE CONCRETO ARMADO CA-3, PB, REJUNT. C/ ARGAMASSA, DN =

1500 mm.m 898,26 1.191,63 931,15 1.235,26 939,40 1.246,21 935,02 1.240,40 935,81 1.241,45

110300 TUBULACAO PERFURADA DE CONCRETO P/ DRENOS SUB-SUPERFICIAIS

110301 FORNEC. E ASSENT. DE TUBO DE CONCRETO POROSO (JUNTA SECA) P/ DRENO, DN 200mm, MF. m 22,74 30,17 26,32 34,92 27,24 36,14 26,74 35,47 26,84 35,61

110304 FORNEC. E ASSENT. DE TUBO DE CONCRETO POROSO (JUNTA SECA) P/ DRENO, DN 300mm, MF. m 32,17 42,68 37,43 49,65 38,75 51,41 38,05 50,48 38,18 50,65

110307 FORNEC. E ASSENT. DE TUBO DE CONCRETO POROSO (JUNTA SECA) P/ DRENO, DN 400mm, MF. m 43,37 57,53 50,10 66,46 51,79 68,70 50,90 67,52 51,05 67,72

110310 FORNEC. E ASSENT. DE TUBO DE CONCRETO POROSO (JUNTA SECA) P/ DRENO, DN 500mm, MF. m 57,68 76,52 65,93 87,46 68,01 90,22 66,90 88,75 67,09 89,00

110313 FORNEC. E ASSENT. DE TUBO DE CONCRETO POROSO (JUNTA SECA) P/ DRENO, DN 600mm, MF. m 77,61 102,96 88,10 116,87 90,73 120,36 89,34 118,52 89,58 118,84

110400 TUBULACAO PERFURADA E CORRUGADA DE PVC RIGIDO/PEADP/ DRENOS SUB-SUPERFICIAIS

Página: 20 de 59

Page 21: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

110404FORNEC. E ASSENT. DE TUBO DRENO PERFURADO E CORRUGADO DE PVC RIGIDO/PEAD

DN=75mm.m 29,12 38,63 32,25 42,78 33,03 43,82 32,62 43,27 32,69 43,37

110407FORNEC. E ASSENT. DE TUBO DRENO PERFURADO E CORRUGADOS DE PVC RIGIDO/PEAD

DN=100mm.m 12,08 16,03 15,21 20,18 15,99 21,21 15,58 20,67 15,65 20,76

110410FORNEC. E ASSENT. DE TUBO DRENO PERFURADO E CORRUGADO DE PVC RIGIDO/PEAD

DN=150mm.m 92,20 122,31 95,33 126,46 96,11 127,50 95,70 126,96 95,77 127,05

110500 DISPOSITIVOS DE DRENAG. SUPERFICIAL EM CONCRETO MOLDADO NO LOCAL

110501EXEC. DE BOCA DE BUEIRO EM CONCRETO CICLOPICO C/ 30% DE PEDRA DE MAO, fck=11 MPa, P/

BUEIRO C/ DN=400mm (DP1105-01)un 514,60 682,67 620,55 823,22 647,16 858,52 632,97 839,70 635,58 843,16

110503EXEC. DE BOCA DE BUEIRO EM CONCRETO CICLOPICO C/ 30% DE PEDRA DE MAO, fck=11 MPa,P/

BUEIRO C/ DN=600mm (DP1105-01)un 555,83 737,36 669,86 888,64 698,50 926,63 683,23 906,37 686,02 910,07

110507EXEC. DE BOCA DE BUEIRO EM CONCRETO CICLOPICO C/ 30% DE PEDRA DE MAO, fck=11 MPa,P/

BUEIRO C/ DN=800mm (DP1105-01)un 943,53 1.251,69 1.136,18 1.507,26 1.184,55 1.571,42 1.158,77 1.537,22 1.163,50 1.543,50

110510EXEC. DE BOCA DE BUEIRO EM CONCRETO CICLOPICO C/ 30% DE PEDRA DE MAO, fck=11 MPa,P/

BUEIRO C/ DN=1000mm (DP1105-01)un 1.481,97 1.965,98 1.782,93 2.365,23 1.858,50 2.465,49 1.818,23 2.412,06 1.825,59 2.421,83

110513EXEC. DE BOCA DE BUEIRO EM CONCRETO CICLOPICO C/ 30% DE PEDRA DE MAO, fck=11 MPa,P/

BUEIRO C/ DN=1200mm (DP1105-01)un 2.171,80 2.881,11 2.611,27 3.464,11 2.721,62 3.610,50 2.662,82 3.532,50 2.673,57 3.546,76

110600 DISPOSITIVOS DE DRENAGEM SUPERFICIAL EM ALVENARIA DE PEDRA ARGAMASSADA

110601EXEC. DE BOCA DE BUEIRO EM ALVENARIA DE PEDRA ARGAMASSA, REVESTIDA COM

ARGAMASSA P/BUEIRO C/DN=400mm (DP1105-01)un 493,28 654,39 595,53 790,03 621,20 824,08 607,55 805,98 610,01 809,24

110603EXEC. DE BOCA DE BUEIRO EM ALVENARIA DE PEDRA ARGAMASSADA REVESTIDA COM

ARGAMASSA ,P/BUEIRO C/ DN=600mm (DP1105-01)un 401,68 532,87 502,06 666,03 527,25 699,45 513,84 681,66 516,26 684,87

110607EXEC. DE BOCA DE BUEIRO EM ALVENARIA DE PEDRA ARGAMASSADA REVESTIDA COM

ARGAMASSA ,P/BUEIRO C/ DN=800mm (DP1105-01)un 736,96 977,65 921,28 1.222,17 967,53 1.283,53 942,93 1.250,89 947,38 1.256,79

110610EXEC. DE BOCA DE BUEIRO EM ALVENARIA DE PEDRA ARGAMASSADA REVESTIDA COM

ARGAMASSA ,P/BUEIRO C/ DN=1000mm (DP1105-01)un 1.225,62 1.625,91 1.531,49 2.031,67 1.608,25 2.133,50 1.567,41 2.079,33 1.574,79 2.089,12

110613EXEC. DE BOCA DE BUEIRO EM ALVENARIA DE PEDRA ARGAMASSADA REVESTIDA COM

ARGAMASSA ,P/BUEIRO C/ DN=1200mm (DP1105-01)un 1.882,46 2.497,27 2.352,25 3.120,49 2.470,15 3.276,90 2.407,42 3.193,68 2.418,77 3.208,74

110616 EXEC.DE VALETA EM ALVENARIA DE PEDRA ARGAMASSADA S/ REVESTIMENTO (DP1106-01) m3 251,76 333,98 310,03 411,29 324,66 430,69 316,88 420,37 318,28 422,23

110619EXEC. DE DESCIDA D'AGUA EM ALVENARIA DE PEDRA ARGAMASSADA S/ REVESTIMENTO

(DP1106-01)m3 323,14 428,68 403,47 535,24 423,63 561,99 412,90 547,75 414,84 550,33

110700 ENROCAMENTO P/ PROTECAO

110701 ENROCAMENTO C/ PEDRA BRUTA JOGADA C/ FORNEC. DO MATERIAL m3 62,30 82,65 62,68 83,15 62,78 83,28 62,73 83,22 62,74 83,23

119701 ENROCAMENTO C/ PEDRA BRUTA JOGADA C/ FORNEC. DO MATERIAL (MRR / RMS) m3 62,34 82,70 62,73 83,22 62,84 83,36 62,78 83,28 62,78 83,28

110704 ENROCAMENTO C/ PEDRA DE MAO, C/ ARRUMACAO MANUAL, INCL. FORNEC. DO MATERIAL m3 138,01 183,08 179,14 237,65 189,46 251,34 183,97 244,05 184,96 245,37

119704ENROCAMENTO C/ PEDRA DE MAO, C/ ARRUMACAO MANUAL, INCL. FORNEC. DO MATERIAL (MRR

/ RMS)m3 139,95 185,66 182,02 241,47 192,57 255,46 186,95 248,01 187,93 249,31

110707 ENROCAMENTO C/ PEDRA BRUTA, C/ ARRUMACAO MECANICA, INCL. FORNEC. DO MATERIAL m3 59,84 79,38 60,61 80,41 60,80 80,66 60,70 80,52 60,72 80,55

110800 ENSECADEIRAS P/ PEQUENAS OBRAS

110801 ENSECADEIRA DE PAREDE DUPLA C/ PRANCHAS DE MADEIRA E NUCLEO IMPERMEAVEL m2 314,71 417,49 356,39 472,79 366,83 486,64 361,27 479,26 362,27 480,59

119801ENSECADEIRA DE PAREDE DUPLA C/ PRANCHAS DE MADEIRA E NUCLEO IMPERMEAVEL (MRR /

RMS)m2 314,71 417,49 356,39 472,79 366,83 486,64 361,27 479,26 362,27 480,59

110804 ENSECADEIRA DE PAREDE SIMPLES, C/ PRANCHAS DE MADEIRA m2 157,12 208,44 177,96 236,08 183,18 243,01 180,40 239,32 180,90 239,98

119804 ENSECADEIRA DE PAREDE SIMPLES, C/ PRANCHAS DE MADEIRA (MRR / RMS) m2 157,12 208,44 177,96 236,08 183,18 243,01 180,40 239,32 180,90 239,98

110807 ENSECADEIRA C/ SACO DE AREIA C/REMOCAO m3 304,77 404,31 349,04 463,04 360,16 477,79 354,25 469,95 355,30 471,34

110810 ENSECADEIRA C/ SACO DE AREIA S/REMOCAO m3 258,82 343,35 282,78 375,14 288,79 383,11 285,60 378,88 286,17 379,63

110900 GABIOES

110901 EXEC. DE GABIOES TIPO CAIXA C/ DIAFRAGMAS, MALHA 8 X 10, REVEST. C/ PVC , h=0,50m m3 233,49 309,75 245,39 325,53 248,39 329,51 246,79 327,39 247,07 327,76

110904 EXEC. DE GABIOES TIPO CAIXA C/ DIAFRAGMAS, MALHA 8 X 10, REVEST. C/ PVC , h=1,00m m3 289,41 383,93 302,52 401,32 305,82 405,70 304,07 403,38 304,38 403,79

110907 EXEC. DE GABIAO TIPO COLCHAO RENO, MALHA 6 X 8, REVEST. C/ PVC e=0,17m m2 102,57 136,07 104,55 138,70 105,05 139,36 104,79 139,01 104,83 139,07

110910 EXEC. DE GABIAO TIPO COLCHAO RENO, MALHA 6 X 8, REVEST. C/ PVC e=0,23m m2 101,18 134,23 103,86 137,78 104,53 138,67 104,17 138,19 104,24 138,28

110913 EXEC. DE GABIAO TIPO COLCHAO RENO, MALHA 6 X 8, REVEST. C/ PVC e=0,30m m2 85,02 112,79 88,84 117,86 89,80 119,13 89,29 118,45 89,38 118,57

111000 MANTA GEOTEXTIL

111001FORNEC. E COLOCACAO DE MANTA GEOTEXTIL NAO TECIDA C/ GRAMATURA DE 200 g/m² A 220

g/m²m2 6,63 8,80 6,82 9,05 6,87 9,11 6,84 9,07 6,85 9,09

111004 FORNEC. E COLOCACAO DE MANTA GEOTEXTIL NAO TECIDA C/ GRAMATURA DE 300 g/m² m2 8,34 11,06 9,11 12,09 9,30 12,34 9,20 12,20 9,22 12,23

111007 FORNEC. E COLOCACAO DE MANTA GEOTEXTIL NAO TECIDA C/ GRAMATURA DE 380 A 400 g/m² m2 10,02 13,29 11,32 15,02 11,64 15,44 11,47 15,22 11,50 15,26

111010 FORNEC. E COLOCACAO DE MANTA GEOTEXTIL TECIDA C/ GRAMATURA DE 222 g/m² m2 11,23 14,90 12,00 15,92 12,19 16,17 12,09 16,04 12,11 16,07

111013 FORNEC. E COLOCACAO DE MANTA GEOTEXTIL TECIDA C/ GRAMATURA DE 250g/m² m2 12,61 16,73 13,38 17,75 13,57 18,00 13,47 17,87 13,49 17,90

111016 FORNEC. E COLOCACAO DE MANTA GEOTEXTIL TECIDA C/ GRAMATURA DE 445 g/m² m2 11,69 15,51 13,22 17,54 13,60 18,04 13,40 17,78 13,43 17,82

119000 SERVICOS NAO CODIFICADOS

119001FORNEC. E COLOCACAO DE MANTA PEAD, e=2,00mm C/ MAO DE OBRA E EQUIPAMENTOS

NECESSARIOS A EXECUCAO DOS SERVICOS INCLUINDO O ACOMPANHAMENTO TECNICO DO

FORNECEDOR

m2 29,44 39,06 30,97 41,08 31,35 41,59 31,15 41,32 31,18 41,36

119002EXECUCAO DE CANALETAS RETANGULARES, DESCIDAS D`AGUA, CAIXAS DE DISSIPACAO DE

ENERGIA DE CONCRETO ARMADO fck=15mpa COM TODO O MATERIAL NECESSARIOm3 1.306,87 1.733,69 1.566,46 2.078,07 1.631,34 2.164,14 1.597,26 2.118,93 1.603,58 2.127,31

119010 ENTRONCAMENTO INTERCEPTOR DN 500mm m 1.754,15 2.327,06 2.030,32 2.693,42 2.099,55 2.785,26 2.062,67 2.736,34 2.069,36 2.745,21

119011 DESMONTE DE ROCHA SA EM TUNEL LINER COM USO DE EXPLOSIVOS DN=1.60m m 1.728,20 2.292,63 2.405,85 3.191,60 2.580,75 3.423,62 2.487,80 3.300,32 2.504,25 3.322,14

119501FORNEC. E COLOCACAO DE LONA PLASTICA PRETA, PARA IMPERMEABILIZACAO, ESPESSURA 150

MICRAS.(SINAPI 68053)m2 3,89 5,16 5,15 6,83 5,46 7,24 5,29 7,02 5,32 7,06

120000ASSENT. MONTAGEM E REMOCAO DE TUBULACOES, PECAS, CONEXOES, VALVULAS E

APARELHOS

120100TUBULACOES ADUTORAS E REDES DE DISTRIB. DE AGUA, INCL. PECAS E CONEXOES-FoFo DUCTIL

OU ACO CARBONO DE PONTA E BOLSA C/JUNTA ELAST. OU JUNTA TRAV.INTERNA(JTI)(APLICA-SE

P/LINHAS DE AGUA E ESGOTO)

120101ASSENT. DE TUBOS, PECAS E CONEXOES EM FoFo DUCTIL E ACO CARBONO, PONTA E BOLSA,

JUNTA ELASTICA / JTI - DN 80 mmm 3,27 4,34 4,87 6,46 5,27 6,99 5,05 6,70 5,09 6,75

120104ASSENT. DE TUBOS, PECAS E CONEXOES EM FoFo DUCTIL E ACO CARBONO, PONTA E BOLSA,

JUNTA ELASTICA / JTI - DN 100mmm 3,85 5,11 5,73 7,60 6,20 8,22 5,95 7,89 6,00 7,96

120107ASSENT. DE TUBOS, PECAS E CONEXOES EM FoFo DUCTIL E ACO CARBONO, PONTA E BOLSA,

JUNTA ELASTICA / JTI - DN 150mmm 4,65 6,17 6,27 8,32 6,66 8,84 6,45 8,56 6,48 8,60

120110ASSENT. DE TUBOS, PECAS E CONEXOES EM FoFo DUCTIL E ACO CARBONO, PONTA E BOLSA,

JUNTA ELASTICA / JTI - DN 200mmm 6,02 7,99 8,03 10,65 8,53 11,32 8,26 10,96 8,31 11,02

120113ASSENT. DE TUBOS, PECAS E CONEXOES EM FoFo DUCTIL E ACO CARBONO, PONTA E BOLSA,

JUNTA ELASTICA / JTI - DN 250mmm 7,24 9,60 9,65 12,80 10,26 13,61 9,93 13,17 9,99 13,25

120116ASSENT. DE TUBOS, PECAS E CONEXOES EM FoFo DUCTIL E ACO CARBONO, PONTA E BOLSA,

JUNTA ELASTICA / JTI - DN 300mmm 8,10 10,75 10,90 14,46 11,60 15,39 11,22 14,88 11,29 14,98

120119ASSENT. DE TUBOS, PECAS E CONEXOES EM FoFo DUCTIL E ACO CARBONO, PONTA E BOLSA,

JUNTA ELASTICA / JTI - DN 350mmm 9,52 12,63 12,70 16,85 13,50 17,91 13,08 17,35 13,15 17,44

120122ASSENT. DE TUBOS, PECAS E CONEXOES EM FoFo DUCTIL E ACO CARBONO, PONTA E BOLSA,

JUNTA ELASTICA / JTI - DN 400mmm 10,84 14,38 14,52 19,26 15,44 20,48 14,95 19,83 15,03 19,94

120125ASSENT. DE TUBOS, PECAS E CONEXOES EM FoFo DUCTIL E ACO CARBONO, PONTA E BOLSA,

JUNTA ELASTICA / JTI - DN 450mmm 12,09 16,04 16,30 21,62 17,36 23,03 16,80 22,29 16,89 22,41

120128ASSENT. DE TUBOS, PECAS E CONEXOES EM FoFo DUCTIL E ACO CARBONO, PONTA E BOLSA,

JUNTA ELASTICA / JTI - DN 500mmm 13,28 17,62 18,03 23,92 19,21 25,48 18,58 24,65 18,68 24,78

120131ASSENT. DE TUBOS, PECAS E CONEXOES EM FoFo DUCTIL, PONTA E BOLSA, JUNTA ELASTICA / JTI

- DN 550mmm 15,54 20,62 21,37 28,35 22,82 30,27 22,05 29,25 22,18 29,42

120134ASSENT. DE TUBOS, PECAS E CONEXOES EM FoFo DUCTIL E ACO CARBONO, PONTA E BOLSA,

JUNTA ELASTICA / JTI - DN 600mmm 16,56 21,97 21,65 28,72 22,92 30,41 22,24 29,50 22,35 29,65

120137ASSENT. DE TUBOS, PECAS E CONEXOES EM FoFo DUCTIL E ACO CARBONO, PONTA E BOLSA,

JUNTA ELASTICA / JTI - DN 700mmm 19,99 26,52 27,40 36,35 29,25 38,80 28,27 37,50 28,43 37,72

120140ASSENT. DE TUBOS, PECAS E CONEXOES EM FoFo DUCTIL E ACO CARBONO, PONTA E BOLSA,

JUNTA ELASTICA / JTI - DN 800mmm 22,77 30,21 31,43 41,70 33,61 44,59 32,45 43,05 32,65 43,31

120143ASSENT. DE TUBOS, PECAS E CONEXOES EM FoFo DUCTIL E ACO CARBONO, PONTA E BOLSA,

JUNTA ELASTICA / JTI - DN 900mmm 28,02 37,17 36,59 48,54 38,73 51,38 37,60 49,88 37,79 50,13

120146ASSENT. DE TUBOS, PECAS E CONEXOES EM FoFo DUCTIL E ACO CARBONO, PONTA E BOLSA,

JUNTA ELASTICA / JTI - DN 1000mmm 30,27 40,16 39,11 51,88 41,32 54,82 40,14 53,25 40,35 53,53

120149ASSENT. DE TUBOS, PECAS E CONEXOES EM ACO CARBONO, PONTA E BOLSA, JUNTA ELASTICA /

JTI - DN 1100mmm 36,17 47,98 46,45 61,62 49,02 65,03 47,65 63,21 47,89 63,53

120152ASSENT. DE TUBOS, PECAS E CONEXOES EM FoFo DUCTIL E ACO CARBONO, PONTA E BOLSA,

JUNTA ELASTICA / JTI - DN 1200mmm 41,87 55,54 54,88 72,80 58,13 77,12 56,40 74,82 56,70 75,22

120200BARRILETES OU ARRANJOS EM TUBOS, PECAS, CONEXOES, VALVULAS, APARELHOS E ACESSORIOS

DE FERRO FUNDIDO DUCTIL OU ACO CARBONO, C/ JUNTA TRAVADA EXTERNA, MECANICA OU

FLANGEADA

Página: 21 de 59

Page 22: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

120201MONT. DE PECAS, CONEXOES, VALVULAS, APARELHOS E ACESSORIOS DE FERRO FUNDIDO

DUCTIL OU ACO CARBONO, JUNTA FLANGEADA OU MECANICA C/ DIAMETROS DE 50 A 250 mm.kg 1,09 1,45 1,63 2,16 1,76 2,33 1,69 2,24 1,70 2,26

120204MONT. DE PECAS, CONEXOES,VALVULAS, APARELHOS E ACESSORIOS DE FERRO FUNDIDO DUCTIL

OU ACO CARBONO, JUNTA TRAVADA, EXTERNA MECANICA OU FLANGEADA C/ DIAMETROS DE

300 A 600 mm.

kg 0,77 1,02 0,96 1,27 1,00 1,33 0,97 1,29 0,98 1,30

120207MONT. DE PECAS, CONEXOES, VALVULAS, APARELHOS E ACESSORIOS DE FERRO FUNDIDO

DUCTIL OU ACO CARBONO, JUNTA TRAVADA, EXTERNA MECANICA OU FLANGEADA C/

DIAMETROS DE 700 A 1200 mm.

kg 0,94 1,25 1,13 1,50 1,17 1,55 1,14 1,51 1,15 1,53

120210MONT. DE PECAS, CONEXOES,VALVULAS, APARELHOS E ACESSORIOS DE ACO CARBONO, JUNTA

FLANGEADA C/ DIAMETROS DE 52 A 60 POLEGADAS.kg 1,09 1,45 1,35 1,79 1,41 1,87 1,38 1,83 1,39 1,84

120300TUBULAÇOES DE ADUTORAS E REDES DE DISTRIBUIÇAO DE AGUA, INCL. PEÇAS E CONEXOES -

PVC RIGIDO E PVC REFORÇADO C/ FIBRA DE VIDRO (RPVC) DE PONTA E BOLSA C/ JUNTA

ELASTICA120301 ASSENT. DE TUBOS E CONEXOES EM PVC RIG.PBA,PB JE- AGUA - DN 50 mm m 1,51 2,00 2,23 2,96 2,42 3,21 2,32 3,08 2,34 3,10

120304 ASSENT. DE TUBOS E CONEXOES EM PVC RIG.PBA,PB JE- AGUA - DN 65 mm m 1,55 2,06 2,30 3,05 2,49 3,30 2,40 3,18 2,42 3,21

120307 ASSENT. DE TUBOS E CONEXOES EM PVC RIG.PBA,PB JE- AGUA - DN 75 mm m 1,55 2,06 2,30 3,05 2,49 3,30 2,40 3,18 2,42 3,21

120310 ASSENT. DE TUBOS E CONEXOES EM PVC RIG. PBA, PB JE E RPVC PB JE- AGUA - DN 100 mm m 1,60 2,12 2,37 3,14 2,57 3,41 2,47 3,28 2,49 3,30

120313 ASSENT. DE TUBOS E CONEXOES EM PVC RIG. DEFºFº E RPVC PB JE - AGUA - DN 125 mm m 1,87 2,48 2,80 3,71 3,02 4,01 2,90 3,85 2,92 3,87

120316 ASSENT. DE TUBOS E CONEXOES EM PVC RIG. DEFºFº E RPVC PB JE- AGUA - DN 150 mm m 1,87 2,48 2,80 3,71 3,02 4,01 2,90 3,85 2,92 3,87

120319 ASSENT. DE TUBOS E CONEXOES EM PVC RIG. DEFºFº E RPVC PB JE- AGUA - DN 200 mm m 2,02 2,68 3,00 3,98 3,25 4,31 3,12 4,14 3,14 4,17

120322 ASSENT. DE TUBOS E CONEXOES EM PVC RIG. DEFºFº E RPVC PB JE- AGUA - DN 250 mm m 2,16 2,87 3,21 4,26 3,48 4,62 3,34 4,43 3,36 4,46

120325 ASSENT. DE TUBOS E CONEXOES EM PVC RIG. DEFºFº E RPVC PB JE- AGUA - DN 300 mm m 2,40 3,18 3,57 4,74 3,86 5,12 3,70 4,91 3,73 4,95

120327 ASSENT. DE TUBOS E CONEXOES EM PVC RIG. DEFºFº E RPVC PB JE- AGUA - DN 400 mm m 3,91 5,19 5,81 7,71 6,28 8,33 6,04 8,01 6,07 8,05

120328 ASSENT. DE TUBOS E CONEXOES EM RPVC PB JE - AGUA - DN 300mm e 350mm m 3,81 5,05 3,93 5,21 3,96 5,25 3,95 5,24 3,95 5,24

120331 ASSENT. DE TUBOS E CONEXOES EM RPVC PB JE - AGUA - DN 400mm m 4,48 5,94 4,64 6,16 4,68 6,21 4,65 6,17 4,66 6,18

120334 ASSENT. DE TUBOS E CONEXOES EM RPVC PB JE - AGUA - DN 450mm m 8,12 10,77 8,32 11,04 8,36 11,09 8,33 11,05 8,34 11,06

120337 ASSENT. DE TUBOS E CONEXOES EM RPVC PB JE - AGUA - DN 500mm m 8,23 10,92 8,47 11,24 8,53 11,32 8,50 11,28 8,51 11,29

120340 ASSENT. DE TUBOS E CONEXOES EM RPVC PB JE - AGUA - DN 600mm m 8,34 11,06 8,63 11,45 8,70 11,54 8,66 11,49 8,67 11,50

120343ASSENT. DE TUBOS E CONEXOES EM RPVC PB JE - AGUA - DN 700mm

#mM 8,59 11,40 9,02 11,97 9,12 12,10 9,07 12,03 9,07 12,03

120346 ASSENT. DE TUBOS E CONEXOES EM RPVC / PRFV PB JE - - DN 800mm a 1000mm m 9,45 12,54 10,00 13,27 10,13 13,44 10,06 13,35 10,07 13,36

120400TUBULAÇOES DE REDE DE COLETA DE ESGOTO SANITARIO - PVC RIGIDO DE PONTA E BOLSA C/

JUNTA ELASTICA120401 ASSENT. DE TUBOS EM PVC RIG. PB JE- ESGOTO - DN 40 A 75mm m 1,39 1,84 2,06 2,73 2,23 2,96 2,14 2,84 2,16 2,87

120401 ASSENT. DE TUBOS EM PVC RIG. PB JE- ESGOTO - DN 40 A 75mm (MRR / RMS) m 1,39 1,84 2,06 2,73 2,23 2,96 2,14 2,84 2,16 2,87

120403 ASSENT. DE TUBOS EM PVC RIG. PB JE- ESGOTO - DN 100 mm m 1,60 2,12 2,37 3,14 2,57 3,41 2,47 3,28 2,49 3,30

120403 ASSENT. DE TUBOS EM PVC RIG. PB JE- ESGOTO - DN 100 mm (MRR / RMS) m 1,60 2,12 2,37 3,14 2,57 3,41 2,47 3,28 2,49 3,30

120404 ASSENT. DE TUBOS EM PVC RIG. PB JE- ESGOTO - DN 125 mm m 1,82 2,41 2,70 3,58 2,92 3,87 2,80 3,71 2,83 3,75

120404 ASSENT. DE TUBOS EM PVC RIG. PB JE- ESGOTO - DN 125 mm (MRR / RMS) m 1,82 2,41 2,70 3,58 2,92 3,87 2,80 3,71 2,83 3,75

120407 ASSENT. DE TUBOS EM PVC RIG. PB JE- ESGOTO - DN 150 mm m 1,87 2,48 2,80 3,71 3,02 4,01 2,90 3,85 2,92 3,87

120407 ASSENT. DE TUBOS EM PVC RIG. PB JE- ESGOTO - DN 150 mm (MRR / RMS) m 1,87 2,48 2,80 3,71 3,02 4,01 2,90 3,85 2,92 3,87

120410 ASSENT. DE TUBOS EM PVC RIG. PB JE- ESGOTO - DN 200 mm m 2,02 2,68 3,00 3,98 3,25 4,31 3,12 4,14 3,14 4,17

120410 ASSENT. DE TUBOS EM PVC RIG. PB JE- ESGOTO - DN 200 mm (MRR / RMS) m 2,02 2,68 3,00 3,98 3,25 4,31 3,12 4,14 3,14 4,17

120413 ASSENT. DE TUBOS EM PVC RIG. PB JE- ESGOTO - DN 250 mm m 2,16 2,87 3,21 4,26 3,48 4,62 3,34 4,43 3,36 4,46

120413 ASSENT. DE TUBOS EM PVC RIG. PB JE- ESGOTO - DN 250 mm (MRR / RMS) m 2,16 2,87 3,21 4,26 3,48 4,62 3,34 4,43 3,36 4,46

120416 ASSENT. DE TUBOS EM PVC RIG. PB JE- ESGOTO - DN 300 mm m 2,40 3,18 3,57 4,74 3,86 5,12 3,70 4,91 3,73 4,95

120416 ASSENT. DE TUBOS EM PVC RIG. PB JE- ESGOTO - DN 300 mm (MRR / RMS) m 2,40 3,18 3,57 4,74 3,86 5,12 3,70 4,91 3,73 4,95

120419 ASSENT. DE TUBOS EM PVC RIG. PB JE- ESGOTO - DN 350 mm m 2,86 3,79 4,26 5,65 4,61 6,12 4,43 5,88 4,46 5,92

120419 ASSENT. DE TUBOS EM PVC RIG. PB JE- ESGOTO - DN 350 mm (MRR / RMS) m 2,86 3,79 4,26 5,65 4,61 6,12 4,43 5,88 4,46 5,92

120422 ASSENT. DE TUBOS EM PVC RIG. PB JE- ESGOTO - DN 400 mm m 3,90 5,17 5,80 7,69 6,28 8,33 6,02 7,99 6,07 8,05

120422 ASSENT. DE TUBOS EM PVC RIG. PB JE- ESGOTO - DN 400 mm (MRR / RMS) m 3,90 5,17 5,80 7,69 6,28 8,33 6,02 7,99 6,07 8,05

120425 ASSENT. DE TUBOS EM PVC RIG. PB JE- ESGOTO - DN 450 mm m 6,09 8,08 9,06 12,02 9,80 13,00 9,40 12,47 9,47 12,56

120425 ASSENT. DE TUBOS EM PVC RIG. PB JE- ESGOTO - DN 450 mm (MRR / RMS) m 6,09 8,08 9,06 12,02 9,80 13,00 9,40 12,47 9,47 12,56

120500TUBULAÇOES DE REDE DE COLETA DE ESGOTO SANITARIO - CONCRETO DE PONTA E BOLSA C/

JUNTA ELASTICA120501 ASSENT. DE TUBOS EM CONCRETO, PB JE- ESGOTO - DN 200 mm m 16,37 21,72 24,37 32,33 26,37 34,98 25,31 33,58 25,49 33,82

120504 ASSENT. DE TUBOS EM CONCRETO, PB JE- ESGOTO - DN 300 mm m 14,86 19,71 22,11 29,33 23,94 31,76 22,97 30,47 23,14 30,70

120507 ASSENT. DE TUBOS EM CONCRETO, PB JE- ESGOTO - DN 400 mm m 21,18 28,10 31,52 41,81 34,11 45,25 32,73 43,42 32,98 43,75

120510 ASSENT. DE TUBOS EM CONCRETO, PB JE- ESGOTO - DN 500 mm m 24,48 32,48 31,61 41,93 33,39 44,30 32,44 43,03 32,61 43,26

120513 ASSENT. DE TUBOS EM CONCRETO, PB JE- ESGOTO - DN 600 mm m 31,99 42,44 40,98 54,36 43,22 57,34 42,03 55,76 42,25 56,05

120514 ASSENT. DE TUBOS EM CONCRETO, PB JE- ESGOTO - DN 700 mm m 40,53 53,77 50,78 67,36 53,34 70,76 51,98 68,96 52,22 69,28

120516 ASSENT. DE TUBOS EM CONCRETO, PB JE- ESGOTO - DN 800 mm m 54,96 72,91 67,51 89,56 70,65 93,72 68,98 91,51 69,28 91,91

120517 ASSENT. DE TUBOS EM CONCRETO, PB JE- ESGOTO - DN 900 mm m 71,73 95,16 89,28 118,44 93,67 124,26 91,33 121,16 91,75 121,72

120519 ASSENT. DE TUBOS EM CONCRETO, PB JE- ESGOTO - DN 1000 mm m 75,81 100,57 92,94 123,29 97,23 128,99 94,94 125,95 95,35 126,49

120522 ASSENT. DE TUBOS EM CONCRETO, PB JE- ESGOTO - DN 1200 mm m 102,17 135,54 129,18 171,37 135,95 180,35 132,35 175,58 132,99 176,42

120525 ASSENT. DE TUBOS EM CONCRETO, PB JE- ESGOTO - DN 1500 mm m 109,11 144,75 139,52 185,09 147,13 195,18 143,07 189,80 143,80 190,77

120550 TUBULACOES DE REDE DE COLETA DE ESGOTO SANITARIO - PEAD

120555 ASSENT. DE TUBOS EM PEAD, DN 150 ATE 300mm m 41,31 54,80 53,11 70,46 56,07 74,38 54,49 72,29 54,77 72,66

120555 ASSENT. DE TUBOS EM PEAD, DN 150 ATE 300mm m 41,31 54,80 53,11 70,46 56,07 74,38 54,49 72,29 54,77 72,66

120560 ASSENT. DE TUBOS EM PEAD, DN DE 315mm ATÉ 560mm m 46,01 61,04 58,95 78,20 62,18 82,49 60,46 80,21 60,78 80,63

120560 ASSENT. DE TUBOS EM PEAD, DN DE 315mm ATÉ 560mm (MRR / RMS) m 46,01 61,04 58,95 78,20 62,18 82,49 60,46 80,21 60,78 80,63

120565 ASSENT. DE TUBOS EM PEAD, DN DE 630mm ATE 800mm m 49,86 66,14 63,90 84,77 67,43 89,45 65,54 86,95 65,89 87,41

120565 ASSENT. DE TUBOS EM PEAD, DN DE 630mm ATE 800mm (MRR / RMS) m 49,86 66,14 63,90 84,77 67,43 89,45 65,54 86,95 65,89 87,41

120600 REMOCAO DE TUBULACAO

120601REMOCAO DE TUBULACAO EM FERRO FUNDIDO OU ACO CARBONO, PONTA E BOLSA, JUNTA

ELASTICA, DN 50 A 300 mmm 8,37 11,10 11,43 15,16 12,20 16,18 11,78 15,63 11,85 15,72

120604REMOCAO DE TUBULACAO EM FERRO FUNDIDO OU ACO CARBONO, PONTA E BOLSA, JUNTA

ELASTICA, DN 350 A 600 mmm 17,43 23,12 23,54 31,23 25,06 33,24 24,25 32,17 24,39 32,36

120607REMOCAO DE TUBULACAO EM FERRO FUNDIDO OU ACO CARBONO, PONTA E BOLSA, JUNTA

ELASTICA, DN 700 A 1200 mmm 34,95 46,36 47,16 62,56 50,21 66,61 48,60 64,47 48,88 64,84

120610 REMOCAO DE TUBULACAO EM PVC PB JE E CIMENTO AMIANTO, DN DE 40 A 150 mm m 1,60 2,12 2,23 2,96 2,38 3,16 2,30 3,05 2,31 3,06

120613 REMOCAO DE TUBULACAO EM PVC PB JE DN DE 200 A 400 mm m 3,20 4,25 4,45 5,90 4,76 6,31 4,60 6,10 4,62 6,13

120700 CORTE E ESMERILHAMENTO EM TUBO DE FERRO FUNDIDO DUCTIL OU ACO CARBONO (NA OBRA)

120701 CORTE E ESMERILHAMENTO EM TUBO DE FoFo DUCTIL OU ACO CARBONO, DN < 100mm un 1,24 1,64 1,83 2,43 1,99 2,64 1,90 2,52 1,92 2,55

120704 CORTE E ESMERILHAMENTO EM TUBO DE FoFo DUCTIL OU ACO CARBONO, DN 100mm un 2,00 2,65 2,96 3,93 3,21 4,26 3,07 4,07 3,10 4,11

120707 CORTE E ESMERILHAMENTO DE TUBO DE FoFo DUCTIL OU ACO CARBONO, DN 150mm un 3,79 5,03 5,63 7,47 6,09 8,08 5,84 7,75 5,89 7,81

120710 CORTE E ESMERILHAMENTO DE TUBO DE FoFo DUCTIL OU ACO CARBONO, DN 200mm un 4,54 6,02 6,75 8,95 7,29 9,67 7,00 9,29 7,05 9,35

120713 CORTE E ESMERILHAMENTO DE TUBO DE FoFo DUCTIL OU ACO CARBONO, DN 250mm un 5,67 7,52 8,43 11,18 9,11 12,09 8,75 11,61 8,81 11,69

120716 CORTE E ESMERILHAMENTO DE TUBO DE FoFo DUCTIL OU ACO CARBONO, DN 300mm un 6,91 9,17 10,25 13,60 11,09 14,71 10,65 14,13 10,72 14,22

120719 CORTE E ESMERILHAMENTO DE TUBO DE FoFo DUCTIL OU ACO CARBONO, DN 350mm un 8,04 10,67 11,94 15,84 12,91 17,13 12,40 16,45 12,48 16,56

120722 CORTE E ESMERILHAMENTO DE TUBO DE FoFo DUCTIL OU ACO CARBONO, DN 400mm un 9,26 12,28 13,75 18,24 14,87 19,73 14,28 18,94 14,38 19,08

120725 CORTE E ESMERILHAMENTO DE TUBO DE FoFo DUCTIL OU ACO CARBONO, DN 450mm un 11,35 15,06 16,84 22,34 18,21 24,16 17,49 23,20 17,62 23,37

120728 CORTE E ESMERILHAMENTO DE TUBO DE FoFo DUCTIL OU ACO CARBONO, DN 500mm un 11,35 15,06 16,84 22,34 18,21 24,16 17,49 23,20 17,62 23,37

120731 CORTE E ESMERILHAMENTO DE TUBO DE FoFo DUCTIL OU ACO CARBONO, DN 550mm un 17,46 23,16 25,94 34,41 28,06 37,22 26,93 35,73 27,12 35,98

120734 CORTE E ESMERILHAMENTO DE TUBO DE FoFo DUCTIL OU ACO CARBONO, DN 600mm un 17,46 23,16 25,94 34,41 28,06 37,22 26,93 35,73 27,12 35,98

120737 CORTE E ESMERILHAMENTO DE TUBO DE FoFo DUCTIL OU ACO CARBONO, DN 700mm un 20,01 26,55 29,72 39,43 32,14 42,64 30,85 40,93 31,08 41,23

120740 CORTE E ESMERILHAMENTO DE TUBO DE FoFo DUCTIL OU ACO CARBONO, DN 800mm un 21,57 28,61 32,04 42,50 34,66 45,98 33,27 44,14 33,51 44,45

120743 CORTE E ESMERILHAMENTO DE TUBO DE FoFo DUCTIL OU ACO CARBONO, DN 900mm un 24,94 33,09 37,04 49,14 40,07 53,16 38,46 51,02 38,74 51,39

120746 CORTE E ESMERILHAMENTO DE TUBO DE FoFo DUCTIL OU ACO CARBONO, DN 1000mm un 28,30 37,54 42,05 55,78 45,48 60,33 43,66 57,92 43,97 58,33

120749 CORTE E ESMERILHAMENTO DE TUBO DE FoFo DUCTIL OU ACO CARBONO, DN 1100mm un 33,00 43,78 49,04 65,06 53,04 70,36 50,92 67,55 51,29 68,04

Página: 22 de 59

Page 23: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

120752 CORTE E ESMERILHAMENTO DE TUBO DE FoFo DUCTIL OU ACO CARBONO, DN 1200mm un 33,00 43,78 49,04 65,06 53,04 70,36 50,92 67,55 51,29 68,04

120800EXEC. DE "TUNNEL LINER" EM "LOCALIZACAO DA TRAVESSIA" C/ DN="DIAMETRO

NOMINAL",L="EXTENSAO", INCL. PROJETO EXECUTIVO ,SONDAGEM E FORNEC. DE MAT. EXCETO

POCOS DE SERVICO

120805EXEC. DE "TUNNEL LINER" C/ DN=1,20m, E=2,70mm, P=122kg/m INCL. PROJETO EXECUTIVO

,SONDAGEM E FORNEC. DE MAT. EXCETO POCOS DE SERVICO EM CHAPA GALVANIZADAm 2.819,63 3.740,52 3.285,86 4.359,02 3.400,99 4.511,75 3.340,23 4.431,15 3.351,60 4.446,23

120808EXEC. DE "TUNNEL LINER" C/ DN=1,40m, E=2,70mm, P=143kg/m INCL. PROJETO EXECUTIVO

,SONDAGEM E FORNEC. DE MAT. EXCETO POCOS DE SERVICO EM CHAPA GALVANIZADAm 3.142,04 4.168,23 3.653,62 4.846,89 3.779,84 5.014,34 3.713,27 4.926,02 3.725,78 4.942,62

120811EXEC. DE "TUNNEL LINER", C/ DN=1,60m, E=2,70mm, P=162kg/m INCL.PROJETO EXECUTIVO

,SONDAGEM E FORNEC. DE MAT. EXCETO POCOS DE SERVICO EM CHAPA GALVANIZADAm 3.662,69 4.858,92 4.228,43 5.609,44 4.367,93 5.794,50 4.294,36 5.696,90 4.308,22 5.715,28

120814EXEC. DE "TUNNEL LINER", C/ DN=1,80m, E=2,70mm, P=185kg/m INCL. PROJETO EXECUTIVO

,SONDAGEM E FORNEC. DE MAT. EXCETO POCOS DE SERVICO EM CHAPA GALVANIZADAm 4.258,95 5.649,92 5.007,01 6.642,30 5.191,86 6.887,52 5.094,26 6.758,05 5.112,50 6.782,24

120815EXEC. DE "TUNNEL LINER", C/ DN=2,00m, E=2,70mm, P=193,5g/m INCL. PROJETO EXECUTIVO

,SONDAGEM E FORNEC. DE MAT. EXCETO POCOS DE SERVICO EM CHAPA GALVANIZADAm 4.637,92 6.152,66 5.455,74 7.237,58 5.657,97 7.505,86 5.551,16 7.364,17 5.571,08 7.390,59

120817EXEC. DE "TUNNEL LINER", C/ DN=2,20m, E=2,70mm, P=202kg/m INCL. PROJETO EXECUTIVO

,SONDAGEM E FORNEC. DE MAT. EXCETO POCOS DE SERVICO EM CHAPA GALVANIZADAm 5.248,96 6.963,27 6.161,15 8.173,38 6.386,88 8.472,84 6.267,60 8.314,60 6.289,77 8.344,01

120823EXEC. DE "TUNNEL LINER", C/ DN=3,00m, E=2,70mm, P=236g/m INCL. PROJETO EXECUTIVO

,SONDAGEM E FORNEC. DE MAT. EXCETO POCOS DE SERVICO EM CHAPA GALVANIZADAm 6.624,45 8.788,00 7.634,91 10.128,47 7.884,80 10.459,98 7.752,82 10.284,89 7.777,44 10.317,55

121300EXEC. DE FURO DIRECIONAL MND, C/ DN="Diametro Nominal", INCL.INCLUSIVE FORNEC.SOLDA E

ASSENT. DE TUBO, C/EQUIPAMENTOS DE APOIO PARA EXECUCAO DOS SERVICOS, SONDAGEM E

FORNEC. DE MAT.

121305EXEC. DE FURO DIRECIONAL MND, C/ DN=150,INCLUSIVE FORNEC.SOLDA E ASSENT. DE TUBO,

C/EQUIPAMENTOS DE APOIO PARA EXECUCAO DOS SERVICOS, SONDAGEM E FORNEC. DE MAT.M 840,95 1.115,60 840,95 1.115,60 840,95 1.115,60 840,95 1.115,60 840,95 1.115,60

121306EXEC. DE FURO DIRECIONAL MND, C/ DN=150,INCLUSIVE FORNEC.SOLDA E ASSENT. DE TUBO,

C/EQUIPAMENTOS DE APOIO PARA EXECUCAO DOS SERVICOS, SONDAGEM, S/FORNEC. DE TUBOSm 761,24 1.009,86 761,24 1.009,86 761,24 1.009,86 761,24 1.009,86 761,24 1.009,86

121306EXEC. DE FURO DIRECIONAL MND, C/ DN=150,INCLUSIVE FORNEC.SOLDA E ASSENT. DE TUBO,

C/EQUIPAMENTOS DE APOIO PARA EXECUCAO DOS SERVICOS, SONDAGEM, S/FORNEC. DE TUBOS

(MRR / RMS)

m 761,24 1.009,86 761,24 1.009,86 761,24 1.009,86 761,24 1.009,86 761,24 1.009,86

121310EXEC. DE FURO DIRECIONAL MND, C/ DN=200,INCLUSIVE FORNEC.SOLDA E ASSENT. DE TUBO,

C/EQUIPAMENTOS DE APOIO PARA EXECUCAO DOS SERVICOS, SONDAGEM E FORNEC. DE MAT.M 981,75 1.302,39 981,75 1.302,39 981,75 1.302,39 981,75 1.302,39 981,75 1.302,39

121311EXEC. DE FURO DIRECIONAL MND, C/ DN=200,INCLUSIVE FORNEC.SOLDA E ASSENT. DE TUBO,

C/EQUIPAMENTOS DE APOIO PARA EXECUCAO DOS SERVICOS, SONDAGEM, S/FORNEC. DE TUBOSm 824,52 1.093,81 824,52 1.093,81 824,52 1.093,81 824,52 1.093,81 824,52 1.093,81

121315EXEC. DE FURO DIRECIONAL MND, C/ DN=300,INCLUSIVE FORNEC.SOLDA E ASSENT. DE TUBO,

C/EQUIPAMENTOS DE APOIO PARA EXECUCAO DOS SERVICOS, SONDAGEM E FORNEC. DE MAT.M 1.283,64 1.702,88 1.283,64 1.702,88 1.283,64 1.702,88 1.283,64 1.702,88 1.283,64 1.702,88

121316EXEC. DE FURO DIRECIONAL MND, C/ DN=300,INCLUSIVE FORNEC.SOLDA E ASSENT. DE TUBO,

C/EQUIPAMENTOS DE APOIO PARA EXECUCAO DOS SERVICOS, SONDAGEM, S/FORNEC. DE

TUBOS.

m 975,33 1.293,87 975,33 1.293,87 975,33 1.293,87 975,33 1.293,87 975,33 1.293,87

121320EXEC. DE FURO DIRECIONAL MND, C/ DN=400,INCLUSIVE FORNEC.SOLDA E ASSENT. DE TUBO,

C/EQUIPAMENTOS DE APOIO PARA EXECUCAO DOS SERVICOS, SONDAGEM E FORNEC. DE MAT.M 1.685,38 2.235,83 1.685,38 2.235,83 1.685,38 2.235,83 1.685,38 2.235,83 1.685,38 2.235,83

121321EXEC. DE FURO DIRECIONAL MND, C/ DN=400,INCLUSIVE FORNEC.SOLDA E ASSENT. DE TUBO,

C/EQUIPAMENTOS DE APOIO PARA EXECUCAO DOS SERVICOS, SONDAGEM, S/FORNEC. DE TUBOSm 1.188,99 1.577,31 1.188,99 1.577,31 1.188,99 1.577,31 1.188,99 1.577,31 1.188,99 1.577,31

121500MONTAGEM DE TUBOS EM ACO CARBONO, INCLUINDO ASSENTAMENTO, SOLDAGEM, INSPECAO E

TESTES

121501MONTAGEM DE TUBOS DN100, EM ACO CARBONO, INCLUINDO ASSENTAMENTO, SOLDAGEM,

INSPECAO E TESTESTON 7.711,95 10.230,67 9.819,98 13.027,19 10.348,05 13.727,72 10.066,81 13.354,63 10.117,93 13.422,45

121502MONTAGEM DE TUBOS DN150, EM ACO CARBONO, INCLUINDO ASSENTAMENTO, SOLDAGEM,

INSPECAO E TESTESTON 6.983,55 9.264,38 8.782,40 11.650,73 9.233,02 12.248,52 8.993,03 11.930,15 9.036,65 11.988,02

121503MONTAGEM DE TUBOS DN200, EM ACO CARBONO, INCLUINDO ASSENTAMENTO, SOLDAGEM,

INSPECAO E TESTESTON 5.391,99 7.153,01 6.443,62 8.548,11 6.707,13 8.897,68 6.566,82 8.711,54 6.592,08 8.745,05

121504MONTAGEM DE TUBOS DN250, EM ACO CARBONO, INCLUINDO ASSENTAMENTO, SOLDAGEM,

INSPECAO E TESTESTON 5.924,08 7.858,88 7.273,22 9.648,65 7.611,18 10.096,99 7.431,18 9.858,20 7.463,91 9.901,62

121505MONTAGEM DE TUBOS DN250, EM ACO CARBONO, INCLUINDO ASSENTAMENTO, SOLDAGEM,

INSPECAO E TESTESTON 5.725,43 7.595,36 6.990,24 9.273,25 7.307,08 9.693,57 7.138,33 9.469,71 7.169,00 9.510,40

121506MONTAGEM DE TUBOS DN300, EM ACO CARBONO, INCLUINDO ASSENTAMENTO, SOLDAGEM,

INSPECAO E TESTESTON 5.186,44 6.880,33 6.198,29 8.222,65 6.451,76 8.558,90 6.316,77 8.379,83 6.341,31 8.412,38

121507MONTAGEM DE TUBOS DN350, EM ACO CARBONO, INCLUINDO ASSENTAMENTO, SOLDAGEM,

INSPECAO E TESTESTON 4.997,03 6.629,06 5.952,66 7.896,80 6.192,05 8.214,37 6.064,55 8.045,23 6.087,73 8.075,98

121508MONTAGEM DE TUBOS DN400, EM ACO CARBONO, INCLUINDO ASSENTAMENTO, SOLDAGEM,

INSPECAO E TESTESTON 4.732,16 6.277,68 5.575,36 7.396,27 5.786,59 7.676,49 5.674,09 7.527,25 5.694,54 7.554,38

121509MONTAGEM DE TUBOS DN500, EM ACO CARBONO, INCLUINDO ASSENTAMENTO, SOLDAGEM,

INSPECAO E TESTESTON 4.401,07 5.838,46 5.103,74 6.770,62 5.279,77 7.004,14 5.186,03 6.879,79 5.203,06 6.902,38

121510MONTAGEM DE TUBOS DN600, EM ACO CARBONO, INCLUINDO ASSENTAMENTO, SOLDAGEM,

INSPECAO E TESTESTON 4.202,41 5.574,92 4.820,76 6.395,22 4.975,66 6.600,71 4.893,16 6.491,27 4.908,16 6.511,17

121511MONTAGEM DE TUBOS DN700, EM ACO CARBONO, INCLUINDO ASSENTAMENTO, SOLDAGEM,

INSPECAO E TESTESTON 4.069,95 5.399,20 4.632,10 6.144,94 4.772,92 6.331,76 4.697,93 6.232,27 4.711,55 6.250,34

121512MONTAGEM DE TUBOS DN800, EM ACO CARBONO, INCLUINDO ASSENTAMENTO, SOLDAGEM,

INSPECAO E TESTESTON 4.003,76 5.311,39 4.537,80 6.019,85 4.671,56 6.197,29 4.600,31 6.102,77 4.613,27 6.119,96

121513MONTAGEM DE TUBOS DN900, EM ACO CARBONO, INCLUINDO ASSENTAMENTO, SOLDAGEM,

INSPECAO E TESTESTON 3.937,55 5.223,55 4.443,46 5.894,69 4.570,20 6.062,83 4.502,69 5.973,27 4.514,98 5.989,57

121514MONTAGEM DE TUBOS DN1000, EM ACO CARBONO, INCLUINDO ASSENTAMENTO, SOLDAGEM,

INSPECAO E TESTESTON 3.884,56 5.153,26 4.368,01 5.794,60 4.489,11 5.955,25 4.424,61 5.869,69 4.436,34 5.885,25

121515MONTAGEM DE TUBOS DN1200, EM ACO CARBONO, INCLUINDO ASSENTAMENTO, SOLDAGEM,

INSPECAO E TESTESTON 3.805,09 5.047,83 4.254,80 5.644,42 4.367,47 5.793,89 4.307,47 5.714,29 4.318,37 5.728,75

121516MONTAGEM DE TUBOS DN1400, EM ACO CARBONO, INCLUINDO ASSENTAMENTO, SOLDAGEM,

INSPECAO E TESTESTON 3.752,15 4.977,60 4.179,36 5.544,34 4.286,40 5.686,34 4.229,38 5.610,70 4.239,75 5.624,45

121517MONTAGEM DE TUBOS DN1600, EM ACO CARBONO, INCLUINDO ASSENTAMENTO, SOLDAGEM,

INSPECAO E TESTESTON 3.699,16 4.907,31 4.103,89 5.444,22 4.205,28 5.578,72 4.151,29 5.507,10 4.161,10 5.520,12

121518MONTAGEM DE TUBOS DN1800, EM ACO CARBONO, INCLUINDO ASSENTAMENTO, SOLDAGEM,

INSPECAO E TESTESTON 3.632,91 4.819,42 4.009,56 5.319,08 4.103,91 5.444,25 4.053,67 5.377,60 4.062,79 5.389,70

121519MONTAGEM DE TUBOS DN2000, EM ACO CARBONO, INCLUINDO ASSENTAMENTO, SOLDAGEM,

INSPECAO E TESTESTON 3.540,23 4.696,47 3.877,51 5.143,90 3.962,00 5.255,99 3.917,00 5.196,29 3.925,18 5.207,14

121400 LOCACAO DE CAMINHAO PIPA INCLUINDO MOTORISTA E COMBUSTIVEL H 70,85 93,99 76,91 102,03 78,43 104,05 77,62 102,97 77,76 103,16

121405 LOCACAO DE CAMINHAO BASCULANTE INCLUINDO MOTORISTA E COMBUSTIVEL H 74,43 98,74 80,49 106,78 82,01 108,79 81,20 107,72 81,34 107,91

121410DESOBSTRUCAO EM INTERCEPT., BOMBEAMENTO EM Cls. PV'S OU FOSSAS, LAVAGEM DE REDE E

SERV.CORRELATOS C/UTILIZ.EQUIP.PESADO TIPO HIGH VELOCITY (JATO), VAC ALL OU

COMBINADO C/1 OPERADOR E DOIS AJUDANTES

H 103,83 137,74 124,54 165,21 129,73 172,10 126,97 168,44 127,46 169,09

129000 SERVICOS NAO CODIFICADOS

129001TRAVESSIA SOB A RODOVIA PELO METODO NAO DESTRUTIVO DN=150mm E CANALETA INTERNA

CONFORME PROJETO PARA VEICULACAO DE ESGOTOSm 920,89 1.221,65 920,89 1.221,65 920,89 1.221,65 920,89 1.221,65 920,89 1.221,65

129002TRAVESSIA SOB A RODOVIA PELO METODO NAO DESTRUTIVO DN=200mm E CANALETA INTERNA

CONFORME PROJETO PARA VEICULACAO DE ESGOTOSm 1.059,02 1.404,90 1.059,02 1.404,90 1.059,02 1.404,90 1.059,02 1.404,90 1.059,02 1.404,90

129005 ASSENTAMENTO / INSTALACAO DE MANGOTE FLEXIVEL DE DN 150 A 300 L=5,0 OU 10,0M UN 165,22 219,18 211,03 279,95 222,49 295,16 216,40 287,08 217,45 288,47

129006 ASSENTAMENTO / INSTALACAO DE MANGOTE FLEXIVEL DE DN 350 A 500 L=5,0 OU 10,0M UN 224,95 298,42 286,03 379,45 301,31 399,72 293,19 388,95 294,59 390,80

129007 ASSENTAMENTO / INSTALACAO DE MANGOTE FLEXIVEL ATE DN 100 L=5,0 OU 10,0M UN 110,14 146,11 140,68 186,63 148,32 196,76 144,26 191,38 144,96 192,30

129010FORNECIMENTO E ASSENTAMENTO DE TUBO EM FERRO FUNDIDO DN 150mm COM ESCAVACAO,

REATERRO E ENVOLTORIASm 212,11 281,39 217,27 288,23 218,54 289,92 217,87 289,03 217,98 289,17

129011FORNECIMENTO E ASSENTAMENTO DE TUBO EM RPVC / PRFV DN 150mm COM ESCAVACAO,

REATERRO E ENVOLTORIAm 109,89 145,78 113,66 150,78 114,61 152,04 114,09 151,35 114,19 151,48

129012FORNECIMENTO E ASSENTAMENTO DE TUBO EM FERRO FUNDIDO DN 300mm COM ESCAVACAO,

REATERRO E ENVOLTORIASm 379,29 503,17 386,18 512,31 387,91 514,60 386,99 513,38 387,16 513,61

129013FORNECIMENTO E ASSENTAMENTO DE TUBO EM RPVC / PRFV DN 300mm COM ESCAVACAO,

REATERRO E ENVOLTORIAm 230,90 306,31 235,03 311,79 236,08 313,18 235,51 312,43 235,61 312,56

129014ASSENTAMENTO DE TUBO EM FERRO FUNDIDO DN 150mm COM ESCAVACAO, REATERRO E

ENVOLTORIASm 22,90 30,38 28,06 37,22 29,33 38,91 28,66 38,02 28,77 38,17

129015ASSENTAMENTO DE TUBO EM RPVC / PRFV DN 150mm COM ESCAVACAO, REATERRO E

ENVOLTORIAm 34,91 46,31 38,68 51,31 39,63 52,57 39,11 51,88 39,21 52,02

129016ASSENTAMENTO DE TUBO EM FERRO FUNDIDO DN 300mm COM ESCAVACAO, REATERRO E

ENVOLTORIASm 30,49 40,45 37,44 49,67 39,19 51,99 38,26 50,76 38,43 50,98

129017ASSENTAMENTO DE TUBO EM RPVC / PRFV DN 300mm COM ESCAVACAO, REATERRO E

ENVOLTORIAm 48,81 64,75 52,94 70,23 53,99 71,62 53,42 70,87 53,52 71,00

Página: 23 de 59

Page 24: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

129025 ASSENTAMENTO E FORNECIMENTO DE MANGUEIRA FLEXIVEL D=85mm CONFORME PROJETO M 50,17 66,56 52,69 69,90 53,32 70,73 52,99 70,30 53,05 70,38

129026ASSENTAMENTO E FORNECIMENTO DE CORRENTE EM ACO GALVANOZADO INCLUSIVE FIXACAO

NO CONCRETO COM CHUMBADORES TIPO PARABOLT.m 91,62 121,54 97,86 129,82 99,42 131,89 98,61 130,82 98,75 131,00

129050FORNECIMENTO E ASSENTAMENTO DE TUBO EM PVC DN50mm COM ESCAVACAO MECANIZADA

EM SOLO DE 1a, REATERRO COM MATERIAL DAS ESCAVACOES E ENVOLTORIASm 27,01 35,83 31,44 41,71 32,60 43,25 31,94 42,37 32,04 42,50

129051FORNECIMENTO E ASSENTAMENTO DE TUBO EM PVC DN50mm COM ESCAVACAO EM ROCHA

BRANDA, REATERRO COM MATERIAL DE EMPRESTIMO E ENVOLTORIASm 63,57 84,33 71,02 94,22 72,95 96,78 71,88 95,36 72,06 95,59

129052FORNECIMENTO E ASSENTAMENTO DE TUBO EM PVC DN50mm COM ESCAVACAO EM ROCHA SA,

REATERRO COM MATERIAL DE EMPRESTIMO E ENVOLTORIASm 135,25 179,42 172,47 228,80 181,88 241,28 176,84 234,60 177,71 235,75

129053FORNECIMENTO E ASSENTAMENTO DE TUBO EM PVC DN50mm COM ESCAVACAO EM LAMA,

REATERRO COM MATERIAL DE EMPRESTIMO E ENVOLTORIASm 143,08 189,81 164,90 218,76 170,46 226,13 167,47 222,17 167,98 222,84

129055ASSENTAMENTO DE TUBO EM PVC DN50mm COM ESCAVACAO MECANIZADA EM SOLO DE 1a,

REATERRO COM MATERIAL DAS ESCAVACOES E ENVOLTORIAS (VALA 0,60x1,00)mm 16,93 22,46 20,11 26,68 20,98 27,83 20,48 27,17 20,55 27,26

129056ASSENTAMENTO DE TUBO EM PVC DN50mm COM ESCAVACAO EM ROCHA BRANDA, REATERRO

COM MATERIAL DE EMPRESTIMO E ENVOLTORIAS (VALA 0,60x1,00)mm 56,35 74,75 63,80 84,64 65,73 87,20 64,66 85,78 64,84 86,02

129057ASSENTAMENTO DE TUBO EM PVC DN50mm COM ESCAVACAO EM ROCHA SA, REATERRO COM

MATERIAL DE EMPRESTIMO E ENVOLTORIAS (VALA 0,60x1,00)mm 128,03 169,84 165,25 219,22 174,66 231,70 169,62 225,02 170,49 226,17

129058ASSENTAMENTO DE TUBO EM PVC DN50mm COM ESCAVACAO EM LAMA, REATERRO COM

MATERIAL DE EMPRESTIMO E ENVOLTORIAS (VALA 0,60x1,00)mm 135,86 180,23 157,68 209,18 163,24 216,55 160,25 212,59 160,76 213,26

129062 TRANSFERENCIA DE RAMAL PREDIAL DE AGUA EM RUAL PAVIMENTADAS un 110,91 147,13 155,36 206,10 166,55 220,95 160,61 213,07 161,67 214,47

129063 TRANSFERENCIA DE RAMAL PREDIAL DE AGUA EM RUAS NAO PAVIMENTADAS un 53,39 70,83 78,35 103,94 84,61 112,24 81,29 107,84 81,86 108,60

129065REMANEJAMENTO DE REDE DE AGUA COM DIAMETRO SUPERIOR OU IGUAL A 200 E INFERIOR OU

IGUAL A 400mmm 34,68 46,01 50,26 66,67 54,19 71,89 52,12 69,14 52,47 69,61

129066 REMANEJAMENTO DE REDE DE AGUA COM DIAMETRO ATE 100mm m 5,41 7,18 7,63 10,12 8,19 10,86 7,89 10,47 7,95 10,55

129075ASSENTAMENTO DE TUBO EM PVC DN50mm COM ESCAVACAO MECANIZADA EM SOLO DE 1a,

REATERRO COM MATERIAL DAS ESCAVACOES E ENVOLTORIAS (VALA 0,50x0,80)mm 13,11 17,39 15,51 20,58 16,17 21,45 15,79 20,95 15,84 21,01

129076ASSENTAMENTO DE TUBO EM PVC DN50mm COM ESCAVACAO EM ROCHA BRANDA, REATERRO

COM MATERIAL DE EMPRESTIMO E ENVOLTORIAS (VALA 0,50x0,80)mm 43,41 57,59 48,70 64,61 50,10 66,46 49,32 65,43 49,44 65,59

129077ASSENTAMENTO DE TUBO EM PVC DN50mm COM ESCAVACAO EM ROCHA SA, REATERRO COM

MATERIAL DE EMPRESTIMO E ENVOLTORIAS (VALA 0,50x0,80)m 91,21 121,00 116,33 154,32 122,72 162,80 119,29 158,25 119,88 159,03

129078ASSENTAMENTO DE TUBO EM PVC DN50mm COM ESCAVACAO EM LAMA, REATERRO COM

MATERIAL DE EMPRESTIMO E ENVOLTORIAS (VALA 0,50x0,80)mm 106,75 141,61 124,33 164,94 128,81 170,88 126,40 167,68 126,80 168,21

129105FORNECIMENTO, PINTURA E MONT. DE PECAS, CONEXOES, VALVULAS, APARELHOS E ACESSORIOS

DE FERRO FUNDIDO DUCTIL OU ACO CARBONO, JUNTA FLANGEADA OU MECANICA C/

DIAMETROS DE 50 A 250 mm.

kg 21,67 28,75 25,67 34,05 26,67 35,38 26,14 34,68 26,24 34,81

129301

EXECUCAO DE TRAVESSIA SUB AQUATICA, INCLUSIVE MOBIL., DESMOBIL., LANCAMENTO

TUBULACAO, SERVICOS SUB AQUATICOS, DERROCAMENTO/DRAGAGEM E DEMAIS

SERV.NECESSARIOS C/FORNEC.MATERIAL EXCETO TUBO PEAD

M 2.036,77 2.701,98 2.330,95 3.092,24 2.405,92 3.191,69 2.366,06 3.138,82 2.373,19 3.148,27

129302

EXECUCAO DE EMISSARIO SUBMARIN0 DN 500mm, INCLUSIVE MOBIL., DESMOBIL., LANCAMENTO

TUBULACAO, SERVICOS SUB AQUATICOS, DERROCAMENTO/DRAGAGEM E DEMAIS

SERV.NECESSARIOS C/FORNEC.MATERIAL EXCETO TUBO PEAD

M 3.082,24 4.088,90 3.514,20 4.661,94 3.624,31 4.808,01 3.565,79 4.730,38 3.576,26 4.744,27

129303

EXECUCAO DE EMISSARIO SUBMARIN0 DN 400mm, INCLUSIVE MOBIL., DESMOBIL., LANCAMENTO

TUBULACAO, SERVICOS SUB AQUATICOS, DERROCAMENTO/DRAGAGEM E DEMAIS

SERV.NECESSARIOS C/FORNEC.MAT. INCLUSIVE TUBO PEAD

M 3.786,99 5.023,82 4.218,95 5.596,86 4.329,06 5.742,93 4.270,54 5.665,30 4.281,01 5.679,19

129555 ASSENTAMENTO DE TUBO PEAD ATE DN 315MM M 34,71 46,05 42,10 55,85 43,95 58,30 42,96 56,99 43,14 57,23

129560 ASSENTAMENTO DE TUBO PEAD DN315 A 560MM M 40,99 54,38 49,86 66,14 52,08 69,09 50,89 67,51 51,10 67,79

129565 ASSENTAMENTO DE TUBO PEAD ACIMA DE DN 630MM M 44,02 58,40 54,36 72,11 56,95 75,55 55,56 73,71 55,81 74,04129501 SOLDA DE TOPO EM TUBULACAO EM ACO CARBONO EXTREMIDADE BISELADA un 2.906,26 3.855,44 3.815,02 5.061,01 4.042,66 5.362,99 3.921,52 5.202,29 3943,3 5.231,18

130000 TRANSPORTE DE TUBOS, PECAS E CONEXOES

130100 CARGA E DESCARGA DE TUBOS, PECAS E CONEXOES DE PVC RIG./ RPVC / PRFV

130101 CARGA E DESCARGA DE TUBOS PVC RIG. / RPVC / PRFV, DN ATE 350 mm m 0,11 0,15 0,13 0,17 0,14 0,19 0,13 0,17 0,13 0,17

130104 CARGA E DESCARGA DE TUBO PVC RIG. / RPVC / PRFV, DN 400 A 1000 mm m 0,12 0,16 0,15 0,20 0,16 0,21 0,16 0,21 0,16 0,21

130200 CARGA E DESCARGA DE TUBOS,PECAS E CONEXOES DE FºFº DUCTIL OU ACO CARBONO

130201 CARGA E DESCARGA DE TUBO DE FºFº DUCTIL OU ACO CARBONO, P/DN ATE 300mm. t 46,65 61,89 47,98 63,65 48,32 64,10 48,14 63,86 48,17 63,90

130204 CARGA E DESCARGA DE TUBO DE FºFº DUCTIL OU ACO CARBONO, P/DN 350 A 600mm t 46,65 61,89 47,98 63,65 48,32 64,10 48,14 63,86 48,17 63,90

130207 CARGA E DESCARGA DE TUBO DE FºFº DUCTIL OU ACO CARBONO, P/ DN ACIMA DE 600mm t 50,72 67,29 52,05 69,05 52,39 69,50 52,21 69,26 52,24 69,30

130300 CARGA E DESCARGA DE TUBOS DE CONCRETO

130301 CARGA E DESCARGA DE TUBOS DE CONCRETO, P/ DN ATE 600 mm t 57,97 76,90 59,50 78,93 59,88 79,44 59,68 79,17 59,71 79,21

130304 CARGA E DESCARGA DE TUBOS DE CONCRETO, P/ DN 700 A 1200mm t 57,97 76,90 59,50 78,93 59,88 79,44 59,68 79,17 59,71 79,21

130307 CARGA E DESCARGA DE TUBOS DE CONCRETO, P/ DN ACIMA DE 1200mm t 57,97 76,90 59,50 78,93 59,88 79,44 59,68 79,17 59,71 79,21

130400 MOMENTO DE TRANSPORTE P/TUBOS, PECAS E CONEX. DE PVC RIGIDO/RPVC / PRFV

130401MOMENTO DE TRANSPORTE P/TUBOS, PECAS E CONEXOES DE PVC RIG./RPVC / PRFV C/DN ATE

350mm (DISTANCIA ATE 30km)mxkm 0,03 0,04 0,04 0,05 0,04 0,05 0,04 0,05 0,04 0,05

130404MOMENTO DE TRANSPORTE P/TUBOS, PECAS E CONEXOES DE PVC RIG./RPVC / PRFV COM

350<DN<1000mm (DISTANCIA ATE 30km)mxkm 0,06 0,08 0,06 0,08 0,06 0,08 0,06 0,08 0,06 0,08

130408MOMENTO DE TRANSPORTE P/TUBOS, PECAS E CONEXOES DE PVC RIG./RPVC / PRFV EM

DISTANCIAS ATE 300kmkm 4,08 5,41 4,08 5,41 4,08 5,41 4,08 5,41 4,08 5,41

130410MOMENTO DE TRANSPORTE P/TUBOS, PECAS E CONEXOES DE PVC RIG./RPVC / PRFV

(COMPLEMENTO PARA DISTANCIA ACIMA DE 300km)km 2,77 3,67 2,77 3,67 2,77 3,67 2,77 3,67 2,77 3,67

130500 MOMENTO DE TRANSPORTE P/ TUBOS, PECAS E CONEXOES DE FºFº DUCTIL OU ACO CARBONO

130501 MOMENTO DE TRANSP. P/ TUBOS, PECAS E CONEXOES DE FoFo DUCTIL OU ACO CARBONO txKm 0,42 0,56 0,44 0,58 0,45 0,60 0,44 0,58 0,44 0,58

130600 MOMENTO DE TRANSPORTE P/ TUBOS DE CONCRETO

130601 MOMENTO DE TRANSP. P/ TUBOS DE CONCRETO P/ DN ATE 600mm txKm 0,45 0,60 0,48 0,64 0,48 0,64 0,48 0,64 0,48 0,64

130604 MOMENTO DE TRANSP. P/ TUBOS DE CONCRETO P/ DN 700 A 1200mm txKm 0,45 0,60 0,48 0,64 0,48 0,64 0,48 0,64 0,48 0,64

130607 MOMENTO DE TRANSP. P/ TUBOS DE CONCRETO P/ DN ACIMA DE 1200mm txKm 0,45 0,60 0,48 0,64 0,48 0,64 0,48 0,64 0,48 0,64

139000 SERVICOS NAO CODIFICADOS

139005MOMENTO DE TRANSPORTE MANUAL P/TUBOS, PECAS E CONEXOES DE PVC RIG./RPVC / PRFV

C/DN ATE 350mmmxkm 1,72 2,28 2,56 3,40 2,77 3,67 2,66 3,53 2,68 3,56

139010 MOMENTO DE TRANSPORTE MANUAL P/TUBOS, PECAS E CONEXOES DE FoFo C/DN ATE 350mm mxkm 3,44 4,56 5,12 6,79 5,54 7,35 5,32 7,06 5,36 7,11

139301CARGA, DESCARGA E MOMENTO DE TRANSPORTE DE BLOCO DE ANCORAGEM EM CONCRETO

ARMADO PARA TRAVESSIA SUB AQUATICAT 128,42 170,36 133,01 176,45 134,16 177,98 133,55 177,17 133,66 177,31

139501 TRANSPORTE LOCAL C/ BASCULANTE 10m3 RODOV. NAO PAV. JAZIDA A txkm 0,37 0,49 0,38 0,50 0,39 0,52 0,39 0,52 0,39 0,52

139504 TRANSPORTE LOCAL PEDRA BRUTA C/ BASCULANTE 10m3 RODOV. NAO P txkm 0,37 0,49 0,38 0,50 0,39 0,52 0,39 0,52 0,39 0,52

140000 DEMOLICAO E RECOMPOSICAO DE PAVIMENTOS

140100 LEVANTAMENTO / DEMOLICAO DE PAVIMENTO EM ABERTURA DE VALAS

140101 LEVANTAMENTO DE PEDRA PORTUGUESA m2 4,53 6,01 6,75 8,95 7,30 9,68 7,01 9,30 7,06 9,37

140199 LEVANTAMENTO DE PEDRA PORTUGUESA (MRR / RMS) m2 4,69 6,22 7,00 9,29 7,56 10,03 7,25 9,62 7,31 9,70

140104 LEVANTAMENTO DE PARALELEPIPEDO OU PEDRA IRREGULAR m2 5,89 7,81 8,77 11,63 9,49 12,59 9,11 12,09 9,18 12,18

149304 LEVANTAMENTO DE PARALELEPIPEDO OU PEDRA IRREGULAR (MRR / RMS) m2 6,10 8,09 9,08 12,05 9,83 13,04 9,43 12,51 9,50 12,60

140107 LEVANTAMENTO DE PLACAS PRE-MOLDADAS DE CONCRETO EM PASSEIO m2 4,53 6,01 6,75 8,95 7,30 9,68 7,01 9,30 7,06 9,37

149107 LEVANTAMENTO DE PLACAS PRE-MOLDADAS DE CONCRETO EM PASSEIO (MRR / RMS) m2 4,69 6,22 7,00 9,29 7,56 10,03 7,25 9,62 7,31 9,70

140110 LEVANTAMENTO DE BLOCO ARTICULADO DE CONCRETO m2 5,89 7,81 8,77 11,63 9,49 12,59 9,11 12,09 9,18 12,18

149310 LEVANTAMENTO DE BLOCO ARTICULADO DE CONCRETO (MRR / RMS) m2 6,10 8,09 9,08 12,05 9,83 13,04 9,43 12,51 9,50 12,60

140113 LEVANTAMENTO DE GUIA OU MEIO-FIO PRE-MOLDADO m 4,53 6,01 6,75 8,95 7,30 9,68 7,01 9,30 7,06 9,37

149913 LEVANTAMENTO DE GUIA OU MEIO-FIO PRE-MOLDADO (MRR / RMS) m 4,69 6,22 7,00 9,29 7,56 10,03 7,25 9,62 7,31 9,70

140116 DEMOLICAO DE PASSEIO EM CONCRETO SIMPLES m2 9,88 13,11 14,71 19,51 15,92 21,12 15,28 20,27 15,40 20,43

149916 DEMOLICAO DE PASSEIO EM CONCRETO SIMPLES (MRR / RMS) m2 10,24 13,58 15,24 20,22 16,50 21,89 15,82 20,99 15,95 21,16

140119 DEMOLICAO DE PASSEIO EM LADRILHO HIDRAULICO m2 8,08 10,72 12,01 15,93 13,00 17,25 12,48 16,56 12,57 16,68

149119 DEMOLICAO DE PASSEIO EM LADRILHO HIDRAULICO (MRR / RMS) m2 8,36 11,09 12,45 16,52 13,47 17,87 12,93 17,15 13,02 17,27

140122 DEMOLICAO DE SARJETAS DE CONCRETO m3 38,58 51,18 52,09 69,10 55,48 73,60 53,69 71,23 54,00 71,64

140125 DEMOLICAO DE ASFALTO m3 36,62 48,58 48,08 63,78 50,96 67,60 49,44 65,59 49,70 65,93

140128 DEMOLICAO DE PAVIMENTO EM CONCRETO m3 38,58 51,18 52,09 69,10 55,48 73,60 53,69 71,23 54,00 71,64

149128 DEMOLICAO DE PAVIMENTO EM CONCRETO (MRR / RMS) m3 39,06 51,82 52,82 70,07 56,26 74,63 54,42 72,19 54,75 72,63

140131 DEMOLICAO DE ASFALTO E LEVANTAMENTO DE BASE C/PARALELEPIPEDO OU PEDRA IRREGULAR m2 10,35 13,73 13,61 18,06 14,43 19,14 13,99 18,56 14,08 18,68

140200 RECOMPOSICAO DE PAVIMENTACAO P/ FECHAMENTO DE VALAS

140201RECOMPOSICAO DE PAVIM. C/ PARALELO OU PEDRA C/ APROVEITAMENTO DE 100% DO

MATERIAL LEVANTADOm2 25,20 33,43 32,86 43,59 34,80 46,17 33,77 44,80 33,96 45,05

Página: 24 de 59

Page 25: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

149203RECOMPOSICAO DE PAVIM. C/ PARALELO OU PEDRA C/ APROVEITAMENTO DE 100% DO

MATERIAL LEVANTADO (MRR / RMS)m2 25,61 33,97 33,47 44,40 35,45 47,03 34,39 45,62 34,58 45,87

140202 RECOMPOSICAO DE PAVIMENTO EM CONCRETO EM TRINCHEIRAS m3 483,67 641,64 573,24 760,46 595,72 790,28 583,76 774,42 585,92 777,28

149202 RECOMPOSICAO DE PAVIMENTO EM CONCRETO EM TRINCHEIRAS (MRR / RMS) m3 486,05 644,79 576,77 765,14 599,52 795,32 587,41 779,26 589,56 782,11

140204RECOMPOSICAO DE PAVIM. C/ BLOCO ARTICULADO C/ APROVEITAMENTO DE 80% DO MATERIAL

LEVANTADOm2 33,34 44,23 41,35 54,85 43,36 57,52 42,29 56,10 42,49 56,37

149904RECOMPOSICAO DE PAVIM. C/ BLOCO ARTICULADO C/ APROVEITAMENTO DE 80% DO MATERIAL

LEVANTADO (MRR / RMS)m2 33,71 44,72 46,41 61,57 49,58 65,77 47,87 63,50 48,19 63,93

140207RECOMPOSICAO DE PASSEIO C/ PEDRA PORTUGUESA C/ APROVEITAMENTO DE 80% DO

MATERIAL LEVANTADOm2 33,42 44,33 45,96 60,97 49,11 65,15 47,43 62,92 47,74 63,33

149907RECOMPOSICAO DE PASSEIO C/ PEDRA PORTUGUESA C/ APROVEITAMENTO DE 80% DO

MATERIAL LEVANTADO (MRR / RMS)m2 28,84 38,26 39,15 51,94 41,73 55,36 40,35 53,53 40,59 53,85

140210 RECOMPOSICAO DE PASSEIO C/PLACA DE CONCRETO S/ APROVEITAMENTO DE MAT. DEMOLIDO m2 38,35 50,88 44,29 58,76 45,78 60,73 44,98 59,67 45,13 59,87

149910RECOMPOSICAO DE PASSEIO C/PLACA DE CONCRETO S/ APROVEITAMENTO DE MAT. DEMOLIDO

(MRR / RMS)m2 38,54 51,13 44,59 59,15 46,09 61,14 45,28 60,07 45,43 60,27

140211 RECOMPOSICAO DE PAVIMENTO EM CONCRETO S/ APROVEITAMENTO DO MAT. DEMOLIDO m2 30,86 40,94 41,13 54,56 43,71 57,99 42,33 56,15 42,58 56,49

149911RECOMPOSICAO DE PAVIMENTO EM CONCRETO S/ APROVEITAMENTO DO MAT. DEMOLIDO (MRR

/ RMS)m2 31,26 41,47 41,73 55,36 44,36 58,85 42,96 56,99 43,20 57,31

140213RECOMPOSICAO DE PASSEIO C/ LADRILHO HIDRAULICO S/ APROVEITAMENTO DO MAT.

DEMOLIDOm2 56,21 74,57 64,73 85,87 66,87 88,71 65,74 87,21 65,94 87,48

149213RECOMPOSICAO DE PASSEIO C/ LADRILHO HIDRAULICO S/ APROVEITAMENTO DO MAT.

DEMOLIDO (MRR / RMS)m2 56,64 75,14 65,38 86,73 67,55 89,61 66,38 88,06 66,60 88,35

140216 RECOMPOSICAO DE GUIA OU MEIO-FIO C/ APROVEITAMENTO DE 80% DO MAT. LEVANTADO m 12,39 16,44 16,05 21,29 16,99 22,54 16,49 21,88 16,57 21,98

149716RECOMPOSICAO DE GUIA OU MEIO-FIO C/ APROVEITAMENTO DE 80% DO MAT. LEVANTADO

(MRR / RMS)m 12,52 16,61 16,25 21,56 17,18 22,79 16,69 22,14 16,78 22,26

140219 RECOMPOSICAO DE PAVIM. COM SOLO-CIMENTO EM TRINCHEIRAS m3 133,16 176,65 169,79 225,24 178,99 237,45 174,10 230,96 174,97 232,12

140222 RECOMPOSICAO DE PAVIMENTACAO C/ CASCALHO (REVESTIMENTO PRIMARIO), EM TRINCHEIRAS m3 60,36 80,07 61,24 81,24 61,46 81,53 61,34 81,37 61,36 81,40

140225RECOMPOSICAO DE PAVIM. C/ CONCRETO BETUMINOSO USINADO A QUENTE, EM TRINCHEIRA,

INCLUSIVE IMPRIMACAOm3 487,88 647,22 493,33 654,45 494,78 656,38 494,14 655,53 494,18 655,58

140228RECOMPOSICAO DE PAVIM.C/CONCRETO ASFALTICO USINADO A FRIO,EM TRINCHEIRA,INCLUSIVE

IMPRIMACAOm3 483,61 641,56 489,02 648,73 490,46 650,64 489,83 649,81 489,87 649,86

149228RECOMPOSICAO DE PAVIM.C/CONCRETO ASFALTICO USINADO A FRIO,EM TRINCHEIRA,INCLUSIVE

IMPRIMACAO (MRR / RMS)m3 483,74 641,73 489,41 649,25 490,88 651,20 490,23 650,34 490,27 650,39

140231RECOMPOSICAO DE BASE OU SUB-BASE, EM TRINCHEIRA, C/ SOLO ESTABILIZADO

GRANULOMETRICAMENTE (ARENOSO)m3 82,01 108,79 82,96 110,05 83,20 110,37 83,07 110,20 83,10 110,24

140234 RECOMPOSICAO DE BASE, EM TRINCHEIRA, C/ BRITA GRADUADA m3 84,08 111,54 85,03 112,80 85,27 113,12 85,14 112,95 85,17 112,99

140237RECOMPOSICAO DE PAVIM., EM TRATAMENTO SUPERFICIAL SIMPLES, EM TRINCHEIRA, INCLUSIVE

IMPRIMACAOm2 7,34 9,74 7,34 9,74 7,34 9,74 7,34 9,74 7,34 9,74

140240RECOMPOSICAO DE PAVIM., EM TRATAMENTO SUPERFICIAL DUPLO, EM TRINCHEIRA, INCLUSIVE

IMPRIMACAOm2 11,45 15,19 11,45 15,19 11,45 15,19 11,45 15,19 11,45 15,19

140243RECOMPOSICAO DE PAVIM., EM TRATAMENTO SUPERFICIAL TRIPLO, EM TRINCHEIRA, INCLUSIVE

IMPRIMACAOm2 14,09 18,69 14,09 18,69 14,09 18,69 14,09 18,69 14,09 18,69

140246RECOMPOSICAO DE PAVIM., EM TRATAMENTO CONTRA-PO, EM TRINCHEIRA, INCLUSIVE

IMPRIMACAOm2 3,57 4,74 3,60 4,78 3,61 4,79 3,61 4,79 3,61 4,79

149000 SERVICOS NAO CODIFICADOS

149101 RECOMPOSICAO DE CANALETAS L=50cm H=50cm EM CONCRETO (COM 50% DANIFICADAS) m 29,58 39,24 37,68 49,99 39,71 52,68 38,63 51,25 38,82 51,50

149201RECOMPOSICAO DE PAVIM. C/ BLOCO ARTICULADO C/ APROVEITAMENTO DE 50% DO MATERIAL

LEVANTADOm2 51,39 68,17 60,91 80,80 63,30 83,97 62,03 82,29 62,26 82,59

149295RECOMPOSIÇÃO DE PAV. C/ CONCRETO BETUMINOSO USINADO A QUENTE, EM TRINCHEIRA,

INCLUSIVE IMPRIMACAO, E CAMINHAO DE APOIO (OBRA DE SAA E SES)m3 530,87 704,25 536,32 711,48 537,77 713,41 537,13 712,56 537,17 712,61

150000 EDIFICACOES

150100 PAREDES E PAINEIS

150101 ALVENARIA DE VEDACAO C/ BLOCO CERAMICO FURADO C/ e=10cm m2 31,96 42,40 42,15 55,92 44,71 59,31 43,35 57,51 43,60 57,84

159901 ALVENARIA DE VEDACAO C/ BLOCO CERAMICO FURADO C/ e=10cm (MRR / RMS) m2 32,48 43,09 42,92 56,94 45,54 60,41 44,13 58,54 44,39 58,89

150104 ALVENARIA DE VEDACAO C/ BLOCO CERAMICO FURADO C/ e=15cm m2 59,54 78,99 75,41 100,04 79,39 105,32 77,27 102,51 77,66 103,02

150107 ALVENARIA DE VEDACAO C/ BLOCO CERAMICO FURADO C/ e=20cm m2 81,16 107,67 103,97 137,93 109,69 145,51 106,64 141,47 107,19 142,20

159907 ALVENARIA DE VEDACAO C/ BLOCO CERAMICO FURADO C/ e=20cm (MRR / RMS) m2 82,75 109,78 106,36 141,10 112,25 148,91 109,10 144,73 109,67 145,49

150110 ALVENARIA DE VEDACAO C/TIJOLO CERAMICO LAMINADO A VISTA C/e=11cm m2 96,35 127,82 125,29 166,21 132,56 175,85 128,69 170,72 129,40 171,66

150113 ALVENARIA DE VEDACAO C/TIJOLO CERAMICO LAMINADO A VISTA C/e=23,5cm m2 152,95 202,90 189,64 251,58 198,85 263,79 193,95 257,29 194,84 258,47

150116 ALVENARIA DE VEDACAO C/ TIJOLO MACICO (COMUM) C/ e=5cm m2 41,21 54,67 50,45 66,93 52,76 69,99 51,53 68,36 51,74 68,64

150119 ALVENARIA DE VEDACAO C/ TIJOLO MACICO (COMUM) C/ e=10cm m2 74,01 98,18 92,77 123,07 97,48 129,32 94,98 126,00 95,43 126,60

159919 ALVENARIA DE VEDACAO C/ TIJOLO MACICO (COMUM) C/ e=10cm (MRR / RMS) m2 75,19 99,75 94,54 125,42 99,37 131,82 96,80 128,41 97,25 129,01

150122 ALVENARIA DE VEDACAO C/ TIJOLO MACICO (COMUM) C/ e=20cm m2 129,36 171,61 153,06 203,05 159,00 210,93 155,83 206,72 156,41 207,49

159922 ALVENARIA DE VEDACAO C/ TIJOLO MACICO (COMUM) C/ e=20cm (MRR / RMS) m2 131,51 174,46 156,28 207,32 162,47 215,53 159,17 211,15 159,76 211,94

150125 ALVENARIA DE VEDACAO C/ TIJOLO MACICO (COMUM), EM VOLUME m3 412,22 546,85 475,18 630,37 490,98 651,33 482,58 640,19 484,09 642,19

150128 ALVENARIA DE VEDACAO C/ BLOCO VAZADO DE CONCRETO SIMPLES C/e=9cm m2 27,97 37,11 35,72 47,39 37,67 49,97 36,64 48,61 36,83 48,86

150131 ALVENARIA DE VEDACAO C/BLOCO VAZADO DE CONCRETO SIMPLES C/e=14cm m2 41,27 54,75 52,90 70,18 55,82 74,05 54,26 71,98 54,54 72,35

150134 ALVENARIA DE VEDACAO C/BLOCO VAZADO DE CONCRETO SIMPLES C/e=18cm m2 54,69 72,55 70,21 93,14 74,11 98,31 72,04 95,57 72,41 96,06

150137 ELEMENTOS VAZADOS CERAMICOS (COBOGO) m2 86,69 115,00 97,35 129,14 100,02 132,69 98,60 130,80 98,85 131,13

150140 ELEMENTOS VAZADOS DE CONCRETO PRE-MOLDADO (COBOGO) m2 110,75 146,92 129,24 171,45 133,89 177,62 131,42 174,34 131,86 174,93

150143 ELEMENTOS VAZADOS DE VIDRO (COBOGO) C/ e=10cm m2 363,08 481,66 403,12 534,78 413,16 548,10 407,81 541,00 408,79 542,30

150146 ALVENARIA DE VEDACAO C/ BLOCO DE VIDRO CANELADO DE 20X20X10 cm C/ e=10cm m2 353,02 468,32 383,45 508,68 391,09 518,82 387,02 513,42 387,76 514,40

150149 ALVENARIA DE PEDRA APARENTE C/ JUNTA ARGAMASSADA P/ ELEVACAO m3 335,89 445,59 424,52 563,17 446,75 592,66 434,92 576,96 437,07 579,82

159949 ALVENARIA DE PEDRA APARENTE C/ JUNTA ARGAMASSADA P/ ELEVACAO (MRR / RMS) m3 338,77 449,41 428,80 568,85 451,36 598,77 439,33 582,82 441,48 585,67

150152 ALVENARIA DE PEDRA C/JUNTA ARGAMASSADA P/ FUNDACAO m3 319,17 423,41 397,36 527,14 416,98 553,17 406,54 539,32 408,43 541,82

159952 ALVENARIA DE PEDRA C/JUNTA ARGAMASSADA P/ FUNDACAO (MRR / RMS) m3 322,44 427,75 402,24 533,61 422,23 560,13 411,56 545,98 413,46 548,50

150155 ALVENARIA ESTRUTURAL DE BLOCO DE CONCRETO, INCLUINDO GROUT, C/ e = 15 cm m2 58,88 78,11 70,47 93,49 73,38 97,35 71,83 95,29 72,11 95,66

150158 ALVENARIA ESTRUTURAL DE BLOCO DE CONCRETO, INCLUINDO GROUT, C/ e = 20 cm m2 120,08 159,30 144,69 191,95 150,83 200,09 147,61 195,82 148,22 196,63

150161 DIVISORIAS DE GRANILITE, e=3 cm, C/ ARGAMASSA DE CIMENTO E AREIA m2 147,83 196,11 180,49 239,44 188,68 250,30 184,32 244,52 185,11 245,57

150164 DIVISORIAS DE MARMORE, e = 3 cm, INCL. ELEMENTOS DE FIXACAO m2 419,59 556,63 452,25 599,95 460,44 610,82 456,08 605,04 456,87 606,08

150167 DIVISORIAS DE GRANITO, e = 3 cm, INCL. ELEMENTOS DE FIXACAO m2 419,59 556,63 452,25 599,95 460,44 610,82 456,08 605,04 456,87 606,08

150170 DIVISORIAS EM PAINEL EM COMPENSADO RESINADO m2 73,71 97,78 90,44 119,98 94,63 125,54 92,40 122,58 92,81 123,12

150200 COBERTURA

150201COBERTURA C/ TELHA DE FIBROCIMENTO TIPO CANALETE 49 OU SIMILAR, C/ MADEIRAMENTO,

INCL. ELEMENTOS P/ FIXACAO E VEDACAOm2 106,23 140,92 109,50 145,26 110,32 146,35 109,89 145,78 109,96 145,87

150204COBERTURA C/ TELHA DE FIBROCIMENTO TIPO CANALETE 90 OU SIMILAR, C/ MADEIRAMENTO,

INCL. ELEMENTOS P/ FIXACAO E VEDACAOm2 88,89 117,92 92,82 123,14 93,81 124,45 93,28 123,75 93,38 123,88

150207COBERTURA C/ TELHA DE FIBROCIMENTO ONDULADAS C/ e=6mm, C/ MADEIRAMENTO, INCL.

ELEMENTOS P/ FIXACAO E VEDACAOm2 71,68 95,09 79,35 105,27 81,28 107,83 80,25 106,46 80,44 106,71

150210COBERTURA C/ TELHA DE FIBROCIMENTO ONDULADAS C/ e=8mm, C/ MADEIRAMENTO, INCL.

ELEMENTOS P/ FIXACAO E VEDACAOm2 80,75 107,12 88,42 117,30 90,35 119,86 89,32 118,49 89,51 118,74

150213COBERTURA C/ TELHA CERAMICA TIPO CANAL C/ MADEIRAMENTO, INCL. ELEMENTOS P/

FIXACAOm2 92,74 123,03 111,15 147,45 115,76 153,57 113,30 150,30 113,75 150,90

150216 RUFO DE CONCRETO PRE-MOLDADO INCL. ELEMENTOS P/ FIXACAO m 14,73 19,54 15,11 20,04 15,20 20,16 15,15 20,10 15,16 20,11

150219 RUFO EM CHAPA GALVANIZADA INCL. ELEMENTOS P/ FIXACAO m 41,02 54,42 43,63 57,88 44,27 58,73 43,92 58,26 44,00 58,37

150222RUFO DE FIBROCIMENTO P/ TELHA TIPO CANALETE 49, INCL. ELEMENTOS P/ FIXACAO E

VEDACAOm 30,42 40,36 32,89 43,63 33,51 44,45 33,18 44,02 33,24 44,10

150225RUFO DE FIBROCIMENTO P/ TELHA TIPO CANALETE 90, INCL. ELEMENTOS P/ FIXACAO E

VEDACAOm 24,01 31,85 25,99 34,48 26,49 35,14 26,22 34,78 26,27 34,85

150228 CUMEEIRA DE CHAPA GALVANIZADA INCL. ELEMENTOS P/ FIXACAO m 35,85 47,56 38,21 50,69 38,79 51,46 38,48 51,05 38,55 51,14

150231CUMEEIRA NORMAL DE FIBROCIMENTO P/ TELHA TIPO CANALETE 49, INCL. ELEMENTOS P/

FIXACAO E VEDACAOm 67,68 89,78 68,37 90,70 68,54 90,93 68,46 90,82 68,47 90,83

150234CUMEEIRA NORMAL DE FIBROCIMENTO P/ TELHA TIPO CANALETE 90, INCL. ELEMENTOS P/

FIXACAO E VEDACAOm 96,41 127,90 97,40 129,21 97,65 129,54 97,52 129,37 97,55 129,41

150237CUMEEIRA NORMAL DE FIBROCIMENTO P/ TELHA TIPO ONDULADA, INCL. ELEMENTOS P/ FIXACAO

E VEDACAOm 48,86 64,82 49,98 66,30 50,25 66,66 50,10 66,46 50,13 66,50

150300 ESQUADRIAS / VIDROS

150301PORTA EXTERNA LISA EM MADEIRA DE LEI, COMPLETA, DE 1 FOLHA, INCL. FERRAGENS,

GUARNICOES, LIXAMENTO, EMASSAMENTO E PINTURA A OLEOm2 333,48 442,39 382,64 507,61 394,93 523,91 388,36 515,20 389,54 516,76

150304PORTA INTERNA EM COMPENSADO, COMPLETA, DE 1 FOLHA, INCL. FERRAGENS, GUARNICOES,

LIXAMENTO, EMASSAMENTO E PINTURA A OLEOm2 338,60 449,19 392,27 520,39 405,69 538,19 398,52 528,68 399,80 530,37

150307PORTA EXTERNA LISA EM MADEIRA DE LEI, COMPLETA, DE 2 FOLHAS, INCL. FERRAGENS,

GUARNICOES, LIXAMENTO,EMASSAMENTO E PINTURA A OLEOm2 238,71 316,67 280,80 372,51 291,31 386,45 285,69 379,00 286,70 380,34

150310PORTA INTERNA EM COMPENSADO, COMPLETA, INCL. FERRAGENS, GUARNICOES, LIXAMENTO,

EMASSAMENTO E PINTURA A OLEOm2 246,36 326,82 291,95 387,30 303,33 402,40 297,25 394,33 298,35 395,79

150313JANELA EM MADEIRA DE LEI TIPO GUILHOTINA C/ VENEZIANAS E VIDRO, INCL. FERRAGENS,

GUARNICOES, LIXAMENTO, EMASSAMENTO E PINTURA A OLEOm2 712,13 944,71 788,43 1.045,93 807,52 1.071,26 797,33 1.057,74 799,16 1.060,17

150316JANELA EM MADEIRA DE LEI TIPO BASCULANTE C/ VIDRO, INCL. FERRAGENS, GUARNICOES,

EMASSAMENTO, LIXAMENTO E PINTURA A OLEOm2 371,66 493,04 445,04 590,39 463,41 614,76 453,61 601,76 455,38 604,11

Página: 25 de 59

Page 26: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

150319 PORTA DE ENTRADA EM ALUMINIO, C/ 1 FOLHA, DE ABRIR, INCL. FERRAGENS E GUARNICOES m2 418,39 555,04 434,13 575,92 438,06 581,13 435,97 578,36 436,35 578,86

150322 PORTA DE ENTRADA EM ALUMINIO, C/ 2 FOLHAS, DE ABRIR, INCL. FERRAGENS E GUARNICOES m2 586,37 777,88 600,92 797,18 604,55 802,00 602,62 799,44 602,97 799,90

150325 PORTA DE ENTRADA EM ALUMINIO, DE CORRER, INCL. FERRAGENS E GUARNICOES m2 372,23 493,80 382,98 508,06 385,67 511,63 384,24 509,73 384,50 510,08

150328 JANELA EM ALUMINIO, TIPO BASCULHANTE, C/ VIDRO, INCL. FERRAGENS E GUARNICOES m2 191,66 254,26 203,54 270,02 206,52 273,97 204,94 271,87 205,22 272,24

150331 JANELA EM ALUMINIO, DE CORRER, C/ VIDRO, INCL. FERRAGENS E GUARNICOES m2 264,86 351,36 276,74 367,12 279,72 371,08 278,14 368,98 278,42 369,35

150334PORTA DE FERRO LISA, DE CORRER, TIPO CAIXILHO INCL. FERRAGENS, GUARNICOES,

LIXAMENTO E PINTURA DE PROTECAO A BASE DE ESMALTEm2 365,28 484,58 383,63 508,92 388,22 515,01 385,79 511,79 386,24 512,39

150337PORTA DE FERRO, CORPO EM TELA, DE CORRER, INCL. FERRAGENS, GUARNICOES, LIXAMENTO E

PINTURA DE PROTECAO A BASE DE ESMALTEm2 432,30 573,49 464,43 616,11 472,46 626,77 468,20 621,11 468,98 622,15

150340PORTA DE FERRO LISA, DE ABRIR, C/ 02 FOLHAS, INCL. FERRAGENS, GUARNICOES, LIXAMENTO E

PINTURA DE PROTECAO A BASE DE ESMALTEm2 369,43 490,09 392,11 520,17 397,80 527,72 394,78 523,72 395,33 524,44

150343PORTA DE ACO DE CHAPA ONDULADA (DE ENROLAR), INCL. FERRAGENS, GUARNICOES,

LIXAMENTO E PINTURA DE PROTECAO A BASE DE ESMALTEm2 261,60 347,04 298,82 396,41 308,13 408,77 303,19 402,21 304,09 403,41

150400 REVESTIMENTOS DE PAREDES E TETOS

150401 CHAPISCO C/ ARGAMASSA DE CIMENTO E AREIA m2 3,93 5,21 5,07 6,73 5,36 7,11 5,21 6,91 5,24 6,95

159401 CHAPISCO C/ ARGAMASSA DE CIMENTO E AREIA (MRR / RMS) m2 3,98 5,28 5,14 6,82 5,44 7,22 5,28 7,00 5,30 7,03

150404 CHAPISCO C/ ARGAMASSA DE CIMENTO E AREIA C/ IMPERMEABILIZANTE m2 4,16 5,52 5,30 7,03 5,59 7,42 5,44 7,22 5,47 7,26

150407 REVESTIMENTO C/ ARGAMASSA DE CIMENTO E AREIA GROSSA P/ REVESTIMENTO DE CAIXAS m2 19,66 26,08 26,21 34,77 27,85 36,95 26,97 35,78 27,14 36,00

150410 MASSA UNICA (CIMENTO / CAL / AREIA) m2 27,80 36,88 36,96 49,03 39,25 52,07 38,03 50,45 38,25 50,74

150411 MASSA UNICA (CIMENTO / ARENOSO / AREIA) m2 28,06 37,22 38,72 51,37 41,39 54,91 39,97 53,02 40,23 53,37

159411 MASSA UNICA (CIMENTO / ARENOSO / AREIA) (MRR / RMS) m2 28,46 37,76 39,29 52,12 42,01 55,73 40,57 53,82 40,82 54,15

150413 MASSA UNICA (CIMENTO / CAL / AREIA) C/ IMPERMEABILIZANTE m2 35,57 47,19 48,13 63,85 51,28 68,03 49,61 65,81 49,91 66,21

150414 MASSA UNICA (CIMENTO / ARENOSO / AREIA) COM IMPERMEABILIZANTE m2 30,00 39,80 41,22 54,68 44,04 58,42 42,54 56,43 42,81 56,79

150416 REVESTIMENTO DE PAREDE EM AZULEJO C/ EMBOCO, E REJUNTAMENTO EM CIMENTO BRANCO m2 56,69 75,20 70,24 93,18 73,64 97,69 71,83 95,29 72,15 95,71

150419 REVESTIMENTO DE PAREDE EM CERAMICA C/EMBOCO E REJUNTAMENTO EM CIMENTO BRANCO m2 56,31 74,70 69,86 92,68 73,26 97,19 71,45 94,79 71,77 95,21

150422REVESTIMENTO DE TETO C/ FORRO DE MADEIRA DE LEI (TABUA APARELHADA, NAS DIMENSOES

DE 10 X 1 cm), INCL. MAT. P/ FIXACAOm2 68,80 91,27 75,95 100,76 77,74 103,13 76,79 101,87 76,97 102,11

150425 REVESTIMENTO DE TETO C/ FORRO DE PLACA DE GESSO, PRE-MOLDADA, INCL. MAT. P/ FIXACAO m2 6,04 8,01 6,23 8,26 6,28 8,33 6,25 8,29 6,26 8,30

150500 REVESTIMENTOS DE PISOS / ARREMATES

150501 LASTRO DE CONCRETO NAO ESTRUTURAL SOB PISOS, e=8cm, C/ IMPERMEABILIZANTE m2 35,79 47,48 45,44 60,28 47,86 63,49 46,57 61,78 46,81 62,10

150502 LASTRO DE CONCRETO NAO ESTRUTURAL SOB PISOS, e=5cm, C/ IMPERMEABILIZANTE m2 24,30 32,24 30,34 40,25 31,86 42,27 31,06 41,20 31,19 41,38

150504 LASTRO EM CONCRETO NAO ESTRUTURAL SOB PISOS, e=8cm m2 27,98 37,12 35,57 47,19 37,49 49,73 36,47 48,38 36,66 48,63

150505 LASTRO EM CONCRETO ESTRUTURAL SOB PISOS, e=20cm m2 101,65 134,85 112,22 148,87 114,88 152,40 113,46 150,52 113,72 150,86

150507 PISO CIMENTADO, ALISADO m2 31,40 41,66 42,44 56,30 45,21 59,98 43,74 58,03 44,01 58,38

159507 PISO CIMENTADO, ALISADO (MRR / RMS) m2 31,83 42,23 43,06 57,12 45,88 60,86 44,38 58,87 44,65 59,23

150510 PISO CIMENTADO, DESEMPOLADO C/ JUNTA DE PVC m2 30,35 40,26 41,68 55,29 44,53 59,07 43,01 57,06 43,29 57,43

159510 PISO CIMENTADO, DESEMPOLADO C/ JUNTA DE PVC (MRR / RMS) m2 30,79 40,85 42,34 56,17 45,24 60,02 43,69 57,96 43,98 58,34

150513 PISO CIMENTADO ESTRIADO P/ RAMPAS m2 30,21 40,08 42,27 56,08 45,29 60,08 43,69 57,96 43,97 58,33

150516 PISO EM LADRILHO CERAMICO C/ CONTRA-PISO m2 55,12 73,12 68,57 90,96 71,95 95,45 70,16 93,07 70,49 93,51

150517 PISO EM PEDRA ARDOSIA C/ CONTRA-PISO m2 45,14 59,88 58,83 78,04 62,26 82,59 60,43 80,17 60,77 80,62

150518 PISO EM GRANITO m2 218,44 289,78 239,75 318,05 245,09 325,14 242,25 321,37 242,77 322,06

150519 PISO VINILICO C/ ARGAMASSA DE REGULARIZACAO m2 53,47 70,93 56,05 74,36 56,70 75,22 56,36 74,77 56,42 74,85

150520 PISO EM LADRILHO HIDRAULICO C/ CONTRA-PISO m2 59,57 79,03 72,42 96,07 75,65 100,36 73,94 98,09 74,25 98,50

150521 PISO EM PEDRA NATURAL C/ CONTRA-PISO m2 54,14 71,82 67,45 89,48 70,80 93,92 69,02 91,56 69,34 91,99

150522 PISO DE BORRACHA ANTI-DERRAPANTE C/ ARGAMASSA DE REGULARIZACAO m2 46,76 62,03 49,65 65,87 50,37 66,82 49,99 66,32 50,06 66,41

150525 EXEC. DE PISO DE ALTA RESISTENCIA, e=8mm, INCL. JUNTAS m2 46,02 61,05 53,64 71,16 55,55 73,69 54,53 72,34 54,72 72,59

150528 EXEC. DE PISO DE ALTA RESISTENCIA, e=10mm, INCL. JUNTAS m2 70,44 93,45 78,93 104,71 81,05 107,52 79,92 106,02 80,13 106,30

150531 EXEC. DE PISO DE ALTA RESISTENCIA, e=12mm, INCL. JUNTAS m2 57,15 75,82 66,46 88,17 68,79 91,26 67,55 89,61 67,77 89,90

150534 PISO EM TABOADO C/ ARAGAMASSA DE REGULARIZACAO m2 139,98 185,70 155,18 205,86 158,99 210,92 156,97 208,24 157,34 208,73

150535 PISO ELEVADO m2 201,28 267,02 201,28 267,02 201,28 267,02 201,28 267,02 201,28 267,02

150537 PISO EM TACOS DE MADEIRA C/ ARGAMASSA DE REGULARIZACAO m2 119,38 158,37 130,22 172,75 132,94 176,36 131,50 174,45 131,76 174,79

150540 RODAPE CIMENTADO, H=10cm m 5,19 6,89 7,27 9,64 7,79 10,33 7,51 9,96 7,56 10,03

150543 RODAPE CERAMICO, H=7,5cm m 8,12 10,77 10,71 14,21 11,36 15,07 11,02 14,62 11,08 14,70

150546 RODAPE VINILICO m 7,16 9,50 7,59 10,07 7,69 10,20 7,64 10,14 7,65 10,15

150549 RODAPE DE ALTA RESISTENCIA, H=10cm, e=1,5cm m 10,95 14,53 12,99 17,23 13,51 17,92 13,23 17,55 13,28 17,62

150552 RODAPE DE MADEIRA, H=7cm, e=1cm m 14,16 18,78 15,95 21,16 16,40 21,76 16,15 21,42 16,20 21,49

150555 SOLEIRA DE MARMORE , H=15cm, e=2cm m 37,49 49,73 41,45 54,99 42,42 56,27 41,89 55,57 42,00 55,72

150558 SOLEIRA DE GRANITO, H=15cm, e=2cm m 32,04 42,50 34,17 45,33 34,69 46,02 34,41 45,65 34,47 45,73

150561 SOLEIRA PRE-MOLDADA DE GRANILITE, H=15cm, e=2cm m 40,32 53,49 44,28 58,74 45,25 60,03 44,72 59,33 44,83 59,47

150564 PEITORIL EM MARMORE, H=20cm, e=2cm m 80,94 107,38 84,90 112,63 85,87 113,92 85,34 113,21 85,45 113,36

150567 PEITORIL EM GRANITO, H=20cm, e=2cm m 40,32 53,49 44,28 58,74 45,25 60,03 44,72 59,33 44,83 59,47

150570 PEITORIL PRE-MOLDADO DE CONCRETO, H=20cm, e=2cm m 14,45 19,17 18,41 24,42 19,38 25,71 18,85 25,01 18,96 25,15

150600 TRATAMENTO / IMPERMEABILIZACAO

150601IMPERMEABILIZACAO EM ESTRUTURAS COM MANTA ASFALTICA, REGULARIZACAO E PROTECAO

MECANICAm2 63,83 84,68 68,84 91,32 70,11 93,01 69,43 92,11 69,55 92,27

150604IMPERMEABILIZACAO EM CALHAS COM MANTA ASFALTICA, REGULARIZACAO E PROTECAO

MECANICAm2 63,83 84,68 68,84 91,32 70,11 93,01 69,43 92,11 69,55 92,27

150607 IMPERMEABILIZACAO EM RESERVATORIOS COM PREPARO DE SUPERFICIE E TRATAMENTO EPOXI m2 61,93 82,16 61,93 82,16 61,93 82,16 61,93 82,16 61,93 82,16

150610IMPERMEABILIZACAO EM ESTACOES DE TRAT. DE AGUA E ESGOTO COM PREPARO DE

SUPERFICIE E TRATAMENTO EPOXIm2 61,93 82,16 61,93 82,16 61,93 82,16 61,93 82,16 61,93 82,16

150613 IMPERMEABILIZACAO EM JARDINEIRAS COM MANTA ASFALTICA E PROTECAO MECANICA m2 45,86 60,84 48,40 64,21 49,05 65,07 48,70 64,61 48,76 64,69

150616 IMPERMEABILIZACAO COM IGOL COM 3 DEMAOS m2 18,39 24,40 23,45 31,11 24,72 32,79 24,05 31,90 24,16 32,05

150619 IMPERMEABILIZACAO EM ESTRUTURAS COM TRATAMENTO EPOXI m2 55,56 73,71 55,56 73,71 55,56 73,71 55,56 73,71 55,56 73,71

150622TRATAMENTO EM ESTRUTURA DE MADEIRA, INCL. LIXAMENTO E APLICACAO DE CARBOLINEUM,

EM TRES DEMAOSm2 7,19 9,54 9,66 12,81 10,28 13,64 9,95 13,20 10,01 13,28

150700 PINTURA

150701 PINTURA A BASE DE CONSERVADO P, OU SIMILAR P/ CAIACAO, INCL. LIXAMENTO m2 5,21 6,91 7,47 9,91 8,03 10,65 7,74 10,27 7,79 10,33

150704 PINTURA C/ PVA-LATEX, S/ MASSA, INCL. LIXAMENTO, EM DUAS DEMAOS m2 8,10 10,75 10,67 14,15 11,32 15,02 10,97 14,55 11,03 14,63

150704 PINTURA C/ PVA-LATEX, S/ MASSA, INCL. LIXAMENTO, EM DUAS DEMAOS (MRR / RMS) m2 8,10 10,75 10,67 14,15 11,32 15,02 10,97 14,55 11,03 14,63

150707 PINTURA C/ PVA-LATEX, C/ MASSA, INCL. LIXAMENTO, EM DUAS DEMAOS m2 13,26 17,59 18,04 23,93 19,24 25,52 18,59 24,66 18,71 24,82

150707 PINTURA C/ PVA-LATEX, C/ MASSA, INCL. LIXAMENTO, EM DUAS DEMAOS (MRR / RMS) m2 13,26 17,59 18,04 23,93 19,24 25,52 18,59 24,66 18,71 24,82

150710 PINTURA A OLEO, S/ MASSA, EM PAREDES, EM DUAS DEMAOS m2 14,19 18,82 18,13 24,05 19,12 25,36 18,60 24,67 18,69 24,79

150713 PINTURA A OLEO, C/ MASSA, EM PAREDES, EM DUAS DEMAOS m2 20,86 27,67 26,69 35,41 28,14 37,33 27,36 36,30 27,50 36,48

150716PINTURA A OLEO, S/ MASSA, SOBRE MADEIRA, INCL. LIXAMENTO E APLICACAO DE PRIMER

(SELADOR), EM DUAS DEMAOSm2 14,03 18,61 17,97 23,84 18,96 25,15 18,44 24,46 18,53 24,58

150719PINTURA A OLEO, C/ MASSA, SOBRE MADEIRA, INCL. LIXAMENTO E APLICACAO DE PRIMER

(SELADOR), EM DUAS DEMAOSm2 20,87 27,69 26,70 35,42 28,15 37,34 27,37 36,31 27,51 36,49

150722 PINTURA ESMALTE, S/ MASSA, SOBRE MADEIRA, INCL. LIXAMENTO, EM DUAS DEMAOS m2 9,88 13,11 12,78 16,95 13,52 17,94 13,13 17,42 13,20 17,51

150725 PINTURA ESMALTE, C/ MASSA, SOBRE MADEIRA, INCL. LIXAMENTO, EM DUAS DEMAOS m2 20,75 27,53 26,51 35,17 27,96 37,09 27,19 36,07 27,33 36,26

150728 PINTURA A VERNIZ EM MADEIRA, INCL. LIXAMENTO, EM DUAS DEMAOS m2 8,86 11,75 11,25 14,92 11,85 15,72 11,53 15,30 11,58 15,36

150731 PINTURA A OLEO EM METAL, INCL. BASE ANTICORROSIVA E LIXAMENTO,EM DUAS DEMAOS m2 15,63 20,73 20,85 27,66 22,15 29,38 21,45 28,46 21,58 28,63

150734 PINTURA ESMALTE EM METAL, INCL. BASE ANTICORROSIVA E LIXAMENTO, EM DUAS DEMAOS m2 23,83 31,61 32,17 42,68 34,25 45,44 33,15 43,98 33,35 44,24

150737 PINTURA GRAFITE EM METAL, INCL. BASE ANTICORROSIVA E LIXAMENTO, EM DUAS DEMAOS m2 19,41 25,75 25,01 33,18 26,41 35,04 25,66 34,04 25,80 34,23

150740 PINTURA A BASE DE SILICONE, EM DUAS DEMAOS m2 10,64 14,12 13,77 18,27 14,55 19,30 14,14 18,76 14,21 18,85

150743 PINTURA EPOXI C/ MASSA, EM DUAS DEMAOS m2 59,75 79,26 76,43 101,39 80,60 106,92 78,38 103,98 78,78 104,51

150746 PINTURA EPOXI S/ MASSA, EM DUAS DEMAOS m2 36,00 47,76 46,94 62,27 49,68 65,91 48,22 63,97 48,48 64,31

150749PINTURA INTERNA E EXTERNA C/ TINTA ACRILICA S/ MASSA, INCL. O LIQUIDO SELADOR E

LIXAMENTO, EM DUAS DEMAOSm2 17,28 22,92 22,24 29,50 23,47 31,14 22,81 30,26 22,93 30,42

150749PINTURA INTERNA E EXTERNA C/ TINTA ACRILICA S/ MASSA, INCL. O LIQUIDO SELADOR E

LIXAMENTO, EM DUAS DEMAOS (MRR / RMS)m2 17,28 22,92 22,24 29,50 23,47 31,14 22,81 30,26 22,93 30,42

150752PINTURA INTERNA E EXTERNA C/ TINTA ACRILICA C/ MASSA, INCL. O LIQUIDO SELADOR E

LIXAMENTO, EM DUAS DEMAOSm2 24,00 31,84 30,60 40,59 32,25 42,78 31,37 41,62 31,53 41,83

150752PINTURA INTERNA E EXTERNA C/ TINTA ACRILICA C/ MASSA, INCL. O LIQUIDO SELADOR E

LIXAMENTO, EM DUAS DEMAOS (MRR / RMS)m2 24,00 31,84 30,60 40,59 32,25 42,78 31,37 41,62 31,53 41,83

150755PINTURA DE PISO CIMENTADO, C/TINTA NOVACOR, OU SIMILAR, INCL. LIXAMENTO, EM DUAS

DEMAOSm2 7,60 10,08 10,29 13,65 10,97 14,55 10,61 14,08 10,67 14,15

150758 PINTURA A BASE DE CIMENTO m2 6,85 9,09 9,25 12,27 9,85 13,07 9,53 12,64 9,59 12,72

150800 SERVICOS COMPLEMENTARES

150801 CHUMBADORES METALICOS kg 9,28 12,31 11,29 14,98 11,79 15,64 11,52 15,28 11,57 15,35

Página: 26 de 59

Page 27: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

150804FORNEC. E MONTAGEM DE ARMARIOS SOB BANCADA, EM MADEIRA DE LEI REVESTIDA C/

FORMICA, INCL. ELEMENTOS P/ FIXACAOm2 594,02 788,03 595,01 789,34 595,26 789,67 595,13 789,50 595,16 789,54

150807 FORNEC. E INST. DE ARMARIOS DE ACO, INCL. ELEMENTOS P/ FIXACAO m2 346,29 459,39 348,38 462,16 348,90 462,85 348,62 462,48 348,67 462,55

150810FORNEC. E MONTAGEM DE GRADE DE PROTECAO EM CHAPA DE ACO No.7, PERFURADA C/

ORIFICIOS DE 1" DE DIAMETRO, e=3/16", C/ ACESSORIOS P/ FIXACAO, INCL. ASSENT. E PINTURAm2 160,73 213,22 187,08 248,18 193,67 256,92 190,15 252,25 190,79 253,10

150813FORNEC. E MONTAGEM DE GUARDA-CORPO EM TUBOS DE FERRO GALVANIZADO, DN = 1 1/2",

INCL. PINTURA A OLEO EM DUAS DEMAOS SOB BASE ANTICORROSIVA, h = 0,80mm2 193,59 256,82 207,72 275,56 211,26 280,26 209,37 277,75 209,71 278,20

150816FORNEC. E MONTAGEM DE ESCADA MARINHEIRO, EM ACO CA-25, DN 3/4", INCL. PINTURA A

BASE DE EPOXIm 85,97 114,05 96,51 128,03 99,15 131,53 97,74 129,66 97,99 129,99

150817FORNEC. E MONTAGEM DE ESCADA MARINHEIRO, EM ACO CA-25, DN 3/4", INCL. PINTURA A

BASE DE EPOXI COM GUARDA-CORPOm 298,59 396,11 309,13 410,09 311,77 413,59 310,36 411,72 310,61 412,06

150819FORNEC. E MONTAGEM DE ESCADA TIPO PISCINA EM TUBO DE ACO GALVANIZADO DE 2",

DEGRAUS EM ACO-CA25, DN = 3/4", FIXADA ATRAVES DE BARRA CHATA DE 2"X3/16" E

CHUMBADORES URX DN=3/16", INCL.ELEM. DE FIXACAO

m 159,41 211,47 171,14 227,03 174,08 230,93 172,51 228,85 172,79 229,22

150820FORNEC.MONTAGEM ESCADA TIPO PISCINA EM TUBO DE ACO GALVAN.DE 2",DEGRAUS EM ACO-

CA25,DN=3/4", FIXADA COM BARRA CHATA DE 2"X3/16" E CHUMBADORES URX

DN=3/16",INCL.ELEM.DE FIXACAO E GUARDA-CORPO.

m 372,03 493,53 383,76 509,10 386,70 513,00 385,13 510,91 385,41 511,28

150822 BANCADA DE MARMORE BRANCO, L =55 cm, e = 3 cm m 346,23 459,31 356,25 472,60 358,77 475,94 357,43 474,17 357,67 474,49

150825 BANCADA DE ACO INOX, L =55 cm m 529,53 702,47 559,25 741,90 566,70 751,78 562,73 746,52 563,45 747,47

150828 BANCADA DE CONCRETO SOBRE ALVENARIA, L=55cm m 317,62 421,35 410,43 544,48 433,69 575,33 421,30 558,90 423,57 561,91

150900 LIMPEZA DA OBRA

150901 LIMPEZA DE REVESTIMENTOS CERAMICOS E AZULEJOS m2 3,06 4,06 4,20 5,57 4,49 5,96 4,34 5,76 4,36 5,78

150904 LIMPEZA DE APARELHOS SANITARIOS un 4,73 6,27 6,64 8,81 7,12 9,45 6,87 9,11 6,91 9,17

150907 LIMPEZA DE VIDROS m2 2,70 3,58 3,47 4,60 3,66 4,86 3,56 4,72 3,58 4,75

150910 LIMPEZA DE PISOS CIMENTADOS m2 2,82 3,74 3,83 5,08 4,08 5,41 3,95 5,24 3,97 5,27

150913 LIMPEZA DE PISOS CERAMICOS m2 4,55 6,04 6,46 8,57 6,94 9,21 6,69 8,87 6,73 8,93

150917 LIMPEZA DA OBRA m2 1,21 1,61 1,80 2,39 1,95 2,59 1,87 2,48 1,89 2,51

159000 SERVICOS NAO CODIFICADOS

159001IMPERMEABILIZACAO COM MANTA ASFALTICA 3mm DAS SUPERFICIES DE CONCRETO INCLUSIVE

PROTECAO MECANICAM2 45,86 60,84 48,40 64,21 49,05 65,07 48,70 64,61 48,76 64,69

159010 REGULARIZACAO DE SUPERFICIE COM ARGAMASSA 1/3 m2 5,05 6,70 7,37 9,78 7,94 10,53 7,64 10,14 7,69 10,20

159015 PROTECAO MECANICA PARA SUPERFICIES IMPERMEABILIZADAS m2 12,05 15,99 15,34 20,35 16,18 21,46 15,73 20,87 15,82 20,99

159016 LIMPEZA DAS SUPERFICIES COM JATO DE AREIA m2 7,86 10,43 9,70 12,87 10,16 13,48 9,91 13,15 9,96 13,21

159017 IMPERMEABILIZACAO DE RESERVATORIOS S/REGULARIZACAO E S/PROTECAO MECANICA m2 36,63 48,59 43,72 58,00 45,50 60,36 44,55 59,10 44,72 59,33

159018 HIDROJATEAMENTO m2 9,95 13,20 10,72 14,22 10,91 14,47 10,81 14,34 10,83 14,37

159019 REPARO SUPERFICIAL COM ESTUCAMENTO CORRETIVO m2 52,04 69,04 56,99 75,60 58,23 77,25 57,57 76,37 57,69 76,53

159101 FORRO DE GESSO EM PLACAS LISO m2 5,63 7,47 5,63 7,47 5,63 7,47 5,63 7,47 5,63 7,47

159102 REJUNTE DE PISO CERAMICO m2 3,49 4,63 4,63 6,14 4,92 6,53 4,77 6,33 4,79 6,35

159104 FORRO DE PVC L=20cm COM ESTRUTURA DE MADEIRA M2 68,25 90,54 76,04 100,87 77,99 103,46 76,96 102,10 77,14 102,33

159150 ESTRUTURA DE MADEIRA PARA VIVEIROS COM MADEIRA SERRADA m2 229,90 304,99 229,90 304,99 229,90 304,99 229,90 304,99 229,90 304,99

159151 FECHAMENTO DE TELA PARA VIVEIROS DE ANIMAIS m2 100,63 133,50 122,47 162,47 127,93 169,71 125,03 165,86 125,53 166,53

159152 FECHAMENTO DE TELA PARA VIVEIROS DE PLANTAS (120m2) COM ESTRUTURA DE MADEIRA UN 19.560,44 25.948,88 23.060,71 30.592,34 23.937,31 31.755,24 23.471,44 31.137,21 23.554,48 31.247,37

159200REVESTIMENTO DE FACHADA EM LUXALON M250 AZUL COBALTO COM FORNECIMENTO,

COLOCACAO E MONTAGEMm2 200,25 265,65 200,25 265,65 200,25 265,65 200,25 265,65 200,25 265,65

159201 LIMPEZA E DESOBSTRUCAO DE REDES DE ESGOTO / DRENAGEM M 1,68 2,23 1,84 2,44 1,88 2,49 1,86 2,47 1,86 2,47

159202 LIMPEZA E DESOBSTRUCAO DE REDES DE ESGOTO / DRENAGEM H 139,89 185,58 153,60 203,77 157,04 208,33 155,21 205,90 155,54 206,34

159205 TELHA METALICA TERMO ACUSTICA COM FORNECIMENTO, COLOCACAO E MONTAGEM m2 75,95 100,76 75,95 100,76 75,95 100,76 75,95 100,76 75,95 100,76

159206 ESTRUTURA METALICA PARA TELHA TERMO ACUSTICA kg 3,82 5,07 3,82 5,07 3,82 5,07 3,82 5,07 3,82 5,07

159208 CALHA METALICA m 31,63 41,96 36,38 48,26 37,57 49,84 36,94 49,00 37,06 49,16

159220 BRISE EM LUXALON INSTALADO m2 234,17 310,65 234,17 310,65 234,17 310,65 234,17 310,65 234,17 310,65

159230 FORRO ACUSTICO m2 101,81 135,06 101,81 135,06 101,81 135,06 101,81 135,06 101,81 135,06

159513

FORNEC. E MONTAGEM DE GUARDA-CORPO EM TUBOS DE FERRO GALVANIZADO, DN = 1 1/2",

INCL. PINTURA A OLEO EM DUAS DEMAOS SOB BASE ANTICORROSIVA, h = 1,20mm 231,86 307,59 248,07 329,09 252,13 334,48 249,96 331,60 250,36 332,13

160000 INSTALACOES HIDRAULICAS E SANITARIAS

160100INST. HIDRAULICAS (AGUA FRIA E INST. PLUVIAIS) E SANITARIAS EM CASA DE QUIMICA, INCL.

ASSENT. DE TANQUE P/ RESERVACAO, TUBOS, VALVULAS, PECAS, CONEX., APARELHOS E

ACESSORIOS162000 RESERVATORIOS COM FUSTE METALICOS EM ACO USI SAC41

162100 RESERVATORIO METALICO EM ACO USI SAC41 COM CAPACIDADE NOMINAL DE 5000l

162101FORNECIMENTO E INSTALACAO DE RESERVATORIO METALICO EM ACO USI SAC41 COM

CAPACIDADE NOMINAL DE 5000l E FUSTE C/ H=8mun 9.004,94 11.945,95 9.004,94 11.945,95 9.004,94 11.945,95 9.004,94 11.945,95 9.004,94 11.945,95

162104FORNECIMENTO E INSTALACAO DE RESERVATORIO METALICO EM ACO USI SAC41 COM

CAPACIDADE NOMINAL DE 5000l E FUSTE C/ H=10mun 10.346,80 13.726,06 10.346,80 13.726,06 10.346,80 13.726,06 10.346,80 13.726,06 10.346,80 13.726,06

162107FORNECIMENTO E INSTALACAO DE RESERVATORIO METALICO EM ACO USI SAC41 COM

CAPACIDADE NOMINAL DE 5000l E FUSTE C/ H=12mun 11.313,74 15.008,81 11.313,74 15.008,81 11.313,74 15.008,81 11.313,74 15.008,81 11.313,74 15.008,81

162200 RESERVATORIO METALICO EM ACO USI SAC41 COM CAPACIDADE NOMINAL DE 10000l

162201FORNECIMENTO E INSTALACAO DE RESERVATORIO METALICO EM ACO USI SAC41 COM

CAPACIDADE NOMINAL DE 10000l E FUSTE C/ H=8m TRATADO E PINTADOun 11.449,24 15.188,56 11.449,24 15.188,56 11.449,24 15.188,56 11.449,24 15.188,56 11.449,24 15.188,56

162204FORNECIMENTO E INSTALACAO DE RESERVATORIO METALICO EM ACO USI SAC41 COM

CAPACIDADE NOMINAL DE 10000l E FUSTE C/ H=10m TRATADO E PINTADOun 14.023,77 18.603,93 14.023,77 18.603,93 14.023,77 18.603,93 14.023,77 18.603,93 14.023,77 18.603,93

162207FORNECIMENTO E INSTALACAO DE RESERVATORIO METALICO EM ACO USI SAC41 COM

CAPACIDADE NOMINAL DE 10000l E FUSTE C/ H=12m TRATADO E PINTADOun 19.030,76 25.246,21 19.030,76 25.246,21 19.030,76 25.246,21 19.030,76 25.246,21 19.030,76 25.246,21

162300 RESERVATORIO METALICO EM ACO USI SAC41 COM CAPACIDADE NOMINAL DE 15000l

162301FORNECIMENTO E INSTALACAO DE RESERVATORIO METALICO EM ACO USI SAC41 COM

CAPACIDADE NOMINAL DE 15000l E FUSTE C/ H=8m TRATADO E PINTADOun 16.615,40 22.041,99 16.615,40 22.041,99 16.615,40 22.041,99 16.615,40 22.041,99 16.615,40 22.041,99

162304FORNECIMENTO E INSTALACAO DE RESERVATORIO METALICO EM ACO USI SAC41 COM

CAPACIDADE NOMINAL DE 15000l E FUSTE C/ H=10m TRATADO E PINTADOun 19.767,47 26.223,53 19.767,47 26.223,53 19.767,47 26.223,53 19.767,47 26.223,53 19.767,47 26.223,53

162307FORNECIMENTO E INSTALACAO DE RESERVATORIO METALICO EM ACO USI SAC41 COM

CAPACIDADE NOMINAL DE 15000l E FUSTE C/ H=12m TRATADO E PINTADOun 23.582,56 31.284,62 23.582,56 31.284,62 23.582,56 31.284,62 23.582,56 31.284,62 23.582,56 31.284,62

162400 RESERVATORIO METALICO EM ACO USI SAC41 COM CAPACIDADE NOMINAL DE 20000l

162401FORNECIMENTO E INSTALACAO DE RESERVATORIO METALICO EM ACO USI SAC41 COM

CAPACIDADE NOMINAL DE 20000l E FUSTE C/ H=8m TRATADO E PINTADOun 17.299,50 22.949,52 17.299,50 22.949,52 17.299,50 22.949,52 17.299,50 22.949,52 17.299,50 22.949,52

162404FORNECIMENTO E INSTALACAO DE RESERVATORIO METALICO EM ACO USI SAC41 COM

CAPACIDADE NOMINAL DE 20000l E FUSTE C/ H=10m TRATADO E PINTADOun 21.169,84 28.083,91 21.169,84 28.083,91 21.169,84 28.083,91 21.169,84 28.083,91 21.169,84 28.083,91

162407FORNECIMENTO E INSTALACAO DE RESERVATORIO METALICO EM ACO USI SAC41 COM

CAPACIDADE NOMINAL DE 20000l E FUSTE C/ H=12m TRATADO E PINTADOun 24.337,70 32.286,39 24.337,70 32.286,39 24.337,70 32.286,39 24.337,70 32.286,39 24.337,70 32.286,39

162500 RESERVATORIO METALICO EM ACO USI SAC41 COM CAPACIDADE NOMINAL DE 30000l

162501FORNECIMENTO E INSTALACAO DE RESERVATORIO METALICO EM ACO USI SAC41 COM

CAPACIDADE NOMINAL DE 25000l E FUSTE C/H=8m TRATADO E PINTADOun 21.169,84 28.083,91 21.169,84 28.083,91 21.169,84 28.083,91 21.169,84 28.083,91 21.169,84 28.083,91

162504FORNECIMENTO E INSTALACAO DE RESERVATORIO METALICO EM ACO USI SAC41 COM

CAPACIDADE NOMINAL DE 25000l E FUSTE C/H=10m TRATADO E PINTADOun 23.161,59 30.726,17 23.161,59 30.726,17 23.161,59 30.726,17 23.161,59 30.726,17 23.161,59 30.726,17

162507FORNECIMENTO E INSTALACAO DE RESERVATORIO METALICO EM ACO USI SAC41 COM

CAPACIDADE NOMINAL DE 25000l E FUSTE C/H=12m TRATADO E PINTADOun 25.190,16 33.417,27 25.190,16 33.417,27 25.190,16 33.417,27 25.190,16 33.417,27 25.190,16 33.417,27

162600 RESERVATORIO METALICO EM ACO USI SAC41 COM CAPACIDADE NOMINAL DE 50000l

162601FORNECIMENTO E INSTALACAO DE RESERVATORIO METALICO EM ACO USI SAC41 COM

CAPACIDADE NOMINAL DE 50000l E FUSTE C/ H=8m TRATADO E PINTADOun 33.772,81 44.803,01 33.772,81 44.803,01 33.772,81 44.803,01 33.772,81 44.803,01 33.772,81 44.803,01

162604FORNECIMENTO E INSTALACAO DE RESERVATORIO METALICO EM ACO USI SAC41 COM

CAPACIDADE NOMINAL DE 50000l E FUSTE C/ H=10m TRATADO E PINTADOun 37.979,95 50.384,20 37.979,95 50.384,20 37.979,95 50.384,20 37.979,95 50.384,20 37.979,95 50.384,20

162607FORNECIMENTO E INSTALACAO DE RESERVATORIO METALICO EM ACO USI SAC41 COM

CAPACIDADE NOMINAL DE 50000l E FUSTE C/ H=12m TRATADO E PINTADOun 42.711,99 56.661,73 42.711,99 56.661,73 42.711,99 56.661,73 42.711,99 56.661,73 42.711,99 56.661,73

162700 RESERVATORIO METALICO EM ACO USI SAC41 COM CAPACIDADE NOMINAL DE 75000l

162701FORNECIMENTO E INSTALACAO DE RESERVATORIO METALICO EM ACO USI SAC41 COM

CAPACIDADE NOMINAL DE 75000l E FUSTE C/ H=8m TRATADO E PINTADOun 64.458,04 85.510,04 64.458,04 85.510,04 64.458,04 85.510,04 64.458,04 85.510,04 64.458,04 85.510,04

162704FORNECIMENTO E INSTALACAO DE RESERVATORIO METALICO EM ACO USI SAC41 COM

CAPACIDADE NOMINAL DE 75000l E FUSTE C/ H=10m TRATADO E PINTADOun 67.303,58 89.284,93 67.303,58 89.284,93 67.303,58 89.284,93 67.303,58 89.284,93 67.303,58 89.284,93

162707FORNECIMENTO E INSTALACAO DE RESERVATORIO METALICO EM ACO USI SAC41 COM

CAPACIDADE NOMINAL DE 75000l E FUSTE C/ H=12m TRATADO E PINTADOun 71.892,22 95.372,22 71.892,22 95.372,22 71.892,22 95.372,22 71.892,22 95.372,22 71.892,22 95.372,22

162800 RESERVATORIO METALICO EM ACO USI SAC41 COM CAPACIDADE NOMINAL DE 100000l

162801FORNECIMENTO E INSTALACAO DE RESERVATORIO METALICO EM ACO USI SAC41 COM

CAPACIDADE NOMINAL DE 100000l E FUSTE C/ H=8m TRATADO E PINTADOun 68.198,16 90.471,68 68.198,16 90.471,68 68.198,16 90.471,68 68.198,16 90.471,68 68.198,16 90.471,68

162804FORNECIMENTO E INSTALACAO DE RESERVATORIO METALICO EM ACO USI SAC41 COM

CAPACIDADE NOMINAL DE 100000l E FUSTE C/ H=10m TRATADO E PINTADOun 73.881,33 98.010,97 73.881,33 98.010,97 73.881,33 98.010,97 73.881,33 98.010,97 73.881,33 98.010,97

Página: 27 de 59

Page 28: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

162807FORNECIMENTO E INSTALACAO DE RESERVATORIO METALICO EM ACO USI SAC41 COM

CAPACIDADE NOMINAL DE 100000l E FUSTE C/ H=12m TRATADO E PINTADOun 73.881,33 98.010,97 73.881,33 98.010,97 73.881,33 98.010,97 73.881,33 98.010,97 73.881,33 98.010,97

169000 SERVICOS NAO CODIFICADOS

169001 INSTALACOES HIDRO SANITARIAS cj 4.115,17 5.459,18 5.157,17 6.841,50 5.418,17 7.187,74 5.279,17 7.003,35 5.304,17 7.036,51

169101 RALO EM CHAPA DE ACO INOX FORNECIMENTO E ASSENTAMENTO un 45,77 60,72 61,07 81,02 64,90 86,10 62,86 83,39 63,23 83,88

169105 FORNECIMENTO E FIXACAO DE CANTONEIRAS EM ALUMINIO PARA DAFA'S m 36,54 48,47 37,57 49,84 37,84 50,20 37,70 50,01 37,73 50,05

169200 CAIXA D'AGUA 1000l un 382,12 506,92 423,80 562,21 434,24 576,06 428,68 568,69 429,68 570,01

170000 SERVICOS AMBIENTAIS, RECUPERACAO DE AREAS DEGRADADAS E PAISAGISMO

170100 PREPARACAO DO TERRENO E CORRECOES

170101 ARAGEM MANUAL DE SOLOS EM 1a CATEGORIA M2 0,63 0,84 0,93 1,23 1,01 1,34 0,97 1,29 0,97 1,29

170102 ARAGEM MANUAL DE SOLOS EM 2a CATEGORIA SEM ADUBACAO M2 1,09 1,45 1,63 2,16 1,76 2,33 1,69 2,24 1,71 2,27

170103 ARAGEM MANUAL DE SOLOS EM 2a CATEGORIA COM ADUBACAO M2 1,98 2,63 2,67 3,54 2,84 3,77 2,75 3,65 2,76 3,66

170104 ARAGEM MECANIZADA DE SOLOS EM 1a CATEGORIA HA 434,21 576,02 502,97 667,24 520,25 690,16 511,07 677,99 512,69 680,13

170105 ARAGEM MECANIZADA DE SOLOS EM 2a CATEGORIA SEM ADUBACAO HA 596,17 790,88 664,93 882,10 682,21 905,02 673,03 892,84 674,65 894,99

170106 ARAGEM MECANIZADA DE SOLOS EM 2a CATEGORIA COM ADUBACAO E APLICACAO DE CALCARIO HA 1.116,51 1.481,16 1.185,27 1.572,38 1.202,55 1.595,30 1.193,37 1.583,12 1.194,99 1.585,27

170110 ABERTURA MANUAL DE COVAS, INCLUSIVE MARCACAO UN 2,27 3,01 3,12 4,14 3,33 4,42 3,22 4,27 3,24 4,30

170111 ABERTURA MECANIZADA DE COVAS, INCLUSIVE MARCACAO UN 0,99 1,31 1,05 1,39 1,07 1,42 1,06 1,41 1,06 1,41

170120 APLICACAO DE CALCARIO, COM FORNECIMENTO DE MATERIAL HA 18,46 24,49 23,17 30,74 24,35 32,30 23,72 31,47 23,83 31,61

170121 APLICACAO DE UREIA, COM FORNECIMENTO DE MATERIAL HA 93,31 123,79 98,02 130,03 99,20 131,60 98,57 130,76 98,68 130,91

170130 APLICACAO DE ADUBO FOLIAR, COM FORNECIMENTO DE MATERIAL HA 148,18 196,58 178,74 237,12 186,42 247,30 182,34 241,89 183,06 242,85

170131 APLICACAO DE ADUBO ORGANICO CURTIDO (ESTERCO), COM FORNECIMENTO DE MATERIAL M2 11,45 15,19 16,04 21,28 17,19 22,80 16,58 22,00 16,69 22,14

170200 CERCAS E INFRAESTRUTURA

170201CERCA C/ 04 FIOS DE ARAME FARPADO 16 BWG 4" X 4", C/ ESTACA DE MADEIRA TIPO

EUCALIPTO TRATADO OU SIMILAR C/ DIMENSÕES DE 0,10 A 0,12 x 2,10 m (DP1804-03)m 12,28 16,29 15,43 20,47 16,22 21,52 15,80 20,96 15,87 21,05

170202CERCA C/ 08 FIOS DE ARAME FARPADO 16 BWG 4" X 4", C/ ESTACA DE MADEIRA TIPO

EUCALIPTO TRATADO OU SIMILAR C/ DIMENSÕES DE 0,10 A 012 x 2,10 m (DP1804-03)m 14,80 19,63 17,95 23,81 18,74 24,86 18,32 24,30 18,39 24,40

170203FORNECIMENTO E EXECUCAO DE PALICADAS EM MADEIRA IMUNIZADA (EUCALIPTO TRATADO),

COM FORNECIMENTO DE MATERIALM2 235,39 312,27 330,89 438,96 354,89 470,80 342,14 453,88 344,39 456,87

170204FORNECIMENTO E EXECUCAO DE PALICADAS EM C/ ESTACAS GRANDES (2,00X0,10M) C/ ESPECIES

VEGETAIS EXOTICAS P/ ENRAIZAMENTO NO LOCAL, COM FORNECIMENTO DE MATERIALM2 314,83 417,65 410,33 544,34 434,33 576,18 421,58 559,27 423,83 562,25

170211REPARO DE CERCA C/ 04 FIOS DE ARAME FARPADO 16 BWG 4" X 4", C/ ESTACA DE MADEIRA

TIPO EUCALIPTO TRATADO OU SIMILAR C/ DIMENSÕES DE 0,10 A 0,12 x 2,10 m (DP1804-03)m 5,71 7,57 7,29 9,67 7,69 10,20 7,47 9,91 7,52 9,98

170212REPADO DE CERCA C/ 08 FIOS DE ARAME FARPADO 16 BWG 4" X 4", C/ ESTACA DE MADEIRA

TIPO EUCALIPTO TRATADO OU SIMILAR C/ DIMENSÕES DE 0,10 A 012 x 2,10 m (DP1804-03)m 7,01 9,30 8,59 11,40 8,99 11,93 8,77 11,63 8,82 11,70

170300 PLANTIO DE GRAMAS, MUDAS ORNAMENTAIS E ARVORES

170301PLANTIO DE MUDAS DE GRANDE PORTE, ARBUSTOS E CERCAS VIVAS, INCLUINDO FECHAMENTO

DE COVAS, EXCETO FORNECIMENTO DE MUDASUN 0,78 1,03 1,16 1,54 1,26 1,67 1,21 1,61 1,22 1,62

170302PLANTIO DE MUDAS NATIVAS PARA CINTURAO VERDE E MATA NATIVA, EXCETO FORNECIMENTO

DE MUDASUN 0,42 0,56 0,62 0,82 0,67 0,89 0,64 0,85 0,65 0,86

170303 PLANTIO DE MUDAS ORNAMENTAIS (ARRANJO), EXCETO FORNECIMENTO DE MUDAS UN 1,17 1,55 1,75 2,32 1,89 2,51 1,81 2,40 1,83 2,43

170304PLANTIO DE MUDAS NATIVAS PARA CINTURAO VERDE OU MATA CILIAR, INCLUINDO

FERILIZACAO MANUAL COM MISTURA DE SOLO E FECHAMENTO DE COVA, EXCETO

FORNECIMENTO DE MUDAS

UN 2,07 2,75 2,43 3,22 2,52 3,34 2,47 3,28 2,48 3,29

170305PLANTIO DE MUDAS ORNAMENTAIS (ARRANJO), INCLUINDO FERTILIZACAO MANUAL COM

MISTURA DE SOLO E FECHAMENTO DE COVA, EXCETO FORNECIMENTO DE MUDASM2 7,26 9,63 8,45 11,21 8,75 11,61 8,59 11,40 8,62 11,44

170306PLANTIO DE MUDAS ORNAMENTAIS (GRANDE PORTE), INCLUINDO FERILIZACAO MANUAL COM

MISTURA DE SOLO E FECHAMENTO DE COVA, EXCETO FORNECIMENTO DE MUDASUN 7,60 10,08 8,46 11,22 8,68 11,51 8,56 11,36 8,58 11,38

170310 PLANTIO MANUAL DE GRAMA, EM SEMENTES, COM FORNECIMENTO DAS SEMENTES M2 3,55 4,71 3,78 5,01 3,84 5,09 3,81 5,05 3,81 5,05

170311 PLANTIO DE CAPIM E LEGUMINOSAS HA 657,22 871,87 810,02 1.074,57 848,42 1.125,51 828,02 1.098,45 831,62 1.103,23

170320 COROAMENTO DE MUDAS UN 0,78 1,03 1,16 1,54 1,26 1,67 1,21 1,61 1,22 1,62

170321 FERTILIZACAO MANUAL DO TERRENO COM MISTURA DE SOLO M2 30,39 40,32 30,87 40,95 30,99 41,11 30,92 41,02 30,93 41,03

170322 FERTILIZACAO MANUAL NITROGENADA (APLICACAO DE UREIA E/OU ESTERCO) M2 8,75 11,61 8,95 11,87 9,00 11,94 8,97 11,90 8,97 11,90

170323 APLICACAO DE GEL HIDRATANTE, COM FORNECIMENTO DE MATERIAL UN 0,18 0,24 0,24 0,32 0,25 0,33 0,24 0,32 0,25 0,33

170324 PULVERIZACAO COM ADUBO FOLIAR, COM FORNECIMENTO DE MATERIAL HA 148,18 196,58 178,74 237,12 186,42 247,30 182,34 241,89 183,06 242,85

170325 TUTORAMENTO DE MUDAS, COM FORNECIMENTO DE MATERIAL UN 2,43 3,22 2,60 3,45 2,65 3,52 2,62 3,48 2,63 3,49

170326 APLICACAO DE MULCH (COBERTURA MORTA) UN 172,04 228,23 256,08 339,72 277,20 367,73 265,98 352,85 267,96 355,48

170327 FORNECIMENTO E APLICACAO DE SEIXO ROLADO ORNAMENTAL M3 191,97 254,67 253,09 335,75 268,45 356,13 260,29 345,30 261,73 347,21

170330 HIDROSEMEADURA EM TALUDES COM FIBRA DE COCO m2 36,89 48,94 39,05 51,80 39,59 52,52 39,31 52,15 39,35 52,20

170400 SISTEMAS DE IRRIGACAO

170401IRRIGACAO POR GOTEJAMENTO E MICROASPERSAO, COM FORNECIMENTO DE MATERIAL,

EXCETO CONJUNTO MOTO-BOMBA100M2 1.566,97 2.078,74 1.582,98 2.099,98 1.586,99 2.105,30 1.584,85 2.102,46 1.585,24 2.102,98

170402IRRIGACAO POR GOTEJAMENTO, COM FORNECIMENTO DE MATERIAL, EXCETO CONJUNTO MOTO-

BOMBA100M2 1.535,33 2.036,77 1.551,34 2.058,01 1.555,35 2.063,33 1.553,21 2.060,49 1.553,60 2.061,01

170403IRRIGACAO POR MICROASPERSAO, COM FORNECIMENTO DE MATERIAL, EXCETO CONJUNTO

MOTO-BOMBA100M2 1.820,73 2.415,38 1.904,70 2.526,78 1.925,76 2.554,71 1.914,57 2.539,87 1.916,55 2.542,50

170500 CONTROLE DE INSETOS E PRAGAS

170501 APLICACAO MANUAL DE FORMICIDAS, COM FORNECIMENTO DE MATERIAL M2 0,31 0,41 0,36 0,48 0,38 0,50 0,37 0,49 0,37 0,49

170502APLICACAO MECANIZADA DE FORMICIDAS PARA CONTROLE DE PRAGAS E FORMIGAS, COM

FORNECIMENTO DE MATERIALM2 0,51 0,68 0,53 0,70 0,53 0,70 0,53 0,70 0,53 0,70

170600 MANUTENCAO DE AREAS E PERIODO DE PEGA

170601 CORTES E PODAS DE MUDAS M2 9,39 12,46 13,97 18,53 15,12 20,06 14,51 19,25 14,61 19,38

170602 REPLANTIO DE MUDAS COM FERTILIZACAO MANUAL UN 5,41 7,18 5,60 7,43 5,65 7,50 5,62 7,46 5,63 7,47

170603 PEGA DE AREA BENEFICIADA (PERIODO DE 1 MES, 3X NA SEMANA) PARA PAISAISMO M2 1,25 1,66 1,86 2,47 2,02 2,68 1,93 2,56 1,95 2,59

179001 ESCARIFICACAO E DESCOMPACTACAO MECANICA DO SOLO ha 1.238,06 1.642,41 1.373,41 1.821,97 1.407,34 1.866,98 1.389,28 1.843,02 1.392,50 1.847,29

179002REPOSICAO CAMADA ORGANICA MECANICA EM JAZIDA DEGRADADA S/ FORNECIMENTO SOLO

(DIST MEDIA TRANSP DE 4 KM)ha 523,49 694,46 557,29 739,30 565,77 750,55 561,26 744,57 562,06 745,63

179324MANUTENCAO C/ APLICACAO DE FERTILIZANTE E ADUBO FOLIAR, INCL. ADUBACAO DE

COBERTURAha 4.625,50 6.136,19 4.992,22 6.622,68 5.084,38 6.744,94 5.035,42 6.679,99 5.044,06 6.691,45

179720PARUCFS - ESTIMATIVA DE CUSTO DE SERVICOS DE TERCEIROS - PLANO DE RESGATE DE FAUNA

E FLORA (01/02)un 10.067,91 13.356,09 10.067,91 13.356,09 10.067,91 13.356,09 10.067,91 13.356,09 10.067,91 13.356,09

179721PARUCFS - ESTIMATIVA DE CUSTO DE SERVICOS DE TERCEIROS - PLANO DE RESGATE DE FAUNA

E FLORA (02/02)un 11.701,19 15.522,80 11.701,19 15.522,80 11.701,19 15.522,80 11.701,19 15.522,80 11.701,19 15.522,80

179722 PARUCFS - ESTIMATIVA DE CUSTO DE SERVICOS DE TERCEIROS - EQUIPAMENTOS E OUTROS un 23.806,47 31.581,66 23.806,47 31.581,66 23.806,47 31.581,66 23.806,47 31.581,66 23.806,47 31.581,66

179723 PSMPA - ESTIMATIVA DE CUSTO DE DESPESAS GERAIS (01/03) un 3.432,80 4.553,95 3.432,80 4.553,95 3.432,80 4.553,95 3.432,80 4.553,95 3.432,80 4.553,95

179724 PSMPA - ESTIMATIVA DE CUSTO DE DESPESAS GERAIS (02/03) un 2.570,48 3.410,00 2.570,48 3.410,00 2.570,48 3.410,00 2.570,48 3.410,00 2.570,48 3.410,00

179725 PSMPA - ESTIMATIVA DE CUSTO DE DESPESAS GERAIS (03/03) un 755,40 1.002,11 755,40 1.002,11 755,40 1.002,11 755,40 1.002,11 755,40 1.002,11

179726 PSMPA - ESTIMATIVA DE CUSTO PARA SERVICOS DE TERCEIROS un 110,00 145,93 110,00 145,93 110,00 145,93 110,00 145,93 110,00 145,93

179727 PRF - ESTIMATIVA DE CUSTO DE SERVICOS DE TERCEIROS - PLANO DE RESGATE DE FLORA un 7.984,92 10.592,79 7.984,92 10.592,79 7.984,92 10.592,79 7.984,92 10.592,79 7.984,92 10.592,79

179728 PRF - ESTIMATIVA DE CUSTO DE SERVICOS DE TERCEIROS - EQUIPAMENTOS E OUTROS un 78.803,95 104.541,32 78.803,95 104.541,32 78.803,95 104.541,32 78.803,95 104.541,32 78.803,95 104.541,32

179729PMLRC - ESTIMATIVA DE CUSTO DE SERVICOS DE TERCEIROS - PLANO DE MONITORAMENTO DA

POPULACAO DE LONTRAS (01/02)un 19.925,44 26.433,09 19.925,44 26.433,09 19.925,44 26.433,09 19.925,44 26.433,09 19.925,44 26.433,09

179731PMLRC - ESTIMATIVA DE CUSTO DE SERVICOS DE TERCEIROS - PLANO DE MONITORAMENTO DA

POPULACAO DE LONTRAS (02/02)un 602,78 799,65 602,78 799,65 602,78 799,65 602,78 799,65 602,78 799,65

179732 PMLRC - ESTIMATIVA DE CUSTO DE SERVICOS DE TERCEIROS - EQUIPAMENTOS E OUTROS un 8,50 11,28 8,50 11,28 8,50 11,28 8,50 11,28 8,50 11,28

179733 PMQA - ESTIMATIVA DE CUSTO DE SERVICOS DE TERCEIROS - PROG. MONT. QUAL. AGUA un 2.500,00 3.316,50 2.500,00 3.316,50 2.500,00 3.316,50 2.500,00 3.316,50 2.500,00 3.316,50

179734PMQA - ESTIMATIVA DE CUSTO DE SERVICOS DE TERCEIROS - ANALISES FISICAS, QUIMICAS E

BIOLOGICAS DA AGUA (01/02)un 58.380,00 77.446,91 58.380,00 77.446,91 58.380,00 77.446,91 58.380,00 77.446,91 58.380,00 77.446,91

179735PMQA - ESTIMATIVA DE CUSTO DE SERVICOS DE TERCEIROS - ANALISES FISICAS, QUIMICAS E

BIOLOGICAS DA AGUA (02/02)un 151.620,00 201.139,09 151.620,00 201.139,09 151.620,00 201.139,09 151.620,00 201.139,09 151.620,00 201.139,09

179736PMQA - ESTIMATIVA DE CUSTO DE SERVICOS DE TERCEIROS - ANALISES DOS SEDIMENTOS -

METAIS TOTAISun 12.360,00 16.396,78 12.360,00 16.396,78 12.360,00 16.396,78 12.360,00 16.396,78 12.360,00 16.396,78

179737 PMQA - ESTIMATIVA DE CUSTO DE SERVICOS DE TERCEIROS - ANALISES DOS SEDIMENTOS un 600,00 795,96 600,00 795,96 600,00 795,96 600,00 795,96 600,00 795,96

179738 PMMEOA - ESTIMATIVA DE CUSTO DE SERVICOS DE TERCEIROS - PROG. MONT. MAN. ORG. AQU. un 46.920,00 62.244,07 46.920,00 62.244,07 46.920,00 62.244,07 46.920,00 62.244,07 46.920,00 62.244,07

179739PMMEOA - ESTIMATIVA DE CUSTO DE SERVICOS DE TERCEIROS - EQUIPAMENTOS E OUTRAS

DESPESASun 123.000,00 163.171,80 123.000,00 163.171,80 123.000,00 163.171,80 123.000,00 163.171,80 123.000,00 163.171,80

179742 PSMPA - ESTIMATIVA DE CUSTO DE VIAGENS, DIARIAS E TRANSLADO un 26.709,64 35.433,01 26.709,64 35.433,01 26.709,64 35.433,01 26.709,64 35.433,01 26.709,64 35.433,01

179743 PSMPA - ESTIMATIVA DE CUSTO DE SERVICOS GRAFICOS un 2.405,20 3.190,74 2.405,20 3.190,74 2.405,20 3.190,74 2.405,20 3.190,74 2.405,20 3.190,74

Página: 28 de 59

Page 29: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

179749 MUVUCA há 357,68 474,50 449,36 596,12 472,40 626,69 460,16 610,45 462,32 613,31179001 ESCARIFICACAO E DESCOMPACTACAO MECANICA DO SOLO ha 1.238,06 1.642,41 1.373,41 1.821,97 1.407,34 1.866,98 1.389,28 1.843,02 1392,5 1.847,29

179002REPOSICAO CAMADA ORGANICA MECANICA EM JAZIDA DEGRADADA S/ FORNECIMENTO SOLO

(DIST MEDIA TRANSP DE 4 KM)ha 523,49 694,46 557,29 739,30 565,77 750,55 561,26 744,57 562,06 745,63

179324MANUTENCAO C/ APLICACAO DE FERTILIZANTE E ADUBO FOLIAR, INCL. ADUBACAO DE

COBERTURAHA 4.625,50 6.136,19 4.992,22 6.622,68 5.084,38 6.744,94 5.035,42 6.679,99 5044,06 6.691,45

179701PMQAS - ESTIMATIVA DE CUSTO DE SERVICOS DE TERCEIROS - PROG. MONT. QUAL. AGUA UN 57.000,00 75.616,20 57.000,00 75.616,20 57.000,00 75.616,20 57.000,00 75.616,20 57.000,00 75.616,20

179702PMQAS - ESTIMATIVA DE CUSTO DE SERVICOS DE TERCEIROS - ANALISES FISICAS, QUIMICAS E

BIOLOGICAS DA AGUA (01/02)UN 61.299,00 81.319,25 61.299,00 81.319,25 61.299,00 81.319,25 61.299,00 81.319,25 61.299,00 81.319,25

179703PMQAS - ESTIMATIVA DE CUSTO DE SERVICOS DE TERCEIROS - ANALISES FISICAS, QUIMICAS E

BIOLOGICAS DA AGUA (02/02)UN 9.135,00 12.118,49 9.135,00 12.118,49 9.135,00 12.118,49 9.135,00 12.118,49 9.135,00 12.118,49

179704PMQAS - ESTIMATIVA DE CUSTO DE SERVICOS DE TERCEIROS - ANALISES DOS SEDIMENTOS -

GRANULOMETRIAUN 110,00 145,93 110,00 145,93 110,00 145,93 110,00 145,93 110,00 145,93

179705PMQAS - ESTIMATIVA DE CUSTO DE SERVICOS DE TERCEIROS - ANALISES DOS SEDIMENTOS -

METAIS TOTAISUN 4.120,00 5.465,59 4.120,00 5.465,59 4.120,00 5.465,59 4.120,00 5.465,59 4.120,00 5.465,59

179706PMQAS - ESTIMATIVA DE CUSTO DE SERVICOS DE TERCEIROS - ANALISES DOS SEDIMENTOS -

HIDROCARBONETOS POLICICLICOS AROMATICOSUN 437,00 579,72 437,00 579,72 437,00 579,72 437,00 579,72 437,00 579,72

179707PMQAS - ESTIMATIVA DE CUSTO DE SERVICOS DE TERCEIROS - SERVICO DE PERFILAGEM UN 400,00 530,64 400,00 530,64 400,00 530,64 400,00 530,64 400,00 530,64

179708PRFF - ESTIMATIVA DE CUSTO DE SERVICOS DE TERCEIROS - PLANO DE RESGATE DE FAUNA E

FLORA (01/02)UN 12.240,55 16.238,31 12.240,55 16.238,31 12.240,55 16.238,31 12.240,55 16.238,31 12.240,55 16.238,31

179709PRFF - ESTIMATIVA DE CUSTO DE SERVICOS DE TERCEIROS - PLANO DE RESGATE DE FAUNA E

FLORA (02/02)UN 11.468,98 15.214,75 11.468,98 15.214,75 11.468,98 15.214,75 11.468,98 15.214,75 11.468,98 15.214,75

179710PRFF - ESTIMATIVA DE CUSTO DE SERVICOS DE TERCEIROS - EQUIPAMENTOS E OUTROS UN 125.566,73 166.576,82 125.566,73 166.576,82 125.566,73 166.576,82 125.566,73 166.576,82 125.566,73 166.576,82

179711 MRA - ESTIMATIVA DE CUSTO DE DESPESAS GERAIS (01/03) UN 3.432,80 4.553,95 3.432,80 4.553,95 3.432,80 4.553,95 3.432,80 4.553,95 3.432,80 4.553,95179712 MRA - ESTIMATIVA DE CUSTO DE DESPESAS GERAIS (02/03) UN 2.511,28 3.331,46 2.511,28 3.331,46 2.511,28 3.331,46 2.511,28 3.331,46 2.511,28 3.331,46179713 MRA - ESTIMATIVA DE CUSTO DE DESPESAS GERAIS (03/03) UN 755,40 1.002,11 755,40 1.002,11 755,40 1.002,11 755,40 1.002,11 755,40 1.002,11

179714PMMOA - ESTIMATIVA DE CUSTO DE SERVICOS DE TERCEIROS - PROG. MONT. MAN. ORG. AQU. UN 50.190,00 66.582,05 50.190,00 66.582,05 50.190,00 66.582,05 50.190,00 66.582,05 50.190,00 66.582,05

179715PMMOA - ESTIMATIVA DE CUSTO DE SERVICOS DE TERCEIROS - EQUIPAMENTOS E OUTRAS

DESPESASUN 8.550,00 11.342,43 8.550,00 11.342,43 8.550,00 11.342,43 8.550,00 11.342,43 8.550,00 11.342,43

179718 MRA - ESTIMATIVA DE CUSTO DE VIAGENS, DIARIAS E TRANSLADO UN 23.607,80 31.318,11 23.607,80 31.318,11 23.607,80 31.318,11 23.607,80 31.318,11 23.607,80 31.318,11179719 MRA - ESTIMATIVA DE CUSTO DE SERVICOS GRAFICOS UN 3.018,40 4.004,21 3.018,40 4.004,21 3.018,40 4.004,21 3.018,40 4.004,21 3.018,40 4.004,21179730 MRA - ESTIMATIVA DE CUSTO PARA SERVICOS DE TERCEIROS UN 110,00 145,93 110,00 145,93 110,00 145,93 110,00 145,93 110,00 145,93

180000 URBANIZACAO

180100 PAVIMENTACAO DE PASSEIOS

180101 PASSEIO EM PEDRA PORTUGUESA m2 52,61 69,79 64,29 85,29 67,23 89,19 65,66 87,10 65,95 87,49

180104 PASSEIO EM PLACAS DE CONCRETO SIMPLES m2 28,14 37,33 32,98 43,75 34,18 45,34 33,53 44,48 33,67 44,67

180105 PASSEIO EM CIMENTADO DESEMPOLADO m2 29,47 39,09 39,36 52,21 41,84 55,50 40,52 53,75 40,76 54,07

180107 PASSEIO EM LADRILHO HIDRAULICO m2 77,15 102,35 88,30 117,14 91,10 120,85 89,62 118,89 89,89 119,25

180110 PASSEIO EM PLACAS PRE-MOLDADAS DE CONCRETO ARMADO m2 82,21 109,06 102,73 136,28 107,87 143,10 105,12 139,45 105,63 140,13

180113MEIO-FIO DE CONCRETO PADRAO DNER, TIPO ECONOMICO, ASSENTADO SOBRE LASTRO DE

CONCRETO MAGROm 27,04 35,87 29,84 39,59 30,55 40,53 30,17 40,02 30,23 40,10

189113MEIO-FIO DE CONCRETO PADRAO DNER, TIPO ECONOMICO, ASSENTADO SOBRE LASTRO DE

CONCRETO MAGRO (MRR / RMS)m 27,19 36,07 30,10 39,93 30,80 40,86 30,42 40,36 30,50 40,46

180116MEIO FIO DE CONCRETO C/ DIMENSOES 1,00X0,30X0,15, ASSENTADO SOBRE LASTRO DE

CONCRETO MAGROm 23,58 31,28 26,38 35,00 27,09 35,94 26,71 35,43 26,77 35,51

180200 PAVIMENTACAO DE RUAS

180201 REGULARIZACAO E COMPACTACAO DO SUB-LEITO m2 0,54 0,72 0,57 0,76 0,58 0,77 0,58 0,77 0,58 0,77

180204 SUB-BASE EM ARENOSO C/ COMPACT. MECANIZADA m3 74,95 99,43 74,95 99,43 74,95 99,43 74,95 99,43 74,95 99,43

180207 BASE EM BRITA GRADUADA C/ COMPACT. MECANIZADA m3 80,40 106,66 80,40 106,66 80,40 106,66 80,40 106,66 80,40 106,66

180210 IMPRIMACAO m2 3,93 5,21 3,93 5,21 3,93 5,21 3,93 5,21 3,93 5,21

180213 PAVIMENTO C/ CBUQ m3 465,73 617,84 465,73 617,84 465,73 617,84 465,73 617,84 465,73 617,84

180214PAVIMENTACAO ASFALTICA - CBUQ - UTILIZANDO VIBROACABADORA EM SERVICOS

DESCONTINUADOS APOS INTERVENCOS PARA REPARO DE REDES - DESCONTINUA - ESPESSURA

DE 5CM

M2 31,64 41,97 32,03 42,49 32,12 42,61 32,07 42,54 32,08 42,56

189214PAVIMENTACAO ASFALTICA - CBUQ - UTILIZANDO VIBROACABADORA EM SERVICOS

DESCONTINUADOS APOS INTERVENCOS PARA REPARO DE REDES - DESCONTINUA - ESPESSURA

DE 5CM (MRR / RMS)

M2 31,64 41,97 32,04 42,50 32,14 42,64 32,09 42,57 32,10 42,58

180216 PAVIMENTO C/ ASFALTO FRIO m3 317,04 420,59 317,04 420,59 317,04 420,59 317,04 420,59 317,04 420,59

180219 PAVIMENTO EM PARALELEPIPEDO m2 38,87 51,56 43,25 57,38 44,35 58,83 43,77 58,07 43,87 58,20

189219 PAVIMENTO EM PARALELEPIPEDO (MRR / RMS) m2 39,00 51,74 43,43 57,61 44,56 59,11 43,97 58,33 44,07 58,46

180222 PAVIMENTO EM PEDRA IRREGULAR m2 26,75 35,49 31,51 41,80 32,71 43,39 32,08 42,56 32,19 42,70

180225 PAVIMENTO EM BLOCO ARTICULADO DE CONCRETO m2 64,43 85,47 67,27 89,24 67,98 90,18 67,60 89,68 67,67 89,77

180250EXECUCAO DE FRESAGEM EM PAVIMENTACAO ASFALTICA, PARA RECUPERACAO DE TRECHOS DE

VIAS PUBLICAS APOS INTERVENCOES PARA REPARO DE REDES - DESCONTINUA INCLUSIVE BOTA

FORA

m2 3,31 4,39 4,16 5,52 4,37 5,80 4,26 5,65 4,28 5,68

180251

MOB E DESMOB - EQUIPAMENTOS PARA RECUPERACAO DE PAVIMENTACAO EM SERVICOS

DESCONTINUADOS EXCLUSIVO P/INTERVENCOES EM REDES - CONSIDERANDO 1 MINI-

FRESADEIRA, 1 ROLO COMPACTADOR E 1 VIBROACABADORA

UN 2.563,94 3.401,32 2.914,32 3.866,14 3.002,29 3.982,84 2.955,52 3.920,79 2.963,80 3.931,78

180300 REGULARIZACAO E REVESTIMENTO DE SUPERFICIES

180301 REVEST. PRIMARIO C/ CASCALHO OU SAIBRO S/ COMPACTACAO m3 51,55 68,39 51,55 68,39 51,55 68,39 51,55 68,39 51,55 68,39

180304 REVEST. PRIMARIO C/ CASCALHO OU SAIBRO C/ COMPACTACAO m3 53,84 71,42 53,84 71,42 53,84 71,42 53,84 71,42 53,84 71,42

180307 REVEST. PRIMARIO C/ BRITA GRADUADA S/ COMPACTACAO m3 76,98 102,12 76,98 102,12 76,98 102,12 76,98 102,12 76,98 102,12

180310 REVEST. PRIMARIO C/ PEDRISCO S/ COMPACTACAO m3 69,43 92,11 69,43 92,11 69,43 92,11 69,43 92,11 69,43 92,11

180400 CERCA / MURO

180401CERCA C/ TELA DE ARAME GALVANIZADO REVESTIDA EM PVC C/MALHA DE 2", 12BWG C/

ESTACAS DE CONCRETO PRE-MOLDADAS,C/ PONTA INCLINADA E DIMENSOES DE

0,10x0,10x3,00m, (DP1804-01)

m 96,54 128,07 112,43 149,15 116,39 154,40 114,28 151,60 114,66 152,11

180402CERCA C/ TELA DE ARAME GALVANIZADO REVESTIDA EM PVC C/ MALHA DE 2" 14BWG

,C/ESTACAS DE CONCRETO PRE-MOLDADAS C/ PONTA INCLINADA E DIMENSOES DE

0.10x0.10x3.00m (DP1804-01)

m 81,86 108,60 97,75 129,68 101,71 134,93 99,60 132,13 99,98 132,63

180404CERCA C/ 14 FIOS DE ARAME FARPADO 16 BWG 4" x 4", C/ESTACAS DE CONCRETO PRE-

MOLDADAS C/ PONTA INCLINADA E DIMENSOES DE 0.10 x 0,10 x 3.00m (DP1804-02)m 52,26 69,33 63,22 83,87 65,96 87,50 64,48 85,54 64,76 85,91

180405CERCA C/ 14 FIOS DE ARAME FARPADO 16 BWG 4"x4", C/ESTACAS DE CONCRETO PRE-

MOLDADAS,C/ PONTA RETA E DIMENSOES DE 0.10x0.10x3.00m (DP1804-02)m 52,53 69,69 63,49 84,23 66,23 87,86 64,75 85,90 65,03 86,27

180407CERCA C/ 08 FIOS DE ARAME FARPADO 16 BWG 4" x 4", C/ESTACAS DE CONCRETO PRE-

MOLDADAS,C/PONTA INCLINADA E DIMENSOES DE 0.10 x 0,10 x 3.00m (DP1804-02)m 45,57 60,45 55,18 73,20 57,59 76,40 56,29 74,67 56,53 74,99

180408CERCA C/ 08 FIOS DE ARAME FARPADO 16 BWG 4"x4", C/ESTACAS DE CONCRETO PRE-MOLDADAS

C/ PONTA RETA E DIMENSOES DE 0.10x0.10x3.00m (DP1804-02)m 45,84 60,81 55,45 73,56 57,86 76,76 56,56 75,03 56,80 75,35

180410CERCA C/ 05 FIOS DE ARAME FARPADO 16 BWG 4" x 4", C/ ESTACAS DE CONCRETO PRE-

MOLDADAS C/PONTA RETA E DIMENSOES DE 0.10 x 0,10 x 3.00m (DP1804-02)m 41,17 54,62 49,64 65,85 51,76 68,66 50,62 67,15 50,83 67,43

180413CERCA C/ 08 FIOS DE ARAME FARPADO 16 BWG 4" X 4", C/ ESTACA DE MADEIRA DE LEI C/

DIMENSÕES DE 0,10 x 010 x 2,10 m (DP1804-03)m 22,80 30,25 26,52 35,18 27,45 36,42 26,96 35,77 27,03 35,86

180416CERCA C/ 05 FIOS DE ARAME FARPADO 16 BWG 4" X 4", C/ ESTACA DE MADEIRA DE LEI C/

DIMENSOES DE 0,10 x 010 x 2,10 m (DP1804-03)m 19,33 25,64 22,28 29,56 23,02 30,54 22,63 30,02 22,68 30,09

180419MURO PRE-MOLDADO DE PLACAS DE CONCRETO ARMADO, e=3cm C/COLUNAS DE CONCRETO

ARMADO C/DIMENSOES DE 0,13 X 0,13 X 3,00m,(DP1804-04)m 117,79 156,26 123,71 164,11 125,19 166,08 124,39 165,02 124,54 165,21

180421MURO DE ALVENARIA DE BLOCO H=2,00m E FUNDACOES EM ALVENARIA DE PEDRA COM PILARES

A CADA 3mm 202,13 268,15 245,87 326,17 256,84 340,72 251,02 333,00 252,08 334,41

180500 PORTAO

180501PORTAO P/ PEDESTRES EM TUBOS DE FERRO GALVANIZADO DE 01 FOLHA, C/ VEDACAO EM TELA

DE ARAME PRENSADO,INCL.GUARNICOES E FERRAGENS, C/ LARGURA ATE 1,50m (DP1805-01/03)m2 400,33 531,08 424,13 562,65 430,08 570,54 426,95 566,39 427,53 567,16

180504PORTAO P/ VEICULOS EM TUBOS DE FERRO GALVANIZADO DE 01 OU 02 FOLHAS, C/ VEDACAO EM

TELA DE ARAME PRENSADO,INCL. GUARNICOES E FERRAGENS, C/ LARGURA DE 2 A 5m (DP1805-

02/03)

m2 404,26 536,29 439,25 582,71 447,99 594,30 443,38 588,19 444,22 589,30

180507PORTAO P/ PEDESTRES EM TUBOS DE FERRO GALVANIZADO DE 01 FOLHA, C/ VEDACAO EM

CHAPA DE ACO GALVANIZADO,INCL. GUARNICOES E FERRAGENS, C/ LARGURA ATE 1,50m

(DP1805-01/03)

m2 396,55 526,06 420,35 557,64 426,30 565,53 423,17 561,38 423,75 562,15

180510PORTAO P/ VEICULOS EM TUBOS DE FERRO GALVANIZADO DE 01 OU 02 FOLHAS, C/ VEDACAO EM

CHAPA DE ACO GALVANIZADO,INCL. GUARNICOES E FERRAGENS, C/ LARGURA DE 2 A 5m

(DP1805-02/03)

m2 400,51 531,32 435,50 577,73 444,24 589,33 439,63 583,21 440,47 584,33

180600 GRAMADO / ARBORIZACAO

180601PLANTIO DE GRAMA EM PLACA,INCL. CAMADA DE TERRA VEGETAL, e=0,05m, TRANSP. E

IRRIGACAO ATE A PEGA TOTALm2 9,91 13,15 10,86 14,41 11,10 14,73 10,97 14,55 10,99 14,58

189601PLANTIO DE GRAMA EM PLACA,INCL. CAMADA DE TERRA VEGETAL, e=0,05m, TRANSP. E

IRRIGACAO ATE A PEGA TOTAL (MRR / RMS)m2 9,94 13,19 10,92 14,49 11,17 14,82 11,03 14,63 11,06 14,67

180604PLANTIO DE GRAMA EM LEIVA, INCL. CAMADA DE TERRA VEGETAL, e=0,05m, TRANSP. E

IRRIGACAO ATE A PEGA TOTALm2 13,77 18,27 14,77 19,59 15,01 19,91 14,88 19,74 14,91 19,78

180605PLANTIO DE GRAMA EM MUDA, INCL. CAMADA DE TERRA VEGETAL, e=0,05m, TRANSP. E

IRRIGACAO ATE A PEGA TOTALm2 13,66 18,12 14,66 19,45 14,90 19,77 14,77 19,59 14,80 19,63

Página: 29 de 59

Page 30: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

180607PLANTIO DE ARVORES, C/ h >= 2,00 m, INCL. PREPARO E ADUBACAO DO SOLO E IRRIGACAO

ATE A PEGA TOTALun 136,52 181,11 139,00 184,40 139,62 185,22 139,29 184,78 139,35 184,86

180610PLANTIO DE ARBUSTOS C/ 0,50m<=h<=2,00m, ESPACADOS A CADA 3,00m, P/ FORMACAO DE

CERCA VIVA, INCL. PREPARO E ADUBACAO DO SOLO E IRRIGACAO ATE A PEGA TOTALm 13,94 18,49 14,43 19,14 14,56 19,32 14,49 19,22 14,50 19,24

189000 SERVICOS NAO CODIFICADOS

189001 CHICANAS EM PLACAS DE CONCRETO m2 79,12 104,96 96,35 127,82 100,67 133,55 98,39 130,52 98,81 131,08

189110 PRATELEIRAS DE CONCRETO M2 116,25 154,22 127,36 168,96 130,15 172,66 128,67 170,69 128,94 171,05

189311PLANTIO DE MUDAS ESPACADAS ENTRE 2,5 E 2,5m (INCLUSIVE TERRA VEGETAL, ADUBACAO,

FORN. MUDA EM SACO)UN 11,48 15,23 12,63 16,75 12,91 17,13 12,76 16,93 12,79 16,97

189504 REVEST. PRIMARIO C/ CASCALHO OU SAIBRO C/ COMPACTACAO M3 20,99 27,85 21,98 29,16 22,22 29,48 22,10 29,32 22,11 29,33

190000 INSTALACOES MECANICAS

190100 CONJUNTO MOTO-BOMBA (MONTAGEM E INST.)

190101 MONTAGEM E INST. DE CONJUNTO MOTO-BOMBA DE EIXO HORIZONTAL, POTENCIA ATE 5 CV un 130,06 172,54 193,56 256,78 209,45 277,86 201,01 266,66 202,47 268,60

190104MONTAGEM E INST. DE CONJUNTO MOTO-BOMBA DE EIXO HORIZONTAL, POTENCIA MAIOR QUE 5

ATE 10 CVun 204,84 271,74 304,86 404,43 329,88 437,62 316,59 419,99 318,89 423,04

190107MONTAGEM E INST. DE CONJUNTO MOTO-BOMBA DE EIXO HORIZONTAL, POTENCIA MAIOR QUE

10 ATE 30 CVun 273,12 362,32 406,49 539,25 439,85 583,51 422,11 559,97 425,18 564,04

190110MONTAGEM E INST. DE CONJUNTO MOTO-BOMBA DE EIXO HORIZONTAL, POTENCIA MAIOR QUE

30 ATE 75 CVun 565,65 750,39 837,17 1.110,59 905,07 1.200,67 868,98 1.152,79 875,29 1.161,16

190113MONTAGEM E INST. DE CONJUNTO MOTO-BOMBA DE EIXO HORIZONTAL, POTENCIA MAIOR QUE

75 ATE 150 CVun 912,53 1.210,56 1.350,59 1.791,69 1.460,15 1.937,03 1.401,92 1.859,79 1.412,13 1.873,33

190116MONTAGEM E INST. DE CONJUNTO MOTO-BOMBA DE EIXO HORIZONTAL, POTENCIA MAIOR QUE

150 ATE 250 CVun 1.820,12 2.414,57 2.693,84 3.573,65 2.912,36 3.863,54 2.796,20 3.709,44 2.816,60 3.736,50

190119MONTAGEM E INST. DE CONJUNTO MOTO-BOMBA DE EIXO HORIZONTAL, POTENCIA MAIOR QUE

250 ATE 500 CVun 3.449,78 4.576,48 5.103,79 6.770,69 5.517,47 7.319,48 5.297,56 7.027,74 5.336,21 7.079,02

190122MONTAGEM E INST. DE CONJUNTO MOTO-BOMBA DE EIXO HORIZONTAL, POTENCIA MAIOR QUE

500 ATE 600 CVun 6.632,60 8.798,81 9.824,10 13.032,65 10.622,30 14.091,54 10.198,00 13.528,67 10.272,50 13.627,50

190125MONTAGEM E INST. DE CONJUNTO MOTO-BOMBA DE EIXO HORIZONTAL, POTENCIA MAIOR QUE

600 CV ATE 800 CVun 10.740,20 14.247,95 15.927,65 21.129,62 17.224,85 22.850,49 16.535,50 21.935,99 16.655,75 22.095,52

190128MONTAGEM E INST. DE CONJUNTO MOTO-BOMBA SUBMERSIVEL (EIXO VERTICAL) EM POCOS

TUBULARES, POTENCIA ATE 5 CVun 86,75 115,08 127,96 169,75 138,27 183,43 132,79 176,16 133,74 177,42

190131MONTAGEM E INST. DE CONJUNTO MOTO-BOMBA SUBMERSIVEL (EIXO VERTICAL) EM POCOS

TUBULARES, POTENCIA MAIOR QUE 5 ATE 10 CV.un 126,87 168,31 187,45 248,67 202,61 268,78 194,55 258,09 195,95 259,95

190134MONTAGEM E INST. DE CONJUNTO MOTO-BOMBA SUBMERSIVEL (EIXO VERTICAL) EM POCOS

TUBULARES, POTENCIA MAIOR QUE 10 ATE 15 CVun 165,30 219,29 244,19 323,94 263,93 350,13 253,43 336,20 255,26 338,63

190137MONTAGEM E INST. DE CONJUNTO MOTO-BOMBA SUBMERSIVEL (EIXO VERTICAL) EM POCOS

TUBULARES, POTENCIA MAIOR QUE 15 ATE 20 CVun 218,14 289,38 321,90 427,03 347,86 461,47 334,06 443,16 336,46 446,35

190140MONTAGEM E INST. DE CONJUNTO MOTO-BOMBA SUBMERSIVEL (EIXO VERTICAL) EM POCOS

TUBULARES, POTENCIA MAIOR QUE 20 ATE 30 CVun 347,84 461,44 513,09 680,67 554,43 735,51 532,45 706,35 536,28 711,43

190143MONTAGEM E INST. DE CONJUNTO MOTO-BOMBA SUBMERSIVEL (EIXO VERTICAL) EM POCOS

TUBULARES, POTENCIA MAIOR QUE 30CVun 442,50 587,02 653,06 866,35 705,74 936,23 677,73 899,08 682,61 905,55

190200 TALHA MANUAL C/ TROLE MANUAL (MONTAGEM E INST.)

190201 MONTAGEM E INST. DE TALHA MANUAL C/TROLE MANUAL, C/CAPAC. DE 01t un 78,18 103,71 116,35 154,35 125,90 167,02 120,83 160,29 121,70 161,45

190204 MONTAGEM E INST. DE TALHA MANUAL C/TROLE MANUAL, C/CAPAC. DE 02t un 109,45 145,20 162,89 216,09 176,26 233,83 169,16 224,41 170,38 226,03

190207 MONTAGEM E INST. DE TALHA MANUAL C/TROLE MANUAL, C/CAPAC. DE 03t un 140,72 186,68 209,43 277,83 226,62 300,63 217,49 288,52 219,06 290,60

190210 MONTAGEM E INST. DE TALHA MANUAL C/TROLE MANUAL, C/CAPAC. DE 05 un 171,99 228,16 255,97 339,57 276,98 367,44 265,82 352,64 267,74 355,18

190300 TALHA MANUAL C/ TROLE ELETRICO (MONTAGEM E INST.)

190301 MONTAGEM E INST. DE TALHA MANUAL C/ TROLE ELETRICO,C/ CAPAC. DE 01t un 84,40 111,97 125,61 166,63 135,92 180,31 130,44 173,04 131,39 174,30

190304 MONTAGEM E INST. DE TALHA MANUAL C/ TROLE ELETRICO,C/ CAPAC. DE 02t un 121,89 161,70 181,40 240,65 196,29 260,40 188,38 249,90 189,75 251,72

190307 MONTAGEM E INST. DE TALHA MANUAL C/ TROLE ELETRICO,C/ CAPAC. DE 03t un 165,60 219,68 246,45 326,94 266,68 353,78 255,93 339,52 257,80 342,00

190400 TALHA ELETRICA C/ TROLE MANUAL / ELETRICO (MONTAGEM E INST.)

190401 MONTAGEM E INST. DE TALHA ELETRICA C/ TROLE MANUAL / ELETRICO, C/ CAPAC. DE 01t un 90,62 120,22 134,86 178,91 145,93 193,59 140,05 185,79 141,07 187,14

190404 MONTAGEM E INST. DE TALHA ELETRICA C/ TROLE MANUAL / ELETRICO, C/ CAPAC. DE 02t un 134,33 178,20 199,91 265,20 216,32 286,97 207,60 275,40 209,12 277,42

190407 MONTAGEM E INST. DE TALHA ELETRICA C/ TROLE MANUAL / ELETRICO, C/ CAPAC. DE 03t un 178,04 236,19 264,96 351,50 286,71 380,35 275,15 365,01 277,17 367,69

190500 PORTICO ROLANTE ( MONTAGEM E INST.)

190501MONTAGEM E INST. DE PORTICO ROLANTE EM ACO ESTRUTURAL, CAP=500kg, C/ VAO LIVRE DE

2,40 A 3,40 m, INCL. INST. DE TROLE, TALHA, ELEMENTOS P/ COMANDO E CABOS DE

ALIMENTACAO

cj 11.753,96 15.592,80 15.365,75 20.384,20 16.269,75 21.583,45 15.788,90 20.945,55 15.873,45 21.057,72

190502 FORNECIMENTO E MONTAGEM DE TALHA, TROLEY E MONOVIA cj 4.763,71 6.319,54 5.706,02 7.569,61 5.941,61 7.882,14 5.816,48 7.716,14 5.838,05 7.744,76

190505FORNECIMENTO E MONTAGEM DE MONOVIA COM TALHA ELETRICA E TROLEY MANUAL

CAPACIDADE DE CARGA DE 1,0Tonelada COM ELEMENTOS P/ COMANDO E CABOS DE

ALIMENTACAO

cj 15.213,69 20.182,48 15.893,29 21.084,04 16.063,29 21.309,56 15.972,89 21.189,64 15.988,89 21.210,86

190510FORNECIMENTO E MONTAGEM DE MONOVIA PARA TALHA E TROLEY MANUAL CAPACIDADE DE

CARGA DE 1,0Toneladam 286,50 380,07 330,18 438,02 341,10 452,50 335,30 444,81 336,30 446,14

190515MONTAGEM E INST. DE PORTICO ROLANTE EM ACO ESTRUTURAL, CAP=2000kg, C/ VAO LIVRE DE

2,40 A 3,40 m, INCL. INST. DE TROLE, TALHA, ELEMENTOS P/ COMANDO E CABOS DE

ALIMENTACAO

cj 11.725,71 15.555,33 14.950,79 19.833,72 15.757,43 20.903,81 15.328,67 20.335,01 15.403,67 20.434,51

190600 PONTE ROLANTE C/ TALHA MANUAL (MONTAGEM E INST.)

190800 BOMBA PARAFUSO (MONTAGEM E INST.)

190900 ELEMENTOS P/ FIXACAO E SUPORTE

190901 FORNEC.E ASSENT.DE PERFIL METALICO I PARA MONOVIAS kg 15,66 20,77 21,12 28,02 22,48 29,82 21,76 28,87 21,88 29,03

199000 SERVICOS NAO CODIFICADOS

199501MONTAGEM DE COPORTAS HIDRAULICAS, PECAS E DISPOSITIVOS DE ACIONAMENTO - TOMADA

DAGUAun 15.493,80 20.554,08 19.639,70 26.054,03 20.678,10 27.431,57 20.127,00 26.700,48 20222,7 26.827,43

199502 MONTAGEM DE STOP LOGS, PECAS FIXAS E DISPOSITIVOS DE ACIONAMENTO un 15.493,80 20.554,08 19.639,70 26.054,03 20.678,10 27.431,57 20.127,00 26.700,48 20222,7 26.827,43

199503INST E MONTAGEM GRADE DE PROTECAO EM AC, PAINEL 1600X1450MM INCL ALCA PARA

ICAMENTO DE VIGA PESCADORAun 10.441,20 13.851,30 12.975,40 17.213,17 13.610,50 18.055,69 13.273,40 17.608,49 13332,1 17.686,36

200000 LIGACOES PREDIAIS DE AGUA

200100 INTERLIGACAO DE REDE NOVA COM REDE EXISTENTE

200101EXECUCAO DE INTERLIGACAO DE REDE NOVA C/ REDE EXISTENTE, EM PVC, INCL. ASSENT. DE

CONEXOES, CORTE E BISELAMENTO DE TUBOS, S/ FORNEC. DO MAT. HIDRAULICO, C/ DN

VARIANDO DE 50 A 150 mm

un 4,19 5,56 6,12 8,12 6,59 8,74 6,34 8,41 6,38 8,46

200104EXECUCAO DE INTERLIGACAO DE REDE NOVA C/ REDE EXISTENTE, EM PVC, INCL. ASSENT. DE

CONEXOES, CORTE E BISELAMENTO DE TUBOS, S/ FORNEC. DO MAT. HIDRAULICO, C/ DN

VARIANDO DE 200 A 400 mm

un 10,27 13,62 15,15 20,10 16,36 21,70 15,71 20,84 15,83 21,00

200107EXECUCAO DE INTERLIGACAO DE REDE NOVA C/ REDE EXISTENTE, EM FºFº, INCL. ASSENT. DE

CONEXOES, CORTE E BISELAMENTO DE TUBOS, S/ FORNEC. DO MAT. HIDRAULICO, C/ DN

VARIANDO DE 50 A 150 mm

un 45,60 60,49 49,17 65,23 50,06 66,41 49,59 65,79 49,67 65,89

200110EXECUCAO DE INTERLIGACAO DE REDE NOVA C/ REDE EXISTENTE, EM FºFº, INCL. ASSENT. DE

CONEXOES, CORTE E BIZELAMENTO DE TUBOS, S/ FORNEC. DO MAT. HIDRAULICO, C/ DN

VARIANDO DE 200 A 400 mm

un 93,02 123,40 101,25 134,32 103,31 137,05 102,22 135,61 102,41 135,86

200113EXECUCAO DE INTERLIGACAO DE REDE NOVA C/ REDE EXISTENTE, EM FºFº, INCL. ASSENT. DE

CONEXOES, CORTE E BIZELAMENTO DE TUBOS, S/ FORNEC. DO MAT. HIDRAULICO, C/ DN

VARIANDO DE 500 A 800 mm

un 163,02 216,26 176,40 234,01 179,74 238,44 177,96 236,08 178,28 236,51

200116EXECUCAO DE INTERLIGACAO DE REDE NOVA C/ REDE EXISTENTE, EM FºFº, INCL. ASSENT. DE

CONEXOES, CORTE E BIZELAMENTO DE TUBOS, S/ FORNEC. DO MAT. HIDRAULICO, C/ DN >=900

mm

un 229,24 304,11 252,20 334,57 257,95 342,20 254,88 338,12 255,42 338,84

200200 RAMAL PREDIAL DE AGUA - CATEGORIAS 1 E 2 DE SOLO

200201

EXECUCAO RAMAL PREDIAL, TIPOS I-1B/2B/2E,EM PAV.ASFALTICO,C/ASSENT.HIDROMETRO

1,5e3m3/h x 1/2",ASSENT.E FORNEC.DE CX.CCH-I (EMBUT.PASSEIO),S/FORNEC.DO MAT.

HIDRAULICO/HIDROMETRO - 1a E 2a CAT

un 259,88 344,76 316,77 420,23 331,06 439,18 323,46 429,10 324,82 430,91

200202EXECUCAO RAMAL PREDIAL, TIPOS I-1C/2C/2F, EM PAV.ASFALTICO,DN 1/2",ASSENT. E FORNEC.

DE CX.CCH-I (EMBUT.PASSEIO), S/FORNEC. DO MAT. HIDRAULICO, S/FORNEC. E S/ASSENT.

HIDROMETRO - 1a E 2a CAT

un 248,06 329,08 299,73 397,62 312,72 414,85 305,82 405,70 307,05 407,33

200204EXECUCAO RAMAL PREDIAL, TIPOS I-1B/2B/2F, EM

PAV.PARALELEPIPEDO,C/ASSENT.HIDROMETRO 1,5 E 3 m3/h x 1/2",ASSENT. E FORNEC. DE

CX.CCH-I (EMBUT.PASSEIO),S/ FORNEC. DO MAT. HID/HIDR - 1a E 2a CAT

un 255,41 338,83 331,39 439,62 350,52 465,00 340,33 451,48 342,17 453,92

200205EXECUCAO RAMAL PREDIAL, TIPOS I-1C/2C/2F, EM PAV. PARALELEPIPEDO, DN 1/2", S/FORNEC. E

S/ASSENT.HIDROMETRO, ASSENT. E FORNEC. DE CX.CCH-I (EMBUT.PASSEIO), S/FORNEC. DO

MAT. HIDRAULICO - 1a E 2a CAT

un 240,01 318,40 309,02 409,95 326,40 433,00 317,15 420,73 318,82 422,95

200207EXECUCAO RAMAL PREDIAL, TIPOS I-1B/2B/2E, EM PAV. CONCRETO,C/ASSENT.HIDROMETRO

1,5e3m3/h x 1/2",ASSENT.E FORNEC.DE CX.CCH-I (EMBUT.PASSEIO), S/FORNEC. DO MAT.

HIDRAULICO/HIDROMETRO - 1a E 2a CAT

un 291,40 386,57 363,73 482,52 381,90 506,63 372,22 493,79 373,97 496,11

200208EXECUCAO RAMAL PREDIAL, TIPOS I-1C/2C/2F ,EM PAV. CONCRETO, DN 1/2",S/FORNEC.E

S/ASSENT.HIDROMETRO, ASSENT.E FORNEC.DE CX.CCH-I(EMBUT.PASSEIO), S/FORNEC.DO MAT.

HIDRAULICO - 1a E 2a CAT - 1a E 2a CAT

un 279,58 370,89 346,69 459,92 363,56 482,30 354,58 470,39 356,20 472,53

200210EXECUCAO RAMAL PREDIAL, TIPOS I-1B/2B/2E, EM PAV. BL.ARTICULADO,C/ASSENT.HIDROMETRO

1,5 E 3 m3/h x 1/2",ASSENT.E FORNEC.DE CX.CCH-I (EMBUT.PASSEIO), S/FORNEC.DO

MAT.HID/HIDROMETRO - 1a E 2a CAT

un 266,89 354,06 341,77 453,39 360,58 478,35 350,56 465,05 352,37 467,45

Página: 30 de 59

Page 31: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

200211EXECUCAO RAMAL PREDIAL, TIPOS I-1C/2C/2F, EM PAV. BL.ARTICULADO,DN 1/2", S/FORNEC. E

S/ASSENT.HIDROMETRO, ASSENT.E FORNEC.DE CX.CCH-I(EMBUT.PASSEIO), S/FORNEC.DO

MAT.HIDRAULICO. - 1a E 2a CAT

un 255,07 338,38 324,73 430,79 342,24 454,02 332,92 441,65 334,60 443,88

200213EXECUCAO RAMAL PREDIAL, TIPOS I-1B/2B/2E, EM TERRENO NATURAL,C/ASSENT.HIDROMETRO

1,5e3m3/h x 1/2",ASSENT.E FORNEC.DE CX.CCH-I(EMBUT.PASSEIO), S/FORNEC.DO

MAT.HIDRAULICO/HIDROMETRO. - 1a E 2a CAT

un 150,33 199,43 193,88 257,20 204,81 271,70 198,98 263,97 200,03 265,36

200214EXECUCAO RAMAL PREDIAL, TIPOS I-1C/2C/2F, EM TERRENO NATURAL, DN 1/2",S/ASSENT. E

S/FORNEC.HIDROMETRO, ASSENT. E FORNEC. DE CX.CCH I(EMBUT.PASSEIO), S/FORNEC.DO

MAT.HIDRAULICO. - 1a E 2a CAT

un 138,51 183,75 176,84 234,60 186,47 247,37 181,34 240,57 182,26 241,79

200216

EXECUCAO RAMAL PREDIAL, TIPOS I-1A/2A/2D, EM PAV. ASFALTICO,C/ASSENT.HIDROMETRO

1,5a3m3/h x 1/2"ou3/4",ASSENT.DE CAVALETE/ASSENT.CX.CPH (EMBUT.PAREDE),S/FORNEC.DE

CX/MAT.HID/HIDR - 1a E 2a CAT

un 183,62 243,59 231,06 306,52 242,96 322,31 236,63 313,91 237,76 315,41

200217

EXECUCAO RAMAL PREDIAL, TIPOS II-1A/2A/2D, EM PAV.ASFALTICO,C/ASSENT.HIDROMETRO

1,5a3m3/h x 1/2"ou3/4", ASSENT.DE CAVALETE/ASSENT.CX CPH(EMBUT.MURETA), S/FORNEC.DE

CX/MAT.HID/HIDR - 1a E 2a CAT

un 177,21 235,09 222,25 294,84 233,56 309,84 227,55 301,87 228,62 303,29

200219

EXECUCAO RAMAL PREDIAL, TIPOS II-1A/2A/2D, EM

PAV.PARALELEPIPEDO,C/ASSENT.HIDROMETRO 1,5a3m3/h x 1/2"ou3/4",ASSENT.DE

CAVALETE/ASSENT.CX CPH (EMBUT.PAREDE),S/FORNEC.DE CX/MAT.HID/HIDR - 1a E 2a CAT

un 175,58 232,92 240,34 318,84 256,64 340,46 247,96 328,94 249,54 331,04

200220

EXECUCAO RAMAL PREDIAL, TIPOS II-1A/2A/2D, EM

PAV.PARALELEPIPEDO,C/ASSENT.HIDROMETRO 1,5e3m3/h x 1/2"ou3/4",ASSENT.DE

CAVALETE/ASSENT.CX.CPH (EMBUT.MURETA),S/FORNEC.DE CX/MAT.HID/HIDR - 1a E 2a CAT

un 212,35 281,70 284,77 377,78 302,98 401,93 293,29 389,08 295,07 391,44

200222

EXECUCAO RAMAL PREDIAL, TIPOS II-1A/2A/2D , EM PAV.CONCRETO C/ASSENT.HIDROMETRO

1,5e3m3/h x 1/2"ou3/4",ASSENT.DE CAVALETE/ASSENT.CX.CPH (EMBUT. PAREDE),S/FORNEC.DE

CX/MAT.HID/HIDR - 1a E 2a CAT

un 227,33 301,58 290,31 385,13 306,13 406,11 297,70 394,93 299,22 396,95

200223

EXECUCAO RAMAL PREDIAL, TIPOS II-1A/2A/2D, EM PAV.CONCRETO C/ASSENT.HIDROMETRO

1,5e3m3/h x 1/2"ou3/4",ASSENT.DE CAVALETE/ASSENT.CX.CPH (EMBUT. MURETA),S/FORNEC.DE

CX/MAT.HID/HIDR - 1a E 2a CAT

un 220,92 293,07 281,50 373,44 296,73 393,64 288,62 382,88 290,08 384,82

200225EXECUCAO RAMAL PREDIAL, TIPOS II-1A/2A/2D, EM PAV.BL. ARTICULADO

C/ASSENT.HIDROMETRO 1,5e3m3/h x 1/2"ou3/4",ASSENT.DE CAVALETE/ASSENT.CX CPH

(EMBUT.PAREDE), S/FORNEC.DE CX/MAT.HID/HIDR - 1a E 2a CAT

un 190,64 252,90 256,05 339,68 272,48 361,47 263,73 349,86 265,32 351,97

200226EXECUCAO RAMAL PREDIAL, TIPOS II-1A/2A/2D, EM PAV.BL.ARTICULADO,

C/ASSENT.HIDROMETRO 1,5e3m3/h x 1/2"ou3/4",ASSENT. DE CAVALETE/ASSENT.CX. CPH

(EM.MURETA), S/FORNEC.DE CX/MAT.HID/HIDR - 1a E 2a CAT

un 184,23 244,40 247,24 327,99 263,08 349,00 254,65 337,82 256,18 339,85

200228

EXECUCAO RAMAL PREDIAL, TIPOS II-1A/2A/2D, EM TERRENO NATURAL C/ASSENT.HIDROMETRO

1,5e3 m3/h x 1/2"ou3/4",ASSENT.DE CAVALETE/ASSENT.CX.CPH (EMBUT. PAREDE), S/FORNEC.DE

CX/MAT.HID/HIDR - 1a E 2a CAT

un 73,41 97,39 107,29 142,33 115,79 153,61 111,25 147,58 112,07 148,67

200229

EXECUCAO RAMAL PREDIAL, TIPOS II-1A/2A/2D, EM TERRENO NATURAL C/ASSENT.HIDROMETRO

1,5e3m3/h x 1/2"ou3/4",ASSENT.DE CAVALETE/ASSENT.CX.CPH (EMBUT.MURETA), S/FORNEC.DE

CX/MAT.HID/HIDR - 1a E 2a CAT

un 67,00 88,88 98,48 130,64 106,39 141,14 102,17 135,54 102,93 136,55

200231

EXECUCAO RAMAL PREDIAL, TIPO III-3B , EM PAV.ASFALTICO C/ASSENT.HIDROMETRO 10m3/h x

1"(EM CAVALETE INTERNO NO PISO), C/ASSENT/DE CAIXA E S/ FORNEC. DE

CX./MAT.HIDRAULICO/HIDROMETRO - 1a E 2a CAT

un 184,05 244,16 232,01 307,78 244,06 323,77 237,66 315,28 238,80 316,79

200234

EXECUCAO RAMAL PREDIAL, TIPO III-3B , EM PAV. PARALELEPIPEDO,C/ASSENT.HIDROMETRO

10m3/hx1"(EM CAVALETE INTERNO NO PISO), C/ASSENT.DE CAIXA E S/ FORNEC. DE

CX/MAT.HIDRAULICO/HIDROMETRO. - 1a E 2a CAT

un 178,75 237,13 244,91 324,90 261,56 346,99 252,70 335,23 254,30 337,35

200237

EXECUCAO RAMAL PREDIAL, TIPO III-3B , EM PAV.CONCRETO,C/ASSENT.HIDROMETRO

10m3/hx1"(EM CAVALETE INTERNO NO PISO),C/ASSENT/DE CAIXA E S/ FORNEC. DE

CX/MAT.HIDRAULICO/HIDROMETRO - 1a E 2a CAT

un 218,32 289,62 282,58 374,87 298,72 396,28 290,13 384,89 291,68 386,94

200240EXECUCAO RAMAL PREDIAL, TIPO III-3B , EM PAV. BL. ARTICULADO, C/ASSENT.HIDROMETRO

10m3/h x 1" (EM CAVALETE INTERNO NO PISO), C/ASSENT/DE CAIXA E S/ FORNEC. DE

CX/MAT.HID/HIDR - 1a E 2a CAT

un 193,81 257,11 260,62 345,74 277,40 368,00 268,47 356,15 270,08 358,29

200243EXECUCAO RAMAL PREDIAL, TIPO III-3B, EM TERRENO NATURAL C/ASSENT.HIDROMETRO

10m3/hx1" (EM CAVALETE INTERNO NO PISO), C/ASSENT/. DE CAIXA E S/ FORNEC. DE

CX/MAT.HIDRAULICO/HIDROMETRO. - 1a E 2a CAT

un 77,25 102,48 112,73 149,55 121,63 161,35 116,89 155,07 117,74 156,19

200246EXECUCAO RAMAL PREDIAL, TIPO I-3A, EM PAV.ASFALTICO C/ASSENT.HIDROMETRO 10m3/hx1",

ASSENT. E FORNEC. DE CX. CCH II (EMBUT. PASSEIO), S/ FORNEC. DO MAT.

HIDRAULICO/HIDROMETRO - 1a E 2a CAT

un 181,92 241,34 228,92 303,69 240,73 319,35 234,45 311,02 235,57 312,51

200247EXECUCAO RAMAL PREDIAL, TIPO I-3A, EM PAV.ASFALTICO C/ASSENT.HIDROMETRO 10m3/hx1",

ASSENT. DE CX. CCH II (EMBUT. PASSEIO), S/ FORNEC. DE CAIXA/MAT.

HIDRAULICO/HIDROMETRO - 1a E 2a CAT - 1a E 2a CAT

un 181,92 241,34 228,92 303,69 240,73 319,35 234,45 311,02 235,57 312,51

200249

EXECUCAO RAMAL PREDIAL, TIPO I-3A, EM PAV.PARALELEPIPEDO,C/ASSENT.HIDROMETRO 10

m3/hx1", ASSENT. E FORNEC. DE CX. CCH II (EMBUT. PASSEIO), S/ FORNEC. DO MAT.

HIDRAULICO/HIDROMETRO - 1a E 2a CAT

un 173,87 230,66 238,21 316,01 254,41 337,50 245,78 326,05 247,34 328,12

200250

EXECUCAO RAMAL PREDIAL, TIPO I-3A, EM PAV.PARALELEPIPEDO,C/ASSENT.HIDROMETRO 10

m3/hx1", ASSENT. DE CX. CCH II (EMBUT. PASSEIO), S/ FORNEC. DE CAIXA/MAT.

HIDRAULICO/HIDROMETRO - 1a E 2a CAT

un 173,87 230,66 238,21 316,01 254,41 337,50 245,78 326,05 247,34 328,12

200252

EXECUCAO RAMAL PREDIAL, TIPO I-3A, EM PAV.CONCRETO,C/ASSENT.HIDROMETRO 10m3/hx1",

ASSENT. E FORNEC. DE CX CCH II (EMBUT.PASSEIO), S/FORNEC. DE

MAT.HIDRAULICO/HIDROMETRO - 1a E 2a CAT - 1a E 2a CAT

un 225,74 299,47 288,33 382,50 304,05 403,35 295,67 392,24 297,18 394,24

200253

EXECUCAO RAMAL PREDIAL, TIPO I-3A, EM PAV.CONCRETO,C/ASSENT.HIDROMETRO 10m3/hx1",

ASSENT. DE CX CCH II (EMBUT.PASSEIO), S/FORNEC. DE CAIXA/MAT.HIDRAULICO/HIDROMETRO -

1a E 2a CAT - 1a E 2a CAT

un 225,74 299,47 288,33 382,50 304,05 403,35 295,67 392,24 297,18 394,24

200255EXECUCAO RAMAL PREDIAL, TIPO I-3A, EM PAV.BL. ARTICULADO,C/ASSENT.HIDROMETRO 10

m3/hx1", ASSENT. E FORNEC. DE CX. CCH II (EMBUT.PASSEIO), S/FORNEC. DO

MAT.HIDRAULICO/HIDROMETRO - 1a E 2a CAT

un 188,93 250,63 253,92 336,85 270,25 358,51 261,55 346,97 263,12 349,05

200257

EXECUCAO RAMAL PREDIAL, TIPO I-3A, EM TERRENO NATURAL C/ASSENT.HIDROMETRO

10m3/hx1", ASSENT. E FORNEC.DE CX.CCH II (EMBUT.PASSEIO), S/ FORNEC. DO MAT.

HIDRAULICO/HIDROMETRO - 1a E 2a CAT - 1a E 2a CAT

un 72,37 96,01 106,03 140,66 114,48 151,87 109,97 145,89 110,78 146,96

200262

EXECUCAO RAMAL PREDIAL, TIPO I-4A, EM PAV.ASFALTICO C/ASSENT.HIDROMETRO 30m3/hx2",

ASSENT. E FORNEC. DE CX.CCH III (EMBUT.PASSEIO), S/FORNEC. DO MAT.

HIDRAULICO/HIDROMETRO - 1a E 2a CAT - 1a E 2a CAT

un 284,09 376,87 355,83 472,04 373,83 495,92 364,30 483,28 366,02 485,56

200265

EXECUCAO RAMAL PREDIAL, TIPO I-4A, EM PAV. PARALELEPIPEDO,C/ASSENT.HIDROMETRO

30m3/hx2", ASSENT. E FORNEC. DE CX. CCH III(EMBUT.PASSEIO), S/FORNEC. DO MAT.

HIDRAULICO/HIDROMETRO - 1a E 2a CAT

un 276,04 366,19 365,12 484,37 387,51 514,07 375,63 498,31 377,79 501,18

200269EXECUCAO RAMAL PREDIAL, TIPO I-4A, EM PAV.CONCRETO,C/HIDROMETRO 30m3/hx2", ASSENT.

E FORNEC. DE CX. CCH III (EMBUT.PASSEIO), S/ FORNEC. DO MAT. HIDRAULICO/HIDROMETRO -

1a E 2a CAT - 1a E 2a CAT

un 315,61 418,69 402,79 534,34 424,67 563,37 413,06 547,97 415,17 550,76

200272EXECUCAO RAMAL PREDIAL, TIPO I-4A, EM PAV. BL. ARTICULADO,C/ASSENT.HIDROMETRO

30m3/hx2", ASSENT.E FORNEC. DE CX. CCH III (EMBUT.PASSEIO), S/ FORNEC. DO MAT.

HIDRAULICO/HIDROMETRO - 1a E 2a CAT

un 291,10 386,17 380,83 505,21 403,35 535,08 391,40 519,23 393,57 522,11

200275EXECUCAO RAMAL PREDIAL, TIPO I-4A, EM TERRENO NATURAL C/ASSENT.HIDROMETRO

30m3/hx2", ASSENT. E FORNEC. DE CX. CCH III (EMBUT.PASSEIO), S/FORNEC. DO MAT.

HIDRAULICO/HIDROMETRO - 1a E 2a CAT

un 174,54 231,54 232,94 309,02 247,58 328,44 239,82 318,15 241,23 320,02

200279

EXECUCAO RAMAL PREDIAL, TIPO III-4B, EM PAV.ASFALTICO C/ASSENT.HIDROMETRO 30

m3/hx2"(EM CAVALETE INTERNO NO PISO), C/ FORNEC./ASSENT. DE CAIXA E S/FORNEC. DO MAT.

HIDRAULICO/HIDROMETRO - 1a E 2a CAT

un 289,97 384,67 363,79 482,60 382,32 507,19 372,50 494,16 374,27 496,51

200282EXECUCAO RAMAL PREDIAL, TIPO III-4B, EM PAV. PARALELEPIPEDO,C/ASSENT.HIDROMETRO

30m3/hx2",(EM CAVALETE INTERNO NO PISO),C/FORNEC.E ASSENT.DE CAIXA E S/ FORNEC. DO

MAT.HID/HIDR - 1a E 2a CAT

un 281,92 374,00 373,08 494,93 396,00 525,33 383,83 509,19 386,04 512,12

200285

EXECUCAO RAMAL PREDIAL, TIPO III-4B, EM PAV.CONCRETO,C/ASSENT.HIDROMETRO

30m3/hx2",(EM CAVALETE INTERNO NO PISO), C/FORNEC./ASSENT.DE CAIXA E S/ FORNEC. DO

MAT. HIDRAULICO/HIDROMETRO. - 1a E 2a CAT

un 321,49 426,49 410,75 544,90 433,16 574,63 421,26 558,84 423,42 561,71

200289EXECUCAO RAMAL PREDIAL, TIPO III-4B, EM PAV.BL. ARTICULADO,C/ASSENT.HIDROMETRO 30

m3/hx2", (EM CAVALETE INTERNO NO PISO),C/FORNEC./ASSENT. DE CAIXA E S/FORNEC.DO MAT.

HID/HIDR - 1a E 2a CAT

un 296,98 393,97 388,79 515,77 411,84 546,35 399,60 530,11 401,82 533,05

Página: 31 de 59

Page 32: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

200292EXECUCAO RAMAL PREDIAL, TIPO III-4B, EM TERRENO NATURAL, C/ASSENT.HIDROMETRO

30m3/hx2",(EM CAVALETE INTERNO NO PISO), C/FORNEC./ASSENT. DE CAIXA E S/ FORNEC.DO

MAT. HID/HIDR - 1a E 2a CAT

un 180,42 239,35 240,90 319,58 256,07 339,70 248,02 329,02 249,48 330,96

200293ASSENT. DE HIDROMETRO E REGISTRO, EM LIGACAO PREDIAL EXISTENTE NAO MEDIDA, S/ CX.

DE PROTECAO, C/ DN 1/2" A 2", NO PASSEIO, S/ FORNEC./ASSENT. DE CX., S/ FORNEC. DO MAT.

HIDRAULICO/HIDROMETRO.

un 21,87 29,01 31,76 42,13 34,24 45,42 32,92 43,67 33,16 43,99

200294ASSENT. DE HIDROMETRO EM LIGACAO PREDIAL EXISTENTE NAO MEDIDA, C/ CX. DE PROTECAO,

C/ DN 1/2" A 2", NO PASSEIO, S/ FORNEC. DO MAT. HIDRAULICO/HIDROMETRO.un 13,30 17,64 19,24 25,52 20,73 27,50 19,93 26,44 20,08 26,64

200296FORNEC. E ASSENT. DE MURETA PRE-MOLDADA DE CONCRETO ARMADO P/HIDROMETRO EM

CAVALETEun 43,18 57,28 53,24 70,63 55,74 73,94 54,41 72,18 54,67 72,53

200297FORNEC. E ASSENT. DE MURETA PRE-MOLDADA DE CONCRETO ARMADO C/CAIXA PLASTICA

P/HIDROMETRO EM CAVALETEun 68,57 90,96 79,62 105,62 82,37 109,27 80,90 107,32 81,19 107,71

200298 ASSENT. E FORNEC. DE CX.CCH-I (EMBUT.PASSEIO), PARA LIGACOES DE AGUA un 77,96 103,42 87,85 116,54 90,33 119,83 89,01 118,08 89,25 118,40

200300 RAMAL PREDIAL DE AGUA - EM LAMA

200301

EXECUCAO RAMAL PREDIAL, TIPOS I-1B/2B/2E,EM PAV.ASFALTICO,C/ASSENT.HIDROMETRO

1,5e3m3/h x 1/2",ASSENT.E FORNEC.DE CX.CCH-I (EMBUT.PASSEIO),S/FORNEC.DO MAT.

HIDRAULICO/HIDROMETRO - EM LAMA

un 290,36 385,19 348,21 461,94 362,74 481,21 355,02 470,97 356,39 472,79

200302EXECUCAO RAMAL PREDIAL, TIPOS I-1C/2C/2F, EM PAV.ASFALTICO,DN 1/2",ASSENT. E FORNEC.

DE CX.CCH-I (EMBUT.PASSEIO), S/FORNEC. DO MAT. HIDRAULICO, S/FORNEC. E S/ASSENT.

HIDROMETRO - EM LAMA

un 278,54 369,51 331,17 439,33 344,40 456,88 337,38 447,57 338,62 449,21

200304EXECUCAO RAMAL PREDIAL, TIPOS I-1B/2B/2F, EM

PAV.PARALELEPIPEDO,C/ASSENT.HIDROMETRO 1,5 E 3 m3/h x 1/2",ASSENT. E FORNEC. DE

CX.CCH-I (EMBUT.PASSEIO),S/ FORNEC. DO MAT. HID/HIDR - EM LAMA

un 285,89 379,26 362,83 481,33 382,20 507,03 371,89 493,35 373,74 495,80

200305EXECUCAO RAMAL PREDIAL, TIPOS I-1C/2C/2F, EM PAV. PARALELEPIPEDO, DN 1/2", S/FORNEC. E

S/ASSENT.HIDROMETRO, ASSENT. E FORNEC. DE CX.CCH-I (EMBUT.PASSEIO), S/FORNEC. DO

MAT. HIDRAULICO - EM LAMA

un 270,49 358,83 340,46 451,65 358,08 475,03 348,71 462,60 350,39 464,83

200307EXECUCAO RAMAL PREDIAL, TIPOS I-1B/2B/2E, EM PAV. CONCRETO,C/ASSENT.HIDROMETRO

1,5e3m3/h x 1/2",ASSENT.E FORNEC.DE CX.CCH-I (EMBUT.PASSEIO), S/FORNEC. DO MAT.

HIDRAULICO/HIDROMETRO - EM LAMA

un 321,88 427,01 395,17 524,23 413,58 548,66 403,78 535,65 405,54 537,99

200308EXECUCAO RAMAL PREDIAL, TIPOS I-1C/2C/2F ,EM PAV. CONCRETO, DN 1/2",S/FORNEC.E

S/ASSENT.HIDROMETRO, ASSENT.E FORNEC.DE CX.CCH-I(EMBUT.PASSEIO), S/FORNEC.DO MAT.

HIDRAULICO - EM LAMA

un 310,06 411,33 378,13 501,63 395,24 524,33 386,14 512,25 387,77 514,42

200310EXECUCAO RAMAL PREDIAL, TIPOS I-1B/2B/2E, EM PAV. BL.ARTICULADO,C/ASSENT.HIDROMETRO

1,5 E 3 m3/h x 1/2",ASSENT.E FORNEC.DE CX.CCH-I (EMBUT.PASSEIO), S/FORNEC.DO

MAT.HID/HIDROMETRO - EM LAMA

un 297,37 394,49 373,21 495,10 392,26 520,37 382,12 506,92 383,94 509,33

200311EXECUCAO RAMAL PREDIAL, TIPOS I-1C/2C/2F, EM PAV. BL.ARTICULADO,DN 1/2", S/FORNEC. E

S/ASSENT.HIDROMETRO, ASSENT.E FORNEC.DE CX.CCH-I(EMBUT.PASSEIO), S/FORNEC.DO

MAT.HIDRAULICO. - EM LAMA

un 285,55 378,81 356,17 472,50 373,92 496,04 364,48 483,52 366,17 485,76

200313EXECUCAO RAMAL PREDIAL, TIPOS I-1B/2B/2E, EM TERRENO NATURAL,C/ASSENT.HIDROMETRO

1,5e3m3/h x 1/2",ASSENT.E FORNEC.DE CX.CCH-I(EMBUT.PASSEIO), S/FORNEC.DO

MAT.HIDRAULICO/HIDROMETRO. - EM LAMA

un 180,81 239,86 225,32 298,91 236,49 313,73 230,54 305,83 231,60 307,24

200314EXECUCAO RAMAL PREDIAL, TIPOS I-1C/2C/2F, EM TERRENO NATURAL, DN 1/2",S/ASSENT. E

S/FORNEC.HIDROMETRO, ASSENT. E FORNEC. DE CX.CCH I(EMBUT.PASSEIO), S/FORNEC.DO

MAT.HIDRAULICO. - EM LAMA

un 168,99 224,18 208,28 276,30 218,15 289,40 212,90 282,43 213,83 283,67

200316

EXECUCAO RAMAL PREDIAL, TIPOS I-1A/2A/2D, EM PAV. ASFALTICO,C/ASSENT.HIDROMETRO

1,5a3m3/h x 1/2"ou3/4",ASSENT.DE CAVALETE/ASSENT.CX.CPH (EMBUT.PAREDE),S/FORNEC.DE

CX/MAT.HID/HIDR - EM LAMA

un 214,10 284,03 262,50 348,23 274,64 364,34 268,19 355,78 269,33 357,29

200317

EXECUCAO RAMAL PREDIAL, TIPOS II-1A/2A/2D, EM PAV.ASFALTICO,C/ASSENT.HIDROMETRO

1,5a3m3/h x 1/2"ou3/4", ASSENT.DE CAVALETE/ASSENT.CX CPH(EMBUT.MURETA), S/FORNEC.DE

CX/MAT.HID/HIDR - EM LAMA

un 207,69 275,52 253,69 336,55 265,24 351,87 259,11 343,74 260,19 345,17

200319

EXECUCAO RAMAL PREDIAL, TIPOS II-1A/2A/2D, EM

PAV.PARALELEPIPEDO,C/ASSENT.HIDROMETRO 1,5a3m3/h x 1/2"ou3/4",ASSENT.DE

CAVALETE/ASSENT.CX CPH (EMBUT.PAREDE),S/FORNEC.DE CX/MAT.HID/HIDR - EM LAMA

un 206,06 273,36 271,78 360,54 288,32 382,49 279,52 370,81 281,11 372,92

200320

EXECUCAO RAMAL PREDIAL, TIPOS II-1A/2A/2D, EM

PAV.PARALELEPIPEDO,C/ASSENT.HIDROMETRO 1,5e3m3/h x 1/2"ou3/4",ASSENT.DE

CAVALETE/ASSENT.CX.CPH (EMBUT.MURETA),S/FORNEC.DE CX/MAT.HID/HIDR - EM LAMA

un 242,83 322,14 316,21 419,48 334,66 443,96 324,85 430,95 326,64 433,32

200322

EXECUCAO RAMAL PREDIAL, TIPOS II-1A/2A/2D , EM PAV.CONCRETO C/ASSENT.HIDROMETRO

1,5e3m3/h x 1/2"ou3/4",ASSENT.DE CAVALETE/ASSENT.CX.CPH (EMBUT. PAREDE),S/FORNEC.DE

CX/MAT.HID/HIDR - EM LAMA

un 257,81 342,01 321,75 426,83 337,81 448,14 329,26 436,80 330,79 438,83

200323

EXECUCAO RAMAL PREDIAL, TIPOS II-1A/2A/2D, EM PAV.CONCRETO C/ASSENT.HIDROMETRO

1,5e3m3/h x 1/2"ou3/4",ASSENT.DE CAVALETE/ASSENT.CX.CPH (EMBUT. MURETA),S/FORNEC.DE

CX/MAT.HID/HIDR - EM LAMA

un 251,40 333,51 312,94 415,15 328,41 435,67 320,18 424,75 321,65 426,70

200325EXECUCAO RAMAL PREDIAL, TIPOS II-1A/2A/2D, EM PAV.BL. ARTICULADO

C/ASSENT.HIDROMETRO 1,5e3m3/h x 1/2"ou3/4",ASSENT.DE CAVALETE/ASSENT.CX CPH

(EMBUT.PAREDE), S/FORNEC.DE CX/MAT.HID/HIDR - EM LAMA

un 221,12 293,34 287,49 381,38 304,16 403,50 295,29 391,73 296,89 393,85

200326EXECUCAO RAMAL PREDIAL, TIPOS II-1A/2A/2D, EM PAV.BL.ARTICULADO,

C/ASSENT.HIDROMETRO 1,5e3m3/h x 1/2"ou3/4",ASSENT. DE CAVALETE/ASSENT.CX. CPH

(EM.MURETA), S/FORNEC.DE CX/MAT.HID/HIDR - EM LAMA

un 214,71 284,83 278,68 369,70 294,76 391,03 286,21 379,69 287,75 381,73

200328

EXECUCAO RAMAL PREDIAL, TIPOS II-1A/2A/2D, EM TERRENO NATURAL C/ASSENT.HIDROMETRO

1,5e3 m3/h x 1/2"ou3/4",ASSENT.DE CAVALETE/ASSENT.CX.CPH (EMBUT. PAREDE), S/FORNEC.DE

CX/MAT.HID/HIDR - EM LAMA

un 103,89 137,82 138,73 184,04 147,47 195,63 142,81 189,45 143,64 190,55

200329

EXECUCAO RAMAL PREDIAL, TIPOS II-1A/2A/2D, EM TERRENO NATURAL C/ASSENT.HIDROMETRO

1,5e3m3/h x 1/2"ou3/4",ASSENT.DE CAVALETE/ASSENT.CX.CPH (EMBUT.MURETA), S/FORNEC.DE

CX/MAT.HID/HIDR - EM LAMA

un 97,48 129,32 129,92 172,35 138,07 183,16 133,73 177,41 134,50 178,43

200331

EXECUCAO RAMAL PREDIAL, TIPO III-3B , EM PAV.ASFALTICO C/ASSENT.HIDROMETRO 10m3/h x

1"(EM CAVALETE INTERNO NO PISO), C/ASSENT/DE CAIXA E S/ FORNEC. DE

CX./MAT.HIDRAULICO/HIDROMETRO - EM LAMA

un 214,53 284,60 263,45 349,49 275,74 365,80 269,22 357,15 270,37 358,67

200334

EXECUCAO RAMAL PREDIAL, TIPO III-3B , EM PAV. PARALELEPIPEDO,C/ASSENT.HIDROMETRO

10m3/hx1"(EM CAVALETE INTERNO NO PISO), C/ASSENT.DE CAIXA E S/ FORNEC. DE

CX/MAT.HIDRAULICO/HIDROMETRO. - EM LAMA

un 209,23 277,56 276,35 366,61 293,24 389,01 284,26 377,10 285,87 379,24

200337

EXECUCAO RAMAL PREDIAL, TIPO III-3B , EM PAV.CONCRETO,C/ASSENT.HIDROMETRO

10m3/hx1"(EM CAVALETE INTERNO NO PISO),C/ASSENT/DE CAIXA E S/ FORNEC. DE

CX/MAT.HIDRAULICO/HIDROMETRO - EM LAMA

un 248,80 330,06 314,02 416,58 330,40 438,31 321,69 426,75 323,25 428,82

200340EXECUCAO RAMAL PREDIAL, TIPO III-3B , EM PAV. BL. ARTICULADO, C/ASSENT.HIDROMETRO

10m3/h x 1" (EM CAVALETE INTERNO NO PISO), C/ASSENT/DE CAIXA E S/ FORNEC. DE

CX/MAT.HID/HIDR - EM LAMA

un 224,29 297,54 292,06 387,45 309,08 410,03 300,03 398,02 301,65 400,17

200343EXECUCAO RAMAL PREDIAL, TIPO III-3B, EM TERRENO NATURAL C/ASSENT.HIDROMETRO

10m3/hx1" (EM CAVALETE INTERNO NO PISO), C/ASSENT/. DE CAIXA E S/ FORNEC. DE

CX/MAT.HIDRAULICO/HIDROMETRO. - EM LAMA

un 107,73 142,91 144,17 191,26 153,31 203,38 148,45 196,93 149,31 198,07

200346EXECUCAO RAMAL PREDIAL, TIPO I-3A, EM PAV.ASFALTICO C/ASSENT.HIDROMETRO 10m3/hx1",

ASSENT. E FORNEC. DE CX. CCH II (EMBUT. PASSEIO), S/ FORNEC. DO MAT.

HIDRAULICO/HIDROMETRO - EM LAMA

un 212,40 281,77 260,36 345,39 272,41 361,38 266,01 352,89 267,14 354,39

200347EXECUCAO RAMAL PREDIAL, TIPO I-3A, EM PAV.ASFALTICO C/ASSENT.HIDROMETRO 10m3/hx1",

ASSENT. DE CX. CCH II (EMBUT. PASSEIO), S/ FORNEC. DE CAIXA/MAT.

HIDRAULICO/HIDROMETRO - EM LAMA

un 212,40 281,77 260,36 345,39 272,41 361,38 266,01 352,89 267,14 354,39

200349

EXECUCAO RAMAL PREDIAL, TIPO I-3A, EM PAV.PARALELEPIPEDO,C/ASSENT.HIDROMETRO 10

m3/hx1", ASSENT. E FORNEC. DE CX. CCH II (EMBUT. PASSEIO), S/ FORNEC. DO MAT.

HIDRAULICO/HIDROMETRO - EM LAMA

un 204,35 271,09 269,65 357,72 286,09 379,53 277,34 367,92 278,91 370,00

200350

EXECUCAO RAMAL PREDIAL, TIPO I-3A, EM PAV.PARALELEPIPEDO,C/ASSENT.HIDROMETRO 10

m3/hx1", ASSENT. DE CX. CCH II (EMBUT. PASSEIO), S/ FORNEC. DE CAIXA/MAT.

HIDRAULICO/HIDROMETRO - EM LAMA

un 204,35 271,09 269,65 357,72 286,09 379,53 277,34 367,92 278,91 370,00

200352EXECUCAO RAMAL PREDIAL, TIPO I-3A, EM PAV.CONCRETO,C/ASSENT.HIDROMETRO 10m3/hx1",

ASSENT. E FORNEC. DE CX CCH II (EMBUT.PASSEIO), S/FORNEC. DE

MAT.HIDRAULICO/HIDROMETRO - EM LAMA

un 256,22 339,90 319,77 424,21 335,73 445,38 327,23 434,10 328,75 436,12

200353

EXECUCAO RAMAL PREDIAL, TIPO I-3A, EM PAV.CONCRETO,C/ASSENT.HIDROMETRO 10m3/hx1",

ASSENT. DE CX CCH II (EMBUT.PASSEIO), S/FORNEC. DE CAIXA/MAT.HIDRAULICO/HIDROMETRO -

EM LAMA

un 256,22 339,90 319,77 424,21 335,73 445,38 327,23 434,10 328,75 436,12

200355EXECUCAO RAMAL PREDIAL, TIPO I-3A, EM PAV.BL. ARTICULADO,C/ASSENT.HIDROMETRO 10

m3/hx1", ASSENT. E FORNEC. DE CX. CCH II (EMBUT.PASSEIO), S/FORNEC. DO

MAT.HIDRAULICO/HIDROMETRO - EM LAMA

un 219,41 291,07 285,36 378,56 301,93 400,54 293,11 388,84 294,69 390,94

Página: 32 de 59

Page 33: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

200357EXECUCAO RAMAL PREDIAL, TIPO I-3A, EM TERRENO NATURAL C/ASSENT.HIDROMETRO

10m3/hx1", ASSENT. E FORNEC.DE CX.CCH II (EMBUT.PASSEIO), S/ FORNEC. DO MAT.

HIDRAULICO/HIDROMETRO - EM LAMA

un 102,85 136,44 137,47 182,37 146,16 193,90 141,53 187,75 142,35 188,84

200362EXECUCAO RAMAL PREDIAL, TIPO I-4A, EM PAV.ASFALTICO C/ASSENT.HIDROMETRO 30m3/hx2",

ASSENT. E FORNEC. DE CX.CCH III (EMBUT.PASSEIO), S/FORNEC. DO MAT.

HIDRAULICO/HIDROMETRO - EM LAMA

un 314,57 417,31 387,27 513,75 405,51 537,95 395,86 525,15 397,59 527,44

200365

EXECUCAO RAMAL PREDIAL, TIPO I-4A, EM PAV. PARALELEPIPEDO,C/ASSENT.HIDROMETRO

30m3/hx2", ASSENT. E FORNEC. DE CX. CCH III(EMBUT.PASSEIO), S/FORNEC. DO MAT.

HIDRAULICO/HIDROMETRO - EM LAMA

un 306,52 406,63 396,56 526,08 419,19 556,10 407,19 540,18 409,36 543,06

200369EXECUCAO RAMAL PREDIAL, TIPO I-4A, EM PAV.CONCRETO,C/HIDROMETRO 30m3/hx2", ASSENT.

E FORNEC. DE CX. CCH III (EMBUT.PASSEIO), S/ FORNEC. DO MAT. HIDRAULICO/HIDROMETRO -

EM LAMA

un 346,09 459,12 434,23 576,05 456,35 605,39 444,62 589,83 446,74 592,65

200372EXECUCAO RAMAL PREDIAL, TIPO I-4A, EM PAV. BL. ARTICULADO,C/ASSENT.HIDROMETRO

30m3/hx2", ASSENT.E FORNEC. DE CX. CCH III (EMBUT.PASSEIO), S/ FORNEC. DO MAT.

HIDRAULICO/HIDROMETRO - EM LAMA

un 321,58 426,61 412,27 546,92 435,03 577,11 422,96 561,10 425,14 563,99

200375EXECUCAO RAMAL PREDIAL, TIPO I-4A, EM TERRENO NATURAL C/ASSENT.HIDROMETRO

30m3/hx2", ASSENT. E FORNEC. DE CX. CCH III (EMBUT.PASSEIO), S/FORNEC. DO MAT.

HIDRAULICO/HIDROMETRO - EM LAMA

un 205,02 271,98 264,38 350,73 279,26 370,47 271,38 360,01 272,80 361,90

200379

EXECUCAO RAMAL PREDIAL, TIPO III-4B, EM PAV.ASFALTICO C/ASSENT.HIDROMETRO 30

m3/hx2"(EM CAVALETE INTERNO NO PISO), C/ FORNEC./ASSENT. DE CAIXA E S/FORNEC. DO MAT.

HIDRAULICO/HIDROMETRO - EM LAMA

un 320,45 425,11 395,23 524,31 414,00 549,21 404,06 536,03 405,84 538,39

200382EXECUCAO RAMAL PREDIAL, TIPO III-4B, EM PAV. PARALELEPIPEDO,C/ASSENT.HIDROMETRO

30m3/hx2",(EM CAVALETE INTERNO NO PISO),C/FORNEC.E ASSENT.DE CAIXA E S/ FORNEC. DO

MAT.HID/HIDR - EM LAMA

un 312,40 414,43 404,52 536,64 427,68 567,36 415,39 551,06 417,61 554,00

200385

EXECUCAO RAMAL PREDIAL, TIPO III-4B, EM PAV.CONCRETO,C/ASSENT.HIDROMETRO

30m3/hx2",(EM CAVALETE INTERNO NO PISO), C/FORNEC./ASSENT.DE CAIXA E S/ FORNEC. DO

MAT. HIDRAULICO/HIDROMETRO. - EM LAMA

un 351,97 466,92 442,19 586,61 464,84 616,66 452,82 600,71 454,99 603,59

200389EXECUCAO RAMAL PREDIAL, TIPO III-4B, EM PAV.BL. ARTICULADO,C/ASSENT.HIDROMETRO 30

m3/hx2", (EM CAVALETE INTERNO NO PISO),C/FORNEC./ASSENT. DE CAIXA E S/FORNEC.DO MAT.

HID/HIDR - EM LAMA

un 327,46 434,41 420,23 557,48 443,52 588,37 431,16 571,98 433,39 574,94

200392EXECUCAO RAMAL PREDIAL, TIPO III-4B, EM TERRENO NATURAL, C/ASSENT.HIDROMETRO

30m3/hx2",(EM CAVALETE INTERNO NO PISO), C/FORNEC./ASSENT. DE CAIXA E S/ FORNEC.DO

MAT. HID/HIDR - EM LAMA

un 210,90 279,78 272,34 361,29 287,75 381,73 279,58 370,89 281,05 372,84

200400 RAMAL PREDIAL DE AGUA - EM ROCHA

200401

EXECUCAO RAMAL PREDIAL, TIPOS I-1B/2B/2E,EM PAV.ASFALTICO,C/ASSENT.HIDROMETRO

1,5e3m3/h x 1/2",ASSENT.E FORNEC.DE CX.CCH-I (EMBUT.PASSEIO),S/FORNEC.DO MAT.

HIDRAULICO/HIDROMETRO - EM ROCHA

un 292,32 387,79 343,86 456,16 356,80 473,33 349,92 464,20 351,15 465,84

200402EXECUCAO RAMAL PREDIAL, TIPOS I-1C/2C/2F, EM PAV.ASFALTICO,DN 1/2",ASSENT. E FORNEC.

DE CX.CCH-I (EMBUT.PASSEIO), S/FORNEC. DO MAT. HIDRAULICO, S/FORNEC. E S/ASSENT.

HIDROMETRO - EM ROCHA

un 280,50 372,11 326,82 433,56 338,46 449,00 332,28 440,80 333,38 442,26

200404EXECUCAO RAMAL PREDIAL, TIPOS I-1B/2B/2F, EM

PAV.PARALELEPIPEDO,C/ASSENT.HIDROMETRO 1,5 E 3 m3/h x 1/2",ASSENT. E FORNEC. DE

CX.CCH-I (EMBUT.PASSEIO),S/ FORNEC. DO MAT. HID/HIDR - EM ROCHA

un 287,85 381,86 358,48 475,56 376,26 499,15 366,79 486,58 368,50 488,85

200405EXECUCAO RAMAL PREDIAL, TIPOS I-1C/2C/2F, EM PAV. PARALELEPIPEDO, DN 1/2", S/FORNEC. E

S/ASSENT.HIDROMETRO, ASSENT. E FORNEC. DE CX.CCH-I (EMBUT.PASSEIO), S/FORNEC. DO

MAT. HIDRAULICO - EM ROCHA

un 272,45 361,43 336,11 445,88 352,14 467,15 343,61 455,83 345,15 457,88

200407EXECUCAO RAMAL PREDIAL, TIPOS I-1B/2B/2E, EM PAV. CONCRETO,C/ASSENT.HIDROMETRO

1,5e3m3/h x 1/2",ASSENT.E FORNEC.DE CX.CCH-I (EMBUT.PASSEIO), S/FORNEC. DO MAT.

HIDRAULICO/HIDROMETRO - EM ROCHA

un 323,84 429,61 390,82 518,46 407,64 540,78 398,68 528,89 400,30 531,04

200408EXECUCAO RAMAL PREDIAL, TIPOS I-1C/2C/2F ,EM PAV. CONCRETO, DN 1/2",S/FORNEC.E

S/ASSENT.HIDROMETRO, ASSENT.E FORNEC.DE CX.CCH-I(EMBUT.PASSEIO), S/FORNEC.DO MAT.

HIDRAULICO - EM ROCHA

un 312,02 413,93 373,78 495,86 389,30 516,45 381,04 505,49 382,53 507,46

200410EXECUCAO RAMAL PREDIAL, TIPOS I-1B/2B/2E, EM PAV. BL.ARTICULADO,C/ASSENT.HIDROMETRO

1,5 E 3 m3/h x 1/2",ASSENT.E FORNEC.DE CX.CCH-I (EMBUT.PASSEIO), S/FORNEC.DO

MAT.HID/HIDROMETRO - EM ROCHA

un 299,33 397,09 368,86 489,33 386,32 512,49 377,02 500,15 378,70 502,38

200411EXECUCAO RAMAL PREDIAL, TIPOS I-1C/2C/2F, EM PAV. BL.ARTICULADO,DN 1/2", S/FORNEC. E

S/ASSENT.HIDROMETRO, ASSENT.E FORNEC.DE CX.CCH-I(EMBUT.PASSEIO), S/FORNEC.DO

MAT.HIDRAULICO. - EM ROCHA

un 287,51 381,41 351,82 466,72 367,98 488,16 359,38 476,75 360,93 478,81

200413EXECUCAO RAMAL PREDIAL, TIPOS I-1B/2B/2E, EM TERRENO NATURAL,C/ASSENT.HIDROMETRO

1,5e3m3/h x 1/2",ASSENT.E FORNEC.DE CX.CCH-I(EMBUT.PASSEIO), S/FORNEC.DO

MAT.HIDRAULICO/HIDROMETRO. - EM ROCHA

un 182,77 242,46 220,97 293,14 230,55 305,85 225,44 299,07 226,36 300,29

200414EXECUCAO RAMAL PREDIAL, TIPOS I-1C/2C/2F, EM TERRENO NATURAL, DN 1/2",S/ASSENT. E

S/FORNEC.HIDROMETRO, ASSENT. E FORNEC. DE CX.CCH I(EMBUT.PASSEIO), S/FORNEC.DO

MAT.HIDRAULICO. - EM ROCHA

un 170,95 226,78 203,93 270,53 212,21 281,52 207,80 275,67 208,59 276,72

200416

EXECUCAO RAMAL PREDIAL, TIPOS I-1A/2A/2D, EM PAV. ASFALTICO,C/ASSENT.HIDROMETRO

1,5a3m3/h x 1/2"ou3/4",ASSENT.DE CAVALETE/ASSENT.CX.CPH (EMBUT.PAREDE),S/FORNEC.DE

CX/MAT.HID/HIDR - EM ROCHA

un 216,06 286,63 258,15 342,46 268,70 356,46 263,09 349,02 264,09 350,34

200417

EXECUCAO RAMAL PREDIAL, TIPOS II-1A/2A/2D, EM PAV.ASFALTICO,C/ASSENT.HIDROMETRO

1,5a3m3/h x 1/2"ou3/4", ASSENT.DE CAVALETE/ASSENT.CX CPH(EMBUT.MURETA), S/FORNEC.DE

CX/MAT.HID/HIDR - EM ROCHA

un 209,65 278,12 249,34 330,77 259,30 343,99 254,01 336,97 254,95 338,22

200419

EXECUCAO RAMAL PREDIAL, TIPOS II-1A/2A/2D, EM

PAV.PARALELEPIPEDO,C/ASSENT.HIDROMETRO 1,5a3m3/h x 1/2"ou3/4",ASSENT.DE

CAVALETE/ASSENT.CX CPH (EMBUT.PAREDE),S/FORNEC.DE CX/MAT.HID/HIDR - EM ROCHA

un 208,02 275,96 267,43 354,77 282,38 374,61 274,42 364,05 275,87 365,97

200420

EXECUCAO RAMAL PREDIAL, TIPOS II-1A/2A/2D, EM

PAV.PARALELEPIPEDO,C/ASSENT.HIDROMETRO 1,5e3m3/h x 1/2"ou3/4",ASSENT.DE

CAVALETE/ASSENT.CX.CPH (EMBUT.MURETA),S/FORNEC.DE CX/MAT.HID/HIDR - EM ROCHA

un 244,79 324,74 311,86 413,71 328,72 436,08 319,75 424,18 321,40 426,37

200422

EXECUCAO RAMAL PREDIAL, TIPOS II-1A/2A/2D , EM PAV.CONCRETO C/ASSENT.HIDROMETRO

1,5e3m3/h x 1/2"ou3/4",ASSENT.DE CAVALETE/ASSENT.CX.CPH (EMBUT. PAREDE),S/FORNEC.DE

CX/MAT.HID/HIDR - EM ROCHA

un 259,77 344,61 317,40 421,06 331,87 440,26 324,16 430,03 325,55 431,87

200423

EXECUCAO RAMAL PREDIAL, TIPOS II-1A/2A/2D, EM PAV.CONCRETO C/ASSENT.HIDROMETRO

1,5e3m3/h x 1/2"ou3/4",ASSENT.DE CAVALETE/ASSENT.CX.CPH (EMBUT. MURETA),S/FORNEC.DE

CX/MAT.HID/HIDR - EM ROCHA

un 253,36 336,11 308,59 409,38 322,47 427,79 315,08 417,99 316,41 419,75

200425EXECUCAO RAMAL PREDIAL, TIPOS II-1A/2A/2D, EM PAV.BL. ARTICULADO

C/ASSENT.HIDROMETRO 1,5e3m3/h x 1/2"ou3/4",ASSENT.DE CAVALETE/ASSENT.CX CPH

(EMBUT.PAREDE), S/FORNEC.DE CX/MAT.HID/HIDR - EM ROCHA

un 223,08 295,94 283,14 375,61 298,22 395,62 290,19 384,97 291,65 386,90

200426EXECUCAO RAMAL PREDIAL, TIPOS II-1A/2A/2D, EM PAV.BL.ARTICULADO,

C/ASSENT.HIDROMETRO 1,5e3m3/h x 1/2"ou3/4",ASSENT. DE CAVALETE/ASSENT.CX. CPH

(EM.MURETA), S/FORNEC.DE CX/MAT.HID/HIDR - EM ROCHA

un 216,67 287,43 274,33 363,93 288,82 383,15 281,11 372,92 282,51 374,78

200428

EXECUCAO RAMAL PREDIAL, TIPOS II-1A/2A/2D, EM TERRENO NATURAL C/ASSENT.HIDROMETRO

1,5e3 m3/h x 1/2"ou3/4",ASSENT.DE CAVALETE/ASSENT.CX.CPH (EMBUT. PAREDE), S/FORNEC.DE

CX/MAT.HID/HIDR - EM ROCHA

un 105,85 140,42 134,38 178,27 141,53 187,75 137,71 182,69 138,40 183,60

200429

EXECUCAO RAMAL PREDIAL, TIPOS II-1A/2A/2D, EM TERRENO NATURAL C/ASSENT.HIDROMETRO

1,5e3m3/h x 1/2"ou3/4",ASSENT.DE CAVALETE/ASSENT.CX.CPH (EMBUT.MURETA), S/FORNEC.DE

CX/MAT.HID/HIDR - EM ROCHA

un 99,44 131,92 125,57 166,58 132,13 175,28 128,63 170,64 129,26 171,48

200431

EXECUCAO RAMAL PREDIAL, TIPO III-3B , EM PAV.ASFALTICO C/ASSENT.HIDROMETRO 10m3/h x

1"(EM CAVALETE INTERNO NO PISO), C/ASSENT/DE CAIXA E S/ FORNEC. DE

CX./MAT.HIDRAULICO/HIDROMETRO - EM ROCHA

un 216,49 287,20 259,10 343,72 269,80 357,92 264,12 350,38 265,13 351,72

200434

EXECUCAO RAMAL PREDIAL, TIPO III-3B , EM PAV. PARALELEPIPEDO,C/ASSENT.HIDROMETRO

10m3/hx1"(EM CAVALETE INTERNO NO PISO), C/ASSENT.DE CAIXA E S/ FORNEC. DE

CX/MAT.HIDRAULICO/HIDROMETRO. - EM ROCHA

un 211,19 280,16 272,00 360,84 287,30 381,13 279,16 370,33 280,63 372,28

200437

EXECUCAO RAMAL PREDIAL, TIPO III-3B , EM PAV.CONCRETO,C/ASSENT.HIDROMETRO

10m3/hx1"(EM CAVALETE INTERNO NO PISO),C/ASSENT/DE CAIXA E S/ FORNEC. DE

CX/MAT.HIDRAULICO/HIDROMETRO - EM ROCHA

un 250,76 332,66 309,67 410,81 324,46 430,43 316,59 419,99 318,01 421,87

200440EXECUCAO RAMAL PREDIAL, TIPO III-3B , EM PAV. BL. ARTICULADO, C/ASSENT.HIDROMETRO

10m3/h x 1" (EM CAVALETE INTERNO NO PISO), C/ASSENT/DE CAIXA E S/ FORNEC. DE

CX/MAT.HID/HIDR - EM ROCHA

un 226,25 300,14 287,71 381,68 303,14 402,15 294,93 391,25 296,41 393,22

200443EXECUCAO RAMAL PREDIAL, TIPO III-3B, EM TERRENO NATURAL C/ASSENT.HIDROMETRO

10m3/hx1" (EM CAVALETE INTERNO NO PISO), C/ASSENT/. DE CAIXA E S/ FORNEC. DE

CX/MAT.HIDRAULICO/HIDROMETRO. - EM ROCHA

un 109,69 145,51 139,82 185,49 147,37 195,50 143,35 190,17 144,07 191,12

Página: 33 de 59

Page 34: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

200446EXECUCAO RAMAL PREDIAL, TIPO I-3A, EM PAV.ASFALTICO C/ASSENT.HIDROMETRO 10m3/hx1",

ASSENT. E FORNEC. DE CX. CCH II (EMBUT. PASSEIO), S/ FORNEC. DO MAT.

HIDRAULICO/HIDROMETRO - EM ROCHA

un 214,36 284,37 256,01 339,62 266,47 353,50 260,91 346,12 261,90 347,44

200447EXECUCAO RAMAL PREDIAL, TIPO I-3A, EM PAV.ASFALTICO C/ASSENT.HIDROMETRO 10m3/hx1",

ASSENT. DE CX. CCH II (EMBUT. PASSEIO), S/ FORNEC. DE CAIXA/MAT.

HIDRAULICO/HIDROMETRO - EM ROCHA

un 214,36 284,37 256,01 339,62 266,47 353,50 260,91 346,12 261,90 347,44

200449

EXECUCAO RAMAL PREDIAL, TIPO I-3A, EM PAV.PARALELEPIPEDO,C/ASSENT.HIDROMETRO 10

m3/hx1", ASSENT. E FORNEC. DE CX. CCH II (EMBUT. PASSEIO), S/ FORNEC. DO MAT.

HIDRAULICO/HIDROMETRO - EM ROCHA

un 206,31 273,69 265,30 351,95 280,15 371,65 272,24 361,15 273,67 363,05

200450

EXECUCAO RAMAL PREDIAL, TIPO I-3A, EM PAV.PARALELEPIPEDO,C/ASSENT.HIDROMETRO 10

m3/hx1", ASSENT. DE CX. CCH II (EMBUT. PASSEIO), S/ FORNEC. DE CAIXA/MAT.

HIDRAULICO/HIDROMETRO - EM ROCHA

un 206,31 273,69 265,30 351,95 280,15 371,65 272,24 361,15 273,67 363,05

200452EXECUCAO RAMAL PREDIAL, TIPO I-3A, EM PAV.CONCRETO,C/ASSENT.HIDROMETRO 10m3/hx1",

ASSENT. E FORNEC. DE CX CCH II (EMBUT.PASSEIO), S/FORNEC. DE

MAT.HIDRAULICO/HIDROMETRO - EM ROCHA

un 258,18 342,50 315,42 418,44 329,79 437,50 322,13 427,34 323,51 429,17

200453

EXECUCAO RAMAL PREDIAL, TIPO I-3A, EM PAV.CONCRETO,C/ASSENT.HIDROMETRO 10m3/hx1",

ASSENT. DE CX CCH II (EMBUT.PASSEIO), S/FORNEC. DE CAIXA/MAT.HIDRAULICO/HIDROMETRO -

EM ROCHA

un 258,18 342,50 315,42 418,44 329,79 437,50 322,13 427,34 323,51 429,17

200455EXECUCAO RAMAL PREDIAL, TIPO I-3A, EM PAV.BL. ARTICULADO,C/ASSENT.HIDROMETRO 10

m3/hx1", ASSENT. E FORNEC. DE CX. CCH II (EMBUT.PASSEIO), S/FORNEC. DO

MAT.HIDRAULICO/HIDROMETRO - EM ROCHA

un 221,37 293,67 281,01 372,79 295,99 392,66 288,01 382,07 289,45 383,98

200457EXECUCAO RAMAL PREDIAL, TIPO I-3A, EM TERRENO NATURAL C/ASSENT.HIDROMETRO

10m3/hx1", ASSENT. E FORNEC.DE CX.CCH II (EMBUT.PASSEIO), S/ FORNEC. DO MAT.

HIDRAULICO/HIDROMETRO - EM ROCHA

un 104,81 139,04 133,12 176,60 140,22 186,02 136,43 180,99 137,11 181,89

200462EXECUCAO RAMAL PREDIAL, TIPO I-4A, EM PAV.ASFALTICO C/ASSENT.HIDROMETRO 30m3/hx2",

ASSENT. E FORNEC. DE CX.CCH III (EMBUT.PASSEIO), S/FORNEC. DO MAT.

HIDRAULICO/HIDROMETRO - EM ROCHA

un 316,53 419,91 382,92 507,98 399,57 530,07 390,76 518,38 392,35 520,49

200465

EXECUCAO RAMAL PREDIAL, TIPO I-4A, EM PAV. PARALELEPIPEDO,C/ASSENT.HIDROMETRO

30m3/hx2", ASSENT. E FORNEC. DE CX. CCH III(EMBUT.PASSEIO), S/FORNEC. DO MAT.

HIDRAULICO/HIDROMETRO - EM ROCHA

un 308,48 409,23 392,21 520,31 413,25 548,22 402,09 533,41 404,12 536,11

200469EXECUCAO RAMAL PREDIAL, TIPO I-4A, EM PAV.CONCRETO,C/HIDROMETRO 30m3/hx2", ASSENT.

E FORNEC. DE CX. CCH III (EMBUT.PASSEIO), S/ FORNEC. DO MAT. HIDRAULICO/HIDROMETRO -

EM ROCHA

un 348,05 461,72 429,88 570,28 450,41 597,51 439,52 583,07 441,50 585,69

200472EXECUCAO RAMAL PREDIAL, TIPO I-4A, EM PAV. BL. ARTICULADO,C/ASSENT.HIDROMETRO

30m3/hx2", ASSENT.E FORNEC. DE CX. CCH III (EMBUT.PASSEIO), S/ FORNEC. DO MAT.

HIDRAULICO/HIDROMETRO - EM ROCHA

un 323,54 429,21 407,92 541,15 429,09 569,23 417,86 554,33 419,90 557,04

200475EXECUCAO RAMAL PREDIAL, TIPO I-4A, EM TERRENO NATURAL C/ASSENT.HIDROMETRO

30m3/hx2", ASSENT. E FORNEC. DE CX. CCH III (EMBUT.PASSEIO), S/FORNEC. DO MAT.

HIDRAULICO/HIDROMETRO - EM ROCHA

un 206,98 274,58 260,03 344,96 273,32 362,59 266,28 353,25 267,56 354,95

200479

EXECUCAO RAMAL PREDIAL, TIPO III-4B, EM PAV.ASFALTICO C/ASSENT.HIDROMETRO 30

m3/hx2"(EM CAVALETE INTERNO NO PISO), C/ FORNEC./ASSENT. DE CAIXA E S/FORNEC. DO MAT.

HIDRAULICO/HIDROMETRO - EM ROCHA

un 322,41 427,71 390,88 518,54 408,06 541,33 398,96 529,26 400,60 531,44

200482EXECUCAO RAMAL PREDIAL, TIPO III-4B, EM PAV. PARALELEPIPEDO,C/ASSENT.HIDROMETRO

30m3/hx2",(EM CAVALETE INTERNO NO PISO),C/FORNEC.E ASSENT.DE CAIXA E S/ FORNEC. DO

MAT.HID/HIDR - EM ROCHA

un 314,36 417,03 400,17 530,87 421,74 559,48 410,29 544,29 412,37 547,05

200485

EXECUCAO RAMAL PREDIAL, TIPO III-4B, EM PAV.CONCRETO,C/ASSENT.HIDROMETRO

30m3/hx2",(EM CAVALETE INTERNO NO PISO), C/FORNEC./ASSENT.DE CAIXA E S/ FORNEC. DO

MAT. HIDRAULICO/HIDROMETRO. - EM ROCHA

un 353,93 469,52 437,84 580,84 458,90 608,78 447,72 593,95 449,75 596,64

200489EXECUCAO RAMAL PREDIAL, TIPO III-4B, EM PAV.BL. ARTICULADO,C/ASSENT.HIDROMETRO 30

m3/hx2", (EM CAVALETE INTERNO NO PISO),C/FORNEC./ASSENT. DE CAIXA E S/FORNEC.DO MAT.

HID/HIDR - EM ROCHA

un 329,42 437,01 415,88 551,71 437,58 580,49 426,06 565,21 428,15 567,98

200492EXECUCAO RAMAL PREDIAL, TIPO III-4B, EM TERRENO NATURAL, C/ASSENT.HIDROMETRO

30m3/hx2",(EM CAVALETE INTERNO NO PISO), C/FORNEC./ASSENT. DE CAIXA E S/ FORNEC.DO

MAT. HID/HIDR - EM ROCHA

un 212,86 282,38 267,99 355,52 281,81 373,85 274,48 364,13 275,81 365,89

209000 SERVICOS NAO CODIFICADOS

209204ASSENT. DE HIDROMETRO E REGISTRO, EM LIGACAO PREDIAL EXISTENTE NAO MEDIDA, S/ CX.

DE PROTECAO, C/ DN 1/2" A 2", EM PAREDE, S/ FORNEC. DO MAT. HIDRAULICO/HIDROMETRO.un 42,19 55,97 59,01 78,28 63,22 83,87 60,98 80,90 61,39 81,44

209228 TRANSFERENCIA DE RAMAL PREDIAL, TIPOS II-1A/2A/2D, EM TERRENO NATURAL un 23,82 31,60 35,03 46,47 37,85 50,21 36,36 48,24 36,62 48,58

209293ASSENT. DE HIDROMETRO E REGISTRO, EM LIGACAO PREDIAL EXISTENTE NAO MEDIDA, C/ CX.

DE PROTECAO, C/ DN 1/2" A 2", EM PAREDE, S/ FORNEC. DO MAT. HIDRAULICO/HIDROMETRO.un 73,38 97,35 94,02 124,73 99,19 131,59 96,44 127,94 96,94 128,60

210000 LIGACOES PREDIAIS DE ESGOTO

210100 RAMAL PREDIAL - ESGOTO

210101EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.ASFALTICO,DN 100mm, S/FORN.DO MATERIAL

HIDRAULICO - 1a E 2a CATm 61,68 81,82 75,08 99,60 78,46 104,09 76,66 101,70 76,98 102,12

210102EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.ASFALTICO,DN 100mm, S/RECOMPOSICAO

PAV. ASF. E S/FORN.DO MATERIAL HIDRAULICO - 1a E 2a CATm 50,41 66,87 63,69 84,49 67,03 88,92 65,25 86,56 65,57 86,99

219902EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.ASFALTICO,DN 100mm, S/RECOMPOSICAO

PAV. ASF. E S/FORN.DO MATERIAL HIDRAULICO - 1a E 2a CAT (MRR / RMS)m 51,08 67,76 64,72 85,86 68,12 90,37 66,30 87,95 66,62 88,38

219702EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.ASFALTICO,DN 100mm, S/RECOMPOSICAO

PAV. ASF. E S/FORN.DO MATERIAL HIDRAULICO - 1a E 2a CAT (MRR / RMS)m 51,31 68,07 65,02 86,26 68,44 90,79 66,63 88,39 66,95 88,82

210104EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.CONCRETO,DN 100mm, S/FORN.MATERIAL

HIDRAULICO - 1a E 2a CATm 70,40 93,39 88,01 116,75 92,44 122,63 90,09 119,51 90,51 120,07

219904EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.CONCRETO,DN 100mm, S/FORN.MATERIAL

HIDRAULICO - 1a E 2a CAT (MRR / RMS)m 71,59 94,97 89,76 119,08 94,30 125,10 91,90 121,91 92,33 122,48

210105EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.CIMENTADO,DN 100mm, S/FORN.MATERIAL

HIDRAULICO - 1a E 2a CATm 66,01 87,57 86,81 115,16 92,04 122,10 89,27 118,43 89,77 119,09

219905EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.CIMENTADO,DN 100mm, S/FORN.MATERIAL

HIDRAULICO - 1a E 2a CAT (MRR / RMS)m 67,28 89,25 88,68 117,64 94,04 124,75 91,20 120,99 91,71 121,66

210107EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.C/ PARALELEPIPEDO/PEDRA IRREGULAR,DN

100mm,S/ FORNEC. DO MAT. HIDRAULICO.m 62,95 83,51 83,39 110,63 88,53 117,44 85,81 113,84 86,30 114,49

219907EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.C/ PARALELEPIPEDO/PEDRA IRREGULAR,DN

100mm,S/ FORNEC. DO MAT. HIDRAULICO. (MRR / RMS)m 64,26 85,25 85,33 113,20 90,61 120,20 87,79 116,46 88,31 117,15

210108EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.C/ PEDRA PORTUGUESA, DN 100mm,

S/FORNEC. DO MAT. HIDRAULICO.m 67,75 89,88 91,15 120,92 97,02 128,71 93,90 124,57 94,46 125,31

219108EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.C/ PEDRA PORTUGUESA, DN 100mm,

S/FORNEC. DO MAT. HIDRAULICO. (MRR / RMS)m 68,94 91,46 92,93 123,28 98,91 131,21 95,71 126,97 96,30 127,75

210113EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.BLOCO ARTICULADO DE CONCRETO,DN

100mm,S/ FORNEC. DO MAT. HIDRAULICO - 1a E 2a CATm 68,65 91,07 89,34 118,52 94,52 125,39 91,77 121,74 92,27 122,41

219113EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.BLOCO ARTICULADO DE CONCRETO,DN

100mm,S/ FORNEC. DO MAT. HIDRAULICO - 1a E 2a CAT (MRR / RMS)m 69,95 92,80 91,24 121,04 96,58 128,12 93,74 124,36 94,26 125,05

210116EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM TERRENO NATURAL,DN 100mm, S/FORNEC. DO

MAT.HIDRAULICO.m 31,69 42,04 41,18 54,63 43,58 57,81 42,32 56,14 42,54 56,43

219916EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM TERRENO NATURAL,DN 100mm, S/FORNEC. DO

MAT.HIDRAULICO. (MRR / RMS)m 32,39 42,97 42,21 56,00 44,68 59,27 43,37 57,53 43,59 57,83

210119EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.ASFALTICO,DN 150mm, S/FORNEC.DO

MAT.HIDRAULICO - 1a E 2a CATm 70,54 93,58 83,95 111,37 87,32 115,84 85,52 113,45 85,84 113,88

219119EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.ASFALTICO,DN 150mm, S/FORNEC.DO

MAT.HIDRAULICO - 1a E 2a CAT (MRR / RMS)m 71,21 94,47 84,99 112,75 88,42 117,30 86,58 114,86 86,90 115,28

219919EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.ASFALTICO,DN 150mm, S/FORNEC.DO

MAT.HIDRAULICO - 1a E 2a CAT (MRR / RMS)m 71,43 94,76 85,28 113,13 88,72 117,70 86,89 115,27 87,21 115,69

210122EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.CONCRETO,DN 150mm,S/FORNEC.DO MAT.

HIDRAULICO - 1a E 2a CATm 108,18 143,51 131,13 173,96 136,89 181,60 133,83 177,54 134,38 178,27

219122EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.CONCRETO,DN 150mm,S/FORNEC.DO MAT.

HIDRAULICO - 1a E 2a CAT (MRR / RMS)m 109,69 145,51 133,38 176,94 139,28 184,77 136,13 180,59 136,70 181,35

210125EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV. C/ PARALELEPIPEDO/PEDRA IRREGULAR,DN

150mm,S/ FORNEC. DO MAT. HIDRAULICO - 1a E 2a CATm 72,32 95,94 92,79 123,10 97,90 129,87 95,19 126,28 95,67 126,92

219125EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV. C/ PARALELEPIPEDO/PEDRA IRREGULAR,DN

150mm,S/ FORNEC. DO MAT. HIDRAULICO - 1a E 2a CAT (MRR / RMS)m 73,63 97,68 94,72 125,66 99,99 132,65 97,16 128,89 97,69 129,60

210131EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV. C/BLOCO ARTICULADO DE CONCRETO,DN

150mm,S/ FORNEC. DO MAT. HIDRAULICO.m 78,02 103,50 98,74 130,99 103,89 137,82 101,15 134,19 101,64 134,84

219131EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV. C/BLOCO ARTICULADO DE CONCRETO,DN

150mm,S/ FORNEC. DO MAT. HIDRAULICO. (MRR / RMS)m 79,32 105,23 100,63 133,50 105,96 140,57 103,11 136,79 103,64 137,49

210134EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM TERRENO NATURAL,DN 150mm,S/ FORNEC. DO

MAT. HIDRAULICO - 1a E 2a CATm 36,12 47,92 45,60 60,49 47,96 63,62 46,71 61,97 46,92 62,24

219134EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM TERRENO NATURAL,DN 150mm,S/ FORNEC. DO

MAT. HIDRAULICO - 1a E 2a CAT (MRR / RMS)m 36,81 48,83 46,61 61,83 49,06 65,08 47,75 63,35 47,98 63,65

Página: 34 de 59

Page 35: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

210137 TAMPONAMENTO DO RAMAL DOMICILIAR, C/ PASTILHA DE ARGAMASSA, INCL. FORNEC. DO MAT. un 2,15 2,85 3,15 4,18 3,41 4,52 3,27 4,34 3,30 4,38

210200 LIGACOES INTRA-DOMICILIARES

210201EXECUCAO DE LIGACAO INTRA-DOMICILIAR,EM PISO DE CONCRETO SIMPLES,DN 100mm,

S/FORNEC. DO MAT. HIDRAULICOm 45,69 60,61 62,52 82,94 66,75 88,55 64,52 85,59 64,93 86,14

210207EXECUCAO DE LIGACAO INTRA-DOMICILIAR,EM PISO CERAMICO,DN 100mm,

S/FORNE.MAT.HIDRAULICOm 57,55 76,35 75,59 100,28 80,12 106,29 77,73 103,12 78,17 103,70

210210EXECUCAO DE LIGACAO INTRA-DOMICILIAR,EM PISO EM TACO DE MADEIRA,DN 100mm,

S/FORNE. DO MAT.HIDRAULICOm 92,88 123,21 111,23 147,56 115,84 153,67 113,40 150,44 113,86 151,05

210213EXECUCAO DE LIGACAO INTRA-DOMICILIAR,EM PISO EM TERRENO NATURAL,DN 100mm,

S/FORNEC.DO MAT.HIDRAULICOm 15,13 20,07 20,32 26,96 21,62 28,68 20,95 27,79 21,07 27,95

210216EXECUCAO DE LIGACAO INTRA-DOMICILIAR,EM PISO DE CONCRETO SIMPLES,DN

150mm,S/FORNEC. DO MAT. HIDRAULICOm 45,97 60,98 62,91 83,46 67,16 89,09 64,91 86,11 65,32 86,65

210222EXECUCAO DE LIGACAO INTRA-DOMICILIAR,EM PISO CERAMICO,DN 150mm,S/FORNEC. DO

MAT.HIDRAULICOm 57,83 76,72 75,98 100,80 80,53 106,83 78,12 103,63 78,56 104,22

210225EXECUCAO DE LIGACAO INTRA-DOMICILIAR,EM PISO EM TACO DE MADEIRA,DN

150mm,S/FORNEC. DO MAT. HIDRAULICOm 95,15 126,23 114,53 151,94 119,38 158,37 116,81 154,96 117,28 155,58

210228EXECUCAO DE LIGACAO INTRA-DOMICILIAR,EM PISO EM TERRENO NATURAL,DN 150mm,

S/FORNEC. DO MAT. HIDRAULICOm 16,27 21,58 21,61 28,67 22,94 30,43 22,24 29,50 22,36 29,66

210231EXECUCAO DE LIGACAO INTRA-DOMICILIAR,EM PISO EM TERRENO NATURAL,DN 75mm,

S/FORNEC. DO MAT. HIDRAULICOm 14,15 18,77 19,27 25,56 20,57 27,29 19,88 26,37 20,01 26,55

210300 SISTEMA CONDOMINIAL

210301EXECUCAO DE LIGACAO PREDIAL CONDOMINIAL,EM RAMAL DE DESCARGA EXISTENTE, C/DN 100

A 150MM ,S/FORNECIMENTO DO MAT. HIDRAULICO (DP 2103-02).un 9,43 12,51 14,03 18,61 15,19 20,15 14,58 19,34 14,68 19,47

210304RAMAL C/ ASSENTAMENTO DE TUBOS EM PVC PB JE ESGOTO DN 100 a 200MM, EM PISO DE

PARALELEPIPEDO PARA LIGACOES, RAMAIS CONDOMINIAIS OU REDES BASICAS, EM

PROFUNDIDADE ATE 1,00m.

m 34,98 46,40 45,54 60,41 48,20 63,94 46,80 62,08 47,03 62,39

210400 RAMAL PREDIAL - ESGOTO

210401EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.ASFALTICO,DN 100mm, S/FORN.DO MATERIAL

HIDRAULICO - EM LAMAm 67,25 89,21 83,36 110,59 87,42 115,97 85,25 113,09 85,64 113,61

210402EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.ASFALTICO,DN 100mm, S/RECOMPOSICAO

PAV. ASF. E S/FORN.DO MATERIAL HIDRAULICO - EM LAMAm 55,98 74,26 71,97 95,48 75,99 100,81 73,84 97,96 74,23 98,47

210404EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.CONCRETO,DN 100mm, S/FORN.MATERIAL

HIDRAULICO - EM LAMAm 75,97 100,78 96,29 127,74 101,40 134,52 98,68 130,91 99,17 131,56

210405EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.CIMENTADO,DN 100mm, S/FORN.MATERIAL

HIDRAULICO - EM LAMAm 71,58 94,96 95,09 126,15 101,00 133,99 97,86 129,82 98,43 130,58

210407EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.C/ PARALELEPIPEDO/PEDRA IRREGULAR,DN

100mm,S/ FORNEC. DO MAT. HIDRAULICO.m 68,52 90,90 91,67 121,61 97,49 129,33 94,40 125,23 94,96 125,97

210408EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.C/ PEDRA PORTUGUESA, DN 100mm,

S/FORNEC. DO MAT. HIDRAULICO.m 73,32 97,27 99,43 131,90 105,98 140,59 102,49 135,96 103,12 136,80

210413EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.BLOCO ARTICULADO DE CONCRETO,DN

100mm,S/ FORNEC. DO MAT. HIDRAULICO - EM LAMAm 74,22 98,46 97,62 129,50 103,48 137,28 100,36 133,14 100,93 133,89

210416EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM TERRENO NATURAL,DN 100mm, S/FORNEC. DO

MAT.HIDRAULICO.m 37,26 49,43 49,46 65,61 52,54 69,70 50,91 67,54 51,20 67,92

210419EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.ASFALTICO,DN 150mm, S/FORNEC.DO

MAT.HIDRAULICO - EM LAMAm 76,11 100,97 92,23 122,35 96,28 127,73 94,11 124,85 94,50 125,36

210422EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.CONCRETO,DN 150mm,S/FORNEC.DO MAT.

HIDRAULICO - EM LAMAm 113,75 150,90 139,41 184,94 145,85 193,48 142,42 188,93 143,04 189,76

210425EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV. C/ PARALELEPIPEDO/PEDRA IRREGULAR,DN

150mm,S/ FORNEC. DO MAT. HIDRAULICO - EM LAMAm 77,89 103,33 101,07 134,08 106,86 141,76 103,78 137,67 104,33 138,40

210431EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV. C/BLOCO ARTICULADO DE CONCRETO,DN

150mm,S/ FORNEC. DO MAT. HIDRAULICO.m 83,59 110,89 107,02 141,97 112,85 149,71 109,74 145,58 110,30 146,32

210434EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM TERRENO NATURAL,DN 150mm,S/ FORNEC. DO

MAT. HIDRAULICO - EM LAMAm 41,69 55,31 53,88 71,48 56,92 75,51 55,30 73,36 55,58 73,73

210437 TAMPONAMENTO DO RAMAL DOMICILIAR, C/ PASTILHA DE ARGAMASSA, INCL. FORNEC. DO MAT. un 2,15 2,85 3,15 4,18 3,41 4,52 3,27 4,34 3,30 4,38

210500 RAMAL PREDIAL - ESGOTO

210501EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.ASFALTICO,DN 100mm, S/FORN.DO MATERIAL

HIDRAULICO - EM ROCHAm 76,84 101,94 87,98 116,71 90,80 120,46 89,30 118,47 89,57 118,82

210502EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.ASFALTICO,DN 100mm, S/RECOMPOSICAO

PAV. ASF. E S/FORN.DO MATERIAL HIDRAULICO - EM ROCHAm 65,57 86,99 76,59 101,60 79,37 105,29 77,89 103,33 78,16 103,69

210504EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.CONCRETO,DN 100mm, S/FORN.MATERIAL

HIDRAULICO - EM ROCHAm 85,56 113,50 100,91 133,87 104,78 139,00 102,73 136,28 103,10 136,77

210505EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.CIMENTADO,DN 100mm, S/FORN.MATERIAL

HIDRAULICO - EM ROCHAm 81,17 107,68 99,71 132,28 104,38 138,47 101,91 135,19 102,36 135,79

210507EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.C/ PARALELEPIPEDO/PEDRA IRREGULAR,DN

100mm,S/ FORNEC. DO MAT. HIDRAULICO.m 80,39 106,65 98,27 130,36 102,76 136,32 100,38 133,16 100,81 133,73

210508EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.C/ PEDRA PORTUGUESA, DN 100mm,

S/FORNEC. DO MAT. HIDRAULICO.m 85,19 113,01 106,03 140,66 111,25 147,58 108,47 143,90 108,97 144,56

210513EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.BLOCO ARTICULADO DE CONCRETO,DN

100mm,S/ FORNEC. DO MAT. HIDRAULICO - EM ROCHAm 86,09 114,21 104,22 138,26 108,75 144,27 106,34 141,07 106,78 141,65

210516EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM TERRENO NATURAL,DN 100mm, S/FORNEC. DO

MAT.HIDRAULICO.m 49,13 65,18 56,06 74,37 57,81 76,69 56,89 75,47 57,05 75,68

210519EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.ASFALTICO,DN 150mm, S/FORNEC.DO

MAT.HIDRAULICO - EM ROCHAm 84,41 111,98 95,75 127,02 98,59 130,79 97,07 128,77 97,34 129,13

210522EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV.CONCRETO,DN 150mm,S/FORNEC.DO MAT.

HIDRAULICO - EM ROCHAm 122,05 161,91 142,93 189,61 148,16 196,55 145,38 192,86 145,88 193,52

210525EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV. C/ PARALELEPIPEDO/PEDRA IRREGULAR,DN

150mm,S/ FORNEC. DO MAT. HIDRAULICO - EM ROCHAm 88,47 117,36 106,56 141,36 111,07 147,35 108,67 144,16 109,11 144,75

210531EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAV. C/BLOCO ARTICULADO DE CONCRETO,DN

150mm,S/ FORNEC. DO MAT. HIDRAULICO.m 94,17 124,93 112,51 149,26 117,06 155,29 114,63 152,07 115,08 152,67

210534EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM TERRENO NATURAL,DN 150mm,S/ FORNEC. DO

MAT. HIDRAULICO - EM ROCHAm 52,27 69,34 59,37 78,76 61,13 81,10 60,19 79,85 60,36 80,07

210537 TAMPONAMENTO DO RAMAL DOMICILIAR, C/ PASTILHA DE ARGAMASSA, INCL. FORNEC. DO MAT. un 2,15 2,85 3,15 4,18 3,41 4,52 3,27 4,34 3,30 4,38

219000 SERVICOS NAO CODIFICADOS

219001EXECUCAO DE RAMAL PREDIAL P/ESGOTO EM PAVIMENTO CERAMICO DN 100mm, S/FORNEC. DO

MAT. HIDRAULICOun 67,76 89,89 89,39 118,58 94,83 125,80 91,99 122,03 92,48 122,68

219002EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAVIMENTO CIMENTADO, DN 100mm,S/ FORNEC.

DO MAT. HIDRAULICOm 50,79 67,38 69,57 92,29 74,29 98,55 71,81 95,26 72,24 95,83

219003EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAVIMENTO DE PEDRA ARDOSIA, DN 100mm,S/

FORNEC. DO MAT. HIDRAULICOm 66,55 88,29 89,78 119,10 95,61 126,84 92,54 122,76 93,08 123,48

219004EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAVIMENTO DE GRANITO, DN 100mm,S/ FORNEC.

DO MAT. HIDRAULICOm 189,63 251,56 218,96 290,47 226,30 300,21 222,42 295,06 223,13 296,00

219005EXECUCAO DE RAMAL PREDIAL P/ESGOTO,EM PAVIMENTO DE LADRILHO HIDRAULICO, DN

100mm,S/ FORNEC. DO MAT. HIDRAULICOm 70,43 93,43 91,70 121,65 97,05 128,75 94,25 125,03 94,74 125,68

219006 EXECUCAO DE REDE CONDOMINIAL (m) m 66,97 88,84 84,81 112,51 89,31 118,48 86,93 115,32 87,35 115,88

219101EXECUCAO DE LIGACAO INTRA-DOMICILIAR,EM PISO DE CIMENTADO, DN 100mm, S/FORNEC. DO

MAT. HIDRAULICOm 47,96 63,62 65,76 87,24 70,24 93,18 67,89 90,06 68,30 90,61

219102EXECUCAO DE LIGACAO INTRA-DOMICILIAR,EM PISO DE PEDRA ARDOSIA, DN 100mm, S/FORNEC.

DO MAT. HIDRAULICOm 63,72 84,53 85,97 114,05 91,56 121,46 88,62 117,56 89,14 118,25

219103EXECUCAO DE LIGACAO INTRA-DOMICILIAR,EM PISO DE PEDRAS ORNAMENTAIS, DN 100mm,

S/FORNEC. DO MAT. HIDRAULICOm 70,95 94,12 93,41 123,92 99,06 131,41 96,09 127,47 96,61 128,16

219104EXECUCAO DE LIGACAO INTRA-DOMICILIAR,EM TERRENO NATURAL C/GRAMA, DN 100mm,

S/FORNEC. DO MAT. HIDRAULICOm 26,83 35,59 34,85 46,23 36,87 48,91 35,82 47,52 36,00 47,76

219105EXECUCAO DE LIGACAO INTRA-DOMICILIAR,EM PEDRA PORTUGUESA, DN 100mm, S/FORNEC. DO

MAT. HIDRAULICOm 48,58 64,45 67,06 88,96 71,71 95,13 69,28 91,91 69,70 92,46

219106EXECUCAO DE LIGACAO INTRA-DOMICILIAR,EM BLOQUETE, DN 100mm, S/FORNEC. DO MAT.

HIDRAULICOm 47,26 62,70 62,35 82,71 66,14 87,74 64,16 85,11 64,50 85,57

219107EXECUCAO DE LIGACAO INTRA-DOMICILIAR,EM PARALELO, DN 100mm, S/FORNEC. DO MAT.

HIDRAULICOm 41,82 55,48 56,49 74,94 60,18 79,83 58,26 77,29 58,60 77,74

219110EXECUCAO DE LIGACAO INTRA-DOMICILIAR,EM PISO DE CIMENTADO, DN 75mm, S/FORNEC. DO

MAT. HIDRAULICOm 39,18 51,98 53,37 70,80 56,92 75,51 55,05 73,03 55,39 73,48

219112EXECUCAO DE LIGACAO INTRA-DOMICILIAR,EM PISO CERÂMICO, DN 75mm, S/FORNEC. DO MAT.

HIDRAULICOm 51,22 67,95 66,44 88,14 70,26 93,21 68,26 90,55 68,62 91,03

219114EXECUCAO DE LIGACAO INTRA-DOMICILIAR,EM TERRENO NATURAL, DN 75mm, S/FORNEC. DO

MAT. HIDRAULICOm 14,92 19,79 20,01 26,55 21,28 28,23 20,62 27,35 20,74 27,51

219116EXECUCAO DE LIGACAO INTRA-DOMICILIAR,EM PISO DE CONCRETO SIMPLES, DN 75mm,

S/FORNEC. DO MAT. HIDRAULICOm 36,04 47,81 47,92 63,57 50,91 67,54 49,35 65,47 49,63 65,84

219118EXECUCAO DE LIGACAO INTRA-DOMICILIAR,EM PISO DE TACO DE MADEIRA, DN 75mm,

S/FORNEC. DO MAT. HIDRAULICOm 80,73 107,10 94,06 124,78 97,39 129,20 95,64 126,88 95,96 127,30

219150 EXECUCAO DE SONDAGEM PARA VERIFICAO DAS SAIDAS DE ESGOTO EM TERRENO NATURAL un 15,48 20,54 21,30 28,26 22,75 30,18 21,99 29,17 22,12 29,34

219151 EXECUCAO DE SONDAGEM PARA VERIFICAO DAS SAIDAS DE ESGOTO EM PISO CIMENTADO un 44,44 58,95 59,93 79,50 63,81 84,65 61,77 81,94 62,12 82,41

219201 LIGACAO TIPO SERRA-SERRA UN 29,49 39,12 39,11 51,88 41,53 55,09 40,24 53,38 40,48 53,70

Página: 35 de 59

Page 36: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

219301APOIO DE CAMINHAO C/DIESEL, MOTORISTA P/EXECUCAO DE LIGACAO INTRA-DOMICILIAR E

RAMAL DOMICILIAR P/ATENDIMENTO DE SS (SOLICITACAO DE SERVICO).mes 13.055,38 17.319,27 14.477,69 19.206,10 14.834,17 19.679,01 14.644,42 19.427,29 14.678,24 19.472,15

219304APOIO DE CAMINHAO C/DIESEL, MOTORISTA P/EXECUCAO DE LIGACAO INTRA-DOMICILIAR E

RAMAL DOMICILIAR P/ATENDIMENTO DE SS (SOLICITACAO DE SERVICO).M 99,22 131,63 110,03 145,97 112,74 149,56 111,30 147,65 111,55 147,98

219501MONTAGEM COMPLETA DAS INSTALACOES HIDRO-SANITARIAS DA CASA DO OPERADOR un 3.670,40 4.869,15 5.463,20 7.247,48 5.912,80 7.843,92 5.673,60 7.526,60 5716 7.582,85

220000 ESTACAO DE TRATAMENTO - AGUA E ESGOTO

220100 CANAL DE CHEGADA

220101INST. DE MEDIDOR PARSHALL DE FIBRA DE VIDRO C/ LARGURA "W" DE 0`3" ATE 0`9", S/

FORNEC. DO MEDIDORun 91,66 121,60 136,42 180,97 147,64 195,86 141,68 187,95 142,72 189,33

220104INST. DE MEDIDOR PARSHALL DE FIBRA DE VIDRO C/ LARGURA "W" DE 1` ATE 3`, S/ FORNEC.

DO MEDIDORun 211,72 280,87 283,78 376,46 301,82 400,39 292,24 387,69 293,90 389,89

220107INST. DE MEDIDOR PARSHALL DE FIBRA DE VIDRO C/ LARGURA "W" ACIMA 4`, S/ FORNEC. DO

MEDIDORun 277,34 367,92 365,78 485,24 387,92 514,61 376,16 499,01 378,20 501,72

220110INSTALACAO DE INDICADOR DE VAZAO P/ MEDIDOR PARSHALL ,S/ FORNEC. DO EQUIP. E MAT.

HIDRAULICOun 67,66 89,76 100,69 133,58 108,95 144,53 104,57 138,72 105,32 139,72

220200 FLOCULADORES

220201MONTAGEM E ASSENT. DE FLOCULADOR MECANICO C/POTENCIA ATE 1CV, DE EIXO VERT., C/

PALETAS DE MADEIRA, C/ BASE CHUMBADA NO CONCRETO, INCL. FORNEC. DE MAT. P/ INST., S/

FORNEC. DO EQUIP.

un 188,82 250,49 248,79 330,04 263,83 350,00 255,83 339,38 257,24 341,25

220204MONTAGEM E ASSENT. DE FLOCULADOR MECANICO C/ POTENCIA >1CV, DE EIXO VERT., C/

PALETAS DE MADEIRA, C/ BASE CHUMBADA NO CONCRETO, INCL. FORNEC. DE MAT. P/ INST., S/

FORNEC. DO EQUIP.

un 227,86 302,28 302,85 401,76 321,66 426,71 311,65 413,43 313,44 415,81

220207MONTAGEM E ASSENT. DE FLOCULADOR MECANICO TIPO FLUXO AXIAL, C/ POTENCIA ATE 1CV, C/

EIXO VERTICAL E HELICE, C/ BASE CHUMBADA NO CONCRETO, INCL. FORNEC. DE MAT. P/ INST.,

S/ FORNEC. DO EQUIP.

un 86,86 115,23 121,05 160,58 129,62 171,95 125,06 165,90 125,87 166,98

220210MONTAGEM E ASSENT. DE FLOCULADOR MECANICO TIPO FLUXO AXIAL, C/ POTENCIA >1CV, C/

EIXO VERTICAL E HELICE, C/ BASE CHUMBADA NO CONCRETO, INCL. FORNEC. DE MAT. P/ INST.,

S/ FORNEC. DO EQUIP.

un 99,25 131,67 139,49 185,05 149,57 198,42 144,20 191,30 145,15 192,56

220300 DECANTADORES

220301FORNEC. E COLOCACAO DE SUPORTE DE MADEIRA DE LEI (5 X 10 cm) P/ FIXACAO DOS MODULOS

TUBULARES, C/ CHAPA E PARAFUSO DE ALUMINIOm 57,90 76,81 63,36 84,05 64,72 85,86 64,00 84,90 64,12 85,06

220302FORNEC. E COLOCACAO DE SUPORTE EM PVC P/FIXACAO DOS MODULOS TUBULARES, C/ CHAPA E

PARAFUSOS DE ALUMINIOm 9,89 13,12 14,26 18,92 15,35 20,36 14,76 19,58 14,86 19,71

220303FORNEC. E ASSENT. DE MODULOS TUBULARES, P/ DECANTACAO, TIPO COLMEIA, 50X90X600MM

EM PVC, INCL. FORNEC. DA SOLDA E ELEMENTOS P/ FIXACAO E PROTECAO DO MODULO.m2 479,38 635,95 487,01 646,07 488,92 648,60 487,91 647,26 488,08 647,49

220304FORNEC. E ASSENT. DE MODULOS TUBULARES, P/ DECANTACAO, TIPO COLMEIA, 50X90X1000MM

EM PVC, INCL. FORNEC. DA SOLDA E ELEMENTOS P/ FIXACAO E PROTECAO DO MODULO.m2 775,75 1.029,11 784,91 1.041,26 787,21 1.044,31 785,99 1.042,69 786,20 1.042,97

220305FORNEC. E ASSENT. DE MODULOS TUBULARES, P/ DECANTACAO, TIPO COLMEIA, 50X90X1200MM

EM PVC, INCL. FORNEC. DA SOLDA E ELEMENTOS P/ FIXACAO E PROTECAO DO MODULO.m2 924,93 1.227,01 935,62 1.241,19 938,30 1.244,75 936,87 1.242,85 937,11 1.243,17

220307FORNEC. E ASSENT. DE PERFIL EM ALUMINIO DO DECANTADOR (VERTEDOR) C/ CHUMBADORES

DE ACO INOX, L=0,20m E C=1,00mm 52,97 70,27 57,34 76,07 58,43 77,51 57,84 76,73 57,94 76,86

220310FORNEC. E ASSENT. DE PERFIL EM FIBRA DE VIDRO DO DECANTADOR (VERTEDOR) C/

CHUMBADORES DE ACO INOX, L=0,20m E C=1,00mm 201,80 267,71 207,26 274,95 208,62 276,76 207,90 275,80 208,02 275,96

220400 FILTROS

220401FORNEC. E ASSENT. DE SISTEMA DE DRENAGEM PARA FUNDO DE FILTROS, CONSTITUIDO DE

BLOCOS E ACESSORIOS EM PEADm2 299,35 397,12 312,09 414,02 315,28 418,25 313,59 416,01 313,88 416,39

220404FORNEC. E INST. DE DISTRIBUIDOR P/FUNDO DE FILTRO EM POLIETILENO, C/ LUVA DE FIXACAO,

TUBOS E CONEXOES, INCL. CORTE E FURACAO DA LAJEm2 577,61 766,26 629,08 834,54 641,99 851,66 635,13 842,56 636,37 844,21

220407FORNEC., CONFECCAO E INSTAL. DE DISTRIBUIDOR P/ FUNDO DE FILTRO, TIPO ESPINHA DE

PEIXE C/ TUBO PVC JE CL 20m2 324,16 430,03 349,86 464,12 356,30 472,67 352,87 468,12 353,49 468,94

220410 FORNEC.,COLOCACAO E ESPALH. DE PEDREGULHO SELECIONADO,EM CAMADAS m3 749,65 994,49 780,21 1.035,03 787,89 1.045,21 783,81 1.039,80 784,53 1.040,76

220413 FORNEC., COLOCACAO E ESPALH. DE AREIA SELECIONADA, EM CAMADAS m3 1.012,34 1.342,97 1.042,90 1.383,51 1.050,58 1.393,70 1.046,50 1.388,29 1.047,22 1.389,24

220416 FORNEC., COLOCACAO E ESPALH. DE CARVAO ANTRACITO m3 2.256,31 2.993,22 2.283,05 3.028,69 2.289,77 3.037,61 2.286,20 3.032,87 2.286,83 3.033,71

220419 COLOCACAO E ESPALH. DE AREIA SELECIONADA, EM CAMADAS m3 42,23 56,02 62,86 83,39 68,04 90,26 65,29 86,61 65,77 87,25

220422 RETIRADA, SELECAO E COLOCACAO DE LEITO FILTRANTE EM ETA DE PRESSAO m3 195,50 259,35 291,00 386,04 315,00 417,88 302,25 400,96 304,50 403,95

220500 CASA DE QUIMICA E CASA DE CLORACAO

220501 FORNEC. E INSTAL. DE ESTRADO EM MADEIRA DE LEI m2 65,13 86,40 77,63 102,98 80,77 107,15 79,09 104,92 79,39 105,32

220503 FORNEC. E INSTAL. DE MONTA-CARGA COMPLETO C/ CAPAC. MAX=300kg, P/ 2 PARADAS un 28.088,25 37.261,87 28.313,65 37.560,89 28.370,19 37.635,89 28.340,14 37.596,03 28.345,43 37.603,05

220505 FORNEC. E INSTAL. DE MONTA-CARGA COMPLETO C/ CAPAC. MAX.=300kg, P/ 3 PARADAS un 31.527,75 41.824,71 31.826,68 42.221,27 31.901,66 42.320,74 31.861,81 42.267,88 31.868,82 42.277,18

220600 COMPORTAS E VERTEDORES

220601FORNEC.E INST.DE VERTEDOR DE FIBRA DE VIDRO,C/ACIONAMENTO DIRETO NA GAVETA, e=6

mm, INCL.QUADRO DE FIBRA DE VIDRO E CHUMBADORES DE ACO INOXm2 300,04 398,03 339,61 450,53 349,53 463,69 344,26 456,70 345,19 457,93

220602FORNEC. INST. DE COMPORTA DE SUPERFICIE DE FIBRA DE VIDRO, C/ ALCA DE SUSPENCAO,

e=12cm, INCL.QUADRO DE FIBRA DE VIDRO E CHUMBADORES DE ACO INOXm2 526,95 699,05 566,52 751,55 576,44 764,71 571,17 757,71 572,10 758,95

220604MONT. E INSTAL. DE COMPORTA DE SUPERFICIE C/ ACION. DIRETO NA GAVETA, C/AREA DO

CANAL ATE 0,40m²un 82,47 109,40 122,04 161,90 131,96 175,06 126,69 168,07 127,62 169,30

220607MONT. E INSTAL. DE COMPORTA DE SUPERFICIE C/ ACION. DIRETO NA GAVETA, C/AREA DO

CANAL DE 0,401m² ATE 0,90m²un 99,90 132,53 147,29 195,39 159,16 211,14 152,84 202,76 153,96 204,24

220610MONT. E INSTAL. DE COMPORTA DE SUPERFICIE C/ACION. ATRAVES DE VOLANTE EM FºFº SOBRE

PORTICO DE ACO, C/ AREA DO CANAL ATE 0,40m²un 118,60 157,33 169,17 224,42 181,84 241,23 175,10 232,29 176,30 233,88

220613MONT. E INSTAL. DE COMPORTA DE SUPERFICIE C/ACION. ATRAVES DE VOLANTE EM FºFº SOBRE

PORTICO DE ACO, C/ AREA DO CANAL DE 0,401 ATE 0,90m²un 133,92 177,66 191,28 253,75 205,64 272,80 198,01 262,68 199,36 264,47

220616MONT. E INSTAL. DE COMPORTA DE SUPERFICIE C/ACION. ATRAVES DE ALCA DE SUSPENSAO

SOBRE PORTICO DE ACO, C/AREA DO CANAL ATE 0,40m²un 103,91 137,85 147,29 195,39 158,18 209,84 152,39 202,16 153,41 203,51

220619MONT. E INSTAL. DE COMPORTA DE SUPERFICIE C/ ACION. ATRAVES DE ALCA DE SUSPENSAO

SOBRE PORTICO DE ACO, C/ AREA DO CANAL DE 0,401 ATE 0,90m²un 121,65 161,38 173,01 229,52 185,87 246,58 179,04 237,51 180,25 239,12

220622MONT. E INSTAL. DE COMPORTA DE SUPERFICIE C/ ACION. POR ATUADOR HIDRAULICO OU

PNEUMATICO, SOBRE PORTICO DE ACO, C/ AREA DO CANAL ATE 0,40m²un 132,24 175,43 189,46 251,34 203,80 270,36 196,18 260,25 197,53 262,04

220625MONT. E INSTAL. DE COMPORTA DE SUPERFICIE C/ ACION. POR ATUADOR HIDRAULICO OU

PNEUMATICO, SOBRE PORTICO DE ACO, C/ AREA DO CANAL DE 0,401 ATE 0,90m²un 144,75 192,03 207,39 275,12 223,07 295,92 214,73 284,86 216,20 286,81

220628MONT. E INSTAL. DE COMPORTA DE SUPERFICIE C/ACION. ELETRICO POR MOTOR C/ REDUTOR

DE VELOCIDADE, SOBRE PORTICO DE ACO, C/ AREA DO CANAL ATE 0,40m²un 140,95 186,98 202,42 268,53 217,83 288,97 209,63 278,10 211,09 280,03

220631MONT. E INSTAL. DE COMPORTA DE SUPERFICIE C/ACION. ELETRICO POR MOTOR C/ REDUTOR

DE VELOCIDADE, SOBRE PORTICO DE ACO, C/ AREA DO CANAL DE 0,401 ATE 0,90m²un 161,24 213,90 231,93 307,68 249,63 331,16 240,21 318,66 241,88 320,88

220634MONT. E INSTAL. DE COMPORTA DE DUPLO FLUXO COMPLETA C/PEDESTAL DE SUSPENSAO

SIMPLES E VOLANTE EM FºFº E VEDACAO DE ACO, C/ AREA DO CANAL ATE 0,50m²un 233,70 310,03 302,45 401,23 319,68 424,09 310,52 411,94 312,14 414,08

220637MONT. E INSTAL. DE COMPORTA DE DUPLO FLUXO COMPLETA C/PEDESTAL DE SUSPENSAO

SIMPLES E VOLANTE EM FºFº E VEDACAO DE ACO, C/ AREA DO CANAL DE 0,50m² ATE 0.80 m²un 427,09 566,58 530,52 703,79 556,45 738,19 542,67 719,91 545,09 723,12

220640MONT. E INSTAL. DE COMPORTA DE DUPLO FLUXO COMPLETA C/PEDESTAL DE SUSPENSAO

SIMPLES E VOLANTE EM FºFº E VEDACAO DE ACO, C/ AREA DO CANAL DE 0.801m² ATE 1,50m² .un 782,14 1.037,59 931,97 1.236,35 969,54 1.286,19 949,57 1.259,70 953,09 1.264,37

220643MONT. E INSTAL. DE COMPORTA DE DUPLO FLUXO COMPLETA C/ATUADOR

HIDRAULICO/PNEUMATICO EM FºFº E VEDACAO DE ACO, C/ AREA DO CANAL ATE 0,50m²un 274,50 364,15 355,34 471,39 375,60 498,27 364,83 483,98 366,73 486,50

220646MONT. E INSTAL. DE COMPORTA DE DUPLO FLUXO COMPLETA C/ATUADOR

HIDRAULICO/PNEUMATICO EM FºFº E VEDACAO DE ACO, C/AREA DO CANAL DE 0,501m² ATE

0.80m²

un 483,93 641,98 599,45 795,23 628,41 833,65 613,02 813,23 615,72 816,81

220649MONT. E INSTAL. DE COMPORTA DE DUPLO FLUXO COMPLETA C/ATUADOR

HIDRAULICO/PNEUMATICO EM FºFº E VEDACAO DE ACO, C/AREA DO CANAL DE 0,801m² ATE

1.50m²

un 838,98 1.112,99 1.000,90 1.327,79 1.041,50 1.381,65 1.019,92 1.353,03 1.023,72 1.358,07

220652MONT. E INSTAL. DE COMPORTA DE DUPLO FLUXO COMPLETA C/PEDESTAL DE SUSPENSAO

C/ENGRENAGENS E VOLANTE EM FºFº E VEDACAO DE ACO, C/ AREA DO CANAL ATE 0,50m²un 315,30 418,28 408,23 541,56 431,52 572,45 419,14 556,03 421,32 558,92

220655MONT. E INSTAL. DE COMPORTA DE DUPLO FLUXO COMPLETA C/PEDESTAL DE SUSPENSAO

C/ENGRENAGENS E VOLANTE EM FºFº E VEDACAO DE ACO, C/ AREA DO CANAL DE 0,501m² ATE

0.80m²

un 540,76 717,37 668,37 886,66 700,36 929,10 683,36 906,55 686,34 910,50

220658MONT. E INSTAL. DE COMPORTA DE DUPLO FLUXO COMPLETA C/PEDESTAL DE SUSPENSAO

C/ENGRENAGENS E VOLANTE EM FºFº E VEDACAO DE ACO, C/ AREA DO CANAL DE 0,801m² ATE

1.50m²

un 883,81 1.172,46 1.057,82 1.403,30 1.101,45 1.461,18 1.078,26 1.430,42 1.082,34 1.435,83

220700 GRADES MANUAIS P/ PRE-TRATAMENTO DE ESGOTOS / AGUA BRUTA

Página: 36 de 59

Page 37: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

220701FORNEC.E ASSENT.DE GRADE MANUAL P/PRE-TRATAMENTO DE ESGOTOS/AGUA

BRUTA,INCLUINDO PINTURA DE PROTECAOm2 298,32 395,75 319,28 423,56 324,51 430,49 321,71 426,78 322,22 427,46

220702FORNEC.E ASSENT.DE GRADE MANUAL P/PRE-TRATAMENTO DE ESGOTOS/AGUA

BRUTA,INCLUINDO PINTURA DE PROTECAOun 47,09 62,47 51,18 67,90 52,19 69,24 51,65 68,52 51,75 68,65

220705FORNEC.E ASSENT.DE GRADE DE RETENCAO P/PRE-TRATAMENTO DE ESGOTOS/AGUA BRUTA,

GALVANIZADA A FOGO 1x3/16" MALHA 3cmm2 271,11 359,65 284,82 377,84 288,26 382,41 286,43 379,98 286,76 380,42

229000 SERVICOS NAO CODIFICADOS

229002FORNECIMENTO E ASSENTAMENTO DE SEPARADOR DE FASES EM FIBRA DE VIDRO NERVURADO

INTERNAMENTE P/DAFASm2 251,05 333,04 251,05 333,04 251,05 333,04 251,05 333,04 251,05 333,04

229003FORNECIMENTO E ASSENTAMENTO DE DEFLETOR EM FIBRA DE VIDRO NERVURADO

INTERNAMENTE P/DAFASm2 210,49 279,24 210,49 279,24 210,49 279,24 210,49 279,24 210,49 279,24

229004FORNECIMENTO E ASSENTAMENTO DE CALHA EM FIBRA DE VIDRO COM FIXACAO REFORCADA P/

DAFAS SECAO 30x30cmm 209,21 277,54 209,21 277,54 209,21 277,54 209,21 277,54 209,21 277,54

229005 CAMADA DE BRITA SELECIONADA PARA LEITO DE SECAGEM M3 90,01 119,41 102,68 136,22 105,87 140,45 104,17 138,19 104,47 138,59

229006 CAMADA DE AREIA SELECIONADA PARA LEITO DE SECAGEM M3 95,50 126,69 104,35 138,43 106,58 141,39 105,39 139,81 105,60 140,09

229007 CAMADA DE TIJOLO COM JUNTA DE 2.0cm PARA LEITO DE SECAGEM M2 32,50 43,11 38,44 50,99 39,93 52,97 39,13 51,91 39,28 52,11

229013 FORNEC.E INST.DE CHAVE TIPO T EM TUBOS GALVANIZADO P/CABECOTE DE REGISTRO un 797,79 1.058,35 839,35 1.113,48 849,75 1.127,28 844,23 1.119,96 845,19 1.121,23

229205 FORNECIMENTO E MONTAGEM DE BOMBA SUBMERSIVEL P=2,0cv PARA TANQUE DE AERACAO un 86,75 115,08 127,96 169,75 138,27 183,43 132,79 176,16 133,74 177,42

229206FORNECIMENTO E MONTAGEM DE BOMBA SUBMERSIVEL P=2,0cv PARA ELEVATORIA DE LODO

CLARIFICADOcj 86,75 115,08 127,96 169,75 138,27 183,43 132,79 176,16 133,74 177,42

229303ASSENT. E MONTAGEM DE MODULOS TUBULARES, P/ DECANTACAO, TIPO COLMEIA,

50X90X600MM EM PVC, S/ FORNEC. DA SOLDA E ELEMENTOS P/ FIXACAO E PROTECAO DO

MODULO.

m2 41,23 54,70 48,86 64,82 50,77 67,35 49,76 66,01 49,93 66,24

229304ASSENT. E MONTAGEM DE MODULOS TUBULARES, P/ DECANTACAO, TIPO COLMEIA,

50X90X1000MM EM PVC, S/ FORNEC. DA SOLDA E ELEMENTOS P/ FIXACAO E PROTECAO DO

MODULO.

m2 44,35 58,83 53,51 70,99 55,81 74,04 54,59 72,42 54,80 72,70

229305ASSENT. E MONTAGEM DE MODULOS TUBULARES, P/ DECANTACAO, TIPO COLMEIA,

50X90X1200MM EM PVC, S/ FORNEC. DA SOLDA E ELEMENTOS P/ FIXACAO E PROTECAO DO

MODULO.

m2 47,48 62,99 58,17 77,17 60,85 80,72 59,42 78,83 59,66 79,14

240000 SERVICOS PARA PERFURACAO DE POCOS

240001 DIARIA EQUIPE (3 PROFISSIONAIS CAMPO) - PERCUSSORA DIA 249,60 331,12 249,60 331,12 249,60 331,12 249,60 331,12 249,60 331,12

240002 DIARIA EQUIPE (5 PROFISSIONAIS CAMPO) - ROTOPNEUMATICA DIA 416,00 551,87 416,00 551,87 416,00 551,87 416,00 551,87 416,00 551,87

240003 DIARIA EQUIPE (6 PROFISSIONAIS CAMPO) - ROTATIVA - POCO < 300M DIA 499,20 662,24 499,20 662,24 499,20 662,24 499,20 662,24 499,20 662,24

240004 DIARIA EQUIPE (12 PROFISSIONAIS CAMPO) - ROTATIVA - POCO > 300M DIA 998,40 1.324,48 998,40 1.324,48 998,40 1.324,48 998,40 1.324,48 998,40 1.324,48

240005 DIARIA EQUIPE (3 PROFISSIONAIS CAMPO) - BOMBEIO DIA 249,60 331,12 249,60 331,12 249,60 331,12 249,60 331,12 249,60 331,12

240011 EQUIPE (3 PROFISSIONAIS CAMPO) - PERCUSSORA H 52,95 70,24 84,99 112,75 93,00 123,37 88,74 117,72 89,49 118,72

240012 EQUIPE (5 PROFISSIONAIS CAMPO) - ROTOPNEUMATICA H 88,25 117,07 141,65 187,91 155,00 205,62 147,90 196,20 149,15 197,86

240013 EQUIPE (6 PROFISSIONAIS CAMPO) - ROTATIVA - POCO < 300M H 119,98 159,17 192,54 255,42 210,72 279,54 201,04 266,70 202,74 268,95

240014 EQUIPE (12 PROFISSIONAIS CAMPO) - ROTATIVA - POCO > 300M H 174,14 231,01 279,48 370,76 305,84 405,73 291,81 387,12 294,30 390,42

240015 EQUIPE (3 PROFISSIONAIS CAMPO) - BOMBEIO H 56,47 74,91 90,63 120,23 99,18 131,57 94,63 125,54 95,43 126,60

240016 EQUIPE (3 PROFISSIONAIS CAMPO) - INSTALACOES ELETICAS H 30,24 40,12 45,01 59,71 48,71 64,62 46,74 62,01 47,09 62,47

240021 TRANSPORTE DE MATERIAIS - CAMINHAO DE CAPACIDADE MINIMA 10T KM 14,70 19,50 20,76 27,54 22,28 29,56 21,47 28,48 21,61 28,67

240022TRANSPORTE DE GRUPO GERADOR PARA APOIO A UNIDADE DE TESTE DE BOMBEAMENTO COM

VAZAO 150M3<250M3KM 87,59 116,20 87,71 116,36 87,74 116,40 87,73 116,38 87,73 116,38

240023 TRANSPORTE DE UNIDADE DE PERFILAGEM OPTICA KM 4,39 5,82 4,67 6,20 4,75 6,30 4,71 6,25 4,72 6,26

240024 TRANSPORTE DE UNIDADE DE PERFURACAO PERCUSSORA KM 8,38 11,12 9,90 13,13 10,28 13,64 10,08 13,37 10,12 13,43

240025TRANSPORTE DE UNIDADE ROTOPNEUMATICA COM COMPRESSOR - CALCARIO, CRISTALINO,

META-SEDIMENTO / QUARTZITOKM 29,04 38,52 30,80 40,86 31,25 41,46 31,01 41,14 31,05 41,19

240026 TRANSPORTE DE UNIDADE DE PERFURACAO ROTATIVA - SEDIMENTO POCO 150M KM 30,24 40,12 32,00 42,45 32,45 43,05 32,21 42,73 32,25 42,78

240027 TRANSPORTE DE UNIDADE DE PERFURACAO ROTATIVA 150M<250M KM 30,24 40,12 32,00 42,45 32,45 43,05 32,21 42,73 32,25 42,78

240028TRANSPORTE DE UNIDADE DE PERFURACAO ROTATIVA COM BOMBA LAMA - SEDIMENTO POCO

150M<250MKM 25,63 34,00 25,94 34,41 26,02 34,52 25,97 34,45 25,98 34,47

240029TRANSPORTE DE UNIDADE DE PERFURACAO ROTATIVA COM BOMBA LAMA - SEDIMENTO POCO

250M<450MKM 51,19 67,91 55,40 73,49 56,45 74,89 55,89 74,14 55,99 74,28

240030TRANSPORTE DE UNIDADE DE TESTE (DESENVOLVIMENTO / BOMBEAMENTO) C/ COMPRESSORO

(180PSI / 300CFM) PARA POCO <150MKM 6,37 8,45 7,23 9,59 7,44 9,87 7,33 9,72 7,35 9,75

240031TRANSPORTE DE UNIDADE DE TESTE (DESENVOLVIMENTO / BOMBEAMENTO) C/ COMPRESSORO

(250PSI / 750CFM) PARA POCO 150M<250MKM 6,71 8,90 7,68 10,19 7,93 10,52 7,80 10,35 7,82 10,37

240032TRANSPORTE DE UNIDADE DE TESTE (DESENVOLVIMENTO / BOMBEAMENTO) C/ COMPRESSORO

(250PSI / 750CFM) PARA POCO 150M<250MKM 7,38 9,79 8,51 11,29 8,79 11,66 8,64 11,46 8,67 11,50

240033TRANSPORTE DE UNIDADE DE TESTE (DESENVOLVIMENTO / BOMBEAMENTO) UEB1 (BOMBA

SUBMERSA) PARA POCO <250MKM 10,87 14,42 11,73 15,56 11,94 15,84 11,83 15,69 11,85 15,72

240034TRANSPORTE DE UNIDADE DE TESTE (DESENVOLVIMENTO / BOMBEAMENTO) UEB2 (BOMBA

SUBMERSA) PARA POCO >250MKM 15,62 20,72 18,50 24,54 19,23 25,51 18,84 24,99 18,91 25,09

241000 ESTUDOS HIDROGEOLOGICOS (LOCACAO) DISTANCIA MENOR QUE 200 KM

241001 DEFINICAO DE MANANCIAL 01 LOCALIDADE MENOR QUE 200 KM UN 1.802,96 2.391,81 2.430,96 3.224,91 2.588,24 3.433,56 2.504,56 3.322,55 2.519,44 3.342,29

241002 DEFINICAO DE MANANCIAL 02 LOCALIDADES MENOR QUE 200 KM UN 1.300,32 1.725,00 1.771,32 2.349,83 1.889,28 2.506,32 1.826,52 2.423,06 1.837,68 2.437,87

241003 DEFINICAO DE MANANCIAL 03 LOCALIDADES MENOR QUE 200 KM UN 1.130,66 1.499,93 1.548,28 2.053,95 1.652,87 2.192,70 1.597,22 2.118,87 1.607,12 2.132,01

241004 DEFINICAO DE MANANCIAL 04 LOCALIDADES MENOR QUE 200 KM UN 1.049,00 1.391,60 1.441,50 1.912,29 1.539,80 2.042,70 1.487,50 1.973,32 1.496,80 1.985,65

241005 DEFINICAO DE MANANCIAL 05 LOCALIDADES MENOR QUE 200 KM UN 998,74 1.324,93 1.375,54 1.824,79 1.469,91 1.949,98 1.419,70 1.883,37 1.428,63 1.895,22

241010 ESTUDOS HIDROGEOLOGICOS (LOCACAO) DISTANCIA ENTRE 200KM E 500KM

241011 DEFINICAO DE MANANCIAL 01 LOCALIDADE ENTRE 200KM E 500KM UN 2.992,74 3.970,17 3.934,74 5.219,83 4.170,66 5.532,80 4.045,14 5.366,28 4.067,46 5.395,89

241012 DEFINICAO DE MANANCIAL 02 LOCALIDADE ENTRE 200KM E 500KM UN 1.895,21 2.514,19 2.523,21 3.347,29 2.680,49 3.555,94 2.596,81 3.444,93 2.611,69 3.464,67

241013 DEFINICAO DE MANANCIAL 03 LOCALIDADE ENTRE 200KM E 500KM UN 1.525,12 2.023,22 2.046,36 2.714,70 2.176,90 2.887,88 2.107,45 2.795,74 2.119,80 2.812,13

241014 DEFINICAO DE MANANCIAL 04 LOCALIDADE ENTRE 200KM E 500KM UN 1.345,83 1.785,38 1.816,83 2.410,21 1.934,79 2.566,69 1.872,03 2.483,43 1.883,19 2.498,24

241015 DEFINICAO DE MANANCIAL 05 LOCALIDADE ENTRE 200KM E 500KM UN 1.236,69 1.640,59 1.676,29 2.223,77 1.786,39 2.369,82 1.727,81 2.292,11 1.738,23 2.305,94

241020 ESTUDOS HIDROGEOLOGICOS (LOCACAO) DISTANCIA MAIOR QUE 500KM

241021 DEFINICAO DE MANANCIAL 01 LOCALIDADE MAIOR QUE 500KM UN 4.551,52 6.038,05 5.807,52 7.704,26 6.122,08 8.121,55 5.954,72 7.899,53 5.984,48 7.939,01

241022 DEFINICAO DE MANANCIAL 02 LOCALIDADE MAIOR QUE 500KM UN 2.674,60 3.548,12 3.459,60 4.589,51 3.656,20 4.850,31 3.551,60 4.711,55 3.570,20 4.736,23

241023 DEFINICAO DE MANANCIAL 03 LOCALIDADE MAIOR QUE 500KM UN 2.048,96 2.718,15 2.676,96 3.551,26 2.834,24 3.759,90 2.750,56 3.648,89 2.765,44 3.668,63

241024 DEFINICAO DE MANANCIAL 04 LOCALIDADE MAIOR QUE 500KM UN 1.736,14 2.303,16 2.285,64 3.032,13 2.423,26 3.214,70 2.350,04 3.117,56 2.363,06 3.134,84

241025 DEFINICAO DE MANANCIAL 05 LOCALIDADE MAIOR QUE 500KM UN 1.548,45 2.054,17 2.050,85 2.720,66 2.176,67 2.887,57 2.109,73 2.798,77 2.121,63 2.814,55

242000 ESTUDOS GEOFISICOS COM ELETRORESISTIVIDADE (LOCACAO) DISTANCIA MENOR QUE 200 KM

242001 DEFINICAO DE MANANCIAL / ELETRORESISTIVIDADE 01 LOCALIDADE MENOR QUE 200 KM UN 2.964,02 3.932,07 4.089,38 5.424,97 4.371,38 5.799,07 4.221,38 5.600,08 4.248,02 5.635,42

242002 DEFINICAO DE MANANCIAL / ELETRORESISTIVIDADE 02 LOCALIDADES MENOR QUE 200 KM UN 2.461,38 3.265,27 3.429,74 4.549,89 3.672,42 4.871,83 3.543,34 4.700,59 3.566,26 4.731,00

242003 DEFINICAO DE MANANCIAL / ELETRORESISTIVIDADE 03 LOCALIDADES MENOR QUE 200 KM UN 2.291,72 3.040,20 3.206,70 4.254,01 3.436,01 4.558,21 3.314,04 4.396,41 3.335,70 4.425,14

242004 DEFINICAO DE MANANCIAL / ELETRORESISTIVIDADE 04 LOCALIDADES MENOR QUE 200 KM UN 2.210,06 2.931,87 3.099,92 4.112,35 3.322,94 4.408,21 3.204,32 4.250,85 3.225,38 4.278,79

242005DEFINICAO DE MANANCIAL / ELETRORESISTIVIDADE 05 OU MAIS LOCALIDADES MENOR QUE 200

KMUN 2.159,80 2.865,19 3.033,96 4.024,85 3.253,05 4.315,50 3.136,52 4.160,91 3.157,21 4.188,35

242100ESTUDOS GEOFISICOS COM ELETRORESISTIVIDADE (LOCACAO) DISTANCIA ENTRE 200KM E

500KM

242101 DEFINICAO DE MANANCIAL / ELETRORESISTIVIDADE 01 LOCALIDADE ENTRE 200 KM E 500 KM UN 4.141,50 5.494,11 5.580,86 7.403,57 5.941,50 7.881,99 5.749,66 7.627,50 5.783,74 7.672,71

242102 DEFINICAO DE MANANCIAL / ELETRORESISTIVIDADE 02 LOCALIDADES ENTRE 200 KM E 500 KM UN 3.056,27 4.054,45 4.181,63 5.547,35 4.463,63 5.921,45 4.313,63 5.722,46 4.340,27 5.757,80

242103 DEFINICAO DE MANANCIAL / ELETRORESISTIVIDADE 03 LOCALIDADES ENTRE 200 KM E 500 KM UN 2.686,18 3.563,49 3.704,78 4.914,76 3.960,04 5.253,39 3.824,27 5.073,28 3.848,38 5.105,26

242104 DEFINICAO DE MANANCIAL / ELETRORESISTIVIDADE 04 LOCALIDADES ENTRE 200 KM E 500 KM UN 2.506,89 3.325,64 3.475,25 4.610,27 3.717,93 4.932,21 3.588,85 4.760,97 3.611,77 4.791,37

242105DEFINICAO DE MANANCIAL / ELETRORESISTIVIDADE 05 OU MAIS LOCALIDADES ENTRE 200 KM E

500 KMUN 2.397,75 3.180,86 3.334,71 4.423,83 3.569,53 4.735,34 3.444,63 4.569,65 3.466,81 4.599,07

242200 ESTUDOS GEOFISICOS COM ELETRORESISTIVIDADE (LOCACAO) DISTANCIA MAIOR QUE 500KM

242201 DEFINICAO DE MANANCIAL / ELETRORESISTIVIDADE 01 LOCALIDADE MAIOR QUE 500KM UN 3.756,88 4.983,88 5.510,24 7.309,88 5.949,52 7.892,63 5.715,84 7.582,63 5.757,36 7.637,71

242202 DEFINICAO DE MANANCIAL / ELETRORESISTIVIDADE 02 LOCALIDADES MAIOR QUE 500KM UN 3.835,66 5.088,39 5.118,02 6.789,57 5.439,34 7.215,83 5.268,42 6.989,09 5.298,78 7.029,36

242203 DEFINICAO DE MANANCIAL / ELETRORESISTIVIDADE 03 LOCALIDADES MAIOR QUE 500KM UN 3.210,02 4.258,41 4.335,38 5.751,32 4.617,38 6.125,42 4.467,38 5.926,43 4.494,02 5.961,77

242204 DEFINICAO DE MANANCIAL / ELETRORESISTIVIDADE 04 LOCALIDADES MAIOR QUE 500KM UN 2.897,20 3.843,43 3.944,06 5.232,19 4.206,40 5.580,21 4.066,86 5.395,10 4.091,64 5.427,97

242205DEFINICAO DE MANANCIAL / ELETRORESISTIVIDADE 05 OU MAIS LOCALIDADES MAIOR QUE 500

KMUN 2.709,51 3.594,44 3.709,27 4.920,72 3.959,81 5.253,08 3.826,55 5.076,30 3.850,21 5.107,69

242300 ESTUDOS GEOFISICOS COM VLF (LOCACAO) DISTANCIA MENOR QUE 200 KM

242301 DEFINICAO DE MANANCIAL / V L F 01 LOCALIDADE MENOR QUE 200 KM UN 1.963,68 2.605,02 2.652,80 3.519,20 2.825,44 3.748,23 2.733,60 3.626,39 2.749,92 3.648,04

242302 DEFINICAO DE MANANCIAL / V L F 02 LOCALIDADES MENOR QUE 200 KM UN 1.620,11 2.149,24 2.230,73 2.959,29 2.383,71 3.162,23 2.302,33 3.054,27 2.316,79 3.073,45

242303 DEFINICAO DE MANANCIAL / V L F 03 LOCALIDADES MENOR QUE 200 KM UN 1.501,34 1.991,68 2.083,70 2.764,24 2.229,60 2.957,79 2.151,99 2.854,83 2.165,78 2.873,12

242304 DEFINICAO DE MANANCIAL / V L F 04 LOCALIDADES MENOR QUE 200 KM UN 1.448,33 1.921,35 2.019,70 2.679,33 2.162,85 2.869,24 2.086,70 2.768,22 2.100,23 2.786,17

242305 DEFINICAO DE MANANCIAL / V L F 05 OU MAIS LOCALIDADES MENOR QUE 200KM UN 1.413,97 1.875,77 1.977,49 2.623,34 2.118,67 2.810,63 2.043,57 2.711,00 2.056,91 2.728,70

242400 ESTUDOS GEOFISICOS COM VLF (LOCACAO) DISTANCIA ENTRE 200KM E 500KM

Página: 37 de 59

Page 38: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

242401 DEFINICAO DE MANANCIAL / V L F 01 LOCALIDADE ENTRE 200 KM E 500 KM UN 3.153,46 4.183,38 4.156,58 5.514,12 4.407,86 5.847,47 4.274,18 5.670,13 4.297,94 5.701,65

242402 DEFINICAO DE MANANCIAL / V L F 02 LOCALIDADES ENTRE 200 KM E 500 KM UN 2.215,00 2.938,42 2.982,62 3.956,74 3.174,92 4.211,85 3.072,62 4.076,14 3.090,80 4.100,26

242403 DEFINICAO DE MANANCIAL / V L F 03 LOCALIDADES ENTRE 200 KM E 500 KM UN 1.902,18 2.523,43 2.591,30 3.437,62 2.763,94 3.666,64 2.672,10 3.544,81 2.688,42 3.566,46

242404 DEFINICAO DE MANANCIAL / V L F 04 LOCALIDADES ENTRE 200 KM E 500 KM UN 1.745,16 2.315,13 2.395,03 3.177,25 2.557,84 3.393,23 2.471,23 3.278,33 2.486,62 3.298,75

242405 DEFINICAO DE MANANCIAL / V L F 05 OU MAIS LOCALIDADES ENTRE 200 KM UN 1.651,92 2.191,44 2.278,24 3.022,31 2.435,15 3.230,47 2.351,68 3.119,74 2.366,51 3.139,41

242500 ESTUDOS GEOFISICOS COM VLF (LOCACAO) DISTANCIA MAIOR QUE 500KM

242501 DEFINICAO DE MANANCIAL / V L F 01 LOCALIDADE MAIOR QUE 500 KM UN 2.793,44 3.705,78 4.110,56 5.453,07 4.440,48 5.890,74 4.264,96 5.657,90 4.296,16 5.699,29

242502 DEFINICAO DE MANANCIAL / V L F 02 LOCALIDADES MAIOR QUE 500 KM UN 2.994,39 3.972,36 3.919,01 5.198,96 4.150,63 5.506,23 4.027,41 5.342,76 4.049,31 5.371,81

242503 DEFINICAO DE MANANCIAL / V L F 03 LOCALIDADES MAIOR QUE 500 KM UN 2.419,66 3.209,92 3.212,40 4.261,57 3.410,99 4.525,02 3.305,34 4.384,86 3.324,12 4.409,78

242504 DEFINICAO DE MANANCIAL / V L F 04 LOCALIDADES MAIOR QUE 500 KM UN 2.133,52 2.830,33 2.860,72 3.795,03 3.042,89 4.036,70 2.945,98 3.908,14 2.963,20 3.930,98

242505 DEFINICAO DE MANANCIAL / V L F 05 OU MAIS LOCALIDADES MAIOR QUE 500KM UN 2.027,31 2.689,43 2.747,83 3.645,27 2.928,33 3.884,72 2.832,31 3.757,34 2.849,37 3.779,97

243000ACOMPANHAMENTO TECNICO EMPREITADO (PERFURACAO EM ROCHA -

CRISTALINA/CALCARIA/META-SEDIMENTAR/QUATZITICA)

243001ACOMPANHAMENTO TECNICO EMPREITADO (PERFURACAO EM ROCHA -

CRISTALINA/CALCARIA/META-SEDIMENTAR/QUARTZITICA) 01 POCO PARA DISTANCIAS MENORES

QUE 200KM

UN 1.938,78 2.571,99 2.880,78 3.821,64 3.116,70 4.134,61 2.991,18 3.968,10 3.013,50 3.997,71

243002ACOMPANHAMENTO TECNICO EMPREITADO (PERFURACAO EM ROCHA -

CRISTALINA/CALCARIA/META-SEDIMENTAR/QUARTZITICA) 02 POCO PARA DISTANCIAS MENORES

QUE 200KM

UN 1.615,65 2.143,32 2.400,65 3.184,70 2.597,25 3.445,51 2.492,65 3.306,75 2.511,25 3.331,42

243003ACOMPANHAMENTO TECNICO EMPREITADO (PERFURACAO EM ROCHA -

CRISTALINA/CALCARIA/META-SEDIMENTAR/QUARTZITICA) 03 POCO PARA DISTANCIAS MENORES

QUE 200KM

UN 1.505,79 1.997,58 2.237,41 2.968,15 2.420,64 3.211,22 2.323,15 3.081,89 2.340,49 3.104,89

243004ACOMPANHAMENTO TECNICO EMPREITADO (PERFURACAO EM ROCHA -

CRISTALINA/CALCARIA/META-SEDIMENTAR/QUARTZITICA) 04 POCO PARA DISTANCIAS MENORES

QUE 200KM

UN 1.454,09 1.929,00 2.160,59 2.866,24 2.337,53 3.100,97 2.243,39 2.976,08 2.260,13 2.998,29

243005ACOMPANHAMENTO TECNICO EMPREITADO (PERFURACAO EM ROCHA -

CRISTALINA/CALCARIA/META-SEDIMENTAR/QUARTZITICA) 05 OU MAIS POCOS PARA DISTANCIAS

MENORES QUE 200KM

UN 1.421,77 1.886,12 2.112,57 2.802,54 2.285,58 3.032,05 2.193,53 2.909,94 2.209,90 2.931,65

243006ACOMPANHAMENTO TECNICO EMPREITADO (PERFURACAO EM ROCHA -

CRISTALINA/CALCARIA/META-SEDIMENTAR/QUARTZITICA) 01 POCO PARA DISTANCIAS ENTRE

200KM E 500KM

UN 2.585,04 3.429,31 3.841,04 5.095,52 4.155,60 5.512,82 3.988,24 5.290,80 4.018,00 5.330,28

243007ACOMPANHAMENTO TECNICO EMPREITADO (PERFURACAO EM ROCHA -

CRISTALINA/CALCARIA/META-SEDIMENTAR/QUARTZITICA) 02 POCO PARA DISTANCIAS ENTRE

200KM E 500KM

UN 1.938,78 2.571,99 2.880,78 3.821,64 3.116,70 4.134,61 2.991,18 3.968,10 3.013,50 3.997,71

243008ACOMPANHAMENTO TECNICO EMPREITADO (PERFURACAO EM ROCHA -

CRISTALINA/CALCARIA/META-SEDIMENTAR/QUARTZITICA) 03 POCO PARA DISTANCIAS ENTRE

200KM E 500KM

UN 1.654,15 2.194,40 2.450,14 3.250,36 2.649,49 3.514,81 2.543,43 3.374,11 2.562,29 3.399,13

243009ACOMPANHAMENTO TECNICO EMPREITADO (PERFURACAO EM ROCHA -

CRISTALINA/CALCARIA/META-SEDIMENTAR/QUARTZITICA) 04 POCO PARA DISTANCIAS ENTRE

200KM E 500KM

UN 1.615,65 2.143,32 2.400,65 3.184,70 2.597,25 3.445,51 2.492,65 3.306,75 2.511,25 3.331,42

243010ACOMPANHAMENTO TECNICO EMPREITADO (PERFURACAO EM ROCHA -

CRISTALINA/CALCARIA/META-SEDIMENTAR/QUARTZITICA) 05 OU MAIS POCOS PARA DISTANCIAS

ENTRE 200KM E 500KM

UN 1.551,02 2.057,58 2.304,62 3.057,31 2.493,36 3.307,69 2.392,94 3.174,47 2.410,80 3.198,17

243011ACOMPANHAMENTO TECNICO EMPREITADO (PERFURACAO EM ROCHA -

CRISTALINA/CALCARIA/META-SEDIMENTAR/QUARTZITICA) 01 POCO PARA DISTANCIAS MAIORES

DE 500KM

UN 3.877,56 5.143,97 5.761,56 7.643,29 6.233,40 8.269,23 5.982,36 7.936,20 6.027,00 7.995,42

243012ACOMPANHAMENTO TECNICO EMPREITADO (PERFURACAO EM ROCHA -

CRISTALINA/CALCARIA/META-SEDIMENTAR/QUARTZITICA) 02 POCO PARA DISTANCIAS MAIORES

DE 500KM

UN 2.585,04 3.429,31 3.841,04 5.095,52 4.155,60 5.512,82 3.988,24 5.290,80 4.018,00 5.330,28

243013ACOMPANHAMENTO TECNICO EMPREITADO (PERFURACAO EM ROCHA -

CRISTALINA/CALCARIA/META-SEDIMENTAR/QUARTZITICA) 03 POCO PARA DISTANCIAS MAIORES

DE 500KM

UN 2.152,05 2.854,91 3.197,67 4.242,03 3.459,54 4.589,43 3.320,21 4.404,59 3.344,99 4.437,46

243014ACOMPANHAMENTO TECNICO EMPREITADO (PERFURACAO EM ROCHA -

CRISTALINA/CALCARIA/META-SEDIMENTAR/QUARTZITICA) 04 POCO PARA DISTANCIAS MAIORES

DE 500KM

UN 1.938,78 2.571,99 2.880,78 3.821,64 3.116,70 4.134,61 2.991,18 3.968,10 3.013,50 3.997,71

243015ACOMPANHAMENTO TECNICO EMPREITADO (PERFURACAO EM ROCHA -

CRISTALINA/CALCARIA/META-SEDIMENTAR/QUARTZITICA) 05 OU MAIS POCOS PARA DISTANCIAS

MAIORES DE 500KM

UN 1.809,53 2.400,52 2.688,73 3.566,87 2.908,92 3.858,97 2.791,77 3.703,56 2.812,60 3.731,20

243016ACOMPANHAMENTO TECNICO EMPREITADO (PERFURACAO EM ROCHA SEDIMENTAR) POCO COM

PROFUNDIDADE 150M < 250M E DISTANCIA MAIOR QUE 500KMUN 7.755,12 10.287,94 11.523,12 15.286,57 12.466,80 16.538,46 11.964,72 15.872,40 12.054,00 15.990,84

243017ACOMPANHAMENTO TECNICO EMPREITADO (PERFURACAO EM ROCHA SEDIMENTAR) POCO COM

PROFUNDIDADE 250M < 450M E DISTANCIA MENOR QUE 200KMUN 11.632,68 15.431,91 17.284,68 22.929,86 18.700,20 24.807,69 17.947,08 23.808,60 18.081,00 23.986,25

243018ACOMPANHAMENTO TECNICO EMPREITADO (PERFURACAO EM ROCHA SEDIMENTAR) POCO COM

PROFUNDIDADE 250M < 450M E DISTANCIA ENTRE 200KM E 500KMUN 12.278,94 16.289,24 18.244,94 24.203,74 19.739,10 26.185,89 18.944,14 25.131,30 19.085,50 25.318,82

243019ACOMPANHAMENTO TECNICO EMPREITADO (PERFURACAO EM ROCHA SEDIMENTAR) POCO COM

PROFUNDIDADE 250M < 450M E DISTANCIA MAIOR QUE 500KMUN 12.925,20 17.146,57 19.205,20 25.477,62 20.778,00 27.564,09 19.941,20 26.454,00 20.090,00 26.651,39

243020 ACOMPANHAMENTO TECNICO EMPREITADO (PERFURACAO EM ROCHA - SEDIMENTAR)

243021ACOMPANHAMENTO TECNICO EMPREITADO (PERFURACAO EM ROCHA SEDIMENTAR) POCO COM

PROFUNDIDADE < 150M E DISTANCIA MENOR QUE 200KMUN 3.231,30 4.286,64 4.801,30 6.369,40 5.194,50 6.891,02 4.985,30 6.613,50 5.022,50 6.662,85

243022ACOMPANHAMENTO TECNICO EMPREITADO (PERFURACAO EM ROCHA SEDIMENTAR) POCO COM

PROFUNDIDADE < 150M E DISTANCIA ENTRE 200KM E 500KMUN 3.877,56 5.143,97 5.761,56 7.643,29 6.233,40 8.269,23 5.982,36 7.936,20 6.027,00 7.995,42

243023ACOMPANHAMENTO TECNICO EMPREITADO (PERFURACAO EM ROCHA SEDIMENTAR) POCO COM

PROFUNDIDADE < 150M E DISTANCIA MAIOR QUE 500KMUN 4.523,82 6.001,30 6.721,82 8.917,17 7.272,30 9.647,43 6.979,42 9.258,90 7.031,50 9.327,99

243024ACOMPANHAMENTO TECNICO EMPREITADO (PERFURACAO EM ROCHA SEDIMENTAR) POCO COM

PROFUNDIDADE 150M < 250M E DISTANCIA MENOR QUE 200KMUN 6.462,60 8.573,29 9.602,60 12.738,81 10.389,00 13.782,05 9.970,60 13.227,00 10.045,00 13.325,70

243025ACOMPANHAMENTO TECNICO EMPREITADO (PERFURACAO EM ROCHA SEDIMENTAR) POCO COM

PROFUNDIDADE 150M < 250M E DISTANCIA ENTRE 200KM E 500KMUN 7.108,86 9.430,61 10.562,86 14.012,69 11.427,90 15.160,25 10.967,66 14.549,70 11.049,50 14.658,27

243026ACOMPANHAMENTO TECNICO EMPREITADO (PERFURACAO EM ROCHA SEDIMENTAR) POCO COM

PROFUNDIDADE 150M < 250M E DISTANCIA MAIOR QUE 500KMUN 7.755,12 10.287,94 11.523,12 15.286,57 12.466,80 16.538,46 11.964,72 15.872,40 12.054,00 15.990,84

243027ACOMPANHAMENTO TECNICO EMPREITADO (PERFURACAO EM ROCHA SEDIMENTAR) POCO COM

PROFUNDIDADE 250M < 450M E DISTANCIA MENOR QUE 200KMUN 11.632,68 15.431,91 17.284,68 22.929,86 18.700,20 24.807,69 17.947,08 23.808,60 18.081,00 23.986,25

243028ACOMPANHAMENTO TECNICO EMPREITADO (PERFURACAO EM ROCHA SEDIMENTAR) POCO COM

PROFUNDIDADE 250M < 450M E DISTANCIA ENTRE 200KM E 500KMUN 12.278,94 16.289,24 18.244,94 24.203,74 19.739,10 26.185,89 18.944,14 25.131,30 19.085,50 25.318,82

243029ACOMPANHAMENTO TECNICO EMPREITADO (PERFURACAO EM ROCHA SEDIMENTAR) POCO COM

PROFUNDIDADE 250M < 450M E DISTANCIA MAIOR QUE 500KMUN 12.925,20 17.146,57 19.205,20 25.477,62 20.778,00 27.564,09 19.941,20 26.454,00 20.090,00 26.651,39

244000 TRANSPORTES AUXILIARES

244001TAXA MINIMA (100KM) PARA TRANSPORTE DE MATERIAIS - CAMINHAO COM CAPACIDADE

MINIMA 10TUN 1.470,00 1.950,10 2.076,00 2.754,02 2.228,00 2.955,66 2.147,00 2.848,21 2.161,00 2.866,78

244002 TAXA MINIMA (100KM) PARA TRANSPORTE DE GERADOR, MOTOR E OUTROS EQUIPAMENTOS UN 8.759,00 11.619,69 8.771,00 11.635,61 8.774,00 11.639,59 8.773,00 11.638,26 8.773,00 11.638,26

244003 TAXA MINIMA (100KM) PARA TRANSPORTE DE UNIDADE DE PERFILAGEM OPTICA UN 439,00 582,38 467,00 619,52 475,00 630,14 471,00 624,83 472,00 626,16

244010 TRANSPORTE DE UNIDADE DE PERFURACAO PERCUSSORA / ROTOPNEUMATICA / ROTATIVA

244011 TAXA MINIMA (100KM) PARA TRANSPORTE E1 - UNIDADE DE PERFURACAO PERCUSSORA UN 838,00 1.111,69 990,00 1.313,33 1.028,00 1.363,74 1.008,00 1.337,21 1.012,00 1.342,52

244012TAXA MINIMA (100KM) PARA TRANSPORTE E2 +E5 - UNIDADE DE PERFURACAO

ROTOPNEUMATICA COM COMPRESSOR DE PERFURACAO - CALCARIO, CRISTALINO, META-

SEDIMENTO / QUARTZITO

UN 2.904,00 3.852,45 3.080,00 4.085,93 3.125,00 4.145,63 3.101,00 4.113,79 3.105,00 4.119,09

244013TAXA MINIMA (100KM) PARA TRANSPORTE E2 - UNIDADE DE PERFURACAO ROTATIVA -

SEDIMENTO POCO < 150MUN 3.024,00 4.011,64 3.200,00 4.245,12 3.245,00 4.304,82 3.221,00 4.272,98 3.225,00 4.278,29

244014TAXA MINIMA (100KM) PARA TRANSPORTE E3 - UNIDADE DE PERFURACAO ROTATIVA POCO

150M < 250MUN 3.024,00 4.011,64 3.200,00 4.245,12 3.245,00 4.304,82 3.221,00 4.272,98 3.225,00 4.278,29

244015TAXA MINIMA (100KM) PARA TRANSPORTE E3 + E9 - UNIDADE DE PERFURACAO ROTATIVA COM

BOMBA DE LAMA - SEDIMENTO POCO 150M < 250MUN 2.563,00 3.400,08 2.594,00 3.441,20 2.602,00 3.451,81 2.597,00 3.445,18 2.598,00 3.446,51

244016TAXA MINIMA (100KM) PARA TRANSPORTE E4 + E10 - UNIDADE DE PERFURACAO ROTATIVA COM

BOMBA DE LAMA - SEDIMENTO POCO 250M < 450MUN 5.119,00 6.790,87 5.540,00 7.349,36 5.645,00 7.488,66 5.589,00 7.414,37 5.599,00 7.427,63

244040 TRANSPORTE DE UNIDADE DE TESTE (DESENVOLVIMENTO / BOMBEAMENTO)

244041TAXA MINIMA (100Km) TRANSPORTE E5 - UNIDADE DE TESTE (DESENVOLVIMENTO /

BOMBEAMENTO) - COMPRESSOR (180PSI / 300CFM) PARA POCO < 150MUN 637,00 845,04 723,00 959,13 744,00 986,99 733,00 972,40 735,00 975,05

244042TAXA MINIMA (100Km) TRANSPORTE E6 - UNIDADE DE TESTE (DESENVOLVIMENTO /

BOMBEAMENTO) - COMPRESSOR (250PSI / 750CFM) PARA POCO 150M < 250MUN 671,00 890,15 768,00 1.018,83 793,00 1.051,99 780,00 1.034,75 782,00 1.037,40

244043TAXA MINIMA (100Km) TRANSPORTE E7 - UNIDADE DE TESTE (DESENVOLVIMENTO /

BOMBEAMENTO) - COMPRESSOR (350PSI / 950CFM) PARA POCO > 250MUN 738,00 979,03 851,00 1.128,94 879,00 1.166,08 864,00 1.146,18 867,00 1.150,16

Página: 38 de 59

Page 39: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

244044TAXA MINIMA (100KM) TRANSPORTE E12 - UNIDADE DE BOMBEAMENTO UEB1 (BOMBA

SUBMERSA) PARA POCO < 250MUN 1.087,00 1.442,01 1.173,00 1.556,10 1.194,00 1.583,96 1.183,00 1.569,37 1.185,00 1.572,02

244045TAXA MINIMA (100KM) TRANSPORTE E13 - UNIDADE DE BOMBEAMENTO UEB2 (BOMBA

SUBMERSA) PARA POCO > 250MUN 1.562,00 2.072,15 1.850,00 2.454,21 1.923,00 2.551,05 1.884,00 2.499,31 1.891,00 2.508,60

245000 INSTALACAO DE UNIDADE DE PERFURACAO PERCUSSORA

245001INSTALACAO E1 - UNIDADE PERCUSSORA PARA PERFURACAO EM CALCARIO / CRISTALINO /

META-SEDIMENTO / QUARTZITO POCOS < 150MUN 586,96 778,66 891,76 1.183,01 968,00 1.284,15 927,44 1.230,34 934,56 1.239,79

245002 INSTALACAO E1 - UNIDADE PERCUSSORA PARA PERFURACAO NO SEDIMENTO POCOS < 150M UN 1.797,96 2.385,17 2.255,16 2.991,70 2.369,52 3.143,41 2.308,68 3.062,69 2.319,36 3.076,86

245003INSTALACAO E1 - UNIDADE PERCUSSORA PARA DESENVOLVIMENTO, TESTE DE BOMBEAMENTO E

SERVICOS DE DESOBSTRUCAO E LIMPEZA (RECUPERACAO) EM POCOS < 250MUN 998,04 1.324,00 1.455,24 1.930,52 1.569,60 2.082,23 1.508,76 2.001,52 1.519,44 2.015,69

245004INSTALACAO E1 - UNIDADE PERCUSSORA PARA DESENVOLVIMENTO, TESTE DE BOMBEAMENTO E

SERVICOS DE DESOBSTRUCAO E LIMPEZA EM POCOS (RECUPERACAO) > 250MUN 1.593,86 2.114,41 2.279,66 3.024,20 2.451,20 3.251,76 2.359,94 3.130,70 2.375,96 3.151,95

245010 INSTALACAO DE UNIDADE DE PERFURACAO ROTOPNEUMATICA / ROTATIVA

245011INSTALACAO E2+E7 - UNIDADE DE PERFURACAO ROTOPNEUMATICA COM COMPRESSOR DE

PERFURACAO - CRISTALINO, CALCARIO E META-SEDIMENTO / QUARTZITOUN 388,99 516,03 602,59 799,40 655,99 870,24 627,59 832,56 632,59 839,19

245012 INSTALACAO E2 - UNIDADE DE PERFURACAO ROTATIVA (SEDIMENTO) POCO < 150M UN 1.777,97 2.358,66 1.991,57 2.642,02 2.044,97 2.712,86 2.016,57 2.675,18 2.021,57 2.681,81

245013 INSTALACAO E3+E9 - UNIDADE DE PERFURACAO ROTATIVA (SEDIMENTO) POCO 150M < 250M UN 3.546,82 4.705,21 3.982,18 5.282,76 4.091,26 5.427,47 4.033,18 5.350,42 4.043,38 5.363,95

245014 INSTALACAO E4+E10 - UNIDADE DE PERFURACAO ROTATIVA (SEDIMENTO) POCO 250M < 450M UN 5.925,24 7.860,42 6.767,96 8.978,38 6.978,84 9.258,13 6.866,60 9.109,23 6.886,52 9.135,66

245020 INSTALACAO DE UNIDADE DE TESTE (DESENVOLVIMENTO / BOMBEAMENTO)

245021INSTALACAO E5 - UNIDADE DE TESTE (DESENVOLVIMENTO / BOMBEAMENTO) - COMPRESSOR

(180PSI / 300CFM) PARA POCO < 150M NO SEDIMENTO COM INJECAO DIRETAUN 424,86 563,62 604,08 801,37 648,87 860,79 625,05 829,19 629,25 834,76

245022INSTALACAO E6 - UNIDADE DE TESTE (DESENVOLVIMENTO / BOMBEAMENTO) - COMPRESSOR

(250PSI / 750CFM) PARA POCO 150M < 250M NO SEDIMENTO COM INJECAO DIRETAUN 936,81 1.242,77 1.331,31 1.766,12 1.430,11 1.897,18 1.377,51 1.827,40 1.386,76 1.839,68

245023INSTALACAO E7 - UNIDADE DE TESTE (DESENVOLVIMENTO / BOMBEAMENTO) - COMPRESSOR

(350PSI / 950CFM) PARA POCO > 250M NO SEDIMENTO COM INJECAO DIRETAUN 1.886,56 2.502,71 2.641,21 3.503,83 2.830,06 3.754,36 2.729,56 3.621,03 2.747,41 3.644,71

245024INSTALACAO E5 - UNIDADE DE TESTE (DESENVOLVIMENTO / BOMBEAMENTO) - COMPRESSOR

(180PSI / 300CFM) PARA POCO < 150M NO SEDIMENTO COM COLUNA DE PRODUCAOUN 553,36 734,09 724,16 960,67 766,91 1.017,38 744,16 987,20 748,16 992,51

245025INSTALACAO E6 - UNIDADE DE TESTE (DESENVOLVIMENTO / BOMBEAMENTO) - COMPRESSOR

(250PSI / 750CFM) PARA POCO 150M < 250M NO SEDIMENTO COM COLUNA DE PRODUCAOUN 1.485,03 1.970,04 1.860,79 2.468,52 1.954,84 2.593,29 1.904,79 2.526,89 1.913,59 2.538,57

245026INSTALACAO E7 - UNIDADE DE TESTE (DESENVOLVIMENTO / BOMBEAMENTO) - COMPRESSOR

(350PSI / 950CFM) PARA POCO > 250M NO SEDIMENTO COM COLUNA DE PRODUCAOUN 3.940,93 5.228,04 5.449,37 7.229,13 5.826,89 7.729,95 5.625,91 7.463,33 5.661,75 7.510,88

245027INSTALACAO E5 - UNIDADE DE TESTE (DESENVOLVIMENTO / BOMBEAMENTO) (COMPRESSOR

180PSI / 300CFM) POCO < 180M NO CALCARIO / CRISTALINO / META-SEDIMENTO / QUARTZITO

COM COLUNA DE PRODUCAO

UN 553,36 734,09 724,16 960,67 766,91 1.017,38 744,16 987,20 748,16 992,51

245028INSTALACAO E12 - UNIDADE DE DESENVOLVIMENTO / BOMBEAMENTO (BOMBA SUBMERSA - UEB

1) POCO < 180M NO CALARIO / CRISTALINO / META-SEDIMENTOUN 448,21 594,60 619,01 821,18 661,76 877,89 639,01 847,71 643,01 853,02

245029INSTALACAO E12 - UNIDADE DE DESENVOLVIMENTO / BOMBEAMENTO (BOMBA SUBMERSA - UEB

1) POCO < 150M NO SEDIMENTOUN 542,29 719,40 781,41 1.036,62 841,26 1.116,02 809,41 1.073,76 815,01 1.081,19

245030INSTALACAO E12 - UNIDADE DE DESENVOLVIMENTO / BOMBEAMENTO (BOMBA SUBMERSA - UEB

1) POCO 150M < 250M NO SEDIMENTOUN 1.289,35 1.710,45 1.759,97 2.334,78 1.877,77 2.491,05 1.815,07 2.407,87 1.826,17 2.422,60

245031INSTALACAO E13 - UNIDADE DE DESENVOLVIMENTO / BOMBEAMENTO (BOMBA SUBMERSA - UEB

2) POCO > 250M NO SEDIMENTOUN 5.992,59 7.949,77 7.358,59 9.761,91 7.700,43 10.215,39 7.518,51 9.974,06 7.550,67 10.016,72

246000 PERFURACAO EM ROCHA SEDIMENTAR

246001 PERFURACAO DIAMETRO DE 8 POL - UNIDADE PERCUSSORA POCO < 150M M 258,08 342,37 260,09 345,04 260,60 345,71 260,33 345,35 260,38 345,42

246002 PERFURACAO DIAMETRO DE 10 POL - UNIDADE PERCUSSORA POCO < 150M M 319,37 423,68 321,79 426,89 322,40 427,70 322,08 427,27 322,13 427,34

246003 PERFURACAO DIAMETRO DE 12 POL - UNIDADE PERCUSSORA POCO < 150M M 377,02 500,15 379,87 503,94 380,58 504,88 380,20 504,37 380,27 504,47

246004 PERFURACAO DIAMETRO DE 8 1/2 POL - UNIDADE ROTATIVA POCO < 150M M 380,42 504,67 382,84 507,88 383,45 508,68 383,13 508,26 383,18 508,33

246005 PERFURACAO DIAMETRO DE 9 7/8 POL - UNIDADE ROTATIVA POCO < 150M M 495,37 657,16 499,01 661,99 499,92 663,19 499,43 662,54 499,52 662,66

246006 PERFURACAO DIAMETRO DE 12 1/4 POL - UNIDADE ROTATIVA POCO < 150M M 654,29 867,98 659,74 875,21 661,11 877,03 660,38 876,06 660,50 876,22

246007 PERFURACAO DIAMETRO DE 14 3/4 POL - UNIDADE ROTATIVA POCO < 150M M 729,83 968,19 735,89 976,23 737,41 978,25 736,60 977,17 736,74 977,36

246008 PERFURACAO DIAMETRO DE 17 1/2 POL - UNIDADE ROTATIVA POCO < 150M M 785,51 1.042,06 791,57 1.050,10 793,09 1.052,11 792,28 1.051,04 792,42 1.051,22

246009 PERFURACAO DIAMETRO DE 20 1/2 POL - UNIDADE ROTATIVA POCO < 150M M 870,95 1.155,40 877,61 1.164,24 879,28 1.166,45 878,39 1.165,27 878,55 1.165,48

246010 PERFURACAO EM ROCHA CALCARIA E META-SEDIMENTAR

246011 PERFURACAO DIAMETRO DE 9 7/8 POL - UNIDADE ROTATIVA POCO 150M < 250M M 575,08 762,90 580,77 770,45 582,20 772,35 581,44 771,34 581,57 771,51

246012 PERFURACAO DIAMETRO DE 12 1/4 POL - UNIDADE ROTATIVA POCO 150M < 250M M 733,49 973,05 740,95 982,94 742,82 985,43 741,82 984,10 741,99 984,32

246013 PERFURACAO DIAMETRO DE 14 3/4 POL - UNIDADE ROTATIVA POCO 150M < 250M M 990,60 1.314,13 1.000,78 1.327,63 1.003,33 1.331,02 1.001,98 1.329,23 1.002,21 1.329,53

246014 PERFURACAO DIAMETRO DE 17 1/2 POL - UNIDADE ROTATIVA POCO 150M < 250M M 1.365,47 1.811,43 1.379,47 1.830,00 1.382,98 1.834,66 1.381,11 1.832,18 1.381,44 1.832,62

246015 PERFURACAO DIAMETRO DE 20 1/2 POL - UNIDADE ROTATIVA POCO 150M < 250M M 1.369,70 1.817,04 1.380,24 1.831,03 1.382,89 1.834,54 1.381,48 1.832,67 1.381,72 1.832,99

246016 PERFURACAO DIAMETRO DE 22 POL - UNIDADE ROTATIVA POCO 150M < 250M M 1.441,06 1.911,71 1.451,97 1.926,18 1.454,70 1.929,81 1.453,25 1.927,88 1.453,50 1.928,21

246017 PERFURACAO DIAMETRO DE 24 POL - UNIDADE ROTATIVA POCO 150M < 250M M 1.552,96 2.060,16 1.564,60 2.075,60 1.567,52 2.079,47 1.565,96 2.077,40 1.566,23 2.077,76

246018 PERFURACAO DIAMETRO DE 12 1/4 POL - UNIDADE ROTATIVA POCO 250M < 450M M 626,35 830,92 630,24 836,08 631,22 837,38 630,70 836,69 630,79 836,81

246019 PERFURACAO DIAMETRO DE 14 3/4 POL - UNIDADE ROTATIVA POCO 250M < 450M M 867,60 1.150,96 873,57 1.158,88 875,07 1.160,87 874,27 1.159,81 874,41 1.159,99

246020 PERFURACAO EM ROCHA QUARTZITICA

246021 PERFURACAO DIAMETRO DE 20 1/2 POL - UNIDADE ROTATIVA POCO 250M < 450M M 1.845,19 2.447,83 1.857,91 2.464,70 1.861,10 2.468,94 1.859,40 2.466,68 1.859,70 2.467,08

246022 PERFURACAO DIAMETRO DE 22 POL - UNIDADE ROTATIVA POCO 250M < 450M M 2.499,70 3.316,10 2.518,48 3.341,02 2.523,19 3.347,26 2.520,68 3.343,93 2.521,12 3.344,52

246023 PERFURACAO DIAMETRO DE 24 POL - UNIDADE ROTATIVA POCO 250M < 450M M 2.638,77 3.500,59 2.658,16 3.526,32 2.663,03 3.532,78 2.660,43 3.529,33 2.660,88 3.529,92

246024 PERFURACAO DIAMETRO DE 26 POL - UNIDADE ROTATIVA POCO 250M < 450M M 2.596,00 3.443,85 2.615,99 3.470,37 2.621,01 3.477,03 2.618,34 3.473,49 2.618,80 3.474,10

246025 PERFURACAO DIAMETRO DE 30 POL - UNIDADE ROTATIVA POCO 250M < 450M M 2.816,70 3.736,63 2.837,91 3.764,77 2.843,23 3.771,83 2.840,39 3.768,06 2.840,88 3.768,71

246030 PERFURACAO EM ROCHA CRISTALINA

246031 PERFURACAO DIAMETRO 6 POL - ROCHA SA - UNIDADE ROTOPNEUMATICA POCO < 100M M 75,11 99,64 75,11 99,64 75,11 99,64 75,11 99,64 75,11 99,64

246032PERFURACAO DIAMETRO 8 POL - ROCHA SA OU DECOMPOSTA - UNIDADE ROTOPNEUMATICA

POCO < 100MM 89,95 119,33 89,95 119,33 89,95 119,33 89,95 119,33 89,95 119,33

246033PERFURACAO DIAMETRO 10 POL - ROCHA DECOMPOSTA - UNIDADE ROTOPNEUMATICA POCO <

100MM 126,49 167,80 126,49 167,80 126,49 167,80 126,49 167,80 126,49 167,80

247000DESCIDA DE REVESTIMENTO (CRAVACAO) EM ROCHA DECOMPOSTA (CALCARIO / CRISTALINO /

META-SEDIMENTO / QUARTZITO )247001 REVESTIMENTO DIAMETRO 6 POL DIN 2440 M 14,30 18,97 14,30 18,97 14,30 18,97 14,30 18,97 14,30 18,97

247010 INSTALACAO DE TUBOS (DIN2440 OU SCH-40) E FILTROS DE ACO

247011 REVESTIMENTO DIAMETRO 6 POL POCO < 150M M 19,04 25,26 19,96 26,48 20,19 26,78 20,07 26,62 20,09 26,65

247012 REVESTIMENTO DIAMETRO 6 POL POCO 150M < 250M M 19,90 26,40 20,82 27,62 21,04 27,91 20,92 27,75 20,94 27,78

247013 REVESTIMENTO DIAMETRO 8 POL POCO 150M < 250M M 29,80 39,53 31,24 41,44 31,60 41,92 31,41 41,67 31,44 41,71

247014 REVESTIMENTO DIAMETRO 10 POL POCO 150M < 250M M 39,60 52,53 41,42 54,95 41,88 55,56 41,64 55,24 41,68 55,29

247015 REVESTIMENTO DIAMETRO 8 POL POCO > 250M M 41,82 55,48 43,20 57,31 43,55 57,77 43,36 57,52 43,40 57,57

247016 REVESTIMENTO DIAMETRO 10 POL POCO > 250M M 49,91 66,21 51,59 68,44 52,01 69,00 51,78 68,69 51,83 68,76

247017 REVESTIMENTO DIAMETRO 12 POL POCO > 250M M 54,66 72,51 57,57 76,37 58,30 77,34 57,92 76,84 57,99 76,93

247018 REVESTIMENTO DIAMETRO 14 POL POCO > 250M M 68,96 91,48 72,90 96,71 73,89 98,02 73,36 97,32 73,46 97,45

247020 INSTALACAO DE TUBO E FILTRO GEOMECANICO (PVC)

247021 REVESTIMENTO DIAMETRO DE 6 POL POCO < 150M M 7,93 10,52 7,93 10,52 7,93 10,52 7,93 10,52 7,93 10,52

247022 REVESTIMENTO DIAMETRO DE 8 POL POCO < 150M M 10,12 13,43 10,12 13,43 10,12 13,43 10,12 13,43 10,12 13,43

247023 REVESTIMENTO DIAMETRO DE 6 POL POCO 150M < 250M M 10,33 13,70 10,33 13,70 10,33 13,70 10,33 13,70 10,33 13,70

247024 REVESTIMENTO DIAMETRO DE 8 POL POCO 150M < 250M M 12,15 16,12 12,15 16,12 12,15 16,12 12,15 16,12 12,15 16,12

247030 INSTALACAO DE TUBULAO DE ACO

247031 REVESTIMENTO EM TUBULAO DE ACO - DIAMETRO 12 POL M 86,52 114,78 126,98 168,45 137,66 182,62 131,98 175,08 132,98 176,41

247032 REVESTIMENTO EM TUBULAO DE ACO - DIAMETRO 14 POL M 128,88 170,97 171,86 227,99 183,73 243,74 177,41 235,35 178,52 236,82

247033 REVESTIMENTO EM TUBULAO DE ACO - DIAMETRO 16 POL M 170,26 225,87 228,77 303,49 244,93 324,92 236,32 313,50 237,84 315,52

247034 REVESTIMENTO EM TUBULAO DE ACO - DIAMETRO 20 POL M 182,54 242,16 231,48 307,08 245,53 325,72 238,05 315,80 239,38 317,56

247035 REVESTIMENTO EM TUBULAO DE ACO - DIAMETRO 22 POL M 192,51 255,38 240,85 319,51 254,90 338,15 247,42 328,23 248,75 329,99

247036 REVESTIMENTO EM TUBULAO DE ACO - DIAMETRO 26 POL M 208,56 276,68 255,70 339,21 269,75 357,85 262,27 347,93 263,60 349,69

248000 DESENVOLVIMENTO OU TESTE COM SONDA PERCUSSORA

248001 DESENVOLVIMENTO OU TESTE COM SONDA PERCUSSORA - PLUNGE OU BOMBA PISTAO H 80,45 106,72 103,83 137,74 109,68 145,50 106,57 141,38 107,12 142,11

248010 DESENVOLVIMENTO OU TESTE COM COMPRESSOR

248011DESENVOLVIMENTO OU TESTE COM COMPRESSOR 180 PSI / 300 CFM NO CALCARIO / CRISTALINO

/ META-SEDIMENTO / QUARTZITO COM COLUNA DE PRODUCAOH 52,16 69,20 74,94 99,42 80,64 106,98 77,61 102,96 78,14 103,66

248012DESENVOLVIMENTO OU TESTE COM COMPRESSOR 250 PSI / 750 CFM NO CALCARIO / CRISTALINO

/ META-SEDIMENTO / QUARTZITO COM INJECAO DIRETAH 88,11 116,89 123,73 164,14 132,64 175,96 127,90 169,67 128,73 170,77

248013DESENVOLVIMENTO OU TESTE COM COMPRESSOR 350 PSI / 900 CFM NO CALCARIO / CRISTALINO

/ META-SEDIMENTO / QUARTZITO COM INJECAO DIRETAH 77,50 102,81 113,12 150,06 122,03 161,88 117,29 155,60 118,12 156,70

248014DESENVOLVIMENTO OU TESTE COM COMPRESSOR 180 PSI / 300 CFM NO SEDIMENTO COM

COLUNA DE PRODUCAOH 52,16 69,20 74,94 99,42 80,64 106,98 77,61 102,96 78,14 103,66

248015DESENVOLVIMENTO OU TESTE COM COMPRESSOR 250 PSI / 750 CFM NO SEDIMENTO COM

COLUNA DE PRODUCAOH 66,92 88,78 89,70 119,00 95,40 126,56 92,37 122,54 92,90 123,24

248016DESENVOLVIMENTO OU TESTE COM COMPRESSOR 350 PSI / 900 CFM NO SEDIMENTO COM

COLUNA DE PRODUCAOH 56,31 74,70 79,09 104,92 84,79 112,48 81,76 108,46 82,29 109,17

Página: 39 de 59

Page 40: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

248017DESENVOLVIMENTO OU TESTE COM COMPRESSOR 250 PSI / 750 CFM NO SEDIMENTO COM

INJECAO DIRETAH 117,94 156,46 170,56 226,26 183,74 243,75 176,72 234,44 177,96 236,08

248018DESENVOLVIMENTO OU TESTE COM COMPRESSOR 350PSI / 900 CFM NO SEDIMENTO COM

INJECAO DIRETAH 143,45 190,30 217,94 289,12 236,58 313,85 226,66 300,69 228,42 303,02

248020 DESENVOLVIMENTO OU TESTE COM BOMBA SUBMERSA

248021DESENVOLVIMENTO OU TESTE COM BOMBA SUBMERSA - UEB1 NO CALCARIO / CRISTALINO /

META-SEDIMENTO / QUARTZITOH 95,30 126,42 123,75 164,17 130,88 173,63 127,09 168,60 127,75 169,47

248022DESENVOLVIMENTO OU TESTE COM BOMBA SUBMERSA - UEB1 NO SEDIMENTO COM VAZAO <

60M3H 111,96 148,53 140,41 186,27 147,54 195,73 143,75 190,70 144,41 191,57

248023DESENVOLVIMENTO OU TESTE COM BOMBA SUBMERSA - UEB1 NO SEDIMENTO COM VAZAO 60M3

< 150M3H 127,17 168,70 159,67 211,82 167,81 222,62 163,48 216,87 164,24 217,88

248024DESENVOLVIMENTO OU TESTE COM BOMBA SUBMERSA - UEB2 NO SEDIMENTO COM VAZAO

150M3 < 250M3H 292,99 388,68 330,12 437,94 339,40 450,25 334,47 443,71 335,34 444,86

249000 COLETA DE AGUA E ANALISE LABORATORIAL

249001 COLETA DE AGUA E ANALISE FISICO-QUIIMICA SIMPLIFICADA UN 58,40 77,47 60,82 80,68 61,43 81,49 61,11 81,07 61,16 81,13

249002 COLETA DE AGUA E ANALISE FISICO-QUIMICA COMPLETA UN 58,40 77,47 60,82 80,68 61,43 81,49 61,11 81,07 61,16 81,13

249003 COLETA DE AGUA E ANALISE BACTEREOLOGICA UN 204,83 271,73 207,25 274,94 207,86 275,75 207,54 275,32 207,59 275,39

249010 BASE DE CIMENTO

249011 BASE DE SUSTENTACAO DA SONDA POCO > 250M (3,00M X 3,00M X 0,60M) UN 35.445,87 47.022,49 38.517,45 51.097,25 39.316,17 52.156,83 38.890,65 51.592,34 38.964,57 51.690,40

249012 BASE DE PROTECAO DA BOCA DO POCO / CIMENTACAO SUPERFICIAL UN 143,93 190,94 213,49 283,22 230,90 306,31 221,63 294,01 223,26 296,18

249013 BASE DE SUSTENTACAO DAS HASTES POCO > 250M (3,00M X 1,50M X 0,30M) UN 613,66 814,08 663,06 879,62 684,50 908,06 673,10 892,93 675,14 895,64

249020 CIMENTACAO

249021 CIMENTACAO ANELAR PROFUNDA - POCOS < 150M - (VEDACAO DE AQUIFERO) M3 1.164,34 1.544,61 1.524,04 2.021,79 1.630,84 2.163,47 1.574,04 2.088,12 1.584,04 2.101,39

249022 CIMENTACAO ANELAR PROFUNDA - POCOS 150M < 250M - (VEDACAO DE AQUIFERO) M3 1.425,53 1.891,11 1.938,51 2.571,63 2.083,95 2.764,57 2.006,51 2.661,84 2.020,11 2.679,88

249023 CIMENTACAO ANELAR PROFUNDA - POCOS > 250M - (VEDACAO DE AQUIFERO) M3 1.912,58 2.537,23 2.687,80 3.565,64 2.898,68 3.845,39 2.786,44 3.696,49 2.806,36 3.722,92

249024 CIMENTACAO DE PREENCHIMENTO - POCO < 150M - (OBSTRUCAO DE PARTE DO POCO) M3 1.394,18 1.849,52 1.860,68 2.468,38 1.994,18 2.645,48 1.923,18 2.551,29 1.935,68 2.567,87

249025 CIMENTACAO DE PREENCHIMENTO - POCO 150M < 250M - (OBSTRUCAO DE PARTE DO POCO) M3 1.906,85 2.529,63 2.637,51 3.498,92 2.837,49 3.764,21 2.731,01 3.622,96 2.749,71 3.647,77

249026 CIMENTACAO DE PREENCHIMENTO - POCO > 250M - (OBSTRUCAO DE PARTE DO POCO) M3 2.952,52 3.916,81 4.149,10 5.504,20 4.465,42 5.923,83 4.297,06 5.700,48 4.326,94 5.740,12

249030 RETIRADA OU REINSTALACAO DE COLUNA DE EDUCAO E EQUIPAMENTOS DE BOMBEIO

249031RETIRADA OU REINSTALACAO DE COLUNA DE EDUCAO E EQUIPAMENTOS DE BOMBEIO PARA

POCO < 200MM 7,15 9,49 10,19 13,52 10,95 14,53 10,54 13,98 10,61 14,08

249040 APLICACAO DE MATERIAL COMPLEMENTAR

249041 COLOCACAO DE PRE-FILTRO - UNIDADE PERCUSSORA M3 249,61 331,13 282,21 374,38 290,37 385,20 286,02 379,43 286,78 380,44

249042 COLOCACAO DE PRE-FILTRO - UNIDADE ROTATIVA POCOS < 150M M3 276,26 366,49 318,47 422,48 329,04 436,50 323,42 429,05 324,40 430,35

249043 COLOCACAO DE PRE-FILTRO - UNIDADE ROTATIVA POCOS 150M < 250M M3 222,69 295,42 262,58 348,34 272,58 361,60 267,25 354,53 268,18 355,77

249044 COLOCACAO DE PRE-FILTRO - UNIDADE ROTATIVA POCOS > 250M M3 814,37 1.080,34 906,21 1.202,18 929,23 1.232,72 916,96 1.216,44 919,10 1.219,28

249045 COLOCACAO DE BRITA COM SONDA PERCUSSORA H 100,69 133,58 138,79 184,12 148,32 196,76 143,25 190,04 144,14 191,22

249046 COLOCACAO DE BRITA COM SONDA ROTATIVA/ROTOPNEUMATICA PARA POCOS < 150M H 141,59 187,83 194,99 258,67 208,34 276,38 201,24 266,96 202,49 268,62

249047 COLOCACAO DE BRITA COM SONDA ROTATIVA PARA POCOS 150M < 250M H 180,67 239,68 253,23 335,93 271,41 360,05 261,73 347,21 263,43 349,47

249048 COLOCACAO DE BRITA COM SONDA ROTATIVA PARA POCOS > 250M H 345,01 457,69 456,41 605,47 484,29 642,46 469,45 622,77 472,08 626,26

249050 PERFILAGEM OPTICA

249051 PERFILAGEM OPTICA POCOS < 100M UN 13.702,81 18.178,15 13.905,25 18.446,70 13.955,89 18.513,88 13.928,89 18.478,07 13.933,69 18.484,43

249052 PERFILAGEM OPTICA POCOS 100M < 200M UN 20.859,25 27.671,88 21.196,65 28.119,48 21.281,05 28.231,44 21.236,05 28.171,74 21.244,05 28.182,36

249053 PERFILAGEM OPTICA POCOS 200M < 300M UN 28.015,69 37.165,61 28.488,05 37.792,25 28.606,21 37.949,00 28.543,21 37.865,42 28.554,41 37.880,28

249060 DESOBSTRUCAO / LIMPEZA / RECUPERACAO (SERVICOS ESPECIAIS)

249061 DESOBSTRUCAO E LIMPEZA - PERCUSSORA (ESCOVA / PLUNGE) POCO < 250M H 131,62 174,61 137,68 182,65 139,20 184,66 138,39 183,59 138,53 183,77

249062 DESOBSTRUCAO E LIMPEZA - COMPRESSOR DE 180 PSI / 300 CFM POCO < 150M H 80,39 106,65 120,26 159,54 130,23 172,76 124,92 165,72 125,86 166,97

249063 DESOBSTRUCAO E LIMPEZA - COMPRESSOR DE 250 PSI / 750 CFM POCO 150M < 250M H 95,15 126,23 135,02 179,12 144,99 192,34 139,68 185,30 140,62 186,55

249064 DESOBSTRUCAO E LIMPEZA - COMPRESSOR DE 350 PSI / 900 CFM POCO > 250M H 84,54 112,15 124,41 165,04 134,38 178,27 129,07 171,22 130,01 172,47

249065 RETIRADA DE FERRAMENTAS E MATERIAIS DE DENTRO DE POCOS < 150M (""PESCARIA"") DIA 1.052,96 1.396,86 1.101,44 1.461,17 1.113,60 1.477,30 1.107,12 1.468,71 1.108,24 1.470,19

249066 RETIRADA DE FERRAMENTAS E MATERIAIS DE DENTRO DE POCOS > 150M (""PESCARIA"") DIA 1.829,74 2.427,33 2.192,22 2.908,20 2.283,02 3.028,65 2.234,70 2.964,55 2.243,26 2.975,91

249071 APLICACAO DE HEXA-T PARA DESENVOLVIMENTO DE POCOS COM PERCUSSORA UN 324,82 430,91 401,02 531,99 420,08 557,28 409,94 543,83 411,72 546,19

249072 APLICACAO DE HEXA-T PARA DESENVOLVIMENTO COM SONDA ROTATIVA EM POCOS < 150M UN 424,77 563,50 584,97 776,02 625,02 829,15 603,72 800,89 607,47 805,87

249073APLICACAO DE HEXA-T PARA DESENVOLVIMENTO COM SONDA ROTATIVA EM POCOS 150M <

250MUN 722,68 958,71 1.012,92 1.343,74 1.085,64 1.440,21 1.046,92 1.388,84 1.053,72 1.397,86

249074 APLICACAO DE HEXA-T PARA DESENVOLVIMENTO COM SONDA ROTATIVA EM POCOS > 250M UN 1.007,65 1.336,75 1.271,00 1.686,11 1.336,90 1.773,53 1.301,83 1.727,01 1.308,05 1.735,26

249075 DESINFECCAO DE POCO COM SONDA PERCUSSORA UN 693,76 920,34 998,56 1.324,69 1.074,80 1.425,83 1.034,24 1.372,02 1.041,36 1.381,47

249076 DESINFECCAO DE POCO COM COMPRESSOR UN 451,76 599,30 725,04 961,84 793,44 1.052,58 757,04 1.004,29 763,44 1.012,78

250000 SERVICOS DE CONSERVACAO / MANUTENCAO / OPERACAO PARA S.A.A.'S E S.E.S.'S

250100 CORRECAO DE VAZAMENTOS EM ADUTORAS REDES E RAMAIS

250101 290 - CORRECAO DE VAZAMENTOS NO HIDROMETRO UN 12,82 17,01 16,47 21,85 17,38 23,06 16,89 22,41 16,98 22,53

250102 290 - CORRECAO DE VAZAMENTOS NO HIDROMETRO - (I) UN 12,82 17,01 16,47 21,85 17,38 23,06 16,89 22,41 16,98 22,53

250103291 - CORRECAO DE VAZAMENTOS NO RAMAL NA RUA COM PAVIMENTO EM PARALELO OU PEDRA

SEM FORNECIMENTO DO MATERIAL HIDRAULICOUN 64,86 86,04 83,27 110,47 87,89 116,59 85,44 113,34 85,88 113,93

250104291 - CORRECAO DE VAZAMENTOS NO RAMAL NA RUA COM PAVIMENTO EM PARALELO OU PEDRA

COM FORNECIMENTO DO MATERIAL HIDRAULICOUN 69,80 92,60 88,21 117,02 92,83 123,15 90,38 119,90 90,82 120,48

250105291 - CORRECAO DE VAZAMENTOS NO RAMAL NA RUA COM PAVIMENTO EM PARALEO OU PEDRA -

(I)UN 68,83 91,31 87,24 115,73 91,86 121,86 89,41 118,61 89,85 119,20

250106292 - CORRECAO DE VAZAMENTOS NO RAMAL NA RUA SEM PAVIMENTO SEM FORNECIMENTO DO

MATERIAL HIDRAULICOUN 32,77 43,47 41,81 55,47 44,08 58,48 42,87 56,87 43,09 57,16

250107292 - CORRECAO DE VAZAMENTOS NO RAMAL NA RUA SEM PAVIMENTO COM FORNECIMENTO DO

MATERIAL HIDRAULICOUN 36,74 48,74 45,78 60,73 48,05 63,74 46,84 62,14 47,06 62,43

250108 292 - CORRECAO DE VAZAMENTOS NO RAMAL NA RUA SEM PAVIMENTO - (I) UN 36,74 48,74 45,78 60,73 48,05 63,74 46,84 62,14 47,06 62,43

250109293 - CORRECAO DE VAZAMENTOS NO RAMAL NO PASSEIO COM PAVIMENTO DE CONCRETO SEM

FORNECIMENTO DO MATERIAL HIDRAULICOUN 55,38 73,47 71,60 94,98 75,67 100,38 73,50 97,51 73,89 98,02

250110293 - CORRECAO DE VAZAMENTOS NO RAMAL NO PASSEIO COM PAVIMENTO DE CONCRETO COM

FORNECIMENTO DO MATERIAL HIDRAULICOUN 59,35 78,73 75,57 100,25 79,64 105,65 77,47 102,77 77,86 103,29

250111 293 - CORRECAO DE VAZAMENTOS NO RAMAL NO PASSEIO COM PAVIMENTO DE CONCRETO - (I) UN 59,35 78,73 75,57 100,25 79,64 105,65 77,47 102,77 77,86 103,29

250112294 - CORRECAO DE VAZAMENTOS NO RAMAL NO PASSEIO SEM PAVIMENTO SEM FORNECIMENTO

DO MATERIAL HIDRAULICOUN 25,59 33,95 32,59 43,23 34,34 45,56 33,41 44,32 33,58 44,55

250113294 - CORRECAO DE VAZAMENTOS NO RAMAL NO PASSEIO SEM PAVIMENTO COM FORNECIMENTO

DO MATERIAL HIDRAULICOUN 29,56 39,21 36,56 48,50 38,31 50,82 37,38 49,59 37,55 49,81

250114 294 - CORRECAO DE VAZAMENTOS NO RAMAL NO PASSEIO SEM PAVIMENTO - (I) UN 29,56 39,21 36,56 48,50 38,31 50,82 37,38 49,59 37,55 49,81

250116 318 - CORRECAO DE VAZAMENTOS DE REDE NO PASSEIO COM PAVIMENTO UN 82,05 108,85 105,38 139,80 111,22 147,54 108,11 143,42 108,67 144,16

250117 318 - CORRECAO DE VAZAMENTOS DE REDE NO PASSEIO COM PAVIMENTO - (I) UN 82,05 108,85 105,38 139,80 111,22 147,54 108,11 143,42 108,67 144,16

250119 319 - CORRECAO DE VAZAMENTOS DE REDE NO PASSEIO SEM PAVIMENTO UN 71,79 95,24 92,20 122,31 97,31 129,09 94,60 125,50 95,09 126,15

250120 319 - CORRECAO DE VAZAMENTOS DE REDE NO PASSEIO SEM PAVIMENTO - (I) UN 71,79 95,24 92,20 122,31 97,31 129,09 94,60 125,50 95,09 126,15

250122 320 - CORRECAO DE VAZAMENTOS DE REDE NA RUA COM PAVIMENTO UN 129,47 171,75 175,90 233,35 187,55 248,80 181,34 240,57 182,46 242,05

250123 320 - CORRECAO DE VAZAMENTOS DE REDE NA RUA COM PAVIMENTO - (I) UN 118,91 157,75 160,19 212,51 170,54 226,24 165,04 218,94 166,02 220,24

250125 321 - CORRECAO DE VAZAMENTOS DE REDE NA RUA SEM PAVIMENTO UN 71,79 95,24 92,20 122,31 97,31 129,09 94,60 125,50 95,09 126,15

250126 321 - CORRECAO DE VAZAMENTOS DE REDE NA RUA SEM PAVIMENTO - (I) UN 71,79 95,24 92,20 122,31 97,31 129,09 94,60 125,50 95,09 126,15

250128322 - CORRECAO DE VAZAMENTOS DE REDE NO PASSEIO EM PVC DN 110 COM PAVIMENTO, NAO

INCLUI O MATERIAL DA RECOMPOSICAO E HIDRAULICOUN 82,05 108,85 105,38 139,80 111,22 147,54 108,11 143,42 108,67 144,16

250129322 - CORRECAO DE VAZAMENTOS DE REDE NO PASSEIO EM PVC DN 110 COM PAVIMENTO, NAO

INCLUI O MATERIAL DA RECOMPOSICAO DO PAVIMENTO E HIDRAULICO - (I)UN 82,05 108,85 105,38 139,80 111,22 147,54 108,11 143,42 108,67 144,16

250131 323 - CORRECAO DE VAZAMENTOS DE REDE NO PASSEIO EM PVC DN 110 SEM PAVIMENTO UN 71,79 95,24 92,20 122,31 97,31 129,09 94,60 125,50 95,09 126,15

250132 323 - CORRECAO DE VAZAMENTOS DE REDE NO PASSEIO EM PVC DN 110 SEM PAVIMENTO - (I) UN 71,79 95,24 92,20 122,31 97,31 129,09 94,60 125,50 95,09 126,15

250134324 - CORRECAO DE VAZAMENTOS DE REDE NA RUA EM PVC DN ATE 110 COM PAVIMENTO, NAO

INCLUI O MATERIAL DA RECOMPOSICAO DO PAVIMENTO E HIDRAULICOUN 82,05 108,85 105,38 139,80 111,22 147,54 108,11 143,42 108,67 144,16

250135324 - CORRECAO DE VAZAMENTOS DE REDE NA RUA EM PVC DN ATE 110 COM PAVIMENTO, NAO

INCLUI O MATERIAL DA RECOMPOSICAO DO PAVIMENTO E HIDRAULICO - (I)UN 82,05 108,85 105,38 139,80 111,22 147,54 108,11 143,42 108,67 144,16

250137 325 - CORRECAO DE VAZAMENTOS DE REDE NA RUA EM PVC DN ATE 110 SEM PAVIMENTO UN 71,79 95,24 92,20 122,31 97,31 129,09 94,60 125,50 95,09 126,15

250138 325 - CORRECAO DE VAZAMENTOS DE REDE NA RUA EM PVC DN ATE 110 SEM PAVIMENTO - (I) UN 71,79 95,24 92,20 122,31 97,31 129,09 94,60 125,50 95,09 126,15

250140326 - CORRECAO DE VAZAMENTOS DE REDE NA RUA EM PVC DN 150/200 COM PAVIMENTO, NAO

INCLUI O MATERIAL DA RECOMPOSICAO DO PAVIMENTO E HIDRAULICOUN 169,93 225,43 230,87 306,27 246,16 326,56 238,01 315,74 239,48 317,69

Página: 40 de 59

Page 41: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

250141326 - CORRECAO DE VAZAMENTOS DE REDE NA RUA EM PVC DN 150/200 COM PAVIMENTO, NAO

INCLUI O MATERIAL DA RECOMPOSICAO DO PAVIMENTO E HIDRAULICO - (I)UN 156,07 207,04 210,25 278,92 223,84 296,95 216,62 287,37 217,90 289,07

250143 327 - CORRECAO DE VAZAMENTOS DE REDE NA RUA EM PVC DN 150/200 SEM PAVIMENTO UN 153,75 203,96 208,89 277,11 222,72 295,46 215,35 285,68 216,68 287,45

250144 327 - CORRECAO DE VAZAMENTOS DE REDE NA RUA EM PVC DN 150/200 SEM PAVIMENTO - (I) UN 141,21 187,33 190,23 252,36 202,52 268,66 195,99 260,00 197,14 261,53

250146000 - CORRECAO DE VAZAMENTOS DE REDE NA RUA EM PVC DN 250/350 COM PAVIMENTO, NAO

INCLUI O MATERIAL DA RECOMPOSICAO DO PAVIMENTO E HIDRAULICOUN 178,02 236,16 241,87 320,86 257,88 342,10 249,35 330,79 250,89 332,83

250147000 - CORRECAO DE VAZAMENTOS DE REDE NA RUA EM PVC DN 250/350 COM PAVIMENTO, NAO

INCLUI O MATERIAL DA RECOMPOSICAO DO PAVIMENTO E HIDRAULICO - (I)UN 163,50 216,90 220,26 292,20 234,50 311,09 226,93 301,05 228,27 302,82

250149 000 - CORRECAO DE VAZAMENTOS DE REDE NA RUA EM PVC DN 250/350 SEM PAVIMENTO UN 161,84 214,70 219,88 291,69 234,44 311,01 226,68 300,71 228,08 302,57

250150 000 - CORRECAO DE VAZAMENTOS DE REDE NA RUA EM PVC DN 250/350 SEM PAVIMENTO - (I) UN 148,64 197,19 200,24 265,64 213,18 282,80 206,30 273,68 207,52 275,30

250152000 - CORRECAO DE VAZAMENTOS DE REDE NA RUA EM PVC DN 400/500 COM PAVIMENTO, NAO

INCLUI O MATERIAL DA RECOMPOSICAO DO PAVIMENTO E HIDRAULICOUN 275,13 364,99 373,80 495,88 398,55 528,72 385,36 511,22 387,74 514,38

250153000 - CORRECAO DE VAZAMENTOS DE REDE NA RUA EM PVC DN 400/500 COM PAVIMENTO, NAO

INCLUI O MATERIAL DA RECOMPOSICAO DO PAVIMENTO E HIDRAULICO - (I)UN 252,69 335,22 340,41 451,59 362,41 480,77 350,71 465,25 352,78 468,00

250155 000 - CORRECAO DE VAZAMENTOS DE REDE NA RUA EM PVC DN 400/500 SEM PAVIMENTO UN 242,76 322,05 329,82 437,54 351,66 466,51 340,02 451,07 342,12 453,86

250156 000 - CORRECAO DE VAZAMENTOS DE REDE NA RUA EM PVC DN 400/500 SEM PAVIMENTO - (I) UN 222,96 295,78 300,36 398,46 319,77 424,21 309,45 410,52 311,28 412,94

250158328 - CORRECAO DE VAZAMENTOS EM REDE NA RUA DE FOFO ATE DN 100 COM PAVIMENTO,

NAO INCLUI O MATERIAL DA RECOMPOSICAO DO PAVIMENTO E HIDRAULICOUN 206,35 273,74 280,35 371,91 298,91 396,53 289,02 383,41 290,80 385,78

250159328 - CORRECAO DE VAZAMENTOS EM REDE NA RUA DE FOFO ATE DN 100 COM PAVIMENTO,

NAO INCLUI O MATERIAL PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICO - (I)UN 189,52 251,42 255,31 338,69 271,80 360,57 263,03 348,94 264,59 351,01

250161 329 - CORRECAO DE VAZAMENTOS EM REDE NA RUA DE FOFO ATE DN 100 SEM PAVIMENTO UN 141,61 187,86 192,40 255,24 205,14 272,14 198,35 263,13 199,57 264,75

250162 329 - CORRECAO DE VAZAMENTOS EM REDE NA RUA DE FOFO ATE DN 100 SEM PAVIMENTO - (I) UN 130,06 172,54 175,21 232,43 186,53 247,45 180,51 239,46 181,58 240,88

250164330 - CORRECAO DE VAZAMENTOS EM REDE NA RUA DE FOFO DN 150/250 COM PAVIMENTO, NAO

INCLUI O MATERIAL DA RECOMPOSICAO DO PAVIMENTO E HIDRAULICOUN 210,39 279,10 285,84 379,20 304,77 404,31 294,68 390,92 296,50 393,34

250165330 - CORRECAO DE VAZAMENTOS EM REDE NA RUA DE FOFO DN 150/250 COM PAVIMENTO, NAO

INCLUI O MATERIAL DA RECOMPOSICAO DO PAVIMENTO E HIDRAULICO - (I)UN 193,23 256,34 260,31 345,33 277,13 367,64 268,19 355,78 269,78 357,89

250167 331 - CORRECAO DE VAZAMENTOS EM REDE NA RUA DE FOFO DN 150/250 SEM PAVIMENTO UN 145,66 193,23 197,89 262,52 211,00 279,91 204,01 270,64 205,27 272,31

250168 331 - CORRECAO DE VAZAMENTOS EM REDE NA RUA DE FOFO DN 150/250 SEM PAVIMENTO - (I) UN 133,78 177,47 180,22 239,08 191,86 254,52 185,67 246,31 186,77 247,77

250170000 - CORRECAO DE VAZAMENTOS EM REDE NA RUA DE FOFO DN 300/400 COM PAVIMENTO, NAO

INCLUI O MATERIAL DA RECOMPOSICAO DO PAVIMENTO E HIDRAULICOUN 258,94 343,51 351,81 466,71 375,10 497,61 362,69 481,14 364,93 484,12

250171000 - CORRECAO DE VAZAMENTOS EM REDE NA RUA DE FOFO DN 300/400 COM PAVIMENTO, NAO

INCLUI O MATERIAL DA RECOMPOSICAO DO PAVIMENTO E HIDRAULICO - (I)UN 237,82 315,49 320,38 425,02 341,09 452,49 330,08 437,88 332,03 440,47

250173 000 - CORRECAO DE VAZAMENTOS EM REDE NA RUA DE FOFO DN 300/400 SEM PAVIMENTO UN 242,76 322,05 329,82 437,54 351,66 466,51 340,02 451,07 342,12 453,86

250174 000 - CORRECAO DE VAZAMENTOS EM REDE NA RUA DE FOFO DN 300/400 SEM PAVIMENTO - (I) UN 222,96 295,78 300,36 398,46 319,77 424,21 309,45 410,52 311,28 412,94

250175000 - CORRECAO DE VAZAMENTOS EM REDE ADUTORA FOFO DN ATE 100 COM PAVIMENTO, NAO

INCLUI O MATERIAL DA RECOMPOSICAO DO PAVIMENTO E HIDRAULICOUN 242,76 322,05 329,82 437,54 351,66 466,51 340,02 451,07 342,12 453,86

250176000 - CORRECAO DE VAZAMENTOS EM REDE ADUTORA FOFO DN ATE 100 COM PAVIMENTO, NAO

INCLUI O MTERIAL DA RECOMPOSICAO DO PAVIMENTO E HIDRAULICO - (I)UN 222,96 295,78 300,36 398,46 319,77 424,21 309,45 410,52 311,28 412,94

250177 000 - CORRECAO DE VAZAMENTOS EM REDE ADUTORA FOFO DN ATE 100 SEM PAVIMENTO UN 178,02 236,16 241,87 320,86 257,88 342,10 249,35 330,79 250,89 332,83

250178 000 - CORRECAO DE VAZAMENTOS EM REDE ADUTORA FOFO DN ATE 100 SEM PAVIMENTO - (I) UN 163,50 216,90 220,26 292,20 234,50 311,09 226,93 301,05 228,27 302,82

250179000 - CORRECAO DE VAZAMENTOS EM REDE ADUTORA FOFO DN 150/250 COM PAVIMENTO, NAO

INCLUI O MATERIAL DA RECOMPOSICAO DO PAVIMENTO E HIDRAULICOUN 258,94 343,51 351,81 466,71 375,10 497,61 362,69 481,14 364,93 484,12

250180000 - CORRECAO DE VAZAMENTOS EM REDE ADUTORA FOFO DN 150/250 COM PAVIMENTO, NAO

INCLUI O MATERIAL DA RECOMPOSICAO DO PAVIMENTO E HIDRAULICO - (I)UN 237,82 315,49 320,38 425,02 341,09 452,49 330,08 437,88 332,03 440,47

250181 000 - CORRECAO DE VAZAMENTOS EM REDE ADUTORA FOFO DN 150/250 SEM PAVIMENTO UN 226,58 300,58 307,83 408,37 328,22 435,42 317,35 421,00 319,31 423,60

250182 000 - CORRECAO DE VAZAMENTOS EM REDE ADUTORA FOFO DN 150/250 SEM PAVIMENTO - (I) UN 208,10 276,07 280,34 371,90 298,45 395,92 288,82 383,15 290,53 385,42

250183000 - CORRECAO DE VAZAMENTOS EM REDE ADUTORA FOFO DN 300/600 COM PAVIMENTO, NAO

INCLUI O MATERIAL DA RECOMPOSICAO DO PAVIMENTO E HIDRAULICOUN 404,60 536,74 549,70 729,23 586,10 777,52 566,70 751,78 570,20 756,43

250184000 - CORRECAO DE VAZAMENTOS EM REDE ADUTORA FOFO DN 300/600 COM PAVIMENTO, NAO

INCLUI O MATERIAL DA RECOMPOSICAO DO PAVIMENTO E HIDRAULICO - (I)UN 371,60 492,96 500,60 664,10 532,95 707,01 515,75 684,19 518,80 688,24

250185 332 - CORRECAO DE VAZAMENTOS EM REDE ADUTORA FOFO DN 300/600 SEM PAVIMENTO UN 323,68 429,39 439,76 583,39 468,88 622,02 453,36 601,43 456,16 605,14

250186 332 - CORRECAO DE VAZAMENTOS EM REDE ADUTORA FOFO DN 300/600 SEM PAVIMENTO - (I) UN 297,28 394,37 400,48 531,28 426,36 565,61 412,60 547,36 415,04 550,59

250187000 - CORRECAO DE VAZAMENTOS EM REDE ADUTORA FOFO DN 600/900 COM PAVIMENTO, NAO

INCLUI O MATERIAL DA RECOMPOSICAO DO PAVIMENTO E HIDRAULICOUN 647,36 858,79 879,52 1.166,77 937,76 1.244,03 906,72 1.202,85 912,32 1.210,28

250188000 - CORRECAO DE VAZAMENTOS EM REDE ADUTORA FOFO DN 600/900 COM PAVIMENTO, NAO

INCLUI O MATERIAL DA RECOMPOSICAO DE PAVIMENTO E HIDRAULICO - (I)UN 594,56 788,74 800,96 1.062,55 852,72 1.131,22 825,20 1.094,71 830,08 1.101,18

250189 000 - CORRECAO DE VAZAMENTOS EM REDE ADUTORA FOFO DN 600/900 SEM PAVIMENTO UN 566,44 751,44 769,58 1.020,92 820,54 1.088,53 793,38 1.052,50 798,28 1.059,00

250190 000 - CORRECAO DE VAZAMENTOS EM REDE ADUTORA FOFO DN 600/900 SEM PAVIMENTO - (I) UN 520,24 690,15 700,84 929,73 746,13 989,82 722,05 957,87 726,32 963,54

250200 MANUTENCAO DE REDE

250201334 - AMPLIACAO DE REDE EM RUAS COM PAVIMENTO, NAO INCLUI MATERIAL PARA

RECOMPOSICAO DE PAVIMENTO E HIDRAULICOUN 40,46 53,67 54,97 72,92 58,61 77,75 56,67 75,18 57,02 75,64

250204 333 - AMPLIACAO DE REDE EM RUAS SEM PAVIMENTO UN 34,80 46,17 47,27 62,71 50,40 66,86 48,74 64,66 49,04 65,06

250207 335 - EXECUCAO DE REDE PROVISORIA PARA REMANEJAMENTO UN 17,80 23,61 24,19 32,09 25,79 34,21 24,93 33,07 25,09 33,28

250210 336 - RETIRADA DE REDE PROVISORIA UN 17,80 23,61 24,19 32,09 25,79 34,21 24,93 33,07 25,09 33,28

250213337 - REMANEJAMENTO DE REDES DE DISTRIBUICAO DE AGUA, NAO INCLUI MATERIAL DE

RECOMPOSICAO DE PAVIMENTO E HIDRAULICOUN 105,20 139,56 142,92 189,60 152,39 202,16 147,34 195,46 148,25 196,67

250216356 - EXTENCAO DE REDE DE DISTRIBUICAO DE AGUA, NAO INCLUI MATERIAL DE

RECOMPOSICAO DE PAVIMENTO E HIDRAULICOUN 80,92 107,35 109,94 145,85 117,22 155,50 113,34 150,36 114,04 151,29

250219357 - DESOBSTRUCAO DE REDE DE DISTRIBUICAO DE AGUA, NAO INCLUI MATERIAL DE

RECOMPOSICAO DE PAVIMENTO E HIDRAULICO, SE NECESSARIOUN 202,30 268,37 274,85 364,62 293,05 388,76 283,35 375,89 285,10 378,21

250222358 - ENTRONCAMENTO DE REDE DE DISTRIBUICAO DE AGUA ATE 100 MM COM PAVIEMTACAO,

NAO INCLUI MATERIAL DE RECOMPOSICAO DE PAVIMENTO E HIDRAULICOUN 169,93 225,43 230,87 306,27 246,16 326,56 238,01 315,74 239,48 317,69

250223 000 - ENTRONCAMENTO DE REDE DE DISTRIBUICAO DE AGUA ATE 100 MM SEM PAVIEMTACAO UN 157,79 209,32 214,38 284,40 228,58 303,23 221,01 293,19 222,38 295,01

250225000 - ENTRONCAMENTO DE REDE DN 150 A 250 MM COM PAVIMENTO, NAO INCLUI MATERIAL DA

RECOMPOSICAO DE PAVIMENTO E HIDRAULICOUN 178,02 236,16 241,87 320,86 257,88 342,10 249,35 330,79 250,89 332,83

250228 000 - ENTRONCAMENTO DE REDE DN 150 A 250 MM SEM PAVIMENTO UN 161,84 214,70 219,88 291,69 234,44 311,01 226,68 300,71 228,08 302,57

250231000 - ENTRONCAMENTO DE REDE DN 300 A 400 MM COM PAVIMENTO, NAO INCLUI MATERIAL DE

RECOMPOSICAO DE PAVIMENTO E HIDRAULICOUN 307,50 407,93 417,77 554,21 445,44 590,92 430,69 571,35 433,35 574,88

250234 000 - ENTRONCAMENTO DE REDE DN 300 A 400 MM SEM PAVIMENTO UN 283,22 375,72 384,79 510,46 410,27 544,26 396,69 526,25 399,14 529,50

250237000 - ENTRONCAMENTO DE REDE DN 450 A 600 MM COM PAVIMENTO, NAO INCLUI MATERIAL DA

RECOMPOSICAO DE PAVIMENTO E HIDRAULICOUN 509,80 676,30 692,62 918,83 738,49 979,68 714,04 947,25 718,45 953,10

250240 000 - ENTRONCAMENTO DE REDE DN 450 A 600 MM SEM PAVIMENTO UN 485,52 644,09 659,64 875,08 703,32 933,02 680,04 902,14 684,24 907,71

250243000 - ENTRONCAMENTO DE REDE DN 650 A 800 MM COM PAVIMENTO, NAO INCLUI MATERIAL DE

RECOMPOSICAO DE PAVIMENTO E HIDRAULICOUN 679,73 901,73 923,50 1.225,12 984,65 1.306,24 952,06 1.263,00 957,94 1.270,80

250246 000 - ENTRONCAMENTO DE REDE DN 650 A 800 MM SEM PAVIMENTO UN 647,36 858,79 879,52 1.166,77 937,76 1.244,03 906,72 1.202,85 912,32 1.210,28

Página: 41 de 59

Page 42: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

250249359 - CAPEAMENTO DE REDE DE DISTRIBUICAO DE AGUA, NAO INCLUI MATERIAL PARA

RECOMPOSICAO DE PAVIMENTO E HIDRAULICOUN 118,95 157,80 161,61 214,39 172,31 228,59 166,61 221,02 167,64 222,39

250252000 - SECCIONAMENTO REDE DN 50 ATE 100 PVC COM PAVIMENTO, NAO INCLUI MATERIAL PARA

RECOMPOSICAO DE PAVIMENTO E HIDRAULICOM 51,28 68,03 65,86 87,37 69,51 92,21 67,57 89,64 67,92 90,10

250255 000 - SECCIONAMENTO REDE DN 50 ATE 100 PVC SEM PAVIMENTO M 41,02 54,42 52,69 69,90 55,61 73,77 54,06 71,72 54,34 72,09

250264 ASSENT. DE TUBOS E CONEXOES EM PEAD PP JS TERMOFUSSAO DN 63 mm - AGUA m 5,68 7,54 6,43 8,53 6,62 8,78 6,53 8,66 6,55 8,69

250267 ASSENT. DE TUBOS E CONEXOES EM PEAD PP JS TERMOFUSSAO DN 75 mm - AGUA m 6,71 8,90 7,46 9,90 7,65 10,15 7,56 10,03 7,58 10,06

250270 ASSENT. DE TUBOS E CONEXOES EM PEAD PP JS TERMOFUSSAO DN 110 mm - AGUA m 8,48 11,25 9,25 12,27 9,45 12,54 9,35 12,40 9,37 12,43

250274 ASSENT. DE TUBOS E CONEXOES EM PEAD PP JS TERMOFUSSAO DN 150 A 315 mm - AGUA m 22,51 29,86 23,44 31,10 23,66 31,39 23,54 31,23 23,56 31,25

250284 ASSENT. DE TUBOS E CONEXOES EM PEAD COM JUNTA DE COMPRESSAO DN 63 mm - AGUA m 1,55 2,06 2,30 3,05 2,49 3,30 2,40 3,18 2,42 3,21

250287 ASSENT. DE TUBOS E CONEXOES EM PEAD COM JUNTA DE COMPRESSAO DN 75 mm - AGUA m 1,55 2,06 2,30 3,05 2,49 3,30 2,40 3,18 2,42 3,21

250290 ASSENT. DE TUBOS E CONEXOES EM PEAD COM JUNTA DE COMPRESSAO DN 110 mm - AGUA m 1,60 2,12 2,37 3,14 2,57 3,41 2,47 3,28 2,49 3,30

250300 MANUTENCAO DE RAMAIS

250301286 - DESOBSTRUCAO DE LIGACAO NO PASSEIO COM PAVIMENTO, NAO INCLUI MATERIAL PARA

RECOMPOSICAO DE PAVIMENTO E HIDRAULICOUN 89,74 119,05 115,26 152,90 121,64 161,37 118,25 156,87 118,86 157,68

250304 287 - DESOBSTRUCAO DE LIGACAO NO PASSEIO SEM PAVIMENTO UN 69,23 91,84 88,91 117,95 93,84 124,49 91,22 121,01 91,69 121,64

250307 288 - LEVANTAMENTO/REBAIXAMENTO RAMAL DE AGUA SEM PAVIMENTO UN 76,92 102,04 98,79 131,05 104,27 138,32 101,36 134,46 101,88 135,15

250310289 - LEVANTAMENTO/REBAIXAMENTO RAMAL DE AGUA COM PAVIMENTO, NAO INCLUI

MATERIAL PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICOUN 94,65 125,56 121,81 161,59 128,62 170,63 125,00 165,83 125,65 166,69

250313295 - RESTABELECIMENTO DE LIGACAO PREDIAL DN 1/2" A 3/4", NAO INCLUI MATERIAL PARA

RECOMPOSICAO DE PAVIMENTO E HIDRAULICOUN 89,74 119,05 115,26 152,90 121,64 161,37 118,25 156,87 118,86 157,68

250316296 - RESTABELECIMENTO DE LIGACAO PREDIAL DN 1" A 1.1/2", NAO INCLUI MATERIAL PARA

RECOMPOSICAO D EPAVIMENTO E HIDRAULICOUN 115,38 153,06 148,19 196,59 156,40 207,48 152,03 201,68 152,82 202,73

250319297 - RESTABELECIMENTO DE LIGACAO PREDIAL DN 2", NAO INCLUI MATERIAL PARA

RECOMPOSICAO DE PAVIMENTO E HIDRAULICOUN 128,20 170,07 164,65 218,42 173,78 230,54 168,93 224,10 169,80 225,26

250400 MANUTENCAO DE REGISTRO DE MANOBRA E CAIXA NA REDE DISTRIBUICAO

250401 281 - COLOCACAO DE FILTRO DE HIDROMETRO DE 2" 300M UN 51,28 68,03 65,86 87,37 69,51 92,21 67,57 89,64 67,92 90,10

250404 282 - COLOCACAO DE FILTRO DE HIDROMETRO DE 3" 1100M3 UN 64,10 85,04 82,33 109,22 86,89 115,27 84,46 112,04 84,90 112,63

250407 283 - COLOCACAO DE FILTRO DE HIDROMETRO DE 4" 1800M3 UN 76,92 102,04 98,79 131,05 104,27 138,32 101,36 134,46 101,88 135,15

250410 284 - COLOCACAO DE FILTRO DE HIDROMETRO DE 6" 4000M3 UN 89,74 119,05 115,26 152,90 121,64 161,37 118,25 156,87 118,86 157,68

250413 285 - COLOCACAO DE FILTRO DE HIDROMETRO UN 38,46 51,02 49,40 65,53 52,13 69,16 50,68 67,23 50,94 67,58

250416 311 - INSTALACAO DE LIMITADOR DE CONSUMO UN 25,64 34,01 32,93 43,68 34,76 46,11 33,79 44,83 33,96 45,05

250419 312 - RETIRADA DE LIMITADOR DE CONSUMO UN 25,64 34,01 32,93 43,68 34,76 46,11 33,79 44,83 33,96 45,05

250422 313 - SUBSTITUICAO DE REGISTRO NO RAMAL, NAO INCLUI MATERIAL HIDRAULICO UN 14,92 19,79 20,84 27,65 22,33 29,62 21,53 28,56 21,68 28,76

250425 314 - SUBSTITUICAO DE TUBETE DE HIDROMETRO, NAO INCLUI MATERIAL HIDRAULICO UN 12,62 16,74 17,63 23,39 18,89 25,06 18,22 24,17 18,34 24,33

250428 315 - DESCARGA NO RAMAL, SEM FORNECIMENTO DE MATERIAL HIDRAULICO UN 22,95 30,45 32,06 42,53 34,35 45,57 33,13 43,95 33,35 44,24

250431 316 - CAPEAMENTO NO RAMAL, SEM FORNECIMENTO DE MATERIAL HIDRAULICO UN 11,48 15,23 16,03 21,27 17,18 22,79 16,57 21,98 16,68 22,13

250434 317 - OUTROS SERVICOS DE RAMAIS, SEM FORNECIMENTO DE MATERIAIS UN 51,28 68,03 65,86 87,37 69,51 92,21 67,57 89,64 67,92 90,10

250437 338 - REPARO NA TAMPA DO REGISTRO DE MANOBRA, SEM FORNECIMENTO DE MATERIAIS UN 32,37 42,94 43,98 58,34 46,89 62,20 45,34 60,15 45,62 60,52

250440339 - SUBSTITUICAO DE TAMPA DE CONCRETO NO REGISTRO DE MANOBRA COM PAVIMENTO,

SEM FORNECIMENTO DE MATERIAIS PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICOUN 64,74 85,88 87,95 116,67 93,78 124,41 90,67 120,28 91,23 121,03

250441000 - SUBSTITUICAO DE TAMPA DE CONCRETO NO REGISTRO DE MANOBRA SEM PAVIMENTO,

SEM FORNCIMENTO DE MATERIAISUN 48,55 64,41 65,96 87,50 70,33 93,30 68,00 90,21 68,42 90,77

250443 340 - LIMPEZA DE CAIXA DE PROTECAO DO REGISTRO DE MANOBRA COM PAVIMENTO UN 60,69 80,51 82,46 109,39 87,92 116,63 85,01 112,77 85,53 113,46

250444 000 - LIMPEZA DE CAIXA DE PROTECAO DO REGISTRO DE MANOBRA SEM PAVIMENTO UN 40,46 53,67 54,97 72,92 58,61 77,75 56,67 75,18 57,02 75,64

250445 000 - SUBSTITUICAO APERTO DE GAXETA EM REGISTRO DE MANOBRA ATE 100 MM UN 56,41 74,83 72,45 96,11 76,46 101,43 74,33 98,61 74,71 99,11

250447 341 - SUBSTITUICAO APERTO DE GAXETA EM REGISTRO DE MANOBRA ACIMA DE 100 MM UN 69,23 91,84 88,91 117,95 93,84 124,49 91,22 121,01 91,69 121,64

250449 000 - SUBSTITUICAO DE HASTE E/OU GAVETA DE REGISTRO DE MANOBRA ATE DN 100MM UN 73,33 97,28 94,18 124,94 99,40 131,86 96,63 128,19 97,13 128,85

250451 342 - SUBSTITUICAO DE HASTE E/OU GAVETA DE REGISTRO DE MANOBRA ATE DN 200MM UN 141,61 187,86 192,40 255,24 205,14 272,14 198,35 263,13 199,57 264,75

250453 343 - SUBSTITUICAO DO REGISTRO DE MANOBRA ATE DN 100MM COM PAVIMENTO UN 157,79 209,32 214,38 284,40 228,58 303,23 221,01 293,19 222,38 295,01

250454 000 - SUBSTITUICAO DO REGISTRO DE MANOBRA ATE DN 100MM SEM PAVIMENTO UN 145,66 193,23 197,89 262,52 211,00 279,91 204,01 270,64 205,27 272,31

250455 344 - SUBSTITUICAO DO REGISTRO DE MANOBRA DN 150 E 200MM COM PAVIMENTO UN 166,70 221,14 226,48 300,45 241,47 320,33 233,48 309,73 234,92 311,64

250456 000 - SUBSTITUICAO DO REGISTRO DE MANOBRA DN 150 E 200MM SEM PAVIMENTO UN 155,37 206,11 211,08 280,02 225,06 298,56 217,61 288,68 218,96 290,47

250457 000 - SUBSTITUICAO DO REGISTRO DE MANOBRA DN 250MM COM PAVIMENTO UN 218,48 289,84 296,84 393,79 316,49 419,86 306,02 405,97 307,91 408,47

250459 000 - SUBSTITUICAO DO REGISTRO DE MANOBRA DN 250MM SEM PAVIMENTO UN 202,30 268,37 274,85 364,62 293,05 388,76 283,35 375,89 285,10 378,21

250461 000 - SUBSTITUICAO DO REGISTRO DE MANOBRA 300 A 400 MM COM PAVIMENTO UN 347,96 461,60 472,74 627,14 504,05 668,67 487,36 646,53 490,37 650,52

250463 000 - SUBSTITUICAO DO REGISTRO DE MANOBRA 300 A 400 MM SEM PAVIMENTO UN 323,68 429,39 439,76 583,39 468,88 622,02 453,36 601,43 456,16 605,14

250465 000 - SUBSTITUICAO DO REGISTRO DE MANOBRA 450 A 600 MM COM PAVIMENTO UN 598,81 794,38 813,56 1.079,27 867,43 1.150,73 838,72 1.112,65 843,90 1.119,52

250467 000 - SUBSTITUICAO DO REGISTRO DE MANOBRA 450 A 600 MM SEM PAVIMENTO UN 566,44 751,44 769,58 1.020,92 820,54 1.088,53 793,38 1.052,50 798,28 1.059,00

250469 345 - FECHAMENTO DO REGISTRO DE MANOBRA DO SETOR UN 17,21 22,83 24,05 31,90 25,76 34,17 24,85 32,97 25,01 33,18

250470 000 - FECHAMENTO E ABERTURA DO REGISTRO DE MANOBRA ATE DN 100 MM UN 4,59 6,09 6,41 8,50 6,87 9,11 6,63 8,80 6,67 8,85

250471 346 - ABERTURA DO REGISTRO DE MANOBRA DO SETOR UN 14,92 19,79 20,84 27,65 22,33 29,62 21,53 28,56 21,68 28,76

250472 000 - FECHAMENTO E ABERTURA DO REGISTRO DE MANOBRA ACIMA DN 150 MM UN 6,89 9,14 9,62 12,76 10,31 13,68 9,94 13,19 10,01 13,28

250473 347 - MANOBRA DO REGISTRO PARA REDISTRIBUICAO UN 2,30 3,05 3,21 4,26 3,44 4,56 3,31 4,39 3,34 4,43

250475 348 - MANOBRA DO REGISTRO PARA PITOMETRIA UN 102,56 136,06 131,72 174,74 139,02 184,42 135,14 179,28 135,84 180,21

250477 349 - MANOBRA DO REGISTRO PARA VERIFICACAO DE SETOR MANOBRA UN 19,51 25,88 27,25 36,15 29,20 38,74 28,16 37,36 28,35 37,61

250479 350 - COLOCACAO DE HIDRANTE UN 303,45 402,56 412,28 546,93 439,58 583,15 425,03 563,84 427,65 567,32

250481 351 - RETIRADA DE HIDRANTE UN 262,99 348,88 357,31 474,01 380,97 505,39 368,36 488,67 370,63 491,68

250483 352 - SUBSTITUICAO/APERTO DE GAXETA EM HIDRANTE UN 20,51 27,21 26,34 34,94 27,80 36,88 27,03 35,86 27,17 36,04

250485 353 - SUBSTITUICAO DE VALVULAS / HASTE DE HIDRANTE UN 76,92 102,04 98,79 131,05 104,27 138,32 101,36 134,46 101,88 135,15

250487 354 - COLOCACAO DE VENTOSA UN 242,76 322,05 329,82 437,54 351,66 466,51 340,02 451,07 342,12 453,86

250489 355 - CONSERTO DE VENTOSA UN 69,23 91,84 88,91 117,95 93,84 124,49 91,22 121,01 91,69 121,64

250491 376 - COLOCACAO DE TOMADA PITOMETRICA UN 141,61 187,86 192,40 255,24 205,14 272,14 198,35 263,13 199,57 264,75

250500 SUBSTITUICAO DE RAMAL

250501 277 - SUBSTITUICAO DE RAMAL NO PASSEIO COM PAVIMENTO EM PARALELO UN 115,16 152,77 148,15 196,54 156,42 207,51 152,03 201,68 152,82 202,73

250504 278 - SUBSTITUICAO DE RAMAL NO PASSEIO SEM PAVIMENTO EM PARALELO UN 102,34 135,76 131,69 174,70 139,04 184,45 135,14 179,28 135,84 180,21

250507 279 - SUBSTITUICAO DE RAMAL NO RUA COM PAVIMENTO EM PARALELO UN 194,67 258,25 263,80 349,96 281,15 372,97 271,91 360,72 273,57 362,92

250510 280 - SUBSTITUICAO DE RAMAL NO RUA SEM PAVIMENTO UN 141,61 187,86 192,40 255,24 205,14 272,14 198,35 263,13 199,57 264,75

250513 385 - SUBSTITUICAO DE LIGACAO DE AGUA UN 100,00 132,66 128,43 170,38 135,54 179,81 131,76 174,79 132,44 175,69

250600 AMPLIACAO DIAMETRO DE RAMAL

250601 306 - AMPLIACAO DE RAMAL un 175,60 232,95 238,57 316,49 254,37 337,45 245,95 326,28 247,47 328,29

250604 307 - AMPLIACAO DE RAMAL DE 3/4" un 82,05 108,85 105,38 139,80 111,22 147,54 108,11 143,42 108,67 144,16

250607 308 - AMPLIACAO DE RAMAL DE 1" un 175,60 232,95 238,57 316,49 254,37 337,45 245,95 326,28 247,47 328,29

250610 309 - AMPLIACAO DE RAMAL DE 1.1/2" un 175,60 232,95 238,57 316,49 254,37 337,45 245,95 326,28 247,47 328,29

250613 310 - AMPLIACAO DE RAMAL DE 2" un 175,60 232,95 238,57 316,49 254,37 337,45 245,95 326,28 247,47 328,29

250700 SERVICOS TÉCNICOS / COLETA E TRANSPORTE DE AMOSTRAS

250710 377 - DESINFECCAO DE REDE UN 121,38 161,02 164,91 218,77 175,83 233,26 170,01 225,54 171,06 226,93

250713 378 - LAVAGEM DE REDE COM ABERTURA DE HIDRANTE UN 20,75 27,53 28,89 38,33 30,94 41,05 29,85 39,60 30,05 39,86

250716 379 - LAVAGEM DE REDE COM RETIRADA DE CAP/SEC PVC ATE 100MM UN 116,06 153,97 162,19 215,16 173,74 230,48 167,59 222,32 168,68 223,77

250719 380 - LAVAGEM DE REDE COM RETIRADA DE CAP/SEC PVC 150-200MM UN 208,91 277,14 291,94 387,29 312,73 414,87 301,66 400,18 303,62 402,78

250722 381 - LAVAGEM DE REDE COM RETIRADA DE CAP/SEC PVC 100-200MM UN 246,98 327,64 345,14 457,86 369,71 490,46 356,63 473,11 358,94 476,17

250725 382 - LOCAL POSICAO DE HIDRANTE UN 31,76 42,13 42,72 56,67 45,47 60,32 44,00 58,37 44,27 58,73

250728 383 - LOCAL POSICAO DE REGISTRO DE MANOBRA UN 39,71 52,68 53,40 70,84 56,84 75,40 55,01 72,98 55,34 73,41

250731 384 - SONDAGEM PARA LOCALIZACAO DE REDE PARA SUA ATUALIZACAO CADASTRAL UN 77,82 103,24 104,66 138,84 111,40 147,78 107,81 143,02 108,46 143,88

250734 386 - ESTUDO DE VIABILIDADE PARA ABASTECIMENTO DE AGUA UN 79,41 105,35 106,80 141,68 113,67 150,79 110,01 145,94 110,67 146,81

250737 388 - PESQUISA DE VAZAMENTO INTERNO UN 33,35 44,24 44,86 59,51 47,74 63,33 46,20 61,29 46,48 61,66

250740 000 - COLETA E TRANSPORTE DE AMOSTRA - C/MOTO km 0,70 0,93 0,96 1,27 1,02 1,35 0,99 1,31 0,99 1,31

250743 000 - COLETA E TRANSPORTE DE AMOSTRA - C/FIAT (UNO) km 1,24 1,64 1,49 1,98 1,55 2,06 1,52 2,02 1,53 2,03

250746 000 - COLETA E TRANSPORTE DE AMOSTRA - C/SAVEIRO km 1,42 1,88 1,67 2,22 1,74 2,31 1,70 2,26 1,71 2,27

250749 000 - COLETA E TRANSPORTE DE AMOSTRA - C/GOL km 1,24 1,64 1,49 1,98 1,56 2,07 1,52 2,02 1,53 2,03

250752 000 - COLETA E TRANSPORTE DE AMOSTRA - C/PICK UP km 1,40 1,86 1,65 2,19 1,71 2,27 1,68 2,23 1,69 2,24

250900 PESQUISAS E VERIFICACOES

250901 361 - VERIFICACAO VAZAMENTO NO IMOVEL E ATUALIZACAO CADASTRAL UN 44,12 58,53 56,75 75,28 59,93 79,50 58,23 77,25 58,54 77,66

250904362 - VERIFICACAO VAZAMENTO NO IMOVEL SUBSTITUICAO DE HIDROMETRO E ATUALIZACAO

CADASTRALUN 415,20 550,80 534,16 708,62 564,00 748,20 548,08 727,08 550,96 730,90

250907 363 - VERIFICACAO BAIXA DE PRESSAO UN 18,31 24,29 25,49 33,82 27,30 36,22 26,34 34,94 26,51 35,17

250910 364 - VERIFICACAO FALTA DE AGUA - IMOVEL (HIDROMETRO) un 13,77 18,27 19,24 25,52 20,61 27,34 19,88 26,37 20,01 26,55

250913 365 - VERIFICACAO FALTA DE AGUA NA RUA SEM PAVIMENTO UN 13,77 18,27 19,24 25,52 20,61 27,34 19,88 26,37 20,01 26,55

250914 000 - VERIFICACAO FALTA DE AGUA NA RUA COM PAVIMENTO UN 15,30 20,30 21,37 28,35 22,90 30,38 22,09 29,30 22,23 29,49

250916 366 - VERIFICACAO PREVIA DE VAZAMENTO NA RUA UN 11,48 15,23 16,03 21,27 17,18 22,79 16,57 21,98 16,68 22,13

250919 367 - VERIFICACAO DO FUNCIONAMENTO DA VENTOSA UN 22,95 30,45 32,06 42,53 34,35 45,57 33,13 43,95 33,35 44,24

250922 368 - VERIFICACAO DA QUALIDADE DA AGUA NO IMOVEL UN 29,44 39,06 38,57 51,17 40,86 54,20 39,64 52,59 39,86 52,88

250925 369 - PEDIDO DE VERIFICACAO DA REDE DE AGUA UN 44,16 58,58 57,86 76,76 61,29 81,31 59,46 78,88 59,79 79,32

250928 370 - VERIFICACAO DO BAIXO CONSUMO UN 12,21 16,20 17,00 22,55 18,20 24,14 17,56 23,30 17,68 23,45

Página: 42 de 59

Page 43: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

250931 371 - VERIFICACAO DE INDICIO DE VAZAMENTO INFORMACAO POR GEOFONAMENTO UN 44,12 58,53 56,75 75,28 59,93 79,50 58,23 77,25 58,54 77,66

251000EXECUCAO DE CONSERTOS EM RAMAL,COLETOR,INTERCEPTOR E LINHA DE RECALQUE

(produtividade das equipes para (I)=80%, p/RMS=70%)

251001392 - CONSERTO COLETOR PVC DN <= 200MM H= 2MT COM PAVIMENTO, NAO INCLUI MATERIAL

PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICOUN 597,78 793,01 787,51 1.044,71 835,12 1.107,87 809,78 1.074,25 814,40 1.080,38

259901392 - CONSERTO COLETOR PVC DN <= 200MM H= 2MT COM PAVIMENTO, NAO INCLUI MATERIAL

PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICO (MRR / RMS)UN 602,49 799,26 794,51 1.054,00 842,64 1.117,85 816,95 1.083,77 821,61 1.089,95

251002392 - CONSERTO COLETOR PVC DN <= 200MM H= 2MT COM PAVIMENTO, NAO INCLUI MATERIAL

PARA RECOMPOSICA DE PAVIMENTO E HIDRAULICO (I)UN 429,79 570,16 566,19 751,11 600,39 796,48 582,18 772,32 585,50 776,72

251004 393 - CONSERTO COLETOR PVC DN <= 200MM H= 2MT SEM PAVIMENTO UN 448,34 594,77 590,63 783,53 626,34 830,90 607,33 805,68 610,80 810,29

259004 393 - CONSERTO COLETOR PVC DN <= 200MM H= 2MT SEM PAVIMENTO (MRR / RMS) UN 451,87 599,45 595,88 790,49 631,98 838,38 612,71 812,82 616,21 817,46

251005 393 - CONSERTO COLETOR PVC DN <= 200MM H= 2MT SEM PAVIMENTO (I) UN 322,64 428,01 425,03 563,84 450,70 597,90 437,03 579,76 439,52 583,07

251007000 - CONSERTO COLETOR PVC DE 100 ATE 150 MM COM PAVIMENTO, NAO INCLUI MATERIAL

PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICOUN 561,10 744,36 739,19 980,61 783,87 1.039,88 760,09 1.008,34 764,42 1.014,08

259007000 - CONSERTO COLETOR PVC DE 100 ATE 150 MM COM PAVIMENTO, NAO INCLUI MATERIAL

PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICO (MRR / RMS)UN 565,52 750,22 745,75 989,31 790,94 1.049,26 766,82 1.017,26 771,19 1.023,06

251008000 - CONSERTO COLETOR PVC DE 100 ATE 150 MM COM PAVIMENTO, NAO INCLUI MATERIAL

PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICO (I)UN 402,71 534,24 530,51 703,77 562,56 746,29 545,49 723,65 548,60 727,77

251010 000 - CONSERTO COLETOR PVC DE 100 ATE 150 MM SEM PAVIMENTO UN 486,38 645,23 640,75 850,02 679,48 901,40 658,86 874,04 662,62 879,03

259010 000 - CONSERTO COLETOR PVC DE 100 ATE 150 MM SEM PAVIMENTO (MRR / RMS) UN 490,21 650,31 646,44 857,57 685,61 909,53 664,70 881,79 668,49 886,82

251011 000 - CONSERTO COLETOR PVC DE 100 ATE 150 MM SEM PAVIMENTO (I) UN 349,72 463,94 460,71 611,18 488,54 648,10 473,72 628,44 476,42 632,02

251013000 - CONSERTO COLETOR PVC DE 200 ATE 250 MM COM PAVIMENTO, NAO INCLUI MATERIAL

PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICOUN 597,78 793,01 787,51 1.044,71 835,12 1.107,87 809,78 1.074,25 814,40 1.080,38

259013000 - CONSERTO COLETOR PVC DE 200 ATE 250 MM COM PAVIMENTO, NAO INCLUI MATERIAL

PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICO (MRR / RMS)UN 602,49 799,26 794,51 1.054,00 842,64 1.117,85 816,95 1.083,77 821,61 1.089,95

251014000 - CONSERTO COLETOR PVC DE 200 ATE 250 MM COM PAVIMENTO, NAO INCLUI MATERIAL

PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICO (I)UN 429,79 570,16 566,19 751,11 600,39 796,48 582,18 772,32 585,50 776,72

251016 000 - CONSERTO COLETOR PVC DE 200 ATE 250 MM SEM PAVIMENTO UN 523,06 693,89 689,07 914,12 730,73 969,39 708,55 939,96 712,60 945,34

259016 000 - CONSERTO COLETOR PVC DE 200 ATE 250 MM SEM PAVIMENTO (MRR / RMS) UN 527,18 699,36 695,19 922,24 737,31 978,12 714,83 948,29 718,91 953,71

251017 000 - CONSERTO COLETOR PVC DE 200 ATE 250 MM SEM PAVIMENTO (I) UN 376,80 499,86 496,38 658,50 526,37 698,28 510,40 677,10 513,31 680,96

251019000 - CONSERTO COLETOR PVC DE 300 ATE 400 MM COM PAVIMENTO, NAO INCLUI MATERIAL

PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICOUN 747,23 991,28 984,39 1.305,89 1.043,90 1.384,84 1.012,22 1.342,81 1.018,00 1.350,48

259019000 - CONSERTO COLETOR PVC DE 300 ATE 400 MM COM PAVIMENTO, NAO INCLUI MATERIAL

PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICO (MRR / RMS)UN 753,12 999,09 993,14 1.317,50 1.053,31 1.397,32 1.021,19 1.354,71 1.027,02 1.362,44

251020000 - CONSERTO COLETOR PVC DE 300 ATE 400 MM COM PAVIMENTO, NAO INCLUI MATERIAL

PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICO (I)UN 538,12 713,87 708,90 940,43 751,72 997,23 728,92 966,99 733,07 972,49

251022 000 - CONSERTO COLETOR PVC DE 300 ATE 400 MM SEM PAVIMENTO UN 672,51 892,15 885,95 1.175,30 939,51 1.246,35 911,00 1.208,53 916,20 1.215,43

259022 000 - CONSERTO COLETOR PVC DE 300 ATE 400 MM SEM PAVIMENTO (MRR / RMS) UN 677,80 899,17 893,82 1.185,74 947,97 1.257,58 919,07 1.219,24 924,31 1.226,19

251023 000 - CONSERTO COLETOR PVC DE 300 ATE 400 MM SEM PAVIMENTO (I) UN 483,95 642,01 637,54 845,76 676,05 896,85 655,55 869,65 659,29 874,61

251025394 - CONSERTO COLETOR CERAMICO ATE 150 MM COM PAVIMENTO, NAO INCLUI MATERIAL

PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICOUN 672,51 892,15 885,95 1.175,30 939,51 1.246,35 911,00 1.208,53 916,20 1.215,43

259025394 - CONSERTO COLETOR CERAMICO ATE 150 MM COM PAVIMENTO, NAO INCLUI MATERIAL

PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICO (MRR / RMS)UN 677,80 899,17 893,82 1.185,74 947,97 1.257,58 919,07 1.219,24 924,31 1.226,19

251026394 - CONSERTO COLETOR CERAMICO ATE 150 MM COM PAVIMENTO, NAO INCLUI MATERIAL

PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICO (I)UN 483,95 642,01 637,54 845,76 676,05 896,85 655,55 869,65 659,29 874,61

251028 395 - CONSERTO COLETOR CERAMICO ATE 150 MM SEM PAVIMENTO UN 448,34 594,77 590,63 783,53 626,34 830,90 607,33 805,68 610,80 810,29

259028 395 - CONSERTO COLETOR CERAMICO ATE 150 MM SEM PAVIMENTO (MRR / RMS) UN 451,87 599,45 595,88 790,49 631,98 838,38 612,71 812,82 616,21 817,46

251029 395 - CONSERTO COLETOR CERAMICO ATE 150 MM SEM PAVIMENTO (I) UN 322,64 428,01 425,03 563,84 450,70 597,90 437,03 579,76 439,52 583,07

251031000 - CONSERTO COLETOR CERAMICO DE 150 ATE 200 MM COM PAVIMENTO, NAO INCLUI

MATERIAL PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICOUN 702,40 931,80 925,33 1.227,54 981,27 1.301,75 951,49 1.262,25 956,92 1.269,45

259931000 - CONSERTO COLETOR CERAMICO DE 150 ATE 200 MM COM PAVIMENTO, NAO INCLUI

MATERIAL PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICO (MRR / RMS)UN 707,93 939,14 933,55 1.238,45 990,11 1.313,48 959,91 1.273,42 965,39 1.280,69

251032000 - CONSERTO COLETOR CERAMICO DE 150 ATE 200 MM COM PAVIMENTO, NAO INCLUI

MATERIAL PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICO (I)UN 505,15 670,13 665,46 882,80 705,66 936,13 684,26 907,74 688,16 912,91

251034 000 - CONSERTO COLETOR CERAMICO DE 150 ATE 200 MM SEM PAVIMENTO UN 567,89 753,36 748,14 992,48 793,36 1.052,47 769,29 1.020,54 773,68 1.026,36

259934 000 - CONSERTO COLETOR CERAMICO DE 150 ATE 200 MM SEM PAVIMENTO (MRR / RMS) UN 572,37 759,31 754,78 1.001,29 800,51 1.061,96 776,10 1.029,57 780,53 1.035,45

251035 000 - CONSERTO COLETOR CERAMICO DE 150 ATE 200 MM SEM PAVIMENTO (I) UN 408,59 542,04 538,27 714,07 570,78 757,20 553,47 734,23 556,62 738,41

251037396 - CONSERTO COLETOR CERAMICO DE 200 ATE 250 MM COM PAVIMENTO, NAO INCLUI

MATERIAL PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICOUN 747,23 991,28 984,39 1.305,89 1.043,90 1.384,84 1.012,22 1.342,81 1.018,00 1.350,48

259937396 - CONSERTO COLETOR CERAMICO DE 200 ATE 250 MM COM PAVIMENTO, NAO INCLUI

MATERIAL PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICO (MRR / RMS)UN 753,12 999,09 993,14 1.317,50 1.053,31 1.397,32 1.021,19 1.354,71 1.027,02 1.362,44

251038396 - CONSERTO COLETOR CERAMICO DE 200 ATE 250 MM COM PAVIMENTO, NAO INCLUI

MATERIAL PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICO (I)UN 538,12 713,87 708,90 940,43 751,72 997,23 728,92 966,99 733,07 972,49

251040 397 - CONSERTO COLETOR CERAMICO DE 200 ATE 250 MM SEM PAVIMENTO UN 597,78 793,01 787,51 1.044,71 835,12 1.107,87 809,78 1.074,25 814,40 1.080,38

259040 397 - CONSERTO COLETOR CERAMICO DE 200 ATE 250 MM SEM PAVIMENTO (MRR / RMS UN 602,49 799,26 794,51 1.054,00 842,64 1.117,85 816,95 1.083,77 821,61 1.089,95

251041 397 - CONSERTO COLETOR CERAMICO DE 200 ATE 250 MM SEM PAVIMENTO (I) UN 429,79 570,16 566,19 751,11 600,39 796,48 582,18 772,32 585,50 776,72

251043398 - CONSERTO COLETOR CERAMICO DE 300 ATE 375 MM COM PAVIMENTO, NAO INCLUI

MATERIAL PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICOUN 1.046,12 1.387,78 1.378,15 1.828,25 1.461,46 1.938,77 1.417,11 1.879,94 1.425,19 1.890,66

259043398 - CONSERTO COLETOR CERAMICO DE 300 ATE 375 MM COM PAVIMENTO, NAO INCLUI

MATERIAL PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICO (MRR / RMS)UN 1.054,36 1.398,71 1.390,39 1.844,49 1.474,63 1.956,24 1.429,66 1.896,59 1.437,82 1.907,41

251044398 - CONSERTO COLETOR CERAMICO DE 300 ATE 375 MM COM PAVIMENTO, NAO INCLUI

MATERIAL PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICO (I)UN 752,42 998,16 991,22 1.314,95 1.051,09 1.394,38 1.019,21 1.352,08 1.025,02 1.359,79

251046 399 - CONSERTO COLETOR CERAMICO DE 300 ATE 375 MM SEM PAVIMENTO UN 747,23 991,28 984,39 1.305,89 1.043,90 1.384,84 1.012,22 1.342,81 1.018,00 1.350,48

259046 399 - CONSERTO COLETOR CERAMICO DE 300 ATE 375 MM SEM PAVIMENTO (MRR / RMS) UN 753,12 999,09 993,14 1.317,50 1.053,31 1.397,32 1.021,19 1.354,71 1.027,02 1.362,44

251047 399 - CONSERTO COLETOR CERAMICO DE 300 ATE 375 MM SEM PAVIMENTO (I) UN 538,12 713,87 708,90 940,43 751,72 997,23 728,92 966,99 733,07 972,49

251049000 - CONSERTO COLETOR CERAMICO DE 400 ATE 500 MM COM PAVIMENTO, NAO INCLUI

MATERIAL PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICOUN 1.195,57 1.586,04 1.575,02 2.089,42 1.670,24 2.215,74 1.619,55 2.148,50 1.628,79 2.160,75

259049000 - CONSERTO COLETOR CERAMICO DE 400 ATE 500 MM COM PAVIMENTO, NAO INCLUI

MATERIAL PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICOUN 1.204,98 1.598,53 1.589,02 2.107,99 1.685,29 2.235,71 1.633,90 2.167,53 1.643,22 2.179,90

251050000 - CONSERTO COLETOR CERAMICO DE 400 ATE 500 MM COM PAVIMENTO, NAO INCLUI

MATERIAL PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICO (I)UN 859,58 1.140,32 1.132,38 1.502,22 1.200,78 1.592,95 1.164,35 1.544,63 1.170,99 1.553,44

251052 000 - CONSERTO COLETOR CERAMICO DE 400 ATE 500 MM SEM PAVIMENTO UN 896,68 1.189,54 1.181,27 1.567,07 1.252,68 1.661,81 1.214,66 1.611,37 1.221,59 1.620,56

259052 000 - CONSERTO COLETOR CERAMICO DE 400 ATE 500 MM SEM PAVIMENTO (MRR / RMS) UN 903,74 1.198,90 1.191,76 1.580,99 1.263,97 1.676,78 1.225,42 1.625,64 1.232,42 1.634,93

251053 000 - CONSERTO COLETOR CERAMICO DE 400 ATE 500 MM SEM PAVIMENTO (I) UN 645,27 856,02 850,06 1.127,69 901,41 1.195,81 874,06 1.159,53 879,05 1.166,15

251055400 - CONSERTO INTERCEPTOR CERAMICO OU CONCRETO 400 A 1200 MM COM PAVIMENTO, NAO

INCLUI MATERIAL PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICOUN 5.380,06 7.137,19 7.087,61 9.402,42 7.516,08 9.970,83 7.287,98 9.668,23 7.329,56 9.723,39

251056400 - CONSERTO INTERCEPTOR CERAMICO OU CONCRETO 400 A 1200 MM COM PAVIMENTO, NAO

INCLUI MATERIAL PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICO (I)UN 3.870,44 5.134,53 5.098,79 6.764,05 5.406,79 7.172,65 5.242,77 6.955,06 5.272,68 6.994,74

251057 401 - CONSERTO RAMAL PREDIAL DE ESGOTO UN 373,62 495,64 492,20 652,95 521,95 692,42 506,11 671,41 509,00 675,24

251058 401 - CONSERTO RAMAL PREDIAL DE ESGOTO (I) UN 268,47 356,15 353,67 469,18 375,04 497,53 363,66 482,43 365,73 485,18

251059000 - CONSERTO RAMAL PREDIAL DE ESGOTO PVC 100 MM COM PAVIMENTO, NAO INCLUI

MATERIAL PARA RECOMOSICAO DE PAVIMENTO E HIDRAULICOUN 225,63 299,32 289,78 384,42 305,84 405,73 297,31 394,41 298,85 396,45

251060000 - CONSERTO RAMAL PREDIAL DE ESGOTO PVC 100 MM COM PAVIMENTO, NAO INCLUI

MATERIAL PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICO (I)UN 187,17 248,30 240,39 318,90 253,71 336,57 246,63 327,18 247,91 328,88

251061 000 - CONSERTO RAMAL PREDIAL DE ESGOTO PVC 100 MM SEM PAVIMENTO UN 169,22 224,49 217,34 288,32 229,38 304,30 222,98 295,81 224,14 297,34

251062 000 - CONSERTO RAMAL PREDIAL DE ESGOTO PVC 100 MM SEM PAVIMENTO (I) UN 140,51 186,40 180,46 239,40 190,46 252,66 185,14 245,61 186,10 246,88

251063000 - CONSERTO RAMAL PREDIAL DE ESGOTO PVC 125 MM COM PAVIMENTO, NAO INCLUI

MATERIAL PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICOUN 225,63 299,32 289,78 384,42 305,84 405,73 297,31 394,41 298,85 396,45

251064000 - CONSERTO RAMAL PREDIAL DE ESGOTO PVC 125 MM COM PAVIMENTO, NAO INCLUI

MATERIAL PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICO (I)UN 187,17 248,30 240,39 318,90 253,71 336,57 246,63 327,18 247,91 328,88

251065 000 - CONSERTO RAMAL PREDIAL DE ESGOTO PVC 125 MM SEM PAVIMENTO UN 169,22 224,49 217,34 288,32 229,38 304,30 222,98 295,81 224,14 297,34

251066 000 - CONSERTO RAMAL PREDIAL DE ESGOTO PVC 125 MM SEM PAVIMENTO (I) UN 140,51 186,40 180,46 239,40 190,46 252,66 185,14 245,61 186,10 246,88

251067000 - CONSERTO RAMAL PREDIAL DE ESGOTO PVC 150 MM COM PAVIMENTO, NAO INCLUI

MATERIAL PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICOUN 373,62 495,64 492,20 652,95 521,95 692,42 506,11 671,41 509,00 675,24

251068000 - CONSERTO RAMAL PREDIAL DE ESGOTO PVC 150 MM COM PAVIMENTO, NAO INCLUI

MATERIAL PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICO (I)UN 268,47 356,15 353,67 469,18 375,04 497,53 363,66 482,43 365,73 485,18

251069 000 - CONSERTO RAMAL PREDIAL DE ESGOTO PVC 150 MM SEM PAVIMENTO UN 298,89 396,51 393,76 522,36 417,56 553,94 404,89 537,13 407,20 540,19

251070 000 - CONSERTO RAMAL PREDIAL DE ESGOTO PVC 150 MM SEM PAVIMENTO (I) UN 215,48 285,86 283,87 376,58 301,02 399,33 291,89 387,22 293,55 389,42

251071000 - CONSERTO RAMAL PREDIAL DE ESGOTO PVC 200 MM COM PAVIMENTO, NAO INCLUI

MATERIAL PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICOUN 448,34 594,77 590,63 783,53 626,34 830,90 607,33 805,68 610,80 810,29

251072000 - CONSERTO RAMAL PREDIAL DE ESGOTO PVC 200 MM COM PAVIMENTO NAO INCLUI

MATERIAL PARA RECOMPOSICAO DE PAVIMENTO E HIDRAULICOUN 322,64 428,01 425,03 563,84 450,70 597,90 437,03 579,76 439,52 583,07

251073 000 - CONSERTO RAMAL PREDIAL DE ESGOTO PVC 200 MM SEM PAVIMENTO UN 523,06 693,89 689,07 914,12 730,73 969,39 708,55 939,96 712,60 945,34

251074 000 - CONSERTO RAMAL PREDIAL DE ESGOTO PVC 200 MM SEM PAVIMENTO - (I) UN 376,80 499,86 496,38 658,50 526,37 698,28 510,40 677,10 513,31 680,96

251075000 - CONSERTO RAMAL PREDIAL DE ESGOTO CERAMICO ATE 200 MM COM PAVIMENTO, NAO

INCLUI MATERIAL PARA RECOMPOSICAO DO PAVIMENTO E HIDRAULICOUN 672,51 892,15 885,95 1.175,30 939,51 1.246,35 911,00 1.208,53 916,20 1.215,43

Página: 43 de 59

Page 44: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

251076000 - CONSERTO RAMAL PREDIAL DE ESGOTO CERAMICO ATE 200 MM COM PAVIMENTO, NAO

INCLUI MATERIAL PARA RECOMPOSICAO DO PAVIMENTO E HIDRAULICO (I)UN 483,95 642,01 637,54 845,76 676,05 896,85 655,55 869,65 659,29 874,61

251077 000 - CONSERTO RAMAL PREDIAL DE ESGOTO CERAMICO ATE 200 MM SEM PAVIMENTO UN 523,06 693,89 689,07 914,12 730,73 969,39 708,55 939,96 712,60 945,34

251078 000 - CONSERTO RAMAL PREDIAL DE ESGOTO CERAMICO ATE 200 MM SEM PAVIMENTO - (I) UN 376,80 499,86 496,38 658,50 526,37 698,28 510,40 677,10 513,31 680,96

251079000 - CONSERTO EM TUBULACAO DE FoFo OU A.C.,PB JE DE 350 ATE 400 MM INCLUINDO CORTE E

POSICIONAMENTO DAS CONEXOES,COM PAVIMENTO, NAO INCLUI MATERIAL PARA

RECOMPOSICAO DE PAVIMENTO E HIDRAULICO

UN 1.046,12 1.387,78 1.378,15 1.828,25 1.461,46 1.938,77 1.417,11 1.879,94 1.425,19 1.890,66

251080000 - CONSERTO EM TUBULACAO DE FoFo OU A.C., PB JE DE 350 ATE 400 MM INCLUINDO CORTE

E POSICIONAMENTO DAS CONEXOES, COM PAVIMENTO, NAO INCLUI MATERIAL PARA

RECOMPOSICAO DE PAVIMENTO E HIDRAULICO (I)

UN 752,42 998,16 991,22 1.314,95 1.051,09 1.394,38 1.019,21 1.352,08 1.025,02 1.359,79

251081000 - CONSERTO EM TUBULACAO DE FoFo OU A.C.,PB JE DE 500 ATE 700 MM INCLUINDO CORTE E

POSICIONAMENTO DAS CONEXOES,COM PAVIMENTO, NAO INCLUI MATERIAL PARA

RECOMPOSICAO DE PAVIMENTO E HIDRAULICO

UN 1.389,85 1.843,78 1.830,97 2.428,96 1.941,65 2.575,79 1.882,73 2.497,63 1.893,47 2.511,88

251082000 - CONSERTO EM TUBULACAO DE FoFo OU A.C., PB JE DE 500 ATE 700 MM INCLUINDO CORTE

E POSICIONAMENTO DAS CONEXOES, COM PAVIMENTO, NAO INCLUI MATERIAL PARA

RECOPOSICAO DE PAVIMENTO E HIDRAULICO (I)

UN 999,70 1.326,20 1.316,97 1.747,09 1.396,52 1.852,62 1.354,16 1.796,43 1.361,88 1.806,67

251083 000 - CONSERTO EM LINHA DE RECALQUE ATE 100 MM COM PAVIMENTO UN 339,65 450,58 447,45 593,59 474,50 629,47 460,10 610,37 462,73 613,86

259083 000 - CONSERTO EM LINHA DE RECALQUE ATE 100 MM COM PAVIMENTO (MRR / RMS) UN 342,33 454,13 451,43 598,87 478,78 635,15 464,18 615,78 466,83 619,30

251084 000 - CONSERTO EM LINHA DE RECALQUE ATE 100 MM COM PAVIMENTO - (I) UN 294,38 390,52 387,80 514,46 411,23 545,54 398,75 528,98 401,03 532,01

251085 000 - CONSERTO EM LINHA DE RECALQUE ATE 100 MM SEM PAVIMENTO UN 271,72 360,46 357,96 474,87 379,60 503,58 368,08 488,29 370,18 491,08

259085 000 - CONSERTO EM LINHA DE RECALQUE ATE 100 MM SEM PAVIMENTO (MRR / RMS) UN 273,86 363,30 361,14 479,09 383,02 508,11 371,34 492,62 373,46 495,43

251086 000 - CONSERTO EM LINHA DE RECALQUE ATE 100 MM SEM PAVIMENTO - (I) UN 235,50 312,41 310,24 411,56 328,98 436,42 319,00 423,19 320,82 425,60

251087 000 - CONSERTO EM LINHA DE RECALQUE 150 A 250 MM COM PAVIMENTO UN 407,58 540,70 536,94 712,30 569,40 755,37 552,12 732,44 555,27 736,62

259087 000 - CONSERTO EM LINHA DE RECALQUE 150 A 250 MM COM PAVIMENTO (MRR / RMS) UN 410,79 544,95 541,71 718,63 574,53 762,17 557,01 738,93 560,19 743,15

251088 000 - CONSERTO EM LINHA DE RECALQUE 150 A 250 MM COM PAVIMENTO - (I) UN 353,25 468,62 465,36 617,35 493,47 654,64 478,50 634,78 481,23 638,40

251089 000 - CONSERTO EM LINHA DE RECALQUE 150 A 250 MM SEM PAVIMENTO UN 339,65 450,58 447,45 593,59 474,50 629,47 460,10 610,37 462,73 613,86

259089 000 - CONSERTO EM LINHA DE RECALQUE 150 A 250 MM SEM PAVIMENTO (MRR / RMS) UN 342,33 454,13 451,43 598,87 478,78 635,15 464,18 615,78 466,83 619,30

251090 000 - CONSERTO EM LINHA DE RECALQUE 150 A 250 MM SEM PAVIMENTO - (I) UN 294,38 390,52 387,80 514,46 411,23 545,54 398,75 528,98 401,03 532,01

251091 000 - CONSERTO EM LINHA DE RECALQUE 300 A 400 MM COM PAVIMENTO UN 502,68 666,86 662,23 878,51 702,26 931,62 680,95 903,35 684,83 908,50

259091 000 - CONSERTO EM LINHA DE RECALQUE 300 A 400 MM COM PAVIMENTO (MRR / RMS) UN 506,64 672,11 668,11 886,31 708,59 940,02 686,98 911,35 690,90 916,55

251092 000 - CONSERTO EM LINHA DE RECALQUE 300 A 400 MM COM PAVIMENTO - (I) UN 435,68 577,97 573,94 761,39 608,61 807,38 590,15 782,89 593,52 787,36

251093 000 - CONSERTO EM LINHA DE RECALQUE 300 A 400 MM SEM PAVIMENTO UN 461,92 612,78 608,53 807,28 645,32 856,08 625,74 830,11 629,31 834,84

259093 000 - CONSERTO EM LINHA DE RECALQUE 300 A 400 MM SEM PAVIMENTO (MRR / RMS) UN 465,56 617,61 613,94 814,45 651,13 863,79 631,28 837,46 634,88 842,23

251094 000 - CONSERTO EM LINHA DE RECALQUE 300 A 400 MM SEM PAVIMENTO - (I) UN 400,35 531,10 527,41 699,66 559,27 741,93 542,30 719,42 545,39 723,51

251095 000 - CONSERTO EM LINHA DE RECALQUE 450 A 550 MM COM PAVIMENTO UN 679,30 901,16 894,90 1.187,17 949,00 1.258,94 920,20 1.220,74 925,45 1.227,70

259095 000 - CONSERTO EM LINHA DE RECALQUE 450 A 550 MM COM PAVIMENTO (MRR / RMS) UN 684,65 908,26 902,85 1.197,72 957,55 1.270,29 928,35 1.231,55 933,65 1.238,58

251096 000 - CONSERTO EM LINHA DE RECALQUE 450 A 550 MM COM PAVIMENTO - (I) UN 588,75 781,04 775,60 1.028,91 822,45 1.091,06 797,50 1.057,96 802,05 1.064,00

251097 000 - CONSERTO EM LINHA DE RECALQUE 450 A 550 MM SEM PAVIMENTO UN 543,44 720,93 715,92 949,74 759,20 1.007,15 736,16 976,59 740,36 982,16

259097 000 - CONSERTO EM LINHA DE RECALQUE 450 A 550 MM SEM PAVIMENTO (MRR / RMS) UN 547,72 726,61 722,28 958,18 766,04 1.016,23 742,68 985,24 746,92 990,86

251098 000 - CONSERTO EM LINHA DE RECALQUE 450 A 550 MM SEM PAVIMENTO - (I) UN 471,00 624,83 620,48 823,13 657,96 872,85 638,00 846,37 641,64 851,20

251100 AMPLIACAO DE REDE COLETORA E RAMAL PREDIAL DE ESGOTO

251101 402 - AMPLIACAO DE REDE COLETORA DE ESGOTO PVC ATE 150 COM PAVIMENTO UN 57,06 75,70 75,17 99,72 79,72 105,76 77,30 102,55 77,74 103,13

251104 403 - AMPLIACAO DE REDE COLETORA DE ESGOTO PVC ATE 150 SEM PAVIMENTO UN 50,27 66,69 66,22 87,85 70,23 93,17 68,09 90,33 68,48 90,85

251107 404 - AMPLIACAO DE REDE COLETORA DE ESGOTO PVC ACIMA DE 150 COM PAVIMENTO UN 67,93 90,12 89,49 118,72 94,90 125,89 92,02 122,07 92,55 122,78

251110 405 - AMPLIACAO DE REDE COLETORA DE ESGOTO CERAMICO ATE 150 COM PAVIMENTO UN 61,14 81,11 80,54 106,84 85,41 113,30 82,82 109,87 83,29 110,49

251113406 - AMPLIACAO DE REDE COLETORA DE ESGOTO CERAMICO DE 200 ATE 250 MM COM

PAVIMENTOUN 74,72 99,12 98,44 130,59 104,39 138,48 101,22 134,28 101,80 135,05

251116407 - AMPLIACAO DE REDE COLETORA DE ESGOTO CERAMICO DE 200 ATE 250 MM SEM

PAVIMENTOUN 67,93 90,12 89,49 118,72 94,90 125,89 92,02 122,07 92,55 122,78

251119408 - AMPLIACAO DE REDE COLETORA DE ESGOTO CERAMICO DE 300 ATE 375 MM COM

PAVIMENTOUN 81,52 108,14 107,39 142,46 113,88 151,07 110,42 146,48 111,05 147,32

251122409 - AMPLIACAO DE REDE COLETORA DE ESGOTO CERAMICO DE 300 ATE 375 MM SEM

PAVIMENTOUN 74,72 99,12 98,44 130,59 104,39 138,48 101,22 134,28 101,80 135,05

251125410 - AMPLIACAO DE REDE COLETORA DE ESGOTO CERAMICO DE 400 ATE 500 MM COM

PAVIMENTOUN 108,69 144,19 143,18 189,94 151,84 201,43 147,23 195,32 148,07 196,43

251128411 - AMPLIACAO DE REDE COLETORA DE ESGOTO CERAMICO DE 400 ATE 500 MM SEM

PAVIMENTOUN 101,90 135,18 134,24 178,08 142,35 188,84 138,03 183,11 138,82 184,16

251131 430 - AMPLIACAO DIAMETRO DO RAMAL EM PVC COM PAVIMENTO UN 679,30 901,16 894,90 1.187,17 949,00 1.258,94 920,20 1.220,74 925,45 1.227,70

251134 431 - AMPLIACAO DIAMETRO DO RAMAL EM PVC SEM PAVIMENTO UN 543,44 720,93 715,92 949,74 759,20 1.007,15 736,16 976,59 740,36 982,16

251137 432 - AMPLIACAO DIAMETRO DO RAMAL CERAMICO COM PAVIMENTO UN 815,16 1.081,39 1.073,88 1.424,61 1.138,80 1.510,73 1.104,24 1.464,88 1.110,54 1.473,24

251140 433 - AMPLIACAO DIAMETRO DO RAMAL CERAMICO SEM PAVIMENTO UN 679,30 901,16 894,90 1.187,17 949,00 1.258,94 920,20 1.220,74 925,45 1.227,70

251200 REMANEJAMENTRO DE REDE COLETORA E RAMAL DE ESGOTO

251201 412 - REMANEJAMENTO DE REDE COLETORA DE ESGOTO EM PVC DN 150 MM COM PAVIMENTO UN 101,90 135,18 134,24 178,08 142,35 188,84 138,03 183,11 138,82 184,16

251204 413 - REMANEJAMENTO DE REDE COLETORA DE ESGOTO EM PVC DN 150 MM SEM PAVIMENTO UN 95,10 126,16 125,29 166,21 132,86 176,25 128,83 170,91 129,56 171,87

251207414 - REMANEJAMENTO DE REDE COLETORA DE ESGOTO CERAMICO ATE DN 150 MM COM

PAVIMENTOUN 115,48 153,20 152,13 201,82 161,33 214,02 156,43 207,52 157,33 208,71

251210415 - REMANEJAMENTO DE REDE COLETORA DE ESGOTO CERAMICO ATE DN 150 MM SEM

PAVIMENTOUN 108,69 144,19 143,18 189,94 151,84 201,43 147,23 195,32 148,07 196,43

251213416 - REMANEJAMENTO DE REDE COLETORA DE ESGOTO CERAMICO DE DN 200 ATE 250 MM COM

PAVIMENTOUN 135,86 180,23 178,98 237,43 189,80 251,79 184,04 244,15 185,09 245,54

251216417 - REMANEJAMENTO DE REDE COLETORA DE ESGOTO CERAMICO DE DN 200 ATE 250 MM SEM

PAVIMENTOUN 129,07 171,22 170,03 225,56 180,31 239,20 174,84 231,94 175,84 233,27

251219418 - REMANEJAMENTO DE REDE COLETORA DE ESGOTO CERAMICO DE DN 300 ATE 375 MM COM

PAVIMENTOUN 271,72 360,46 357,96 474,87 379,60 503,58 368,08 488,29 370,18 491,08

251222419 - REMANEJAMENTO DE REDE COLETORA DE ESGOTO CERAMICO DE DN 300 ATE 375 MM SEM

PAVIMENTOUN 142,65 189,24 187,93 249,31 199,29 264,38 193,24 256,35 194,34 257,81

251225420 - REMANEJAMENTO DE REDE COLETORA DE ESGOTO CERAMICO DE DN 400 ATE 500 MM COM

PAVIMENTOUN 176,62 234,30 232,67 308,66 246,74 327,33 239,25 317,39 240,62 319,21

251228421 - REMANEJAMENTO DE REDE COLETORA DE ESGOTO CERAMICO DE DN 400 ATE 500 MM SEM

PAVIMENTOUN 149,45 198,26 196,88 261,18 208,78 276,97 202,44 268,56 203,60 270,10

251231426 - REMANEJAMENTO DE RAMAL DE ESGOTO EM PVC DN 150 MM COM PAVIMENTO DE UMA

POSICAO PARA OUTRAUN 543,44 720,93 715,92 949,74 759,20 1.007,15 736,16 976,59 740,36 982,16

251234427 - REMANEJAMENTO DE RAMAL DE ESGOTO EM PVC DN 150 MM SEM PAVIMENTO DE UMA

POSOCAO PARA OUTRAUN 475,51 630,81 626,43 831,02 664,30 881,26 644,14 854,52 647,82 859,40

251237428 - REMANEJAMENTO DE RAMAL DE ESGOTO CERAMICO / CONCRETO ATE 150 COM

PAVIMENTO DE UMA POSICAO PARA OUTRAUN 611,37 811,04 805,41 1.068,46 854,10 1.133,05 828,18 1.098,66 832,91 1.104,94

251240429 - REMANEJAMENTO DE RAMAL DE ESGOTO CERAMICO / CONCRETO ATE 150 SEM PAVIMENTO

DE UMA POSICAO PARA OUTRAUN 543,44 720,93 715,92 949,74 759,20 1.007,15 736,16 976,59 740,36 982,16

251243 434 - REMANEJAMENTO VERTICAL RAMAL DE ESGOTO EM PVC ATE 150 COM PAVIMENTO UN 135,86 180,23 178,98 237,43 189,80 251,79 184,04 244,15 185,09 245,54

251246 435 - REMANEJAMENTO VERTICAL RAMAL DE ESGOTO EM PVC ATE 150 SEM PAVIMENTO UN 129,07 171,22 170,03 225,56 180,31 239,20 174,84 231,94 175,84 233,27

251249 436 - REMANEJAMENTO VERTICAL RAMAL DE ESGOTO CERAMICO ATE 150 COM PAVIMENTO UN 156,24 207,27 205,83 273,05 218,27 289,56 211,65 280,77 212,85 282,37

251252 437 - REMANEJAMENTO VERTICAL RAMAL DE ESGOTO CERAMICO ATE 150 SEM PAVIMENTO UN 149,45 198,26 196,88 261,18 208,78 276,97 202,44 268,56 203,60 270,10

251255 422 - SUBSTITUICAO DE RAMAL DE ESGOTO EM PVC ATE 150 COM PAVIMENTO UN 543,44 720,93 715,92 949,74 759,20 1.007,15 736,16 976,59 740,36 982,16

251258 423 - SUBSTITUICAO DE RAMAL DE ESGOTO EM PVC ATE 150 SEM PAVIMENTO UN 407,58 540,70 536,94 712,30 569,40 755,37 552,12 732,44 555,27 736,62

251261 424 - SUBSTITUICAO DE RAMAL DE ESGOTO CERAMICO ATE 150 COM PAVIMENTO UN 679,30 901,16 894,90 1.187,17 949,00 1.258,94 920,20 1.220,74 925,45 1.227,70

251264 425 - SUBSTITUICAO DE RAMAL DE ESGOTO CERAMICO ATE 150 SEM PAVIMENTO UN 543,44 720,93 715,92 949,74 759,20 1.007,15 736,16 976,59 740,36 982,16

251300 DESOBSTRUCAO DE REDE/RAMAL PREDIAL

251301438 - DESOBSTRUCAO DE REDE COLETORA DE ESGOTO ENTRE PV'S COM EQUIPAMENTO PESADO

(JATO)UN 37,78 50,12 56,23 74,59 60,85 80,72 58,39 77,46 58,84 78,06

259301438 - DESOBSTRUCAO DE REDE COLETORA DE ESGOTO ENTRE PV'S COM EQUIPAMENTO PESADO

(JATO) (MRR / RMS)UN 38,31 50,82 57,02 75,64 61,70 81,85 59,21 78,55 59,65 79,13

251304000 - DESOBSTRUCAO DE REDE COLETORA DE ESGOTO ENTRE PV'S COM EQUIPAMENTO PESADO

(JATO VACUO)UN 43,93 58,28 65,38 86,73 70,75 93,86 67,90 90,08 68,41 90,75

259304000 - DESOBSTRUCAO DE REDE COLETORA DE ESGOTO ENTRE PV'S COM EQUIPAMENTO PESADO

(JATO VACUO) (MRR / RMS)UN 44,85 59,50 66,75 88,55 72,23 95,82 69,31 91,95 69,82 92,62

251307 439 - DESOBSTRUCAO DE REDE COLETORA DE ESGOTO ENTRE PV'S SEM EQUIPAMENTO UN 56,67 75,18 84,35 111,90 91,28 121,09 87,59 116,20 88,26 117,09

251310 440 - DESOBSTRUCAO DE RAMAL PREDIAL DE ESGOTO COM EQUIPAMENTO LEVE UN 32,11 42,60 47,80 63,41 51,72 68,61 49,63 65,84 50,01 66,34

Página: 44 de 59

Page 45: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

259310 440 - DESOBSTRUCAO DE RAMAL PREDIAL DE ESGOTO COM EQUIPAMENTO LEVE (MRR / RMS) UN 32,56 43,19 48,47 64,30 52,45 69,58 50,33 66,77 50,70 67,26

251313 000 - DESOBSTRUCAO DE RAMAL PREDIAL DE ESGOTO COM EQUIPAMENTO PESADO UN 32,95 43,71 49,04 65,06 53,06 70,39 50,93 67,56 51,31 68,07

259313 000 - DESOBSTRUCAO DE RAMAL PREDIAL DE ESGOTO COM EQUIPAMENTO PESADO (MRR / RMS) UN 33,64 44,63 50,06 66,41 54,17 71,86 51,98 68,96 52,37 69,47

251316 441 - DESOBSTRUCAO DE RAMAL PREDIAL DE ESGOTO SEM EQUIPAMENTO UN 18,89 25,06 28,12 37,30 30,43 40,37 29,20 38,74 29,42 39,03

259316 441 - DESOBSTRUCAO DE RAMAL PREDIAL DE ESGOTO SEM EQUIPAMENTO (MRR / RMS) UN 19,16 25,42 28,51 37,82 30,85 40,93 29,61 39,28 29,83 39,57

251319 000 - OBTURADOR DE LIGACAO PREDIAL DE ESGOTO COM VALVULA UN 17,09 22,67 21,95 29,12 23,17 30,74 22,52 29,88 22,64 30,03

251322 000 - OBTURADOR DE LIGACAO PREDIAL DE ESGOTO COM MASSA FERRO UN 23,92 31,73 29,69 39,39 31,14 41,31 30,37 40,29 30,51 40,47

251325 000 - REATIVACAO DE LIGACAO PREDIAL DE ESGOTO COM VALVULA UN 8,51 11,29 10,93 14,50 11,54 15,31 11,22 14,88 11,27 14,95

251328 000 - REATIVACAO DE LIGACAO PREDIAL DE ESGOTO COM MASSA FERRO UN 12,82 17,01 16,47 21,85 17,38 23,06 16,89 22,41 16,98 22,53

251400 LIMPEZA DE POCOS DE VISITAS E CAIXAS DE INSPACAO

251401 442 - BOMBEAMENTO DE POCO DE VISITA UN 112,82 149,67 144,89 192,21 152,92 202,86 148,65 197,20 149,42 198,22

251404 443 - BOMBEAMENTO DE FOSSA UN 56,41 74,83 72,45 96,11 76,46 101,43 74,33 98,61 74,71 99,11

251407 444 - LIMPEZA CAIXA DE INSPECAO UN 14,36 19,05 18,44 24,46 19,46 25,82 18,92 25,10 19,02 25,23

259407 444 - LIMPEZA CAIXA DE INSPECAO (MRR / RMS) UN 14,49 19,22 18,63 24,71 19,67 26,09 19,12 25,36 19,22 25,50

251410 445 - LIMPEZA PV'S COM PROFUNDIDADE ATE 3,00 M. UN 18,46 24,49 23,71 31,45 25,02 33,19 24,33 32,28 24,45 32,44

259410 445 - LIMPEZA PV'S COM PROFUNDIDADE ATE 3,00 M. (MRR / RMS) UN 18,63 24,71 23,96 31,79 25,29 33,55 24,58 32,61 24,71 32,78

251413 446 - LIMPEZA PV'S COM PROFUNDIDADE ACIMA DE 3,00 M. UN 28,20 37,41 36,22 48,05 38,23 50,72 37,16 49,30 37,36 49,56

259413 446 - LIMPEZA PV'S COM PROFUNDIDADE ACIMA DE 3,00 M. (MRR / RMS) UN 28,46 37,76 36,60 48,55 38,64 51,26 37,55 49,81 37,75 50,08

251416447 - LIMPEZA DE REDE COLETORA DE ESGOTO COM BUCKETS (MANUTENCAO PREVENTIVA 100

M)UN 169,22 224,49 217,34 288,32 229,38 304,30 222,98 295,81 224,14 297,34

259416447 - LIMPEZA DE REDE COLETORA DE ESGOTO COM BUCKETS (MANUTENCAO PREVENTIVA 100

M) ( MRR / RMS)UN 170,74 226,50 219,62 291,35 231,83 307,55 225,32 298,91 226,48 300,45

251419 448 - LAVAJEM DE REDE COLETORA DE ESGOTO COM DN 200 MM UN 56,41 74,83 72,45 96,11 76,46 101,43 74,33 98,61 74,71 99,11

251422 449 - LIMPEZA INSPECAO TUBULACAO DE ESGOTO UN 14,36 19,05 18,44 24,46 19,46 25,82 18,92 25,10 19,02 25,23

251425 450 - LIMPEZA CALHA DE DIMENCAO DE (0,30 X 0,80 M) M 12,82 17,01 16,47 21,85 17,38 23,06 16,89 22,41 16,98 22,53

251428 000 - LIMPEZA CANAL DRENAGEM SECAO MEDIA DE (1,00 X 0,80 M) COM REMOCAO EXPURGO M 41,02 54,42 52,69 69,90 55,61 73,77 54,06 71,72 54,34 72,09

251431 SERVICOS DE LIMPEZA DE ESTACAO ELEVATORIA DE ESGOTO UN 836,80 1.110,10 1.127,92 1.496,30 1.201,12 1.593,41 1.162,24 1.541,83 1.169,20 1.551,06

251600 CONSTRUCAO E CONSERTO EM POCOS DE VISITA E CAIXA DE INSPECAO

251601 459 - CONSTRUCAO DE CAIXA DE INSPECAO DE ESGOTO COM DEMOLICAO DA EXISTENTE UN 224,17 297,38 295,32 391,77 313,17 415,45 303,67 402,85 305,40 405,14

259601459 - CONSTRUCAO DE CAIXA DE INSPECAO DE ESGOTO COM DEMOLICAO DA EXISTENTE (MRR /

RMS)UN 225,93 299,72 297,94 395,25 315,99 419,19 306,36 406,42 308,10 408,73

251604 460 - CONSTRUCAO DE CAIXA DE INSPECAO DE ESGOTO SEM DEMOLICAO DA EXISTENTE UN 149,45 198,26 196,88 261,18 208,78 276,97 202,44 268,56 203,60 270,10

259604460 - CONSTRUCAO DE CAIXA DE INSPECAO DE ESGOTO SEM DEMOLICAO DA EXISTENTE (MRR /

RMS)UN 150,62 199,81 198,63 263,50 210,66 279,46 204,24 270,94 205,40 272,48

251607 461 - CONFECCAO DE CAIXA DE INSPECAO UN 597,78 793,01 787,51 1.044,71 835,12 1.107,87 809,78 1.074,25 814,40 1.080,38

259607 461 - CONFECCAO DE CAIXA DE INSPECAO (MRR / RMS) UN 602,49 799,26 794,51 1.054,00 842,64 1.117,85 816,95 1.083,77 821,61 1.089,95

251610 462 - CONSERTO DE PV'S DANIFICADO COM PROFUNDIDADE DE ATE 3,00 M COM DEMOLICAO UN 448,34 594,77 590,63 783,53 626,34 830,90 607,33 805,68 610,80 810,29

259610462 - CONSERTO DE PV'S DANIFICADO COM PROFUNDIDADE DE ATE 3,00 M COM DEMOLICAO

(MRR / RMS)UN 451,87 599,45 595,88 790,49 631,98 838,38 612,71 812,82 616,21 817,46

251613 463 - CONSERTO DE PV'S DANIFICADO COM PROFUNDIDADE DE ATE 3,00 M SEM DEMOLICAO UN 224,17 297,38 295,32 391,77 313,17 415,45 303,67 402,85 305,40 405,14

259613463 - CONSERTO DE PV'S DANIFICADO COM PROFUNDIDADE DE ATE 3,00 M SEM DEMOLICAO

(MRR / RMS)UN 225,93 299,72 297,94 395,25 315,99 419,19 306,36 406,42 308,10 408,73

251616 464 - CONSERTO DE PV'S DANIFICADO COM PROFUNDIDADE MAIOR DE 3,00 M COM DEMOLICAO UN 896,68 1.189,54 1.181,27 1.567,07 1.252,68 1.661,81 1.214,66 1.611,37 1.221,59 1.620,56

259616464 - CONSERTO DE PV'S DANIFICADO COM PROFUNDIDADE MAIOR DE 3,00 M COM DEMOLICAO

(MRR / RMS)UN 903,74 1.198,90 1.191,76 1.580,99 1.263,97 1.676,78 1.225,42 1.625,64 1.232,42 1.634,93

251619 465 - CONSERTO DE PV'S DANIFICADO COM PROFUNDIDADE MAIOR DE 3,00 M SEM DEMOLICAO UN 373,62 495,64 492,20 652,95 521,95 692,42 506,11 671,41 509,00 675,24

259619465 - CONSERTO DE PV'S DANIFICADO COM PROFUNDIDADE MAIOR DE 3,00 M SEM DEMOLICAO

(MRR / RMS)UN 376,56 499,54 496,57 658,75 526,65 698,65 510,59 677,35 513,51 681,22

251622 466 - CONFECCAO DE PV'S DN 0,60 M E PROFUNDIDADE DE 1,80 M. UN 896,68 1.189,54 1.181,27 1.567,07 1.252,68 1.661,81 1.214,66 1.611,37 1.221,59 1.620,56

259622 466 - CONFECCAO DE PV'S DN 0,60 M E PROFUNDIDADE DE 1,80 M. (MRR / RMS) UN 903,74 1.198,90 1.191,76 1.580,99 1.263,97 1.676,78 1.225,42 1.625,64 1.232,42 1.634,93

251625 467 - CONFECCAO DE PV'S DN 1,10 M E PROFUNDIDADE DE 2,00 M. UN 1.195,57 1.586,04 1.575,02 2.089,42 1.670,24 2.215,74 1.619,55 2.148,50 1.628,79 2.160,75

259625 467 - CONFECCAO DE PV'S DN 1,10 M E PROFUNDIDADE DE 2,00 M. (MRR / RMS) UN 1.204,98 1.598,53 1.589,02 2.107,99 1.685,29 2.235,71 1.633,90 2.167,53 1.643,22 2.179,90

251628 000 - CONSERTOS DE CAIXA DE INSPECAO COM DEMOLICAO DA EXISTENTE UN 56,41 74,83 72,45 96,11 76,46 101,43 74,33 98,61 74,71 99,11

259628 000 - CONSERTOS DE CAIXA DE INSPECAO COM DEMOLICAO DA EXISTENTE (MRR / RMS) UN 56,91 75,50 73,21 97,12 77,28 102,52 75,11 99,64 75,49 100,15

251629 000 - CONSERTOS DE CAIXA DE INSPECAO SEM DEMOLICAO DA EXISTENTE UN 37,95 50,34 48,74 64,66 51,44 68,24 50,00 66,33 50,26 66,67

259629 000 - CONSERTOS DE CAIXA DE INSPECAO SEM DEMOLICAO DA EXISTENTE (MRR / RMS) UN 38,29 50,80 49,25 65,34 51,99 68,97 50,53 67,03 50,79 67,38

251631 000 - PEQUENOS CONSERTOS DE POCO DE VISITA UN 30,77 40,82 39,52 52,43 41,71 55,33 40,54 53,78 40,75 54,06

259631 000 - PEQUENOS CONSERTOS DE POCO DE VISITA (MRR / RMS) UN 31,04 41,18 39,93 52,97 42,15 55,92 40,97 54,35 41,18 54,63

251634 000 - PEQUENOS CONSERTOS DE CAIXAS DE INSPECAO UN 18,46 24,49 23,71 31,45 25,02 33,19 24,33 32,28 24,45 32,44

259634 000 - PEQUENOS CONSERTOS DE CAIXAS DE INSPECAO (MRR / RMS) UN 18,63 24,71 23,96 31,79 25,29 33,55 24,58 32,61 24,71 32,78

251700 SERVICOS EM TAMPA E TAMPOES PARA CAIXAS E PV'S

251701 468 - IMPLANTACAO DE INSPECAO TUBULAR DE ESGOTO UN 225,63 299,32 289,78 384,42 305,84 405,73 297,31 394,41 298,85 396,45

251704 469 - AJUSTE ALTURA DA TAMPA NA CAIXA DE INSPACAO UN 22,56 29,93 28,98 38,44 30,58 40,57 29,73 39,44 29,88 39,64

259704 469 - AJUSTE ALTURA DA TAMPA NA CAIXA DE INSPACAO (MRR / RMS) UN 22,77 30,21 29,28 38,84 30,91 41,01 30,04 39,85 30,20 40,06

251707 470 - REPARO E/OU VEDACAO DA TAMPA DA CAIXA DE INSPACAO QUEBRADA UN 11,28 14,96 14,49 19,22 15,29 20,28 14,87 19,73 14,94 19,82

259707 470 - REPARO E/OU VEDACAO DA TAMPA DA CAIXA DE INSPACAO QUEBRADA (MRR / RMS) UN 11,38 15,10 14,64 19,42 15,46 20,51 15,02 19,93 15,10 20,03

251710 471 - AJUSTE DA ALTURA DO TAMPAO NO PV UN 56,41 74,83 72,45 96,11 76,46 101,43 74,33 98,61 74,71 99,11

259710 471 - AJUSTE DA ALTURA DO TAMPAO NO PV (MRR / RMS) UN 56,91 75,50 73,21 97,12 77,28 102,52 75,11 99,64 75,49 100,15

251713 472 - REPARO E/OU VEDACAO DO TAMPAO NO PV UN 18,46 24,49 23,71 31,45 25,02 33,19 24,33 32,28 24,45 32,44

259713 472 - REPARO E/OU VEDACAO DO TAMPAO NO PV (MRR / RMS) UN 18,63 24,71 23,96 31,79 25,29 33,55 24,58 32,61 24,71 32,78

251716 473 - AJUSTE DA ALTURA DA TAMPA NA CAIXA DE INSPECAO TUBULAR DO RAMAL PREDIAL UN 42,56 56,46 54,66 72,51 57,69 76,53 56,08 74,40 56,37 74,78

251719 474 - REPARO DA TAMPA NA CAIXA DE INSPECAO TUBULAR DO RAMAL PREDIAL UN 8,72 11,57 11,20 14,86 11,82 15,68 11,49 15,24 11,55 15,32

251722 475 - REPOSICAO DE CAPOEIRA COM DN 0,90M EM PV UN 84,61 112,24 108,67 144,16 114,69 152,15 111,49 147,90 112,07 148,67

259722 475 - REPOSICAO DE CAPOEIRA COM DN 0,90M EM PV (MRR / RMS) UN 85,37 113,25 109,81 145,67 115,91 153,77 112,66 149,45 113,24 150,22

251725 476 - REPOSICAO DE CAPOEIRA COM DN 1,30M EM PV UN 153,84 204,08 197,58 262,11 208,53 276,64 202,71 268,92 203,76 270,31

259725 476 - REPOSICAO DE CAPOEIRA COM DN 1,30M EM PV (MRR / RMS) UN 155,22 205,91 199,65 264,86 210,75 279,58 204,84 271,74 205,89 273,13

251728000 - SUBSTITUICAO DE TAMPAO DE CONCRETO OU DE ARO COM TAMPA FOFO EM CAIXA DE

INSPECAO COM VEDACAO COM PAVIMENTOUN 20,51 27,21 26,34 34,94 27,80 36,88 27,03 35,86 27,17 36,04

259728000 - SUBSTITUICAO DE TAMPAO DE CONCRETO OU DE ARO COM TAMPA FOFO EM CAIXA DE

INSPECAO COM VEDACAO COM PAVIMENTO (MRR / RMS)UN 20,70 27,46 26,62 35,31 28,10 37,28 27,31 36,23 27,45 36,42

251731000 - SUBSTITUICAO DE TAMPAO DE CONCRETO OU DE ARO COM TAMPA FOFO EM CAIXA DE

INSPECAO COM VEDACAO SEM PAVIMENTOUN 17,95 23,81 23,05 30,58 24,33 32,28 23,65 31,37 23,77 31,53

259731000 - SUBSTITUICAO DE TAMPAO DE CONCRETO OU DE ARO COM TAMPA FOFO EM CAIXA DE

INSPECAO COM VEDACAO SEM PAVIMENTO (MRR / RMS)UN 18,11 24,02 23,29 30,90 24,59 32,62 23,90 31,71 24,02 31,86

251734000 - SUBSTITUICAO DE TAMPAO DE CONCRETO OU DE ARO COM TAMPA FOFO EM POCO DE

VISITA COM PAVIMENTOUN 25,64 34,01 32,93 43,68 34,76 46,11 33,79 44,83 33,96 45,05

259734000 - SUBSTITUICAO DE TAMPAO DE CONCRETO OU DE ARO COM TAMPA FOFO EM POCO DE

VISITA COM PAVIMENTO (MRR / RMS)UN 25,87 34,32 33,28 44,15 35,13 46,60 34,14 45,29 34,32 45,53

251737000 - SUBSTITUICAO DE TAMPAO DE CONCRETO OU DE ARO COM TAMPA FOFO EM POCO DE

VISITA SEM PAVIMENTOUN 23,08 30,62 29,64 39,32 31,28 41,50 30,41 40,34 30,56 40,54

259737000 - SUBSTITUICAO DE TAMPAO DE CONCRETO OU DE ARO COM TAMPA FOFO EM POCO DE

VISITA SEM PAVIMENTO (MRR / RMS)UN 23,28 30,88 29,95 39,73 31,61 41,93 30,73 40,77 30,88 40,97

251740 000 - SUBSTITUICAO DE TAMPA DE FOFO EM CAIXA DE INSPECAO UN 7,69 10,20 9,88 13,11 10,43 13,84 10,14 13,45 10,19 13,52

251743 000 - SUBSTITUICAO DE TAMPA DE FOFO EM POCO DE VISITA UN 15,38 20,40 19,76 26,21 20,85 27,66 20,27 26,89 20,38 27,04

251800 LIGACAO PREDIAL DE ESGOTO

251801 454 - EXECUCAO DE LIGACAO PREDIAL DE ESGOTO NO PASSEIO COM PAVIMENTO UN 407,58 540,70 536,94 712,30 569,40 755,37 552,12 732,44 555,27 736,62

251804 453 - EXECUCAO DE LIGACAO PREDIAL DE ESGOTO NO PASSEIO SEM PAVIMENTO UN 339,65 450,58 447,45 593,59 474,50 629,47 460,10 610,37 462,73 613,86

251807 456 - EXECUCAO DE LIGACAO PREDIAL DE ESGOTO NA RUA COM PAVIMENTO UN 679,30 901,16 894,90 1.187,17 949,00 1.258,94 920,20 1.220,74 925,45 1.227,70

251810 455 - EXECUCAO DE LIGACAO PREDIAL DE ESGOTO NA RUA SEM PAVIMENTO UN 543,44 720,93 715,92 949,74 759,20 1.007,15 736,16 976,59 740,36 982,16

251813 458 - EXECUCAO DE LIGACAO PREDIAL DE ESGOTO NO OUTRO LADO DA RUA COM PAVIMENTO UN 883,09 1.171,51 1.163,37 1.543,33 1.233,70 1.636,63 1.196,26 1.586,96 1.203,09 1.596,02

251816 457 - EXECUCAO DE LIGACAO PREDIAL DE ESGOTO NO OUTRO LADO DA RUA SEM PAVIMENTO UN 747,23 991,28 984,39 1.305,89 1.043,90 1.384,84 1.012,22 1.342,81 1.018,00 1.350,48

251900 AMPLIACAO DIAMETRO DO RAMAL

251901 430 - AMPLIACAO DIAMETRO DO RAMAL EM PVC COM PAVIMENTO UN 679,30 901,16 894,90 1.187,17 949,00 1.258,94 920,20 1.220,74 925,45 1.227,70

251904 431 - AMPLIACAO DIAMETRO DO RAMAL EM PVC SEM PAVIMENTO UN 543,44 720,93 715,92 949,74 759,20 1.007,15 736,16 976,59 740,36 982,16

251907 432 - AMPLIACAO DIAMETRO DO RAMAL CERAMICO COM PAVIMENTO UN 815,16 1.081,39 1.073,88 1.424,61 1.138,80 1.510,73 1.104,24 1.464,88 1.110,54 1.473,24

251910 433 - AMPLIACAO DIAMETRO DO RAMAL CERAMICO SEM PAVIMENTO UN 679,30 901,16 894,90 1.187,17 949,00 1.258,94 920,20 1.220,74 925,45 1.227,70

252000 SERVICOS TÉCNICOS / ADMINISTRATIVOS - ESGOTO

252001 387 - ESTUDO DE VIABILIDADE PARA ESGOTO SANITARIO un 102,56 136,06 131,72 174,74 139,02 184,42 135,14 179,28 135,84 180,21

252004 451 - SONDAGEM DE RAMAL PREDIAL DE ESGOTO SANITARIO un 25,64 34,01 32,93 43,68 34,76 46,11 33,79 44,83 33,96 45,05

252007 452 - PEDIDO DE VERIFICACAO DE RAMAL DE ESGOTO SANITARIO PELO USUARIO un 25,64 34,01 32,93 43,68 34,76 46,11 33,79 44,83 33,96 45,05

252010 490 - LIGACAO PROVISORIA un 237,76 315,41 313,22 415,52 332,15 440,63 322,07 427,26 323,91 429,70

Página: 45 de 59

Page 46: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

252013 491 - DESLOCAMENTO DO COLETOR PREDIAL DE ESGOTO un 1.086,88 1.441,86 1.431,84 1.899,48 1.518,40 2.014,31 1.472,32 1.953,18 1.480,72 1.964,32

252016 492 - RELIGACAO DO COLETOR PREDIAL DE ESGOTO un 271,72 360,46 357,96 474,87 379,60 503,58 368,08 488,29 370,18 491,08

252019 493 - VERIFICACAO DO FLUXO DE ESGOTO PV un 271,72 360,46 357,96 474,87 379,60 503,58 368,08 488,29 370,18 491,08

252022 494 - DESLIGAMENTO DO COLETOR PREDIAL DE ESGOTO un 271,72 360,46 357,96 474,87 379,60 503,58 368,08 488,29 370,18 491,08

252023 000 - LIGAR ESGOTO DE UMA UNIDADE MOVEL INCLUINDO O DESLIGAMENTO un 25,64 34,01 32,93 43,68 34,76 46,11 33,79 44,83 33,96 45,05

252024 000 - LIGAR ESGOTO DE UNIDADE MOVEL EM SERIE INCLUINDO O DESLIGAMENTO un 67,93 90,12 89,49 118,72 94,90 125,89 92,02 122,07 92,55 122,78

252025 000 - INVESTIGACAO DE LIGACOES EXECUTADAS REGULARMENTE NAO CADASTRADAS un 46,15 61,22 59,27 78,63 62,56 82,99 60,81 80,67 61,13 81,10

252028 000 - INVESTIGACAO DE LIGACOES IRREGULARES NAO CADASTRADAS un 76,92 102,04 98,79 131,05 104,27 138,32 101,36 134,46 101,88 135,15

252031000 - PAGAMENTO DE DESLOCAMENTO IMPRODUTIVO PARA EQUIPE DE OPERACAO DE

HIDROJATEADORun 9,45 12,54 14,06 18,65 15,21 20,18 14,60 19,37 14,71 19,51

259031000 - PAGAMENTO DE DESLOCAMENTO IMPRODUTIVO PARA EQUIPE DE OPERACAO DE

HIDROJATEADOR (MRR / RMS)un 9,58 12,71 14,26 18,92 15,43 20,47 14,80 19,63 14,91 19,78

252034000 - PAGAMENTO DE DESLOCAMENTO IMPRODUTIVO PARA EQUIPE DE 02 PARA OPERACAO DE

HIGH VELOCITYun 9,45 12,54 14,06 18,65 15,21 20,18 14,60 19,37 14,71 19,51

259034000 - PAGAMENTO DE DESLOCAMENTO IMPRODUTIVO PARA EQUIPE DE 02 PARA OPERACAO DE

HIGH VELOCITY (MRR / RMS)un 9,58 12,71 14,26 18,92 15,43 20,47 14,80 19,63 14,91 19,78

252037000 - PAGAMENTO DE DESLOCAMENTO IMPRODUTIVO PARA EQUIPE DE 03 PARA OPERACAO DE

HIGH VELOCITYun 12,67 16,81 18,86 25,02 20,41 27,08 19,59 25,99 19,73 26,17

259037000 - PAGAMENTO DE DESLOCAMENTO IMPRODUTIVO PARA EQUIPE DE 03 PARA OPERACAO DE

HIGH VELOCITY (MRR / RMS)un 12,94 17,17 19,26 25,55 20,84 27,65 19,99 26,52 20,14 26,72

252040000 - PAGAMENTO DE DESLOCAMENTO IMPRODUTIVO PARA EQUIPE DE 02 PARA MANUTENCAO

DE REDES E RAMAISun 12,82 17,01 16,47 21,85 17,38 23,06 16,89 22,41 16,98 22,53

259940000 - PAGAMENTO DE DESLOCAMENTO IMPRODUTIVO PARA EQUIPE DE 02 PARA MANUTENCAO

DE REDES E RAMAIS (MRR / RMS)un 12,94 17,17 16,64 22,07 17,56 23,30 17,07 22,65 17,16 22,76

259940000 - PAGAMENTO DE DESLOCAMENTO IMPRODUTIVO PARA EQUIPE DE 02 PARA MANUTENCAO

DE REDES E RAMAIS (MRR / RMS)un 12,94 17,17 16,64 22,07 17,56 23,30 17,07 22,65 17,16 22,76

252043000 - PAGAMENTO DE DESLOCAMENTO IMPRODUTIVO PARA EQUIPE DE 04 PARA MANUTENCAO

DE REDES E RAMAISun 33,97 45,06 44,75 59,37 47,45 62,95 46,01 61,04 46,27 61,38

259943000 - PAGAMENTO DE DESLOCAMENTO IMPRODUTIVO PARA EQUIPE DE 04 PARA MANUTENCAO

DE REDES E RAMAIS (MRR / RMS)un 34,23 45,41 45,14 59,88 47,88 63,52 46,42 61,58 46,68 61,93

229000 SERVICOS NAO CODIFICADOS

260000 ATIVIDADES DA AREA COMERCIAL

260100 VISITA, ENTREGA DE CONTA E LEITURA DE HIDROMETRO

260101 114 - REVISAR LEITURA - (I) un 0,46 0,61 0,63 0,84 0,67 0,89 0,65 0,86 0,65 0,86

260102 114 - REVISAR LEITURA - (M) un 3,21 4,26 4,44 5,89 4,75 6,30 4,59 6,09 4,62 6,13

260104 269 - ENTREGA DE CONTAS - (I) un 0,19 0,25 0,28 0,37 0,30 0,40 0,29 0,38 0,29 0,38

260105 269 - ENTREGA DE CONTAS - (M) un 2,11 2,80 2,92 3,87 3,12 4,14 3,01 3,99 3,03 4,02

260106 000 - VISITA OPERACIONAL - (I) un 0,73 0,97 1,01 1,34 1,07 1,42 1,04 1,38 1,05 1,39

260107 000 - VISITA COMERCIAL - (I) un 0,49 0,65 0,67 0,89 0,72 0,96 0,69 0,92 0,70 0,93

260108 000 - VISITA COMERCIAL - (M) un 0,92 1,22 1,28 1,70 1,37 1,82 1,32 1,75 1,33 1,76

260109 000 - VISITA OPERACIONAL - (M) un 5,86 7,77 7,53 9,99 7,94 10,53 7,72 10,24 7,76 10,29

260110 000 - ENTREGA DE NOTIFICACAO DE DEBITO, PROTOCOLOS, INFORMES E 2 VIA - (M) un 3,71 4,92 5,14 6,82 5,50 7,30 5,31 7,04 5,34 7,08

260111 000 - ENTREGA DE NOTIFICACAO DE DEBITO, PROTOCOLOS, INFORMES E 2 VIA - (I) un 0,35 0,46 0,52 0,69 0,57 0,76 0,54 0,72 0,55 0,73

260113 271 - LEITURA DE HIDROMETRO E ATUALIZACAO DE CADASTRO un 9,04 11,99 12,50 16,58 13,37 17,74 12,91 17,13 12,99 17,23

260116 000 - LEITURA DE HIDROMETROS E ENTREGA DE CONTAS -  (I) un 0,31 0,41 0,42 0,56 0,45 0,60 0,43 0,57 0,44 0,58

260123 000 - LEITURA DE HIDROMETRO - (I) un 0,28 0,37 0,42 0,56 0,45 0,60 0,43 0,57 0,44 0,58

260125 000 - LEITURA DE HIDROMETRO - (M) un 0,32 0,42 0,47 0,62 0,51 0,68 0,49 0,65 0,49 0,65

260127 000 - AVISO DE CORTE - (I) un 0,46 0,61 0,63 0,84 0,67 0,89 0,65 0,86 0,65 0,86

260128 000 - AVISO DE CORTE - (M) un 0,42 0,56 0,59 0,78 0,63 0,84 0,61 0,81 0,61 0,81

260131 000 - ENTREGA DE NOTIFICACAO DE CORTE E OUTROS - (I) un 0,35 0,46 0,52 0,69 0,57 0,76 0,54 0,72 0,55 0,73

260133 000 - ENTREGA DE NOTIFICACAO DE CORTE COM NEGOCIACAO DO DÉVITO un 0,80 1,06 1,11 1,47 1,19 1,58 1,15 1,53 1,15 1,53

260200 AFERICAO DE HIDROMETRO

260201 263 - AFERICAO DE HIDROMETRO LOCAL 1/2" un 28,69 38,06 40,08 53,17 42,94 56,96 41,41 54,93 41,69 55,31

260204 264 - AFERICAO DE HIDROMETRO LOCAL 3/4" un 28,69 38,06 40,08 53,17 42,94 56,96 41,41 54,93 41,69 55,31

260207 265 - AFERICAO DE HIDROMETRO LOCAL 1" un 28,69 38,06 40,08 53,17 42,94 56,96 41,41 54,93 41,69 55,31

260210 266 - AFERICAO DE HIDROMETRO LOCAL 1.1/2" un 28,69 38,06 40,08 53,17 42,94 56,96 41,41 54,93 41,69 55,31

260213 267 - AFERICAO DE HIDROMETRO LOCAL 2" un 28,69 38,06 40,08 53,17 42,94 56,96 41,41 54,93 41,69 55,31

260300 SUPRESSAO DE RAMAL DE AGUA

260301 262 - SUPRESSAO DE RAMAL DE AGUA un 102,56 136,06 131,72 174,74 139,02 184,42 135,14 179,28 135,84 180,21

260303000 - SUPRESSAO DE RAMAL DE AGUA EM AREA COM PAVIMENTO, COM COLOCACAO E SEM

FORNECIMENTO DE CAP NO COLAR DE TOMADAun 63,88 84,74 82,29 109,17 86,91 115,29 84,46 112,04 84,90 112,63

260304000 - SUPRESSAO DE RAMAL DE AGUA EM AREA COM PAVIMENTO EM PARALELO, COM

COLOCACAO E FORNECIMENTO DE DE CAPSULA DE BRONZE NO COLAR DE TOMADAun 66,65 88,42 85,06 112,84 89,68 118,97 87,23 115,72 87,67 116,30

260305000 - SUPRESSAO DE RAMAL DE AGUA EM AREA COM PAVIMENTO EM PARALELO, COM RETIRADA

DE COLAR DE TOMADA COM FORNECIMENTO DO MATERIALun 81,52 108,14 101,39 134,50 106,37 141,11 103,73 137,61 104,20 138,23

260306000 - SUPRESSAO DE RAMAL DE AGUA EM AREA COM PAVIMENTO, COM RETIRADA DE COLAR DE

TOMADA SEM FORNECIMENTO DO MATERIALun 69,01 91,55 88,88 117,91 93,86 124,51 91,22 121,01 91,69 121,64

260307000 - SUPRESSAO DE RAMAL DE AGUA EM AREA SEM PAVIMENTO, COM COLOCACAO E

FORNECIMENTO DE CAPSULA DE BRONZE NO COLAR DE TOMADAun 32,07 42,54 40,40 53,59 42,49 56,37 41,38 54,89 41,58 55,16

260308000 - SUPRESSAO DE RAMAL DE AGUA EM AREA SEM PAVIMENTO, COM RETIRADA DE COLAR DE

TOMADA COM FORNECIMENTO DO MATERIALun 45,33 60,13 54,66 72,51 57,00 75,62 55,75 73,96 55,98 74,26

260309000 - SUPRESSAO DE RAMAL DE AGUA EM AREA SEM PAVIMENTO, COM COLOCACAO DE CAP NO

COLAR DE TOMADA SEM FORNECIMENTO DO MATERIALun 29,30 38,87 37,63 49,92 39,72 52,69 38,61 51,22 38,81 51,49

260310000 - SUPRESSAO DE RAMAL DE AGUA EM AREA COM PAVIMENTO EM PARALELO, COM RETIRADA

DE COLAR DE TOMADA SEM FORNECIMENTO DO MATERIALun 81,32 107,88 104,68 138,87 110,54 146,64 107,43 142,52 107,99 143,26

260315000 - MUDANCA DE RAMAL DOMICILIAR EM RUAS COM PAVIMENTO SEM FORNECIMENTO DO

MATERIALun 71,33 94,63 91,82 121,81 96,96 128,63 94,24 125,02 94,73 125,67

260316000 - MUDANCA DE RAMAL DOMICILIAR EM RUAS COM PAVIMENTO COM FORNECIMENTO DO

MATERIALun 71,75 95,18 92,24 122,37 97,38 129,18 94,66 125,58 95,15 126,23

260318000 - MUDANCA DE RAMAL DOMICILIAR EM RUAS SEM PAVIMENTO SEM FORNECIMENTO DO

MATERIALun 29,42 39,03 37,75 50,08 39,84 52,85 38,73 51,38 38,93 51,64

260319000 - MUDANCA DE RAMAL DOMICILIAR EM RUAS SEM PAVIMENTO COM FORNECIMENTO DO

MATERIALun 29,84 39,59 38,17 50,64 40,26 53,41 39,15 51,94 39,35 52,20

260400 INSTALACAO DE HIDROMETRO

260401 201 - COLOCACAO DE HIDROMETRO 1/2" - 3 M3 un 11,48 15,23 16,03 21,27 17,18 22,79 16,57 21,98 16,68 22,13

260404 202 - COLOCACAO DE HIDROMETRO 3/4" - 3 M3 un 11,48 15,23 16,03 21,27 17,18 22,79 16,57 21,98 16,68 22,13

260407 203 - COLOCACAO DE HIDROMETRO 1" - 7 M3 un 18,36 24,36 25,65 34,03 27,48 36,45 26,50 35,15 26,68 35,39

260410 204 - COLOCACAO DE HIDROMETRO 1" - 10 M3 un 41,02 54,42 52,69 69,90 55,61 73,77 54,06 71,72 54,34 72,09

260413 205 - COLOCACAO DE HIDROMETRO 1.1/2" - 20 M3 un 41,02 54,42 52,69 69,90 55,61 73,77 54,06 71,72 54,34 72,09

260416 206 - COLOCACAO DE HIDROMETRO 2" - 30 M3 un 41,02 54,42 52,69 69,90 55,61 73,77 54,06 71,72 54,34 72,09

260419 207 - COLOCACAO DE HIDROMETRO 2" - WOLTMANN 300 M3 un 46,15 61,22 59,27 78,63 62,56 82,99 60,81 80,67 61,13 81,10

260422 208 - COLOCACAO DE HIDROMETRO 3" - WOLTMANN 1100 M3 un 51,28 68,03 65,86 87,37 69,51 92,21 67,57 89,64 67,92 90,10

260425 209 - COLOCACAO DE HIDROMETRO 4" - WOLTMANN 1400 M3 un 76,92 102,04 98,79 131,05 104,27 138,32 101,36 134,46 101,88 135,15

260428 210 - COLOCACAO DE HIDROMETRO 6" - WOLTMANN 4000 M3 un 56,41 74,83 72,45 96,11 76,46 101,43 74,33 98,61 74,71 99,11

260431000 - INSTALACAO DE HIDROMETRO EM LIGACAO PREDIAL EXISTENTE NAO MEDIDA, COM

FORENCIMENTO DE CAIXA NO PASSEIO, SEM FORNECIMENTO HIDROMETRO E TAMPAun 89,49 118,72 98,46 130,62 100,71 133,60 99,51 132,01 99,73 132,30

260432000 - INSTALACAO DE HIDROMETRO EM LIGACAO PREDIAL EXISTENTE NAO MEDIDA, COM

ASSENTAMENTO DE CAIXA DE PROTECAO NA PAREDE, SEM FORNECIMENTO DO MATERIAL

HIDRAULICO, HIDROMETRO E CAIXA

un 69,52 92,23 89,46 118,68 94,45 125,30 91,80 121,78 92,28 122,42

260433

000 - INSTALACAO DE HIDROMETRO EM LIGACAO PREDIAL EXISTENTE NAO MEDIDA, COM

ASSENTAMENTO DE CAIXA DE PROTECAO NA PAREDE, SEM FORNECIMENTO HIDROMETRO E

CAIXA COM FORNECIMENTO DO MATERIAL HIDRAULICO

un 74,66 99,04 94,60 125,50 99,59 132,12 96,94 128,60 97,42 129,24

260434

000 - INSTALACAO DE HIDROMETRO EM LIGACAO PREDIAL EXISTENTE NAO MEDIDA, COM

ASSENTAMENTO DE CAIXA NA MURETA, SEM FORNECIMENTO HIDROMETRO E MURETA COM

CAIXA, COM FORNECIMENTO DO MATERIAL HIDRAULICO

un 57,50 76,28 72,08 95,62 75,73 100,46 73,79 97,89 74,14 98,35

260435000 - INSTALACAO DE HIDROMETRO EM LIGACAO PREDIAL EXISTENTE NAO MEDIDA, COM

ASSENTAMENTO DE CAIXA NA MURETA, SEM FORNECIMENTO DO MATERIAL HIDRAULICO,

HIDROMETRO E MURETA COM CAIXA

un 52,36 69,46 66,94 88,80 70,59 93,64 68,65 91,07 69,00 91,54

260436000 - INSTALACAO DE HIDROMETRO EM LIGACAO PREDIAL EXISTENTE N/MEDIDA,C/CAIXA

EXISTENTE NO PASSEIO,SEM FORNECIMENTO HIDROMETROun 23,02 30,54 29,50 39,13 31,12 41,28 30,26 40,14 30,41 40,34

260438000 - INSTALACAO DE HIDROMETRO EM LIGACAO PREDIAL EXISTENTE NAO MEDIDA, EM CAIXA

EXISTENTE NA PAREDE SEM FORNECIMENTO DO MATERIAL HIDRAULICO E HIDROMETROun 29,54 39,19 37,63 49,92 39,66 52,61 38,58 51,18 38,78 51,45

260439000 - INSTALACAO DE HIDROMETRO EM LIGACAO PREDIAL EXISTENTE NAO MEDIDA, EM CAIXA

EXISTENTE NA PAREDE SEM FORNECIMENTO HIDROMETRO, COM FORNECIMENTO DO MATERIAL

HIDRAULICO

un 34,68 46,01 42,77 56,74 44,80 59,43 43,72 58,00 43,92 58,26

260440000 - INSTALACAO DE HIDROMETRO EM LIGACAO PREDIAL EXISTENTE NAO MEDIDA,COM CAIXA

EXISTENTE NA MURETA,SEM FORNECIMENTO HIDROMETRO,COM FORNECIMENTO DO MATERIAL

HIDRAULICO

un 31,86 42,27 39,15 51,94 40,98 54,36 40,01 53,08 40,18 53,30

260441000 - INSTALACAO DE HIDROMETRO EM LIGACAO PREDIAL EXISTENTE NAO MEDIDA,COM CAIXA

EXISTENTE NA MURETA,SEM FORNECIMENTO DO MATERIAL HIDRAULICO E HIDROMETROun 26,72 35,45 34,01 45,12 35,84 47,55 34,87 46,26 35,04 46,48

Página: 46 de 59

Page 47: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

260442000 - INSTALACAO DE HIDROMETRO EM LIGACAO PREDIAL EXISTENTE NAO MEDIDA, EM

CAVALETE, SEM FORNECIMENTO HIDROMETRO,COM FORNECIMENTO DO MATERIAL HIDRAULICOun 45,77 60,72 57,44 76,20 60,36 80,07 58,81 78,02 59,09 78,39

260443000 - INSTALACAO DE HIDROMETRO EM LIGACAO PREDIAL EXISTENTE NAO MEDIDA, EM

CAVALETE, SEM FORNECIMENTO DO MATERIAL HIDRAULICO E HIDROMETROun 42,10 55,85 53,77 71,33 56,69 75,20 55,14 73,15 55,42 73,52

260500 SUBSTITUICAO HIDROMETRO PARA MANUTENCAO

260501 211 - SUBSTITUICAO DE HIDROMETRO PARA AFERICAO E ATUALIZACAO CADASTRAL un 12,62 16,74 17,63 23,39 18,89 25,06 18,22 24,17 18,34 24,33

260504 212 - SUBSTITUICAO DE HIDROMETRO 1/2" - 3 M3 un 11,48 15,23 16,03 21,27 17,18 22,79 16,57 21,98 16,68 22,13

260507 213 - SUBSTITUICAO DE HIDROMETRO 3/4" - 3 M3 un 11,48 15,23 16,03 21,27 17,18 22,79 16,57 21,98 16,68 22,13

260510 214 - SUBSTITUICAO DE HIDROMETRO 1" - 7 M3 un 13,77 18,27 19,24 25,52 20,61 27,34 19,88 26,37 20,01 26,55

260513 215 - SUBSTITUICAO DE HIDROMETRO 1" - 10 M3 un 30,77 40,82 39,52 52,43 41,71 55,33 40,54 53,78 40,75 54,06

260516 216 - SUBSTITUICAO DE HIDROMETRO 1.1/2" - 20 M3 un 35,90 47,62 46,10 61,16 48,66 64,55 47,30 62,75 47,54 63,07

260519 217 - SUBSTITUICAO DE HIDROMETRO 2" - 30 M3 un 46,15 61,22 59,27 78,63 62,56 82,99 60,81 80,67 61,13 81,10

260522 218 - SUBSTITUICAO DE HIDROMETRO 2" WOLTMANN - 300 M3 un 46,15 61,22 59,27 78,63 62,56 82,99 60,81 80,67 61,13 81,10

260525 219 - SUBSTITUICAO DE HIDROMETRO 3" WOLTMANN - 1100 M3 un 51,28 68,03 65,86 87,37 69,51 92,21 67,57 89,64 67,92 90,10

260528 220 - SUBSTITUICAO DE HIDROMETRO 4" WOLTMANN - 1400 M3 un 56,41 74,83 72,45 96,11 76,46 101,43 74,33 98,61 74,71 99,11

260531 221 - SUBSTITUICAO DE HIDROMETRO 6" WOLTMANN - 4000 M3 un 76,92 102,04 98,79 131,05 104,27 138,32 101,36 134,46 101,88 135,15

260534 274 - SUBSTITUICAO DE HIDROMETRO 4" WOLTMANN - 1800 M3 un 80,31 106,54 109,03 144,64 116,23 154,19 112,40 149,11 113,09 150,03

260600 LIGACAO DE AGUA

260601 223 - LIGACAO DE 1/2" COM HIDROMETRO NO PASSEIO SEM PAVIMENTO un 64,10 85,04 82,33 109,22 86,89 115,27 84,46 112,04 84,90 112,63

260604 224 - LIGACAO DE 1/2" SEM HIDROMETRO NO PASSEIO SEM PAVIMENTO un 61,54 81,64 79,03 104,84 83,41 110,65 81,08 107,56 81,50 108,12

260607 225 - LIGACAO DE 3/4" COM HIDROMETRO NO PASSEIO SEM PAVIMENTO un 64,10 85,04 82,33 109,22 86,89 115,27 84,46 112,04 84,90 112,63

260610 226 - LIGACAO DE 1/2" COM HIDROMETRO NO PASSEIO COM PAVIMENTO un 102,34 135,76 131,69 174,70 139,04 184,45 135,14 179,28 135,84 180,21

260611 226 - LIGACAO DE 1/2" COM HIDROMETRO NO PASSEIO COM PAVIMENTO SEM RECOMPOSICAO un 89,74 119,05 115,26 152,90 121,64 161,37 118,25 156,87 118,86 157,68

260613 227 - LIGACAO DE 1/2" SEM HIDROMETRO NO PASSEIO COM PAVIMENTO un 89,52 118,76 115,22 152,85 121,67 161,41 118,25 156,87 118,86 157,68

260614 227 - LIGACAO DE 1/2" SEM HIDROMETRO NO PASSEIO COM PAVIMENTO SEM RECOMPOSICAO un 76,92 102,04 98,79 131,05 104,27 138,32 101,36 134,46 101,88 135,15

260616 228 - LIGACAO DE 3/4" C0M HIDROMETRO NO PASSEIO COM PAVIMENTO un 102,34 135,76 131,69 174,70 139,04 184,45 135,14 179,28 135,84 180,21

260617 228 - LIGACAO DE 3/4" C0M HIDROMETRO NO PASSEIO COM PAVIMENTO SEM RECOMPOSICAO un 89,74 119,05 115,26 152,90 121,64 161,37 118,25 156,87 118,86 157,68

260619 229 - LIGACAO DE 1/2" C0M HIDROMETRO NA RUA SEM PAVIMENTO un 76,92 102,04 98,79 131,05 104,27 138,32 101,36 134,46 101,88 135,15

260622 230 - LIGACAO DE 1/2" SEM HIDROMETRO NA RUA SEM PAVIMENTO un 61,54 81,64 79,03 104,84 83,41 110,65 81,08 107,56 81,50 108,12

260625 231 - LIGACAO DE 3/4" COM HIDROMETRO NA RUA SEM PAVIMENTO un 76,92 102,04 98,79 131,05 104,27 138,32 101,36 134,46 101,88 135,15

260628 232 - LIGACAO DE 1/2" COM HIDROMETRO NA RUA COM PAVIMENTO un 104,90 139,16 134,98 179,06 142,52 189,07 138,52 183,76 139,24 184,72

260629 232 - LIGACAO DE 1/2" COM HIDROMETRO NA RUA COM PAVIMENTO SEM RECOMPOSICAO un 92,30 122,45 118,55 157,27 125,12 165,98 121,63 161,35 122,26 162,19

260631 233 - LIGACAO DE 1/2" SEM HIDROMETRO NA RUA COM PAVIMENTO un 102,85 136,44 132,34 175,56 139,74 185,38 135,81 180,17 136,52 181,11

260632 233 - LIGACAO DE 1/2" SEM HIDROMETRO NA RUA COM PAVIMENTO SEM RECOMPOSICAO un 90,25 119,73 115,91 153,77 122,34 162,30 118,92 157,76 119,54 158,58

260634 234 - LIGACAO DE 3/4" COM HIDROMETRO NA RUA COM PAVIMENTO un 104,90 139,16 134,98 179,06 142,52 189,07 138,52 183,76 139,24 184,72

260635 234 - LIGACAO DE 3/4" COM HIDROMETRO NA RUA COM PAVIMENTO SEM RECOMPOSICAO un 92,30 122,45 118,55 157,27 125,12 165,98 121,63 161,35 122,26 162,19

260637 235 - LIGACAO DE 1" COM HIDROMETRO NO PASSEIO SEM PAVIMENTO un 94,36 125,18 121,18 160,76 127,90 169,67 124,33 164,94 124,97 165,79

260640 236 - LIGACAO DE 2" COM HIDROMETRO NO PASSEIO SEM PAVIMENTO un 94,36 125,18 121,18 160,76 127,90 169,67 124,33 164,94 124,97 165,79

260643 237 - LIGACAO DE 1" COM HIDROMETRO NO PASSEIO COM PAVIMENTO un 111,06 147,33 142,88 189,54 150,86 200,13 146,62 194,51 147,39 195,53

260644 237 - LIGACAO DE 1" COM HIDROMETRO NO PASSEIO COM PAVIMENTO SEM RECOMPOSICAO un 98,46 130,62 126,45 167,75 133,46 177,05 129,73 172,10 130,41 173,00

260646 238 - LIGACAO DE 2" COM HIDROMETRO NO PASSEIO COM PAVIMENTO un 115,16 152,77 148,15 196,54 156,42 207,51 152,03 201,68 152,82 202,73

260647 238 - LIGACAO DE 2" COM HIDROMETRO NO PASSEIO COM PAVIMENTO SEM RECOMPOSICAO un 102,56 136,06 131,72 174,74 139,02 184,42 135,14 179,28 135,84 180,21

260649 239 - LIGACAO DE 1" COM HIDROMETRO NA RUA SEM PAVIMENTO un 94,36 125,18 121,18 160,76 127,90 169,67 124,33 164,94 124,97 165,79

260652 240 - LIGACAO DE 2" COM HIDROMETRO NA RUA SEM PAVIMENTO un 94,36 125,18 121,18 160,76 127,90 169,67 124,33 164,94 124,97 165,79

260655 241 - LIGACAO DE 1" COM HIDROMETRO NA RUA COM PAVIMENTO un 111,06 147,33 142,88 189,54 150,86 200,13 146,62 194,51 147,39 195,53

260656 241 - LIGACAO DE 1" COM HIDROMETRO NA RUA COM PAVIMENTO SEM RECOMPOSICAO un 98,46 130,62 126,45 167,75 133,46 177,05 129,73 172,10 130,41 173,00

260658 242 - LIGACAO DE 2" COM HIDROMETRO NA RUA COM PAVIMENTO un 111,06 147,33 142,88 189,54 150,86 200,13 146,62 194,51 147,39 195,53

260659 242 - LIGACAO DE 2" COM HIDROMETRO NA RUA COM PAVIMENTO SEM RECOMPOSICAO un 98,46 130,62 126,45 167,75 133,46 177,05 129,73 172,10 130,41 173,00

260661 243 - LIGACAO DE 1.1/2" COM HIDROMETRO NO PASSEIO SEM PAVIMENTO un 94,36 125,18 121,18 160,76 127,90 169,67 124,33 164,94 124,97 165,79

260664 244 - LIGACAO DE 1.1/2" COM HIDROMETRO NO PASSEIO COM PAVIMENTO un 115,16 152,77 148,15 196,54 156,42 207,51 152,03 201,68 152,82 202,73

260665 244 - LIGACAO DE 1.1/2" COM HIDROMETRO NO PASSEIO COM PAVIMENTO un 102,56 136,06 131,72 174,74 139,02 184,42 135,14 179,28 135,84 180,21

260667 245 - LIGACAO DE 1.1/2" COM HIDROMETRO NA RUA SEM PAVIMENTO un 94,36 125,18 121,18 160,76 127,90 169,67 124,33 164,94 124,97 165,79

260670 246 - LIGACAO DE 1.1/2" COM HIDROMETRO NA RUA COM PAVIMENTO un 111,06 147,33 142,88 189,54 150,86 200,13 146,62 194,51 147,39 195,53

260671 246 - LIGACAO DE 1.1/2" COM HIDROMETRO NA RUA COM PAVIMENTO SEM RECOMPOSICAO un 98,46 130,62 126,45 167,75 133,46 177,05 129,73 172,10 130,41 173,00

260673 247 - LIGACAO DE >2" COM HIDROMETRO NO PASSEIO SEM PAVIMENTO un 118,97 157,83 152,80 202,70 161,26 213,93 156,76 207,96 157,57 209,03

260676 248 - LIGACAO DE >2" COM HIDROMETRO NO PASSEIO COM PAVIMENTO un 135,67 179,98 174,49 231,48 184,22 244,39 179,06 237,54 179,99 238,77

260679 249 - LIGACAO DE >2" COM HIDROMETRO NA RUA SEM PAVIMENTO un 106,66 141,50 136,99 181,73 144,58 191,80 140,55 186,45 141,27 187,41

260682 250 - LIGACAO DE >2" COM HIDROMETRO NA RUA COM PAVIMENTO un 121,31 160,93 156,05 207,02 164,76 218,57 160,14 212,44 160,97 213,54

260683 251 - LIGACAO DE AGUA POPULAR 1/2" un 64,10 85,04 82,33 109,22 86,89 115,27 84,46 112,04 84,90 112,63

260684000 - LIGACAO DOMICILIAR SEM HIDROMETRO SEM FORNECIMENTO DE MATERIAL EM RUAS COM

PAVIMENTOun 76,27 101,18 97,59 129,46 102,94 136,56 100,10 132,79 100,61 133,47

260685000 - LIGACAO DOMICILIAR SEM HIDROMETRO COM FORNECIMENTO DE MATERIAL EM RUAS COM

PAVIMENTOun 100,81 133,73 122,13 162,02 127,48 169,11 124,64 165,35 125,15 166,02

260686000 - LIGACAO DOMICILIAR COM ASSENTAMENTO DE HIDROMETRO EMBUTIDO NA PAREDE COM

PAVIMENTO,COM FORNECIMENTO DE MATERIAL,EXETO HIDROMETRO, COM CAIXA FORNECIDA E

ASSENTADA PELO USUARIO

un 114,57 151,99 138,81 184,15 144,89 192,21 141,67 187,94 142,25 188,71

260687000 - LIGACAO DOMICILIAR SEM HIDROMETRO SEM FORNECIMENTO DE MATERIAL EM RUAS SEM

PAVIMENTOun 38,03 50,45 48,23 63,98 50,79 67,38 49,43 65,57 49,67 65,89

260688000 - LIGACAO DOMICILIAR SEM HIDROMETRO COM FORNECIMENTO DE MATERIAL EM RUAS SEM

PAVIMENTOun 62,57 83,01 72,77 96,54 75,33 99,93 73,97 98,13 74,21 98,45

260689000 - LIGACAO DOMICILIAR COM ASSENTAMENTO DE HIDROMETRO EMBUTIDO NA PAREDE COM

PAVIMENTO,SEM FORNECIMENTO DE MATERIAL,EXETO HIDROMETRO, COM CAIXA FORNECIDA E

ASSENTADA PELO USUARIO

un 93,01 123,39 117,25 155,54 123,33 163,61 120,11 159,34 120,69 160,11

260690000 - LIGACAO DOMICILIAR COM ASSENTAMENTO DE HIDROMETRO EMBUTIDO NA PAREDE SEM

PAVIMENTO,COM FORNECIMENTO DE MATERIAL,EXETO HIDROMETRO, COM CAIXA FORNECIDA E

ASSENTADA PELO USUARIO

un 76,33 101,26 89,45 118,66 92,74 123,03 90,99 120,71 91,31 121,13

260691000 - LIGACAO DOMICILIAR COM ASSENTAMENTO DE HIDROMETRO EMBUTIDO NA PAREDE SEM

PAVIMENTO,SEM FORNECIMENTO DE MATERIAL/HIDROMETRO, COM CAIXA FORNECIDA E

ASSENTADA PELO USUARIO

un 54,77 72,66 67,89 90,06 71,18 94,43 69,43 92,11 69,75 92,53

260692000 - LIGACAO DOMICILIAR COM ASSENTAMENTO DE HIDROMETRO EMBUTIDO NA PAREDE COM

PAVIMENTO, SEM FORNECIMENTO DE MATERIAL, CAIXA E HIDROMETROun 115,88 153,73 146,86 194,82 154,62 205,12 150,50 199,65 151,25 200,65

260693000 - LIGACAO DOMICILIAR COM ASSENTAMENTO DE HIDROMETRO EMBUTIDO NA PAREDE COM

PAVIMENTO, COM FORNECIMENTO DE MATERIAL, EXCETO CAIXA E HIDROMETROun 140,42 186,28 171,40 227,38 179,16 237,67 175,04 232,21 175,79 233,20

260694000 - LIGACAO DOMICILIAR COM ASSENTAMENTO DE HIDROMETRO EMBUTIDO NA PAREDE SEM

PAVIMENTO,SEM FORNECIMENTO DE MATERIAL CAIXA E HIDROMETROun 77,64 103,00 97,50 129,34 102,47 135,94 99,82 132,42 100,31 133,07

260695000 - LIGACAO DOMICILIAR COM ASSENTAMENTO DE HIDROMETRO EMBUTIDO NA PAREDE SEM

PAVIMENTO,COM FORNECIMENTO DE MATERIAL EXCETO CAIXA E HIDROMETROun 102,18 135,55 122,04 161,90 127,01 168,49 124,36 164,98 124,85 165,63

260696000 - LIGACAO DOMICILIAR COM ASSENTAMENTO DE HIDROMETRO EM MURETA COM

PAVIMENTO,SEM FORNECIMENTO DE MATERIAL, MURETA,CAIXA E HIDROMETROun 100,70 133,59 127,13 168,65 133,76 177,45 130,24 172,78 130,88 173,63

260697000 - LIGACAO DOMICILIAR COM ASSENTAMENTO DE HIDROMETRO EM MURETA COM

PAVIMENTO,COM FORNECIMENTO DE MATERIAL, EXCETO MURETA,CAIXA E HIDROMETROun 125,24 166,14 151,67 201,21 158,30 210,00 154,78 205,33 155,42 206,18

260698000 - LIGACAO DOMICILIAR COM ASSENTAMENTO DE HIDROMETRO EM MURETA SEM

PAVIMENTO, SEM FORNECIMENTO DE MATERIAL, MURETA,CAIXA E HIDROMETROun 67,22 89,17 83,88 111,28 88,06 116,82 85,84 113,88 86,24 114,41

260699000 - LIGACAO DOMICILIAR COM ASSENTAMENTO DE HIDROMETRO EM MURETA SEM

PAVIMENTO, COM FORNECIMENTO DE MATERIAL,EXCETO MURETA,CAIXA E HIDROMETROun 91,76 121,73 108,42 143,83 112,60 149,38 110,38 146,43 110,78 146,96

260700 REATIVACAO DE FORNECIMENTO DE AGUA

260701 252 - RELIGACAO DO RAMAL un 11,48 15,23 16,03 21,27 17,18 22,79 16,57 21,98 16,68 22,13

260704 253 - RELIGACAO DO ABASTECIMENTO DE CORTE INDEVIDO un 11,48 15,23 16,03 21,27 17,18 22,79 16,57 21,98 16,68 22,13

260707 254 - RELIGACAO DO RAMAL POR CORTE-FECHAMENTO DE TOMADA DA REDE un 51,28 68,03 65,86 87,37 69,51 92,21 67,57 89,64 67,92 90,10

260710 255 - RELIGACAO DO RAMAL POR CORTE INDEVIDO (FECHAMENTO DE TOMADA DA REDE) un 51,28 68,03 65,86 87,37 69,51 92,21 67,57 89,64 67,92 90,10

260715000 - REATIVACAO DE FORNECIMEMTO DE AGUA NO FERRULE/ COLAR DE TOMADA, COM

PAVIMENTO, SEM FORNECIMENTO DO MATERIAL HIDRAULICOun 42,85 56,84 55,01 72,98 58,06 77,02 56,44 74,87 56,73 75,26

260716000 - REATIVACAO DE FORNECIMEMTO DE AGUA NO FERRULE/ COLAR DE TOMADA, COM

PAVIMENTO, COM FORNECIMENTO DO MATERIAL HIDRAULICOun 44,74 59,35 56,90 75,48 59,95 79,53 58,33 77,38 58,62 77,77

Página: 47 de 59

Page 48: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

260718000 - REATIVACAO DE FORNECIMEMTO DE AGUA NO FERRULE/ COLAR DE TOMADA, SEM

PAVIMENTO, SEM FORNECIMENTO DO MATERIAL HIDRAULICOun 21,48 28,50 27,31 36,23 28,77 38,17 28,00 37,14 28,14 37,33

260719000 - REATIVACAO DE FORNECIMEMTO DE AGUA NO FERRULE/ COLAR DE TOMADA, SEM

PAVIMENTO COM FORNECIMENTO DO MATERIAL HIDRAULICOun 23,37 31,00 29,20 38,74 30,66 40,67 29,89 39,65 30,03 39,84

260722 000 - REATIVACAO DE FORNECIMEMTO DE AGUA NO REGISTRO un 4,59 6,09 6,41 8,50 6,87 9,11 6,63 8,80 6,67 8,85

260725000 - REATIVACAO DE FORNECIMEMTO DE AGUA EM RAMAL MEDIDO COM RETIRADA DE

ARRUELA CEGAun 7,70 10,21 10,62 14,09 11,35 15,06 10,96 14,54 11,03 14,63

260727000 - REATIVACAO DE FORNECIMEMTO DE AGUA EM RAMAL NAO MEDIDO COM RETIRADA DE

CAP SEM FORNECIMENTO DOS MATERIAISun 8,19 10,86 11,11 14,74 11,84 15,71 11,45 15,19 11,52 15,28

260728000 - REATIVACAO DE FORNECIMEMTO DE AGUA EM RAMAL NAO MEDIDO COM RETIRADA DE

CAP, COM FORNECIMENTO DOS MATERIAISun 9,77 12,96 12,69 16,83 13,42 17,80 13,03 17,29 13,10 17,38

260731000 - REATIVACAO DE FORNECIMEMTO DE AGUA NA CAIXA DE PROTECAO COM RETIRADA DE

CAPSULAun 12,60 16,72 17,46 23,16 18,68 24,78 18,03 23,92 18,15 24,08

260733000 - REATIVACAO DE FORNECIMENTO DE AGUA EM RAMAL COM RETIRADA DE CAPSULA COM

PAVIMENTO SEM FORNECIMENTO DOS MATERIAISun 33,96 45,05 43,62 57,87 46,05 61,09 44,77 59,39 45,00 59,70

260734000 - REATIVACAO DE FORNECIMENTO DE AGUA EM RAMAL COM RETIRADA DE CAPSULA COM

PAVIMENTO EM PARALELO COM FORNECIMENTO DOS MATERIAISun 35,54 47,15 45,20 59,96 47,63 63,19 46,35 61,49 46,58 61,79

260736000 - REATIVACAO DE FORNECIMENTO DE AGUA EM RAMAL COM RETIRADA DE CAPSULA SEM

PAVIMENTO SEM FORNECIMENTO DOS MATERIAISun 15,50 20,56 19,67 26,09 20,71 27,47 20,15 26,73 20,25 26,86

260737000 - REATIVACAO DE FORNECIMENTO DE AGUA EM RAMAL COM RETIRADA DE CAPSULA SEM

PAVIMENTO COM FORNECIMENTO DOS MATERIAISun 17,08 22,66 21,25 28,19 22,29 29,57 21,73 28,83 21,83 28,96

260739000 - REATIVACAO DE FORNECIMEMTO DE AGUA EM RAMAL SUPRIMIDO COM COLAR EXISTENTE,

EM AREA PAVIMENTADA, INCLUINDO ASSENTAMENTO DE HIDROMETRO SEN FORNECIMENTO

DOS MATERIAIS

un 64,85 86,03 83,26 110,45 87,88 116,58 85,43 113,33 85,87 113,92

260740000 - REATIVACAO DE FORNECIMEMTO DE AGUA EM RAMAL SUPRIMIDO COM COLAR EXISTENTE,

EM AREA PAVIMENTADA COM PARALELO, INCLUINDO ASSENTAMENTO DE HIDROMETRO COM

FORNECIMENTO DOS MATERIAIS

un 74,82 99,26 93,23 123,68 97,85 129,81 95,40 126,56 95,84 127,14

260742000 - REATIVACAO DE FORNECIMEMTO DE AGUA EM RAMAL SUPRIMIDO COM COLAR EXISTENTE

EM AREA SEM PAVIMENTO, INCLUINDO ASSENTAMENTO DE HIDROMETRO, SEM FORNECIMENTO

DOS MATERIAIS

un 30,27 40,16 38,60 51,21 40,69 53,98 39,58 52,51 39,78 52,77

260743000 - REATIVACAO DE FORNECIMEMTO DE AGUA EM RAMAL SUPRIMIDO COM COLAR EXISTENTE

EM AREA SEM PAVIMENTO, INCLUINDO ASSENTAMENTO DE HIDROMETRO, COM FORNRCIMENTO

DOS MATERIAIS

un 40,24 53,38 48,57 64,43 50,66 67,21 49,55 65,73 49,75 66,00

260745000 - INSTALACAO DE RAMAL PARA FUTURA LIGACAO DE AGUA ATE MEIO FIO (RAMAL COM

CAPEAMENTO), SEM FORNECIMENTO DO MATERIAL HIDRAULICOun 42,98 57,02 55,14 73,15 58,20 77,21 56,58 75,06 56,87 75,44

260746000 - INSTALACAO DE RAMAL PARA FUTURA LIGACAO DE AGUA ATE MEIO FIO (RAMAL COM

CAPEAMENTO), COM FORNECIMENTO DO MATERIAL HIDRAULICOun 56,63 75,13 68,79 91,26 71,85 95,32 70,23 93,17 70,52 93,55

260748000 - REATIVACAO DE FORNECIMEMTO DE AGUA EM RAMAL SUPRIMIDO SEM COLAR EM AREA

PAVIMENTADA,INCLUINDO ASSENTAMENTO DE HIDROMETRO, SEM FORNECIMENTO DO

MATERIAL HIDRAULICO

un 69,98 92,84 89,85 119,20 94,83 125,80 92,19 122,30 92,66 122,92

260749000 - REATIVACAO DE FORNECIMEMTO DE AGUA EM RAMAL SUPRIMIDO SEM COLAR EM AREA

PAVIMENTADA COM PARALELO,INCLUINDO ASSENTAMENTO DE HIDROMETRO, COM

FORNECIMENTO DO MATERIAL HIDRAULICO

un 87,73 116,38 107,60 142,74 112,58 149,35 109,94 145,85 110,41 146,47

260751000 - REATIVACAO DE FORNECIMEMTO DE AGUA EM RAMAL SUPRIMIDO SEM COLAR EM AREA

SEM PAVIMENTO,INCLUINDO ASSENTAMENTO DE HIDROMETRO, SEM FORNECIMENTO DO

MATERIAL HIDRAULICO

un 35,33 46,87 45,10 59,83 47,54 63,07 46,24 61,34 46,48 61,66

260752000 - REATIVACAO DE FORNECIMEMTO DE AGUA EM RAMAL SUPRIMIDO SEM COLAR EM AREA

SEM PAVIMENTO,INCLUINDO ASSENTAMENTO DE HIDROMETRO, COM FORNECIMENTO DO

MATERIAL HIDRAULICO

un 53,08 70,42 62,85 83,38 65,29 86,61 63,99 84,89 64,23 85,21

260754000 - REATIVACAO DE FORNECIMEMTO DE AGUA EM RAMAL SUPRIMIDO COM COLAR

EXISTENTE,EM AREA PAVIMENTADA EM LIGACAO NAO MEDIDA, SEM FORNECIMENTO DO

MATERIAL HIDRAULICO

un 59,72 79,22 76,67 101,71 80,93 107,36 78,67 104,36 79,08 104,91

260755000 - REATIVACAO DE FORNECIMEMTO DE AGUA EM RAMAL SUPRIMIDO COM COLAR

EXISTENTE,EM AREA PAVIMENTADA EM PARALELO EM LIGACAO NAO MEDIDA, COM

FORNECIMENTO DO MATERIAL HIDRAULICO

un 69,69 92,45 86,64 114,94 90,90 120,59 88,64 117,59 89,05 118,13

260757000 - REATIVACAO DE FORNECIMEMTO DE AGUA EM RAMAL SUPRIMIDO COM COLAR EXISTENTE

EM AREA SEM PAVIMENTO EM LIGACAO NAO MEDIDA SEM FORNECIMENTO DO MATERIAL

HIDRAULICO

un 25,07 33,26 31,92 42,35 33,64 44,63 32,73 43,42 32,89 43,63

260758000 - REATIVACAO DE FORNECIMEMTO DE AGUA EM RAMAL SUPRIMIDO COM COLAR EXISTENTE

EM AREA SEM PAVIMENTO EM LIGACAO NAO MEDIDA, COM FORNECIMENTO DO MATERIAL

HIDRAULICO

un 35,04 46,48 41,89 55,57 43,61 57,85 42,70 56,65 42,86 56,86

260760000 - REATIVACAO DE FORNECIMEMTO DE AGUA EM RAMAL SUPRIMIDO SEM COLAR EM AREA

PAVIMENTADA EM LIGACAO NAO MEDIDA, SEM FORNECIMENTO DO MATERIAL HIRAULICOun 64,85 86,03 83,26 110,45 87,88 116,58 85,43 113,33 85,87 113,92

260761000 - REATIVACAO DE FORNECIMEMTO DE AGUA EM RAMAL SUPRIMIDO SEM COLAR EM AREA

PAVIMENTADA EM PARALELO EM LIGACAO NAO MEDIDAun 82,60 109,58 101,01 134,00 105,63 140,13 103,18 136,88 103,62 137,46

260763000 - REATIVACAO DE FORNECIMEMTO DE AGUA EM RAMAL SUPRIMIDO SEM COLAR EM AREA

SEM PAVIMENTO EM LIGACAO NAO MEDIDA, SEM FORNECIMENTO DO MATERIAL HIDRAULICOun 30,20 40,06 38,51 51,09 40,59 53,85 39,48 52,37 39,68 52,64

260764000 - REATIVACAO DE FORNECIMEMTO DE AGUA EM RAMAL SUPRIMIDO SEM COLAR EM AREA

SEM PAVIMENTO EM LIGACAO NAO MEDIDA, COM FORNECIMENTO DO MATERIAL HIDRAULICOun 47,95 63,61 56,26 74,63 58,34 77,39 57,23 75,92 57,43 76,19

260800 TRANSFERENCIA DE RAMAL E/OU HIDROMETRO

260801 298 - TRANSFERENCIA DE RAMAL DA REDE DE DISTRIBUICAO PARA OUTRA COM PAVIMENTO un 62,85 83,38 80,97 107,41 85,52 113,45 83,11 110,25 83,54 110,82

260804 000 - TRANSFERENCIA DE RAMAL DA REDE DE DISTRIBUICAO PARA OUTRA SEM PAVIMENTO un 35,90 47,62 46,10 61,16 48,66 64,55 47,30 62,75 47,54 63,07

260807 299 - TRANSFERENCIA DE RAMAL DE UMA POSICAO PARA OUTRA COM PAVIMENTO un 110,03 145,97 141,56 187,79 149,47 198,29 145,27 192,72 146,03 193,72

260810 000 - TRANSFERENCIA DE RAMAL DE UMA POSICAO PARA OUTRA SEM PAVIMENTO un 93,84 124,49 120,52 159,88 127,20 168,74 123,65 164,03 124,29 164,88

260813 300 - TRANSFERENCIA DE RAMAL E/OU HIDROMETRO DE 1/2" un 50,25 66,66 64,54 85,62 68,12 90,37 66,22 87,85 66,56 88,30

260816 301 - TRANSFERENCIA DE RAMAL E/OU HIDROMETRO DE 3/4" un 50,25 66,66 64,54 85,62 68,12 90,37 66,22 87,85 66,56 88,30

260819 302 - TRANSFERENCIA DE RAMAL E/OU HIDROMETRO DE 1" un 97,43 129,25 125,13 166,00 132,07 175,20 128,38 170,31 129,05 171,20

260822 303 - TRANSFERENCIA DE RAMAL E/OU HIDROMETRO DE 1.1/2" un 97,43 129,25 125,13 166,00 132,07 175,20 128,38 170,31 129,05 171,20

260825 304 - TRANSFERENCIA DE RAMAL E/OU HIDROMETRO DE 2" un 97,43 129,25 125,13 166,00 132,07 175,20 128,38 170,31 129,05 171,20

260828 305 - TRANSFERENCIA DE RAMAL E/OU HIDROMETRO >2" un 97,43 129,25 125,13 166,00 132,07 175,20 128,38 170,31 129,05 171,20

260830000 - TRANSFERENCIA DE HIDROMETRO DO PASSEIO PARA PAREDE SEM MATERIAL HIDRAULICO

E CAIXAun 77,25 102,48 99,37 131,82 104,92 139,19 101,98 135,29 102,52 136,00

260831000 - TRANSFERENCIA DE HIDROMETRO DO PASSEIO PARA PAREDE COM MATERIAL HIDRAULICO

EXCETO CAIXAun 83,44 110,69 105,56 140,04 111,11 147,40 108,17 143,50 108,71 144,21

260833000 - TRANSFERENCIA DE HIDROMETRO DO PASSEIO PARA MURETA SEM MATERIAL HIDRAULICO

E CAIXAun 64,95 86,16 83,36 110,59 87,98 116,71 85,53 113,46 85,97 114,05

260834000 - TRANSFERENCIA DE HIDROMETRO DO PASSEIO PARA MURETA COM MATERIAL HIDRAULICO

EXCETO CAIXAun 68,99 91,52 87,40 115,94 92,02 122,07 89,57 118,82 90,01 119,41

260900 SUSPENSAO DE FORNECIMENTO DE AGUA

260901 257 - CORTE NO RAMAL un 12,62 16,74 17,63 23,39 18,89 25,06 18,22 24,17 18,34 24,33

260904 258 - CORTE NO RAMAL A PEDIDO DO USUARIO un 53,84 71,42 69,15 91,73 72,99 96,83 70,95 94,12 71,32 94,61

260907 259 - CORTE NO FERRULE OU TOMADA DE REDE un 53,84 71,42 69,15 91,73 72,99 96,83 70,95 94,12 71,32 94,61

260910 260 - CORTE POR FALTA DE PAGAMENTO un 53,84 71,42 69,15 91,73 72,99 96,83 70,95 94,12 71,32 94,61

260913 261 - CORTE POR INFRACAO un 53,84 71,42 69,15 91,73 72,99 96,83 70,95 94,12 71,32 94,61

260915000 - SUSPENSAO DE FORNECIMENTO DE AGUA EM REDE COM FECHAMENTO NO FERRULE /

COLAR DE TOMADA COM PAVIMENTO, SEM FORNECIMENTO DO MATERIALun 44,16 58,58 56,96 75,56 60,18 79,83 58,47 77,57 58,78 77,98

260916000 - SUSPENSAO DE FORNECIMENTO DE AGUA EM REDE COM FECHAMENTO NO FERRULE /

COLAR DE TOMADA COM PAVIMENTO, COM FORNECIMENTO DO MATERIALun 46,93 62,26 59,73 79,24 62,95 83,51 61,24 81,24 61,55 81,65

260918000 - SUSPENSAO DE FORNECIMENTO DE AGUA EM REDE COM FECHAMENTO NO FERRULE /

COLAR DE TOMADA SEM PAVIMENTO, SEM FORNECIMENTO DO MATERIALun 24,10 31,97 30,95 41,06 32,67 43,34 31,76 42,13 31,92 42,35

260919000 - SUSPENSAO DE FORNECIMENTO DE AGUA EM REDE COM FECHAMENTO NO FERRULE /

COLAR DE TOMADA SEM PAVIMENTO, COM FORNECIMENTO DO MATERIALun 26,87 35,65 33,72 44,73 35,44 47,01 34,53 45,81 34,69 46,02

260922 000 - SUSPENSAO DE FORNECIMENTO DE AGUA NO REGISTRO un 1,20 1,59 1,65 2,19 1,77 2,35 1,71 2,27 1,72 2,28

260924000 - SUSPENSAO DE FORNECIMENTO DE AGUA EM RAMAL MEDIDO COM USO DE ARRUELA CEGA,

SEM FORNECIMENTO DO MATERIALun 6,24 8,28 8,67 11,50 9,28 12,31 8,96 11,89 9,01 11,95

260925000 - SUSPENSAO DE FORNECIMENTO DE AGUA EM RAMAL MEDIDO COM USO DE ARRUELA CEGA,

COM FORNECIMENTO DO MATERIALun 6,85 9,09 9,28 12,31 9,89 13,12 9,57 12,70 9,62 12,76

260927000 - SUSPENSAO DE FORNECIMENTO DE AGUA EM RAMAL NAO MEDIDO, COM USO DE CAP, SEM

FORNECIMENTO DO MATERIALun 7,65 10,15 10,35 13,73 11,03 14,63 10,67 14,15 10,73 14,23

260928000 - SUSPENSAO DE FORNECIMENTO DE AGUA EM RAMAL NAO MEDIDO, COM USO DE CAP, COM

FORNECIMENTO DO MATERIALun 8,56 11,36 11,26 14,94 11,94 15,84 11,58 15,36 11,64 15,44

260930000 - SUSPENSAO DE FORNECIMENTO DE AGUA NA CAIXA DE PROTECAO, COM USO DE CAPSULA,

SEM FORNECIMENTO DO MATERIALun 13,68 18,15 17,56 23,30 18,54 24,60 18,02 23,91 18,11 24,02

260931000 - SUSPENSAO DE FORNECIMENTO DE AGUA NA CAIXA DE PROTECAO, COM USO DE CAPSULA

COM FORNECIMENTOun 16,45 21,82 20,33 26,97 21,31 28,27 20,79 27,58 20,88 27,70

Página: 48 de 59

Page 49: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

260933000 - SUSPENSAO DE FORNECIMENTO DE AGUA EM RAMAL, COM USO DE CAPSULA SEM

FORNECIMENTO E COM PAVIMENTOun 33,11 43,92 42,77 56,74 45,20 59,96 43,92 58,26 44,15 58,57

260934000 - SUSPENSAO DE FORNECIMENTO DE AGUA EM RAMAL, COM USO DE CAPSULA COM

FORNECIMENTO E PAVIMENTO PARALELOun 35,88 47,60 45,54 60,41 47,97 63,64 46,69 61,94 46,92 62,24

260936000 - SUSPENSAO DE FORNECIMENTO DE AGUA EM RAMAL, COM USO DE CAPSULA SEM

FORNECIMENTO E SEM PAVIMENTOun 14,65 19,43 18,82 24,97 19,86 26,35 19,30 25,60 19,40 25,74

260937000 - SUSPENSAO DE FORNECIMENTO DE AGUA EM RAMAL, COM USO DE CAPSULA COM

FORNECIMENTO E SEM PAVIMENTOun 17,42 23,11 21,59 28,64 22,63 30,02 22,07 29,28 22,17 29,41

261100 SERVICOS TÉNICOS / ADMINISTRATIVOS - COMERCIAL

261107 118 - ASSENTAMENTO DE CAIXA DE PROTECAO DE HIDROMETRO NA PAREDE un 27,48 36,45 35,53 47,13 37,54 49,80 36,47 48,38 36,67 48,65

261110 124 - COLOCACAO DE REGISTRO DE 1/2" un 7,34 9,74 10,26 13,61 10,99 14,58 10,60 14,06 10,67 14,15

261113 124 - COLOCACAO DE REGISTRO DE 3/4" un 7,34 9,74 10,26 13,61 10,99 14,58 10,60 14,06 10,67 14,15

261116 125 - SELAGEM DE HIDROMETRO un 0,92 1,22 1,28 1,70 1,37 1,82 1,33 1,76 1,33 1,76

261119 126 - INSTALACAO DE LACRE ANTI FURTO PARA LIGACOES MEDIDAS un 1,15 1,53 1,60 2,12 1,72 2,28 1,66 2,20 1,67 2,22

261122 133 - REVISAO DE LIGACAO INATIVA HABITADA un 6,12 8,12 8,55 11,34 9,16 12,15 8,84 11,73 8,89 11,79

261123 000 - REVISAO DE LIGACAO INATIVA DESABITADA un 1,15 1,53 1,60 2,12 1,72 2,28 1,66 2,20 1,67 2,22

261124 000 - REVISAO DE LIGACAO INATIVA EM LIGACAO COM RAMAL SUPRIMIDO un 11,93 15,83 16,67 22,11 17,86 23,69 17,23 22,86 17,34 23,00

261125 134 - REVISAO DE LIGACOES CORTADAS NAO REVISADAS un 8,03 10,65 11,22 14,88 12,02 15,95 11,60 15,39 11,67 15,48

261128 000 - REVISAO DE LIGACOES INATIVAS - SERVICO DE FISCALIZACAO E NEGOCIACAO un 10,80 14,33 15,09 20,02 16,17 21,45 15,59 20,68 15,69 20,81

261130 000 - NEGOCIACAO DE DEBITOS COM PAGAMENTO PELO CLIENTE un 13,09 17,37 16,10 21,36 16,86 22,37 16,45 21,82 16,53 21,93

261131 268 - DANIFICACAO DE HIDROMETRO un 28,69 38,06 40,08 53,17 42,94 56,96 41,41 54,93 41,69 55,31

261134 270 - IDENTIFICACAO DE RAMAIS (CADASTRO) un 12,62 16,74 17,63 23,39 18,89 25,06 18,22 24,17 18,34 24,33

261137 000 - IDENTIFICACAO DE HIDROMETRO NAO CADASTRADO un 5,99 7,95 8,37 11,10 8,97 11,90 8,65 11,48 8,70 11,54

261140 272 - VENDA DE AGUA ATRAVES DE CARRO PIPA un 18,68 24,78 27,79 36,87 30,08 39,90 28,86 38,29 29,08 38,58

261143 273 - FORNECIMENTO DE AGUA ATRAVES DE CARRO PIPA un 18,68 24,78 27,79 36,87 30,08 39,90 28,86 38,29 29,08 38,58

261146 000 - COLOCACAO DE TAMPA COM ARO EM CAIXA PLASTICA DE HIDROMETRO NA PAREDE un 9,18 12,18 12,82 17,01 13,74 18,23 13,25 17,58 13,34 17,70

261149000 - COLOCACAO E FORNECIMENTO DE TAMPA COM ARO EM CAIXA PLASTICA PARA

HIDROMETROun 19,67 26,09 23,31 30,92 24,23 32,14 23,74 31,49 23,83 31,61

261152 000 - SUBSTITUICAO TAMPA EM CAIXA PLASTICA PARA HIDROMETRO un 6,12 8,12 8,55 11,34 9,16 12,15 8,84 11,73 8,89 11,79

261153 000 - SUBSTITUICAO TAMPA COM ARO EM CAIXA METALICA DO HIDROMETRO NO PASSEIO un 4,59 6,09 6,41 8,50 6,87 9,11 6,63 8,80 6,67 8,85

261155 000 - COLOCACAO E FORNECIMENTO DE TAMPA EM CAIXA PLASTICA PARA HIDROMETRO un 14,96 19,85 17,39 23,07 18,00 23,88 17,68 23,45 17,73 23,52

261158000 - COLOCACAO E FORNECIMENTO DE ARO COM TAMPA TRANSPARENTE EM CAIXA PLASTICA

PARA HIDROMETROun 21,33 28,30 24,97 33,13 25,89 34,35 25,40 33,70 25,49 33,82

261161 000 - LIMPEZA DE CAIXA E ABRIGO DE PROTECAO DE HIDROMETRO un 7,34 9,74 10,26 13,61 10,99 14,58 10,60 14,06 10,67 14,15

261164 000 - SUBSTITUICAO DE REGISTRO DE METAL (PADRAO EMBASA) DE 1/2" OU 3/4" un 7,34 9,74 10,26 13,61 10,99 14,58 10,60 14,06 10,67 14,15

261166 000 - SUSPENSAO DE HIDROMETRO SEM FORNECIMENTO DO MATERIAL HIDRAULICO un 15,07 19,99 20,34 26,98 21,67 28,75 20,96 27,81 21,10 27,99

261167 000 - SUSPENSAO DE HIDROMETRO COM FORNECIMENTO DO MATERIAL HIDRAULICO un 18,69 24,79 23,96 31,79 25,29 33,55 24,58 32,61 24,72 32,79

261170 000 - DESSOTERRAMENTO DE CAIXA ABRIGO DE PROTECAO DE HIDROMETRO un 14,87 19,73 19,10 25,34 20,16 26,74 19,60 26,00 19,70 26,13

261173 000 - DESOBSTRUCAO DO FILTRO DO HIDROMETRO un 2,30 3,05 3,21 4,26 3,44 4,56 3,31 4,39 3,34 4,43

261176 275 - RETIRADA DE HIDROMETRO un 12,62 16,74 17,63 23,39 18,89 25,06 18,22 24,17 18,34 24,33

261179 000 - RETIRADA DE HIDROMETRO COM PLUG un 12,92 17,14 17,93 23,79 19,19 25,46 18,52 24,57 18,64 24,73

261182 000 - INSTALACAO DE PONTO DE COLETA EM CAIXA DE HIDROMETRO NA PAREDE un 16,12 21,38 22,49 29,84 24,10 31,97 23,24 30,83 23,40 31,04

261200 CORRECAO DE IRREGULARIDADES

261201 000 - CORRECAO DE IRREGULARIDADES NO HIDROMETRO SEM PAVIMENTO (COM 4 FOTOS) un 36,39 48,27 46,11 61,17 48,54 64,39 47,25 62,68 47,48 62,99

261207 000 - PESQUISA E RETIRADA DE BY PASS (COM LAUDO / FOTOGRAFIA) COM PAVIMENTO UN 66,08 87,66 84,49 112,08 89,11 118,21 86,66 114,96 87,10 115,55

261210 000 - PESQUISA E RETIRADA DE BY PASS (COM LAUDO / FOTOGRAFIA) SEM PAVIMENTO UN 43,22 57,34 54,89 72,82 57,81 76,69 56,26 74,63 56,54 75,01

261213 000 - PESQUISA E RETIRADA DE BY-PASS (SEM LAUDO / FOTOGRAFIA) COM PAVIMENTO UN 35,68 47,33 46,07 61,12 48,68 64,58 47,30 62,75 47,54 63,07

261216 000 - PESQUISA E RETIRADA DE BY-PASS (SEM LAUDO / FOTOGRAFIA) SEM PAVIMENTO UN 17,95 23,81 23,05 30,58 24,33 32,28 23,65 31,37 23,77 31,53

261219 000 - RETIRADA DE BY-PASS COM PAVIMENTO un 30,55 40,53 39,48 52,37 41,73 55,36 40,54 53,78 40,75 54,06

261222 000 - RETIRADA DE BY-PASS SEM PAVIMENTO un 14,36 19,05 18,44 24,46 19,46 25,82 18,92 25,10 19,02 25,23

261225000 - PESQUISA E RETIRADA DE LIGACOES CLANDESTINAS (COM LAUDO / FOTOGRAFIA) COM

PAVIMENTOUN 81,46 108,06 104,25 138,30 109,96 145,87 106,93 141,85 107,48 142,58

261228000 - PESQUISA E RETIRADA DE LIGACOES CLANDESTINAS (COM LAUDO / FOTOGRAFIA) SEM

PAVIMENTOUN 58,61 77,75 74,65 99,03 78,66 104,35 76,53 101,52 76,91 102,03

261231 000 - PESQUISA DE LIGACOES CLANDESTINAS OU BY PASS SEM IDENTIFICACAO COM PAVIMENTO UN 20,29 26,92 26,31 34,90 27,83 36,92 27,03 35,86 27,17 36,04

261234 000 - PESQUISA DE LIGACOES CLANDESTINAS OU BY PASS SEM IDENTIFICACAO SEM PAVIMENTO UN 5,13 6,81 6,59 8,74 6,95 9,22 6,76 8,97 6,79 9,01

261237 372 - VERIFICACAO DE LIGACOES CLANDESTINAS OU BY-PASS UN 38,93 51,64 50,08 66,44 52,88 70,15 51,38 68,16 51,65 68,52

261240 000 - VERIFICACAO DE VAZAMENTOS EM INSTALACOES INTERNAS POR LIGACAO un 27,68 36,72 35,61 47,24 37,60 49,88 36,54 48,47 36,73 48,73

261243 000 - VERIFICACAO DE VAZAMENTOS EM INSTALACOES INTERNAS POR ECONOMIA EXCEDENTE un 8,30 11,01 10,68 14,17 11,28 14,96 10,96 14,54 11,02 14,62

261246000 - PESQUISA PARA DETECTAR VAZAMENTOS, BY PASS, LIGACAO CLANDESTINA, ETC., COM

UTILIZACAO GEOFONE E VPO.UN 37,21 49,36 55,38 73,47 59,93 79,50 57,51 76,29 57,95 76,88

261249 000 - PESQUISA DE CONSUMO EM CAMPO un 6,89 9,14 9,62 12,76 10,31 13,68 9,94 13,19 10,01 13,28

261252 117 - RETIRADA DE LIGACAO CLANDESTINA COM PAVIMENTO un 48,50 64,34 62,53 82,95 66,06 87,64 64,19 85,15 64,52 85,59

261255 000 - RETIRADA DE LIGACAO CLANDESTINA SEM PAVIMENTO un 28,20 37,41 36,22 48,05 38,23 50,72 37,16 49,30 37,36 49,56

261258 000 - PESQUISA COM RETIRADA DE LIGACAO CLANDESTINA COM PAVIMENTO un 80,97 107,41 104,24 138,28 110,08 146,03 106,98 141,92 107,54 142,66

261261 000 - PESQUISA COM RETIRADA DE LIGACAO CLANDESTINA SEM PAVIMENTO un 51,28 68,03 65,86 87,37 69,51 92,21 67,57 89,64 67,92 90,10

262000RECOMPOSICAO DE PAVIMENTACAO - RMS - COM APOIO DE CAMINHAO PARA DESLOCAMENTO

DAS EQUIPES

262201RECOMPOSICAO DE PAVIM. C/ PARALELO OU PEDRA C/ APROVEITAMENTO DE 100% DO

MATERIAL LEVANTADO, INCLUINDO CAMINHAO DE APOIOm2 34,29 45,49 39,96 53,01 41,39 54,91 40,64 53,91 40,77 54,09

262225RECOMPOSICAO DE PAVIM. C/ CONCRETO BETUMINOSO USINADO A QUENTE, EM TRINCHEIRA,

INCLUSIVE IMPRIMACAO E CAMINHAO DE APOIOm3 767,43 1.018,07 778,73 1.033,06 781,80 1.037,14 780,51 1.035,42 780,55 1.035,48

262228RECOMPOSICAO DE PAVIM.C/CONCRETO ASFALTICO USINADO A FRIO,EM TRINCHEIRA,INCLUSIVE

IMPRIMACAO E CAMINHAO DE APOIOm3 610,72 810,18 616,13 817,36 617,57 819,27 616,94 818,43 616,98 818,49

269000 SERVICOS NAO CODIFICADOS

269002LIMPEZA INTERNA DE RESERVATORIO COM DESINFECAO, FORNECIMENTO DE PRODUTOS

QUIMICOS E EQUIPAMENTO POR CONTA DA EMBASA (FERREMENTAS E MAO DE OBRA PELA

CONTRATADA)

m2 0,17 0,23 0,26 0,34 0,28 0,37 0,27 0,36 0,27 0,36

269005 LIMPEZA MANUAL DE CAIXA DE AREIA DE ESTACAO DE TRATAMENTO DE ESGOTO m3 589,87 782,52 723,88 960,30 757,57 1.004,99 739,62 981,18 743,00 985,66

300000 RECURSOS HUMANOS E MATERIAIS

300100 RECURSOS HUMANOS

300101 CONSULTOR INTERNACIONAL hora 186,39 247,26 299,10 396,79 327,35 434,26 312,32 414,32 315,00 417,88

300103 CONSULTOR NACIONAL hora 143,37 190,19 230,07 305,21 251,80 334,04 240,24 318,70 242,30 321,44

300105 COORDENADOR hora 128,37 170,30 206,00 273,28 225,46 299,10 215,10 285,35 216,95 287,81

300106 CONSULTOR NACIONAL hora 128,37 170,30 206,00 273,28 225,46 299,10 215,10 285,35 216,95 287,81

300107 ENGENHEIRO SENIOR hora 67,78 89,92 102,15 135,51 111,79 148,30 106,66 141,50 107,57 142,70

300109 ENGENHEIRO MEDIO hora 51,63 68,49 77,80 103,21 85,14 112,95 81,23 107,76 81,93 108,69

300111 ENGENHEIRO JUNIOR hora 51,08 67,76 61,81 82,00 67,65 89,74 64,54 85,62 65,10 86,36

300113 TECNICO SENIOR hora 21,17 28,08 33,97 45,06 37,18 49,32 35,47 47,05 35,77 47,45

300115 TECNICO MEDIO hora 17,65 23,41 28,33 37,58 31,00 41,12 29,58 39,24 29,83 39,57

300117 TECNICO JUNIOR hora 14,71 19,51 23,60 31,31 25,83 34,27 24,64 32,69 24,86 32,98

300119 AUXILIAR TECNICO hora 10,23 13,57 16,42 21,78 17,97 23,84 17,14 22,74 17,29 22,94

300121 PROJETISTA hora 57,00 75,62 91,47 121,34 100,10 132,79 95,51 126,70 96,33 127,79

300123 DESENHISTA PROJETISTA hora 8,56 11,36 13,74 18,23 15,04 19,95 14,35 19,04 14,47 19,20

300125 DESENHISTA COPISTA hora 7,36 9,76 11,81 15,67 12,93 17,15 12,33 16,36 12,44 16,50

300127 SECRETARIA SENIOR hora 21,14 28,04 33,92 45,00 37,12 49,24 35,42 46,99 35,72 47,39

300129 SECRETARIA MEDIO hora 17,61 23,36 28,25 37,48 30,92 41,02 29,50 39,13 29,76 39,48

300131 SECRETARIA JUNIOR hora 14,68 19,47 23,55 31,24 25,78 34,20 24,59 32,62 24,81 32,91

300133 ARQUITETO SENIOR hora 52,67 69,87 84,52 112,12 92,51 122,72 88,26 117,09 89,01 118,08

300135 ARQUITETO MEDIO hora 44,48 59,01 71,38 94,69 78,13 103,65 74,54 98,88 75,18 99,73

300137 ARQUITETO JUNIOR hora 38,79 51,46 62,25 82,58 68,13 90,38 65,00 86,23 65,55 86,96

300139 TOPOGRAFO SENIOR hora 20,03 26,57 32,14 42,64 35,17 46,66 33,56 44,52 33,84 44,89

300141 TOPOGRAFO MEDIO hora 15,41 20,44 24,73 32,81 27,07 35,91 25,83 34,27 26,05 34,56

300143 TOPOGRAFO JUNIOR hora 13,10 17,38 21,02 27,89 23,01 30,53 21,95 29,12 22,14 29,37

300145 GEOLOGO SENIOR hora 98,69 130,92 158,37 210,09 173,32 229,93 165,36 219,37 166,78 221,25

300147 GEOLOGO MEDIO hora 83,45 110,70 133,92 177,66 146,57 194,44 139,84 185,51 141,04 187,10

300149 GEOLOGO JUNIOR hora 64,90 86,10 104,15 138,17 113,98 151,21 108,75 144,27 109,68 145,50

300151 ECONOMISTA SENIOR hora 62,90 83,44 100,94 133,91 110,47 146,55 105,40 139,82 106,30 141,02

300153 ECONOMISTA MEDIO hora 56,61 75,10 90,84 120,51 99,42 131,89 94,85 125,83 95,67 126,92

300155 ECONOMISTA JUNIOR hora 45,29 60,08 72,69 96,43 79,55 105,53 75,90 100,69 76,55 101,55

300157 ENGENHEIRO CHEFE DE PROJETO hora 67,78 89,92 102,15 135,51 111,79 148,30 106,66 141,50 107,57 142,70

300159 ENGENHEIRO RESIDENTE hora 51,63 68,49 81,97 108,74 89,71 119,01 85,59 113,54 86,32 114,51

300161 ANALISTA DE SISTEMAS SENIOR hora 98,69 130,92 158,37 210,09 173,32 229,93 165,36 219,37 166,78 221,25

300163 ANALISTA DE SISTEMAS MEDIO hora 83,45 110,70 133,92 177,66 146,57 194,44 139,84 185,51 141,04 187,10

Página: 49 de 59

Page 50: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

300165 ANALISTA DE SISTEMAS JUNIOR hora 64,90 86,10 104,15 138,17 113,98 151,21 108,75 144,27 109,68 145,50

300167 DIGITADOR SENIOR hora 12,84 17,03 20,61 27,34 22,56 29,93 21,52 28,55 21,71 28,80

300169 DIGITADOR MEDIO hora 10,71 14,21 17,19 22,80 18,81 24,95 17,95 23,81 18,10 24,01

300171 DIGITADOR JUNIOR hora 8,92 11,83 14,32 19,00 15,67 20,79 14,95 19,83 15,08 20,01

300173 PROGRAMADOR DE COMPUTADOR SENIOR hora 55,95 74,22 89,78 119,10 98,26 130,35 93,74 124,36 94,55 125,43

300175 PROGRAMADOR DE COMPUTADOR MEDIO hora 27,76 36,83 44,55 59,10 48,76 64,69 46,52 61,71 46,92 62,24

300177 PROGRAMADOR DE COMPUTADOR JUNIOR hora 14,41 19,12 23,12 30,67 25,30 33,56 24,14 32,02 24,35 32,30

300179 OPERADOR DE MICROCOMPUTADOR hora 27,76 36,83 44,55 59,10 48,76 64,69 46,52 61,71 46,92 62,24

300181 DATILOGRAFO hora 8,04 10,67 12,90 17,11 14,12 18,73 13,47 17,87 13,58 18,02

300185 CONTINUO hora 8,20 10,88 13,17 17,47 14,40 19,10 13,74 18,23 13,86 18,39

300187 MOTORISTA hora 10,02 13,29 16,08 21,33 17,60 23,35 16,79 22,27 16,93 22,46

300200 RECURSOS MATERIAIS

300201 COPIA HELIOGRAFICA A0 un 9,90 13,13 9,90 13,13 9,90 13,13 9,90 13,13 9,90 13,13

300202 COPIA HELIOGRAFICA A1 un 6,95 9,22 6,95 9,22 6,95 9,22 6,95 9,22 6,95 9,22

300204 COPIA HELIOGRAFICA A3 un 3,59 4,76 3,59 4,76 3,59 4,76 3,59 4,76 3,59 4,76

300205 COPIA HELIOGRAFICA A4 un 1,79 2,37 1,79 2,37 1,79 2,37 1,79 2,37 1,79 2,37

300206 COPIA XEROGRAFICA A0 COLORIDA un 27,68 36,72 27,68 36,72 27,68 36,72 27,68 36,72 27,68 36,72

300207 COPIA XEROGRAFICA A1 COLORIDA un 13,84 18,36 13,84 18,36 13,84 18,36 13,84 18,36 13,84 18,36

300208 COPIA XEROGRAFICA A2 COLORIDA un 6,92 9,18 6,92 9,18 6,92 9,18 6,92 9,18 6,92 9,18

300209 COPIA XEROGRAFICA A3 COLORIDA un 3,45 4,58 3,45 4,58 3,45 4,58 3,45 4,58 3,45 4,58

300210 COPIA XEROGRAFICA A4 COLORIDA un 1,74 2,31 1,74 2,31 1,74 2,31 1,74 2,31 1,74 2,31

300211 COPIA XEROGRAFICA A0 PRETO/BRANCO un 16,60 22,02 16,60 22,02 16,60 22,02 16,60 22,02 16,60 22,02

300212 COPIA XEROGRAFICA A1 PRETO/BRANCO un 8,32 11,04 8,32 11,04 8,32 11,04 8,32 11,04 8,32 11,04

300213 COPIA XEROGRAFICA A2 PRETO/BRANCO un 4,21 5,58 4,21 5,58 4,21 5,58 4,21 5,58 4,21 5,58

300214 COPIA XEROGRAFICA A3 PRETO/BRANCO un 2,06 2,73 2,06 2,73 2,06 2,73 2,06 2,73 2,06 2,73

300215 COPIA XEROGRAFICA A4 PRETO/BRANCO un 0,16 0,21 0,16 0,21 0,16 0,21 0,16 0,21 0,16 0,21

300221 ENCADERNACAO COM GARRA ATE 50 FOLHAS un 2,36 3,13 2,36 3,13 2,36 3,13 2,36 3,13 2,36 3,13

300222 ENCADERNACAO COM GARRA ATE 100 FOLHAS un 2,63 3,49 2,63 3,49 2,63 3,49 2,63 3,49 2,63 3,49

300223 ENCADERNACAO COM GARRA ATE 150 FOLHAS un 3,30 4,38 3,30 4,38 3,30 4,38 3,30 4,38 3,30 4,38

300224 ENCADERNACAO COM GARRA ATE 200 FOLHAS un 3,94 5,23 3,94 5,23 3,94 5,23 3,94 5,23 3,94 5,23

300225 ENCADERNACAO COM GARRA ATE 250 FOLHAS un 4,61 6,12 4,61 6,12 4,61 6,12 4,61 6,12 4,61 6,12

300226 ENCADERNACAO COM ESPIRAL ATE 50 FOLHAS un 2,24 2,97 2,24 2,97 2,24 2,97 2,24 2,97 2,24 2,97

300227 ENCADERNACAO COM ESPIRAL ATE 100 FOLHAS un 2,24 2,97 2,24 2,97 2,24 2,97 2,24 2,97 2,24 2,97

300228 ENCADERNACAO COM ESPIRAL ATE 150 FOLHAS un 2,50 3,32 2,50 3,32 2,50 3,32 2,50 3,32 2,50 3,32

300229 ENCADERNACAO COM ESPIRAL ATE 200 FOLHAS un 2,50 3,32 2,50 3,32 2,50 3,32 2,50 3,32 2,50 3,32

300230 ENCADERNACAO COM ESPIRAL ATE 250 FOLHAS un 3,09 4,10 3,09 4,10 3,09 4,10 3,09 4,10 3,09 4,10

300231 TRANSPORTE EM VEICULO PASSEIO / UTILITARIO Km 1,72 2,28 1,72 2,28 1,72 2,28 1,72 2,28 1,72 2,28

300232 REFEICAO un 7,89 10,47 7,89 10,47 7,89 10,47 7,89 10,47 7,89 10,47

300233 DIARIA NIVEL SUPERIOR un 149,98 198,96 149,98 198,96 149,98 198,96 149,98 198,96 149,98 198,96

300234 DIARIA NIVEL MEDIO un 117,08 155,32 117,08 155,32 117,08 155,32 117,08 155,32 117,08 155,32

300235 ALUGUEL DE MICRO-COMPUTADOR COM ESTABILIZADOR dia 32,90 43,65 32,90 43,65 32,90 43,65 32,90 43,65 32,90 43,65

300236 ALUGUEL DE IMPRESSORA dia 6,58 8,73 6,58 8,73 6,58 8,73 6,58 8,73 6,58 8,73

300237 ALUGUEL DE PLOTER dia 86,83 115,19 86,83 115,19 86,83 115,19 86,83 115,19 86,83 115,19

300238 DISQUETE 3 1/2" DF/HD un 2,36 3,13 2,36 3,13 2,36 3,13 2,36 3,13 2,36 3,13

300239 CARTUCHO DE TINTA PARA PLOTER un 105,24 139,61 105,24 139,61 105,24 139,61 105,24 139,61 105,24 139,61

300240 CARTUCHO DE TINTA PARA IMPRESSORA un 105,24 139,61 105,24 139,61 105,24 139,61 105,24 139,61 105,24 139,61

300241 PLOTAGEM EM PAPEL OPACO A0 un 12,38 16,42 12,38 16,42 12,38 16,42 12,38 16,42 12,38 16,42

300242 PLOTAGEM EM PAPEL OPACO A1 un 6,97 9,25 6,97 9,25 6,97 9,25 6,97 9,25 6,97 9,25

300243 PLOTAGEM EM PAPEL OPACO A2 un 4,34 5,76 4,34 5,76 4,34 5,76 4,34 5,76 4,34 5,76

300244 PLOTAGEM EM PAPEL OPACO A3 un 3,16 4,19 3,16 4,19 3,16 4,19 3,16 4,19 3,16 4,19

300245 PLOTAGEM EM PAPEL OPACO A4 un 2,36 3,13 2,36 3,13 2,36 3,13 2,36 3,13 2,36 3,13

300246 PLOTAGEM EM PAPEL VEGETAL A0 un 17,90 23,75 17,90 23,75 17,90 23,75 17,90 23,75 17,90 23,75

300247 PLOTAGEM EM PAPEL VEGETAL A1 un 9,99 13,25 9,99 13,25 9,99 13,25 9,99 13,25 9,99 13,25

300248 PLOTAGEM EM PAPEL VEGETAL A2 un 5,92 7,85 5,92 7,85 5,92 7,85 5,92 7,85 5,92 7,85

300249 PLOTAGEM EM PAPEL VEGETAL A3 un 4,74 6,29 4,74 6,29 4,74 6,29 4,74 6,29 4,74 6,29

300250 PLOTAGEM EM PAPEL VEGETAL A4 un 3,56 4,72 3,56 4,72 3,56 4,72 3,56 4,72 3,56 4,72

300256 PAPEL COUCHE (0,60 X 0,90 m) fl 47,36 62,83 47,36 62,83 47,36 62,83 47,36 62,83 47,36 62,83

300257 ALUGUEL DE VEICULO GOL CLI - 1.6 COM COMBUSTIVEL E RADIO TRANSPORTE PORTATIL mes 4.159,30 5.517,73 4.159,30 5.517,73 4.159,30 5.517,73 4.159,30 5.517,73 4.159,30 5.517,73

300258 ALUGUEL DE VEICULO GOL 1000 C/COMBUSTIVEL mes 2.483,78 3.294,98 2.483,78 3.294,98 2.483,78 3.294,98 2.483,78 3.294,98 2.483,78 3.294,98

300259 ALUGUEL DE VEICULO TIPO UTILITARIO CLI - 1.6 C/COMBUSTIVEL mes 3.022,98 4.010,29 3.022,98 4.010,29 3.022,98 4.010,29 3.022,98 4.010,29 3.022,98 4.010,29

300260 ALUGUEL DE GOL COM COMBUSTIVEL E MOTORISTA mes 6.225,42 8.258,64 7.475,00 9.916,34 7.788,42 10.332,12 7.621,40 10.110,55 7.650,27 10.148,85

309000 SERVICOS NAO CODIFICADOS

309001 ALUGUEL DE VEICULO 1.0 C/MOTORISTA SEM COMBUSTIVEL mes 3.872,68 5.137,50 5.204,86 6.904,77 5.538,74 7.347,69 5.361,02 7.111,93 5.392,70 7.153,96

309002 ALUGUEL DE VEICULO 1.0 C/COMBUSTIVEL PARA 6000km/mes E MOTORISTA mes 5.722,68 7.591,71 7.054,86 9.358,98 7.388,74 9.801,90 7.211,02 9.566,14 7.242,70 9.608,17

309003 ALUGUEL DE VEICULO 1.0 C/COMBUSTIVEL PARA 6000km/mes SEM MOTORISTA mes 3.519,78 4.669,34 3.519,78 4.669,34 3.519,78 4.669,34 3.519,78 4.669,34 3.519,78 4.669,34

310000 SERVICOS TOPOGRAFICOS

310100 LEVANTAMENTOS PLANIALTIMETRICOS CADASTRAIS

310101

LEVANTAM.CADASTRAL,PLANIALT.DE AREAS ESPECIAIS DESTIN.A CAPTACAO, ETA,

RESERV.,ELEVAT.E ETE, C/CURVAS DE NIVEL DE METRO EM METRO,IMPLANT.DE NO

MIN.1(UM)RN POR AREA C/INDIC. NA PLANTA,DES.NA ESC.1:200

ha 641,59 851,13 641,59 851,13 641,59 851,13 641,59 851,13 641,59 851,13

310104LEVANT. SEMI-CADASTRAL, PLANIALT.DE AREA URBANA E/OU SUBURBANA, INCL.:DEM.DOS

QUARTEIR.E RUAS,IND.DALARG.DE RUAS E PASS., POLIG.FECHADA, IMPLANT.DE RN, NIVEL. E

CONTRA-NIV.e PLANTA NA ESC. 1:1000

ha 289,42 383,94 289,42 383,94 289,42 383,94 289,42 383,94 289,42 383,94

310107LEVANT. SEMI-CADASTRAL, PLANIAlT. DE AREA URBANA E/OU SUBURBANA, INCL.:DEM. DOS

QUERT.,IND. LARG. DE RUAS, POLIGONAIS FECH., IMPL. DE RN, NIVEL. E CONTRA-NIV. e PLANTA

NA ESCALA 1:2000

ha 289,42 383,94 289,42 383,94 289,42 383,94 289,42 383,94 289,42 383,94

310110LEVANT. CADASTRAL PLANIALT.DE EIXO DE ADUTORA, LINHA DE REC.,EMISS. E

INTERCEP.C/ESTAQ. DE 20 EM 20M;SEC.TRANSV., IMPLANT. DE RN, DESENHOS, PLANTAS NA ESC.

1:2000, C/ FAIXA DE 60 METROS

Km 2.973,50 3.944,65 2.973,50 3.944,65 2.973,50 3.944,65 2.973,50 3.944,65 2.973,50 3.944,65

310113LEVANT. CADASTRAL PLANIALT. DE EIXO DE ADUTORA, LINHA DE REC., EMISS. E INTERCEP.

C/ESTAQ. DE 20 EM 20M;SEC.TRANSV., IMPLANT. DE RN, DESENHOS E PLANTAS NA ESCALA

1:2000, COM FAIXA DE 30 METROS

Km 1.973,32 2.617,81 1.973,32 2.617,81 1.973,32 2.617,81 1.973,32 2.617,81 1.973,32 2.617,81

310116LEVANTAMENTO SEMI-CADASTRAL PLANIALTIMETRICO DE BACIA HIDRAULICA, COM

LANCAMENTO DE EIXO E SECOES TRANSVERSAIS.ha 664,35 881,33 664,35 881,33 664,35 881,33 664,35 881,33 664,35 881,33

310119LEVANT. ALTIMET.DE EIXOS DE RUA (1/3 DA LARG.DAS RUAS),P/IMPLANT.DE REDE DE

ESGOTO,C/ESTAQ. DE 20EM 20m OU FRACAO,NIVEL.E CONTRA NIVEL.GEOMET.,PTO POR

PTO,IND.DAS COTAS DOS CRUZ.DAS RUAS E PTO NOTAV.

Km 1.137,96 1.509,62 1.137,96 1.509,62 1.137,96 1.509,62 1.137,96 1.509,62 1.137,96 1.509,62

310122LEVANTAMENTO PLANIALTIMETRICO DOS CRUZAMENTOS DAS RUAS E PONTOS NOTAVEIS COM

NIVELAMENTO E CONTRA-NIVELAMENTO GEOMETRICO (A EMBASA FORNECERA AS PLANTAS DO

SEMI-CADASTRAL)

Km 434,14 575,93 434,14 575,93 434,14 575,93 434,14 575,93 434,14 575,93

310200 OUTROS SERVICOS TOPOGRAFICOS

310201IMPLANTACAO DE RN (MARCO DE CONCRETO 0,10 X 0,10 X0,40 m PARAFUSO CALOTA ESFERICA)

OU EM LOCAIS IRREMOVIVEIS INDICADOS EM PLANTAun 55,79 74,01 55,79 74,01 55,79 74,01 55,79 74,01 55,79 74,01

310204 TRANSPORTE DE COTAS(NIVELAMENTO E CONTRA-NIVELAMENTO GEOMETRICO) Km 296,00 392,67 296,00 392,67 296,00 392,67 296,00 392,67 296,00 392,67

310207 TRANSPORTE DE COORDENADAS Km 552,53 732,99 552,53 732,99 552,53 732,99 552,53 732,99 552,53 732,99

310210POLIGONAL P/APOIO BASICO, P/LEVANT.TOPOGR.(ADUTORAE SEMI-CADAST) ATRAVES DE 04

(QUATRO) SERIES DE LEIT. ANG. C/TEODOLITOS DE LEIT.DIRETA DE 1". OBS.LINEARES C/ CADA

SER.DE LEIT. RECIP.,UTIL.DISTANCIA

Km 569,63 755,67 569,63 755,67 569,63 755,67 569,63 755,67 569,63 755,67

310213 ABERTURA DE PICADAS (LARGURA 1.5 m) m 4,68 6,21 6,95 9,22 7,53 9,99 7,22 9,58 7,29 9,67

310216LEVANT.BATIMETRICO (COM SECOES TRANSVERSAIS E NIVELAMENTO GEOMETRICO):DESENHOS,

PLANTAS E PERFIS NA ESC. DE 1:200 OU 1:500 C/ CURVAS DE NIVEL DE METRO EM METROha 4.209,76 5.584,67 4.209,76 5.584,67 4.209,76 5.584,67 4.209,76 5.584,67 4.209,76 5.584,67

310219TRANSP.DE EQUIPE E EQUIP.(INTERIOR),A MEDICAO DAS DISTAN.SERA FEITA POR

QUILOM.RODADO CONSID.SALVADOR COMO PTO DA PARTIDA E CHEGADA A LOCALIDADE ONDE

SERAO REALIZADOS OS SERV.,NAO SERAO CONSID.OS DES

Km 1,84 2,44 1,84 2,44 1,84 2,44 1,84 2,44 1,84 2,44

310222 TRANSPORTE DE EQUIPE E EQUIPAMENTOS (CAPITAL) Km 1,84 2,44 1,84 2,44 1,84 2,44 1,84 2,44 1,84 2,44

310225 MOBILIZACAO E DESMOBILIZACAO DE EQUIPE (INTERIOR) gb 1.578,66 2.094,25 1.578,66 2.094,25 1.578,66 2.094,25 1.578,66 2.094,25 1.578,66 2.094,25

310228 MOBILIZACAO E DESMOBILIZACAO DE EQUIPE (CAPITAL) gb 368,35 488,65 368,35 488,65 368,35 488,65 368,35 488,65 368,35 488,65

310231EXPLORACAO DE LINHA COM NIVELAMENTO E CONTRA-NIVELAMENTO GEOMETRICO: DESENHOS,

PLANTAS NA ESCALA H 1:2000 E V 1:200Km 434,14 575,93 434,14 575,93 434,14 575,93 434,14 575,93 434,14 575,93

310234 RESTITUICAO AEROFOTOGRAMETRICA COM VOO ha 210,49 279,24 210,49 279,24 210,49 279,24 210,49 279,24 210,49 279,24

310237LOCACAO DA AREA DE SEGURANCA DE BACIA HIDRAULICA, INCLUINDO MATERIALIZACAO POR

MEIO DE MARCOS DE CONCRETO A CADA 100mkm 722,74 958,79 750,32 995,37 757,20 1.004,50 753,60 999,73 754,27 1.000,61

319000 SERVICOS NAO CODIFICADOS

319001

SERV.TOPOGRAFICOS,GEOTECNICOS,INSPECAO DE MATERIAIS,DETALHAM.DE

PROJETOS,CADASTRO DE IMOVEIS E DOS SERV.EXECUTADOS E TODOS SERV.NECESSARIOS A

PERFEITA EXECUCAO DO CONTRATO,P/REDES CONDOMINIAIS

M 4,74 6,29 4,74 6,29 4,74 6,29 4,74 6,29 4,74 6,29

319003AUTORIZACAO OU DECLARACAO JUNTO AO MORADOR PARA EXECUCAO DE LIGACAO INTRA

DOMICILIAR DE ESGOTO (P/OBRA S/ASSISTENTE SOCIAL CONTRATADO)un 19,89 26,39 30,34 40,25 33,01 43,79 31,58 41,89 31,83 42,23

319004FICHA DE INSPECAO (FICHA CADASTRO, MEIO DIGITAL C/1 VEICULO GOL(SIMILAR)

P/DESLOC.FISCALIZACAO, ALV.PREFEITURA, LIBERACAO FRENTE DE SERVICO TESTES DAS

LIGACOES (P/OBRA S/ASSISTENTE SOCIAL CONTRATADO)

un 8,42 11,17 11,29 14,98 12,02 15,95 11,63 15,43 11,69 15,51

Página: 50 de 59

Page 51: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

319005 SERVICOS DE SONDAGEM PARA VERIFICACAO DE LIGACAO INTRA DOMICILIAR DE ESGOTO. un 18,13 24,05 26,98 35,79 29,21 38,75 28,02 37,17 28,23 37,45

320000 SERVICOS GEOTECNICOS

320100 SONDAGEM A TRADO (NBR - 09603)

320101 PERFURACAO, INCL. COLETAS DE AMOSTRAS DEFORMADAS SOLO m 42,10 55,85 42,10 55,85 42,10 55,85 42,10 55,85 42,10 55,85

320104 DESLOCAMENTO ENTRE FUROS (ACIMA DE 500 m) un 14,65 19,43 14,65 19,43 14,65 19,43 14,65 19,43 14,65 19,43

320200 SONDAGEM DE SIMPLES RECONHECIMENTO DOS SOLOS (A PERCUSSAO)NBR 06484

320201 PERFURACAO m 61,84 82,04 61,84 82,04 61,84 82,04 61,84 82,04 61,84 82,04

320204 DESLOC ENTRE FUROS ATE 50 m un 49,99 66,32 49,99 66,32 49,99 66,32 49,99 66,32 49,99 66,32

320207 DESLOC ENTRE FUROS DE 51 A 100 m un 82,88 109,95 82,88 109,95 82,88 109,95 82,88 109,95 82,88 109,95

320210 DESLOC ENTRE FUROS DE 101 A 200 m un 165,77 219,91 165,77 219,91 165,77 219,91 165,77 219,91 165,77 219,91

320213 DESLOC ENTRE FUROS ACIMA DE 200 m un 248,63 329,83 248,63 329,83 248,63 329,83 248,63 329,83 248,63 329,83

320216 FORNEC. DE CAIXA P/TESTEMUNHO cx 165,77 219,91 165,77 219,91 165,77 219,91 165,77 219,91 165,77 219,91

320219 ENSAIO DE INFILTRACAO un 552,53 732,99 552,53 732,99 552,53 732,99 552,53 732,99 552,53 732,99

320300 ABERTURA DE POCO DE INSPECAO EM SOLO (NBR - 09604)

320301ESCAVACAO (PA E PICARETA) COM ESCORAMENTO, INCLUSIVE COLETAS DE AMOSTRAS

DEFORMADAS DE SOLOm 236,80 314,14 236,80 314,14 236,80 314,14 236,80 314,14 236,80 314,14

320304ESCAVACAO (PA E PICARETA) SEM ESCORAMENTO, INCLUSIVE COLETAS DE AMOSTRAS

DEFORMADAS DE SOLOm 94,71 125,64 94,71 125,64 94,71 125,64 94,71 125,64 94,71 125,64

320400 SONDAGEM ROTATIVA

320401 EM SOLO - DIAMETRO HX m 249,95 331,58 249,95 331,58 249,95 331,58 249,95 331,58 249,95 331,58

320404 EM SOLO - DIAMETRO NX m 249,95 331,58 249,95 331,58 249,95 331,58 249,95 331,58 249,95 331,58

320407 EM SOLO - DIAMETRO BX m 236,80 314,14 236,80 314,14 236,80 314,14 236,80 314,14 236,80 314,14

320410 EM SOLO - DIAMETRO AX m 236,80 314,14 236,80 314,14 236,80 314,14 236,80 314,14 236,80 314,14

320419 EM ROCHA - DIAMETRO HX - ROCHA MUITO DURA m 749,86 994,76 749,86 994,76 749,86 994,76 749,86 994,76 749,86 994,76

320422 EM ROCHA - DIAMETRO NX - ROCHA BRANDA m 420,98 558,47 420,98 558,47 420,98 558,47 420,98 558,47 420,98 558,47

320425 EM ROCHA - DIAMETRO NX - ROCHA DURA m 598,57 794,06 598,57 794,06 598,57 794,06 598,57 794,06 598,57 794,06

320428 EM ROCHA - DIAMETRO NX - ROCHA MUITO DURA m 795,00 1.054,65 795,00 1.054,65 795,00 1.054,65 795,00 1.054,65 795,00 1.054,65

320431 EM ROCHA - DIAMETRO BX - ROCHA BRANDA m 405,18 537,51 405,18 537,51 405,18 537,51 405,18 537,51 405,18 537,51

320434 EM ROCHA - DIAMETRO BX - ROCHA DURA m 578,84 767,89 578,84 767,89 578,84 767,89 578,84 767,89 578,84 767,89

320437 EM ROCHA - DIAMETRO BX - ROCHA MUITO DURA m 723,56 959,87 723,56 959,87 723,56 959,87 723,56 959,87 723,56 959,87

320440 EM ROCHA - DIAMETRO AX - ROCHA BRANDA m 405,18 537,51 405,18 537,51 405,18 537,51 405,18 537,51 405,18 537,51

320443 EM ROCHA - DIAMETRO AX - ROCHA DURA m 578,84 767,89 578,84 767,89 578,84 767,89 578,84 767,89 578,84 767,89

320446 EM ROCHA - DIAMETRO AX - ROCHA MUITO DURA m 723,56 959,87 723,56 959,87 723,56 959,87 723,56 959,87 723,56 959,87

320449 DESLOCAMENTO ENTRE FUROS ATE 50m un 92,06 122,13 92,06 122,13 92,06 122,13 92,06 122,13 92,06 122,13

320452 DESLOCAMENTO ENTRE FUROS DE 51 A 100 m un 184,10 244,23 184,10 244,23 184,10 244,23 184,10 244,23 184,10 244,23

320455 DESLOCAMENTO ENTRE FUROS DE 101 A 200 m un 276,16 366,35 276,16 366,35 276,16 366,35 276,16 366,35 276,16 366,35

320458 DESLOCAMENTO ENTRE FUROS ACIMA DE 200 m un 368,22 488,48 368,22 488,48 368,22 488,48 368,22 488,48 368,22 488,48

320461 ENSAIO DE PERDA D'AGUA SOB PRESSAO un 613,68 814,11 613,68 814,11 613,68 814,11 613,68 814,11 613,68 814,11

320464 ENSAIO DE PERDA D~AGUA un 552,53 732,99 552,53 732,99 552,53 732,99 552,53 732,99 552,53 732,99

320500 MOBILIZACAO E TRANSPORTE

320501MOBILIZACAO E DESMOBILIZACAO DE EQUIPE E EQUIPAMENTOS (CAPITAL) PARA SONDAGEM A

PERCUSSAOgb 526,22 698,08 526,22 698,08 526,22 698,08 526,22 698,08 526,22 698,08

320504MOBILIZACAO E DESMOBILIZACAO DE EQUIPE E EQUIPAMENTOS (INTERIOR) PARA SONDAGEM A

PERCUSSAOgb 1.578,66 2.094,25 1.578,66 2.094,25 1.578,66 2.094,25 1.578,66 2.094,25 1.578,66 2.094,25

320507TRANSP. DE EQUIPE E EQUIPA. (INTERIOR) P/SONDAGEM A PERCUSSAO.A MEDICAO SERA FEITA

POR QUILOMETRO RODADO, CONSIDER. O PTO DE PARTIDA O MUNICIP.DE SALVADOR E O PTO

DE CHEGADA AS LOCAL. ONDE SERAO REAL

Km 1,95 2,59 1,95 2,59 1,95 2,59 1,95 2,59 1,95 2,59

320510 TRANSPORTE DE EQUIPE E EQUIPAMENTO PARA SONDAGEM A PERCUSSAO (CAPITAL) Km 1,84 2,44 1,84 2,44 1,84 2,44 1,84 2,44 1,84 2,44

320513MOBILIZACAO E DESMOBILIZACAO DE EQUIPE E EQUIPAMENTOS (CAPITAL) PARA SONDAGEM

ROTATIVA OU MISTAgb 861,69 1.143,12 861,69 1.143,12 861,69 1.143,12 861,69 1.143,12 861,69 1.143,12

320516MOBILIZACAO E DESMOBILIZACAO DE EQUIPE E EQUIPAMENTOS (INTERIOR) PARA SONDAGEM

ROTATIVA OU MISTAgb 3.157,33 4.188,51 3.157,33 4.188,51 3.157,33 4.188,51 3.157,33 4.188,51 3.157,33 4.188,51

320519TRANSP. DE EQUIPE E EQUIPA. (INTERIOR) P/ SONDAGEM ROTATIVA OU MISTA . A MEDICAO

SERA FEITA POR QUILOMETRO RODADO, CONSIDER. O PTO DE PARTIDA O MUNICIPIO DE

SALVADOR E O PTO DE CHEGADA AS LOCAL. ONDE

Km 1,84 2,44 1,84 2,44 1,84 2,44 1,84 2,44 1,84 2,44

320522 TRANSPORTE DE EQUIPE E EQUIPAMENTO PARA SONDAGEM ROTATIVA OU MISTA (CAPITAL) Km 1,84 2,44 1,84 2,44 1,84 2,44 1,84 2,44 1,84 2,44

329000 SERVICOS NAO CODIFICADOS

329001SONDAGEM PARA VERIFICACAO DE LIGACAO INTRADOMICILIAR NA REDE CONDOMINIAL, EM

PAVIMENTO DE CONCRETO, CIMENTADO OU CERAMICOm2 32,71 43,39 44,53 59,07 47,49 63,00 45,93 60,93 46,20 61,29

329050 SONDAGEM A PERCUSSAO PARA ELEVATORIAS DE ESGOTO (12m) m 3.861,09 5.122,12 3.861,09 5.122,12 3.861,09 5.122,12 3.861,09 5.122,12 3.861,09 5.122,12

330000 ANALISES FISICO-QUIMICAS E BACTERIOLOGICAS P/ AGUA E/OU ESGOTO

330100 ANALISE DE AMOSTRAS DE AGUA

330101 ACIDEZ un 12,49 16,57 12,49 16,57 12,49 16,57 12,49 16,57 12,49 16,57

330102 ALCALINIDADE un 12,49 16,57 12,49 16,57 12,49 16,57 12,49 16,57 12,49 16,57

330103 ALUMINIO un 28,29 37,53 28,29 37,53 28,29 37,53 28,29 37,53 28,29 37,53

330104 CALCIO un 28,29 37,53 28,29 37,53 28,29 37,53 28,29 37,53 28,29 37,53

330106 CIANETO un 19,74 26,19 19,74 26,19 19,74 26,19 19,74 26,19 19,74 26,19

330107 CINZAS un 26,31 34,90 26,31 34,90 26,31 34,90 26,31 34,90 26,31 34,90

330108 CLORETO un 12,49 16,57 12,49 16,57 12,49 16,57 12,49 16,57 12,49 16,57

330109 CLORO RESIDUAL un 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68

330110 CONDUTIVIDADE un 12,49 16,57 12,49 16,57 12,49 16,57 12,49 16,57 12,49 16,57

330111 CONTAGEM PADRAO DE BACTERIAS un 32,90 43,65 32,90 43,65 32,90 43,65 32,90 43,65 32,90 43,65

330112 COR un 12,49 16,57 12,49 16,57 12,49 16,57 12,49 16,57 12,49 16,57

330113 DBO/DQO un 32,90 43,65 32,90 43,65 32,90 43,65 32,90 43,65 32,90 43,65

330114 DQO un 26,31 34,90 26,31 34,90 26,31 34,90 26,31 34,90 26,31 34,90

330115 DENSIDADE un 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68

330116 DETERGENTE un 32,90 43,65 32,90 43,65 32,90 43,65 32,90 43,65 32,90 43,65

330117 DUREZA un 13,16 17,46 13,16 17,46 13,16 17,46 13,16 17,46 13,16 17,46

330118 ESTREPTOCOCOS FECAIS un 34,21 45,38 34,21 45,38 34,21 45,38 34,21 45,38 34,21 45,38

330119 FENOL un 32,90 43,65 32,90 43,65 32,90 43,65 32,90 43,65 32,90 43,65

330120 FERRO un 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68

330121 FLUORETO un 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68

330122 FOSFATO TOTAL un 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68

330123 FOSFORO TOTAL un 26,31 34,90 26,31 34,90 26,31 34,90 26,31 34,90 26,31 34,90

330124 GAS CARBONICO un 4,61 6,12 4,61 6,12 4,61 6,12 4,61 6,12 4,61 6,12

330125 MAGNESIO un 13,16 17,46 13,16 17,46 13,16 17,46 13,16 17,46 13,16 17,46

330126 MANGANES un 28,29 37,53 28,29 37,53 28,29 37,53 28,29 37,53 28,29 37,53

330127 MERCURIO un 32,90 43,65 32,90 43,65 32,90 43,65 32,90 43,65 32,90 43,65

330128 METAIS SOLUVEIS (ACRESCIMO) un 26,31 34,90 26,31 34,90 26,31 34,90 26,31 34,90 26,31 34,90

330130 NITROGENIO AMONIACAL un 19,74 26,19 19,74 26,19 19,74 26,19 19,74 26,19 19,74 26,19

330131 NITROGENIO AMON/ORG/TOTAL un 19,74 26,19 19,74 26,19 19,74 26,19 19,74 26,19 19,74 26,19

330132 NITROGENIO TOTAL un 26,31 34,90 26,31 34,90 26,31 34,90 26,31 34,90 26,31 34,90

330133 NITROGENIO NITRATO un 26,31 34,90 26,31 34,90 26,31 34,90 26,31 34,90 26,31 34,90

330134 NITROGENIO NITRITO un 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68

330135 NMP COLIFORME TOTAL/FECAL un 32,90 43,65 32,90 43,65 32,90 43,65 32,90 43,65 32,90 43,65

330136 OLEOS E GRAXAS un 26,31 34,90 26,31 34,90 26,31 34,90 26,31 34,90 26,31 34,90

330137 OXIGENIO CONSUMIDO un 12,49 16,57 12,49 16,57 12,49 16,57 12,49 16,57 12,49 16,57

330138 OXIGENIO DISSOLVIDO un 12,49 16,57 12,49 16,57 12,49 16,57 12,49 16,57 12,49 16,57

330139 pH un 4,61 6,12 4,61 6,12 4,61 6,12 4,61 6,12 4,61 6,12

330140 PESTICIDAS CLORADOS un 210,49 279,24 210,49 279,24 210,49 279,24 210,49 279,24 210,49 279,24

330141 POTASSIO un 19,74 26,19 19,74 26,19 19,74 26,19 19,74 26,19 19,74 26,19

330142 SALMONELLA un 32,90 43,65 32,90 43,65 32,90 43,65 32,90 43,65 32,90 43,65

330143 SODIO un 19,74 26,19 19,74 26,19 19,74 26,19 19,74 26,19 19,74 26,19

330144 SOLIDOS DISSOLVIDOS un 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68

330145 SOLIDOS SEDIMENTAVEIS un 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68

330146 SOLIDOS EM SUSPENSAO un 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68

330148 SOLIDOS TOTAIS un 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68

330149 SULFATO un 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68

330150 SULFETO un 26,31 34,90 26,31 34,90 26,31 34,90 26,31 34,90 26,31 34,90

330151 TURBIDEZ un 12,49 16,57 12,49 16,57 12,49 16,57 12,49 16,57 12,49 16,57

330152 UMIDADE un 26,31 34,90 26,31 34,90 26,31 34,90 26,31 34,90 26,31 34,90

330153 ANALISES FISICO-QUIMICAS un 20,93 27,77 20,93 27,77 20,93 27,77 20,93 27,77 20,93 27,77

330154 ANALISE BACTERIOLOGICA un 167,36 222,02 167,36 222,02 167,36 222,02 167,36 222,02 167,36 222,02

330200 ANALISES DE AMOSTRAS BRUTAS DE LODO E/OU SOLO P/ RECEBER O LODO

330201 ACIDEZ un 12,49 16,57 12,49 16,57 12,49 16,57 12,49 16,57 12,49 16,57

330203 ALCALINIDADE un 12,49 16,57 12,49 16,57 12,49 16,57 12,49 16,57 12,49 16,57

330205 ALUMINIO un 28,29 37,53 28,29 37,53 28,29 37,53 28,29 37,53 28,29 37,53

330207 CALCIO un 28,29 37,53 28,29 37,53 28,29 37,53 28,29 37,53 28,29 37,53

330211 CIANETO un 19,74 26,19 19,74 26,19 19,74 26,19 19,74 26,19 19,74 26,19

330215 CLORETO un 12,49 16,57 12,49 16,57 12,49 16,57 12,49 16,57 12,49 16,57

330217 CLORO RESIDUAL un 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68

330223 COR un 12,49 16,57 12,49 16,57 12,49 16,57 12,49 16,57 12,49 16,57

Página: 51 de 59

Page 52: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

330227 DQO un 26,31 34,90 26,31 34,90 26,31 34,90 26,31 34,90 26,31 34,90

330235 FENOL un 32,90 43,65 32,90 43,65 32,90 43,65 32,90 43,65 32,90 43,65

330241 FOSFATO TOTAL un 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68

330243 FOSFORO TOTAL un 26,31 34,90 26,31 34,90 26,31 34,90 26,31 34,90 26,31 34,90

330251 MAGNESIO un 13,16 17,46 13,16 17,46 13,16 17,46 13,16 17,46 13,16 17,46

330253 MANGANES un 28,29 37,53 28,29 37,53 28,29 37,53 28,29 37,53 28,29 37,53

330255 MERCURIO un 32,90 43,65 32,90 43,65 32,90 43,65 32,90 43,65 32,90 43,65

330259 OXIGENIO CONSUMIDO un 12,49 16,57 12,49 16,57 12,49 16,57 12,49 16,57 12,49 16,57

330261 OXIGENIO DISSOLVIDO un 12,49 16,57 12,49 16,57 12,49 16,57 12,49 16,57 12,49 16,57

330263 pH un 4,61 6,12 4,61 6,12 4,61 6,12 4,61 6,12 4,61 6,12

330265 POTASSIO un 19,74 26,19 19,74 26,19 19,74 26,19 19,74 26,19 19,74 26,19

330267 SODIO un 19,74 26,19 19,74 26,19 19,74 26,19 19,74 26,19 19,74 26,19

330269 SOLIDOS DISSOLVIDOS un 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68

330271 SOLIDOS EM SUSPENSAO un 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68

330273 SOLIDOS SECOS un 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68

330275 SOLIDOS SEDIMENTAVEIS un 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68

330277 SOLIDOS TOTAIS (FIXOS/VOLATEIS) un 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68 17,10 22,68

330279 SULFATOS un 26,31 34,90 26,31 34,90 26,31 34,90 26,31 34,90 26,31 34,90

330283 TURBIDEZ un 12,49 16,57 12,49 16,57 12,49 16,57 12,49 16,57 12,49 16,57

330300 MOBILIZACAO / TRANSPORTE P/ COLETA

330319 TRANSPORTE DE AMOSTRAS DE ESGOTOS (SIMPLES E COMPOSTA) ATE 100km un 98,68 130,91 98,68 130,91 98,68 130,91 98,68 130,91 98,68 130,91

330322 TRANSPORTE DE AMOSTRAS DE ESGOTOS (SIMPLES E COMPOSTA) DE 101 A 150km un 105,24 139,61 105,24 139,61 105,24 139,61 105,24 139,61 105,24 139,61

330325 TRANSPORTE DE AMOSTRAS DE ESGOTOS (SIMPLES E COMPOSTA) ALEM, A CADA 50km un 32,90 43,65 32,90 43,65 32,90 43,65 32,90 43,65 32,90 43,65

330328 MOBILIZACAO, COLETA E TRANSPORTE DE AMOSTRAS PARA AGUA ATE 100km un 177,60 235,60 177,60 235,60 177,60 235,60 177,60 235,60 177,60 235,60

330331 MOBILIZACAO, COLETA E TRANSPORTE DE AMOSTRAS PARA AGUA DE 101 A 150km un 223,64 296,68 223,64 296,68 223,64 296,68 223,64 296,68 223,64 296,68

330334 MOBILIZACAO, COLETA E TRANSPORTE DE AMOSTRAS PARA AGUA ALEM, A CADA 50km un 92,09 122,17 92,09 122,17 92,09 122,17 92,09 122,17 92,09 122,17

330400 CARACTERIZACAO MICROBIOLOGICA E PARASITOLOGICA EM AMOSTRA BRUTA DE LODO

330401 COLIMETRIA un 57,88 76,78 57,88 76,78 57,88 76,78 57,88 76,78 57,88 76,78

330404 ENTEROVIRUS un 57,88 76,78 57,88 76,78 57,88 76,78 57,88 76,78 57,88 76,78

330407 PARASITOLOGICO (IDENTIFICACAO E TESTE DE VIABILIDADE) un 57,88 76,78 57,88 76,78 57,88 76,78 57,88 76,78 57,88 76,78

330410 SALMONELAS (ENTEROBACTERIAS PATOGENICAS) un 57,88 76,78 57,88 76,78 57,88 76,78 57,88 76,78 57,88 76,78

339000 SERVICOS NAO CODIFICADOS

340000 ENSAIOS P/ INVESTIGACAO E CONTROLE

340100 ENSAIOS LABORATORIAIS EM AMOSTRAS DE SOLO

340101 ANALISE GRANULOMETRICA POR PENEIRAMENTO EM AMOSTRA DE SOLO (NBR - 07181) un 63,15 83,77 63,15 83,77 63,15 83,77 63,15 83,77 63,15 83,77

340104 ANALISE GRANULOMETRICA POR PENEIRAMENTO E SEDIMENTACAO un 157,86 209,42 157,86 209,42 157,86 209,42 157,86 209,42 157,86 209,42

340107 DETERMINACAO DE LIMITE DE LIQUIDEZ (NBR - 06459) un 65,78 87,26 65,78 87,26 65,78 87,26 65,78 87,26 65,78 87,26

340110 DETERMINACAO DE LIMITE DE PLASTICIDADE (NBR - 07180) un 65,78 87,26 65,78 87,26 65,78 87,26 65,78 87,26 65,78 87,26

340113 DETERMINACAO DE LIMITE E RELACAO DE CONTRACAO (NBR - 07183) un 65,78 87,26 65,78 87,26 65,78 87,26 65,78 87,26 65,78 87,26

340116 MASSA ESPECIFICA REAL DOS GRAOS un 65,78 87,26 65,78 87,26 65,78 87,26 65,78 87,26 65,78 87,26

340119DETERMINACAO DA MASSA ESPECIFICA APARENTE DE AMOSTRAS INDEFORMADAS COM

EMPREGO DE BALANCA HIDROSTATICA (NBR - 10938)un 65,78 87,26 65,78 87,26 65,78 87,26 65,78 87,26 65,78 87,26

340122 UMIDADE NATURAL un 26,31 34,90 26,31 34,90 26,31 34,90 26,31 34,90 26,31 34,90

340125 ENSAIO DE COMPACTACAO - PROCTOR NORMAL (NBR - 07182) un 105,24 139,61 105,24 139,61 105,24 139,61 105,24 139,61 105,24 139,61

340128 ENSAIO DE COMPACTACAO - PROCTOR INTERMEDIARIO (NBR - 07182) un 131,55 174,51 131,55 174,51 131,55 174,51 131,55 174,51 131,55 174,51

340131 ENSAIO DE COMPACTACAO - PROCTOR MODIFICADO (NBR - 07182) un 157,86 209,42 157,86 209,42 157,86 209,42 157,86 209,42 157,86 209,42

340134 INDICE DE SUPORTE CALIFORNIA (NBR 09895) un 171,02 226,88 171,02 226,88 171,02 226,88 171,02 226,88 171,02 226,88

340200 ENSAIOS LABORATORIAIS EM AGREGADO MIUDO P/ CONCRETO

340201 DETERMINACAO DA COMPOSICAO GRANULOMETRICA DE AMOSTRA DE AREIA (NBR - 07217) un 65,78 87,26 65,78 87,26 65,78 87,26 65,78 87,26 65,78 87,26

340204 "ANALISE GRANULOMETRICA POR PENEIRAMENTO E SEDIMENTACAO EM "TOP SOIL" un 223,64 296,68 223,64 296,68 223,64 296,68 223,64 296,68 223,64 296,68

340300 ENSAIOS LABORATORIAIS EM ROCHA OU AGREGADO GRAUDO

340301 DETERMINACAO DA COMPOSICAO GRANULOMETRICA DE AMOSTRA DE BRITA (NBR - 07217) un 65,78 87,26 65,78 87,26 65,78 87,26 65,78 87,26 65,78 87,26

340400 RETIRADAS DE AMOSTRAS DE SOLO

340401 RETIRADA DE BLOCO INDEFORMADO (NBR - 09604) un 526,22 698,08 526,22 698,08 526,22 698,08 526,22 698,08 526,22 698,08

340407 RETIRADA DE AMOSTRA DEFORMADA un 105,24 139,61 105,24 139,61 105,24 139,61 105,24 139,61 105,24 139,61

340500 ENSAIOS P/ CONTROLE DE OBRAS

340519DETERMINACAO DA MASSA ESPECIFICA APARENTE "IN SITU", COM EMPREGO DO CILINDRO DE

CRAVACAO (NBR - 09813)un 157,86 209,42 157,86 209,42 157,86 209,42 157,86 209,42 157,86 209,42

340522 CONTROLE DE COMPACTACAO PELO METODO DE HILF (NBR - 12102) un 197,33 261,78 197,33 261,78 197,33 261,78 197,33 261,78 197,33 261,78

340525 ENSAIO DE PERDA D'AGUA un 552,53 732,99 552,53 732,99 552,53 732,99 552,53 732,99 552,53 732,99

349000 SERVICOS NAO CODIFICADOS

349701 ENSAIO DE REATIVIDADE ALCALI-AGREGADO UN 4.009,82 5.319,43 4.009,82 5.319,43 4.009,82 5.319,43 4.009,82 5.319,43 4009,82 5.319,43

349702 ENSAIO DE CARACTERIZACAO PETROGRAFICA UN 2.682,47 3.558,56 2.682,47 3.558,56 2.682,47 3.558,56 2.682,47 3.558,56 2682,47 3.558,56349703 ENSAIO PARA DEFINICAO DE TRACO UN 1.301,89 1.727,09 1.301,89 1.727,09 1.301,89 1.727,09 1.301,89 1.727,09 1301,89 1.727,09349704 ENSAIO DE CARACTERIZACAO DO SOLO UN 333,81 442,83 333,81 442,83 333,81 442,83 333,81 442,83 333,81 442,83

410100 COMISSIONAMENTO DE SISTEMAS DE ESTACOES ELEVATORIAS

410100 COMISSIONAMENTO DE SISTEMAS DE ESTACOES ELEVATORIAS

410101COMISSIONAMENTO DE ESTACAO ELEVATORIA DE PEQUENO PORTE (P<=200CV) E BAIXA

INSTRUMENTACAO, INC TESTES DE INSTRUMENTOS, EQUIPAMENTOS ELETRICOS, MECANICOS E

PRESERVACAO (AGUA OU ESGOTO)

UN 11.275,13 14.957,59 17.246,07 22.878,64 18.742,57 24.863,89 17.945,99 23.807,15 18.087,97 23.995,50

410102COMISSIONAMENTO DE ESTACAO ELEVATORIA DE PEQUENO PORTE (P<=200CV) E MEDIA

INSTRUMENTACAO, INC TESTES DE INSTRUMENTOS, EQUIPAMENTOS ELETRICOS, MECANICOS E

PRESERVACAO (AGUA OU ESGOTO)

UN 15.183,70 20.142,70 23.518,29 31.199,36 25.607,21 33.970,52 24.495,30 32.495,46 24.693,48 32.758,37

410103COMISSIONAMENTO DE ESTACAO ELEVATORIA DE PEQUENO PORTE (P<=200CV) E ALTA

INSTRUMENTACAO, INC TESTES DE INSTRUMENTOS, EQUIPAMENTOS ELETRICOS, MECANICOS E

PRESERVACAO (AGUA OU ESGOTO)

UN 23.000,82 30.512,89 36.062,75 47.840,84 39.336,49 52.183,79 37.593,92 49.872,09 37.904,50 50.284,11

410111COMISSIONAMENTO DE ESTACAO ELEVATORIA DE MEDIO PORTE (200CV<P<=400CV) E BAIXA

INSTRUMENTACAO, INC TESTES DE INSTRUMENTOS, EQUIPAMENTOS ELETRICOS, MECANICOS E

PRESERVACAO (AGUA OU ESGOTO)

UN 18.568,21 24.632,59 28.525,74 37.842,25 31.021,43 41.153,03 29.693,00 39.390,73 29.929,77 39.704,83

410112COMISSIONAMENTO DE ESTACAO ELEVATORIA DE MEDIO PORTE (200CV<P<=400CV) E MEDIA

INSTRUMENTACAO, INC TESTES DE INSTRUMENTOS, EQUIPAMENTOS ELETRICOS, MECANICOS E

PRESERVACAO (AGUA OU ESGOTO)

UN 26.385,33 35.002,78 41.070,20 54.483,73 44.750,71 59.366,29 42.791,62 56.767,36 43.140,79 57.230,57

410113COMISSIONAMENTO DE ESTACAO ELEVATORIA DE MEDIO PORTE (200CV<P<=400CV) E ALTA

INSTRUMENTACAO, INC TESTES DE INSTRUMENTOS, EQUIPAMENTOS ELETRICOS, MECANICOS E

PRESERVACAO (AGUA OU ESGOTO)

UN 42.019,57 55.743,16 66.159,12 87.766,69 72.209,27 95.792,82 68.988,86 91.520,62 69.562,81 92.282,02

410121COMISSIONAMENTO DE ESTACAO ELEVATORIA DE GRANDE PORTE (P>400CV) E BAIXA

INSTRUMENTACAO, INC TESTES DE INSTRUMENTOS, EQUIPAMENTOS ELETRICOS, MECANICOS E

PRESERVACAO (AGUA OU ESGOTO)

UN 25.214,81 33.449,97 38.768,01 51.429,64 42.164,89 55.935,94 40.356,76 53.537,28 40.679,03 53.964,80

410122COMISSIONAMENTO DE ESTACAO ELEVATORIA DE GRANDE PORTE (P>400CV) E MEDIA

INSTRUMENTACAO, INC TESTES DE INSTRUMENTOS, EQUIPAMENTOS ELETRICOS, MECANICOS E

PRESERVACAO (AGUA OU ESGOTO)

UN 35.696,47 47.354,94 55.588,36 73.743,52 60.573,92 80.357,36 57.920,17 76.836,90 58.393,13 77.464,33

410123COMISSIONAMENTO DE ESTACAO ELEVATORIA DE GRANDE PORTE (P>400CV) E ALTA

INSTRUMENTACAO, INC TESTES DE INSTRUMENTOS, EQUIPAMENTOS ELETRICOS, MECANICOS E

PRESERVACAO (AGUA OU ESGOTO)

UN 50.439,68 66.913,28 79.247,37 105.129,56 86.467,53 114.707,83 82.624,35 109.609,46 83.309,28 110.518,09

410500 COMISSIONAMENTO DE ETE (ESTACAO DE TRATAMENTO DE ESGOTO)

410501COMISSIONAMENTO DE ETE DE PEQUENO PORTE (Q<=50L/S), INCLUINDO TESTES DE

INSTRUMENTOS, EQUIPAMENTOS ELETRICOS, MECANICOS E PRESERVACAOUN 14.551,78 19.304,39 20.197,71 26.794,28 21.612,78 28.671,51 20.859,55 27.672,28 20.993,80 27.850,38

410502COMISSIONAMENTO DE ETE DE MEDIO PORTE (50L/S<Q<=150L/S), INCLUINDO TESTES DE

INSTRUMENTOS, EQUIPAMENTOS ELETRICOS, MECANICOS E PRESERVACAOUN 18.434,63 24.455,38 24.832,88 32.943,30 26.436,50 35.070,66 25.582,91 33.938,29 25.735,05 34.140,12

410503COMISSIONAMENTO DE ETE DE GRANDE PORTE (Q>150L/S), INCLUINDO TESTES DE

INSTRUMENTOS, EQUIPAMENTOS ELETRICOS, MECANICOS E PRESERVACAOUN 23.134,50 30.690,23 31.240,43 41.443,55 33.272,06 44.138,71 32.190,64 42.704,10 32.383,39 42.959,81

410600 COMISSIONAMENTO DE ETA (ESTACAO DE TRATAMENTO DE AGUA)

410601COMISSIONAMENTO DE ETA DE PEQUENO PORTE (Q<=50L/S), INCLUINDO TESTES DE

INSTRUMENTOS, EQUIPAMENTOS ELETRICOS, MECANICOS E PRESERVACAOUN 14.903,43 19.770,89 23.068,52 30.602,70 25.114,97 33.317,52 24.025,67 31.872,45 24.219,81 32.130,00

410602COMISSIONAMENTO DE ETA DE MEDIO PORTE (50L/S<Q<=150L/S), INCLUINDO TESTES DE

INSTRUMENTOS, EQUIPAMENTOS ELETRICOS, MECANICOS E PRESERVACAOUN 17.918,36 23.770,50 27.694,82 36.739,95 30.145,12 39.990,52 28.840,85 38.260,27 29.073,32 38.568,67

410603COMISSIONAMENTO DE ETA DE GRANDE PORTE (Q>150L/S), INCLUINDO TESTES DE

INSTRUMENTOS, EQUIPAMENTOS ELETRICOS, MECANICOS E PRESERVACAOUN 23.597,84 31.304,89 36.597,00 48.549,58 39.855,02 52.871,67 38.120,82 50.571,08 38.429,90 50.981,11

420000 PRE-OPERACAO, PARTIDA DE SISTEMAS

420100 PRE-OPERACAO, PARTIDA DE SISTEMAS DE AGUA

420101PRE-OPERACAO, PARTIDA DE SISTEMAS DE AGUA DE PEQUENO PORTE (Q<=50L/S), INCLUINDO

ELETRIFICACAO, OPERACAO DE EQUIPAMENTOS, VALVULAS E MANOBRASUN 5.912,96 7.844,13 7.137,60 9.468,74 7.444,16 9.875,42 7.281,28 9.659,35 7.309,76 9.697,13

420102PRE-OPERACAO, PARTIDA DE SISTEMAS DE AGUA DE MEDIO PORTE (50L/S<Q<=150L/S),

INCLUINDO ELETRIFICACAO, OPERACAO DE EQUIPAMENTOS, VALVULAS E MANOBRASUN 7.391,20 9.805,17 8.922,00 11.835,93 9.305,20 12.344,28 9.101,60 12.074,18 9.137,20 12.121,41

Página: 52 de 59

Page 53: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

420103PRE-OPERACAO, PARTIDA DE SISTEMAS DE AGUA DE GRANDE PORTE (Q>150L/S), INCLUINDO

ELETRIFICACAO, OPERACAO DE EQUIPAMENTOS, VALVULAS E MANOBRASUN 8.816,49 11.695,96 10.621,41 14.090,36 11.073,24 14.689,76 10.833,18 14.371,30 10.875,15 14.426,97

420500 PRE-OPERACAO, PARTIDA DE SISTEMAS DE ESGOTO

420501PRE-OPERACAO, PARTIDA DE SISTEMAS DE ESGOTO DE PEQUENO PORTE (Q<=50L/S),

INCLUINDO ELETRIFICACAO, OPERACAO DE EQUIPAMENTOS, VALVULAS E MANOBRASUN 5.912,96 7.844,13 7.137,60 9.468,74 7.444,16 9.875,42 7.281,28 9.659,35 7.309,76 9.697,13

420502PRE-OPERACAO, PARTIDA DE SISTEMAS DE ESGOTO DE MEDIO PORTE (50L/S<Q<=150L/S),

INCLUINDO ELETRIFICACAO, OPERACAO DE EQUIPAMENTOS, VALVULAS E MANOBRASUN 7.391,20 9.805,17 8.922,00 11.835,93 9.305,20 12.344,28 9.101,60 12.074,18 9.137,20 12.121,41

420503PRE-OPERACAO, PARTIDA DE SISTEMAS DE ESGOTO DE GRANDE PORTE (Q>150L/S), INCLUINDO

ELETRIFICACAO, OPERACAO DE EQUIPAMENTOS, VALVULAS E MANOBRASUN 8.816,49 11.695,96 10.621,41 14.090,36 11.073,24 14.689,76 10.833,18 14.371,30 10.875,15 14.426,97

430000 OPERACAO ASSISTIDA E TREINAMENTO DE OPERADORES

430000 OPERACAO ASSISTIDA E TREINAMENTO DE OPERADORES

430101OPERACAO ASSISTIDA E TREINAMENTO DE OPERADORES PARA SISTEMAS DE PEQUENO PORTE,

Q<=50L/SMES 6.388,68 8.475,22 10.252,17 13.600,53 11.220,49 14.885,10 10.705,06 14.201,33 10.796,93 14.323,21

430102OPERACAO ASSISTIDA E TREINAMENTO DE OPERADORES PARA SISTEMAS DE MEDIO PORTE,

50L/S<Q<=150L/SMES 12.777,36 16.950,45 20.504,34 27.201,06 22.440,98 29.770,20 21.410,12 28.402,67 21.593,86 28.646,41

430103OPERACAO ASSISTIDA E TREINAMENTO DE OPERADORES PARA SISTEMAS DE GRANDE PORTE,

Q>150L/SMES 19.166,04 25.425,67 30.756,51 40.801,59 33.661,47 44.655,31 32.115,18 42.604,00 32.390,79 42.969,62

500000 COMPOSICOES AUXILIARES

501000 PREPARO DE ARGAMASSAS

501001 ARGAMASSA (CAL HIDRATADA/AREIA FINA) TR. 1:2 m3 462,34 613,340244 500,54 664,016364 510,14 676,751724 505,04 669,986064 505,94 671,180004

501004 ARGAMASSA (CAL HIDRATADA/AREIA FINA) TR. 1:3 m3 357,42 474,153372 395,62 524,829492 405,22 537,564852 400,12 530,799192 401,02 531,993132

501007 ARGAMASSA (CAL HIDRATADA/AREIA FINA) TR. 1:4 m3 289,32 383,811912 319,88 424,352808 327,56 434,541096 323,48 429,128568 324,2 430,08372

501010 ARGAMASSA (CAL HIDRATADA/AREIA FINA) TR. 1:4,5 m3 259,83 344,690478 288,48 382,697568 295,68 392,249088 291,86 387,181476 292,53 388,070298

501013 ARGAMASSA (CAL HIDRATADA/AREIA FINA) TR. 1:6 m3 237,72 315,359352 268,28 355,900248 275,96 366,088536 271,88 360,676008 272,6 361,63116

501016 ARGAMASSA (CIMENTO/AREIA GROSSA) TR. 1:2 m3 492,76 653,695416 530,96 704,371536 540,56 717,106896 535,46 710,341236 536,36 711,535176

501017 ARGAMASSA (CIMENTO/AREIA MEDIA) TR. 1:2 m3 491,21 651,639186 529,41 702,315306 539,01 715,050666 533,91 708,285006 534,81 709,478946

501019 ARGAMASSA (CIMENTO/AREIA GROSSA) TR. 1:3 m3 381,48 506,071368 412,04 546,612264 419,72 556,800552 415,64 551,388024 416,36 552,343176

501020 ARGAMASSA (CIMENTO/AREIA FINA) TR. 1:3 m3 375,39 497,992374 405,95 538,53327 413,63 548,721558 409,55 543,30903 410,27 544,264182

501022 ARGAMASSA (CIMENTO/AREIA GROSSA) TR. 1:4 m3 324,65 430,68069 355,21 471,221586 362,89 481,409874 358,81 475,997346 359,53 476,952498

501023 ARGAMASSA (CIMENTO/AREIA GROSSA) TR. 1:4 COM IMPERMEABILIZANTE m3 325,22 431,436852 355,78 471,977748 363,46 482,166036 359,38 476,753508 360,1 477,70866

501025 ARGAMASSA (CIMENTO/AREIA GROSSA) TR. 1:5 m3 287,26 381,079116 310,18 411,484788 315,94 419,126004 312,88 415,066608 313,42 415,782972

501031 ARGAMASSA (CIMENTO/AREIA GROSSA) TR. 1:7 m3 251,79 334,024614 282,35 374,56551 290,03 384,753798 285,95 379,34127 286,67 380,296422

501034 ARGAMASSA (CIMENTO/AREIA GROSSA) TR. 1:8 m3 239,21 317,335986 269,77 357,876882 277,45 368,06517 273,37 362,652642 274,09 363,607794

501037 ARGAMASSA (CIMENTO/AREIA GROSSA) TR. 1:10 m3 219,52 291,215232 250,08 331,756128 257,76 341,944416 253,68 336,531888 254,4 337,48704

501040 ARGAMASSA MISTA(CIMENTO/CAL HIDRATADA/AREIA GROSSA) TR.1:0,2:5,4 m3 308,87 409,746942 339,43 450,287838 347,11 460,476126 343,03 455,063598 343,75 456,01875

501043 ARGAMASSA MISTA (CIMENTO/CAL HIDRATADA/AREIA GROSSA) TR.1:0,25:3 m3 454,75 603,27135 485,31 643,812246 492,99 654,000534 488,91 648,588006 489,63 649,543158

501046 ARGAMASSA MISTA (CIMENTO/CAL HIDRATADA/AREIA GROSSA) TR.1:0,50:5 m3 344,28 456,721848 367,01 486,875466 372,72 494,450352 369,69 490,430754 370,22 491,133852

501049 ARGAMASSA MISTA (CIMENTO/CAL HIDRATADA/AREIA GROSSA) TR.1:0,50:8 m3 277,69 368,383554 308,25 408,92445 315,93 419,112738 311,85 413,70021 312,57 414,655362

501052 ARGAMASSA MISTA (CIMENTO/CAL HIDRATADA/AREIA GROSSA) TR. 1:1:4 m3 477,44 633,371904 500,17 663,525522 505,88 671,100408 502,85 667,08081 503,38 667,783908

501055 ARGAMASSA MISTA (CIMENTO/CAL HIDRATADA/AREIA GROSSA) TR. 1:1:6 m3 375,99 498,788334 406,55 539,32923 414,23 549,517518 410,15 544,10499 410,87 545,060142

501058 ARGAMASSA MISTA(CIMENTO/CAL HIDRATADA/AREIA GROSSA)TR.1:1, 2:4,2 m3 506,11 671,405526 536,67 711,946422 544,35 722,13471 540,27 716,722182 540,99 717,677334

501061 ARGAMASSA MISTA (CIMENTO/CAL HIDRATADA/AREIA GROSSA) TR. 1:2:6 m3 480,05 636,83433 510,61 677,375226 518,29 687,563514 514,21 682,150986 514,93 683,106138

501064 ARGAMASSA MISTA (CIMENTO/CAL HIDRATADA/AREIA GROSSA) TR. 1:2:8 m3 394,65 523,54269 425,21 564,083586 432,89 574,271874 428,81 568,859346 429,53 569,814498

501067 ARGAMASSA MISTA (CIMENTO/CAL HIDRATADA/AREIA MEDIA 1:2:9 m3 365,37 484,699842 395,93 525,240738 403,61 535,429026 399,53 530,016498 400,25 530,97165

501070 ARGAMASSA MISTA (CIMENTO/CAL HIDRATADA/AREIA GROSSA) TR. 1:2:11 m3 326,05 432,53793 356,61 473,078826 364,29 483,267114 360,21 477,854586 360,93 478,809738

501072 ARGAMASSA MISTA (CIMENTO/CAL HIDRATADA/AREIA GROSSA) TR. 1:3:9 m3 418,45 555,11577 449,01 595,656666 456,69 605,844954 452,61 600,432426 453,33 601,387578

501075 ARGAMASSA MISTA (CIMENTO/CAL HIDRATADA/AREIA GROSSA) TR. 1:3:10 m3 407,03 539,965998 437,59 580,506894 445,27 590,695182 441,19 585,282654 441,91 586,237806

501078 ARGAMASSA GROUT (CIMENTO/CAL HIDRATADA/AREIA GROSSA/PEDRISCO) TR. 1:0, 1:3:2 m3 304,27 403,644582 327,19 434,050254 332,95 441,69147 329,89 437,632074 330,43 438,348438

501081 ARGAMASSA MISTA (CIMENTO/CAL HIDRATADA/AREIA GROSSA) TR. 1:2:4 m3 317,83 421,633278 348,39 462,174174 356,07 472,362462 351,99 466,949934 352,71 467,905086

501084 ARGAMASSA MISTA (CIMENTO/CAL HIDRATADA/AREIA GROSSA) TR. 1:2:6 m3 283,03 375,467598 313,59 416,008494 321,27 426,196782 317,19 420,784254 317,91 421,739406

501087 ARGAMASSA MISTA(CIMENTO/ARENOSO/AREIA GROSSA)TR. 1:2,5:3,5 m3 317,29 420,916914 347,85 461,45781 355,53 471,646098 351,45 466,23357 352,17 467,188722

501090 ARGAMASSA MISTA (CIMENTO/ARENOSO/AREIA GROSSA) TR. 1:3:3 m3 316,77 420,227082 347,33 460,767978 355,01 470,956266 350,93 465,543738 351,65 466,49889

501093 ARGAMASSA MISTA (CIMENTO/ARENOSO/AREIA GROSSA) TR. 1:3:5 m3 282,23 374,406318 312,79 414,947214 320,47 425,135502 316,39 419,722974 317,11 420,678126

501096 ARGAMASSA MISTA (CIMENTO/ARENOSO/AREIA GROSSA) TR. 1:3:7 m3 263,61 349,705026 294,17 390,245922 301,85 400,43421 297,77 395,021682 298,49 395,976834

501099 ARGAMASSA MISTA (CIMENTO/ARENOSO/AREIA GROSSA)TR.1:3,5:2,5 m3 316,25 419,53725 346,81 460,078146 354,49 470,266434 350,41 464,853906 351,13 465,809058

501102 ARGAMASSA MISTA (CIMENTO/ARENOSO/AREIA GROSSA) TR. 1:4:2 m3 315,7 418,80762 346,26 459,348516 353,94 469,536804 349,86 464,124276 350,58 465,079428

501103 ARGAMASSA MISTA (CIMENTO/ARENOSO/AREIA GROSSA) TR. 1:4:3 m3 297,22 394,292052 327,78 434,832948 335,46 445,021236 331,38 439,608708 332,1 440,56386

501105 ARGAMASSA MISTA (CIMENTO/ARENOSO/AREIA GROSSA) TR. 1:4:4 m3 281,42 373,331772 311,98 413,872668 319,66 424,060956 315,58 418,648428 316,3 419,60358

501108 ARGAMASSA MISTA (CIMENTO/ARENOSO/AREIA GROSSA) TR. 1:4:6 m3 262,94 348,816204 293,5 389,3571 301,18 399,545388 297,1 394,13286 297,82 395,088012

501111 ARGAMASSA MISTA (CIMENTO/ARENOSO/AREIA GROSSA) TR. 1:4:8 m3 248,43 329,567238 278,99 370,108134 286,67 380,296422 282,59 374,883894 283,31 375,839046

501114 ARGAMASSA MISTA (CIMENTO/ARENOSO/AREIA GROSSA) TR. 1:5:3 m3 280,61 372,257226 311,17 412,798122 318,85 422,98641 314,77 417,573882 315,49 418,529034

501117 ARGAMASSA MISTA (CIMENTO/ARENOSO/AREIA GROSSA) TR. 1:5:5 m3 262,28 347,940648 292,84 388,481544 300,52 398,669832 296,44 393,257304 297,16 394,212456

501120 ARGAMASSA MISTA (CIMENTO/ARENOSO/AREIA GROSSA) TR. 1:5:7 m3 247,87 328,824342 278,43 369,365238 286,11 379,553526 282,03 374,140998 282,75 375,09615

501123 ARGAMASSA MISTA (CIMENTO/ARENOSO/AREIA GROSSA) TR. 1:6:2 m3 279,81 371,195946 310,37 411,736842 318,05 421,92513 313,97 416,512602 314,69 417,467754

501126 ARGAMASSA MISTA (CIMENTO/ARENOSO/AREIA GROSSA) TR. 1:6:4 m3 261,62 347,065092 292,18 387,605988 299,86 397,794276 295,78 392,381748 296,5 393,3369

501129 ARGAMASSA MISTA (CIMENTO/ARENOSO/AREIA GROSSA) TR. 1:6:6 m3 247,31 328,081446 277,87 368,622342 285,55 378,81063 281,47 373,398102 282,19 374,353254

501132 ARGAMASSA MISTA (CIMENTO/ARENOSO/AREIA GROSSA) TR. 1:7:3 m3 261,02 346,269132 291,58 386,810028 299,26 396,998316 295,18 391,585788 295,9 392,54094

501135 ARGAMASSA MISTA (CIMENTO/ARENOSO/AREIA GROSSA) TR. 1:7:5 m3 246,75 327,33855 277,31 367,879446 284,99 378,067734 280,91 372,655206 281,63 373,610358

501138 ARGAMASSA MISTA (CIMENTO/ARENOSO/AREIA GROSSA) TR. 1:8:4 m3 207,1 274,73886 218,56 289,941696 221,44 293,762304 219,91 291,732606 220,18 292,090788

501141 ARGAMASSA MISTA (CIMENTO/CAL HIDRATADA/AREIA GROSSA) TR. 1:3 - 100KG DE CIMENTO m3 402,83 534,394278 433,39 574,935174 441,07 585,123462 436,99 579,710934 437,71 580,666086

501144 ARGAMASSA MISTA (CIMENTO/CAL HIDRATADA/AREIA GROSSA) TR. 1:4 - 100KG DE CIMENTO m3 350,37 464,800842 380,93 505,341738 388,61 515,530026 384,53 510,117498 385,25 511,07265

501147 ARGAMASSA MISTA (CIMENTO/CAL HIDRATADA/AREIA GROSSA) TR. 1:4 - 130KG DE CIMENTO m3 366,57 486,291762 397,13 526,832658 404,81 537,020946 400,73 531,608418 401,45 532,56357

501150 ARGAMASSA MISTA (CIMENTO/CAL HIDRATADA/AREIA GROSSA) TR. 1:4 - 150KG DE CIMENTO m3 377,37 500,619042 407,93 541,159938 415,61 551,348226 411,53 545,935698 412,25 546,89085

501153 ARGAMASSA MISTA (CIMENTO/SAIBRO/AREIA GROSSA) TR. 1:0,5:2,5 m3 295,21 391,625586 325,77 432,166482 333,45 442,35477 329,37 436,942242 330,09 437,897394

501156 ARGAMASSA MISTA (CIMENTO/SAIBRO/AREIA GROSSA) TR. 1:1:5,5 m3 235,31 312,162246 265,87 352,703142 273,55 362,89143 269,47 357,478902 270,19 358,434054

501159 ARGAMASSA MISTA (CIMENTO/SAIBRO/AREIA GROSSA) TR. 1:2:2 m3 274,43 364,058838 304,99 404,599734 312,67 414,788022 308,59 409,375494 309,31 410,330646

501162 ARGAMASSA MISTA (CIMENTO/SAIBRO/AREIA GROSSA) TR. 1:3:2 m3 261,3 346,64058 291,86 387,181476 299,54 397,369764 295,46 391,957236 296,18 392,912388

501165 ARGAMASSA MISTA (CIMENTO/SAIBRO/AREIA GROSSA) TR. 1:3:3 m3 226,41 300,355506 256,97 340,896402 264,65 351,08469 260,57 345,672162 261,29 346,627314

501168 ARGAMASSA MISTA (CIMENTO/SAIBRO/AREIA GROSSA) TR. 1:3:6 m3 161,32 214,007112 191,88 254,548008 199,56 264,736296 195,48 259,323768 196,2 260,27892

501171 ARGAMASSA (CIMENTO/SAIBRO) TR. 1:6 m3 227,54 301,854564 258,1 342,39546 265,78 352,583748 261,7 347,17122 262,42 348,126372

501174 ARGAMASSA (CIMENTO/SAIBRO) TR. 1:8 m3 203,89 270,480474 234,45 311,02137 242,13 321,209658 238,05 315,79713 238,77 316,752282

501177 ARGAMASSA (CIMENTO/PEDRISCO) TR. 1:4 m3 306,99 407,252934 337,55 447,79383 345,23 457,982118 341,15 452,56959 341,87 453,524742

501180 ARGAMASSA MISTA (CIMENTO/AREIA FINA/CAULIM) m3 220,7 292,78062 251,26 333,321516 258,94 343,509804 254,86 338,097276 255,58 339,052428

502000 CONCRETO

502100 CONCRETO CONVENCIONAL

502101 PREPARO DE CONCRETO FCK = 6,00 MPA, BRITAS 1 E 2 m3 252,31 334,714446 275,23 365,120118 280,99 372,761334 277,93 368,701938 278,47 369,418302

502104 PREPARO DE CONCRETO FCK = 9,00 MPA, BRITAS 1 E 2 m3 260,56 345,658896 283,48 376,064568 289,24 383,705784 286,18 379,646388 286,72 380,362752

502107 PREPARO DE CONCRETO FCK = 11,00 MPA, BRITAS 1 E 2 m3 267,12 354,361392 290,04 384,767064 295,8 392,40828 292,74 388,348884 293,28 389,065248

502113 PREPARO DE CONCRETO FCK = 15,00 MPA, BRITAS 1 E 2 m3 297,75 394,99515 310,16 411,458256 313,28 415,597248 311,62 413,395092 311,92 413,793072

502116 PREPARO DE CONCRETO FCK = 15,00 MPA, COM GRAVILHAO P/CAPEAMENTO DE LAJE m3 310,75 412,24095 333,67 442,646622 339,43 450,287838 336,37 446,228442 336,91 446,944806

502119 PREPARO DE CONCRETO FCK = 18,00 MPA, BRITAS 1 E 2 m3 309,25 410,25105 321,66 426,714156 324,78 430,853148 323,12 428,650992 323,42 429,048972

502120 PREPARO DE CONCRETO FCK = 20,00 MPA, BRITAS 1 E 2 m3 324,88 430,985808 337,29 447,448914 340,41 451,587906 338,75 449,38575 339,05 449,78373

502123 PREPARO DE CONCRETO FCK = 22,00 MPA, BRITAS 1 E 2 m3 333,13 441,930258 345,54 458,393364 348,66 462,532356 347 460,3302 347,3 460,72818

502125 PREPARO DE CONCRETO FCK = 25,00 MPA, BRITAS 1 E 2 m3 346,35 459,46791 358,76 475,931016 361,88 480,070008 360,22 477,867852 360,52 478,265832

502126 PREPARO DE CONCRETO FCK = 30,00 MPA, BRITAS 1 E 2 m3 396,93 526,567338 409,34 543,030444 412,46 547,169436 410,8 544,96728 411,1 545,36526

502127PREPARO CONCRETO C/ CONSUMO MIN. DE CIMENTO DE 150KG / m3, INCL. FORNEC. DE MAT E

PRODUCAOm3 210,27 278,944182 233,19 309,349854 238,95 316,99107 235,89 312,931674 236,43 313,648038

502129PREPARO CONCRETO C/ CONSUMO MIN. DE CIMENTO DE 250KG / m3, INCL. FORNEC. DE MAT.E

PRODUCAOm3 244,37 324,181242 267,29 354,586914 273,05 362,22813 269,99 358,168734 270,53 358,885098

502132PREPARO CONCRETO C/ CONSUMO MIN. DE CIMENTO DE 300KG / m3, INCL. FORNEC. DE MAT.E

PRODUCAOm3 294,64 390,869424 317,56 421,275096 323,32 428,916312 320,26 424,856916 320,8 425,57328

502135PREPARO CONCRETO C/ CONSUMO MIN. DE CIMENTO DE 340KG / m3, INCL. FORNEC. DE MAT.E

PRODUCAOm3 311,09 412,691994 334,01 443,097666 339,77 450,738882 336,71 446,679486 337,25 447,39585

502140 PREPARO DE CONCRETO FCK = 40,00 MPA, BRITAS 1 E 2 m3 422,12 559,984392 445,04 590,390064 450,8 598,03128 447,74 593,971884 448,28 594,688248

502200 CONCRETO CICLOPICO

502201PREPARO CONCRETO CICLOPICO C/ CONCRETO PRIMARIO C/CONS. MIN. DE CIMENTO DE

150KG/m3 E 30% DE PEDRA DE MAO, INCL. FORNEC. DOS MAT.E PRODUCAOm3 202,05 268,03953 224,97 298,445202 230,73 306,086418 227,67 302,027022 228,21 302,743386

502204PREPARO CONCRETO CICLOPICO C/ CONCRETO PRIMARIO C/CONS. MIN. DE CIMENTO DE

200KG/m3 E 30% DE PEDRA DE MAO, INCL. FORNEC. DOS MAT.E PRODUCAOm3 227,89 302,318874 250,81 332,724546 256,57 340,365762 253,51 336,306366 254,05 337,02273

502207PREPARO CONCRETO CICLOPICO C/ CONCRETO PRIMARIO C/CONS. MIN. DE CIMENTO DE

250KG/m3 E 30% DE PEDRA DE MAO, INCL. FORNEC. DOS MAT.E PRODUCAOm3 254,59 337,739094 277,51 368,144766 283,27 375,785982 280,21 371,726586 280,75 372,44295

502210PREPARO CONCRETO CICLOPICO C/ CONCRETO PRIMARIO C/CONS. MIN. DE CIMENTO DE

300KG/m3 E 30% DE PEDRA DE MAO, INCL. FORNEC. DOS MAT.E PRODUCAOm3 281,49 373,424634 304,41 403,830306 310,17 411,471522 307,11 407,412126 307,65 408,12849

Página: 53 de 59

Page 54: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

502300 CONCRETO COMPACTADO C/ ROLO ( CCR )

502301PREPARO CONCRETO COMPACTADO C/ ROLO, CONS. DE CIMENTO DE 60 kg/m3, INCL. FORNEC.

DE MAT.E PRODUCAOm3 106,21 140,898186 107,7 142,87482 108,07 143,365662 107,88 143,113608 107,91 143,153406

502304PREPARO CONCRETO COMPACTADO C/ ROLO, CONS. DE CIMENTO DE 80 kg/m3, INCL. FORNEC.

DE MAT.E PRODUCAOm3 122,45 162,44217 124,23 164,803518 124,68 165,400488 124,44 165,082104 124,48 165,135168

502307PREPARO CONCRETO COMPACTADO C/ ROLO, CONS. DE CIMENTO DE 100 kg/m3, INCL. FORNEC.

DE MAT.E PRODUCAOm3 134 177,7644 136,14 180,603324 136,68 181,319688 136,39 180,934974 136,45 181,01457

502310PREPARO CONCRETO COMPACTADO C/ ROLO, CONS. DE CIMENTO DE 120 kg/m3, INCL. FORNEC.

DE MAT.E PRODUCAOm3 144,96 192,303936 147,52 195,700032 148,16 196,549056 147,82 196,098012 147,89 196,190874

502313PREPARO CONCRETO COMPACTADO C/ ROLO, CONS. DE CIMENTO DE 140 kg/m3, INCL. FORNEC.

DE MAT.E PRODUCAOm3 156,18 207,188388 159,26 211,274316 160,03 212,295798 159,62 211,751892 159,69 211,844754

502316PREPARO ARGAMASSA C/CONSUMO DE CIMENTO DE 350 kg/m3, P/JUNTAS DE CAMADAS DE

CONCRETO ROLADO (SELO) E P/BERCO (CONTATO C/ A FUND), INCL. FORNEC. DE MAT.E

PRODUCAO

m3 292,07 387,460062 314,99 417,865734 320,75 425,50695 317,69 421,447554 318,23 422,163918

502400 CONCRETO PROJETADO

502401PREPARO CONCRETO PROJETADO P/ GRANDES ESPESSURAS FCK=20MPa, INCL. FORNEC. DOS

MAT.E PRODUCAOm3 323,68 429,393888 346,6 459,79956 352,36 467,440776 349,3 463,38138 349,84 464,097744

502404PREPARO CONCRETO PROJETADO P/ GRANDES ESPESSURAS FCK=25MPa, INCL. FORNEC. DOS

MAT.E PRODUCAOm3 350,26 464,654916 373,18 495,060588 378,94 502,701804 375,88 498,642408 376,42 499,358772

502500 ARGAMASSA PROJETADA

502501PREPARO ARGAMASSA PROJETADA P/PEQUENAS ESPESSURAS FCK=20MPa,INCL. FORNEC. DOS

MAT.E PRODUCAOm3 305,1 404,74566 316,56 419,948496 319,44 423,769104 317,91 421,739406 318,18 422,097588

502504PREPARO ARGAMASSA PROJETADA P/PEQUENAS ESPESSURAS FCK=25MPa,INCL. FORNEC. DOS

MAT.E PRODUCAOm3 359,1 476,38206 370,56 491,584896 373,44 495,405504 371,91 493,375806 372,18 493,733988

502600 CONCRETO ARMADO

502601 CONCRETO ARMADO P/CX/P.V.(ACO=40KG,FORMA=15M2) m3 1071,21 1421,067186 1251,52 1660,266432 1296,7 1720,20222 1272,87 1688,589342 1277,32 1694,492712

502602 CONCRETO ARMADO PARA PLACAS PREMOLDADAS COM TELA ACO CA-50 m3 551,66 731,832156 622,19 825,397254 639,87 848,851542 630,39 836,275374 632,09 838,530594

502700 CONCRETO PAVIMENTACAO

502701 CONCRETO A QUENTE, ASFALTICO USINADO m3 401,6 532,76256 403,36 535,097376 403,79 535,667814 403,56 535,362696 403,6 535,41576

502702 IMPRIMACAO m2 3,31 4,391046 3,49 4,629834 3,54 4,696164 3,52 4,669632 3,52 4,669632

509702 IMPRIMACAO (MRR / RMS) m2 3,31 4,391046 3,5 4,6431 3,55 4,70943 3,53 4,682898 3,53 4,682898

502703 CONCRETO A FRIO, ASFALTICO USINADO m3 405,25 537,60465 407,01 539,939466 407,44 540,509904 407,21 540,204786 407,25 540,25785

509703 CONCRETO A FRIO, ASFALTICO USINADO (MRR / RMS) m3 405,38 537,777108 407,19 540,178254 407,65 540,78849 407,41 540,470106 407,45 540,52317

503000 PECAS PRE-MOLDADAS

503110 TAMPA CONCRETO PREMOLDADO FCK=15,0 MPA E=7 CM m2 57,02 75,642732 65,55 86,95863 67,68 89,784288 66,57 88,311762 66,78 88,590348

509910 TAMPA CONCRETO PREMOLDADO FCK=15,0 MPA E=7 CM (MRR / RMS) m2 57,43 76,186638 66,17 87,781122 68,34 90,659844 67,17 89,107722 67,39 89,399574

503113 TAMPA CONCRETO PREMOLDADO FCK=15,0 MPA E=8 CM m2 65,17 86,454522 74,92 99,388872 77,36 102,625776 76,08 100,927728 76,31 101,232846

509913 TAMPA CONCRETO PREMOLDADO FCK=15,0 MPA E=8 CM (MRR / RMS) m2 65,63 87,064758 75,62 100,317492 78,11 103,620726 76,77 101,843082 77 102,1482

503116 TAMPA CONCRETO PREMOLDADO FCK=15,0 MPA E=10 CM m2 81,47 108,078102 93,65 124,23609 96,7 128,28222 95,11 126,172926 95,39 126,544374

509916 TAMPA CONCRETO PREMOLDADO FCK=15,0 MPA E=10 CM (MRR / RMS) m2 82,04 108,834264 94,53 125,403498 97,63 129,515958 95,96 127,300536 96,26 127,698516

503119 TAMPA CONCRETO PREMOLDADO FCK=15,0 MPA E=12 CM m2 97,75 129,67515 112,38 149,083308 116,03 153,925398 114,12 151,391592 114,48 151,869168

509919 TAMPA CONCRETO PREMOLDADO FCK=15,0 MPA E=12 CM (MRR / RMS) m2 98,45 130,60377 113,43 150,476238 117,16 155,424456 115,15 152,75799 115,51 153,235566

503122 TAMPA CONCRETO PREMOLDADO FCK=15,0 MPA E=15 CM m2 122,19 162,097254 140,48 186,360768 145,04 192,410064 142,65 189,23949 143,1 189,83646

509922 TAMPA CONCRETO PREMOLDADO FCK=15,0 MPA E=15 CM (MRR / RMS) m2 123,06 163,251396 141,8 188,11188 146,45 194,28057 143,94 190,950804 144,39 191,547774

503201 FORNEC./INST.CAIXA CCH TIPO III,EMBUTIDA NO PASSEIO P/ HIDROMETRO DP2002-18 un 92,59 122,829894 113 149,9058 118,1 156,67146 115,42 153,116172 115,92 153,779472

503203 FORNEC./INST.CAIXA CCH TIPO IV,EMBUTIDA NO PASSEIO P/ HIDROMETRO DP2002-19 un 110,47 146,549502 134,89 178,945074 140,99 187,037334 137,78 182,778948 138,37 183,561642

504000 APOIO DIVERSOS

504101 TESTE DE FUMACA m 1,46 1,936836 2,02 2,679732 2,16 2,865456 2,09 2,772594 2,1 2,78586

504104 PROTECAO PARA ESCAVACAO A FOGO - S/ CAMADA DE PNEUS AMORTECEDORES un 1531,58 2031,794028 1744,03 2313,630198 1797,23 2384,205318 1768,88 2346,596208 1774,13 2353,560858

504107 PREPARO DE CABECA DE ESTACAS un 21,88 29,026008 32,57 43,207362 35,25 46,76265 33,83 44,878878 34,07 45,197262

504110 ANDAIME PARA REVESTIM. E ALVENARIAS m2 5,06 6,712596 6,44 8,543304 6,78 8,994348 6,6 8,75556 6,64 8,808624

505000 DIVERSAS FORMAS

505101 FORMA P/LAJES S/ESC. 1 REAP./2 USOS (COMPENSADO PLST. 12MM) m2 43,53 57,746898 56,46 74,899836 59,7 79,19802 57,97 76,903002 58,29 77,327514

505104 FORMA P/VIGAS CONC. APAR 2 REAP./3 USOS (COMPENSADO PLAST. 14MM) m2 68,42 90,765972 91,08 120,826728 96,76 128,361816 93,73 124,342218 94,28 125,071848

505107 FORMA P/PILARES CONC.APAR 3 REAP./4 USOS (COMPENSADO PLAST.12MM) m2 69,1 91,66806 86,97 115,374402 91,45 121,31757 89,07 118,160262 89,5 118,7307

505110 FORMA CURVA P/PILARES CONC.APAR 1 REAP./2 USOS (COMPENSADO PLAST.6MM) m2 117,81 156,286746 155,14 205,808724 164,49 218,212434 159,51 211,605966 160,41 212,799906

505113 FORMA P/TAMPA CONCRETO PRE-MOLDADO 10 USOS m2 30,49 40,448034 40,38 53,568108 42,86 56,858076 41,54 55,106964 41,78 55,425348

505116 FORMA PARA CINTAS E VERGAS m2 32,27 42,809382 36,6 48,55356 37,69 49,999554 37,12 49,243392 37,22 49,376052

505201 REGULARIZACAO DO FUNDO DA VALA m2 2,54 3,369564 3,78 5,014548 4,1 5,43906 3,93 5,213538 3,96 5,253336

505203 BOTA FORA SOLO (CARGA E DESCARGA/ MOM.TRANSPORTE 12.5 KM/ ESPALHAMENTO) m3 8,03 10,652598 8,12 10,771992 8,14 10,798524 8,13 10,785258 8,13 10,785258

505206 BOTA FORA ENTULHO (CARGA E DESCARGA/ MOM.TRANSPORTE 12.5KM./ ESPALHAMENTO) m3 18,52 24,568632 24,25 32,17005 25,69 34,080354 24,93 33,072138 25,06 33,244596

505209 BOTA FORA SOLO (CARGA E DESCARGA/ MOM.TRANSPORTE 3 km./ESPALHAMENTO) m3 3,47 4,603302 3,56 4,722696 3,58 4,749228 3,57 4,735962 3,57 4,735962

505212 BOTA FORA ENTULHO (CARGA E DESCARGA/ MOM.TRANSPORTE 3KM./ SEM ESPALHAMENTO) m3 2,23 2,958318 2,23 2,958318 2,23 2,958318 2,23 2,958318 2,23 2,958318

505215 BOTA FORA ENTULHO (CARGA E DESCARGA/ MOM.TRANSPORTE 200M. m3 0,89 1,180674 0,89 1,180674 0,89 1,180674 0,89 1,180674 0,89 1,180674

506000 ALVENARIAS E DIVISORIAS

506101 APERTO COMUM m 19,42 25,762572 25,59 33,947694 27,13 35,990658 26,3 34,88958 26,46 35,101836

506104 CORTE E ATACAMENTO DE PAREDES m2 2,21 2,931786 3,22 4,271652 3,47 4,603302 3,34 4,430844 3,37 4,470642

506107 CINTA/VERGA DE CONCRETO 10 x 10 FCK=15 MPA m3 958,57 1271,638962 1087,83 1443,115278 1120,17 1486,017522 1103,35 1463,70411 1106,43 1467,790038

506108 VERGA E CONTRAVERGA DE CONCRETO 10 x 10 FCK=15 MPA m 12,6 16,71516 14,42 19,129572 14,88 19,739808 14,63 19,408158 14,68 19,474488

506113 CINTA BLOCO CALHA CONCRETO ESTRUTU. 14 x 19 x 19CM m 20,11 26,677926 24,41 32,382306 25,49 33,815034 24,92 33,058872 25,03 33,204798

506116 CINTA BLOCO CALHA CONCRETO ESTRUTU. 19 x 19 x 19CM m 26,67 35,380422 31,86 42,265476 33,16 43,990056 32,48 43,087968 32,61 43,260426

506119 CALHA DE CONCRETO 50 x 20 CM IN-LOCO m 179,45 238,05837 216,44 287,129304 225,73 299,453418 220,79 292,900014 221,69 294,093954

506122 CRAVEJAMENTO m 23,99 31,825134 31,03 41,164398 32,79 43,499214 31,84 42,238944 32,02 42,477732

506125 ATACAMENTO PARA ESQUADRIAS m2 23,87 31,665942 33,4 44,30844 35,8 47,49228 34,52 45,794232 34,75 46,09935

506128 PINTURA A BASE DE BORRACHA CLORADA m2 103,9 137,83374 124,74 165,480084 129,96 172,404936 127,18 168,716988 127,68 169,380288

507000 TRATAMENTOS

507004 REGULARIZACAO DE AREA P/IMPERMEABILIZ. m2 17,97 23,839002 20,44 27,115704 21,06 27,938196 20,73 27,500418 20,79 27,580014

507007 PROTECAO MECANICA P/IMPERMEABILIZACAO m2 12,02 15,945732 14,56 19,315296 15,21 20,177586 14,86 19,713276 14,92 19,792872

507010 JUNTA COM MASTIQUE ASFALTICO m 4,45 5,90337 5,66 7,508556 5,97 7,919802 5,8 7,69428 5,83 7,734078

508000 SERVICOS COMPLEMENTARES

509000 INSTALACOES HIDRO-SANITARIAS

509100 FOSSAS E SUMIDOUROS

509101 FOSSAS SEPTICA D=0,70 h=1,20 PRE-MOLDADA CAP.10 PESSOAS un 1459,79 1936,557414 1473,85 1955,20941 1477,4 1959,91884 1475,52 1957,424832 1475,85 1957,86261

509104 FOSSAS SEPTICA D=0,80 h=1,80 PRE-MOLDADA CAP.15 PESSOAS un 1553,74 2061,191484 1575,12 2089,554192 1580,51 2096,704566 1577,68 2092,950288 1578,14 2093,560524

509107 FOSSAS SEPTICA D=1,50 h=1,80 PRE-MOLDADA CAP.75 PESSOAS un 1682,31 2231,752446 1757,24 2331,154584 1776,14 2356,227324 1766,15 2342,97459 1767,82 2345,190012

509110 FOSSAS SEPTICA D=1,20 h=2,00 PRE-MOLDADA CAP.30 PESSOAS un 2107,23 2795,451318 2160,21 2865,734586 2173,56 2883,444696 2166,5 2874,0789 2167,69 2875,657554

509113 SUMIDOURO D=0,70 h=1,20 PRE-MOLDADO CAP.10 PESSOAS un 539,99 716,350734 723,44 959,715504 726,59 963,894294 724,92 961,678872 725,21 962,063586

509116 SUMIDOURO D=0,80 h=1,80 PRE-MOLDADO CAP.20 PESSOAS un 906,13 1202,072058 925,71 1228,046886 930,64 1234,587024 928,05 1231,15113 928,47 1231,708302

509119 SUMIDOURO D=1,20 h=1,50 PRE-MOLDADO CAP.30 PESSOAS un 1240,7 1645,91262 1290,33 1711,751778 1302,82 1728,321012 1296,2 1719,53892 1297,34 1721,051244

509122 SUMIDOURO D=1,20 h=2,50 PRE-MOLDADO CAP.80 PESSOAS un 3471,8 4605,68988 3532,62 4686,373692 3547,96 4706,723736 3539,85 4695,96501 3541,21 4697,769186

509513 SUMIDOURO D=0,70 H=1,2 PRE-MOLDADO CAP.10 PESSOAS UN 539,99 716,350734 552,46 732,893436 555,61 737,072226 553,94 734,856804 554,23 735,241518

510101 ASSENT.MAT.C/HIDROMETRO P/RAMAL PREDIAL DE AGUA EMBUTIDA NO PASSEIO un 43,21 57,322386 63,2 83,84112 68,2 90,47412 65,53 86,932098 66,01 87,568866

510102 ASSENT.MAT.S/HIDROMETRO P/RAMAL PREDIAL DE AGUA EMBUTIDA NO PASSEIO un 31,39 41,641974 46,16 61,235856 49,86 66,144276 47,89 63,530874 48,24 63,995184

510103 ASSENT.MAT.P/RAMAL PREDIAL AGUA EMBUTIDA NA PAREDE un 39,62 52,559892 58,3 77,34078 62,98 83,549268 60,48 80,232768 60,93 80,829738

510104 ASSENT.MAT.P/RAMAL PREDIAL AGUA EM MURETA PREMOLDADA un 37,84 50,198544 55,65 73,82529 60,11 79,741926 57,73 76,584618 58,16 77,155056

510105 ASSENT.MAT.P/RAMAL PREDIAL AGUA CAVALETE INTERNO NO PISO un 48,09 63,796194 69,9 92,72934 75,35 99,95931 72,45 96,11217 72,97 96,802002

510106 ASSENT.MAT.P/RAMAL PREDIAL AGUA EMBUTIDO NO PASSEIO P/HIDROMETRO 20 m3/HX2" un 52,79 70,031214 77,11 102,294126 83,2 110,37312 79,96 106,074936 80,54 106,844364

510107 ASSENT.MAT.P/RAMAL PREDIAL AGUA EMBUTIDO NO PASSEIO P/HIDROMETRO 30 m3/HX2" un 58,67 77,831622 85,07 112,853862 91,69 121,635954 88,16 116,953056 88,79 117,788814

550000 COMPOSICOES AUXILIARES DAS DESPESAS INDIRETAS

550100 LIMPEZA E PREPARO DO TERRENO

550101 LIMPEZA DA AREA DO CANTEIRO, ALOJAMENTO E EMPRESTIMOS m2 2,77 3,674682 3,54 4,696164 3,73 4,948218 3,63 4,815558 3,65 4,84209

550104 REGULARIZACAO DA AREA CANTEIRO/ALOJAMENTO m2 0,44 0,583704 0,47 0,623502 0,47 0,623502 0,47 0,623502 0,47 0,623502

550107 LIMPEZA FINAL DO CANTEIRO m2 0,74 0,981684 1,1 1,45926 1,2 1,59192 1,14 1,512324 1,16 1,538856

550113 ACERTO MANUAL DO TERRENO m2 0,39 0,517374 0,58 0,769428 0,63 0,835758 0,6 0,79596 0,61 0,809226

550119 REMOCAO MATERIAL m3 10,21 13,544586 10,51 13,942566 10,59 14,048694 10,55 13,99563 10,55 13,99563

550200 LOCACAO DO ARRANJO

550201 LOCACAO DO CANTEIRO, ALOJAMENTO, EMPRESTIMOS E ACESSOS m2 5,88 7,800408 7,23 9,591318 7,56 10,029096 7,39 9,803574 7,42 9,843372

550300 ACESSOS

550301 ABERTURA ACESSOS E CAMINHOS DE SERVICOS m2 1,64 2,175624 1,68 2,228688 1,69 2,241954 1,68 2,228688 1,68 2,228688

550302 ACESSO DE JAZIDAS (SOLO, PEDRA) m2 0,37 0,490842 0,38 0,504108 0,38 0,504108 0,38 0,504108 0,38 0,504108

550303 MANUTENCAO DOS ACESSOS m2 7,9 10,48014 7,9 10,48014 7,9 10,48014 7,9 10,48014 7,9 10,48014

550304 SINALIZACAO DE TRAFEGO m2 50,05 66,39633 51,41 68,200506 51,74 68,638284 51,55 68,38623 51,59 68,439294

550310 CAMINHO SERVICO REVESTIDO BRITA GRADUADA m3 84,86 112,575276 86,77 115,109082 87,25 115,74585 87 115,4142 87,04 115,467264

550400 EDIFICACAOES ADMINISTRATIVAS E INDUSTRIAIS, ALOJAMENTOS E APOIO

550401 ESCRITORIO DA EMBASA m2 243,09 322,483194 310,81 412,320546 327,79 434,846214 318,75 422,85375 320,4 425,04264

550402 ESCRITORIO DA CONTRATADA m2 243,09 322,483194 310,81 412,320546 327,79 434,846214 318,75 422,85375 320,4 425,04264

550403 ESCRITORIO DA FISCALIZACAO m2 243,09 322,483194 310,81 412,320546 327,79 434,846214 318,75 422,85375 320,4 425,04264

550404 ALMOXARIFADO/ESCRITORIO E DEPOSITO FECHADO m2 243,09 322,483194 310,81 412,320546 327,79 434,846214 318,75 422,85375 320,4 425,04264

Página: 54 de 59

Page 55: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

550405 ALMOXARIFADO - TELHEIRO m2 171,63 227,684358 219,95 291,78567 232,1 307,90386 225,63 299,320758 226,81 300,886146

550406 ESCRITORIO DO SETOR DE PESSOAL m2 243,09 322,483194 310,81 412,320546 327,79 434,846214 318,75 422,85375 320,4 425,04264

550407 ESCRITORIO PARA SUPORTE DA ESTRUTURA DE "SSHMT" m2 192,82 255,795012 243,07 322,456662 255,7 339,21162 248,98 330,296868 250,2 331,91532

550408 AMBULATORIO m2 270,67 359,070822 345,53 458,380098 364,34 483,333444 354,32 470,040912 356,14 472,455324

550409 GUARITA m2 192,82 255,795012 243,07 322,456662 255,7 339,21162 248,98 330,296868 250,2 331,91532

550410 CHAPEIRA m2 192,82 255,795012 243,07 322,456662 255,7 339,21162 248,98 330,296868 250,2 331,91532

550411 SANITARIOS m2 470 623,502 592,32 785,771712 623,02 826,498332 606,63 804,755358 609,64 808,748424

550412 SANITARIO DE CAMPO m2 405,47 537,896502 509,24 675,557784 535,28 710,102448 521,39 691,675974 523,93 695,045538

550413 VESTIARIO m2 372,18 493,733988 473,56 628,224696 499,02 661,999932 485,45 643,99797 487,91 647,261406

550414 CANTINA m2 228,52 303,154632 292,33 387,804978 308,35 409,05711 299,82 397,741212 301,38 399,810708

550415 COZINHA E REFEITORIO m2 231,19 306,696654 295 391,347 311,02 412,599132 302,49 401,283234 304,05 403,35273

550416 ESCRITORIO PARA DEPOSITO DE SUB-CONTRATADOS m2 192,82 255,795012 243,07 322,456662 255,7 339,21162 248,98 330,296868 250,2 331,91532

550417 CENTRAL DE FORMA m2 100,37 133,150842 126,34 167,602644 132,86 176,252076 129,38 171,635508 130,01 172,471266

550418 CENTRAL DE ARMACAO m2 100,37 133,150842 126,34 167,602644 132,86 176,252076 129,38 171,635508 130,01 172,471266

550419 DEPOSITO DE CIMENTO m2 268,1 355,66146 337,53 447,767298 354,95 470,87667 345,67 458,565822 347,36 460,807776

550420 COBERTURA DE VEICULOS m2 84,56 112,177296 106,27 140,977782 111,72 148,207752 108,81 144,347346 109,33 145,037178

550421 LABORATORIOS m2 270,67 359,070822 345,53 458,380098 364,34 483,333444 354,32 470,040912 356,14 472,455324

550422 PAIOL m2 268,1 355,66146 337,53 447,767298 354,95 470,87667 345,67 458,565822 347,36 460,807776

550423 OFICINA MECANICA m2 171,63 227,684358 219,95 291,78567 232,1 307,90386 225,63 299,320758 226,81 300,886146

550424 POSTO P/COMBUSTIVEL E LUBRIFICANTE m2 171,63 227,684358 219,95 291,78567 232,1 307,90386 225,63 299,320758 226,81 300,886146

550425 POSTO P/LAVAGEM DE VEICULOS E EQUIPAMENTOS m2 116,07 153,978462 146,23 193,988718 153,82 204,057612 149,77 198,684882 150,51 199,666566

550426 ALOJAMENTO PARA ADMINISTRACAO m2 243,09 322,483194 310,81 412,320546 327,79 434,846214 318,75 422,85375 320,4 425,04264

550427 ALOJAMENTO PARA MESTRES E ENCARREGADOS m2 243,09 322,483194 310,81 412,320546 327,79 434,846214 318,75 422,85375 320,4 425,04264

550428 ALOJAMENTO PARA OFICIAIS m2 287,78 381,768948 367,3 487,26018 387,27 513,752382 376,63 499,637358 378,55 502,18443

550429 ALOJAMENTO PARA SERVENTES m2 243,09 322,483194 310,81 412,320546 327,79 434,846214 318,75 422,85375 320,4 425,04264

550430 SANITARIOS E BANHEIROS m2 470 623,502 592,32 785,771712 623,02 826,498332 606,63 804,755358 609,64 808,748424

550431 SILOS PARA AGREGADOS un 433,37 574,908642 512,49 679,869234 532,33 706,188978 521,77 692,180082 523,69 694,727154

550433 BASE PARA GRUA un 5131,78 6807,819348 6556,99 8698,502934 6913,38 9171,289908 6727,02 8924,064732 6761,12 8969,301792

550439 RESERVATORIO DE ALVENARIA PARA 10.000 L un 2384,34 3163,065444 3081,92 4088,475072 3257 4320,7362 3164,09 4197,481794 3181,01 4219,927866

550500 FECHAMENTO DA AREA DO CANTEIRO

550501 CERCA ARAME FARPADO COM MOUROES DE MADEIRA m2 19,33 25,643178 22,28 29,556648 23,02 30,538332 22,63 30,020958 22,68 30,087288

550502 TAPUMES DE CHAPA COMPENSDA OU TABUA m2 13,91 18,453006 16,53 21,928698 17,19 22,804254 16,83 22,326678 16,9 22,41954

550600 SERVICOS DIVERSOS

550604 CORRIMAO MADEIRA AGRESTE P/BARRACAO m 46,36 61,50 56,78 75,32 59,39 78,79 58,00 76,94 58,25 77,27

550607 ESCADA EM MADEIRA AGRESTE P/BARRACAO un 475,63 630,97 579,83 769,20 605,93 803,83 592,03 785,39 594,53 788,70

550610 ARMARIO EM MADEIRA AGRESTE/COMPENSADO un 79,39 105,32 91,53 121,42 94,57 125,46 92,95 123,31 93,25 123,71

550613 ESTRADO DE MADEIRA PARA DEPOSITO DE CIMENTO m2 83,13 110,28 103,44 137,22 108,53 143,98 105,82 140,38 106,31 141,03

550619 PASSADEIRA DE MADEIRA m2 75,74 100,48 83,65 110,97 85,63 113,60 84,58 112,20 84,77 112,46

550622 PAINEIS EM COMPENSADO RESINADO 10MM m2 61,99 82,24 78,72 104,43 82,91 109,99 80,68 107,03 81,09 107,57

550625 COBERTURA EM TELHA VOGATEX 4MM m2 66,15 87,75 83,51 110,78 87,86 116,56 85,54 113,48 85,96 114,03

550628 ANDAIME DE MADEIRA PARA INTERIOR m2 15,12 20,06 19,27 25,56 20,31 26,94 19,76 26,21 19,86 26,35

550631 FORRO COMPENSADO RESINADO P/BARRACAO m2 21,38 28,36 27,21 36,10 28,66 38,02 27,88 36,99 28,02 37,17

550634 PORTA COMPENSADA P/BARRACAO m2 67,67 89,77 84,77 112,46 89,05 118,13 86,77 115,11 87,19 115,67

550637 PISO EM TABUA P/BARRACAO m2 70,42 93,42 80,84 107,24 83,45 110,70 82,06 108,86 82,31 109,19

509501 JUNTA COM MASTIQUE ELASTICO FORNECIMENTO E APLICACAO.( SINAPI - 72124) m 86,27 114,45 88,35 117,21 88,87 117,89 88,59 117,52 88,64 117,59

559599 CAMINHAO CAVALO MECANICO COM CARRETA PRANCHA UN 167,91 222,75 167,91 222,75 167,91 222,75 167,91 222,75 167,91 222,75

559701 PORTAO DE MADEIRA ROLICA D=11CM COM 5 FIOS DE ARAME FARPADO M 15,51 20,58 15,51 20,58 15,51 20,58 15,51 20,58 15,51 20,58519001 EXECUCAO DE DRENOS DE BRITA EM AREAS DE ATERRO (DPS 06) M 48,18 63,92 48,18 63,92 48,18 63,92 48,18 63,92 48,18 63,92

519002EXECUCAO DE DRENO PROFUNDO COM MANTA GEOTEXTIL, TUBO PEAD PERFURADO, DN110 E

SELO DE ARGILAM 71,07 94,28 71,07 94,28 71,07 94,28 71,07 94,28 71,07 94,28

560000COMPOSICOES AUXILIARES SEM MAO DE OBRA PARA COMPOR O PRECOS DOS

SERVICOS POR EQUIPE560100 ARGAMASSAS E CONCRETO

560101 ARGAMASSA (CIMENTO/AREIA MEDIA) TR. 1:2 m3 413,01 547,90 413,01 547,90 413,01 547,90 413,01 547,90 413,01 547,90

560104 ARGAMASSA (CIMENTO/AREIA GROSSA) TR. 1:3 m3 318,92 423,08 318,92 423,08 318,92 423,08 318,92 423,08 318,92 423,08

560107 ARGAMASSA (CIMENTO/AREIA GROSSA) TR. 1:4 m3 262,09 347,69 262,09 347,69 262,09 347,69 262,09 347,69 262,09 347,69

560110 ARGAMASSA MISTA (CIMENTO/SAIBRO/AREIA GROSSA) TR. 1:3:6 m3 98,76 131,02 98,76 131,02 98,76 131,02 98,76 131,02 98,76 131,02

560200 CONCRETO

560201CONCRETO C/ CONSUMO MIN. DE CIMENTO DE 150Kg/m3, INCL. FORNEC. DE MAT., PRODUCAO,

LANC., ADENS. E CURAm3 171,52 227,54 171,52 227,54 171,52 227,54 171,52 227,54 171,52 227,54

560204 CONCRETO FCK=15MPa, INCL. FORNEC. DOS MAT., PRODUCAO, LANC., ADENS. E CURA m3 269,90 358,05 269,90 358,05 269,90 358,05 269,90 358,05 269,90 358,05

560207PREPARO CONCRETO C/ CONSUMO MIN. DE CIMENTO DE 150KG / m3, INCL. FORNEC. DE MAT E

PRODUCAOm3 163,35 216,70 163,35 216,70 163,35 216,70 163,35 216,70 163,35 216,70

560300 PREPARO DE ARGAMASSA PARA CONCRETO

560301 PREPARO DE CONCRETO FCK = 15,00 MPA, BRITAS 1 E 2 m3 257,05 341,00 257,05 341,00 257,05 341,00 257,05 341,00 257,05 341,00

560304PREPARO CONCRETO C/ CONSUMO MIN. DE CIMENTO DE 150KG / m3, INCL. FORNEC. DE MAT E

PRODUCAOm3 163,35 216,70 163,35 216,70 163,35 216,70 163,35 216,70 163,35 216,70

600000 INSTALACOES ELETRICAS

600000 INSTALACOES ELETRICAS

600091 ELETRODUTO FLEXIVEL SEALTUBO 1/2" m 10,58 14,04 15,76 20,91 17,05 22,62 16,36 21,70 16,48 21,86

600092 ELETRODUTO FLEXIVEL SEALTUBO 3/4" m 13,34 17,70 19,86 26,35 21,49 28,51 20,62 27,35 20,78 27,57

600093 ELETRODUTO FLEXIVEL SEALTUBO 1" m 16,36 21,70 24,36 32,32 26,36 34,97 25,29 33,55 25,48 33,80

600094 ELETRODUTO FLEXIVEL SEALTUBO 1 1/4" m 24,19 32,09 36,01 47,77 38,96 51,68 37,40 49,61 37,68 49,99

600095 ELETRODUTO FLEXIVEL SEALTUBO 1 1/2" m 26,68 35,39 39,71 52,68 42,97 57,00 41,24 54,71 41,55 55,12

600096 ELETRODUTO FLEXIVEL SEALTUBO 2" m 30,24 40,12 45,01 59,71 48,71 64,62 46,74 62,01 47,09 62,47

600097 ELETRODUTO FLEXIVEL SEALTUBO 2 1/2" m 37,18 49,32 55,34 73,41 59,89 79,45 57,46 76,23 57,89 76,80

600098 ELETRODUTO FLEXIVEL SEALTUBO 3" m 42,34 56,17 63,01 83,59 68,19 90,46 65,44 86,81 65,93 87,46

600099 ELETRODUTO FLEXIVEL SEALTUBO 3 1/2" m 47,23 62,66 70,29 93,25 76,07 100,91 72,99 96,83 73,54 97,56

600100 ELETRODUTO FLEXIVEL SEALTUBO 4" m 51,58 68,43 76,77 101,84 83,08 110,21 79,72 105,76 80,32 106,55

600101 ELETRODUTO ACO GALVANIZADO 1/2" m 18,14 24,06 27,01 35,83 29,23 38,78 28,04 37,20 28,25 37,48

600102 ELETRODUTO ACO GALVANIZADO 1" m 21,70 28,79 32,31 42,86 34,96 46,38 33,55 44,51 33,80 44,84

600103 ELETRODUTO ACO GALVANIZADO 3/4" m 19,03 25,25 28,34 37,60 30,66 40,67 29,42 39,03 29,64 39,32

600104 ELETRODUTO ACO GALVANIZADO 1 1/2" m 24,73 32,81 36,81 48,83 39,83 52,84 38,22 50,70 38,51 51,09

600105 ELETRODUTO ACO GALVANIZADO 2 1/2" m 35,58 47,20 52,96 70,26 57,31 76,03 55,00 72,96 55,41 73,51

600106 ELETRODUTO ACO GALVANIZADO 2" m 30,24 40,12 45,01 59,71 48,71 64,62 46,74 62,01 47,09 62,47

600107 ELETRODUTO ACO GALVANIZADO 3" m 41,26 54,74 61,42 81,48 66,47 88,18 63,77 84,60 64,25 85,23

600108 ELETRODUTO PVC RIGIDO ROSCAVEL 1/2" m 3,62 4,80 5,40 7,16 5,85 7,76 5,61 7,44 5,65 7,50

600109 ELETRODUTO PVC RIGIDO ROSCAVEL 3/4" m 3,62 4,80 5,40 7,16 5,85 7,76 5,61 7,44 5,65 7,50

600110 ELETRODUTO PVC RIGIDO ROSCAVEL 4" m 25,61 33,97 38,11 50,56 41,25 54,72 39,57 52,49 39,87 52,89

600111 ELETRODUTO PVC RIGIDO ROSCAVEL 1 1/2" m 12,80 16,98 19,06 25,28 20,62 27,35 19,79 26,25 19,94 26,45

600112 ELETRODUTO PVC RIGIDO ROSCAVEL 2" m 14,94 19,82 22,24 29,50 24,06 31,92 23,08 30,62 23,26 30,86

600113 ELETRODUTO PVC RIGIDO ROSCAVEL 3" m 21,34 28,31 31,76 42,13 34,37 45,60 32,98 43,75 33,23 44,08

600114 ELETRODUTO PVC RIGIDO ROSCAVEL 1" m 9,61 12,75 14,29 18,96 15,46 20,51 14,84 19,69 14,96 19,85

600200 CONEXOES

600200 CONEXOES

600201 CONECTOR CURVO 90 BITOLA 1" FERRO GALV OU ALUMINIO un 2,78 3,69 4,13 5,48 4,46 5,92 4,29 5,69 4,32 5,73

600202 CONECTOR CURVO 90 BITOLA 3/4" FERRO GALV OU ALUMINIO un 2,13 2,83 3,18 4,22 3,43 4,55 3,30 4,38 3,33 4,42

600203 CONECTOR PARAFUSO FENDIDO SPLIT-BOLT PARA CABO DE 16MM2 un 4,27 5,66 6,35 8,42 6,88 9,13 6,59 8,74 6,64 8,81

600204 CONECTOR PARAFUSO FENDIDO SPLIT-BOLT PARA CABO DE 35MM2 un 4,27 5,66 6,35 8,42 6,88 9,13 6,59 8,74 6,64 8,81

600205 CONECTOR RETO BITOLA 1" FERRO GALV OU ALUMINIO PARA ADAPTACAO DE ENTRADAS un 1,07 1,42 1,59 2,11 1,72 2,28 1,65 2,19 1,66 2,20

600206 CONECTOR RETO BITOLA 3/4" FERRO GALV OU ALUMINIO PARA ADAPTACAO DE ENTRADAS un 0,64 0,85 0,96 1,27 1,03 1,37 0,99 1,31 1,00 1,33

600207 TERMINAL OU CONECTOR DE PRESSAO PARA CABO 10MM2 un 6,40 8,49 9,53 12,64 10,31 13,68 9,90 13,13 9,97 13,23

600208 TERMINAL OU CONECTOR DE PRESSAO PARA CABO 120MM2 un 10,67 14,15 15,89 21,08 17,19 22,80 16,49 21,88 16,62 22,05

600209 TERMINAL OU CONECTOR DE PRESSAO PARA CABO 150MM2 un 10,67 14,15 15,89 21,08 17,19 22,80 16,49 21,88 16,62 22,05

600210 TERMINAL OU CONECTOR DE PRESSAO PARA CABO 16MM2 un 6,40 8,49 9,53 12,64 10,31 13,68 9,90 13,13 9,97 13,23

600211 TERMINAL OU CONECTOR DE PRESSAO PARA CABO 185MM2 un 10,67 14,15 15,89 21,08 17,19 22,80 16,49 21,88 16,62 22,05

600212 TERMINAL OU CONECTOR DE PRESSAO PARA CABO 240MM2 un 10,67 14,15 15,89 21,08 17,19 22,80 16,49 21,88 16,62 22,05

600213 TERMINAL OU CONECTOR DE PRESSAO PARA CABO 25MM2 un 6,40 8,49 9,53 12,64 10,31 13,68 9,90 13,13 9,97 13,23

600214 TERMINAL OU CONECTOR DE PRESSAO PARA CABO 35MM2 un 6,40 8,49 9,53 12,64 10,31 13,68 9,90 13,13 9,97 13,23

600215 TERMINAL OU CONECTOR DE PRESSAO PARA CABO 50MM2 un 8,54 11,33 12,70 16,85 13,75 18,24 13,19 17,50 13,29 17,63

600216 TERMINAL OU CONECTOR DE PRESSAO PARA CABO 70MM2 un 8,54 11,33 12,70 16,85 13,75 18,24 13,19 17,50 13,29 17,63

600217 TERMINAL OU CONECTOR DE PRESSAO PARA CABO 95MM2 un 8,54 11,33 12,70 16,85 13,75 18,24 13,19 17,50 13,29 17,63

600300 FIOS E CABOS

600301 CABO DE COBRE NU 10MM2 m 2,13 2,83 3,18 4,22 3,43 4,55 3,30 4,38 3,33 4,42

600302 CABO DE COBRE NU 16MM2 m 2,78 3,69 4,13 5,48 4,46 5,92 4,29 5,69 4,32 5,73

600303 CABO DE COBRE NU 25MM2 m 3,62 4,80 5,40 7,16 5,85 7,76 5,61 7,44 5,65 7,50

600304 CABO DE COBRE NU 35MM2 m 4,48 5,94 6,67 8,85 7,22 9,58 6,93 9,19 6,98 9,26

600305 CABO DE COBRE NU 50MM2 m 6,62 8,78 9,85 13,07 10,66 14,14 10,23 13,57 10,30 13,66

600306 CABO DE COBRE NU 70MM2 ATE 120MM2 m 7,26 9,63 10,80 14,33 11,69 15,51 11,21 14,87 11,30 14,99

600307 CABO DE COBRE NU 150MM2 ATE 240MM2 m 7,68 10,19 11,43 15,16 12,37 16,41 11,87 15,75 11,96 15,87

600308 CABO DE COBRE ISOLAMENTO 6MM2 m 1,49 1,98 2,23 2,96 2,40 3,18 2,31 3,06 2,33 3,09

600309 CABO DE COBRE ISOLAMENTO 10MM2 m 1,71 2,27 2,54 3,37 2,75 3,65 2,64 3,50 2,66 3,53

600310 CABO DE COBRE ISOLAMENTO 16MM2 m 1,92 2,55 2,86 3,79 3,09 4,10 2,97 3,94 2,99 3,97

600311 CABO DE COBRE ISOLAMENTO 25MM2 m 2,13 2,83 3,18 4,22 3,43 4,55 3,30 4,38 3,33 4,42

600312 CABO DE COBRE ISOLAMENTO 50MM2 m 4,27 5,66 6,35 8,42 6,88 9,13 6,59 8,74 6,64 8,81

Página: 55 de 59

Page 56: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

600313 CABO DE COBRE ISOLAMENTO 70MM2 m 5,34 7,08 7,94 10,53 8,60 11,41 8,25 10,94 8,31 11,02

600314 CABO DE COBRE ISOLAMENTO 95MM2 m 6,40 8,49 9,53 12,64 10,31 13,68 9,90 13,13 9,97 13,23

600315 CABO DE COBRE ISOLAMENTO 120MM2 m 7,47 9,91 11,12 14,75 12,03 15,96 11,55 15,32 11,63 15,43

600316 CABO DE COBRE ISOLAMENTO 150MM2 m 8,54 11,33 12,70 16,85 13,75 18,24 13,19 17,50 13,29 17,63

600317 CABO DE COBRE ISOLAMENTO 185MM2 m 9,61 12,75 14,29 18,96 15,46 20,51 14,84 19,69 14,96 19,85

600318 CABO DE COBRE ISOLAMENTO 240MM2 m 10,67 14,15 15,89 21,08 17,19 22,80 16,49 21,88 16,62 22,05

600319 CABO DE COBRE ISOLAMENTO 35MM2 m 3,21 4,26 4,77 6,33 5,15 6,83 4,94 6,55 4,99 6,62

600320 CABO DE COBRE ISOLAMENTO 1,5MM2 m 0,86 1,14 1,27 1,68 1,37 1,82 1,32 1,75 1,32 1,75

600321 CABO DE COBRE ISOLAMENTO 2,5MM2 m 1,07 1,42 1,59 2,11 1,72 2,28 1,65 2,19 1,66 2,20

600322 CABO DE COBRE ISOLAMENTO 4MM2 m 1,30 1,72 1,94 2,57 2,09 2,77 2,01 2,67 2,03 2,69

600400 CAIXAS

600401 CONDULETE EM LIGA ALUMINIO 1/2" un 4,27 5,66 6,35 8,42 6,88 9,13 6,59 8,74 6,64 8,81

600402 CONDULETE EM LIGA ALUMINIO 3/4" un 5,34 7,08 7,94 10,53 8,60 11,41 8,25 10,94 8,31 11,02

600403 CONDULETE EM LIGA ALUMINIO 1" un 6,40 8,49 9,53 12,64 10,31 13,68 9,90 13,13 9,97 13,23

600404 CONDULETE EM LIGA ALUMINIO 1 1/4" un 6,40 8,49 9,53 12,64 10,31 13,68 9,90 13,13 9,97 13,23

600405 CONDULETE EM LIGA ALUMINIO 1 1/2" un 6,40 8,49 9,53 12,64 10,31 13,68 9,90 13,13 9,97 13,23

600406 CONDULETE EM LIGA ALUMINIO 2" un 6,40 8,49 9,53 12,64 10,31 13,68 9,90 13,13 9,97 13,23

600407 CONDULETE EM LIGA ALUMINIO 2 1/2" un 6,40 8,49 9,53 12,64 10,31 13,68 9,90 13,13 9,97 13,23

600408 CONDULETE EM LIGA ALUMINIO 3" un 6,40 8,49 9,53 12,64 10,31 13,68 9,90 13,13 9,97 13,23

600409 CONDULETE EM LIGA ALUMINIO 4" un 6,40 8,49 9,53 12,64 10,31 13,68 9,90 13,13 9,97 13,23

600410 CAIXA DE SOBREPOR EM PVC PARA INSTRALACAO ELETRICA 128X125X62 un 10,67 14,15 15,89 21,08 17,19 22,80 16,49 21,88 16,62 22,05

600411 CAIXA DE LIGACAO EM CHAPA DE ACO 4X2 un 3,21 4,26 4,77 6,33 5,15 6,83 4,94 6,55 4,99 6,62

600412 CAIXA DE PASSAGEM EM CHAPA DE ACO 15X15X8 un 14,94 19,82 22,24 29,50 24,06 31,92 23,08 30,62 23,26 30,86

600413 CAIXA DE PASSAGEM EM CHAPA DE ACO 10X10X8 un 8,54 11,33 12,70 16,85 13,75 18,24 13,19 17,50 13,29 17,63

600414 CAIXA DE PASSAGEM EM CHAPA DE ACO 20X20X10 un 26,68 35,39 39,70 52,67 42,97 57,00 41,23 54,70 41,54 55,11

600415 CAIXA DE PASSAGEM EM CHAPA DE ACO 30X30X12 un 32,01 42,46 47,65 63,21 51,56 68,40 49,47 65,63 49,85 66,13

600416 CAIXA DE PASSAGEM EM CHAPA DE ACO 40X40X15 un 42,68 56,62 63,52 84,27 68,74 91,19 65,96 87,50 66,46 88,17

600500 QUADROS E DISJUNTORES

600501 DISJUNTOR TERMOMAGNETICO MONOPOLAR 10 A 30A 240V un 2,67 3,54 3,97 5,27 4,29 5,69 4,12 5,47 4,15 5,51

600502 DISJUNTOR TERMOMAGNETICO MONOPOLAR 35 A 50A 240V un 2,67 3,54 3,97 5,27 4,29 5,69 4,12 5,47 4,15 5,51

600503 DISJUNTOR TERMOMAGNETICO BIPOLAR 10 A 50A 240V un 3,21 4,26 4,77 6,33 5,15 6,83 4,94 6,55 4,99 6,62

600504 DISJUNTOR TERMOMAGNETICO TRIPOLAR 10 A 50A 240V un 8,54 11,33 12,70 16,85 13,75 18,24 13,19 17,50 13,29 17,63

600505 DISJUNTOR TERMOMAGNETICO TRIPOLAR 60 A 100A 240V un 8,54 11,33 12,70 16,85 13,75 18,24 13,19 17,50 13,29 17,63

600506 DISJUNTOR TERMOMAGNETICO TRIPOLAR 125 A 600A 600 A 240V un 8,54 11,33 12,70 16,85 13,75 18,24 13,19 17,50 13,29 17,63

600507 QUADRO DE DISTRIBUICAO DE ENERGIA EM CHAPA METALICA PARA ATE 6 DISJUNTORES un 42,68 56,62 63,52 84,27 68,74 91,19 65,96 87,50 66,46 88,17

600508 QUADRO DE DISTRIBUICAO DE ENERGIA EM CHAPA METALICA PARA 12 DISJUNTORES un 53,35 70,77 79,41 105,35 85,93 113,99 82,45 109,38 83,08 110,21

600509 QUADRO DE DISTRIBUICAO DE ENERGIA EM CHAPA METALICA PARA 18 DISJUNTORES un 64,02 84,93 95,28 126,40 103,11 136,79 98,94 131,25 99,69 132,25

600510 QUADRO DE DISTRIBUICAO DE ENERGIA EM CHAPA METALICA PARA 24 DISJUNTORES un 74,69 99,08 111,17 147,48 120,30 159,59 115,43 153,13 116,31 154,30

600511 QUADRO DE MEDICAO GERAL EM CHAPA METALICA un 123,77 164,19 184,21 244,37 199,34 264,44 191,29 253,77 192,74 255,69

600512 BARRAMENTO BLINDADO TRIPOLAR un 29,02 38,50 43,19 57,30 46,74 62,01 44,85 59,50 45,19 59,95

600513 BARRAMENTO TIPO L 225 A 800A un 106,70 141,55 158,80 210,66 171,85 227,98 164,90 218,76 166,15 220,41

600514 BARRAMENTO TIPO T 225 A 800A un 155,14 205,81 230,90 306,31 249,87 331,48 239,77 318,08 241,58 320,48

600515 BARRAMENTO TIPO X 225 A 800A un 232,82 308,86 346,50 459,67 374,98 497,45 359,81 477,32 362,54 480,95

600600 INTERRUPTORES E TOMADAS

600601 INTERRUPTOR SIMPLES 1 TECLA un 4,45 5,90 6,62 8,78 7,16 9,50 6,87 9,11 6,92 9,18

600602 INTERRUPTOR SIMPLES 2 TECLAS un 5,51 7,31 8,20 10,88 8,88 11,78 8,52 11,30 8,58 11,38

600603 INTERRUPTOR SIMPLES BIPOLAR 1 TECLA un 7,47 9,91 11,12 14,75 12,03 15,96 11,55 15,32 11,63 15,43

600604 TOMADA 3P+T un 9,61 12,75 14,29 18,96 15,46 20,51 14,84 19,69 14,96 19,85

600605 TOMADA PARA TELEFONE PADRAO TELEBRAS un 5,34 7,08 7,94 10,53 8,60 11,41 8,25 10,94 8,31 11,02

600700 LUMINARIA, BOCAL E LAMPADAS

600701 IGNITOR PARA LAMPADA VSAP ATE 400W un 10,67 14,15 15,89 21,08 17,19 22,80 16,49 21,88 16,62 22,05

600702 LAMPADA INCANDESCENTE ATE 200W un 2,13 2,83 3,18 4,22 3,43 4,55 3,30 4,38 3,33 4,42

600703 LAMPADA VAPOR METALICO 400W un 6,40 8,49 9,53 12,64 10,31 13,68 9,90 13,13 9,97 13,23

600704 LUMINARIA GLOBO DE VIDRO COM BOCAL E LAMPADA un 17,07 22,65 25,41 33,71 27,49 36,47 26,39 35,01 26,59 35,27

600705 LUMINARIA INTERNA TIPO SPOT (S/ LAMPADA) un 10,67 14,15 15,89 21,08 17,19 22,80 16,49 21,88 16,62 22,05

600706 LUMINARIA INTERNA TP CALHA SOBREPOR (INCLUINDO REATOR E LAMPADA) un 14,94 19,82 22,24 29,50 24,06 31,92 23,08 30,62 23,26 30,86

600707 LUMINARIA INTERNA TP CALHA SOBREPOR 2 LAMPADAS (INCLUINDO REATOR E LAMPADA) un 18,14 24,06 26,99 35,80 29,22 38,76 28,04 37,20 28,24 37,46

600708 LUMINARIA INTERNA TP CALHA SOBREPOR 3 LAMPADAS (INCLUINDO REATOR E LAMPADA) un 21,34 28,31 31,76 42,13 34,37 45,60 32,98 43,75 33,23 44,08

600709 LUMINARIA INTERNA TP CALHA SOBREPOR 4 LAMPADAS (INCLUINDO REATOR E LAMPADA) un 25,61 33,97 38,11 50,56 41,25 54,72 39,57 52,49 39,87 52,89

600710LUMINARIA REFLETORA PARA ILUMINACAO PUBLICA PARA LAMPADA VAPOR DE

MERCURIO/SODIO, 1 PETALA EM POSTEun 42,68 56,62 63,52 84,27 68,74 91,19 65,96 87,50 66,46 88,17

600711LUMINARIA REFLETORA PARA ILUMINACAO PUBLICA PARA LAMPADA VAPOR DE

MERCURIO/SODIO, 2 PETALA EM POSTEun 53,35 70,77 79,41 105,35 85,93 113,99 82,45 109,38 83,08 110,21

600901LUMINARIA ABERTA PARA ILUMINACAO PUBLICA PARA LAMPADA VAPOR MERCURIO ATE 400W E

MISTA ATE 500Wun 42,68 56,62 63,52 84,27 68,74 91,19 65,96 87,50 66,46 88,17

600902 REATOR PARA LAMPADA VAPOR DE SODIO, MISTA, 250W A 400W un 21,34 28,31 31,76 42,13 34,37 45,60 32,98 43,75 33,23 44,08

600903 REATOR PARA LAMPADA VAPOR DE MERCURIO 250W A 400W un 32,01 42,46 47,65 63,21 51,56 68,40 49,47 65,63 49,85 66,13

600800 ELETRIFICACAO E ILUMINACAO

600801 ARMACAO SECUNDARIA VERTICAL PARA REDE DE BAIXA TENSAO un 14,94 19,82 22,24 29,50 24,06 31,92 23,08 30,62 23,26 30,86

600802 ALCA PREFORMADA DE DISTRIBUICAO PARA CABO TODOS AS BITOLAS un 2,99 3,97 4,45 5,90 4,81 6,38 4,62 6,13 4,65 6,17

600803 CONECTOR DE PARAFUSO FENDIDO EM LIGA DE COBRE un 1,49 1,98 2,23 2,96 2,40 3,18 2,31 3,06 2,33 3,09

600804 INSTALACAO DE REDE DE BAIXA TENSAO COM 1 CONDUTOR un 29,88 39,64 44,46 58,98 48,12 63,84 46,17 61,25 46,52 61,71

600805 INSTALACAO DE REDE DE BAIXA TENSAO COM 2 CONDUTORES un 59,75 79,26 88,93 117,97 96,23 127,66 92,35 122,51 93,05 123,44

600806 INSTALACAO DE REDE DE BAIXA TENSAO COM 3 CONDUTORES un 89,63 118,90 133,39 176,96 144,36 191,51 138,51 183,75 139,56 185,14

600807 INSTALACAO DE REDE DE BAIXA TENSAO COM 4 CONDUTORES un 119,50 158,53 177,86 235,95 192,47 255,33 184,69 245,01 186,09 246,87

600808 INSTALACAO DE REDE 13,8KV COM 2 CONDUTORES un 89,63 118,90 133,39 176,96 144,36 191,51 138,51 183,75 139,56 185,14

600809 INSTALACAO DE REDE 13,8KV COM 3 CONDUTORES un 149,38 198,17 222,32 294,93 240,59 319,17 230,86 306,26 232,61 308,58

600810 POSTE CONCRETO L=5M A 7M, INCLUSIVE ESCAVACAO un 168,71 223,81 186,59 247,53 191,08 253,49 188,69 250,32 189,12 250,89

600811 POSTE CONCRETO L=9M A 11M, INCLUSIVE ESCAVACAO un 302,11 400,78 335,41 444,95 343,78 456,06 339,33 450,16 340,12 451,20

600812 POSTE CONCRETO L=12M A L=15M, INCLUSIVE ESCAVACAO un 341,34 452,82 379,83 503,88 389,50 516,71 384,36 509,89 385,28 511,11

600813 CHUMBADOR DE ACO PARA FIXACAO DE POSTE RETO OU CURVO COM FLANGE un 69,66 92,41 103,66 137,52 112,17 148,80 107,63 142,78 108,47 143,90

600814 POSTE DE ACO CONICO CONTINUO RETO, FLANGEADO H=7,0M A H=11,0M un 128,04 169,86 190,56 252,80 206,22 273,57 197,88 262,51 199,38 264,50

601000 TRANSFORMADORES

601001 MONTAGEM E INSTALACAO DE TRANSFORMADOR DISTRIBUICAO ATE 150 KVA un 2.085,26 2.766,31 3.041,26 4.034,54 3.280,76 4.352,26 3.153,26 4.183,11 3.175,76 4.212,96

601002 MONTAGEM E INSTALACAO DE TRANSFORMADOR DISTRIBUICAO DE 150 A 225KVA un 3.152,26 4.181,79 4.629,26 6.141,18 4.999,26 6.632,02 4.802,26 6.370,68 4.837,26 6.417,11

601003 MONTAGEM E INSTALACAO DE TRANSFORMADOR DISTRIBUICAO DE 225 A 500KVA un 4.170,52 5.532,61 6.082,52 8.069,07 6.561,52 8.704,51 6.306,52 8.366,23 6.351,52 8.425,93

601004 MONTAGEM E INSTALACAO DE TRANSFORMADOR DISTRIBUICAO DE 500 A 750KVA un 6.877,78 9.124,06 10.049,28 13.331,37 10.843,78 14.385,36 10.420,78 13.824,21 10.495,78 13.923,70

601005 MONTAGEM E INSTALACAO DE TRANSFORMADOR DISTRIBUICAO DE 750 A 1000KVA un 7.944,78 10.539,55 11.637,28 15.438,02 12.562,28 16.665,12 12.069,78 16.011,77 12.157,28 16.127,85

601006 MONTAGEM E INSTALACAO DE TRANSFORMADOR DISTRIBUICAO DE 1000 A 1500KVA un 8.834,78 11.720,22 12.962,28 17.195,76 13.996,28 18.567,47 13.445,78 17.837,17 13.543,28 17.966,52

601007 MONTAGEM E INSTALACAO DE TRANSFORMADOR DISTRIBUICAO DE 1500 A 2000KVA un 10.475,04 13.896,19 15.341,04 20.351,42 16.560,04 21.968,55 15.911,04 21.107,59 16.026,04 21.260,14

601008 MONTAGEM E INSTALACAO DE TRANSFORMADOR DISTRIBUICAO DE 2000 A 3000KVA un 14.999,56 19.898,42 21.949,56 29.118,29 23.690,56 31.427,90 22.763,56 30.198,14 22.928,56 30.417,03

601011 INTERLIGACAO TRAFO/PAINEL - ATE 10M un 151,20 200,58 225,05 298,55 243,55 323,09 233,70 310,03 235,45 312,35

601101 MONTAGEM E INSTALACAO DE GRUPO GERADOR - MOTOR A DISEL t 1.313,69 1.742,74 1.886,79 2.503,02 2.030,34 2.693,45 1.953,89 2.592,03 1.967,64 2.610,27

601201 HASTE COPPERWELD 5/8X3,0M COM CONECTOR un 8,54 11,33 12,70 16,85 13,75 18,24 13,19 17,50 13,29 17,63

601202 PARA-RAIOS TIPO FRANKLIN un 21,34 28,31 31,76 42,13 34,37 45,60 32,98 43,75 33,23 44,08

601301 MUFLA TERMINAL PRIMARIA UNIPOLAR USO INTERNO, ISOLACAO EM EPR un 42,68 56,62 63,52 84,27 68,74 91,19 65,96 87,50 66,46 88,17

601302 ISOLADOR DE PORCELANA TIPO PINO CLASSE 15KV A 35KV un 4,27 5,66 6,35 8,42 6,88 9,13 6,59 8,74 6,64 8,81

601303 ISOLADOR DE SUSPENSAO (DISCO) CLASSE 15KV A 35KV un 10,67 14,15 15,89 21,08 17,19 22,80 16,49 21,88 16,62 22,05

601304 CHAVE SECCIONADORA TRIPOLAR, ABERTURA SOB CARGA, COM FUSIVEIS un 42,68 56,62 63,52 84,27 68,74 91,19 65,96 87,50 66,46 88,17

601305 CHAVE BLINDADA TRIPOLAR un 8,54 11,33 12,70 16,85 13,75 18,24 13,19 17,50 13,29 17,63

601306INSTALACAO, MONTAGEM E CALIBRACAO DE INSTRUMENTO, ATUADORES ELETRICOS, PARA

MEDICAO, MONITORAMENTO E CONTROLEun 69,62 92,36 103,60 137,44 112,10 148,71 107,58 142,72 108,38 143,78

601404 MONTAGEM E INSTALACAO DE PAINEL DE LUZ/FORCA DE PAREDE - 4 CIRCUITOS UN 58,69 77,86 87,34 115,87 94,52 125,39 90,70 120,32 91,39 121,24

601405 MONTAGEM E INSTALACAO DE PAINEL DE LUZ/FORCA DE PAREDE - 8 CIRCUITOS UN 64,02 84,93 95,28 126,40 103,11 136,79 98,94 131,25 99,69 132,25

601406 MONTAGEM E INSTALACAO DE PAINEL DE LUZ/FORCA DE PAREDE - 14 CIRCUITOS UN 96,03 127,39 142,93 189,61 154,67 205,19 148,41 196,88 149,54 198,38

601407 MONTAGEM E INSTALACAO DE PAINEL DE LUZ/FORCA DE PAREDE - 20 CIRCUITOS UN 117,37 155,70 174,69 231,74 189,04 250,78 181,39 240,63 182,77 242,46

601408 MONTAGEM E INSTALACAO DE PAINEL DE LUZ/FORCA DE PAREDE - 26 CIRCUITOS UN 144,05 191,10 214,38 284,40 232,00 307,77 222,62 295,33 224,31 297,57

601409 MONTAGEM E INSTALACAO DE PAINEL DE LUZ/FORCA DE PAREDE - 38 CIRCUITOS UN 240,08 318,49 357,30 473,99 386,67 512,96 371,03 492,21 373,84 495,94

602000 CCM - CENTRO DE CONTROLE DE MOTORES

602001 MONTAGEM E INSTALACAO DE PAINEL DE CENTRO DE CONTROLE DE MOTORES T 539,48 715,67 768,72 1.019,78 826,14 1.095,96 795,56 1.055,39 801,06 1.062,69

602002 MONTAGEM E INSTALACAO DE COLUNA DE CENTRO DE CONTROLE DE MOTORES UN 1.745,32 2.315,34 2.483,82 3.295,04 2.668,82 3.540,46 2.570,32 3.409,79 2.587,82 3.433,00

602003 MONTAGEM E INSTALACAO DE CUBICULO (COLUNA) DE 3,8KV UN 1.745,32 2.315,34 2.483,82 3.295,04 2.668,82 3.540,46 2.570,32 3.409,79 2.587,82 3.433,00

602004 MONTAGEM E INSTALACAO DE CUBICULO (COLUNA) DE 15,0KV UN 2.017,05 2.675,82 2.859,75 3.793,74 3.070,85 4.073,79 2.958,45 3.924,68 2.978,45 3.951,21

602005 MONTAGEM E INSTALACAO DE PAINEL DE CONTROLE / RETIFICADORES T 1.478,44 1.961,30 2.166,16 2.873,63 2.338,42 3.102,15 2.246,68 2.980,45 2.263,18 3.002,33

602006MONTAGEM E INSTALACAO DE PAINEL TIPO MESA DE COMANDO COM QUADRO SEMI-

GRAFICO/SINOTICOUN 1.478,44 1.961,30 2.166,16 2.873,63 2.338,42 3.102,15 2.246,68 2.980,45 2.263,18 3.002,33

602007MONTAGEM, INSTALACAO, CONFIGURACAO DE INVERSOR DE FREQUENCIA 600CV - 4.160V

(INCLUINDO TESTES E PRE-OPERACAO)UN 61.184,40 81.167,23 95.271,44 126.387,09 103.858,08 137.778,13 99.288,00 131.715,46 100.100,88 132.793,83

Página: 56 de 59

Page 57: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

609001 CABO TELEFONICO CI-50 10 PARES, FORNECIMENTO E INSTALACAO.(7 M 3,15 4,18 3,74 4,96 3,89 5,16 3,81 5,05 3,82 5,07

609002 INSTALACAO DE GAMBIARRA PARA SINALIZACAO, COM 20 M INCLUINDO UN 25,90 34,36 28,32 37,57 28,93 38,38 28,61 37,95 28,67 38,03

609003 RELOCACAO DE REDE DE ALTA TENSAO DE 13,8KV, 3#4 CCA, DA COELBA KM 77.051,60 102.216,65 83.944,70 111.361,04 85.672,60 113.653,27 84.755,00 112.435,98 84917,8 112.651,95

609004CUSTO DE ENERGIA ELETRICA - EMPREENDIMENTOS DE BARRAGENS INCL. CENTRAL DE

BRITAGEM , CONCRETAGEM, CANTEIRO E OUTROSKW\h 0,44 0,58 0,44 0,58 0,44 0,58 0,44 0,58 0,44 0,58

609297 TERMINAL AEREO un 6,40 8,49 9,53 12,64 10,31 13,68 9,90 13,13 9,97 13,23609501 MURETA EM ALVENARIA PARA PADRAO DE ENTRADA m2 111,63 148,09 147,37 195,50 156,33 207,39 151,58 201,09 152,45 202,24609503 CAIXA DE INSPECAO EM PVC m 12,80 16,98 19,06 25,28 20,62 27,35 19,79 26,25 19,94 26,45609710 POSTE DE ACO CONICO CONTINUO CURVO FLANGEADO COM JANELA DE I UN 909,53 1.206,58 952,02 1.262,95 962,66 1.277,06 956,99 1.269,54 958,04 1.270,94709701 EXTINTOR DE C02 - FORNEC E INSTALACAO 6KG (SINAP 72554) UN 462,26 613,23 465,22 617,16 465,97 618,16 465,58 617,64 465,64 617,72709702 EXTINTOR INCENDIO TP PO QUIMICO 4KG FORNECIMENTO E COLOCACAO UN 162,13 215,08 167,08 221,65 168,32 223,29 167,66 222,42 167,78 222,58709703 EXTINTOR DE AGUA PRESSURIZADA - FORNEC E INSTALACAO (SINAP 7 UN 143,13 189,88 148,08 196,44 149,32 198,09 148,66 197,21 148,78 197,37

800000

COMPOSICOES DE PRECOS AUXILIARES DAS EQUIPES POR HORA (considerando 44

horas trabalhadas com 4,348 semana por mes, tem 191,32 horas/mes, menos 20% dos

tempos improdutivos (SIPSAP),da 0,00653 mes/hora

800001 ATIVIDADES A SEREM FATURADAS NAS UNIDADES MOVEIS DE AGUA

800100MANUTENCAO E CORRECAO DE VAZAMENTO EM ADUTORAS, REDES DE DISTRIBUICAO, RAMAIS

PREDIAIS E CAIXAS DE HIDROMETRO800101 EQUIPE DE 1 ELEMENTOS COM VEICULO - MOTO - (M)* hora 22,95 30,45 32,06 42,53 34,35 45,57 33,13 43,95 33,35 44,24

800102 EQUIPE DE 1 ELEMENTOS COM VEICULO - MOTO (I)* hora 22,95 30,45 32,06 42,53 34,35 45,57 33,13 43,95 33,35 44,24

800104 EQUIPE DE 1 ELEMENTOS COM VEICULO - BICICLETA (M) hora 18,69 24,79 27,80 36,88 30,08 39,90 28,87 38,30 29,09 38,59

800105 EQUIPE DE 1 ELEMENTOS COM VEICULO - BICICLETA (I) hora 18,69 24,79 27,80 36,88 30,08 39,90 28,87 38,30 29,09 38,59

800107 EQUIPE DE 1 ELEMENTOS SEM VEICULO - (M) hora 18,68 24,78 27,79 36,87 30,08 39,90 28,86 38,29 29,08 38,58

800108 EQUIPE DE 1 ELEMENTOS SEM VEICULO - (I) hora 18,68 24,78 27,79 36,87 30,08 39,90 28,86 38,29 29,08 38,58

800110 EQUIPE DE 2 ELEMENTOS COM VEICULO - SAVEIRO (M)* hora 51,28 68,03 65,86 87,37 69,51 92,21 67,57 89,64 67,92 90,10

809910 EQUIPE DE 2 ELEMENTOS COM VEICULO - SAVEIRO (M)* (MRR / RMS) hora 51,74 68,64 66,55 88,29 70,25 93,19 68,28 90,58 68,63 91,04

800111 EQUIPE DE 2 ELEMENTOS COM VEICULO - SAVEIRO (I)* hora 51,28 68,03 65,86 87,37 69,51 92,21 67,57 89,64 67,92 90,10

800113 EQUIPE DE 2 ELEMENTOS COM VEICULO - KOMBI hora 51,34 68,11 65,91 87,44 69,57 92,29 67,62 89,70 67,98 90,18

800116 EQUIPE DE 2 ELEMENTOS COM VEICULO - F-4000 hora 71,00 94,19 85,58 113,53 89,23 118,37 87,29 115,80 87,64 116,26

800119 EQUIPE DE 2 ELEMENTOS COM VEICULO - D-20 hora 59,88 79,44 74,46 98,78 78,11 103,62 76,17 101,05 76,52 101,51

800122 EQUIPE DE 2 ELEMENTOS COM VEICULO - PICK UP hora 52,19 69,24 66,77 88,58 70,42 93,42 68,48 90,85 68,83 91,31

800125 EQUIPE DE 2 ELEMENTOS COM VEICULO - GOL hora 47,06 62,43 61,64 81,77 65,30 86,63 63,35 84,04 63,70 84,50

800128 EQUIPE DE 2 ELEMENTOS COM VEICULO - FIAT UNO hora 45,34 60,15 59,92 79,49 63,57 84,33 61,63 81,76 61,98 82,22

800131 EQUIPE DE 2 ELEMENTOS SEM VEICULO -(M)* hora 37,21 49,36 55,38 73,47 59,93 79,50 57,51 76,29 57,95 76,88

800134 EQUIPE DE 3 ELEMENTOS COM VEICULO - SAVEIRO hora 69,07 91,63 92,33 122,48 98,16 130,22 95,05 126,09 95,62 126,85

800154 EQUIPE DE 3 ELEMENTOS SEM VEICULO hora 48,12 63,84 71,38 94,69 77,21 102,43 74,11 98,31 74,67 99,06

800158 EQUIPE DE 4 ELEMENTOS COM VEICULO - SAVEIRO hora 80,87 107,28 109,89 145,78 117,16 155,42 113,29 150,29 113,98 151,21

800160 EQUIPE DE 4 ELEMENTOS COM VEICULO - KOMBI (OS) hora 64,03 84,94 86,26 114,43 91,83 121,82 88,86 117,88 89,39 118,58

800161 EQUIPE DE 4 ELEMENTOS COM VEICULO - KOMBI (M)* hora 80,92 107,35 109,94 145,85 117,22 155,50 113,34 150,36 114,04 151,29

800162 EQUIPE DE 4 ELEMENTOS COM VEICULO - KOMBI (I)* hora 74,32 98,59 100,12 132,82 106,59 141,40 103,15 136,84 103,76 137,65

800163 EQUIPE DE 4 ELEMENTOS COM VEICULO - KOMBI(OM) hora 108,31 143,68 147,16 195,22 156,89 208,13 151,70 201,25 152,64 202,49

800164 EQUIPE DE 4 ELEMENTOS COM VEICULO - F 4000 hora 100,59 133,44 129,61 171,94 136,88 181,59 133,00 176,44 133,70 177,37

800167 EQUIPE DE 4 ELEMENTOS COM VEICULO - D 20 hora 89,47 118,69 118,49 157,19 125,76 166,83 121,88 161,69 122,58 162,61

800170 EQUIPE DE 4 ELEMENTOS COM VEICULO - PICK UP (M) hora 81,78 108,49 110,80 146,99 118,07 156,63 114,20 151,50 114,89 152,41

800171 EQUIPE DE 4 ELEMENTOS COM VEICULO - PICK UP (I) hora 76,48 101,46 105,20 139,56 112,40 149,11 108,57 144,03 109,27 144,96

800173 EQUIPE DE 4 ELEMENTOS COM VEICULO - GOL hora 76,65 101,68 105,67 140,18 112,94 149,83 109,07 144,69 109,76 145,61

800176 EQUIPE DE 4 ELEMENTOS COM VEICULO - FIAT UNO hora 74,93 99,40 103,95 137,90 111,22 147,54 107,35 142,41 108,04 143,33

800179 EQUIPE DE 4 ELEMENTOS SEM VEICULO hora 59,92 79,49 88,94 117,99 96,21 127,63 92,34 122,50 93,04 123,43

800180 HORA EXTRA TP 50% POR EQUIPE DE 4 ELEMENTOS COM - F 4000 - (M) hora 60,82 80,68 90,46 120,00 97,88 129,85 93,94 124,62 94,64 125,55

800181 HORA EXTRA TP 70% POR EQUIPE DE 4 ELEMENTOS COM - F 4000 - (M) hora 68,92 91,43 102,54 136,03 110,96 147,20 106,48 141,26 107,28 142,32

800182 HORA EXTRA TP 110% POR EQUIPE DE 4 ELEMENTOS COM - F 4000 - (M) hora 85,14 112,95 126,64 168,00 137,06 181,82 131,52 174,47 132,50 175,77

800183 ADICIONAL NOTURN0 POR EQUIPE DE 4 ELEMENTOS COM - F 4000 - (M) hora 16,20 21,49 24,12 32,00 26,10 34,62 25,02 33,19 25,22 33,46

809183 ADICIONAL NOTURN0 POR EQUIPE DE 4 ELEMENTOS COM - F 4000 - (M) (MRR / RMS) hora 16,46 21,84 24,50 32,50 26,51 35,17 25,42 33,72 25,62 33,99

800200 SERVICOS DE FISCALIZACAO DAS ADUTORAS E REDES DE DISTRIBUICAO NO CAMPO

800300 SERVICOS DE APOIO OPERACIONAL DE CAMPO NAS ADUTORAS E REDES DE DISTRIBUICAO

800301 EQUIPE DE 1 ELEMENTO COM VEICULO - MOTO hora 23,42 31,07 32,54 43,17 34,82 46,19 33,60 44,57 33,83 44,88

800304 EQUIPE DE 1 ELEMENTO COM VEICULO - BICICLETA hora 18,69 24,79 27,80 36,88 30,08 39,90 28,87 38,30 29,09 38,59

800308 EQUIPE DE 1 ELEMENTOS COM VEICULO - SAVEIRO (I)* hora 40,10 53,20 49,21 65,28 51,50 68,32 50,28 66,70 50,51 67,01

800310 EQUIPE DE 2 ELEMENTOS COM VEICULO - SAVEIRO (M)* hora 51,90 68,85 66,77 88,58 70,50 93,53 68,51 90,89 68,87 91,36

800380 HORA EXTRA TP 50% POR EQUIPE DE 1 ELEMENTO COM - MOTO - (M) hora 18,67 24,77 27,77 36,84 30,05 39,86 28,84 38,26 29,05 38,54

800381 HORA EXTRA TP 70% POR EQUIPE DE 1 ELEMENTO COM - MOTO - (M) hora 21,16 28,07 31,48 41,76 34,07 45,20 32,69 43,37 32,94 43,70

800382 HORA EXTRA TP 110% POR EQUIPE DE 1 ELEMENTO COM - MOTO - (M) hora 26,14 34,68 38,88 51,58 42,08 55,82 40,38 53,57 40,68 53,97

800383 ADICIONAL NOTURN0 POR EQUIPE DE 1 ELEMENTO COM - MOTO - (M) hora 4,97 6,59 7,40 9,82 8,01 10,63 7,68 10,19 7,74 10,27

800400 SERVICOS DE PITOMETRIA

800401 EQUIPE DE 1 ELEMENTO COM VEICULO - MOTO* hora 24,41 32,38 33,99 45,09 36,40 48,29 35,12 46,59 35,35 46,90

800404 EQUIPE DE 1 ELEMENTO COM VEICULO - BICICLETA hora 19,68 26,11 29,26 38,82 31,66 42,00 30,39 40,32 30,61 40,61

800407 EQUIPE DE 1 ELEMENTO SEM VEICULO hora 19,67 26,09 29,25 38,80 31,65 41,99 30,38 40,30 30,60 40,59

800410 EQUIPE DE 2 ELEMENTOS COM VEICULO - SAVEIRO * hora 58,88 78,11 77,14 102,33 81,72 108,41 79,28 105,17 79,72 105,76

800413 EQUIPE DE 2 ELEMENTOS COM VEICULO - KOMBI hora 58,94 78,19 77,19 102,40 81,77 108,48 79,34 105,25 79,78 105,84

800416 EQUIPE DE 2 ELEMENTOS COM VEICULO - F-4000 hora 78,60 104,27 96,86 128,49 101,43 134,56 99,00 131,33 99,44 131,92

800419 EQUIPE DE 2 ELEMENTOS COM VEICULO - D-20 hora 67,48 89,52 85,74 113,74 90,31 119,81 87,88 116,58 88,32 117,17

800425 EQUIPE DE 2 ELEMENTOS COM VEICULO - GOL hora 54,66 72,51 72,92 96,74 77,50 102,81 75,06 99,57 75,50 100,16

800428 EQUIPE DE 2 ELEMENTOS COM VEICULO - FIAT UNO* hora 52,94 70,23 71,20 94,45 75,78 100,53 73,34 97,29 73,78 97,88

800458 EQUIPE DE 4 ELEMENTOS COM VEICULO - SAVEIRO hora 97,07 128,77 133,97 177,72 143,21 189,98 138,29 183,46 139,16 184,61

800473 EQUIPE DE 4 ELEMENTOS COM VEICULO - GOL* hora 92,85 123,17 129,75 172,13 138,99 184,38 134,07 177,86 134,94 179,01

800500 SERVICOS OPERACIONAIS DE S.A.A.

800531 EQUIPE DE 2 ELEMENTOS SEM VEICULO hora 29,86 39,61 44,44 58,95 48,09 63,80 46,15 61,22 46,50 61,69

810000ATIVIDADES A SEREM FATURADAS NAS UNIDADES MOVEIS DE ESGOTO (Estas atividades exijem

pagamento de insalubridade de 40%, e a depender do local a EPI deve ser especifica).

810100SERVICOS DE MANUTENCAO DE REDE COLETORA E RAMAIS PREDIAIS DE ESGOTO - (ampliaçao,

remanejamento, manutençao PV e CX.,etc.)810101 EQUIPE DE 1 ELEMENTO COM VEICULO - MOTO hora 23,42 31,07 32,54 43,17 34,82 46,19 33,60 44,57 33,83 44,88

810107 EQUIPE DE 1 ELEMENTO SEM VEICULO hora 18,68 24,78 27,79 36,87 30,08 39,90 28,86 38,29 29,08 38,58

810110 EQUIPE DE 2 ELEMENTOS COM - SAVEIRO (M)* hora 51,28 68,03 65,86 87,37 69,51 92,21 67,57 89,64 67,92 90,10

819110 EQUIPE DE 2 ELEMENTOS COM - SAVEIRO (M)* (MRR / RMS) hora 51,74 68,64 66,55 88,29 70,25 93,19 68,28 90,58 68,63 91,04

810111 EQUIPE DE 2 ELEMENTOS COM - SAVEIRO (I)* hora 51,28 68,03 65,86 87,37 69,51 92,21 67,57 89,64 67,92 90,10

810120 HORA EXTRA TP 50% POR EQUIPE DE 2 ELEMENTOS COM - SAVEIRO - (M) hora 30,41 40,34 45,23 60,00 48,94 64,92 46,97 62,31 47,32 62,77

810121 HORA EXTRA TP 70% POR EQUIPE DE 2 ELEMENTOS COM - SAVEIRO - (M) hora 34,46 45,71 51,27 68,01 55,48 73,60 53,24 70,63 53,64 71,16

810122 HORA EXTRA TP 110% POR EQUIPE DE 2 ELEMENTOS COM - SAVEIRO - (M) hora 42,57 56,47 63,32 84,00 68,53 90,91 65,76 87,24 66,25 87,89

810123 ADICIONAL NOTURN0 POR EQUIPE DE 2 ELEMENTOS COM - SAVEIRO - (M) hora 8,10 10,75 12,06 16,00 13,05 17,31 12,51 16,60 12,61 16,73

819123 ADICIONAL NOTURN0 POR EQUIPE DE 2 ELEMENTOS COM - SAVEIRO - (M) (MRR / RMS) hora 8,23 10,92 12,25 16,25 13,25 17,58 12,71 16,86 12,81 16,99

810125 EQUIPE DE 2 ELEMENTOS COM VEICULO - GOL hora 47,06 62,43 61,64 81,77 65,30 86,63 63,35 84,04 63,70 84,50

810128 EQUIPE DE 2 ELEMENTOS COM VEICULO - FIAT UNO hora 45,34 60,15 59,92 79,49 63,57 84,33 61,63 81,76 61,98 82,22

810131 EQUIPE DE 2 ELEMENTOS SEM VEICULO (M) hora 45,52 60,39 67,74 89,86 73,31 97,25 70,35 93,33 70,88 94,03

810143 EQUIPE DE 3 ELEMENTOS COM VEICULO - D 20 (OS) hora 84,97 112,72 111,72 148,21 118,44 157,12 114,88 152,40 115,53 153,26

810144 EQUIPE DE 4 ELEMENTOS COM VEICULO - KOMBI (cleanto) hora 73,20 97,11 96,25 127,69 102,04 135,37 98,97 131,29 99,53 132,04

810161 EQUIPE DE 4 ELEMENTOS COM VEICULO - KOMBI hora 80,31 106,54 109,03 144,64 116,23 154,19 112,40 149,11 113,09 150,03

810164 EQUIPE DE 5 ELEMENTOS COM - F 4000 (M)* hora 135,86 180,23 178,98 237,43 189,80 251,79 184,04 244,15 185,09 245,54

819164 EQUIPE DE 5 ELEMENTOS COM - F 4000 (M)* (MRR / RMS) hora 136,93 181,65 180,57 239,54 191,51 254,06 185,67 246,31 186,73 247,72

810165 EQUIPE DE 5 ELEMENTOS COM - F 4000 (I)* hora 117,75 156,21 155,12 205,78 164,49 218,21 159,50 211,59 160,41 212,80

810166 EQUIPE DE 5 ELEMENTOS COM - F 4000 (I) COM ENCARREGADO hora 118,49 157,19 158,49 210,25 168,53 223,57 163,18 216,47 164,15 217,76

810173 EQUIPE DE 4 ELEMENTOS COM VEICULO - GOL hora 76,04 100,87 104,76 138,97 111,96 148,53 108,12 143,43 108,82 144,36

810174 HORA EXTRA TP 50% POR EQUIPE DE 5 ELEMENTOS COM - F 4000 (M) hora 79,45 105,40 118,17 156,76 127,87 169,63 122,72 162,80 123,64 164,02

810175 HORA EXTRA TP 70% POR EQUIPE DE 5 ELEMENTOS COM - F 4000 (M) hora 90,03 119,43 133,94 177,68 144,94 192,28 139,09 184,52 140,13 185,90

810176 HORA EXTRA TP 110% POR EQUIPE DE 5 ELEMENTOS COM - F 4000 (M) hora 111,22 147,54 165,44 219,47 179,05 237,53 171,81 227,92 173,09 229,62

810177 ADICIONAL NOTURN0 POR EQUIPE DE 5 ELEMENTOS COM - F 4000 (M) hora 21,17 28,08 31,52 41,81 34,11 45,25 32,70 43,38 32,96 43,72

819177 ADICIONAL NOTURN0 POR EQUIPE DE 5 ELEMENTOS COM - F 4000 (M) (MRR / RMS) hora 21,43 28,43 31,90 42,32 34,52 45,79 33,10 43,91 33,36 44,26

810200 SERVICOS DE FISCAL EM REDES E RAMAIS DE ESGOTO

810400 SERVICOS DE DESOBSTRUCAO DE REDES COLETORA E RAMAIS PREDIAIS DE ESGOTO

810401 EQUIPE DE 1 ELEMENTO COM VEICULO - MOTO hora 16,55 21,96 22,30 29,58 23,75 31,51 22,97 30,47 23,12 30,67

810425 EQUIPE DE 2 ELEMENTOS COM VEICULO - GOL hora 49,95 66,26 65,93 87,46 69,94 92,78 67,81 89,96 68,19 90,46

810449 EQUIPE DE 3 ELEMENTOS COM VEICULO - GOL hora 61,13 81,10 82,58 109,55 87,95 116,67 85,10 112,89 85,61 113,57

810473 EQUIPE DE 4 ELEMENTOS COM VEICULO - GOL hora 79,53 105,50 109,96 145,87 117,58 155,98 113,53 150,61 114,25 151,56

810857 EQUIPE DE 6 ELEMENTOS COM VEICULO - D 20 hora 104,60 138,76 140,99 187,04 150,14 199,18 145,28 192,73 146,15 193,88

810900 SERVICOS DE OPERACAO DE EQUIPAMENTOS PARA DESOBSTRUCOES

810931 EQUIPE DE 2 ELEMENTOS PARA OPERACAO DE HIGH-VELOCITY* hora 37,78 50,12 56,23 74,59 60,85 80,72 58,39 77,46 58,84 78,06

810934 EQUIPE DE 2 ELEMENTOS PARA OPERACAO DE HIDROJATEADOR PORTATIL* hora 37,78 50,12 56,23 74,59 60,85 80,72 58,39 77,46 58,84 78,06

810937 HORA EXTRA TP 50% POR EQUIPE DE 2 ELEMENTOS PARA OPERACAO DE HIGH VELOCITY hora 32,57 43,21 48,44 64,26 52,42 69,54 50,30 66,73 50,69 67,25

810940 HORA EXTRA TP 70% POR EQUIPE DE 2 ELEMENTOS PARA OPERACAO DE HIGH VELOCITY hora 36,90 48,95 54,90 72,83 59,41 78,81 57,01 75,63 57,44 76,20

Página: 57 de 59

Page 58: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

810943 HORA EXTRA TP 110% POR EQUIPE DE 2 PARA OPERACAO DE EQUIPAMENTO HIGH VELOCITY hora 45,58 60,47 67,81 89,96 73,38 97,35 70,42 93,42 70,95 94,12

810946ADICIONAL NOTURN0 POR EQUIPE DE 2 ELEMENTOS PARA OPERACAO DE EQUIPAMENTO HIGH

VELOCITYhora 8,68 11,51 12,92 17,14 13,98 18,55 13,41 17,79 13,51 17,92

819946ADICIONAL NOTURN0 POR EQUIPE DE 2 ELEMENTOS PARA OPERACAO DE EQUIPAMENTO HIGH

VELOCITY (MRR / RMS)hora 8,81 11,69 13,11 17,39 14,18 18,81 13,61 18,06 13,71 18,19

810949HORA EXTRA TP 50% POR EQUIPE DE 2 ELEMENTOS PARA OPERACAO DE HIDROJATEADOR

PORTATILhora 33,29 44,16 49,52 65,69 53,59 71,09 51,43 68,23 51,82 68,74

810952HORA EXTRA TP 70% POR EQUIPE DE 2 ELEMENTOS PARA OPERACAO DE HIDROJATEADOR

PORTATILhora 37,72 50,04 56,12 74,45 60,73 80,56 58,28 77,31 58,71 77,88

810954 EQUIPE DE 3 ELEMENTOS PARA OPERACAO DE HIGH-VELOCITY / VAC-ALL / COMBINADOS* hora 50,68 67,23 75,44 100,08 81,64 108,30 78,34 103,93 78,93 104,71

810955HORA EXTRA TP 110% POR EQUIPE DE 2 PARA OPERACAO DE EQUIPAMENTO HIDROJATEADOR

PORTATILhora 46,59 61,81 69,31 91,95 75,00 99,50 71,97 95,48 72,51 96,19

810957 EQUIPE DE 3 ELEMENTOS PARA OPERACAO DE HIGH-VELOCITY / VAC-ALL / COMBINADO* hora 43,93 58,28 65,38 86,73 70,75 93,86 67,90 90,08 68,41 90,75

810958ADICIONAL NOTURN0 POR EQUIPE DE 2 ELEMENTOS PARA OPERACAO DE EQUIPAMENTO

HIDROJATEADOR PORTATILhora 8,87 11,77 13,20 17,51 14,28 18,94 13,69 18,16 13,80 18,31

810960 HORA EXTRA TP 50% POR EQUIPE DE 3 ELEMENTOS PARA OPERACAO DE HIGH VELOCITY hora 44,31 58,78 65,90 87,42 71,31 94,60 68,43 90,78 68,96 91,48

810963 HORA EXTRA TP 70% POR EQUIPE DE 3 ELEMENTOS PARA OPERACAO DE HIGH VELOCITY hora 50,20 66,60 74,69 99,08 80,82 107,22 77,56 102,89 78,14 103,66

810969 HORA EXTRA TP 110% POR EQUIPE DE 3 PARA OPERACAO DE EQUIPAMENTO HIGH VELOCITY hora 62,01 82,26 92,25 122,38 99,83 132,43 95,80 127,09 96,52 128,04

810971ADICIONAL NOTURN0 POR EQUIPE DE 3 ELEMENTOS PARA OPERACAO DE EQUIPAMENTO HIGH

VELOCITYhora 11,81 15,67 17,58 23,32 19,02 25,23 18,24 24,20 18,38 24,38

820000 ATIVIDADES A SEREM FATURADAS NA AREA TÉCNICA COMERCIAL (PRODUCAO)

820100SERVICOS DE

CORTE/SUPRESSAO/INSTALACAO/SUBSTITUICAO/TRANSFERENCIA/RETIRADA/AFERICAO DE

HIDROMETROS E LIGACOES DOMICILIARES820101 EQUIPE DE 1 ELEMENTO COM VEICULO - MOTO* hora 22,95 30,45 32,06 42,53 34,35 45,57 33,13 43,95 33,35 44,24

820107 EQUIPE DE 1 ELEMENTO SEM VEICULO* hora 18,68 24,78 27,79 36,87 30,08 39,90 28,86 38,29 29,08 38,58

820110 EQUIPE DE 2 ELEMENTOS COM VEICULO - SAVEIRO* hora 51,28 68,03 65,86 87,37 69,51 92,21 67,57 89,64 67,92 90,10

820125 EQUIPE DE 2 ELEMENTOS COM VEICULO - GOL hora 47,06 62,43 61,64 81,77 65,30 86,63 63,35 84,04 63,70 84,50

820128 EQUIPE DE 2 ELEMENTOS COM VEICULO - FIAT UNO hora 45,34 60,15 59,92 79,49 63,57 84,33 61,63 81,76 61,98 82,22

820161 EQUIPE DE 4 ELEMENTOS COM VEICULO - KOMBI* hora 80,31 106,54 109,03 144,64 116,23 154,19 112,40 149,11 113,09 150,03

820173 EQUIPE DE 4 ELEMENTOS COM VEICULO - GOL hora 76,04 100,87 104,76 138,97 111,96 148,53 108,12 143,43 108,82 144,36

820200 SERVICOS DE LEITURISTA E ENTREGA DE CONTAS DOS HIDROMETROS

820201 EQUIPE DE 1 ELEMENTO COM VEICULO - MOTO (M)* hora 20,08 26,64 27,78 36,85 29,71 39,41 28,68 38,05 28,87 38,30

820202 EQUIPE DE 1 ELEMENTO COM VEICULO - MOTO (I)* hora 18,31 24,29 25,16 33,38 26,87 35,65 25,97 34,45 26,13 34,66

820204 EQUIPE DE 1 ELEMENTO COM VEICULO - BICICLETA (I)* hora 14,05 18,64 20,90 27,73 22,61 29,99 21,71 28,80 21,87 29,01

820206 EQUIPE DE 1 ELEMENTO SEM VEICULO - (I)* hora 14,04 18,63 20,89 27,71 22,60 29,98 21,70 28,79 21,86 29,00

820207 EQUIPE DE 1 ELEMENTO SEM VEICULO - (M)* hora 15,81 20,97 23,51 31,19 25,44 33,75 24,41 32,38 24,59 32,62

820300SERVICOS DE COLETA E TRANSPORTE DE AMOSTRAS DE AGUA E ESGOTO (considerando uma

media de 6.000 km rodados por mes para carro e 4.700 km para moto)820301 EQUIPE DE 1 ELEMENTO COM VEICULO - MOTO km 0,70 0,93 0,96 1,27 1,02 1,35 0,99 1,31 0,99 1,31

820308 EQUIPE DE 1 ELEMENTO COM VEICULO - SAVEIRO km 1,42 1,88 1,67 2,22 1,74 2,31 1,70 2,26 1,71 2,27

820328 EQUIPE DE 1 ELEMENTO COM VEICULO - FIAT (UNO) km 1,24 1,64 1,49 1,98 1,55 2,06 1,52 2,02 1,53 2,03

820331 EQUIPE DE 1 ELEMENTO COM VEICULO - MOTO hora 22,49 29,84 30,60 40,59 32,62 43,27 31,54 41,84 31,73 42,09

820338 EQUIPE DE 1 ELEMENTO COM VEICULO - SAVEIRO hora 46,12 61,18 54,35 72,10 56,41 74,83 55,31 73,37 55,51 73,64

820340 EQUIPE DE 2 ELEMENTOS COM VEICULO - SAVEIRO hora 62,18 82,49 78,25 103,81 82,26 109,13 80,12 106,29 80,51 106,80

821200 SERVICOS DE VERIFICACOES

821201 EQUIPE DE 1 ELEMENTO COM VEICULO - MOTO hora 32,07 42,54 45,41 60,24 48,74 64,66 46,97 62,31 47,28 62,72

830000 ATIVIDADES PAGAS POR HORAS EXTRAS TIPO 50 % - MENSALISTA

830110 HORAS EXTRAS TIPO 50% - AGENTE DE SISTEMA ESGOTO hora 15,32 20,32 24,59 32,62 26,91 35,70 25,68 34,07 25,90 34,36

830119 HORAS EXTRAS TIPO 50% - ELETRICISTA hora 15,05 19,97 24,16 32,05 26,44 35,08 25,22 33,46 25,44 33,75

830128 HORAS EXTRAS TIPO 50% - MECANICO hora 15,35 20,36 24,64 32,69 26,97 35,78 25,73 34,13 25,95 34,43

830137 HORAS EXTRAS TIPO 50% - OPERADOR DE EQUIPAMENTO PESADO hora 16,80 22,29 26,95 35,75 29,50 39,13 28,14 37,33 28,38 37,65

830146 HORAS EXTRAS TIPO 50% - MOTORISTA (VEICULO PESADO HIDROJATO) - ESGOTO hora 16,03 21,27 25,72 34,12 28,15 37,34 26,86 35,63 27,09 35,94

830147 HORAS EXTRAS TIPO 50% - MOTORISTA (VEICULO LEVE) hora 15,02 19,93 24,11 31,98 26,39 35,01 25,17 33,39 25,39 33,68

830149 HORAS EXTRAS TIPO 50% - OPERADOR K 500/COMPRESSOR + hora 17,38 23,06 27,89 37,00 30,53 40,50 29,13 38,64 29,38 38,98

830167 HORAS EXTRAS TIPO 50% - SOLDADOR hora 15,05 19,97 24,16 32,05 26,44 35,08 25,22 33,46 25,44 33,75

830207 HORAS EXTRAS TIPO 50% - AUXILIAR MECANICO hora 9,51 12,62 15,26 20,24 16,70 22,15 15,93 21,13 16,07 21,32

830210 HORAS EXTRAS TIPO 50% - TECNICO ELETROMECANICO hora 42,41 56,26 68,06 90,29 74,48 98,81 71,06 94,27 71,67 95,08

830213 HORAS EXTRAS TIPO 50% - TECNICO ELETROTECNICO / NIVEL MEDIO hora 23,51 31,19 37,73 50,05 41,29 54,78 39,40 52,27 39,73 52,71

830216 HORAS EXTRAS TIPO 50% - TORNEIRO MECANICO hora 15,35 20,36 24,64 32,69 26,97 35,78 25,73 34,13 25,95 34,43

830258 HORAS EXTRAS TIPO 50% - PEDREIRO / ENCANADOR / ARTIFICE (M) + ESGOTO hora 15,05 19,97 24,16 32,05 26,44 35,08 25,22 33,46 25,44 33,75

830259 HORAS EXTRAS TIPO 50% - ENCARREGADO DE EQUIPE (MRR/RMS) hora 20,37 27,02 32,69 43,37 35,78 47,47 34,13 45,28 34,43 45,67

830266 HORAS EXTRAS TIPO 50% - SERVENTE (M) + AGUA hora 9,46 12,55 15,19 20,15 16,62 22,05 15,86 21,04 16,00 21,23

830279 HORAS EXTRAS TIPO 50% - AUXILIAR DE LABORATORIO + AGUA hora 11,06 14,67 17,74 23,53 19,42 25,76 18,53 24,58 18,69 24,79

830282 HORAS EXTRAS TIPO 50% - ASSISTENTE DE LABORATORIO + AGUA hora 11,28 14,96 18,11 24,02 19,82 26,29 18,90 25,07 19,07 25,30

830285 HORAS EXTRAS TIPO 50% - MONITOR DE SERVICOS hora 17,20 22,82 27,60 36,61 30,21 40,08 28,82 38,23 29,07 38,56

830290 HORAS EXTRAS TIPO 50% - TECNICO DE NIVEL MEDIO hora 22,02 29,21 35,34 46,88 38,68 51,31 36,90 48,95 37,22 49,38

839101 Horas extras 50% - Servente 1/4 + Servente Pratico 3/4 (MRR / RMS) hora 12,23 16,22 18,19 24,13 19,68 26,11 18,89 25,06 19,03 25,25

831000 ATIVIDADES PAGAS POR HORAS EXTRAS TIPO 70 % - MENSALISTAS

831107 HORAS EXTRAS TIPO 70% - AGENTE DE SERVICOS hora 11,93 15,83 19,14 25,39 20,95 27,79 19,99 26,52 20,16 26,74

831110 HORAS EXTRAS TIPO 70% - AGENTE DE SISTEMA hora 17,37 23,04 27,87 36,97 30,50 40,46 29,10 38,60 29,35 38,94

831112 HORAS EXTRAS TIPO 70% - AGENTE DE SISTEMA ESGOTO hora 17,37 23,04 27,87 36,97 30,50 40,46 29,10 38,60 29,35 38,94

831119 HORAS EXTRAS TIPO 70% - ELETRICISTA hora 17,07 22,65 27,39 36,34 29,97 39,76 28,60 37,94 28,84 38,26

831120 HORAS EXTRAS TIPO 70% - ELETRICISTA - PE hora 20,05 26,60 32,17 42,68 35,20 46,70 33,59 44,56 33,88 44,95

831128 HORAS EXTRAS TIPO 70% - MECANICO hora 17,40 23,08 27,92 37,04 30,55 40,53 29,15 38,67 29,40 39,00

831137 HORAS EXTRAS TIPO 70% - OPERADOR DE EQUIPAMENTO PESADO hora 19,03 25,25 30,54 40,51 33,43 44,35 31,89 42,31 32,17 42,68

831146 HORAS EXTRAS TIPO 70% - MOTORISTA (VEICULO PESADO HIDROJATO) - ESGOTO hora 18,18 24,12 29,17 38,70 31,93 42,36 30,46 40,41 30,72 40,75

831147 HORAS EXTRAS TIPO 70% - MOTORISTA (VEICULO LEVE) hora 17,02 22,58 27,31 36,23 29,89 39,65 28,52 37,83 28,77 38,17

831149 HORAS EXTRAS TIPO 70% - OPERADOR K 500/COMPRESSOR + hora 19,70 26,13 31,61 41,93 34,59 45,89 33,00 43,78 33,28 44,15

831167 HORAS EXTRAS TIPO 70% - SOLDADOR hora 17,07 22,65 27,39 36,34 29,97 39,76 28,60 37,94 28,84 38,26

831207 HORAS EXTRAS TIPO 70% - AUXILIAR MECANICO hora 10,77 14,29 17,29 22,94 18,92 25,10 18,05 23,95 18,20 24,14

831210 HORAS EXTRAS TIPO 70% - TECNICO ELETROMECANICO hora 48,06 63,76 77,12 102,31 84,41 111,98 80,53 106,83 81,22 107,75

831213 HORAS EXTRAS TIPO 70% - TECNICO ELETROTECNICO hora 26,64 35,34 42,74 56,70 46,78 62,06 44,63 59,21 45,01 59,71

831214 HORAS EXTRAS TIPO 70% - TECNICO ELETROTECNICO / MIVEL MEDIO - PE hora 31,29 41,51 50,21 66,61 54,95 72,90 52,43 69,55 52,87 70,14

831216 HORAS EXTRAS TIPO 70% - TORNEIRO MECANICO - hora 17,40 23,08 27,92 37,04 30,55 40,53 29,15 38,67 29,40 39,00

831240 HORAS EXTRAS TIPO 70% - AUXILIAR DE PRODUCAO hora 11,31 15,00 18,15 24,08 19,87 26,36 18,96 25,15 19,12 25,36

831255 HORAS EXTRAS TIPO 70% - ENCARREGADO DE EQUIPE hora 23,09 30,63 37,05 49,15 40,55 53,79 38,69 51,33 39,02 51,76

831256 HORAS EXTRAS TIPO 70% - ENCARREGADO DE EQUIPE (MRR/RMS) hora 23,09 30,63 37,05 51,36 40,55 53,79 38,69 51,33 39,02 51,76

831258 HORAS EXTRAS TIPO 70% - PEDREIRO / ENCANADOR / ARTIFICE (M) + hora 17,07 22,65 27,39 36,34 29,97 39,76 28,60 37,94 28,84 38,26

831267 HORAS EXTRAS TIPO 70% - SERVENTE (M) + ESGOTO hora 10,73 14,23 17,21 22,83 18,84 24,99 17,97 23,84 18,13 24,05

831285 HORAS EXTRAS TIPO 70% - MONITOR DE SERVICOS hora 19,48 25,84 31,27 41,48 34,22 45,40 32,65 43,31 32,93 43,68

831290 HORAS EXTRAS TIPO 70% - TECNICO DE NIVEL MEDIO hora 24,95 33,10 40,04 53,12 43,83 58,14 41,81 55,47 42,17 55,94

839102 Horas extras 70% - Servente 1/4 +3/4 (MRR / RMS) hora 13,85 18,37 20,60 27,33 22,29 29,57 21,39 28,38 21,55 28,59

832000 ATIVIDADES PAGAS POR HORAS EXTRAS TIPO 110 % - MENSALISTAS

832107 HORAS EXTRAS TIPO 110% - AGENTE DE SERVICOS hora 14,74 19,55 23,65 31,37 25,88 34,33 24,69 32,75 24,91 33,05

832110 HORAS EXTRAS TIPO 110% - AGENTE DE SISTEMA hora 21,45 28,46 34,43 45,67 37,68 49,99 35,95 47,69 36,26 48,10

832112 HORAS EXTRAS TIPO 110% - AGENTE DE SISTEMA ESGOTO hora 21,45 28,46 34,43 45,67 37,68 49,99 35,95 47,69 36,26 48,10

832119 HORAS EXTRAS TIPO 110% - ELETRICISTA hora 21,08 27,96 33,82 44,87 37,02 49,11 35,32 46,86 35,62 47,25

832120 HORAS EXTRAS TIPO 110% - ELETRICISTA - PE hora 24,06 31,92 38,60 51,21 42,25 56,05 40,31 53,48 40,66 53,94

832128 HORAS EXTRAS TIPO 110% - MECANICO hora 21,48 28,50 34,47 45,73 37,73 50,05 36,00 47,76 36,31 48,17

832137 HORAS EXTRAS TIPO 110% - OPERADOR EQUIPAMENTO PESADO hora 23,51 31,19 37,73 50,05 41,29 54,78 39,40 52,27 39,73 52,71

832138 HORAS EXTRAS TIPO 110% - OPERADOR EQUIPAMENTO PESADO - PE hora 23,51 31,19 37,73 50,05 41,29 54,78 39,40 52,27 39,73 52,71

832146 HORAS EXTRAS TIPO 110% - MOTORISTA (VEICULO PESADO HIDROJATO) hora 22,44 29,77 36,02 47,78 39,42 52,29 37,61 49,89 37,93 50,32

832149 HORAS EXTRAS TIPO 110% - OPERADOR K 500/COMPRESSOR + hora 24,32 32,26 39,03 51,78 42,72 56,67 40,76 54,07 41,10 54,52

832150 HORAS EXTRAS TIPO 110% - MOTORISTA (VEICULO LEVE) hora 21,03 27,90 33,75 44,77 36,94 49,00 35,24 46,75 35,54 47,15

832167 HORAS EXTRAS TIPO 110% - SOLDADOR hora 21,08 27,96 33,82 44,87 37,02 49,11 35,32 46,86 35,62 47,25

832207 HORAS EXTRAS TIPO 110% - AUXILIAR MECANICO hora 13,31 17,66 21,36 28,34 23,38 31,02 22,30 29,58 22,49 29,84

832210 HORAS EXTRAS TIPO 110% - TECNICO ELETROMECANICO hora 59,37 78,76 95,27 126,39 104,27 138,32 99,48 131,97 100,34 133,11

832211 HORAS EXTRAS TIPO 110% - TECNICO ELETROMECANICO / NIVEL MEDIO - PE hora 64,02 84,93 102,74 136,29 112,44 149,16 107,28 142,32 108,20 143,54

832213 HORAS EXTRAS TIPO 110% - TECNICO ELETROTECNICO hora 32,90 43,65 52,80 70,04 57,78 76,65 55,13 73,14 55,60 73,76

832216 HORAS EXTRAS TIPO 110% - TORNEIRO MECANICO hora 21,48 28,50 34,47 45,73 37,73 50,05 36,00 47,76 36,31 48,17

832240 HORAS EXTRAS TIPO 110% - AUXILIAR DE PRODUCAO - AGUA hora 21,48 28,50 34,47 45,73 37,73 50,05 36,00 47,76 36,31 48,17

832255 HORAS EXTRAS TIPO 110% - ENCARREGADO DE EQUIPE hora 28,51 37,82 45,76 60,71 50,08 66,44 47,78 63,38 48,19 63,93

832256 HORAS EXTRAS TIPO 110% - ENCARREGADO DE EQUIPE (MRR-RMS) hora 28,51 39,52 45,76 63,42 50,08 69,41 47,78 66,22 48,19 66,79

832258 HORAS EXTRAS TIPO 110% - PEDREIRO / ENCANADOR / ARTIFICE (M) ESGOTO hora 21,08 27,96 33,82 44,87 37,02 49,11 35,32 46,86 35,62 47,25

832266 HORAS EXTRAS TIPO 110% - SERVENTE (M) AGUA hora 13,25 17,58 21,26 28,20 23,27 30,87 22,20 29,45 22,39 29,70

832270 HORAS EXTRAS TIPO 110% - COLETOR DE AMOSTRAS + AGUA hora 19,02 25,23 30,52 40,49 33,40 44,31 31,87 42,28 32,14 42,64

832279 HORAS EXTRAS TIPO 110% - AUXILIAR DE LABORATORIO + AGUA hora 15,49 20,55 24,86 32,98 27,20 36,08 25,95 34,43 26,18 34,73

832282 HORAS EXTRAS TIPO 110% - ASSISTENTE DE LABORATORIO + AGUA hora 15,79 20,95 25,34 33,62 27,73 36,79 26,46 35,10 26,68 35,39

833149 ADICIONAL NOTURNO - OPERADOR K 500/COMPRESSOR + hora 1.019,28 1.352,18 1.635,68 2.169,89 1.790,17 2.374,84 1.707,94 2.265,75 1.722,59 2.285,19

833258 ADICIONAL NOTURNO - PEDREIRO / ENCANADOR / ARTIFICE (M) + hora 883,11 1.171,53 1.417,16 1.880,00 1.551,02 2.057,58 1.479,77 1.963,06 1.492,47 1.979,91

Página: 58 de 59

Page 59: Tabela de Preços Para Serviços de Expansão / Operação ......b020001016 op - desenhista / copista h 9,13 12,11 13,58 18,02 14,70 19,50 14,10 18,71 14,21 18,85 b020001019 op - eletricista

BDI: 32,66%

Código Descrição UN S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI S/BDI C/BDI

Tabela de Preços Para Serviços de

Expansão / Operação / Manutenção

Desonerada de 2016Observação: Estes valores são exclusivos para utilização da Operação / Manutenção relativa a Tratamento e Produção

de Água e seus desdobramentos.

BASICO

EMBASA 2016OPERAÇÃO - ÁGUA

SINTRACOM SINTEPAV SINDTICCC SITICCAN

H=86,29%

M=50,23%

H=189,95%

M=153,89%

H=177,13%

M=141,08%

H=199,90%

M=163,85%

H=187,78%

M=151,73%

Legenda:

Serviços Exclusivos da Operação e Manutenção

Serviços comuns a Operação e Expansão

833267 ADICIONAL NOTURNO - SERVENTE + hora 555,25 736,59 891,03 1.182,04 975,19 1.293,69 930,39 1.234,26 938,38 1.244,85

839267 ADICIONAL NOTURNO - SERVENTE + (MRR / RMS) hora 578,15 766,97 927,79 1.230,81 1.015,42 1.347,06 968,78 1.285,18 977,09 1.296,21

832285 HORAS EXTRAS TIPO 110% - MONITOR DE SERVICOS hora 24,07 31,93 38,62 51,23 42,27 56,08 40,33 53,50 40,67 53,95

832290 HORAS EXTRAS TIPO 110% - TECNICO DE NIVEL MEDIO hora 30,83 40,90 49,47 65,63 54,14 71,82 51,65 68,52 52,10 69,12

839103 Horas extras 110% - Servente 1/4 +3/4 (MRR / RMS) hora 17,12 22,71 25,46 33,78 27,55 36,55 26,44 35,08 26,63 35,33

834000 ATIVIDADES PAGAS POR HORAS EXTRAS TIPO 80 % - MENSALISTAS

834107 HORAS EXTRAS TIPO 80% - AGENTE DE SERVIÃOS hora 12,63 16,75 20,27 26,89 22,19 29,44 21,17 28,08 21,35 28,32

834110 HORAS EXTRAS TIPO 80% - AGENTE DE SISTEMA hora 18,39 24,40 29,51 39,15 32,30 42,85 30,81 40,87 31,08 41,23

834112 HORAS EXTRAS TIPO 80% - AGENTE DE SISTEMA ESGOTO hora 18,39 24,40 29,51 39,15 32,30 42,85 30,81 40,87 31,08 41,23

834119 HORAS EXTRAS TIPO 80% - ELETRICISTA hora 18,06 23,96 28,98 38,44 31,71 42,07 30,26 40,14 30,52 40,49

834120 HORAS EXTRAS TIPO 80% - ELETRICISTA - PE hora 21,04 27,91 33,76 44,79 36,94 49,00 35,25 46,76 35,56 47,17

834128 HORAS EXTRAS TIPO 80% - MECANICO hora 18,42 24,44 29,56 39,21 32,35 42,92 30,86 40,94 31,13 41,30

834137 HORAS EXTRAS TIPO 80% - OPERADOR DE EQUIPAMENTO PESADO hora 20,15 26,73 32,33 42,89 35,38 46,94 33,76 44,79 34,05 45,17

834146 HORAS EXTRAS TIPO 80% - MOTORISTA (VEICULO PESADO HIDROJATO) - ESGOTO hora 19,24 25,52 30,88 40,97 33,80 44,84 32,25 42,78 32,52 43,14

834147 HORAS EXTRAS TIPO 80% - MOTORISTA (VEICULO LEVE) hora 18,03 23,92 28,93 38,38 31,66 42,00 30,21 40,08 30,47 40,42

834149 HORAS EXTRAS TIPO 80% - OPERADOR K 500/COMPRESSOR + hora 20,85 27,66 33,46 44,39 36,62 48,58 34,94 46,35 35,24 46,75

834167 HORAS EXTRAS TIPO 80% - SOLDADOR hora 18,06 23,96 28,98 38,44 31,71 42,07 30,26 40,14 30,52 40,49

834207 HORAS EXTRAS TIPO 80% - AUXILIAR MECANICO hora 11,42 15,15 18,32 24,30 20,05 26,60 19,13 25,38 19,30 25,60

834210 HORAS EXTRAS TIPO 80% - TECNICO ELETROMECANICO hora 50,90 67,52 81,68 108,36 89,39 118,58 85,29 113,15 86,02 114,11

834213 HORAS EXTRAS TIPO 80% - TECNICO ELETROTECNICO hora 28,20 37,41 45,25 60,03 49,52 65,69 47,25 62,68 47,66 63,23

834214 HORAS EXTRAS TIPO 80% - TECNICO ELETROTECNICO - PE hora 32,85 43,58 52,72 69,94 57,69 76,53 55,05 73,03 55,52 73,65

834216 HORAS EXTRAS TIPO 80% - TORNEIRO MECANICO - hora 18,42 24,44 29,56 39,21 32,35 42,92 30,86 40,94 31,13 41,30

834240 HORAS EXTRAS TIPO 80% - AUXILIAR DE PRODUÃAO hora 11,99 15,91 19,24 25,52 21,06 27,94 20,09 26,65 20,26 26,88

834255 HORAS EXTRAS TIPO 80% - ENCARREGADO DE EQUIPE hora 24,44 32,42 39,22 52,03 42,93 56,95 40,96 54,34 41,31 54,80

834256 HORAS EXTRAS TIPO 80% - ENCARREGADO DE EQUIPE (MRR/RMS) hora 24,44 33,88 39,22 54,37 42,93 59,52 40,96 56,78 41,31 57,27

834258 HORAS EXTRAS TIPO 80% - PEDREIRO / ENCANADOR / ARTIFICE (M) + hora 18,06 23,96 28,98 38,44 31,71 42,07 30,26 40,14 30,52 40,49

834267 HORAS EXTRAS TIPO 80% - SERVENTE (M) + ESGOTO hora 11,36 15,07 18,23 24,18 19,95 26,47 19,03 25,25 19,19 25,46

839967 Horas extras 80% - Servente (MRR / RMS) hora 11,83 15,69 18,99 25,19 20,79 27,58 19,83 26,31 20,00 26,53

835000 ATIVIDADES PAGAS POR HORAS EXTRAS TIPO 150 % - MENSALISTAS

835107 HORAS EXTRAS TIPO 150% - AGENTE DE SERVIÃOS hora 17,55 23,28 28,16 37,36 30,82 40,89 29,40 39,00 29,65 39,33

835110 HORAS EXTRAS TIPO 150% - AGENTE DE SISTEMA hora 25,54 33,88 40,98 54,36 44,85 59,50 42,79 56,77 43,16 57,26

835112 HORAS EXTRAS TIPO 150% - AGENTE DE SISTEMA ESGOTO hora 25,54 33,88 40,98 54,36 44,85 59,50 42,79 56,77 43,16 57,26

835119 HORAS EXTRAS TIPO 150% - ELETRICISTA hora 25,09 33,28 40,26 53,41 44,06 58,45 42,04 55,77 42,40 56,25

835120 HORAS EXTRAS TIPO 150% - ELETRICISTA - PE hora 28,07 37,24 45,04 59,75 49,29 65,39 47,03 62,39 47,44 62,93

835128 HORAS EXTRAS TIPO 150% - MECANICO hora 25,58 33,93 41,06 54,47 44,93 59,60 42,87 56,87 43,24 57,36

835137 HORAS EXTRAS TIPO 150% - OPERADOR EQUIPAMENTO PESADO hora 27,99 37,13 44,91 59,58 49,16 65,22 46,90 62,22 47,30 62,75

835138 HORAS EXTRAS TIPO 150% - OPERADOR EQUIPAMENTO PESADO - PE hora 27,99 37,13 44,91 59,58 49,16 65,22 46,90 62,22 47,30 62,75

835146 HORAS EXTRAS TIPO 150% - MOTORISTA (VEICULO PESADO HIDROJATO) hora 26,73 35,46 42,89 56,90 46,94 62,27 44,78 59,41 45,17 59,92

835149 HORAS EXTRAS TIPO 150% - OPERADOR K 500/COMPRESSOR + hora 1.048,24 1.390,60 1.682,16 2.231,55 1.841,04 2.442,32 1.756,47 2.330,13 1.771,54 2.350,12

835150 HORAS EXTRAS TIPO 150% - MOTORISTA (VEICULO LEVE) hora 25,03 33,20 40,16 53,28 43,96 58,32 41,94 55,64 42,30 56,12

835167 HORAS EXTRAS TIPO 150% - SOLDADOR hora 25,09 33,28 40,26 53,41 44,06 58,45 42,04 55,77 42,40 56,25

835207 HORAS EXTRAS TIPO 150% - AUXILIAR MECANICO hora 15,85 21,03 25,43 33,74 27,84 36,93 26,56 35,23 26,79 35,54

835210 HORAS EXTRAS TIPO 150% - TECNICO ELETROMECANICO hora 70,68 93,76 113,43 150,48 124,14 164,68 118,44 157,12 119,46 158,48

835211 HORAS EXTRAS TIPO 150% - TECNICO ELETROMECANICO - PE hora 75,33 99,93 120,90 160,39 132,31 175,52 126,24 167,47 127,32 168,90

835216 HORAS EXTRAS TIPO 150% - TORNEIRO MECANICO hora 25,58 33,93 41,06 54,47 44,93 59,60 42,87 56,87 43,24 57,36

835240 HORAS EXTRAS TIPO 150% - AUXILIAR DE PRODUÃAO - AGUA hora 25,58 33,93 41,06 54,47 44,93 59,60 42,87 56,87 43,24 57,36

835242 HORAS EXTRAS TIPO 150% - AUXILIAR DE PRODUÃAO - ESGOTO hora 25,58 33,93 41,06 54,47 44,93 59,60 42,87 56,87 43,24 57,36

835255 HORAS EXTRAS TIPO 150% - ENCARREGADO DE EQUIPE hora 33,95 45,04 54,48 72,27 59,63 79,11 56,89 75,47 57,38 76,12

835258 HORAS EXTRAS TIPO 150% - PEDREIRO / ENCANADOR / ARTIFICE (M) ESGOTO hora 908,20 1.204,82 1.457,42 1.933,41 1.595,08 2.116,03 1.521,81 2.018,83 1.534,87 2.036,16

835266 HORAS EXTRAS TIPO 150% - SERVENTE hora 15,77 20,92 25,31 33,58 27,70 36,75 26,43 35,06 26,66 35,37

839266 Horas extras 150% - Servente (MRR / RMS) hora 16,43 21,80 26,36 34,97 28,85 38,27 27,53 36,52 27,77 36,84

835270 HORAS EXTRAS TIPO 150% - COLETOR DE AMOSTRAS + AGUA hora 22,65 30,05 36,35 48,22 39,79 52,79 37,96 50,36 38,29 50,80

835279 HORAS EXTRAS TIPO 150% - AUXILIAR DE LABORATORIO + AGUA hora 18,43 24,45 29,58 39,24 32,37 42,94 30,89 40,98 31,15 41,32

835282 HORAS EXTRAS TIPO 150% - ASSISTENTE DE LABORATORIO + AGUA hora 18,81 24,95 30,18 40,04 33,03 43,82 31,52 41,81 31,79 42,17

835149 HORAS EXTRAS TIPO 150% - OPERADOR K 500/COMPRESSOR hora 1.048,24 1.390,60 1.682,16 2.231,55 1.841,04 2.442,32 1.756,47 2.330,13 1.771,54 2.350,12

835258 HORAS EXTRAS TIPO 150% - PEDREIRO / ENCANADOR / ARTIFICE (M) ESGOTO hora 908,20 1.204,82 1.457,42 1.933,41 1.595,08 2.116,03 1.521,81 2.018,83 1.534,87 2.036,16

835267 HORAS EXTRAS TIPO 150% - SERVENTE (M) ESGOTO hora 571,02 757,52 916,34 1.215,62 1.002,89 1.330,43 956,82 1.269,32 965,04 1.280,22

840000 ATIVIDADES A SEREM FATURADAS EM UNIDADES FIXAS DE AGUA - MENSALISTAS

840110 HORA EXTRA TP 50% POR EQUIPE DE 2 ELEMENTOS COM - SAVEIRO - (M) hora 24,51 32,51 39,35 52,20 43,06 57,12 41,08 54,50 41,44 54,97

840111 HORA EXTRA TP 70% POR EQUIPE DE 2 ELEMENTOS COM - SAVEIRO - (M) hora 27,80 36,88 44,60 59,17 48,81 64,75 46,57 61,78 46,97 62,31

840112 HORA EXTRA TP 110% POR EQUIPE DE 2 ELEMENTOS COM - SAVEIRO - (M) hora 34,33 45,54 55,08 73,07 60,29 79,98 57,52 76,31 58,01 76,96

840113 ADICIONAL NOTURN0 POR EQUIPE DE 2 ELEMENTOS COM - SAVEIRO - (M) hora 1.438,36 1.908,13 2.308,19 3.062,04 2.526,21 3.351,27 2.410,16 3.197,32 2.430,85 3.224,77

840161 HORA EXTRA TP 50% POR EQUIPE DE 4 ELEMENTOS COM - KOMBI - (M) hora 49,02 65,03 78,70 104,40 86,12 114,25 82,16 108,99 82,88 109,95

840162 HORA EXTRA TP 70% POR EQUIPE DE 4 ELEMENTOS COM - KOMBI - (M) hora 55,60 73,76 89,20 118,33 97,62 129,50 93,14 123,56 93,94 124,62

840163 HORA EXTRA TP 110% POR EQUIPE DE 4 ELEMENTOS COM - KOMBI - (M) hora 68,66 91,08 110,16 146,14 120,58 159,96 115,04 152,61 116,02 153,91

840164 ADICIONAL NOTURN0 POR EQUIPE DE 4 ELEMENTOS COM - KOMBI - (M) hora 2.876,72 3.816,26 4.616,38 6.124,09 5.052,42 6.702,54 4.820,32 6.394,64 4.861,70 6.449,53

850000 ATIVIDADES A SEREM FATURADAS EM UNIDADES FIXAS DE ESGOTO

860000 ATIVIDADES A SEREM FATURADAS NA REPAVIMENTACAO

900000

ATIVIDADES A SEREM FATURADAS NA AREA OPERACAO E MANUTENCAO DAS UNIDADES

FIXAS - POR TURNO - (4turnos 6hs p/24 horas/dias, 6hs*24 dias=144 h/m, 5

turnos*24 dias=120 turno/mes, 5/120=0,00417m/turno.

980000 COMPOSICOES PARA EQUIPES DE PLANTOES OPERACIONAIS

980801PLANTAO OPERAIONAL ATE DUAS HORAS POR EQUIPE DE 2 ELEMENTOS - ENCANADOR E

AJUDANTE - Mhora 24,51 32,51 39,35 52,20 43,06 57,12 41,08 54,50 41,44 54,97

980802PLANTAO OPERAIONAL AOS SABADOS ATE DUAS HORAS POR EQUIPE DE 2 ELEMENTOS -

ENCANADOR E AJUDANTE - Mhora 27,80 36,88 44,60 59,17 48,81 64,75 46,57 61,78 46,97 62,31

980803PLANTAO OPERAIONAL AOS DOMINGOS ATE DUAS HORAS POR EQUIPE DE 2 ELEMENTOS -

ENCANADOR E AJUDANTE - Mhora 34,33 45,54 55,08 73,07 60,29 79,98 57,52 76,31 58,01 76,96

980807PLANTAO OPERAIONAL ATE DUAS HORAS POR EQUIPE DE 4 ELEMENTOS - 2 ENCANADORES E 2

AJUDANTES - Mhora 49,02 65,03 78,70 104,40 86,12 114,25 82,16 108,99 82,88 109,95

980808PLANTAO OPERAIONAL AOS SABADOS - ATE DUAS HORAS POR EQUIPE DE 4 ELEMENTOS - 2

ENCANADORES E 2 AJUDANTES - Mhora 55,60 73,76 89,20 118,33 97,62 129,50 93,14 123,56 93,94 124,62

980809PLANTAO OPERAIONAL AOS DOMINGOS E/OU FERIADOS - ATE DUAS HORAS POR EQUIPE DE 4

ELEMENTOS - 2 ENCANADORES E 2 AJUDANTES - Mhora 68,66 91,08 110,16 146,14 120,58 159,96 115,04 152,61 116,02 153,91

980810 PLANTAO OPERACIONAL AOS SABADOS POR EQUIPE DE PITOMETRIA (AGENTE DE MEDICAO) hora 17,95 23,81 28,81 38,22 31,53 41,83 30,08 39,90 30,34 40,25

980811PLANTAO OPERACIONAL AOS DOMINGOS OU FERIADOS POR EQUIPE DE PITOMETRIA (AGENTE

DE MEDICAO)hora 22,17 29,41 35,58 47,20 38,94 51,66 37,16 49,30 37,47 49,71

980812 PLANTAO OPERACIONAL AOS SABADOS POR EQUIPE DE PITOMETRIA (TEC. INSTRUMENTISTA) hora 24,95 33,10 40,04 53,12 43,83 58,14 41,81 55,47 42,17 55,94

980813PLANTAO OPERACIONAL AOS DOMINGOS OU FERIADOS POR EQUIPE DE PITOMETRIA (TEC.

INSTRUMENTISTA)hora 30,83 40,90 49,47 65,63 54,14 71,82 51,65 68,52 52,10 69,12

980814 PLANTAO OPERACIONAL ATE DUAS 2 HORAS NOTURNAS POR MONITOR DE SERVICO hora 24,08 31,94 38,64 51,26 42,29 56,10 40,35 53,53 40,70 53,99

980815 PLANTAO OPERACIONAL AOS SABADOS POR MONITOR DE SERVICO hora 19,48 25,84 31,27 41,48 34,22 45,40 32,65 43,31 32,93 43,68

980816 PLANTAO OPERACIONAL AOS DOMINGOS E/OU FERIADOS POR MONITOR DE SERVICO hora 24,07 31,93 38,62 51,23 42,27 56,08 40,33 53,50 40,67 53,95

980817 PLANTAO OPERACIONAL ATE DUAS 2 HORAS NOTURNAS POR MOTORISTA hora 21,03 27,90 33,75 44,77 36,95 49,02 35,24 46,75 35,55 47,16

980818 PLANTAO OPERACIONAL AOS SABADOS POR MOTORISTA hora 17,02 22,58 27,31 36,23 29,89 39,65 28,52 37,83 28,77 38,17

980819 PLANTAO OPERACIONAL AOS DOMINGOS E/OU FERIADOS POR MOTORISTA hora 21,03 27,90 33,75 44,77 36,94 49,00 35,24 46,75 35,54 47,15

980820 PLANTAO OPERACIONAL ATE DUAS HORAS NOTURNAS POR TECNICO OPERACIONAL hora 30,83 40,90 49,48 65,64 54,15 71,84 51,66 68,53 52,11 69,13

980821 PLANTAO OPERACIONAL AOS SABADOS POR TECNICO OPERACIONAL hora 24,95 33,10 40,04 53,12 43,83 58,14 41,81 55,47 42,17 55,94

980822 PLANTAO OPERACIONAL AOS DOMINGOS E/OU FERIADOS POR TECNICO OPERACIONAL hora 30,83 40,90 49,47 65,63 54,14 71,82 51,65 68,52 52,10 69,12

980823PLANTAO DE APOIO OPERACIONAL PARA PESQUISA DE BY-PASS E RAMAL CLANDESTINO AOS

DOMINGOS E /OU FERIADOS (AGENTE DE MEDICAO)hora 22,17 29,41 35,58 47,20 38,94 51,66 37,16 49,30 37,47 49,71

980824PLANTAO DE APOIO OPERACIONAL PARA PESQUISA DE BY-PASS E RAMAL CLANDESTINO AOS

DOMINGOS E /OU FERIADOS (TECNICO)hora 30,83 40,90 49,47 65,63 54,14 71,82 51,65 68,52 52,10 69,12

980825PLANTAO DE APOIO OPERACIONAL PARA PESQUISA DE BY-PASS E RAMAL CLANDESTINO AOS

SABADOS (AGENTE DE MEDICAO)hora 17,95 23,81 28,81 38,22 31,53 41,83 30,08 39,90 30,34 40,25

980826PLANTAO DE APOIO OPERACIONAL PARA PESQUISA DE BY-PASS E RAMAL CLANDESTINO AOS

SABADOS (TECNICO)hora 24,95 33,10 40,04 53,12 43,83 58,14 41,81 55,47 42,17 55,94

980827PLANTAO DE APOIO OPERACIONAL PARA PESQUISA DE BY-PASS E RAMAL CLANDESTINO ATE

DUAS HORAS NOTURNAS (AGENTE DE MEDICAO)hora 22,19 29,44 35,60 47,23 38,98 51,71 37,18 49,32 37,51 49,76

Página: 59 de 59