Top Banner
Summer Plan: 2013 Summer Plan: 2013 (1 st March – 31 st May) Prepared by Mr. Mahadev, Chief General Manager, Operations Approved by Managing Director 21 st , February, 2013. Bangalore Electricity Supply Company Limited
15

Summer Plan: 2013 Summer Plan: 2013 (1 st March – 31 st May) Prepared by Mr. Mahadev, Chief General Manager, Operations Approved by Managing Director 21.

Dec 24, 2015

Download

Documents

Brendan Austin
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Summer Plan: 2013 Summer Plan: 2013 (1 st March – 31 st May) Prepared by Mr. Mahadev, Chief General Manager, Operations Approved by Managing Director 21.

Summer Plan: 2013Summer Plan: 2013(1st March – 31st May)

Prepared by

Mr. Mahadev, Chief General Manager, Operations

Approved by

Managing Director

21st, February, 2013.

Bangalore Electricity Supply Company Limited

Page 2: Summer Plan: 2013 Summer Plan: 2013 (1 st March – 31 st May) Prepared by Mr. Mahadev, Chief General Manager, Operations Approved by Managing Director 21.

BESCOM ProfileBESCOM Profile Bangalore Electricity Supply Company Limited (BESCOM) is Power

Distribution Utility distributing electricity across 8 districts viz.,

Population Base : 2.07 Cr

Consumer Base : 79 Lakhs

Districts

Peak Load

Requirement (MW)

Energy

Requirement (MU )

Bangalore Urban 2100 41

Bangalore Rural 365 7.13

Ramanagar 100 1.95

Kolar 275 5.37

Chikkaballapura 245 4.78

Tumkur 495 9.66

Chitradurga 230 4.49

Davanagere 290 5.66

Page 3: Summer Plan: 2013 Summer Plan: 2013 (1 st March – 31 st May) Prepared by Mr. Mahadev, Chief General Manager, Operations Approved by Managing Director 21.

Demand & Supply (2011-2013)

Page 4: Summer Plan: 2013 Summer Plan: 2013 (1 st March – 31 st May) Prepared by Mr. Mahadev, Chief General Manager, Operations Approved by Managing Director 21.

Energy Consumption(2011-2013)

Page 5: Summer Plan: 2013 Summer Plan: 2013 (1 st March – 31 st May) Prepared by Mr. Mahadev, Chief General Manager, Operations Approved by Managing Director 21.

Energy Consumption (2011-2013)

For 2012-13 : Initially proposed by BESCOM: 32,193 MUs.

Approved by KERC: 31,305 MUs.

Consumption till date(17th Feb-2013) : 24,576 MUs.

Balance Upto end of March-2013 : 6,729 Mus(Adequate).

Page 6: Summer Plan: 2013 Summer Plan: 2013 (1 st March – 31 st May) Prepared by Mr. Mahadev, Chief General Manager, Operations Approved by Managing Director 21.

Reasons for Shortages / Gap

1.Low Wind Energy Generation : means no ‘reserve’ available

2. Unforeseen shut downs of thermal generating units at RTPS (Raichur) : 150 MW

3.10 % Unforeseen shutdowns in CGS (Central Generating Station) share to the state : 150 MW

Total Shortage of Load Expected : 300 MW

Page 7: Summer Plan: 2013 Summer Plan: 2013 (1 st March – 31 st May) Prepared by Mr. Mahadev, Chief General Manager, Operations Approved by Managing Director 21.

How BESCOM will close the GAP ?

1. Strict measures to stop illegal conversion of Single Phase to 3 Phase

by IP Set owners and excess consumption [Open Delta] : 210 MW

2. Vigilance Activities : 60 MW

3. Shifting of Peak Load : 30 MW ( From 6 PM to 9 PM to beyond 9 PM)

Page 8: Summer Plan: 2013 Summer Plan: 2013 (1 st March – 31 st May) Prepared by Mr. Mahadev, Chief General Manager, Operations Approved by Managing Director 21.

Open Delta System

1. Open Delta System is a scheme which avoids illegal use of power

supply to IP Sets. Thus there won’t be overloads or excess drawl

from the network.

2. Effective Implementation saves 210 MW

Page 9: Summer Plan: 2013 Summer Plan: 2013 (1 st March – 31 st May) Prepared by Mr. Mahadev, Chief General Manager, Operations Approved by Managing Director 21.

Open Delta Configuration

Page 10: Summer Plan: 2013 Summer Plan: 2013 (1 st March – 31 st May) Prepared by Mr. Mahadev, Chief General Manager, Operations Approved by Managing Director 21.

Vigilance Activities : 60 MW

1. Strengthening of BESCOM Vigilance network by providing 30

additional vehicles & staff .

2. Extra Vigilance during peak hours and at night : to have check

on illegal welding, lights, theft etc.,

3. Both Special Vigilance Team & BESCOM Officers will be on

strict vigil. Expected to do : 1500 inspections / Everyday.

Page 11: Summer Plan: 2013 Summer Plan: 2013 (1 st March – 31 st May) Prepared by Mr. Mahadev, Chief General Manager, Operations Approved by Managing Director 21.

Load Shifting : 30 MW

1. BESCOM would request consumers to shift the use of major

loads like Water pumps, Geysers etc., from peak to non- peak

hours ( after 10 PM)

2. BESCOMs brand ambassador Sri. Upendra will promote

Conservation, and load shifting activities like above

Page 12: Summer Plan: 2013 Summer Plan: 2013 (1 st March – 31 st May) Prepared by Mr. Mahadev, Chief General Manager, Operations Approved by Managing Director 21.

Rural Power Supply Schedule during summer8 SLOTS of 3 HRS DURATION

Batches 6 am - 9 am

9 am - 12 noon

12 noon - 3 pm

3 pm - 6 pm

6 pm - 9 pm

9 pm - 12 am

12 am - 3 am

3 am - 6 am

B1 Single Phase

3 Phase OFF OFF Open

Delta 3

PhaseSingle Phase

Single Phase

B2 Single Phase OFF 3

Phase OFF Open Delta

Single Phase

3 Phase

Single Phase

B3 Single Phase OFF OFF 3

Phase Open Delta

Single Phase

Single Phase

3 Phase

3 Phase : 3 Phase Power Supply Batches B1,B2, B3 will not have same timings,

the batches will be intimated by issuing

pamphlets.

Single Phase: Single Phase Power Supply

Open Delta: Open Delta Power supplyOFF : No Power Supply

Page 13: Summer Plan: 2013 Summer Plan: 2013 (1 st March – 31 st May) Prepared by Mr. Mahadev, Chief General Manager, Operations Approved by Managing Director 21.

Reduction in Power Outages in past 5 years

Page 14: Summer Plan: 2013 Summer Plan: 2013 (1 st March – 31 st May) Prepared by Mr. Mahadev, Chief General Manager, Operations Approved by Managing Director 21.

In Case of any grievances ! Reach us

1. Online Complaint Registration

Log onto www.bescomhelpline.com to register your complaint

2. 24×7 SMS Facility

Just type BESCOM <Space> Subdivision code<space> nature of

complaint and send it to 92431 50000

3. 24×7 Helpline

Call to BESCOMs 24X7 Customer Helpline (080-22873333)-(25 lines are

there)

Page 15: Summer Plan: 2013 Summer Plan: 2013 (1 st March – 31 st May) Prepared by Mr. Mahadev, Chief General Manager, Operations Approved by Managing Director 21.

Thank You