Bangalore Electricity Supply Company Limited. Summer Plan: 2013 (1 st March – 31 st May). Prepared by Mr. Mahadev , Chief General Manager, Operations Approved by Managing Director 21 st , February, 2013. BESCOM Profile. - PowerPoint PPT Presentation

  • Summer Plan: 2013(1st March 31st May)Prepared byMr. Mahadev, Chief General Manager, Operations

    Approved byManaging Director

    21st, February, 2013.

    Bangalore Electricity Supply Company Limited

  • BESCOM Profile Bangalore Electricity Supply Company Limited (BESCOM) is Power Distribution Utility distributing electricity across 8 districts viz.,

    Population Base : 2.07 Cr Consumer Base : 79 Lakhs

    DistrictsPeak Load Requirement (MW)Energy Requirement (MU )Bangalore Urban210041Bangalore Rural3657.13Ramanagar1001.95Kolar2755.37Chikkaballapura2454.78Tumkur4959.66Chitradurga2304.49Davanagere2905.66

  • Demand & Supply (2011-2013)

  • Energy Consumption(2011-2013)

  • Energy Consumption (2011-2013)For 2012-13 : Initially proposed by BESCOM: 32,193 MUs. Approved by KERC: 31,305 MUs. Consumption till date(17th Feb-2013) : 24,576 MUs. Balance Upto end of March-2013 : 6,729 Mus(Adequate).

  • Reasons for Shortages / Gap 1.Low Wind Energy Generation : means no reserve available

    2. Unforeseen shut downs of thermal generating units at RTPS (Raichur) : 150 MW 3.10 % Unforeseen shutdowns in CGS (Central Generating Station) share to the state : 150 MW Total Shortage of Load Expected : 300 MW

  • How BESCOM will close the GAP ?

    1. Strict measures to stop illegal conversion of Single Phase to 3 Phase by IP Set owners and excess consumption [Open Delta] : 210 MW

    2. Vigilance Activities : 60 MW

    3. Shifting of Peak Load : 30 MW ( From 6 PM to 9 PM to beyond 9 PM)

  • Open Delta System

    1. Open Delta System is a scheme which avoids illegal use of power supply to IP Sets. Thus there wont be overloads or excess drawl from the network.

    2. Effective Implementation saves 210 MW

  • Open Delta Configuration

  • Vigilance Activities : 60 MW

    1. Strengthening of BESCOM Vigilance network by providing 30 additional vehicles & staff .

    2. Extra Vigilance during peak hours and at night : to have check on illegal welding, lights, theft etc.,

    3. Both Special Vigilance Team & BESCOM Officers will be on strict vigil. Expected to do : 1500 inspections / Everyday.

  • Load Shifting : 30 MW

    1. BESCOM would request consumers to shift the use of major loads like Water pumps, Geysers etc., from peak to non- peak hours ( after 10 PM)

    2. BESCOMs brand ambassador will promote Conservation, and load shifting activities like above

  • Rural Power Supply Schedule during summer8 SLOTS of 3 HRS DURATION Batches6 am - 9 am9 am - 12 noon12 noon - 3 pm3 pm - 6 pm6 pm - 9 pm9 pm - 12 am12 am - 3 am3 am - 6 amB1Single Phase3 PhaseOFFOFF Open Delta 3 PhaseSingle PhaseSingle PhaseB2Single PhaseOFF3 PhaseOFF Open Delta Single Phase3 PhaseSingle PhaseB3Single PhaseOFFOFF3 Phase Open Delta Single PhaseSingle Phase3 Phase

    3 Phase : 3 Phase Power Supply Batches B1,B2, B3 will not have same timings, the batches will be intimated by issuing pamphlets. Single Phase: Single Phase Power Supply Open Delta: Open Delta Power supplyOFF : No Power Supply

  • Reduction in Power Outages in past 5 years