MGNREGS-JOB CARD POSITION
3814 4354
11603
19771
SC ST OTHERS TOTAL
MGNREGS-INCREASE IN LABOUR ENGAGEMENT
1250
3498
42654612
4045
3678
2068
1485
MGNREGS-INVOLVEMENT OF HOUSEHOLDS
2645
3787
43534597
48415203
5665
6503
11/1
/201
0
27/0
1/10
7/2/
2010
12/2
/201
0
18/0
2/10
9/3/
2010
26/0
3/10
31/0
3/10
MGNREGS-HOUSEHOLD ENGAGED
19771
6503
JOB CARD ISSUED HOUSEHOLD ENGAGED
32%
MGNREGS-INCREASE OF MANDAYS GENERATION
89221
126911
150783162259
173735
197525
240846
293387
MGNREGS-GENERATION OF MANDAYS BY SC/ST/WOMEN
45421
93606
293387
124740
SC ST TOTAL WOMEN
MGNREGS-INCREASE IN COMPLETION OF 100 DAYS
The rapid increase in 100 days completed families shows the effect of Project Initiation Meeting
72132
190 222254
353
617
1004
MGNREGS-INCREASE IN FINANCIAL EXPENDITURE
172.96189.04
212.54222.59
233.73
268.63
313.6
405.69
MGNREGS-WAGE NON-WAGE
Wage Non-Wage:The aspect of generating unskilled employment is maintained.
WAGE, 289.84936, 73%
NON WAGE, 109.72169, 27%
(MS rod for BNRGSK, Royalty, Gaon Sathi, PP etc)
MGNREGS-TYPES OF WORK TAKEN UP
WC(TANKS & FARM PONDS)
29581%
RURAL CONNECTIVITY
6819%
MGNREGS-PROJECT INITIATION
A step to Generate demand for work:Project initiation meeting motivating the job seekers
MGNREGS-PROJECT INITIATION
A step to Generate demand for work:Project initiation meeting motivating the job seekers
MGNREGS-PROJECT INITIATION
A step to Generate demand for work:Project initiation meeting motivating the job seekers
MGNREGS-WORK AT SITE
Execution of WC projects:Water Conservation projects provides a large employment to the job seekers
MGNREGS-WORKSITE FACILITIES
Worksite Facility:Providing Drinking Water Facility at work site as well as engagement of disable person in MGNREGS
MGNREGS-WORKSITE FACILITIES
Worksite Facility:Providing Drinking Water Facility at work site as well as engagement of old aged women in MGNREGS
MGNREGS-WORKSITE FACILITIES
Worksite Facility:Labourers taking rest in a Rest Shed provided at work site
MGNREGS-MEDICAL FACILITY
Medical Facility:Medical treatment of one labour injured during execution of MGNREGS project
MGNREGS-INSPECTION BY AUTHORITIES
Worksite Inspection by District Authorities:PD, DRDA interacting with the labourers and villagers at work site
MGNREGS-INSPECTION BY AUTHORITIES
Worksite Inspection by District Authorities:Collector & PD, Bolangir verifying the job cards at work site
MGNREGS-INSPECTION BY AUTHORITIES
Worksite Inspection by SLM:State Level Monitor interacting with labourers at work site
MGNREGS-SUCCESS STORY
Successful MGNREGS projects:Successful WC project at village Binekela
MGNREGS-SUCCESS STORY
Successful MGNREGS projects:Successful RC project connecting Diaton to Semiapada village
CONVERGENCE
Convergence of NREGS with TFC:A CC road at village Burdipadar.
CONVERGENCE
Convergence of NREGS with TFC:Work in progress of CC road at village Sirekela
Thank You All ……..
MGNREGS:Titilagarh Block of District Bolangir under the state of Orissa is in a step to generate unskilled employment as well as durable assets under MGNREGS…..