Sub-Synchronous Oscillations* ERCOT Comments on NPRR 562 Jonathan Rose Resource Integration Department April, 2014 * Sub-Synchronous Resonance is more precisely called Sub-Synchronous Oscillations.
13

Sub-Synchronous Oscillations* ERCOT Comments on NPRR 562 Jonathan Rose Resource Integration Department April, 2014 * Sub-Synchronous Resonance is more.

Apr 01, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Sub-Synchronous Oscillations* ERCOT Comments on NPRR 562 Jonathan Rose Resource Integration Department April, 2014 * Sub-Synchronous Resonance is more.

Sub-Synchronous Oscillations*ERCOT Comments on NPRR 562

Jonathan RoseResource Integration Department April, 2014

* Sub-Synchronous Resonance is more precisely called Sub-Synchronous Oscillations.

Page 2: Sub-Synchronous Oscillations* ERCOT Comments on NPRR 562 Jonathan Rose Resource Integration Department April, 2014 * Sub-Synchronous Resonance is more.

2

Presentation Overview

• This presentation covers…

– Why ERCOT is proposing changes to NPRR562– Better data has allowed a RELAXATION in the

requirements.– The need for PROTECTION.

Page 3: Sub-Synchronous Oscillations* ERCOT Comments on NPRR 562 Jonathan Rose Resource Integration Department April, 2014 * Sub-Synchronous Resonance is more.

3

Reason for Change

• ERCOT has received additional data– Detailed outage records from Oncor and AEP show:

• Duration of outages is LESS than originally assumed.• Double circuit outages are LESS frequent than originally

assumed.

• A modest relaxation in requirements is possible.

Page 4: Sub-Synchronous Oscillations* ERCOT Comments on NPRR 562 Jonathan Rose Resource Integration Department April, 2014 * Sub-Synchronous Resonance is more.

4

• The data indicated a typical 345 kV line experienced an outage…

• Only 15% of outages on double circuit lines involve both circuits concurrently.– Thus double circuit concurrent outages have a significantly lower

probability than single circuit outages.

Outage Statistics

Type Outage Frequency (Times / year)

Outage Duration (Hours/Outage)

Single Circuit 3.0 54

Concurrent Double Circuit

0.3 56

Concurrent Double Circuit Outage – An overlapping outage such that there is a point in time when both circuits of a double circuit line are outaged together.

Page 5: Sub-Synchronous Oscillations* ERCOT Comments on NPRR 562 Jonathan Rose Resource Integration Department April, 2014 * Sub-Synchronous Resonance is more.

5

• Mitigation: Redesign of system to prevent SSO.– Enables generator to operate normally even under elevated

transmission outages.

• Protection: Switching action to avoid impending damage.– Result in generator tripping, transmission bypass, etc.

• Outage Coordination: ERCOT avoids at-risk combinations when scheduling outages.

• Detailed Study: Determines SSO risk.

• SSO Screening Study: Estimates SSO risk.

NPRR 562: Types of Action

Incr

easi

ng

Act

ion

Page 6: Sub-Synchronous Oscillations* ERCOT Comments on NPRR 562 Jonathan Rose Resource Integration Department April, 2014 * Sub-Synchronous Resonance is more.

6

• Action commensurate with risk.

• Risk gauged by likelihood of occurring(number of simultaneous transmission outages).

• Mitigation

• Protection

• Outage Coordination

• Detailed Study

• Screening Study

NPRR 562: Risk and ActionIn

crea

sin

g R

isk

Incr

easi

ng

Act

ion

Page 7: Sub-Synchronous Oscillations* ERCOT Comments on NPRR 562 Jonathan Rose Resource Integration Department April, 2014 * Sub-Synchronous Resonance is more.

7

1. First, a study is performed.

2. Then, action considered.

NPRR 562: Risk and Action

Detailed StudyScreening Study

Incr

easi

ng

Ris

k In

crea

sin

g A

ctio

n

MitigationProtectionOutage Coordination

• Generator with very high risk situation may require MITIGATION, PROTECTION*, and OUTAGE COORD.

• Generator with high risk situation may require PROTECTION and OUTAGE COORD.

• Generator with moderate risk may require only OUTAGE COORD.

• A screening study which estimates only a slight risk might only require a detailed study to confirm.

*If mitigation is deemed fully effective, then protection would not be required.

Page 8: Sub-Synchronous Oscillations* ERCOT Comments on NPRR 562 Jonathan Rose Resource Integration Department April, 2014 * Sub-Synchronous Resonance is more.

8

Original Proposed Action

N-0 to N-5 (10 ckts) 0 – 6 ckts Detailed study.

N-4 to N-5 (10 ckts) 4 – 6 ckts ERCOT outage coordination procedures.

-- 4 ckts Protection required.

N-0 to N-3 (6 ckts) 0 – 3 ckts Mitigation required.*

Proposed Changes to NPRR

• Originally, double-circuits count as one simultaneous outage.• NOW, circuits counted individually. Double-circuits count as two simultaneous outages. For example, a gen 4 circuits away from SSO would require protection. Four and five double circuits no longer considered credible scenario.

• NOW, protection is mandatory in some cases.• Because ERCOT is proposing to substantially relax requirements, we would like a

layer of protection in the marginal (4 ckts) risk level.

* If mitigation not fully effective, then protection also required.

Page 9: Sub-Synchronous Oscillations* ERCOT Comments on NPRR 562 Jonathan Rose Resource Integration Department April, 2014 * Sub-Synchronous Resonance is more.

Probabilities

The role of probabilities is to guide us when we don’t have good intuition.

12 transmission outages to reach SSO safe to ignore.

4 transmission outages to reach SSO

2 transmission outages to reach SSO action required!!!

Page 10: Sub-Synchronous Oscillations* ERCOT Comments on NPRR 562 Jonathan Rose Resource Integration Department April, 2014 * Sub-Synchronous Resonance is more.

10

• Risk gauged by probabilities.

• Probabilities that a given set of n (single circuit) lines have overlapping outages.– In a year…

– Once in 50 years at any of 20* units…

Numerical Analysis

1 2 3 4 5 6

90% 10% 0.2% 0.005% 0.0001% 2e-6%

Probability of Simultaneous Outages

1 2 3 4 5 6

100% 100% 90% 4.8% 0.1% 0.002%

Probability of Simultaneous Outages

The lower table should be used for ERCOT policy decisions, because policy impacts multiple units over their lifetime.

Notice these probabilities are very

small. The probability of a particular set of 5 transmission lines experiencing a concurrent outage is

very small.

Notice these probabilities are very

small. The probability of a particular set of 5 transmission lines experiencing a concurrent outage is

very small.

Page 11: Sub-Synchronous Oscillations* ERCOT Comments on NPRR 562 Jonathan Rose Resource Integration Department April, 2014 * Sub-Synchronous Resonance is more.

11

Risk versus Action

1 2 3 4 5 6

100% 100% 90% 4.8% 0.1% 0.002%

Probability of Simultaneous Outages

Unlikely no action required beyond a detailed study. ERCOT will perform outage coordination just in case.

Possible Protection required.Possible Protection required.

Likely to occur Mitigation required.Likely to occur Mitigation required.

Note overlapping layers of precaution.

Mitigation may be used in lieu of protection. If mitigation were applied and shown to successfully eliminate risk, then protection would not be required.

Page 12: Sub-Synchronous Oscillations* ERCOT Comments on NPRR 562 Jonathan Rose Resource Integration Department April, 2014 * Sub-Synchronous Resonance is more.

12

• Only 15% of outages on double circuit lines involve both circuits.– A double circuit outage is far less likely than a single circuit outage.

Single versus Double circuits

0 1 2 3 4 5 60 100.000% 100.000% 100.000% 90.439% 4.804% 0.101% 0.002%1 100.000% 99.999% 21.956% 0.519% 0.011% 0.000%2 71.657% 2.584% 0.055% 0.001% 0.000%3 0.302% 0.006% 0.000% 0.000%4 0.001% 0.000% 0.000%5 0.000%

Singles

Do

ub

les

Probability of Occurrence at Least once in 50 yrs*

* At 20 vulnerable units.

Probability of two double circuit outages occurring simultaneously is in-between the probability of three singles

occurring and four singles occurring. May be possible to simply and just talk about “circuits.”

Probability of two double circuit outages occurring simultaneously is in-between the probability of three singles

occurring and four singles occurring. May be possible to simply and just talk about “circuits.”

Page 13: Sub-Synchronous Oscillations* ERCOT Comments on NPRR 562 Jonathan Rose Resource Integration Department April, 2014 * Sub-Synchronous Resonance is more.

13

Presentation Summary

• This presentation covered…

– Why ERCOT is proposing changes to NPRR562– Better data has allowed a RELAXATION in the

requirements.– The need for PROTECTION.