Top Banner
Steven C. Braun, P.E. Steven C. Braun, P.E. Senior Project Manager Senior Project Manager
54

Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

Dec 26, 2015

Download

Documents

Kellie Anderson
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

Steven C. Braun, P.E.Steven C. Braun, P.E.Senior Project ManagerSenior Project Manager

Page 2: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor

This LPA was adopted by Broward County and approved by FHWA

The “corridor” LPA is advancing through two separate projects:

Page 3: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

Project LimitsProject Limits

To Naples

To Naples

To Port Everglades/

Airport

To Port Everglades/

Airport

To Miami

To Miami

Project LimitsProject Limits

Page 4: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

The Planning The Planning ““Vision” for I-595Vision” for I-595

Transit Facility

Reversible Lanes

Ramp Braid

Page 5: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

Project NeedProject Need

• Broward County has been one of the fastest growing urban areas in the US

• Only east-west expressway in Broward County• Strategic Intermodal Corridor• Existing AADT >180,000 vpd• 2034 AADT >300,000 vpd

Page 6: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

• District 4 SIS – Growth Management Priority

• Truly Multi-Modal Corridor I-75 & Sawgrass Expressway I-95 & Florida’s Turnpike Fort Lauderdale-Hollywood International Airport Port Everglades Connection to Tri-Rail and Amtrak Proposed Transit Facility Broward County Greenway

Strategic Strategic Intermodal CorridorIntermodal Corridor

Page 7: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

Key ComponentsKey Components

• Transit Facility

• Highway Improvements Reversible Lanes Ramp Braids Turnpike Interchange CD (Collector-Distributor) System SR 84 Continuous Connection Auxiliary Lanes

Page 8: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

PD&E Study PD&E Study

• Unique project due to complexity and integration with other projects

• Overall project cost >$1 Billion• High profile project with interest by many

agencies, municipalities, residential communities and businesses

• Priority corridor for roadway and transit improvements

Page 9: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

The I-595 SystemThe I-595 System

ReversibleLanes

C-D System

Transit System

Davie Rd.University Dr.

Pine Island Rd.Nob Hill Rd.Hiatus Rd.

Flamingo Rd.136th Ave.

Sawgrass Mills /Bank Atlantic Center

SR 84SR 7

Florida'sTurnpike

To Downtown Ft. Lauderdale

Florida'sTurnpike

I-595 GPLanes

To Port / Airport

75

Saw

gras

s Ex

pres

sway

/ In

ters

tate

75

Page 10: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

PD&E Study Functions PD&E Study Functions & Goals& Goals

• Maintain Consistency with the LPA • Minimize overall project impacts • Develop a project that can be implemented

• Build Consensus • Maintain project schedule

•Advance corridor improvements•Phases of project funded

Page 11: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

• Priority project• High profile complex project

– Public Understanding– Design Decisions

• Early validation of project alternatives• Public expectations

Why Invest in Why Invest in 3D Visualization?3D Visualization?

Page 12: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

• Obtain (and maintain) buy-in from: Management Stakeholders Agencies Team members

Why Invest in Why Invest in 3D Visualization?3D Visualization?

Page 13: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

12-mile Corridor Focus Areas

•Cost & Schedule•Developed one section of the corridor

Different AlternativesElevated Reversible LanesTransit LocationRamp BraidsCommunity Concerns (Location, Noise, Visual)

Turnpike Interchange

Development Development of 3D Visualizationof 3D Visualization

Page 14: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

Elevated Elevated Reversible Reversible Lanes ????Lanes ????

Oh, Okay … Oh, Okay … Elevated Elevated

Reversible Reversible LanesLanes ! !

Page 15: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

What is a “Braided What is a “Braided Ramp” ??Ramp” ??

Page 16: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

No, seriously … No, seriously … what is a “Braided what is a “Braided

Ramp” ??Ramp” ??

Page 17: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

Braided RampsBraided Ramps

Page 18: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

Public HearingPublic Hearing

Page 19: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

REV

I-595 EBI-595 WB

AUX AUXGENERALPURPOSE

SR 84WB

SR 84EB

PROPOSEDTRANSIT

GENERALPURPOSE

CONCRETESIDEWALK

REV

I-595 EBI-595 WB

AUX AUXGENERALPURPOSE

SR 84WB

SR 84EB

PROPOSEDTRANSIT

GENERALPURPOSE

CONCRETESIDEWALK

Master Plan’s LPAMaster Plan’s LPA

Page 20: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

REVERSIBLE LANES

I-595 EBI-595 WB

AUX AUXGENERALPURPOSE

SR 84WB

SR 84EBGENERAL

PURPOSE

CONCRETE SIDEWALK

PROPOSEDTRANSITOR AUXLANES

PD&E PD&E Preferred AlternativePreferred Alternative

Page 21: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

The ResultsThe Results

• Improved deliverable from the PD&E process

• Better Integration of Transit Improvements

• Helped identify the best use of existing right of way for both roadway and transit

• Helped create a shared vision

• Helped “visualize” the vision

Page 22: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

The ResultsThe Results

• Gained consensus

• Project is being advanced

• Better understanding of proposed improvements

• Ownership of the PD&E alternative’s geometry = No major re-design

• Selection of THE Preferred Alternative

• BEAT the original aggressive

project schedule!

Page 23: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

Use the 3D Visualization as a Tool …

• 3D Visualization at Key Milestones

• Project Website

• Future Public Meetings

• Agency Coordination

• Value Engineering / Design Review

• Incorporate Data

(GIS, Environment, Traffic, Land Use, Public Comments)

Future Future Opportunities?Opportunities?

Page 24: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

Future Future Opportunities?Opportunities?

Develop a Project that can be Implemented • Constructability Review• Review key decisions• Facilitate a “seamless” transition to Final Design • Develop the phasing of multiple design/construction

packages• Build onto the 3D Model

• Review & evaluate constructability, compatibility and MOT between adjacent projects

Page 25: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

Steven C. Braun, P.E.Senior Project Manager

Page 26: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.
Page 27: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY

• Martin County MPO’s #1 Priority

• Engineering & Environmental Analysis

• New Bridge Crossing on a New Alignment

• Connecting Palm City with the City of Stuart

• Alternate Route to SR 714 & the Palm City Bridge

• Widen Existing Local Roads

• Environmental Impact Statement (EIS)

• Cost Estimate: $200 Million

Page 28: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.
Page 29: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

Kanner Highway Intersection

Environmentally Sensitive Area

Palm City Bridge

Palm City Residential Community

CR 714

Indian Street

SR 714

Proposed Bridge

Page 30: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

PUBLIC INVOLVEMENT

• Community Assessment Task Team (CATT)

• Agency & Stakeholder Workshops

• Continuous Public Involvement

• Exchange Information Build Consensus

• Community Characteristics Inventory & Database

Page 31: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

CATT MEETINGS WITH STAKEHOLER GROUPS

Regulatory Agencies Community Associations Local Government Community Services Emergency Services

Page 32: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.
Page 33: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

3D VISUALIZATION

Justification Public Interest and Expectations

• Participation in the process

• Understand the alignment alternatives

• Martin County MPO’s #1 Priority

3D Model = Database

• Design / Permitting

• Construction

Page 34: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

3D VISUALIZATION

Implementation “In-house” Project “Hybrid” Project

Consultant Support

District 4 Commitment

• Management Support

• High Profile Project

• Understanding of the Benefits

Page 35: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

3D VISUALIZATION

Development 4-mile Corridor

Key Areas to Reference (“Landmarks”)

Different Alternatives

Grade Separation

“Phased Development” for the Public

Page 36: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

Interactive Stations:• Typical Sections• Alignment Alternatives• Evaluation Matrices• 3D Visualization

PUBLIC WORKSHOPS

Page 37: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

3D Visualization …Allowed people to have a better understanding of the project, visualize the alternatives & make constructive comments.

PUBLIC WORKSHOPS

Page 38: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

Please show me the Please show me the difference between difference between the alternatives…the alternatives…

Page 39: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

ALIGNMENT ALTERNATIVES

Page 40: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

Alternative 2A

Page 41: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

Alternative 2B

Page 42: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

Alternative 2C

Page 43: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.
Page 44: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.
Page 45: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.
Page 46: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

What is a What is a ““Grade Grade

Separation” ??Separation” ??

Page 47: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.
Page 48: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

What will the What will the intersection intersection look like??look like??

Page 49: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.
Page 50: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

What is the What is the bridge going to bridge going to

look like from my look like from my patio??patio??

Page 51: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

PUBLIC HEARING

870 Attendees …

… 1600 comments received within the Public Hearing comment period

Page 52: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

• Open Workshop• 3D Visualization • Video Presentation

PUBLIC HEARING

Page 53: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

This was worth This was worth the the investmentinvestment, , good job CATTgood job CATT!!

Page 54: Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.

Thank You