Top Banner
Schindler Corporate R&D From a centralized development to a Lead Development Center and its decentralized development center Ph. Henneau VP Head R&D-ESE (Elevator System Engineering) © Schindler Apr 2013 | Ph. Henneau | Swiss-VPE 24 Apr 2013
29

Schindler Corporate R&D - vpe-swiss.ch · People moving People Schindler transports 1’000’000’000 people every day with 1’000’000 elevators & escalators 44’000 employees

Jul 04, 2018

Download

Documents

phungliem
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Schindler Corporate R&D - vpe-swiss.ch · People moving People Schindler transports 1’000’000’000 people every day with 1’000’000 elevators & escalators 44’000 employees

Schindler Corporate R&D From a centralized development to a Lead Development Center and its decentralized development center Ph. Henneau VP Head R&D-ESE (Elevator System Engineering)

© Schindler Apr 2013 | Ph. Henneau | Swiss-VPE 24 Apr 2013

Page 2: Schindler Corporate R&D - vpe-swiss.ch · People moving People Schindler transports 1’000’000’000 people every day with 1’000’000 elevators & escalators 44’000 employees

People moving People

Schindler transports 1’000’000’000 people every day with 1’000’000 elevators & escalators 44’000 employees passionate in over 100 countries!

© Schindler Apr 2013 | Ph. Henneau | Swiss-VPE 24 Apr 2013

Page 3: Schindler Corporate R&D - vpe-swiss.ch · People moving People Schindler transports 1’000’000’000 people every day with 1’000’000 elevators & escalators 44’000 employees

Our product is Mobility Product lines Hotels Office buildings Hospitals Airports

Factories Ships Residential buildings Shopping malls

© Schindler Apr 2013 | Ph. Henneau | Swiss-VPE 24 Apr 2013

Page 4: Schindler Corporate R&D - vpe-swiss.ch · People moving People Schindler transports 1’000’000’000 people every day with 1’000’000 elevators & escalators 44’000 employees

CRD-ESE Organization Head Elevator System Engineering (ESE)

Objectives: develop a lead development center in CH and deploy it in AP & IN

© Schindler Apr 2013 | Ph. Henneau | Swiss-VPE 24 Apr 2013

Page 5: Schindler Corporate R&D - vpe-swiss.ch · People moving People Schindler transports 1’000’000’000 people every day with 1’000’000 elevators & escalators 44’000 employees

Elevator System Engineering Trend Unit configuration (>=30 years ago)

Product Line (20 Years ago)

Platform (10 Years)

Each Unit drawn

Standardization: product line with standard layout for representatives, system mapping introduced

Complexity : global worldwide platform, leads to high number of variances. ! ,

© Schindler Apr 2013 | Ph. Henneau | Swiss-VPE 24 Apr 2013

Page 6: Schindler Corporate R&D - vpe-swiss.ch · People moving People Schindler transports 1’000’000’000 people every day with 1’000’000 elevators & escalators 44’000 employees

StakeholderRequirementsDefinition

RequirementsAnalysis

ArchitecturalDesign

Implementation

Integration

Verification

Qualification

Transition

Operation

Maintenance

Disposal

CO C4 C6 C8 C1O C3 C5

Parameters

INCOSE Mapping SE processes vs. PCP

© Schindler Apr 2013 | Ph. Henneau | Swiss-VPE 24 Apr 2013

Page 7: Schindler Corporate R&D - vpe-swiss.ch · People moving People Schindler transports 1’000’000’000 people every day with 1’000’000 elevators & escalators 44’000 employees

CRD-ESE Organization Step #1: Vision & Mission - Organization

“We develop the right elevator right, the first time” • The 'right elevator': fulfils the stakeholder requirements • The 'elevator right': we deliver a qualified system • The 'first time': limited number of development loops ESE relies on 2 pillars:

- ESE-SE shares and promotes system engineering practices within the CRD organization (Legislative)

- ESE-SD makes use of system engineering best practices to timely provide product lines deliverables to the SPM organization (Executive)

© Schindler Apr 2013 | Ph. Henneau | Swiss-VPE 24 Apr 2013

Page 8: Schindler Corporate R&D - vpe-swiss.ch · People moving People Schindler transports 1’000’000’000 people every day with 1’000’000 elevators & escalators 44’000 employees

Switzerland China India

ESE-SE ESE-SE

ESE-SE

ESE-SD E1 E2 E3 MOD

Mechanic

Electronic

Drive

Mechanic

Electronic

Mechanic

Electronic

ESE-SE = legislative 5 Pilars:

• MBSE • System calculation LBLC • Architecture (3D) • System fundamentals: SYBOK

• Requirement Eng. Specialty engineering: • Traction media • Energy efficiency ESE-SD = executive

• Dispo layout / rules • SAIS • BOM • LBLC content (mapping)

Lead Dev. Center CRD-ESE Roles of ESE – fully fledged R&D centers

Drive

Drive

ESE-SD E1 E2 E3 MOD

ESE-SD E1 E2 E3 MOD

Test

Test

Test

© Schindler Apr 2013 | Ph. Henneau | Swiss-VPE 24 Apr 2013

Page 9: Schindler Corporate R&D - vpe-swiss.ch · People moving People Schindler transports 1’000’000’000 people every day with 1’000’000 elevators & escalators 44’000 employees

© Schindler | Ph. Henneau

2.1 Requirements Engineering What’s and How’s

© Schindler Apr 2013 | Ph. Henneau | Swiss-VPE 24 Apr 2013

Page 10: Schindler Corporate R&D - vpe-swiss.ch · People moving People Schindler transports 1’000’000’000 people every day with 1’000’000 elevators & escalators 44’000 employees

2.1 Requirements Engineering What’s and How’s

© Schindler Apr 2013 | Ph. Henneau | Swiss-VPE 24 Apr 2013

Page 11: Schindler Corporate R&D - vpe-swiss.ch · People moving People Schindler transports 1’000’000’000 people every day with 1’000’000 elevators & escalators 44’000 employees

2.2 MBSE Simulation

All load factors simulated And …. Matched against measurements

MBSE is used to provide the sub-systems complete and correct component requirements.

© Schindler Apr 2013 | Ph. Henneau | Swiss-VPE 24 Apr 2013

Page 12: Schindler Corporate R&D - vpe-swiss.ch · People moving People Schindler transports 1’000’000’000 people every day with 1’000’000 elevators & escalators 44’000 employees

2.3 LBLC System Calculation under one roof

© Schindler Apr 2013 | Ph. Henneau | Swiss-VPE 24 Apr 2013

Page 13: Schindler Corporate R&D - vpe-swiss.ch · People moving People Schindler transports 1’000’000’000 people every day with 1’000’000 elevators & escalators 44’000 employees

© Schindler | Ph. Henneau

2.3 LBLC System Calculation under one roof

© Schindler Nov 2012 | Ph. Henneau | TdSE 9.Nov 2012

Page 14: Schindler Corporate R&D - vpe-swiss.ch · People moving People Schindler transports 1’000’000’000 people every day with 1’000’000 elevators & escalators 44’000 employees

2.4 Architectural design 3D Methodology

System parameters

Architecture modeling

Design

System Skeleton model

BS=1000 TS=1500…

Integration Component model

The skeleton models drives the elevator system parameters.

Parameter change triggers: design space adaptation and configuration of components at detail level

© Schindler Apr 2013 | Ph. Henneau | Swiss-VPE 24 Apr 2013

Page 15: Schindler Corporate R&D - vpe-swiss.ch · People moving People Schindler transports 1’000’000’000 people every day with 1’000’000 elevators & escalators 44’000 employees

2.4 Architectural design 3D Methodology

Top down approach Keep variance under control e-integration

© Schindler Apr 2013 | Ph. Henneau | Swiss-VPE 24 Apr 2013

Page 16: Schindler Corporate R&D - vpe-swiss.ch · People moving People Schindler transports 1’000’000’000 people every day with 1’000’000 elevators & escalators 44’000 employees

2.5 Knowledge management SYBOK: System Body of Knowledge

Elevator System Standards Calculation Tools Experts Knowledge

Volume 1 (green): GL – R&D Glossary Volume 2 (white) : SE – Systems Engineering Key Concepts & Processes Volume 3 (purple): CO – Concepts of Operations Volume 4 (yellow): DD – Design Directives Volume 5 (orange): SI – Simulation & Methodologies Volume 6 (blue): DI – Design Implementations (Best Practise)

Project SYBOK 1. Identification 2. Structuring 3. Revision 4. Consolidation

Systems Engineer, R&D global, AE engineers

© Schindler Apr 2013 | Ph. Henneau | Swiss-VPE 24 Apr 2013

Page 17: Schindler Corporate R&D - vpe-swiss.ch · People moving People Schindler transports 1’000’000’000 people every day with 1’000’000 elevators & escalators 44’000 employees

Stakeholder Requirements Definition

Requirements Analysis

Architectural Design

Implementation

Integration

Verification

Qualification

Transition

Operation

Maintenance

Disposal

CO C4 C6 C8 C1O C3 C5

Parameters

Achievements Mapping SE processes vs. PCP/PC

DOORS for C&S

Glossary SYBOK C&S web

3D LBLC 3D

LBLC 3D

LBLC

Enablers: MBSE - LBLC © Schindler Apr 2013 | Ph. Henneau | Swiss-VPE 24 Apr 2013

Page 18: Schindler Corporate R&D - vpe-swiss.ch · People moving People Schindler transports 1’000’000’000 people every day with 1’000’000 elevators & escalators 44’000 employees

Learnings The method

• What are the deficit? Vision & Mission • What can I change/influence? Mind-set & Organization • What does already exist take it, improve it, share &

promote it (make a story, lobbying & massaging) • What doesn’t exist plan & do it • Make everything available for the organization (e.g: server

infrastructure) including documentation.

© Schindler Apr 2013 | Ph. Henneau | Swiss-VPE 24 Apr 2013

Page 19: Schindler Corporate R&D - vpe-swiss.ch · People moving People Schindler transports 1’000’000’000 people every day with 1’000’000 elevators & escalators 44’000 employees

SE@Schindler Benefits – What’s next

• Reduction of # loops observed, for real! • Integration with operation: SAP talks LBLC , each

unit calculated

• Motivation! Next steps: • MBSE: link models (LBLC – 3D) • SysML • V&V

© Schindler Apr 2013 | Ph. Henneau | Swiss-VPE 24 Apr 2013

Page 20: Schindler Corporate R&D - vpe-swiss.ch · People moving People Schindler transports 1’000’000’000 people every day with 1’000’000 elevators & escalators 44’000 employees

Thank you for your attention.

Copyright © Schindler. All rights reserved Schindler owns and retains all copyrights and other intellectual property rights in this presentation. It may not be reproduced, modified or copied nor used for any commercial purposes (e.g. manufacturing), nor communicated to any third parties without our written consent. Schindler undertakes all reasonable efforts to ensure that the information in this presentation is accurate, complete and derives from reliable sources. Schindler however, does not represent nor warrant (either expressly or implicitly) accuracy, reliability, timeliness or completeness of such information. Therefore, Schindler is not liable for any errors, consequence of acts or omissions based on the entirety or part of the information available in this presentation.

© Schindler Apr 2013 | Ph. Henneau | Swiss-VPE 24 Apr 2013

Page 21: Schindler Corporate R&D - vpe-swiss.ch · People moving People Schindler transports 1’000’000’000 people every day with 1’000’000 elevators & escalators 44’000 employees

The Target — Prevent Crushing or Fall into the Hoistway Comply with safety standard of EN 81-1:1998+A3:2009 For personal use only, ask Author for actual version

max. gapbelow apron

max. stoppingdistance

min. openingspace

dangerousarea

max. distance to wall

dangerousarea

max. stoppingdistance

min. openingspace

dangerousarea

apron

dangerousarea

max. gapbelow apron

max. stoppingdistance

min. openingspace

dangerousarea

max. distance to wall

dangerousarea

max. stoppingdistance

min. openingspace

dangerousarea

apron

dangerousarea

© Schindler Apr 2013 | Ph. Henneau | Swiss-VPE 24 Apr 2013

Page 22: Schindler Corporate R&D - vpe-swiss.ch · People moving People Schindler transports 1’000’000’000 people every day with 1’000’000 elevators & escalators 44’000 employees

Components of the Elevator Deployment of what makes the car moving

Car carrying load

Suspension and Traction Media

s = f(t) Elevator Controller coordinate elevator

system

Traction Sheave ω = f(t)

Hoisting Motor M = f(t)

Car Load Sensor measure m

Door Safety Bypassing Device

(SUET) bypass if ok

Safety Circuit safe to move

Hoisting Motor Controller (ACVF)

control motor & brake

Machine Brake stop & hold

Car Position Sensor landing / unlocking /

hoistway zone

move car for distance x return current speed return diagnostic information

i = f(t) u = f(t) f = f(t)

open brake

for each braking element {opened , not opened}

rigid mechanical link

redundant braking capability

redundant suspension

redundant information about unlocking zone {inside , outside }

information about landing zone {inside , outside } information about hoistway zone {top , intermediate , bottom }

information about car load

enable is enabled

is bypassed

bypass door safety devices with safety circuit reliability

traction with high reliability

mechanically link

safe to move car

diagnostic information

Hoisting Motor Rotation Sensor measure ω = f(t)

mechanically link

information about motor rotation

Door open & close / lock

open, close, lock opened, closed, locked

© Schindler Apr 2013 | Ph. Henneau | Swiss-VPE 24 Apr 2013

Page 23: Schindler Corporate R&D - vpe-swiss.ch · People moving People Schindler transports 1’000’000’000 people every day with 1’000’000 elevators & escalators 44’000 employees

Speed vs. Distance of Unintended Car Movement Example for Illustration of Calculation Model

Spe

ed [m

/s]

unlockingzone

intended approach to destinationfree wheeling from

advanced door openingor

releveling

0.0

0.2

0.4

0.6

0.8

1.0

1.2

-0.2 -0.1 0.0 0.1 0.2 0.3 0.4-0.3-0.4-0.5 0.5 1.0

v0

S1 S2 S3

SBZ

V_TRIG

vmax

0.6 0.7 0.8 0.9Distance [m]

© Schindler Apr 2013 | Ph. Henneau | Swiss-VPE 24 Apr 2013

Page 24: Schindler Corporate R&D - vpe-swiss.ch · People moving People Schindler transports 1’000’000’000 people every day with 1’000’000 elevators & escalators 44’000 employees

Controller Product Overview 2 Control Families

Control Software

Alarm Device Service Device LobbyVision

Fixtures E-Vision

Electronic Design El. mechn. Design

PF91 Bionic NX

Bionic / BX / NX

MX / TX

© Schindler Apr 2013 | Ph. Henneau | Swiss-VPE 24 Apr 2013

Page 25: Schindler Corporate R&D - vpe-swiss.ch · People moving People Schindler transports 1’000’000’000 people every day with 1’000’000 elevators & escalators 44’000 employees

Overview R&D - Drive

© Schindler Apr 2013 | Ph. Henneau | Swiss-VPE 24 Apr 2013

Page 26: Schindler Corporate R&D - vpe-swiss.ch · People moving People Schindler transports 1’000’000’000 people every day with 1’000’000 elevators & escalators 44’000 employees

Drive System

=

=

Inverter Motor

Control

Netzwerk

Main responsibilities • Mechanical drive system: Motor, frame, brake • Electrical drive system: Inverter HW, inverter SW • Motion control • Drive mapping

Tacho

Brake

Load

Position

© Schindler Apr 2013 | Ph. Henneau | Swiss-VPE 24 Apr 2013

Page 27: Schindler Corporate R&D - vpe-swiss.ch · People moving People Schindler transports 1’000’000’000 people every day with 1’000’000 elevators & escalators 44’000 employees

Overview R&D – Mechanical / System / Testing

© Schindler Apr 2013 | Ph. Henneau | Swiss-VPE 24 Apr 2013

Page 28: Schindler Corporate R&D - vpe-swiss.ch · People moving People Schindler transports 1’000’000’000 people every day with 1’000’000 elevators & escalators 44’000 employees

Overview R&D – Car, Door & Hoistway

© Schindler Apr 2013 | Ph. Henneau | Swiss-VPE 24 Apr 2013

Page 29: Schindler Corporate R&D - vpe-swiss.ch · People moving People Schindler transports 1’000’000’000 people every day with 1’000’000 elevators & escalators 44’000 employees

Scope of Activities of CDH

• Design of subsystems, components and parts • Support for manufacturing / introduction • Close cooperation with internal & external partners / suppliers • Code approvals (together with notified body) • Field support

© Schindler Apr 2013 | Ph. Henneau | Swiss-VPE 24 Apr 2013