sangath IGBC 040314 - IGBC presentation_040314.pdf · PDF filesangath skyz –igbc green home silver certified. 40 % wind 60% solar generate 2 x 14.6 kwh daily stored in batteries

Jul 28, 2018

ReportDownload

Documents

doanhanh

  • WHAT MAKES ME GREEN?

    QUICK OVERVIEW OF SALIENT GREEN FEATURES AT SANGATH SKYZ

  • SANGATH SKYZ IGBC GREEN HOME SILVER CERTIFIED

  • 40 % WIND

    60% SOLAR GENERATE

    2 X 14.6 KWH DAILY

    STORED IN BATTERIES FOR

    LIGHTING STAIR LOBBIES

    AND PARKING AREAS

    SOLAR AND WIND POWER

    AND PARKING AREAS

    ENTIRE SETUP PROCURED

    FROM UNDER100KMS

    OF SITE

  • REFLECTIVE GLASS USED ON

    ENTIRE EXTERNAL FACADE

    Untreated Treated glass

    GLAZING

    ENTIRE EXTERNAL FACADE

    TO REDUCE SOLAR GAIN

    SAINT GOBAIN ST 167

    LIGHT TRANSMITTANCE 67%

    SHADING COEFF 0.78

    U VALUE 5.86 W/SQMT K

  • SRI KEPT HIGH ON ROOF TO

    MINIMISE ROOF HEATING

    & CONSEQUENTIAL THERMAL

    EMITTANCE

    CHINA MOSAIC IS USED

    WITH AVERAGE SRI OF 0.8

    SOLAR REFLECTIVE INDEX - CHINA MOSAIC

    SRI OF 99 TO 100 UNDER

    DIFFERENT WIND CONDITIONS

  • DAYLIGHTING & VENTILATION

    82.92% OF LIVABLE AREAS RECEIVE DAYLIGHT

    FACTOR OF 2 EXCEEDING IAQ CREDIT 6 OF 75%

    SUFFICIENT SUPPLY OF FRESH AIR EXCEEDS

    ASHRAE STANDARD 62 REQUIREMENT BY 30%

  • 50 KL SYSTEM PROCESSESS 100% GREY WASTE

    GENERATED ON SITE AND IS CAPABLE OF

    BLACK WASTE PROCESSING

    STP CONVERTS TO CLEAN WATER

    TREATED WATER TAKES CARE OF 100%

    SEWAGE TREATMENT PLANT

    TREATED WATER TAKES CARE OF 100%

    FLUSHING REQUIREMENT

    LANDSCAPING REQUIREMNT

    CAR AND FLOOR WASH REQUIREMENT

    WATER SAVING OF 130 L PER PERSON PER DAY

  • 100% WATER FOR FOLLOWING GENERATED

    ON SITE FOR

    FLUSHING REQUIREMENT

    LANDSCAPING REQUIREMNT

    CAR AND FLOOR WASH REQUIREMENT

    DUAL PLUMBING LINES FOR FLUSHING

    DUAL FLUSHING 3/6L SYSTEMS INSTALLED

    WATER EFFICIENCY

    DUAL FLUSHING 3/6L SYSTEMS INSTALLED

    ALL FAUCETS HAVE RESTRICTED FLOWRATE OF

    8LPM AT 3 BAR PRESSURE, CONSUMING 20%

    LESS WATER THAN BASE CASE

  • 100% WATER FALLING ON SITE IS CAPTURED

    AND USED TO CHARGE GROUND WATER TABLE

    BY PERCOLATION WELLS

    ANY WATER OVERRUN FROM SITE PASS

    THROUGH SEDIMENTATION TANK TO MAKE

    SURE THAT SITE CONTAMINANTS AND

    WATER CONSERVATION & RWH

    SURE THAT SITE CONTAMINANTS AND

    POLLUTANTS DO NOT BREACH SITE PERIMETER

  • MAXIMUM MATERIALS

    SOURCED FROM

    MANUFACTURERS

    BASED UNDER 500 KMS

    AWAY

    SKYZ

    REGIONALLY SOURCED MATERIALS

    AWAY

  • NATIVE ADAPTIVE SPECIES HAVE BEEN USED TO

    MINIMISE WATER REQUIREMENT FOR

    IRRIGATION AND PRESERVE LOCAL BIODIVERSITY

    NATIVE ADAPTIVE SPECIES

    IRRIGATION AND PRESERVE LOCAL BIODIVERSITY

    PELTOFORUM

    SAPTAPARINI

    FICUS BENZAMINA

    GARMADO

    EUPHOBERIA DESI

  • LPD CALCULATED FOR COMMON AREAS KEPT

    UNDER .6 W/M2 WHICH IS 20% MORE

    EFFICIENT THAN SPECIFIED

    ALL MOTORS AND PUMPS HAVE

    MINIMUM 65% EFFICIENCY

    DG SET IS CPCB CERTIFIED FOR EMISSIONS

    ALL LIGHT FIXTURES ARE EITHER PL OR LED

    BASED AND MINIMUM BEE 3 STAR CERTIFIED

    ENERGY AND WATER FLOW METERS INSTALLED

    ON DIFFERENT CIRCUITS FOR POST

    ENERGY STRATEGY & MONITORING

    ON DIFFERENT CIRCUITS FOR POST

    OCCUPANCY MONITORING

  • ELECTRIC CHARGINIG POINTS FOR

    10% OF TOTAL GROUND PARKING

    OTHER ELECTRICAL AMENITIES

  • WASTE SEGREGATION DURING CONSTRUCTION

    75% OF WASTE GENERATED DURING

    CONSTRUCTION WAS DIVERTED AWAY FROM

    LANDFILL BY USING IT ON OTHER SANGATH

    SITES

    WASTE SEGREGATION AT APARTMENT LEVEL

    WASTE MANAGEMENT & RECYCLING

    INDIVIDUAL BINS PLANNED FOR EACH

    APARTMENT. THIS IS FURTHER SEGREGATED AT

    COMMUNITY LEVEL BY FM TEAM

    COLOUR CODED BINS PROVIDED IN COMMON

    AREAS

    MINIMUM 20% RECYCLED MATERIAL USED AT

    SITE

  • COMMON TOILET ON GROUND FLOOR HAS

    FITTINGS FOR DA

    RAMPS AT ALL POINTS OF LEVEL CHANGE

    ACCESS FOR DIFFERENTLY ABLED

    ELEVATORS WITH BRAILE BUTTONS AND VOICE

    ASSISTANCE

    SIGNAGE FOR USER CONVENIENCE

    SUITABLY POSITIONED SITOUTS

  • LANDSCAPED GARDENS

    CHILDREN TOT LOTS

    SITOUTS

    OTHER USER AMENITIES

    SITOUTS

    SIGNAGE FOR COMMON AMENITIES,

    ELECTRICAL EQUIPMENTS,

    DIFFERENTLY ABLED ACCESS , PARKING

    USER EDUCATION PANELS AND

    WRITTEN INSTRUCTIONS

  • SERVICE CAMPS

  • ARCHITECTURE

    INTERIORS

    ENERGY EFFICIENCYEDSPRINCIPAL COORDINATING

    THE TEAM

    CONSULTANT CONSULTANT

    ARCHITECT ARCHITECT M.E.P.STRUCTURAL

    ENGINEER

  • T H A N K Y O U